Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gear Steel Buildings LtdfiledCriticalGear Steel Buildings Ltd
Priority to NZ708594ApriorityCriticalpatent/NZ708594A/en
Publication of NZ708594ApublicationCriticalpatent/NZ708594A/en
A building includes a footing element and first and second primary I-beam supports 17, 18) secured to rows of piles of the footing element. The primary supports run parallel to the length of the building. At least two cross beams 22, 23, 26 bear on the top surface of the first and second primary supports such that a longitudinal axis of at least one of the cross beams is at an angle to the length of the first primary support. There are no intermediate load bearing members which span between the first and second primary supports positioned between the first and second primary supports and the footing element. Further cross beams 24 are attached between the ends of the third and fourth cross beams to form a rigid frame attached to the top of the primary beams.
Shelf support frame adapted to be placed on a pair of transverse shelf beams, comprising two bars with a U-profile and a plurality of bars with a C-profile that have tabs connected to the central souls of the bars with a U-profile; a set of a scaffolding shelf that has vertical columns interconnected by transverse beams and a support frame.