Plant for exploiting reservoirs of natural fluids, such as for example oil, natural gas or other hydrocarbon-based extracted fluids. Download PDF

Info

Publication number
OA16689A
OA16689A OA1201300524 OA16689A OA 16689 A OA16689 A OA 16689A OA 1201300524 OA1201300524 OA 1201300524 OA 16689 A OA16689 A OA 16689A
Authority
OA
OAPI
Prior art keywords
production cross
production
cross
plant
extraction
Prior art date
Application number
OA1201300524
Inventor
Stefano DI VINCENZO
Gianfederico CITI
Original Assignee
Eni S.P.A.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eni S.P.A. filed Critical Eni S.P.A.
Publication of OA16689A publication Critical patent/OA16689A/en

Links

Abstract

The plant according to the invention for exploiting reservoirs of natural fluids, such as for example oil, natural gas or other hydrocarbonbased extracted fluids, through a well, wherein the plant comprises a production cross (21) suitable for being installed and operating on a submersed bed. The valves (31, 33) of the production cross suitable for allowing, preventing or regulating the flow of the extracted fluid through the production cross itself are activated by electric actuators. The control umbilical 5' is therefore less costly and can connect oil platforms (3) on the sea surface with production crosses (21) situated on the seabed at depths also reaching 150 meters and over, or situated horizontally at distances from the master oil platform (3), of even 6.5-20 km and over.

Description

The présent invention relates to a plant for exploiting underwater réservoirs of natural fluids, such as for example, oil, natural gas or other hydrocarbon-based extracted fluids. More specifically, the invention relates to an extraction plant through a horizontal production cross. State of the art
In order to exploit already mature underwater hydrocarbon réservoirs to the maximum, it is almost always necessary to create new wells at distances, in a horizontal direction from the preexisting production platform, which are such as to require well trajectories with excessïvely low gradients, and consequently too difficult or costly to be managed directly by the production platform itself. Therefore in these cases the peripheral wells could be managed by spécifie secondary production platforms, currently called “monotubes”, having smaller dimensions than the original platform. The construction of these secondary platforms, however, has various drawbacks: as they are smaller than the main platform, they are more vulnérable to terroristic attacks, and as they are less visible, they are more likely to be struck or in any case damaged by passing ships; at the same time, as they are partially above the surface, they spoil the surrounding landscape.
In order to avoid these drawbacks of secondary platforms, it is customary to manage secondary wells with production crosses 1 situated on the seabed, sending the hydrocarbons extracted to the master platform 3 with a duct 5, commonly called sealine. Current underwater production crosses 1 are.each controlled by an extremely flexible multiple line 5 called control umbilical (Figure 1). In Figure 1, the reference P indicates a well for the extraction of hydrocarbons, the référencés G indicate hydrocarbon réservoirs already being exploited, the reference M indicates the sea and the reference SM indicates the ground beneath the sea.
Présent underwater production crosses are currently remotely activated by means of hydraulic actuations. The control umbilical is therefore substantially a bundle of tubes comprising the duct for the passage of the hydrocarbons extracted, two or more pipes for the supply and return of the oil of the hydraulic actuation circuits and a bundle of electric feeding and signalling wires for the electric instrumentation of the production cross. The hydraulic actuation circuit is fed by a unit comprising a pump, the relative actuation motor and the tank for the oil or other hydraulic fluid; this unit is normally situated on the master platform 3. For horizontal distances of over 6 km, however, the control of the production cross becomes complicated and the costs of the known control umbilical become excessively high, making the development of the satellite well economically inconvénient.
An objective of the présent invention is therefore to overcome the drawbacks of the known Systems described above for exploiting hydrocarbon réservoirs through a control umbilical and -116689 submersed production cross, in particular allowing a réduction in the costs of the control umbilical and increasing the maximum horizontal distance and/or maximum depth of the well for which the exploitation of the latter is economically convenient.
Summary of the invention
According to a first aspect of the présent invention, this and other objectives are achieved by providing a plant for exploiting réservoirs of natural fluids, such as for example oil, naturel gas or other hydrocarbon-based extracted fluids, having the characteristics according to claim 1.
In a second aspect, the invention relates to a method according to claim 11.
Further characteristics ofthe device are objectofthe dépendent claims.
The advantages offered by the présent invention will appear more évident, to experts in the field, from the following detailed description of a particular non-limiting embodiment, illustrated with reference to the following schematic figures.
List of Figures
Figure 1 shows, in a vertical section, a plant of the known type for exploiting an underwater hydrocarbon réservoir;
Figure 2 shows, in a vertical section, a plant for exploiting an underwater hydrocarbon réservoir, according to a preferred embodiment ofthe invention;
Figure 3 shows, in a side view, a functional electric and fluid scheme of the plant of Figure 2;
Figure 4 shows a section, according to a longitudinal plane, of the production cross of the plant of Figure 2;
Figure 5 shows a functional electric and fluid scheme of the production cross of Figure 4;
Figure 6 shows a protection structure that can be used for installing and protecting the production cross of Figure 4 on the installation seabed;
Figure 7 shows a step of a method for installing a production cross according to an aspect of the invention.
Detailed description
Figures 2-6 relate to a plant for exploiting underwater réservoirs of oil, natural gas or other hydrocarbon-based extracted fluids, according to a preferred embodimentofthe invention. Said plant, indicated with the overall reference number 10, can comprise a first surface part and a second underwater part, The first surface part can comprise an oil platform 3’ on which the following are preferably positioned (Figure 3):
an electrical distribution unit or EDU 101;
a topside umbilical termination unit or TUTU of the surface system 102;
-216689 a hydraulic power unit or HPU 103;
a master control station or MCS 104.
The oil platform 3' can be sustained for example by pylons or anchored to fixed cables on the seabed.
The second underwater part comprises a well head unit T situated on a seabed (Figure 2). The first surface part and the second underwater part are connected by a control umbilical or another connection cord 5’.
The well head unit T can be like that shown in Figure 4, and comprise a production completion unit of the well, in turn comprising for example:
cementation vent Systems 6 (shallow water devices);
a main connector of the production completion unit of the well (subsea well connector) 7;
a casing hanger surface casing 9 also called seal ring or VX gasket;
a surface casing 11;
an intermediate casing 13;
a production casing 15;
a supply duct, also called tubing or casing design 17, which terminâtes above in a tubular connecting joint for the secondary production tube (production casing hanger) 19, a cross support 20, also called conductor pipe housîng 20.
The éléments 7, 9, 11, 13, 15, 17, 19, ail hâve a substantially tubular form and are known per se, as is also the conductor pipe housing 20. The well head unit 1’ also comprises a socalled production cross or Christmas tree indicated with the reference number 21. The production cross 21 rests on and is connected to the production completion unit of the well with the necessary hydraulic seal by means of the casing hanger surface casing 9.
The production cross 21 comprises:
a valve body 25, suitable for being fixed to the production completion unit of the well and in which there is a first 27 and second extraction duct 29, suitable for the outflow of the oil, natural gas or other fluid extracted from the réservoir G, outside the réservoir itself;
a first 31 and second extraction control valve 33, both housed in the valve body 25.
The first extraction duct 27 extends coaxially, or in any case longitudinally, with respect to the axis AP of the well section closest to the surface of the sea bottom on which the production cross is situated. The second extraction duct 29 branches out from the first extraction duct 27 and extends transversally with respect to the latter, for example perpendicularly. The first 31 and second extraction control valve 33 are suitable for reversibly allowing, preventing or regulating the flow of oil, natural gas or other fluid extracted through the second extraction duct -316689
33towards the outside ofthe production cross 21 itself.
According to an aspect of the invention, the production cross 21 is a so-called horizontal production cross, i.e. at least one of the extraction control valves 31, 33 is positioned along the second extraction duct 29, and along the first extraction duct 27 there is no valve suitable for reversibly allowing, preventing or regulating the flow of oil, naturel gas or other fluid extracted; this allows secondary interventions to be effected on the well for example with slîck line, coiled tubing or wire line operations (rigless, i.e. without any plant) and always for example for connecting a BOP (Blow Out Preventer) on the well head without having to completely remove the production cross 21 - or at least its valve body 25 - from the production completion unit of the well, unlike a production cross of the vertical type. For this purpose, preferably the upper end of the first extraction duct 27 is substantially straight for a suitable length. In order to connect a BOP to the well head unit T, for example, it is sufficient to remove the crown caps 39, 41 which, during the normal functioning of the well, close and seal the upper end of the cross 21 and the first extraction duct 27.
Preferably at least one of the first 31 and second extraction control valve is an intercepting valve, i.e. only capable of completely opening and closing the duct along which they are positioned, or a régulation or control valve, i.e. capable of varying the flow-rate passîng through it with continuity or at different levels.
According to an aspect of the invention, the two extraction control valves and possible other valves suitable for reversibly allowing, preventing or regulating the flow of oil, natural gas or other fluid extracted through the production cross itself 21, are activated by electric actuators 35, 37, which can be assembled for example inside or in any case on the valve body 25. The electric actuators 35, 37, can for example be rotating motors, linear motors or solenoids depending on the type of valve to be activated (Figure 4).
The first 31 and second extraction control valve 33, and the other possible valves suitable for allowing, preventing or regulating the flow of extracted fluid through the production cross itself, are advantageously not activated by fluid actuators, such as for example, hydraulic or pneumatic actuators, but only by electric actuators preferably combined with manual activations according to the redundancy principle; the manual actuators can be in turn activated for example by scuba-divers, skin-divers or mechanical arms of robots or bathyscaphes.
In order to reduce the weight of the production cross and give it a compact volume, it is préférable to avoid or limit activation interfaces with underwater robots.
The absence of hydraulic or pneumatic actuators advantageously allows to feed the production cross 21 by means of a control umbilical 5’ without any piping for the feeding and return of compressed air, oil or other actuation fluids, and only equipped for example with electric feeding and signaltng cables, thus obtaining a simplicity and slenderness which is reflected in smaller encumbrance dimensions and consequently also in a greater installation facility.
-416689
The control umbilical 5’ can be known per se, and for example can be of the type currently supplied by the companies Technip, Oceaneering or Saipem Energy System.
Ail the valves suitable for reversibly allowing, preventing or regulating the flow of oil, natural gas or other fluid extracted through the production cross itself 21 are advantageously activated by electric actuators,, which can be assembled for example inside or in any case on the valve body
25.
This allows a réduction in the costs of the control umbilical 5’ and enables it to be used for connecting oil platforms on the sea surface with production crosses 21 positioned on the seabed at depths also reaching 150 métrés - currently the maximum admissible depth for jack ups - and over or situated horizontally at distances, from the master oil platform, also reaching 6.5-20 km and over.
This implies much lîghter modifications on the oil platform 3', moreover, and in particular to its control room, with respect to a submersed production cross activated by hydraulic or pneumatic actuators.
Thanks to the absence of hydraulic or pneumatic actuators, the production cross 21 can be significantly lightened, allowing its installation on the well head by means of a fixed drill plant (jack up) with the derrick of the plant, for example. This allows to use plants at a lower cost indicatively with a daily installment about a third of that of a floating plant - and with a greater diffusion.
The actuators of the production cross 21 advantageously guarantee the redundancy principle which is part of the safety system of the production cross. The redundancy System envisages the activation of the valve with a redundant electric system, if a breakage in the primary system is recorded. The two Systems should be considered completely independent and are applied not only to 5 inch valves but also, for example, to 2 inch valves. The production cross 21 is advantageously equipped with a manual mechanical control system of the production cross valves in the case of contemporary damage of the two actuator Systems.
In case of no electric power on the surface, a secondary electric power unit is advantageously automatically activated, which is capable of supplying electric current to the whole underwater system. The secondary electric power unit is situated on the oil platform 3’ or in any case on the above first surface part of the exploitation plant and can comprise a continuity group or a suitable UPS (Universal Power Supply) such as for example an electrogen group with a thermal combustion motor or accumulator battery.
Also the various subsystems on the oil platform 3’ or in any case on the first surface part of the exploitation plant, such as for example EDU, TUTU, HPU or MCS are advantageously constructed applying the redundancy principle.
The production cross 21 preferably comprises a watertight casing (not shown) which encloses and seal séparâtes from the outside water the extraction control valves 31, 33, the possible -516689 other valves suitable for allowing, preventing or regulating the flow of the extracted fluid through the production cross 21 itself and the relative electric actuators.
The production cross 21 is suitable for being installed and operating on a seabed, océan, lake, or river.
The well head unit T is preferably equipped with a well bottom safety valve, or a Surface Controlled Subsurface Safety Valve (SCSSV) 45, of the known type and is exclusively activated and controlled electrically - and possibly also manually - by the production cross 21 through appropriate electric penetrators or in any case electric cabling (Figures 4, 5). Said feeding and control cabling of the well bottom safety valve 45 is preferably interfaced with the underwater electrical control module 47 through one or more suitable connectors 49 which can be exposed to a sea environment (wet-mate), of the known type, for example one or more DigiTRON wetmate connectors commercialized by the company EXPRO/TRONIC. The well bottom safety valve 45 is currently hydraulically activated but the production cross according to a preferred embodiment of the invention only has electric pénétrations. This standardization allows greater simplicity in the engineering phase of the components, production of the system, operations onboard the drilling plant. Furthermore, the insertion of the electric safety valve 45 allows to remove a valve, elsewhere important, on the body of the production cross. This favours the weight and compactness of the system itself.
The underwater electrical control module 47, also called SEM (subsea electrical module) comprises an appropriate logic unit and a plurality of signal or power input and/or output gates to control the various electric actuators of the production cross 2T and/or exchange data with these.
The underwater electrical control module 47 is preferably assembled on the production cross 2Γ itself, for example on its valve body 25, and separated from the water of the sea environment by a suitable watertight casing.
As shown in Figures 3, 4, the control umbilical 5' is preferably suitable for being reversibly coupled with the underwater electrical control module 47 by means of an umbilical termination unit 51, for the sake of brevity also called UTA, which can comprise one or more electric connectors of the wet-mate type and possible rapid couplings 53 for connecting the feeding lines of particular auxiliary chemical substances, such as for example methanol, glycol or other water-based chemical inhibitors for preventing the formation of hydrates. In Figure 5, the reference 54 indicates a plurality of electric data or signal lines directed towards the inside of the production cross 21, the references 55 indicate the group of electric data or power lines which connect the underwater electrical control module 47 and the electric safety valve 45, whereas the references 57, 59 indicate the feeding lines through which the umbilical termination unit 51 supplies the production cross 21 with the above auxiliary substances.
There are preferably a total of at least four electric lines 54 and 55, for a better interfacing ofthe
-616689 production cross 21 for example with intelligent complétions and bottom pressure meters.
Figure 6 shows a side view of an example of a protection structure 61 that can be used for installing and protecting the production cross 21 on the seabed. The protection structure 61 comprises:
a plurality of withdrawable legs 63, which, when the structure has been installed, rest on the seabed;
a trunk 65 suitable for protecting the production cross for example from fishing nets, anchors, waste products or pièces of wreckage comîng from the surface;
a cap 67, also called débris cap, suitable for protecting the production cross from any débris or other objects falling from above.
During the normal functîoning of the cross 21, the protection structure 61 rests on the cross support 20 by means of the connection frame 69.
To ailow the production cross 21 to be installed on the seabed by means of a jack-up, it preferably has a weight equal to or less than 35 tons; more preferably the combination of production cross 21 + protection structure 61 has a weight equal to or less than 35 tons.
In a second aspect, the présent invention relates to a method for installing, maintaining or running the plant 10 comprising the following steps:
-providing a jack up that is a platform 50 comprising a buoyant hull 52 and one or more extendable legs 54 fixed to the hull 52;
-carrying the production cross 1' on a predetermined installation place by means ofthe platform 50;
-extending the one or more extendable legs 54 so as to rest them on an underlying installation seabed SB;
-raising the buoyant hull 52 above the sea-surface or other water-surface so that the hull 52 is supported by the one or more extendable legs 54;
-lowering the production cross T from the buoyant hull 52 down to the installation seabed SB.
The extendable legs 54 can be for example rétractable columns or pillars, for example having reticulated or tubular structures. The extendable legs are kept preferably lifted and retracted while the platform 50 sails carrying the production cross Γ towards the destination place.
After the production cross 1' has been installed, for example onto a well head, the extendable legs 54 can be lifted and retracted again, and the platform can sail away and be used in other locations.
Advantageously the platform -i.e. jack up- is provided with a derrick 56 or other drilling tower or mobile tower, and the production cross is lowered from the buoyant hull 52 down to the
-716689 installation seabed SB Îs made by hanging the production cross T to the derrick 56 or other drilling tower or mobile tower, and hauling the production cross l'from the derrick 56 or other drilling tower or mobile tower down to the installation seabed SB. Preferably the production cross Γ is lowered from the platform down to a well head. This way the production cross T can be installed on a well head at particularly low costs. In particular the previously described platform 50, that is a jack up, is a relatively cheap apparatus for installing, running or maïntaining electric production crosses Γ according to the invention.
The characteristics of the device and of the method, object of the présent invention, as also its advantages, are évident from the above description.
Finally, the device thus conceived can obviously undergo numerous modifications and variants, ail included in the invention. The oil platform 3', for example, can be substituted by a support ship, a floating platform or other surface control unit. A production cross according to the invention can be suitable for being installed and operating underwater not only on a seabed but also on the bed of an océan, lake, river or other submersed beds. Furthermore, ail the details can be substituted by technically équivalent éléments. In practice, the materials used, as also the dimensions, can vary according to technical requirements. The examples and lists of possible variants of the présent patent application should be considered as being nonexhaustive lists.
The présent application daims priority of the italian patent application n° MI2011A001112 and incorporâtes by reference the content thereof.

Claims (5)

1 ) A plant for exploiting réservoirs of natural fluids, such as for example oil, natural gas or other hydrocarbon-based extracted fluids, through a well comprising a well head (1'), wherein the plant comprises a production cross (21) arranged for being installed and operating on a submersed bed, for example of a sea, lake, océan or river, and comprises:
a) a valve body (25) arranged for being fixed onto the well head (1 j and in which a first (27) and a second extraction duct (29) are provided, arranged for allowing the extracted fluid to flow out of the same réservoir;
b) at least one extraction control valve (31, 33), housed in the valve body (25);
wherein:
- the first extraction duct (27) extends coaxially, or in any case longitudinally, with respect to the axis (AP) of the section of the well closest to the surface of the ground or bed on which the production cross is located;
• the second extraction duct (29) branches out from the first extraction duct and extends transversally with respect to the latter;
- the at least one extraction control valve (31, 33) is positioned along the second extraction duct (29) and is arranged for allowing, preventing or regulating the flow of the extracted fluid through the second extraction duct (29) towards the outside of the production cross (21 ) itself;
- along the first extraction duct (27) there is no valve arranged for allowing, preventing or regulating the flow of the extracted fluid;
- the at least one extraction control valve (31, 33) and the possible other valves arranged for allowing, preventing or regulating the flow of the extracted fluid through the production cross (21) itself, are driven by electric actuators,
2) The plant according to claim 1, wherein the at least one extraction control valve (31, 33) and the possible other valves arranged for allowing, preventing or regulating the flow of the extracted fluid through the production cross (21) itself, are not activated by fluid actuators, such as for example hydraulic or pneumatic actuators.
3) The plant according to claim 1, wherein the at least one extraction control valve (31, 33) and the possible other valves arranged for allowing, preventing or regulating the flow of the extracted fluid through the production cross (21) itself and the relative electric actuators are assembled on and/or in the valve body (25).
4) The plant according to claim 1, wherein the production cross (21) comprises a watertight casing which encloses and seal séparâtes from the outside water the at least one extraction control valve (31, 33), the possible other valves arranged for allowing, preventing or regulating the flow of the extracted fluid through the production cross (21) itself and the relative electric actuators.
-916689
5) The plant according to claim 1, comprising a connection cord (5‘) arranged for evacuatîng the extracted fluid from the production cross (21), supplying an electric feed to the latter and transmitting from and/or towards the latter information and/or control signais.
6) The plant according to claim 5, wherein the connection cord (5') does not supply the production cross (21) with pressurized fluids for feeding hydraulic and/or pneumatic actuators assembled on the same cross.
7) The plant according to claim 5, comprising a surface control unit (3) selected from the following:
- an oil platform;
- a support ship;
- a floating platform;
and the connection cord (5') fluidly and electrically connects the surface control unit (3) to the production cross (21 ).
8) The plant according to claim 1, wherein the production cross (21) is situated on a bed of the sea, océan, lake or river.
9) The plant according to claim 8, wherein the production cross (21) is situated at a depth equal to or less than 150 métrés below the water surface.
10) The plant according to claim 8, wherein the production cross (21) is situated at a horizontal distance equal to or greater than 6.5 km from the surface control unit (3).
11) Method for installing, maintaining or running a plant (10) according to one or more preceding claims, comprising the following steps:
-providing a platform (50) comprising a buoyant huit (52) and one or more extendable legs (54) fixed to the hull;
-carrying the production cross (T) on a predetermined installation place by means of the platform (50);
-extending the one or more extendable legs (54) so as to rest them on an underlying installation seabed (SB) or other submersed bed;
-raising the buoyant hull (52) above the sea-surface or other water-surface so that the hull (52) is supported by the one or more extendable legs (54);
-lowering the production cross (1') from the buoyant hull (52) down to the installation seabed (SB) or other submersed bed.
12) Method according to claim 11, wherein:
-the platform (50) is provided with a demck (56) or other drilling tower or mobile tower;
-the step of lowering the production cross from the buoyant hull (52) down to the installation seabed
-1016689 (SB) or other submersed bed comprises the steps of hanging the production cross (Γ) to the derrick (56) or other drilling tower or mobile tower and hauling the production cross (T) from the derrick or other drilling tower or mobile tower down to the installation seabed (SB) or other submersed bed.
5 13) Method according to daims 11 or 12, wherein the production cross (T) is lowered from the platform (50) down to a well head.
OA1201300524 2011-06-20 2012-06-20 Plant for exploiting reservoirs of natural fluids, such as for example oil, natural gas or other hydrocarbon-based extracted fluids. OA16689A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ITMI2011A001112 2011-06-20

Publications (1)

Publication Number Publication Date
OA16689A true OA16689A (en) 2015-12-07

Family

ID=

Similar Documents

Publication Publication Date Title
US20120111572A1 (en) Emergency control system for subsea blowout preventer
US6042303A (en) Riser system for sub sea wells and method of operation
AU2001282979B2 (en) Subsea intervention system
US10774613B2 (en) Tieback cementing plug system
AU2001282979A1 (en) Subsea intervention system
BR112013007444B1 (en) INDEPENDENT ASCENSION COLUMN SYSTEM AND METHOD TO PRODUCE FLUID FROM SUBMARINE SOURCE
US20100236786A1 (en) System and method for performing intervention operations with a subsea y-tool
WO2018160982A1 (en) Wireless control system for subsea devices
MX2013008333A (en) Method for capping a well in the event of subsea blowout preventer failure.
WO2015104173A2 (en) Electrical wellhead shutdown system
US20010013414A1 (en) Floating spar for supporting production risers
WO2013024354A2 (en) Drilling fluid pump module coupled to specially configured riser segment and method for coupling the pump module to the riser
GB2341875A (en) Multiphase production system suitable for deep water
CN101191408A (en) Ocean underwater device
CA3045966A1 (en) Unmanned or remotely operated platform
US10385641B2 (en) Flushing a tool for closed well operation and an associated method
OA16689A (en) Plant for exploiting reservoirs of natural fluids, such as for example oil, natural gas or other hydrocarbon-based extracted fluids.
WO2012175540A1 (en) Plant for exploiting reservoirs of natural fluids, such as for example oil, natural gas or other hydrocarbon-based extracted fluids
US10392869B2 (en) Marine drilling riser joint
GB2471531A (en) Buoyant subsea equipment support system.
Reimert et al. Update of the Enchova Field 10-Well Subsea Production System
Timmermans et al. Large Diameter Pipeline PLEM Design for Remote, Arctic Application
KR20150003191U (en) Bop backup control system and bop system comprising the same
Alekseev et al. Submudline Production Systems As a Solution to Iceberg Hazards
CN109642587A (en) For supplying dynamafluidal method and system to well pressure control device