NZ202211A - Formwork for jump forming curved hollow upright concrete structures:adjustable radially and for inclination - Google Patents

Formwork for jump forming curved hollow upright concrete structures:adjustable radially and for inclination

Info

Publication number
NZ202211A
NZ202211A NZ202211A NZ20221182A NZ202211A NZ 202211 A NZ202211 A NZ 202211A NZ 202211 A NZ202211 A NZ 202211A NZ 20221182 A NZ20221182 A NZ 20221182A NZ 202211 A NZ202211 A NZ 202211A
Authority
NZ
New Zealand
Prior art keywords
panels
post
line
mount
brackets
Prior art date
Application number
NZ202211A
Inventor
H S Mygind
E H Barrett
Original Assignee
Tileman & Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tileman & Co Ltd filed Critical Tileman & Co Ltd
Publication of NZ202211A publication Critical patent/NZ202211A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/062Forms for curved walls
    • E04G11/065Forms for curved walls with mechanical means to modify the curvature

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

II Priority Date(s): V3.-.fo'^ < Complete Specification Filed:'J,?.•.*?? Class: Publication Date: ... At J??.? P.O. Journal, No: . l^&l. '^ccnm ''a ;V> A Patents Form No.5 NEW ZEALAND PATENTS ACT 1953 COMPLETE SPECIFICATION "CONCRETE FORMING APPARATUS" -I-t-WE TILEMAN & CO. LTD. a British company of Tileman House, 131 Upper Richmond Road, Putney, London SW15 2TP United Kingdom hereby declare the invention, for which -3>/ve pray that a patent may be granted to me/us, and the method by which it is to be performed, to be particularly described in and by the following statement followed by page ,A., 2022 { -lft CONCRETE FORMING APPARATUS This invention relates to concrete forming apparatus, in particular to apparatus for forming concrete by the so-called jump-form technique. In 5 this technique upright cylindrical, conical and hyperbolic concrete structures, for example chimneys, towers for supporting television aerials, bridge towers and cooling towers are formed by moving upwards two formworks disposed one within the other 10 and between which the concrete to be formed is placed. The.apparatus described hereinafter is espec ially suited to the construction of hyperbolic natural draught cooling towers. Apparatus for constructing such towers has to be able to accommodat 15 in safety, large variations in the radius of the tower, and in the slope of the tower wall. It is also desirable that use of heavy lifting equipment is minimised.
According to the present invention there 20 is provided apparatus for forming hollow upright concrete structures by the jump-forming technique, the apparatus comprising a plurality of units each consisting of a line of inner shutter panels and a line of outer shutter panels, individual panels in 25 each line having common dimensions and being releasably incorporated in the line such that the overall length of the line can be changed by adding •T % 202211 or removing panels; bracing carried by each panel being interconnected in the assembled line by an adjustable tie assembly such that the line of panels forms a rigid unit the radius of which can be set by adjusting the tie assembly; each line of panels being carried by support post assemblies via adjustment means permitting pivoting of the line of panels relative to the postasseniblies to adjust the inclination of the panels relative to the post assemblies; each line of panels and its post assemblies being releas- ably securable to the structure being formed with the inner and outer lines of panels in opposed relationship to receive therebetween concrete to be formed; the post assemblies being securable to the structure via vertically adjustable brackets which during concrete formation are in lowered positions relative to the post assemblies; the brackets and the panels being independently releasable from the structure so that the units can be lifted for forming further concrete by first releasing and raising the brackets and re-securing them to the structure at raised positions relative to the post assemblies and then releasing the panels and raising the post assemblies and panels relative to the brackets and re-securing the panels to the structure with the brackets again at their lowered positions relative to the post assemblies. In this apparatus the provision of shutter panels having common dimensions facilitates selection of the overall mgth of each unit, which is particularly advantageous tfmere significant changes in circumference are required as the case in the construction of hyperbolic cooling towers. Such changes in circumference of course involve change in 30 radius and in the present apparatus this is simply accomplished by operation of the adjustable tie assemblies. It is to be noted that the radius of each line can be set at an appropriate stage in the lifting procedure/ as can the angle of inclination of the line of shutter 202Z1 I panels which also is simply set by operation of the adjusting means via which the line of panels is carried by its post assemblies. Conveniently lifting is effected by jack means provided in the post assemblies and advantageously this jack means is arranged to operate in compression when lifting the relatively light brackets, and in tension when lifting the relatively heavy line of panels.
For a better understanding of the invention and to show how the same may be carried into effect, reference will now be made, by way of example, to the accompanying drawings, in which:-- Figure 1 is a developed somewhat schematic side view, in the direction of arrow I in Figure 2, of one unit of apparatus for forming in concrete hyperbolic cooling towers by the jump-form technique, Figure 2 is a sectional plan view of the unit of Figure 1, taken on line II-II in Figure 1, Figure 3 is a sectional end view taken on line III-III in Figure 1, Figure 4 is a side view in better detail and on a larger scale of part of a unit such as is shown only schematically in Figures 1 to 3, Figure 5 is a plan view taken on line IV-IV in Figure 4, and Figure 5A is an enlarged detail at A in Figure 5.
Figure 6 is a sectional view taken on line VI-VI in Figure 4, Figure 7 is a plan view of a part of the unit as shown in Figure 5 but drawn to a larger scale, Figure 8 is a schematic perspective view of a detail, of the unit, Figures 9 and 10 are sectional plan views on a larger scale taken, respectively, on line IX-IX and line X-X in Figure 1, Figure 11 is a side view showing, in detail, a part of a modified form of construction as viewed P . ' -4- in the direction of arrow 11 of Figur 2022 1 I Figure 12 is a plan view from above of the detail of Figure 11, and Figure 13 is a sectional view on line 5 XIII-XIII in Figure 11.
The unit shown in the Figures is one of a sufficient number to extend all around the cooling tower being erected. Each unit consists of a line of inner shutter panels 1A and a line of outer 10 shutter panels IB between which the concrete that is to be formed is placed. Each shutter panel 1A, IB consists of a steel sheet 2 stiffened by stiffeners 3 secured to its rear face. At the upper part of the sheet 2 the stiffeners 3 support a bracing 15 framework 4 that extends rearwardly from the sheet 2 and that carries, remote from the sheet 2, a mount 5 at an outer junction of the bracing framework 4. The shutter panels 1A or IB of each line are locked with one another by a tie rod assembly 20 6 which is locked to the mounts 5. In the form shown in detail in Figures 4 to 7, the tie rod assembly 6 consist of an inner rod 6A which is disposed within a series of sleeves 6B. The rod 6A passed through a hole in each mount 5, whereas 25 each sleeve 6B extends from one side or the other of each mount 5 to a connector sleeve 7 mid-way between adjacent mounts 5. At its mount 5 end each sleeve 6B is locked with the adjacent mount 5 by a slot and co-operating lug arrangement, whereas 30 at their connector sleeve 7 ends alternate sleeves 6B are each a slide fit within the adjacent connector sleeve 7, the other sleeve 6B that co-operates with this connector sleeve being in screw-threaded engagement with this connector sleeve. In this 35 way each panel 1A or IB is locked to the immediately adjacent panels on either side of it, the rod assembly 6 and connector sleeves 7 forming, in effect, 2022 t 1 an adjustable tie and strut arrangement extending along the whole length of the unit.
In its configuration as illustrated in Figures 1 and 2 each panel line consists of nineteen 5 similar panels disposed in a central run of nine panels and two outer runs of five panels each. This configuration can, of course, be varied to suit the profile of any particular structure. Between the central run and each outer run is disposed a 10 post assembly 9. Referring also to Figures 3 and 8 and 9, each of these assemblies 9 includes an upright rectangular sectioned hollow post 10 that carries a frame 11 at its upper end, this frame being disposed between the panels 1A or IB that are 1-5 on each side of the post and supporting a steel sheet 2A that bridges the gap between the sheets 2 of these panels. Each frame 11 carries a mount corresponding to the mounts 5 already described so that the frames il can be locked to the tie rod assemblies 20 6.
Each frame 11 is connected to its associated post 10 by pivot members 12A extending from the post 10 and slidably engaged in guides 12B provided on the opposing inner faces of the frame 11. From 25 the base of the frame 11 for about one half of its overall length each post 10 is reinforced by a pair of channel members 13 fast with the opposed sides of the post 10 that are at right angles to the faces of the sheets 2/2A. The portion of the post that 30 is reinforced by the channel members 13 is slotted, along its face that is nearest the concrete to be formed, and receives a bracket 14 that consists of an elongated rectangular-sectioned hollow body 14A which is disposed inside the post 10, and 35 upper and lower arms 14B, 14C that project from the upper and lower ends of the body 14A out of the slot in the post 10 in the direction flTwWaSr tne concrete to be formed. The arms 14B, 14C terminate in angle mounting plates 14D. The bracket body 14A has apertures 14E in a row along its length that constitute a rack with which co-operates a pawl mechanism 15 carried by the post 10.
At its lower end the bracket body 14A has a lug 16 to which is connected the piston rod 17A that projects from one end of the cylinder 17B of an hydraulic piston and cylinder assembly 17.
At its other end the cylinder 17B is connected to a pair of lugs 18 that are fast with the bottom ends of the post 10.
In use units are assembled so as to extend all around the substantial wall, or ring guide, that is conventionally provided atop the cooling tower columns of a cooling tower. To achieve this, each unit assembled as shown in Figures 1 and 2 with its two post assemblies in place is made fast with the wall or girder by making the arms 14B of the post assembly brackets 14 fast with the wall or girder at tie bolts anchored in the wall or girder and passed through bolt holes in the mounting plates 14D of the brackets 14. As illustrated in Figures 1 and 2, the bases of alternate panels 1A, IB are also secured to the wall or girder by utilising tie bolts anchored in the wall or girder and which in this case are utilised to make fast clamps 19 with the bases of the alternate panels. In addition to being made fast at their bases with the wall or girder, as illustrated in Figures 1 and 2 the alternate panels of one line that are so made fast are also made fast to their opposite numbers in the other line by tie bolts passed through holes in lugs 23 provided at the tops of these panels.
As illustrated in Figures 4 to 8, clamps such as the clamps 19 are not used and instead alternate 202211 panels carry upright strongbacks 19A that axe secured to the tie bolts (referenced 19B in these Figures), these strongbacks being slidahle along the panel frames for location with the tie bolts. In place of the lugs 23, holes through alternate panels are utilised. Furthermore, as shown in Figures 5 and 5 A, adjacent frameworks 4 are secured to each other by tie bolts 24 that clamp webs of the framework together between disc springs 25, rubber sealing strips 26 with steel inserts 27 being sandwiched betwBen the framework webs.
In all cases the desired radius for the unit is set by adjustment at the connector sleeves 7. t If, at this stage, it is required that the panels be inclined, this is achieved by operating adjuster bolts 20A arid 20B at the top and bottom of the frames 11 to pivot the panels 1A or IB about the pivot members 12A. It will be appreciated, therefore, that the pivot members 12A/guides 12B and the adjuster bolts 20A, 20B constitute adjustment mechanism via which the panels are carried by the support post assemblies and which permits pivoting the line of panels relative to the post assemblies.
Access for carrying out the operations to make fast the post assemblies and the panels, and to set the angle of inclination of the lines of units, is from scaffolding 21 (Figure 8) fitted to the units at appropriate locations, and (as illustrated in Figures 1 and 2) from working platforms 22 carried by the posts 10.
Gaps between immediately adjacent units are bridged by plywood sheets as at 2B in Figure 1.
It will be understood that reinforcement bars will be in position, and that concrete placed between the panels 1A and IB will be formed as a continuous ring on the wall or girder. After this concrete has been placed, jump-forming proceeds as follows:-Inside Shutter Panels 1. Mounting plates 14D of post assembly brackets 14 released frcm tie bolts (tie bolts themselves left in position). 202211 • 10 • 15 2. Adjuster bolts 20A and 20B operated to move post frames 11 away from placed concrete (pivot members 12A slide in guides 12B) so that brackets 14 will clear concrete face during subsequent lift of these brackets. 3. Jacks constituted by piston and Cylinder arrangements 17 extended to raise brackets 14 relative to remainder of post assemblies (bracket 14 lowered position shown for inside shutter panels in Figure 3 and raised position shown for outside shutter panels). 4. Adjuster bolts 20A and 20B operated to move post assembly brackets 14 towards the placed concrete to engage further tie bolts. Note here that as forming proceeds tie bolts left in the formed concrete becme available for anchoring both the bottom and the top of each bracket.
. Brackets 14 bolted tight against concrete face, any adjustment required in post alignment to suit slope of wall being effected at upper bracket arm 14B by inserting packing 2 8 (Figure 3) between mounting plate 14D and concrete face. 6. Shutter panels 1A released from tie bolts (tie bolts left in position as mentioned in 4 above). 7. Adjuster bolts 20A and 20B operated to move shutter panel runs clear of concrete face. 8. Jacks constituted by piston and cylinder arrangements 17 retracted to raise posts 10 and hence shutter panel runs (panel runs supported via rack 1 1 SEP I985 m arrangements 14E/15 during lifting). 20221 1 9. At completion of lift adjuster bolts 20A, 20B operated to bring shutter panels into position for placing concrete. 10. Bases of alternate panels secured, by clamps 19 or strongbacks 19A, to tie bolts previously left in position. 11. Top radius of shutter runs set as necessary 10 by adjusting tie rod assembly 6 at connector sleeves 7. 12. Reinforcement fixed in position.
Outside shutters Steps 1-11 above repeated. 13. Upper tie bolts fixed through holes in lugs 23 between opposing panels, or through holes in alternate opposing panels. 14. Concrete placed.
It is to be noted that push-pull props 25 . 29 (Figure 8) are provided in the scaffolding 21 for levelling working platforms of the scaffolding as necessary.
As forming proceeds, to accommodate changes in radius the plywood panels 2B bridging the gaps 30 between adjacent units are replaced as necessary and/or the end most panels of each unit are removed, or end panels are added. Placing of concrete can commence as soon as the inner and outer shutters of one unit are in position, suitable stop walls being 35 inserted temporarily.
It is to be noted that the shutters of each unit have common dimensions which simplifies assembling 20221 the unit, and that the panels once assembled are locked together in very rigid fashion and yet in a manner permitting large variations in radius by operation of the connector sleeves 7 of the tie assemblies 6. The range through which the shutter runs can be pivoted by operation of the adjuster bolts 20A, 20B is - 30° to the vertical. This enables a change of batter of over 1° between successive 1.8 metres high lifts. The size of this possible change of batter is such that the apparatus is extremely versatile and is suitable for a large range of variations in cooling tower configuration.
It is also to be noted that the sequence of lifting operations is such that the lifting forces that have to be exerted by the post assembly jacks are relatively light when the jacks are working in compression (lifting post assembly brackets) and relatively heavy when working in tension (lifting remainder of post assemblies and the shutter panels). Although particular suited for the construction of hyperbolic cooling towers, the apparatus described can, of course, be used for constructing other concrete structures such as chimneys and towers by the jump-form technique.
In Figures 11 to 13 there is illustrated a modified form of tie rod assembly ' 106. In this form mounts 105 corresponding to the mounts 5 already described each carry an upright pin 105A. To each pin 105A there are pivotally anchored two oppositely directed bolts 125, 126 one of which is left-hand screw threaded and the other of which is right-hand screw threaded. These bolts are locked fast with the mount 105 by lock nuts 127 that co-operate via washers 128 with arcuate faces 129 of the mount 105 that are centered on the axis of the pin 105A of the mount. Each bolt 125 is secured, at its end 20221 1 remote from its mount 105, to one end of a connector tube 107, to the other end of which is connected the next bolt 126. To effect this connection the bolts 125, 126 are screw-threadly engaged with 5 captive nuts 107A in the tube 107 and are locked in position by lock nuts 130. The span of the bolts 125/126 and the tube 107 between adjacent mounts 105 can be altered by adjustment at the tube 107 in turnbuckle fashion after releasing 10 the lock nuts 127 and 130. 2022.11

Claims (7)

WHAT WE CLAIM IS:
1. Apparatus for forming hollow upright concrete structures by the jump-forming technique, the apparatus comprising a plurality of units each consisting of a line of inner shutter panels and a line of outer shutter panels, individual panels in each line having common dimensions and being releasably incorporated in the line such that the overall length of the line can be changed by adding or removing panels; bracing carried by each panel being interconnected in the assembled line by an adjustable tie assembly such that the line of panels forms a rigid unit the radius of which can be set by adjusting the tie assembly; each line of panels being carried by support post assemblies via adjustment means permittinq pivoting of the line of panels relative to the post assemblies to adjust the inclination of the panels relative to the post assemblies; each line of panels and its post assemblies being releasably securable to the structure being formed with the inner and outer lines of panels in opposed relationship to receive therebetween concrete to be formed; the post assemblies being securable to the structure via vertically adjustable brackets which during concrete formation are in lowered positions relative to the post assemblies; the brackets and the panels being independently releasable from the structure so that the units can be lifted for forming further concrete by first releasing and raising the brackets and re-securing them to the structure at raised positions relative to the post assemblies and then releasing the panels and raising the post assemblies and panels relative to the brackets and . 13 . 202211 re-securing the panels to the structure with the brackets again at their lowered positions relative to the post assemblies.
2. Apparatus as claimed in claim 1, wherein the bracing of each shutter panel carries a mount that is fast therewith, and wherein the adjustable tie assembly associated with each line of shutter panels comprises an inner rod passed through a hole in each mount of the line, a series of sleeves mounted on the inner rod one on each side of 10 each mount, and connector sleeves also mounted on the inner rod, each sleeve of said series extending from its side of its associated mount to an associated one of the connector sleeves; each sleeve of said series being locked to its associated mount, alternate sleeves of said series 15 being in sliding engagement with their associated connector sleeves, and the other sleeve of said series that is associated with each connector sleeve being in screw-threaded engagement with this connector sleeve, whereby the connector sleeve can be rotated relative to the sleeves 20 engaged therewith to move these sleeves, and hence the mounts to which they are locked, towards or away from each other. (
3. Apparatus as claimed in claim 1, wherein the bracing of each shutter panel carries a mount that is fast there- 25 with, and wherein the adjustable tie assembly associated with each line of shutter panels comprises two oppositely directed bolts having screw-threads of opposite hand pivotally anchored to each mount, connector tubes with A * o\ V each of which two of the bolts having screw-threads of 11 SEP 1985 mjj opposite hand are engaged, one at each end, by these 202211 » 10 15 20 25 - 14 - screw threads, and locking means releasably locking each bolt to its mount and to its connector tube, whereby each connector tube with the locking means released can be rotated to move the mounts on each side thereof towards or away from each other.
4. Apparatus as claimed in claim 2 or 3, wherein each support post assembly includes an upright post that carries, via said adjustment means, a frame at its upper end, this frame being disposed between the shutter panels that are on each side of the post and carrying a mount which adjustably secures the frame to the tie assembly, one of said adjustable brackets being vertically slidable with respect to this post and projecting therefrom, and the support post assembly further including a piston and cylinder arrangement operatively connected between the post and the slidable bracket whereby the piston and cylinder arrangement can be operated to raise the bracket relative to the post when the bracket is free of the structure being formed, and to raise the post relative to the bracket when the bracket is secured to the structure.
5. Apparatus as claimed in claim 4, wherein each adjustable bracket is coupled with its associated post through a rack and pawl arrangement.
6. Apparatus as claimed in claim 4 or 5, wherein said adjustment means comprise pivot members extending from said upright posts and slidably engaged in guides provided on said frames, and adjuster bolts at the tops and bottoms of the frames which are adjustable to bring about pivot-mg of the frames about the pivot members. - 15 - 202211
7. Apparatus for forming hollow upright concrete structures by the jump-forming technique, substantially as hereinbefore described with reference to Figures 1 to 10, or Figures 11, 12 and 13, of the accompanying drawings.
NZ202211A 1981-10-19 1982-10-18 Formwork for jump forming curved hollow upright concrete structures:adjustable radially and for inclination NZ202211A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB08131424A GB2108187B (en) 1981-10-19 1981-10-19 Concrete forming apparatus

Publications (1)

Publication Number Publication Date
NZ202211A true NZ202211A (en) 1986-03-14

Family

ID=10525237

Family Applications (1)

Application Number Title Priority Date Filing Date
NZ202211A NZ202211A (en) 1981-10-19 1982-10-18 Formwork for jump forming curved hollow upright concrete structures:adjustable radially and for inclination

Country Status (4)

Country Link
AU (1) AU561007B2 (en)
GB (1) GB2108187B (en)
IT (1) IT1153259B (en)
NZ (1) NZ202211A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2582718B1 (en) * 1985-05-28 1987-08-28 Francois Entreprises Cie FORMWORK AND SHIELDING WALL
ATA165386A (en) * 1986-06-17 1992-10-15 Rund Stahl Bau Gmbh & Co FORMWORK
ITTO20110601A1 (en) * 2011-07-07 2013-01-08 Simcat S R L MODULE FOR THE REALIZATION OF MODULAR FORMWORKS, IN PARTICULAR OF MODULAR FORMWORKS FOR OBTAINING CURVED STRUCTURES

Also Published As

Publication number Publication date
IT1153259B (en) 1987-01-14
AU561007B2 (en) 1987-04-30
GB2108187A (en) 1983-05-11
GB2108187B (en) 1985-10-02
IT8223774A0 (en) 1982-10-15
AU8945982A (en) 1983-04-28

Similar Documents

Publication Publication Date Title
US5575591A (en) Apparatus and method for a modular support and lifting system
US3966164A (en) Adjustable truss support and form for concrete construction
US3902289A (en) Adjustable truss for concrete construction
US4540150A (en) Self elevating formwork installation with variable geometry for making concrete surfaces, particularly very high concrete surfaces
CN117248714B (en) Construction platform and construction method for horizontal beam plates of mutually climbing steel upright posts
CN112031401B (en) Two-way adjustable automatic template opening and closing system of climbing formwork and use method thereof
US20130263549A1 (en) Safety screen system for steel erection work
US4562989A (en) Apparatus for construction of concrete walls
NZ202211A (en) Formwork for jump forming curved hollow upright concrete structures:adjustable radially and for inclination
JPH07247695A (en) Construction method for high structure and construction device used therefor
US1853085A (en) Tower for elevating construction materials
CN211817847U (en) Builder&#39;s jack is encorbelmented to building engineering construction
US5086605A (en) Method of mounting floors in a shell whose concrete wall is erected by a continuous self-climbing shuttering installation
US3187838A (en) Scaffolding structure
GB1563298A (en) Drophead attachments for builder props
CN114232555B (en) High and large construction structure and method for integrally transferred dock buttress wall
CN218643209U (en) Be used for high altitude construction pin-connected panel construction platform of column
CN110748135A (en) Temporary operation platform system and construction method thereof
CN214532026U (en) General type protection canopy
CN221031323U (en) Movable hoistway construction device
CN219430545U (en) Operation platform for utilizing stiffness framework for tower column head section
CN217812236U (en) Assembled liftable operation platform on water
CN219569558U (en) Building frame column template reinforcing apparatus
CN215212555U (en) Assembled reinforcing bar processing protection canopy
CN113174857B (en) Arched bridge is with construction hanging flower basket