NZ521120A - Wireless petroleum well control using an electrically isolated part of the piping for passing communication signals - Google Patents

Wireless petroleum well control using an electrically isolated part of the piping for passing communication signals

Info

Publication number
NZ521120A
NZ521120A NZ521120A NZ52112001A NZ521120A NZ 521120 A NZ521120 A NZ 521120A NZ 521120 A NZ521120 A NZ 521120A NZ 52112001 A NZ52112001 A NZ 52112001A NZ 521120 A NZ521120 A NZ 521120A
Authority
NZ
New Zealand
Prior art keywords
downhole
data
control system
communication network
central computer
Prior art date
Application number
NZ521120A
Inventor
Frederick Gordon Carl
George Leo Stegemeier
Harold J Vinegar
Robert Rex Burnett
William Mountjoy Savage
John Michele Hirsch
James William Hall
Original Assignee
Shell Int Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Int Research filed Critical Shell Int Research
Publication of NZ521120A publication Critical patent/NZ521120A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/003Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings with electrically conducting or insulating means
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/066Valve arrangements for boreholes or wells in wells electrically actuated
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • E21B43/123Gas lift valves
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/13Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency

Abstract

A reservoir production control system (11) comprises: a plurality of wells (15,17,19,21) disposed on a reservoir (13), each well having a borehole and at least one piping structure located within the borehole ; a central computer (51)for collecting downhole data from one or more wells; a downhole communication network (33) associated with one or more wells, the downhole communication network (33) is capable of conveying electrical communication signals along the piping structure (29) of the well with electrically isolated portions of the piping structure(29) defined by electrical chokes; and a surface communication network (38) for communicating information between the downhole communication network (33)and the central computer(51); and whereby the central computer (51)receives downhole data via the downhole communication network (33) and the surface communication network (38).

Description

WIRELESS RESERVOIR PRODUCTION CONTROL BACKGROUND OF THE INVENTION 521 Field of the Invention The present invention relates in general to reservoir optimization and more 5 specifically to petroleum wells having downhole independently addressable wireless measurement and control devices that communicate with surface power and telemetry devices such that production from individual zones within individual wells may be coordinated to optimize overall reservoir production.
Description of Related Art Oil and gas reservoirs are extensive three-dimensional subsurface geological structures whose fluid contents are produced through arrays of wells which withdraw fluids from the reservoir only at points where the wells pass through the producing zones. As fluids are withdrawn at the wells, pressure differentials develop within the reservoir 15 which in turn create displacement of fluids from more distant reservoir regions towards the producing wells. To assist in sweeping desired fluids towards the producing wells, it is common practice in some fields to pump water or other fluids into wells which are designated injection wells.
To assist in comprehending the changing condition of the reservoir and thus 20 manage production from individual wells to optimize recovery from the field overall, it is common practice to develop a reservoir model which reflects the relevant characteristics of the formation's fixed matrix such as porosity and permeability, and the composition, pressure, and temperature of the fluids contained within that matrix. The parameters of both the matrix and the fluids are expected to change as fluids are withdrawn from the 25 producing wells and injection fluids axe introduced at the injection wells. Since the geological formations of the reservoir are generally heterogeneous, the starting values of the matrix and fluid parameters are spatial variables, and as production evolves the changes in these parameters are also spatially variable in addition to being time dependent.
The data used to generate a reservoir model come from many sources. Three-30 dimensional seismic surveys provide stratigraphy and faulting, and wireline logging, existing well production histories provide, and to a lesser extent seismic surveys, provide data on formation fluids.
INTELLECTUAL PROPERTY OFFICE OF N.Z 2 6 APR 20W RECEIVED ■waHnvm The starting values of the reservoir model parameters adjacent to each well can be measured relatively easily using wireline logging tools before each well is cased, but once production has commenced the presence of the well casing prevents many of the measurements which can be made in an open hole. Even measurements which could be 5 made through the casing are usually not performed in existing practice since doing so would require either removing the production hardware and tubing from the well and running cased hole wireline logs, or the use of permanent downhole sensors connected to surface equipment by cables which extend the full depth of the well. These cables are expensive, are not entirely reliable, often introduce operational problems, and their 10 installation at the time of completion complicates that process. The same issue of requiring cables to operate downhole control equipment such as valves also discourages the use of such devices. When downhole control devices are absolutely required, the provision of permanently installed cables can be avoided by using slickline tools, but cost prevents these from altering the settings of downhole devices at frequent intervals. 15 All references cited herein are incorporated by reference to the maximum extent allowable by law. To the extent a reference may not be fully incorporated herein, it is incorporated by reference for background purposes and indicative of the knowledge of one of ordinary skill in the art.
BRIEF SUMMARY OF THE INVENTION The difficulties inherent with restricted measurement and control are largely resolved by methods in accordance with the present invention. Wireless power and communications as described in the Related Applications enable the wells to provide realtime measurement of downhole conditions to update the reservoir model, and based on 25 predictions made from the model, the well production is controlled to optimize field performance. The objective function for production optimization may be altered over time as product market conditions shift, production costs vary, or physical plant capabilities are changed.
The invention and development of wireless communication and electrical power 30 transmission and control by means of pipes and tubing introduces the opportunity for widespread collection of oil field data, both (1) at the surface, through the network of facilities piping and injection and production distribution lines, and (2) in the subsurface, through well casing and tubing. The amounts and types of data that could be collected and intellectual property off1cf of n.7. 3 0 MAR 2004 RECEIVED the degree of control in remote parts of the units would provide a major advance in management of single wells, whole fields, or even company-wide assets.
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 schematically illustrates a reservoir production control system according to the present invention being implemented on a company-wide basis to optimize the production of a plurality of reservoirs.
Figure 2 depicts secondary production operations in a multi-layer reservoir being produced by two wells.
Figure 3 illustrates primary production operations in a multi-layer reservoir by a production well, the production well experiencing water or gas breakthrough in one layer of the reservoir before another layer is oil depleted.
Figure 4 is a flow diagram illustrating the measurement, modeling, and control actions method for closed-loop control of an individual well or a field.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT Referring to FIG. 1 in the drawings, a reservoir production control system 11 according to the present invention is illustrated. Reservoir production control system 11 is used to optimize the production of one or more reservoirs. A reservoir 13 includes a 20 plurality of wells 15,17, 19, 21 completed in the subsurface for producing oil and gas reserves from reservoir 13. The exact number and type of wells present in a particular reservoir could vary significantly from reservoir to reservoir. In FIG. 1, well 15 is an injection well, well 17 is a conventional production well, well 19 is a multi-lateral production well, and well 21 is a data observation well. Each well includes a borehole that 25 begins at a surface of the well and continues into a production zone within the reservoir. Preferably, the wells include casing that is cemented in the borehole during completion of the well. A tubing string or production tubing 29 is located in the borehole of each well.
Wireless data receptors or downhole data pods 31 are distributed in the boreholes of the wells. Downhole data pods 31 send and receive data along a downhole 30 communication network 33. Preferably, the downhole communication network allows transmission of data signals along an electrically isolated portion of the tubing string. In most cases, the electrically isolated portion of the tubing string is created between two ferromagnetic chokes placed on the tubing string. The transmission of data using such intellectual property office of n.z.
MAR 2004 received electrically isolated sections of pipe or tubing is described more fully in U.S. Pat. App. 60/177,999, entitled "Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled "Ferromagnetic Choke in Wellhead," filed Jan. 24, 2000, which are both hereby incorporated by reference. Pods 31 5 may also be equipped to collect data about downhole physical characteristics of the well, including pressure, temperature, acoustic noise, seismic signals, resistivity, fluid turbidity, infrared response, flow rate in the pipe, vibration, or other measurements useful for monitoring the well. This data collection would be accomplished in the manner described in U.S. Pat. App. 60/177,998, entitled "Petroleum Well Having Downhole Sensors, 10 Communication, and Power," filed Jan. 24 2000, which is hereby incorporated by reference. Collected data would be transmitted to the surface of the well over the downhole communication network 33 using the methods described in U.S. Pat. App. 60/177,999, entitled "Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled "Ferromagnetic Choke in 15 Wellhead," filed Jan. 24, 2000. In some cases pod 31 would be equipped to operate accompanying downhole control devices 35, which could include a submersible pump or a controllable gas-lift valve for modifying the flow rate of oil within the production tubing 29. The downhole control device 35 could also include a chemical injector for injecting treatment chemicals such as corrosion inhibitors, scale inhibitor, foaming agents and 20 paraffin solvents. The operation of downhole valves using the power transmission and communication techniques described above is more fully described in U.S.,Pat. App. 60/178,001, entitled "Controllable Gas-Lift Well and Valve," filed Jan. 24, 2000, which is hereby incorporated by reference. Detection of failures of downhole equipment, such as gas-lift valve leakage, electric submersible pump vibration, and rod pump noise, would 25 allow early remedial efforts that would improve productivity of the wells.
In addition to placement of wireless devices in the subsurface portions of the wells, a plurality of surface data pods 37 may be placed in a surface communication network 38 of interconnected pipes 39. The interconnected pipes 39 are common in oil field operations and are generally used to fluidly connect the wells to tanks and separators 41. 30 Each of the interconnected pipes is also a potential data transmission path when a section of the pipes can be electrically isolated as described in U.S. Pat. App. 60/177,999, entitled "Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled "Ferromagnetic Choke in Wellhead," filed Jan. 24, 4 j— — intellectual property office of n.z. 3 0 MAR 2004 RECEIVED 2000. Preferably, the electrically isolated portions of the interconnected pipes are located between ferromagnetic chokes placed on the pipes. The wireless devices at the surface would interact with the subsurface devices to optimize well production in view of any operational constraints at the surface. These constraints might be (1) available gas for gas 5 lift, (2) supply of water or other fluids for flooding projects, (3) upsets in production facilities such as oil/water separation, (4) emulsion control, and (5) other common occurrences encountered in manual operations.
Control of all of the operations described above resides in a central data collection computer 51, which will have a reservoir model with which to compare the actual behavior 10 of the reservoir being monitored by downhole data pods 31. Reservoir conditions that change with time are often unattainable after wells have been completed and pipe cemented in place. With permanent pressure monitors available for timely pressure transient analyses, the progress of depletion of a reservoir can be closely monitored. Deviations from expected behavior, can be analyzed and in some cases, such as poor 15 profile control, may be corrected by the downhole control devices 35, or by well workovers.
Permanently installed resistivity monitors in producing wells would be effective in observing the effects of poor injection profiles. Referring to FIG. 2 in the drawings, a multi-layer reservoir 61 with production well 63 and an injection well 65 is illustrated 20 during flooding operations of secondary production. Downhole sensing and control devices are used to regulate injection into individual layers, in order to prevent early breakthrough of injected fluids and to minimize wasteful cycling of injectants during sweepout of the other layers. This is accomplished by monitoring and controlling flow rates at a number of locations along the injection interval. Alternatively, layers that flood 25 out prematurely can be detected by salinity devices or other detectors spaced along the interval in production well 63.
Referring to FIG. 3 in the drawings, a multi-layer reservoir 71 being produced by a production well 73 is illustrated during primary production. Well 73 is experiencing water or gas breakthrough in one layer of the reservoir before another layer of the reservoir is 30 depleted of oil. By placing downhole equipment and downhole control devices in the layers experiencing water or gas breakthrough, production from these layers can be excluded, thereby permitting continued oil production from layers that are relatively free of gas or water. inteSual property OFFICE OF N.Z. 3 0 MAR 2004 Received The values of downhole data are compared with the reservoir model prediction to determine if the reservoir is operating as expected. When the reservoir operating parameters diverge from expected behavior, new wells may be required, or wells may need to be shut in or abandoned; however, many corrective operations are potentially attainable 5 with the proposed downhole control devices.
FIG. 4 illustrates a measurement and control sequence appropriate to such corrective actions. As illustrated in FIG. 4, such a sequence is cyclic: - Measurements from downhole and surface sensors are collected and passed to the model; - The model may be updated from an external data source, for instance to alter desired production rate, and the measurements are compared to the model; - Based on the results of the comparison, decisions are taken on any action which may be required, and the model parameters are updated; - Any decisions for action are translated into commands which are transmitted to 15 downhole actuators, and the cycle returns to the measurement step.
Reservoir management is not limited to optimization of a single field. Referring again to FIG. 1, a second central computer 77 and a third central computer 79 are associated with a second reservoir and a third reservoir, respectively. Similar to central computer 51, the second and third central computers 77, 79 monitor downhole data and 20 surface data over individual downhole communication networks (not shown) and individual surface communication networks (not shown). The data collected by second central computer 77 and third central computer 79 are integrated with that data collected by central computer 51 over a remote communication network 91. The integration of data among the central computers 51, 77, 79 could include data for all of the fields operated by 25 a particular company. This data can then be integrated and analyzed in conjunction with economic data 93 and world-wide economic trends, such as oil prices and supplies, national production controls, pipeline and tanker capacities, and location storage limitations. The overall effect of having large amounts of information and control in a central location by efficient wireless devices would allow effective optimization of 30 production from all of a company's assets. intellectual PROPERTY office of n.z.
MAR 2004 received

Claims (29)

WHAT WE CLAIM IS:
1. A reservoir production control system comprising: a plurality of wells disposed on a reservoir, each well having a borehole and at least one piping structure located within the borehole; a central computer for collecting downhole data from one or more wells; a downhole communication network associated with one or more wells, the downhole communication network being capable of conveying electrical communication signals along the piping structure of the well with electrically isolated portions of the piping structure defined by electrical chokes; and a surface communication network for communicating information between the downhole communication network and the central computer; whereby the central computer receives downhole data via the downhole communication network and the surface communication network.
2. The production control system according to claim 1, wherein: the downhole data collected from the wells is compared to a reservoir model; and a selected well of the plurality of wells is adjusted to optimize production of the reservoir.
3. The production control system according to claim 1, wherein the surface communication network includes wiring that electrically connects the downhole communication network to the central computer.
4. The production control system according to claim 1, wherein the surface communication network includes: a plurality of interconnected pipes located between the downhole communication network and the central computer; and communication occurs between the downhole communication network and the central computer by passing communication signals along electrically isolated sections of the interconnected pipes. intellectual property office of n.z. 3 0 MAR 2004 RECEIVED
5. The production control system according to claim 4, wherein the electrically isolated sections of interconnected pipe are created by placing ferromagnetic chokes at selected locations along the pipe, the ferromagnetic chokes circumferentially surrounding the pipe and impeding current flow through the pipe.
6. The production control system according to claim 1, wherein communication and power transmission within the downhole communication network occurs along an electrically isolated section of the piping structure.
7. The production control system according to claim 6, wherein the electrically isolated section of the piping structure is located between a first and a second ferromagnetic choke disposed circumferentially around the piping structure, both ferromagnetic chokes impeding current flow along the piping structure.
8. The production control system according to claim 1, further comprising: a second central computer for collecting downhole data from a second reservoir; wherein the second central computer is electrically connected to the first central computer via a remote communication network; and the downhole data collected by the first and second central computers is analyzed and used to collectively optimize the production of the first and second reservoir.
9. A reservoir production control system comprising: a plurality of wells for producing a reservoir, each well having a borehole extending from the surface, and at least one piping structure located within the borehole; at least one downhole data pod located within the borehole of one of the wells for monitoring downhole data about downhole physical characteristics of the well; a least one surface date pod for monitoring surface data; a central computer for collecting the surface data from the surface data pod and the downhole data from the downhole data pod; a downhole communication network for transmitting alternating current electrical power and communication signals along an electrically isolated portion of the piping 8 intellectual property office of n.z. 3 0 MAR 2004 structure of the one or more wells from the downhole data pod to the surface of the one or more wells; and a surface communication network electrically connected between the surface of the well and the central computer; wherein the surface communication network includes a plurality of interconnected pipes having electrically isolated portions for communicating information between the surface of the well and the central computer; and the downhole data and the surface data is analyzed by the central computer to optimize production of the reservoir.
10. The production control system according to claim 9, further comprising: a second central computer for collecting downhole data and surface data associated with a second reservoir, the second computer receiving the data over a second surface communication network; wherein the second central computer is electrically connected to the first central computer.
11. The production control system according to claim 9, further comprising: a second central computer for collecting downhole data and surface data associated with a second reservoir, the second computer receiving the data over a second surface communication network; wherein the second central computer is electrically connected to the first central computer over a remote communication network; and the downhole and surface data collected by the second computer and the downhole and surface data collected by the first central computer are analyzed to optimize the production of both the first reservoir and the second reservoir.
12. The production control system according to claim 11, wherein economic data is also provided to one of the central computers, the economic data being considered in conjunction with the surface data and the downhole data from both reservoirs to collectively optimize the production of the first reservoir and the second reservoir. intellectual property office of n.z. 9 30 MAR 2004
13. The production control system according to claim 12, wherein the economic data is information on petroleum prices.
14. The production control system according to claim 12, wherein the economic data is information on petroleum supplies.
15. The production control system according to claim 12, wherein the economic data is information on national production controls.
16. The production control system according to claim 12, wherein the economic data is information on pipeline capacities.
17. The production control system according to claim 12, wherein the economic data is information on tanker capacities.
18. The production control system according to claim 12, wherein the economic data is information on location storage limitations.
19. The production control system according to claim 9, further comprising at least one downhole control device electrically connected to the downhole communication network, the downhole control device receiving instructions from the central computer to assist in optimizing the production of the reservoir.
20. The production control system according to claim 19, wherein the downhole control device is a controllable gas-lift valve disposed along the piping structure of the well.
21. The production control system according to claim 19, wherein the downhole control device is an electric submersible pump.
22. The production control system according to claim 19, wherein the downhole control device is a chemical treatment injector.
23. The production control system according to claim 19, wherein the downhole control device is an inflow control device. intellectual property office of n.z. 10 3 0 MAR 2004
24. The production control system according to claim 9, wherein at least one of the wells is a conventional production well.
25. The production control system according to claim 9, wherein at least one of the wells is an injection well.
26. The production control system according to claim 9, wherein at least one of the wells is a multi-lateral production well.
27. The production control system according to claim 9, wherein at least one of the wells is a data observation well.
28. A method for controlling the production of a reservoir having a plurality of wells for producing the reservoir, each well having a borehole extending from the surface, and a tubing string inserted in the borehole, the method comprising the steps of. (a) communicating downhole data from a downhole pod in at least one of the wells to the surface along a downhole communication network utilizing an electrically isolated portion of the tubing string; (b) providing a central computer for collecting the downhole data from one or more wells; (c) communicating the downhole data from the surface of the well to the central computer along a surface communication network; and (d) analyzing the downhole data and communicating instructions from the central computer to at least one of the wells to change selected operating parameters of the well.
29. The method according to claim 28, further comprising the step of comparing the downhole data collected by the central computer to a reservoir model. 11 intellectual property office of n.z.
NZ521120A 2000-03-02 2001-03-02 Wireless petroleum well control using an electrically isolated part of the piping for passing communication signals NZ521120A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US18650500P 2000-03-02 2000-03-02
PCT/US2001/006985 WO2001065068A1 (en) 2000-03-02 2001-03-02 Wireless reservoir production control

Publications (1)

Publication Number Publication Date
NZ521120A true NZ521120A (en) 2004-06-25

Family

ID=22685219

Family Applications (1)

Application Number Title Priority Date Filing Date
NZ521120A NZ521120A (en) 2000-03-02 2001-03-02 Wireless petroleum well control using an electrically isolated part of the piping for passing communication signals

Country Status (5)

Country Link
AU (1) AU2001247276A1 (en)
CA (1) CA2401734C (en)
GB (1) GB2376967B (en)
NZ (1) NZ521120A (en)
WO (1) WO2001065068A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6953088B2 (en) 2002-12-23 2005-10-11 Cdx Gas, Llc Method and system for controlling the production rate of fluid from a subterranean zone to maintain production bore stability in the zone
US20070032994A1 (en) * 2005-08-02 2007-02-08 Kimminau Stephen J System and method of flow assurance in a well
EP2313797B1 (en) * 2008-06-18 2012-02-08 Expro North Sea Limited Control of sub surface safety valves
US9031674B2 (en) * 2010-10-13 2015-05-12 Schlumberger Technology Corporation Lift-gas optimization with choke control
CN104391322A (en) * 2014-12-09 2015-03-04 中国石油集团东方地球物理勘探有限责任公司 Outdoor automated monitoring system and method for seismic apparatus arrangement equipment
CN104614771A (en) * 2015-01-22 2015-05-13 深圳市市政设计研究院有限公司 Double-mode high-density electric acquiring control device and method
US20230313647A1 (en) * 2022-03-31 2023-10-05 Halliburton Energy Services, Inc. Methods to dynamically control fluid flow in a multi-well system, methods to dynamically provide real-time status of fluid flow in a multi-well system, and multi-well fluid flow control systems

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9212685D0 (en) * 1992-06-15 1992-07-29 Flight Refueling Ltd Data transfer
EP0721053A1 (en) * 1995-01-03 1996-07-10 Shell Internationale Researchmaatschappij B.V. Downhole electricity transmission system
US5732776A (en) * 1995-02-09 1998-03-31 Baker Hughes Incorporated Downhole production well control system and method
WO1999060247A1 (en) * 1998-05-15 1999-11-25 Baker Hughes Incorporated Automatic hydrocarbon production management system
GB2338253B (en) * 1998-06-12 2000-08-16 Schlumberger Ltd Power and signal transmission using insulated conduit for permanent downhole installations

Also Published As

Publication number Publication date
GB2376967A (en) 2002-12-31
WO2001065068A1 (en) 2001-09-07
CA2401734A1 (en) 2001-09-07
CA2401734C (en) 2009-05-12
GB0220345D0 (en) 2002-10-09
GB2376967B (en) 2004-03-10
AU2001247276A1 (en) 2001-09-12

Similar Documents

Publication Publication Date Title
US7259688B2 (en) Wireless reservoir production control
CA2707482C (en) A method for performing oilfield production operations
US8682589B2 (en) Apparatus and method for managing supply of additive at wellsites
CA2684291C (en) System and method for monitoring and controlling production from wells
US10443358B2 (en) Oilfield-wide production optimization
EP2652259B1 (en) Apparatus and method for controlling fluid flow from a formation
US8700371B2 (en) System and method for controlling an advancing fluid front of a reservoir
US8527248B2 (en) System and method for performing an adaptive drilling operation
US6279658B1 (en) Method of forming and servicing wellbores from a main wellbore
US7073594B2 (en) Wireless downhole well interval inflow and injection control
EP1200706B1 (en) System and method for real time reservoir management
US8925631B2 (en) Large bore completions systems and method
US7711486B2 (en) System and method for monitoring physical condition of production well equipment and controlling well production
AU2001250795B2 (en) Wireless downhole well interval inflow and injection control
US20080262737A1 (en) System and Method for Monitoring and Controlling Production from Wells
US9951601B2 (en) Distributed real-time processing for gas lift optimization
CN111852445B (en) Intelligent oilfield injection and production real-time optimization and regulation system and method
CA2401734C (en) Wireless reservoir production control
CA2671367A1 (en) A method for performing oilfield production operations
US20230167692A1 (en) Method and system for reservoir monitoring using electrical connectors with completion assemblies
US20240003250A1 (en) Method and system for formation pore pressure prediction prior to and during drilling
WO2022232431A1 (en) Method and system for downhole steam generation using laser energy

Legal Events

Date Code Title Description
PSEA Patent sealed
RENW Renewal (renewal fees accepted)
RENW Renewal (renewal fees accepted)
RENW Renewal (renewal fees accepted)
LAPS Patent lapsed