NO750545L - - Google Patents

Info

Publication number
NO750545L
NO750545L NO750545A NO750545A NO750545L NO 750545 L NO750545 L NO 750545L NO 750545 A NO750545 A NO 750545A NO 750545 A NO750545 A NO 750545A NO 750545 L NO750545 L NO 750545L
Authority
NO
Norway
Prior art keywords
flow line
flange
assembly
flow
unit
Prior art date
Application number
NO750545A
Other languages
Norwegian (no)
Inventor
B F Baugh
Original Assignee
Vetco Offshore Ind Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vetco Offshore Ind Inc filed Critical Vetco Offshore Ind Inc
Priority to NO750545A priority Critical patent/NO750545L/no
Priority to NO762419A priority patent/NO762419L/no
Priority to NO762418A priority patent/NO762418L/no
Publication of NO750545L publication Critical patent/NO750545L/no

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Description

Foreliggende oppfinnelse angår ferdiggjøring av borehull på sjøbunnen for overføring av fluidum fra borehullet til overflaten. The present invention relates to the completion of boreholes on the seabed for the transfer of fluid from the borehole to the surface.

US-patent nr. 3.721.294 fremlegger en undervanns-rørforbindelsesanordning for å forbinde et oljerørsaggregat på et borehull på havbunnen til en strømningslinje som har blitt lagt fra et lagersted og ned til oljebrønnen. En av hensiktene med forbindelsesapparatet ifølge US-patent nr. 3.721.294 er at det muliggjør bruken av en standard mindre kostbar føringskon-struksjon som har føringslinjer som strekker seg oppover•fra borehullet til båten som opererer på havoverflaten. US Patent No. 3,721,294 discloses a subsea pipe connection device for connecting an oil pipe assembly on a seabed wellbore to a flow line that has been laid from a storage location down to the oil well. One of the purposes of the connector apparatus of US Patent No. 3,721,294 is to enable the use of a standard less expensive guide construction having guide lines extending upward from the wellbore to the vessel operating on the sea surface.

Anordningen ifølge US-patent nr. 3-721.294 inklu-The device according to US patent no. 3-721,294 including

derer en trekkinnretning som har to trakter hvor det passerer wire gjennom som er i forbindelse med overflatefartøyet 'og-lager-strømningslinjen slik at strømningslinjen kan bli strukket for innretting for forbindelse med oljerørsaggregatet. there is a pulling device having two funnels through which a wire passes which is in connection with the surface vessel and the bearing flow line so that the flow line can be stretched for alignment for connection with the oil pipe assembly.

Det er en hensikt med foreliggende oppfinnelse åIt is a purpose of the present invention to

sørge for en ny og forbedret anordning for selektivt å danne fluidumsforbindelse til et borehull som er boret på, sjøbunnen," provide a new and improved device for selectively forming a fluid connection to a borehole drilled on the seabed,"

hvor en lagerstrømningslinje er nøyaktig plassert for innretti-ng med et oljerørsaggregat ved en kombinasjon av wireanordning. og hydrauliske anordninger, som kontrolleres fra overflaten. Anordningen av den foretrukne utførelse av foreliggende oppfinnelse inkluderer en føringskonstruksjon for borehullet for montering på where a bearing flow line is precisely positioned for alignment with an oil pipe assembly by a combination of wire arrangement. and hydraulic devices, which are controlled from the surface. The device of the preferred embodiment of the present invention includes a guide structure for the borehole for mounting on

et borehull slik at føringskonstruksjonen for borehullet inklu-a borehole so that the guiding structure for the borehole includes

derer føringslinjer som strekker seg oppover til overflaten. Et oljerørsaggregat eller et nettverk som kontrollerer fluidumstrøm- there are guide lines that extend upwards to the surface. An oil pipe assembly or network that controls fluid flow

men fra borehullet blir plassert på føringskonstruksjonen for borehullet for å kontrollere strømmen av borehulls fluidum utover fra borehullet. En lagerstrømningslinje blir lagt fra en legge- but from the borehole is placed on the borehole guide structure to control the flow of borehole fluid outward from the borehole. A stock flow line is laid from a lay-

pram til en posisjon nær borehullet og posisjonsanbringende wire som er festet til lagerstrømningslinjen, blir senket ned langs føringslinjene til borehullet. Den posisjonsanbringende wireinn-retningen blir utstyrt med innretning for å bevege lagerstrøm-■ ningslinjen til en posisjon med delvis innretting med hensyn til oljerørsaggregatet. Det er sørget for hydraulisk kraftinnretning .som kan fjernstyres fra overflaten, for å danne kontakt med og for å bevege lagerstrømningslinjen fra posisjonen med delvis innretting til.en posisjon med i det vesentlige fullstendig innretting med oljerørsaggregatet slik at det dannes en forseglet fluidumforbindelse mellom' de to strømningslinjene. barge to a position close to the borehole and positioning wire attached to the bearing flow line is lowered along the guide lines to the borehole. The positioning wire aligner is provided with means to move the bearing flow line to a position of partial alignment with respect to the oil tube assembly. Hydraulic power equipment is provided, which can be remotely controlled from the surface, to make contact with and to move the bearing flow line from the position of partial alignment to a position of substantially complete alignment with the oil tube assembly so that a sealed fluid connection is formed between the the two flow lines.

Undervannsforbindelsesapparatet ifølge foreliggende ' ' oppfinnelse, inkluderer videre en trekkinnretning for strømnings-linjer og denne innretningen inkluderer.innretning for å trekke en innrettingsenhet fra overflaten til borehullet, og denne enheten er tilpasset for å motta strømningslinjen fra oljerørsag-gregatet og lagerstrømningslinjen i aksial innretting for forbindelse. Trekkinnretningen for strømhingslinjer inkluderer videre en traktenhet som har en wire som passerer gjennom traktenheten og som er festet til lagerstrømningslinjen hvorved posisjonen av strømningslinjen blir kontrollert ved bevegelse av wiren, som blir kontrollert ved'overflaten. Traktenheten virker sammen med wiren for å bevege lagerstrømningslinjen til en.posisjon med delvis innretting med oljerørsaggregatet. Deretter fester den fjernstyrte kraftinnretningen seg til lagerstrømnings-linjen og beveger lagerstrømningslinjen til en låst posisjon i traktenheten slik at strømningslinjen er bevegelig med traktenheten. Traktenheten blir dreid nedover med lagerstrømningslinjen festet til traktenheten til en posisjon hvor lagerstrømningslinjen er fullstendig aksialt innrettet med strømningslinjen av oljerørs-aggregatet. The subsea connection apparatus according to the present invention further includes a flow line pulling device and this device includes means for pulling an alignment unit from the surface to the wellbore, and this unit is adapted to receive the flow line from the oil pipe saw rig and the bearing flow line in axial alignment for connection. The draw device for current hanging lines further includes a hopper assembly having a wire passing through the hopper assembly and attached to the bearing flow line whereby the position of the flow line is controlled by movement of the wire, which is controlled at the surface. The funnel assembly works with the wire to move the bearing flow line to a position in partial alignment with the oil tube assembly. Then the remote power device attaches to the stock flow line and moves the stock flow line to a locked position in the hopper assembly so that the flow line is movable with the hopper assembly. The funnel assembly is rotated downward with the bearing flow line attached to the funnel assembly to a position where the bearing flow line is fully axially aligned with the flow line of the oil tube assembly.

Det er sørget for forbindelsesinnretning for å danne en forseglet fluidumforbindelse mellom den fullstendig innrettede strømningslinjen av oljerørsaggregatet og lagerstrømningslinjen. Før sammenføyingen av de to strømningslinjene, er det sørget for uavhengig prøveinnretning for å prøve lagerstrømningslinjen, og den uavhengige prøveinnretningen 'blir deretter fjernet fra lager-strømningslinjen slik at lagerstrømningslinjen kan bli forbundet med strømningslinjen av oljerørsaggregatet. Den uavhengige prøve- innretningen og trekkinnretningen for strømningslinjer blir fjernet fra borehullsstedet etter at det har blitt etablert en forseglet fluidumforbindelse mellom strømningslinjen■av olje-rørsaggregatet og lagerstrømningslinjen. Connection means are provided to form a sealed fluid connection between the fully aligned flow line of the oil tube assembly and the bearing flow line. Prior to the joining of the two flow lines, an independent test device is provided to test the bearing flow line, and the independent test device is then removed from the bearing flow line so that the bearing flow line can be connected to the flow line of the oil pipe assembly. The independent test device and flowline puller are removed from the wellbore site after a sealed fluid connection has been established between the flowline■of the oil tubing assembly and the bearing flowline.

Det er sørget for hydrauliske terminalforbindelserProvision is made for hydraulic terminal connections

i den posisjonsanbringende enheten for strømningslinjen for hydraulisk kontroll av innretningen for å danne forbindelse mel- in the positioning unit for the flow line for hydraulic control of the device to form connection between

lom de innrettede strømningslinjene og derved tillates det at oljerørsaggregatet blir trukket og dekket fra over flatefartøyet og nødvendigheten av tilbakevending av manifolden av oljerørs-aggregatet for å kontrollere innretningen for å føye sammen^ strømningslinjene,' elimineres. Strømningslinjen av oljerørs-aggregatet inkluderer en strømningslinjeflens og inn i denne terminerer strømningslinjer av oljerørsaggregatet. Strømnings-linjeflensen har påmontert en pakningsenhet for å danne den for- x seglede fluidumforbindelse'mellom strømningslinjeflensen av olje-rørsaggregatet og strømningslinjeflensen på lagerstrømningslinjén. Pakningsenheten kan fjernes ved hjelp av en trekkinnretning lom the aligned flow lines thereby allowing the oil pipe assembly to be pulled and covered from above the surface vessel and the necessity of reversing the manifold of the oil pipe assembly to control the device for joining the flow lines is eliminated. The flow line of the oil pipe assembly includes a flow line flange and into this flow lines of the oil pipe assembly terminate. The flow line flange has a packing assembly attached to it to form the sealed fluid connection between the flow line flange of the oil pipe assembly and the flow line flange of the bearing flow line. The packing unit can be removed using a pulling device

hvorved forseglingsenheten kan bli erstattet om ønskelig.whereby the sealing unit can be replaced if desired.

Disse egenskapene og hensikten av foreliggende oppfinnelse, såvel som flere fortjenestefulle egenskaper, vil bli pekt på i den detaljerte beskrivelse som følger. These features and the purpose of the present invention, as well as several advantageous features, will be pointed out in the detailed description that follows.

Figur 1 er en isometrisk tegning av den fullstend-Figure 1 is an isometric drawing of the complete

ige undervannsforbindelse som er. dannet mellom oljérørsaggre-gatene og lagerstrømningslinjen i overensstemmelse med den foretrukne utførelsen av foreliggende oppfinnelse. Figur 2 er en isometrisk tegning av føringskonstruk-sjonen for borehullet tilpasset for montering på det undersjøiske oljeboringshullet som har blitt boret i en formasjon på sjøbunnen. Figur 3 er en vertikaltegning■som illustrerer fremdriften av innrettingsenheten for strømningslinjer nedover til en posisjon på føringskonstruksjonen for borehullet ved hjelp av anbringelsesenheten eller trekkenheten for strømnings-linjer. ige underwater connection that is. formed between the oil pipe assemblies and the bearing flow line in accordance with the preferred embodiment of the present invention. Figure 2 is an isometric drawing of the guide construction for the borehole adapted for installation on the subsea oil borehole which has been drilled in a formation on the seabed. Figure 3 is a vertical drawing illustrating the advancement of the flowline alignment unit down to a position on the wellbore guide structure by the flowline placement or pulling unit.

Figur 4 er en seksj onstegning tatt-;langs linje 4-4Figure 4 is a sectional drawing taken along line 4-4

i figur 33og illustrerer låsingen av innrettingsenheten for strømningslinjer til føringskonstruksjonen for borehullet. Figur 5 er en isometrisk tegning ay frigjøringen av anbringelsesenheten for strømningslinjer fra innrettingsenheten for strømningslinjer. in Figure 33 and illustrates the locking of the flowline aligner to the wellbore guide structure. Figure 5 is an isometric view of the release of the flow line positioning assembly from the flow line alignment assembly.

Figur 6 er en sidetegning av oljerørsaggregatetFigure 6 is a side drawing of the oil pipe assembly

eller nettverket for kontroll av fluidumstrømmen fra borehullet og som har blitt plassert på føringskonstruksjonen for borehullet og innrettingsenheten for strømningslinjer. or the wellbore fluid flow control network that has been placed on the wellbore guide structure and flowline aligner.

Figur 7 er en horisontaltegning av oljerørsaggregatet og illustrerer anbringelsesposisjonen til strømningslinjeflensen av oljerørsaggregatet og den hydrauliske innretningen for å plassere denne. Figur.8 er en vertikaltetning, delvis i snitt, tatt langs linje 8-8 i figur 7, av den hydraulisk opererte forbindel--sesinnretning for å danne forbindelse mellom den helt innrettede flensen av oljerørsaggregatet og flensen av lagerstrømningslinjen. Figur 9 er en fronttegning av strømningslinjeflensen av oljerørsaggregatet bragt inn i innrettingskanalen av innrettingsenheten for strømningslinjer. Figur 10 'er en delvis skjematisk vertikaltegning av den anbragte anbringelsesenhet for strømningslinjer før sonden av lagerstrømningslinjen trekkes inn i traktenheten. Figur 11 er en skjematisk tegning av de relative posisjonene av overflatefartøyet og leggeprammen for strømnings-linjer med hensyn til det undersjøiske 61jeboringshullet. Figur 12 er en sidetegning av traktenheten av anbringelsesenheten for strømningslinjer som har beveget lager-strømningslinjen og bæreenheten som er festet til, .til en posisjon med delvis innretting med hensyn til strømningslinjeflensen■ av oljerørsaggregatet. Figur 13 er en sidetegning av traktenheten av anbringelsesenheten for strømningslinjer med bæreenheten for lager-, strømningslinjen som har blitt beveget inn i en låst posisjon med traktenheten. Figur 14 er et vertikalsnitt av traktenheten som Figure 7 is a horizontal drawing of the oil pipe assembly and illustrates the placement position of the flow line flange of the oil pipe assembly and the hydraulic device for placing it. Figure 8 is a vertical seal, partially in section, taken along line 8-8 in Figure 7, of the hydraulically operated connection device to form a connection between the fully aligned flange of the oil pipe assembly and the flange of the bearing flow line. Figure 9 is a front view of the flow line flange of the oil pipe assembly brought into the alignment channel by the flow line alignment unit. Figure 10 is a partially schematic vertical drawing of the flowline placement assembly in place before the probe of the stock flowline is pulled into the hopper assembly. Figure 11 is a schematic drawing of the relative positions of the surface vessel and the laying barge for flow lines with respect to the subsea wellbore. Figure 12 is a side view of the hopper assembly of the flowline positioning assembly which has moved the bearing flowline and carrier assembly attached thereto into a partially aligned position with respect to the flowline flange of the oil pipe assembly. Figure 13 is a side view of the hopper assembly of the flow line placement assembly with the storage flow line support assembly which has been moved into a locked position with the hopper assembly. Figure 14 is a vertical section of the funnel unit which

beskrevet i figur 13.described in Figure 13.

Figur 15 er en sidetegning av innrettingsenhetenFigure 15 is a side view of the alignment unit

for strømningslinjer med traktenheten som har blitt skråttstilt eller dreid nedover med hydraulisk kraft til en posisjon hvor for flow lines with the funnel assembly that has been tilted or pivoted downward by hydraulic power to a position where

flensen av. lagerstrømningslinjen i det vesentlige er fullsten-the flange off. the stock flow line is essentially solid-

dig innrettet med flensen av oljerørsaggregatet..aligned with the flange of the oil pipe assembly..

Figur 16 er en fronttegning av. traktenheten hvor bærerenheten og flensen av lagerstrømningslinjen er bragt tilnærmet fullstendig på linje som illustrert i figur 15. Figur 17 er et snitt tatt langs linje 17-17 i figur l6jog illustrerer den andre hydrauliske terminalen for den hydraulisk opererte forbindelsesanordning montert sammen.med.strøm-ningslinjef lensen av oljerørsaggregatet. Figure 16 is a front drawing of. the hopper assembly where the carrier assembly and the flange of the bearing flow line are brought almost completely into alignment as illustrated in Figure 15. Figure 17 is a section taken along line 17-17 in Figure 16 and illustrates the second hydraulic terminal for the hydraulically operated connection device assembled together with ning line flange of the oil pipe assembly.

Figur 18 er et snitt av frigjøringsmekanismen forFigure 18 is a section of the release mechanism for

å frigjøre bæreenheten fra flensen av lagerstrømningslinjen. Figur .19 er et snitt tatt langs linje 19-19 i figur 18, og illustrerer konstruksjonen og forbindelsen av prøveflensen til lagerstrømningslinjen med bærerenheten og flensen til lager-strømningslinjen. Figur 19a er et snitt tatt langs linje 19a-19a i figur 19 og illustrerer fastholdelsen av den horisontale låse-haken ved prøveflensen til lagerstrømningslinjen før fjerning av denne. to release the carrier assembly from the flange of the bearing flow line. Figure .19 is a section taken along line 19-19 of Figure 18, and illustrates the construction and connection of the test flange to the bearing flow line with the carrier assembly and the flange to the bearing flow line. Figure 19a is a section taken along line 19a-19a in Figure 19 and illustrates the retention of the horizontal locking hook at the test flange of the bearing flow line prior to its removal.

Figur 20 er et snitt, på samme måte som figur 18,Figure 20 is a section, in the same way as Figure 18,

av frigjøringsmekanismen som har frigjort bæreenheten fra forbindelse med flensen av lagerstrømningslinjen. Figur 21 er en sidetegning av anbringelsesenheten for'strømningslinjer i en lett oppreist posisjon for å fjerne prøveflensen av lagerstrømningslinjen. of the release mechanism which has released the carrier assembly from connection with the flange of the bearing flow line. Figure 21 is a side view of the flowline application assembly in a slightly upright position for removing the sample flange of the bearing flowline.

Figur 22 er en sidetegning, lik den i figur 21,Figure 22 is a side drawing, similar to that in Figure 21,

av anbringelsesenheten av strømningslinjer med traktenhetenof the placement unit of flow lines with the funnel unit

skrådd oppover.slanted upwards.

Figur 23 er en sidetegning av forbindelsesinnretningen med sideforbindelsesflåtene i en oppreist posisjon med strømningslinjeflensen av oljerørsaggregatet og flensen av lagerstrømningslinjen i posisjon for forbindelse. Figure 23 is a side view of the connection device with the side connection rafts in an upright position with the flow line flange of the oil tube assembly and the flange of the bearing flow line in position for connection.

Figur 24 er en sidetegning, på samme måte som fig-Figure 24 is a side view, in the same way as fig.

ur 23j hvor forbindelsesinnretningen har dannet en forseglet fluidumforbindelse mellom flensene av strømningslinjene. Figur 25 er en sidetegning av fjerningsutstyret i posisjon for- å fjerne pakningsenheten som er festet til strøm-ningslinjef lensen av'oljerørsaggregatet. Figur 26 er en sidetegning av flensene til strøm-ningslinjene som har blitt beveget i fra hverandre for å til- ur 23j where the connection device has formed a sealed fluid connection between the flanges of the flow lines. Figure 25 is a side view of the removal equipment in position to remove the packing unit attached to the flow line flange of the oil pipe assembly. Figure 26 is a side drawing of the flanges of the flow lines which have been moved apart in order to

late at fjerningsutstyret kan fjerne forseglingsenheten.allow the removal equipment to remove the sealing unit.

Med henvisning til tegningene angir bokstaven A generelt anordningen av den foretrukne utførelsen av foreliggende oppfinnelse for å danne en fluidumforbindelse på stedet ved et undersjøisk borehull mellom et nettverk av ét oljerørs-aggregat F og en lagerstrømningslinje S som strekker seg fra siden av borehullet.oppover til en eller annen type av lagrings-mulighet på overflaten av vannmassene. Anordningen A består i hovedsaken av en føringskonstruksjon G som er spesielt illustrert i figur 2, en innrettingsenhet B for strømningslinjer illustrert i forskjellige figurer, inkludert figurene 5- og 10, Referring to the drawings, the letter A generally indicates the arrangement of the preferred embodiment of the present invention for forming a fluid connection in situ at a subsea well between a network of one oil pipe assembly F and a bearing flow line S extending from the side of the wellbore upward to some type of storage possibility on the surface of the water bodies. The device A mainly consists of a guide structure G which is particularly illustrated in figure 2, an alignment unit B for flow lines illustrated in various figures, including figures 5 and 10,

et oljerørsaggregat T eller et kontrollnettverk for fluidum-strømmen, spesielt illustrert i figur 1, og en anbringelsesen- v het P for strømningslinjer illustrert i forskjellige figurer, inkludert figurene 5 og 10. Anordningen A av foreliggende oppfinnelse er konstruert for å monteres til.et oljeboringshull, an oil pipe assembly T or a control network for the fluid flow, particularly illustrated in figure 1, and a placement unit P for flow lines illustrated in various figures, including figures 5 and 10. The device A of the present invention is designed to be mounted to oil well,

noe som er skjematisk angitt ved bokstaven H i figur 1, ogwhich is schematically indicated by the letter H in Figure 1, and

dette borehullet har blitt boret ned i formasjoner som ligger under havbunnen eller under andre vannmasser. Anordningen A this borehole has been drilled into formations that lie under the seabed or under other bodies of water. The device A

av foreliggende oppfinnelse vil generelt benyttet sammen med et overflatefartøy V og en leggepram L for strømningslinjer (figur 11). of the present invention will generally be used together with a surface vessel V and a lay barge L for flow lines (figure 11).

Det første trinnet for dannelsen av undervanns forbindelsen mellom en lagerstrømningslinje 3 og en strømningslinje F av oljerørsaggregatet er å senke ned fra overflatefartøyet V The first step for the formation of the underwater connection between a bearing flow line 3 and a flow line F of the oil pipe assembly is to lower from the surface vessel V

en føringskonstruksjon G. Føringskonstruksjonen G inkluderer en hoveddel som er formet som et sylindrisk hus 10, som er forbundet med fire føringssøyler 11 som strekker seg oppover gjennom radialgående rammedeler lia som er sveiset til hovedhuset 10.^ og som strekker seg radialt utover fra dette og inn i sveise-forbindelse med føririgssøylene 11. Siderammedeler 11b strekker seg mellom nærliggende par av .radialtgående rammedeler lia for å virke sammen med de radialtgående rammedelene for å sørge for en tilstrekkelig sterk ramme for å understøtte føringssøylene 11. a guide structure G. The guide structure G includes a main part which is shaped like a cylindrical housing 10, which is connected by four guide columns 11 which extend upwards through radially extending frame parts 11a which are welded to the main housing 10.^ and which extend radially outward from this and into welded connection with the guide posts 11. Side frame members 11b extend between adjacent pairs of radially extending frame members 11a to cooperate with the radially extending frame members to provide a sufficiently strong frame to support the guide posts 11.

I utførelsen av oppfinnelsen som -er illustrert på tegningene,In carrying out the invention which is illustrated in the drawings,

er rammedelene lia og 11b H-bjelker.. Hver av føringssøylene 11are the frame parts 11a and 11b H-beams.. Each of the guide columns 11

er forbundet med en fleksibel føringslinje 12 som strekker seg is connected by a flexible guide line 12 which extends

oppover fra borehullet til operasjonsfartøyet V på vannoverflaten med føringskonstruksjonen plassert på horehuset H. På denne måten kan føringslinjene 12 bli benyttet som et.førings system for å senke verktøy og annet utstyr slik som de nye komponent- upwards from the borehole to the operational vessel V on the water surface with the guide structure placed on the whore house H. In this way, the guide lines 12 can be used as a guide system for lowering tools and other equipment such as the new component

ene som er beskrevet, nedover fra operasjonsfartøyet V og ned på føringssøylene 11. one that is described, down from the operational vessel V and down onto the guide columns 11.

Etter at retningen for å nærme seg med lagerstrøm-ningslinjen F. har blitt bestemt, blir innrettingsenheten B for strømningslinjer senket ned på føringslinjene 12 og ned på før-ingssøylene 11. Innrettingsenheten for strømningslinjer eller B inkluderer en hovedplatedel 14 som er'sveiset til førings- After the direction of approach with the bearing flow line F. has been determined, the flow line alignment assembly B is lowered onto the guide lines 12 and onto the guide columns 11. The flow line alignment assembly or B includes a main plate portion 14 which is welded to the guide -

hylser 15a og 15b som er tilpasset til å passe over føringssøyl- ' ene li av føringskonstruksjonen G. Føringshylsene 15a og 15b er kjent innen faget og inkluderer' forstørrede koniske lave sek-sjoner slik som 15a' som virker sammen med øvre koniske deler slik som 12a på føringssøylene 11 for å sentrere føringshylsene slik som 15a over føringssøylene etterhvert som innrettingsenheten for strømningslinjen blir senket ned langs føringslinjene 12. Hovedplatedelen 14 som er sveiset eller på annen måte forbundet til de to sideføringshylsene 15a og 15b, inkluderer en horisontal plattformdel 14a som er sveiset eller på annen måte forbundet til hovedplatedelen, som er plassert i et tilnærmet vertikalt plan under monteringen med føringssøylene 11. sleeves 15a and 15b which are adapted to fit over the guide columns 11 of the guide structure G. The guide sleeves 15a and 15b are known in the art and include enlarged conical lower sections such as 15a which cooperate with upper conical portions such as 12a on the guide posts 11 to center the guide sleeves such as 15a above the guide posts as the flow line aligner is lowered along the guide lines 12. The main plate portion 14 which is welded or otherwise connected to the two side guide sleeves 15a and 15b includes a horizontal platform portion 14a which is welded or otherwise connected to the main plate part, which is placed in an approximately vertical plane during assembly with the guide columns 11.

Innrettingsenheten B for strømningslinjen inklu-Alignment unit B for the flow line including

derer en låsekanal 14b som sørger- for en-U-formet utsparing for å motta en låsehake fra et passende bevegelig utstyr som blir benyttet for den faktiske senkingen av innrettingsenheten B for strømningslinjer nedover fra operasjonsfartøyet V og ned på there is a locking channel 14b which provides a U-shaped recess to receive a locking hook from a suitable movable device which is used for the actual lowering of the aligning unit B for flow lines down from the operating vessel V onto

to av føringssøylene 11. Innrettingsenheten B for strømnings-linjen blir i virkeligheten anbragt på føringskonstruksjonen G two of the guide columns 11. The alignment unit B for the flow line is actually placed on the guide structure G

ved anbringelsen av føringshylsene 15a og 15b på de radiale rammedelene lia av føringskonstruksjonen. Innrettingsenheten B by placing the guide sleeves 15a and 15b on the radial frame parts 1a of the guide structure. Alignment unit B

for strømningslinjer blir låst til de radialt gående rammedelene lia av føringskonstruksjonen ved 'låsemekanismer 16, som illustrert i figurene 33- 4 og 10. Låsemekanismene 16 inkluderer en låsedel l6a som er dreibart montert for å understøtte kammene l6b som er sveiset eller på annen måte festet til hovedplate- for flow lines are locked to the radially extending frame members 11a of the guide structure by locking mechanisms 16, as illustrated in Figures 33-4 and 10. The locking mechanisms 16 include a locking member 16a which is rotatably mounted to support the cams 16b which are welded or otherwise attached to motherboard

delen 14. Låsedelene l6a er tilpasset for å kunne dreies til en. posisjon under toppdelene lic av de radiale■rammede lene lia av part 14. The locking parts l6a are adapted to be turned into one. position under the top parts lic of the radial■rammed lean lia of

føringskonstruksjonen for derved å feste innrettingsenheten Bthe guide structure to thereby attach the alignment unit B

for strømningslinjer på føringskonstruksjonen G. for flow lines on the guide structure G.

Innrettingsenheten B for strømningslinjer inkluderer ytterligere en innrettingskanal i7 som er tilpasset slik at den sørger for kanalen eller sporet for å motta strømnings-' linjen.F av oljerørsaggregatet og lagerstrømningslinjen F i en posisjon som i det vesentlige er helt på linje og for å danne en forseglet fluidumforbindelse mellom disse. Innrettingskanale.n 17 inkluderer sidekanaldeler 17a og 17b som er sveiset i en U-.formet innskjæring 17c i hovedrammedelen 14. Sidekanaldelen 17a har et i det vesentlige T-formet spor 17d som er plassert på mot-satt side av et annet, i det vesentlige.T-formet spor 17e i side- ■ kanaldelen 17b. Videre inkluderer sidekanaldelen 17a et i det vesentlige D-formet spor 18a som er maskinert' i en øvre anleggs- j_ flate l8b av denne. På samme måte har sidekanaldelen 17b et i det vesentlige D-formet spor 19a som er plassert tvers overfor det D-formede sporet 18a, og hvor sporet 19a er maskinert i den øvre anleggsoverflaten 19b av denne. Sideinnrettingskanaldelen 17a er understøttet ved rørdelen 20a som strekker seg fra platt-formdelen l4a. I utførelsen ifølge foreliggende oppfinnelse som her er illustrert og diskutert, blir innrettingsenheten B for strømningslinjer' i virkeligheten beveget eller senket ned langs føringslinjene 12 ved hjelp av anbringelsesenheten for strøm-ningslinjer. Mekanismen for å feste innrettingsenheten Bfor strømningslinjer til anbringelsesenheten eller fremdriftsutstyret for strømningslinjer vil bli beskrevet nedenfor. The flow line alignment assembly B further includes an alignment channel i7 adapted to provide the channel or groove to receive the flow line F of the oil tube assembly and the bearing flow line F in a position that is substantially fully aligned and to form a sealed fluid connection between these. Alignment channels 17 include side channel parts 17a and 17b which are welded into a U-shaped cut-out 17c in the main frame part 14. The side channel part 17a has a substantially T-shaped groove 17d which is located on the opposite side of another, in the essential. T-shaped groove 17e in the side ■ channel part 17b. Furthermore, the side channel part 17a includes a substantially D-shaped groove 18a which is machined into an upper contact surface 18b thereof. In the same way, the side channel part 17b has a substantially D-shaped groove 19a which is placed transversely opposite the D-shaped groove 18a, and where the groove 19a is machined into the upper contact surface 19b thereof. The side aligning channel part 17a is supported by the pipe part 20a which extends from the platform part 14a. In the embodiment according to the present invention which is here illustrated and discussed, the alignment unit B for flow lines' is actually moved or lowered along the guide lines 12 by means of the positioning unit for flow lines. The mechanism for attaching the flowline alignment assembly B to the flowline placement assembly or flowline propulsion equipment will be described below.

Etter at innrettingsenheten B for strømningslinjer har blitt senket ned langs føringslinjene 12 og anbragt på før-ingskonstruks j onen G, blir et oljerørsaggregat P eller et nettverk for fluidumstrøm senket ned langs føringslinjene 12 og anbragt på føringskonstruksjonen G og innrettingsenheten B for strømningslinjer. Strømningsnettverket for fluidum, heretter referert til som et oljerørsaggregat er i hovedsaken vel kjent innen feltet som en strømningskontrollinnretning for fluidum for å kontrollere fluidumstrømmen ut av et oljeboringshull. Oljerørs-aggregatet P som benyttes i foreliggende oppfinnelse, inkluderer en hovedhusdel 21 som er tilpasset for å bli montert.over den sentrale husdelen 10 av føringskonstruksjonen G for å kontrollere fluidumstrømmen ut av oljeboringshullet. Oljerørsaggregatet P inkluderer tre oljerørsstrømningslinjer F-l, F-2bg F-3 som After the alignment unit B for flow lines has been lowered along the guide lines 12 and placed on the guide structure G, an oil pipe assembly P or a network for fluid flow is lowered along the guide lines 12 and placed on the guide structure G and the alignment unit B for flow lines. The fluid flow network, hereinafter referred to as an oil pipe assembly is generally well known in the art as a fluid flow control device for controlling fluid flow out of an oil well. The oil pipe assembly P used in the present invention includes a main housing part 21 which is adapted to be mounted over the central housing part 10 of the guide structure G to control the fluid flow out of the oil wellbore. The oil pipe assembly P includes three oil pipe flow lines F-l, F-2bg F-3 which

terminerer i en strømningslinjeflens 22 av oljerørsaggregatet. terminates in a flow line flange 22 of the oil pipe assembly.

Strømningslinjeflensen 22 av oljerørsaggregatet er i virkeligheten en enhet som inkluderer en flensdel eller boks 22d som er tilpasset for å motta endedelene av hver av strømnings-linjene F-l, F-2 og F-3. Til strømnings linjeflensen er det, The flow line flange 22 of the oil pipe assembly is actually a unit that includes a flange portion or box 22d adapted to receive the end portions of each of the flow lines F-1, F-2 and F-3. For the flow line flange it is,

på en måte som skal bli beskrevet nedenfor, tilknyttet en fjernbar pakningsplateenhet 23 som sørger for å danne den flui-dumforseglede forbindelsen mellom strømningslinjeflensen 22 av oljerørsaggregatet og lagerstrømningslinjen F. Strømnings-linjene F-l, F-2 og F-3 av oljerørsaggregatet er også samlet i en muffeinnretning 24 som er glidbart montert inne i en førings-hylse 25 for strømningslinjer og festet til huset 21 av oljerørs-aggregatet. På denne måten er delene av strømningslinjene F-l, F-2 og'F-3 mellom muffeinnretningen 24 og strømnings linjeflensen 22 av oljerørsaggregatet, likesom selve flensen, montert for å in a manner to be described below, associated with a removable packing plate assembly 23 which provides for forming the fluid-sealed connection between the flow line flange 22 of the oil pipe assembly and the bearing flow line F. The flow lines F-1, F-2 and F-3 of the oil pipe assembly are also assembled in a sleeve device 24 which is slidably mounted inside a guide sleeve 25 for flow lines and attached to the housing 21 of the oil pipe assembly. In this way, the parts of the flow lines F-1, F-2 and'F-3 between the sleeve device 24 and the flow line flange 22 of the oil pipe assembly, like the flange itself, are mounted to

kunne beveges i en i det vesentlige horisontal retning, en retning som i det vesentlige er perpendikulær på den - vertikale . could be moved in an essentially horizontal direction, a direction which is essentially perpendicular to the - vertical.

hovedaksen for hovedhusdelen 21 av oljerørsaggregatet. Som tid- • ligere kjent bøyer de krumme strømningslinjene F-l, F-2 og F-3 seg for å tillate bevegelse av de i det vesentlige horisontale anbragte endedeler som understøttes av underdelen 24 av olje-rørsaggregatet og strømningslinjeflensen 22 av oljerørsaggre-gatet.. the main axis of the main housing part 21 of the oil pipe assembly. As previously known, the curved flow lines F-1, F-2 and F-3 bend to allow movement of the substantially horizontally disposed end portions which are supported by the lower portion 24 of the oil pipe assembly and the flow line flange 22 of the oil pipe assembly.

Oljerørsaggregatet T blir senket ned langs førings-linjene 12 ved hjelp av en hvilken som helst passende fremdrifts-innretning som er forbundet til en underdel plassert ved den øvre delen 21a av oljerørsaggregatet T. Når oljerørsaggregatet T The oil pipe assembly T is lowered along the guide lines 12 by means of any suitable propulsion device connected to a lower part located at the upper part 21a of the oil pipe assembly T. When the oil pipe assembly T

har blitt anbragt på føringskonstruksjonen G og innrettingsenheten B for strømningslinjer, blir strømningslinjeflensen 22 has been placed on the guide structure G and the alignment assembly B for flow lines, the flow line flange 22 becomes

av oljerørsaggregatet plassert i og understøttet av innrettingskanalen 17 mellom sidekanaldelene 17a og 17b. For å sentrere strømningslinjeflensen 22 av oljerørsaggregatet mellom sidekanaldelene 17a og-17b, er hver av sidekanaldelene 17a og 17b utstyrt med skrådde toppkanter henholdsvis 17f og 17g, for å virke'sammen med strømningslinjeflensen 22 av oljerørsaggregatet for korrekt innretting av flensen 22 mellom sidekanaldelene .17a og 17b. For ytterligere å fullføre denne innrettingen eller sentreringen of the oil pipe assembly placed in and supported by the alignment channel 17 between the side channel parts 17a and 17b. In order to center the flow line flange 22 of the oil pipe assembly between the side channel parts 17a and 17b, each of the side channel parts 17a and 17b is provided with beveled top edges 17f and 17g, respectively, to work together with the flow line flange 22 of the oil pipe assembly for correct alignment of the flange 22 between the side channel parts 17a and 17b. To further complete this alignment or centering

av strømningslinjeflensen 22 av oljerørsaggregatet i innrettingskanalen 17, er det sørget for skrådde deler 22a og'22b på en forbindelsesinnretning 26 for en strømningslinje, noe som vil bli of the flow line flange 22 of the oil pipe assembly in the aligning channel 17, beveled portions 22a and 22b are provided on a flow line connection device 26, which will be

beskrevet i større detalj nedenfor. Naturligvis inkluderer olje-rørsaggregatet T passende rammedeler slik som illustrert ved 27a, 27b, 27c og 27d som strekker seg utover fra hovedhusdelen 21 og terminerer i føringshylsene 28. Føringshylsene 28 muliggjør at oljerørsaggregatet T kan bli senket ned på føringslinjene .12 og tjene til å montere•oljerørsaggregatet T over føringssøylene 12' på en kjent måte. described in greater detail below. Naturally, the oil pipe assembly T includes suitable frame parts as illustrated at 27a, 27b, 27c and 27d which extend outward from the main body part 21 and terminate in the guide sleeves 28. The guide sleeves 28 enable the oil pipe assembly T to be lowered onto the guide lines 12 and serve to mount the oil pipe assembly T over the guide columns 12' in a known manner.

Oljerørsaggregatet T er'videre utstyrt med en andre hydraulisk terminal som-er angitt med tallet 29 og illustrert i figurene 7 og 17 for å sørge for fluidumforbindelse mellom oljerørsaggregatet og overflaten etter at den konvensjonelle hydrauliske manifold som er montert sammen med hovedhuset 21, har blitt dekket til. The oil pipe assembly T is further equipped with a second hydraulic terminal indicated by the numeral 29 and illustrated in Figures 7 and 17 to provide fluid communication between the oil pipe assembly and the surface after the conventional hydraulic manifold mounted with the main housing 21 has been covered up.

En hydraulisk kraftinnretning 30 strekker seg mellom føringshylsen 25 av muffeinnretningen og strømningslinje-flensen 22 for å sørge for hydraulisk kraft for å bevege strøm-ningslinjef lensen 22 av oljerørsaggregatet i en i det vesentlige horisontal retning inn i og ut av kanalen 17. Den hydrauliske kraftenheten 30 er dreibart montert på en monteringsplate 21a festet til hovedhuset 21 av oljerørsaggregatet og videre til en forbindelsesflens 22c av oljerørsaggregatet som er sveiset eller på annen måte festet til toppen av strømningslinjeflensen 22 av oljerørsaggregatet. Den hydrauliske sylinderenheten 30 A hydraulic power device 30 extends between the guide sleeve 25 of the sleeve device and the flow line flange 22 to provide hydraulic power to move the flow line flange 22 of the oil pipe assembly in a substantially horizontal direction into and out of the channel 17. The hydraulic power unit 30 is rotatably mounted on a mounting plate 21a attached to the main housing 21 of the oil pipe assembly and further to a connecting flange 22c of the oil pipe assembly which is welded or otherwise attached to the top of the flow line flange 22 of the oil pipe assembly. The hydraulic cylinder assembly 30

er dreibart forbundet ved hjelp av en hvilken som helst passende innretning som f.eks. ved forbindelsene med øvrer og bolter som is rotatably connected by means of any suitable device such as e.g. at the connections with uppers and bolts which

■ illustrert ved 30a, til monteringsplaten 21a og ved 30b til for-bindelsesflensen 22c av oljerørsaggregatet. Den dreibare forbindelsen ved 30a til monteringsplaten 21a av oljerørsaggregatet tillater at strømningsflensen 22 av oljerørsaggregatet kan dreies med hensyn til den hydrauliske enheten 30 i et horisontal-plan som illustrert på tegningene. Den dreibare forbindelsen ved 30b mellom den hydrauliske kraftenheten 30 og forbindelses-flensen 22c av oljerørsaggregatet muliggjør at strømningslinje-flensen 22 av oljerørsaggregatet kan bli dreiet i et vertikal-plan. På denne måten er den hydrauliske kraftenheten 30 i stand til å bevege strømningslinjeflensen 22 av oljerørsaggregatet inn- ■ illustrated at 30a, to the mounting plate 21a and at 30b to the connecting flange 22c of the oil pipe assembly. The rotatable connection at 30a to the mounting plate 21a of the oil pipe assembly allows the flow flange 22 of the oil pipe assembly to be rotated with respect to the hydraulic unit 30 in a horizontal plane as illustrated in the drawings. The rotatable connection at 30b between the hydraulic power unit 30 and the connecting flange 22c of the oil pipe assembly enables the flow line flange 22 of the oil pipe assembly to be rotated in a vertical plane. In this way, the hydraulic power unit 30 is able to move the flow line flange 22 of the oil pipe assembly in

over og utover i kanalen til tross for horisontale eller vertikale . variasj oner. i posisjonen av strømningslinjen. above and beyond in the channel despite horizontal or vertical . variations. in the position of the flow line.

Med henvisning til figur 11 blir anbringelsesen-With reference to figure 11, the placement

heten P for strømningslinjen senket ned langs føringslinjene 12 og anbragt på innrettingsenheten B for strømningslinjer på heat P for the flow line lowered along the guide lines 12 and placed on the aligning unit B for flow lines on

en måte som vil bli beskrevet i detalj nedenfor. Når utstyret P er anbragt ved borehullet, strekker wiren W seg fra far- a way that will be described in detail below. When the equipment P is placed at the borehole, the wire W extends from far

tøyet V til utstyret P og'fra utstyret P til leggeprammen L. Leggeprammen L blir deretter benyttet til'å legge strømnings-linjen S nedover til en posisjon nær. trekkutstyret P ved borehullet, the cloth V to the equipment P and from the equipment P to the laying barge L. The laying barge L is then used to lay the flow line S down to a position near. the pulling equipment P at the borehole,

Lagerstrømningslinjen S inkluderer i virkelighetenThe stock flow line S includes in reality

tre strømningslinjer S-l, S-2 og S-3 som terminerer i en lager-strømningslinjeflens 40. Lagerstrømningslinjeflensen 40 er V i virkeligheten en enhet som inkluderer en flensdel 40a som three flow lines S-1, S-2 and S-3 terminating in a bearing flow line flange 40. The bearing flow line flange 40 is actually a unit which includes a flange portion 40a which

mottar og understøtter endedelene av de tre lagerstrømnings-linjene S-l, S-2 og S-3. E-n bæreenhet, generelt angitt ved tallet 4l, er avtagbart montert på flensdelen 40a for å virke sammen med trekkutstyret P for strømningslinjer for først del- receives and supports the end portions of the three stock flow lines S-1, S-2 and S-3. E-n support unit, generally indicated by the number 4l, is removably mounted on the flange part 40a to work together with the draft equipment P for flow lines for first part-

vis plassering og deretter fullstendig plassering av flensdelenshow placement and then complete placement of the flange section

40a i innretningskanalen 17 av innrettingsenheten B for strøm-ningslinjer. Bæreenheten 4l inkluderer en anbringelses flens 42 40a in the alignment channel 17 of the alignment unit B for flow lines. The support unit 41 includes a mounting flange 42

som er dreibart montert på flensdelen 40a av lagerstrømnings-linjen og-en prøveenhet 43 som er dreibart montert på anbringelsesflensen 42. Anbringelsesflensen 42 inkluderer sidemonterings-plater 42a og 42b som er dreibart montert ved pinner 51e og 51f (beskrives nedenfor) på oppovergående ører 40b og 40c som strekker seg oppover fra toppen av flensdelen 40a av lagerstrømnings-' linjen. Den aktuelle dreieforbindelsen mellom anbringelsesflensen 42 og flensen -40 av lagerstrømningslinjen kan frigjøres ved en utløsbar dreibar forbindelsesinnretning generelt angitt ved tallet 44 i figur 18. Sidemonteringsplaten 42a og 42b er sveiset eller på annen måte forbundet til en sirkulær flensdel 42c, hvor-fra det strekker seg laterale innrettingspinner 42d.og 42e. En sylinderformet anbringelsesdel 42f er sveiset eller på annen måte festet ved sentrum av den .sirkulære flensen 42c (også referert til som en anbringelses flens). En forbindelsespinne 42g strekker seg utover fra den konusformede endedelen 42h av den sylindriske anbringelsesdelen og terminerer i en enhetlig ut- which is pivotally mounted on the flange portion 40a of the bearing flow line and a sample unit 43 which is pivotally mounted on the mounting flange 42. The mounting flange 42 includes side mounting plates 42a and 42b which are pivotally mounted at pins 51e and 51f (described below) on upward lugs 40b and 40c extending upwardly from the top of the flange portion 40a of the stock flow line. The actual pivot connection between the mounting flange 42 and the flange -40 of the bearing flow line can be released by a release pivot connection device generally indicated by the numeral 44 in Figure 18. The side mounting plates 42a and 42b are welded or otherwise connected to a circular flange portion 42c, from which it extends themselves lateral alignment pins 42d. and 42e. A cylindrical mounting portion 42f is welded or otherwise attached at the center of the circular flange 42c (also referred to as a mounting flange). A connecting pin 42g extends outwardly from the conical end portion 42h of the cylindrical mounting portion and terminates in a uniform out-

formet mutter 42i. Således er hele anbringelsesflensen 42 montert for dreibar bevegelse med hensyn til flensen 40 av lager-strømningslinjen. shaped nut 42i. Thus, the entire mounting flange 42 is mounted for rotatable movement with respect to the flange 40 of the bearing flow line.

Muffedelen 42 i.er utstyrt -med en spalte 42j som er et rett U-formet spor. Prøveenheten 43 inkluderer en nesedel 43a som består av en hul sylindrisk del 43b som danner en konusform nedover til et nesepunkt 43c. Den hule sylindriske nesedelen 43b inkluderer en kuleformet utskåret del 43d tilpasset for montering over muffen 42i. En pinne 43e er montert i den kuleformede utsparingen og strekker seg innover inn i spalten 42j i muffen 42i. Nesedelen er festet til wiren W ved en blybelagt sinkholder 43e. På denne måten er nesen 43a montert for dreibar bevegelse v i det minste i to plan med hensyn til forbindelsespinneri 42g. Imidlertid hindrer pinnen 43e i nesedelen 43a rotasjon av nesedelen 43a med hensyn til muffen- 42i. Dersom f.eks. forbindelses-v pinnen 42g og resten av anbringelsesflensen 42 er anbragt i et horisontalt plan, vil nesedelen 43a være dreibar i et horisontalt plan og et vertikalt plan, men det vil bli hindret"av pinnen 43e fra å bli tvunnet eller rotert med eller mot urviserne. The sleeve part 42i is equipped with a slot 42j which is a straight U-shaped groove. The sample unit 43 includes a nose part 43a which consists of a hollow cylindrical part 43b which forms a cone shape downward to a nose point 43c. The hollow cylindrical nose portion 43b includes a spherical cutout portion 43d adapted for mounting over the sleeve 42i. A pin 43e is mounted in the spherical recess and extends inwardly into the slot 42j in the sleeve 42i. The nose part is attached to the wire W by a lead-coated zinc holder 43e. In this way, the nose 43a is mounted for rotatable movement v at least in two planes with respect to the connecting pin 42g. However, the pin 43e in the nose portion 43a prevents rotation of the nose portion 43a with respect to the sleeve 42i. If e.g. connecting pin 42g and the rest of the attachment flange 42 are arranged in a horizontal plane, the nose part 43a will be rotatable in a horizontal plane and a vertical plane, but it will be prevented by the pin 43e from being twisted or rotated clockwise or counterclockwise .

Flensdelen 40 av lagerstrømningslinjen inkluderer videre en tilnærmet T-formet låseinnretning 45 for å låse flensen av lagerstrømningslinjen i de tilnærmet T-formede spaltene 17d og 17e i henholdsvis delene 17a og 17b av sideinnret-ningskanalen. Med henvisning til figuren 19 inkluderer den i det vesentlige T-formede låseinnretningen 45 en vertikal låsedel 45a og en horisontal låsedel 45b som er fjærende montert i sidene av strømningslinjeflensen 40a og som blir presset ut av denne ved hvilken som helst passende fjærende innretninger, slik som fjærer 45c er plassert mellom strømningslinjeflensen 40a og låsedelene, slik som '45b. The flange portion 40 of the bearing flow line further includes an approximately T-shaped locking device 45 for locking the flange of the bearing flow line in the approximately T-shaped slots 17d and 17e in the portions 17a and 17b, respectively, of the lateral device channel. Referring to Figure 19, the substantially T-shaped locking means 45 includes a vertical locking member 45a and a horizontal locking member 45b which are resiliently mounted in the sides of the flow line flange 40a and which are forced out of it by any suitable resilient means, such as springs 45c are placed between the flow line flange 40a and the locking members, such as '45b.

Etter at strømningslinjeflensen 40a er anbragt i innrettingskanalen 17 i en posisjon av tilnærmet fullstendig innretting med flensen 22 av oljerørsaggregatet, blir bæreenheten 4l frigjort fra forbindelse med strømningslinjeflensen 40a av oljerørsaggregatet. Før slik frigjøring blir strømningslinjene S-l, S-2 og S-3 uavhengig presset av prøveflensenheten 50,- som deretter blir fjernet med bæreenheten 4l. After the flow line flange 40a is placed in the alignment channel 17 in a position of almost complete alignment with the flange 22 of the oil pipe assembly, the support unit 4l is released from connection with the flow line flange 40a of the oil pipe assembly. Before such release, the flow lines S-1, S-2 and S-3 are independently pressed by the test flange unit 50, which is then removed with the support unit 4l.

Prøveflensen 50 er avtagbart montert til frontsiden 40d av lagerstrømningslinjen og er dessuten festet til bæreen heten 4l. Det er sørget for prøveflensen 50 for uavhengig prøv-ing av strømningslinjene S-l, S-2 og S-3 etter at strømningslinje-flensen 40 har blitt anbragt i innrettingskanalen 17 på innrettingsenheten B for strømningslinjer. Denne uavhengige prøvingen av strømningslinjene S-l, S-2 og S-3 blir fullført før det etableres en forseglet fluidumforbindelse mellom strømningslinje-flensen 22 av oljerørsaggregatet og flensen 40 av lagerstrømnings-linjen. The test flange 50 is removably mounted to the front side 40d of the bearing flow line and is also attached to the carrier 4l. The test flange 50 is provided for independent testing of the flow lines S-1, S-2 and S-3 after the flow line flange 40 has been placed in the alignment channel 17 of the alignment unit B for flow lines. This independent testing of flow lines S-1, S-2 and S-3 is completed before a sealed fluid connection is established between flow line flange 22 of the oil tube assembly and flange 40 of the bearing flow line.

Prøveflensen 50 inkluderer en plate 50a som er tilpasset for plassering nær frontsiden 40d av lagerstrømningslinjen. En topplate 50b og to sideplater 50c er montert henholdsvis til toppen og sidene 40e av strømningslinjeflensen, slik at strøm-nings linj ef lensen kan bli plassert over toppen og sidene av flensen av lagerstrømningslinjen. Sideplatene 50c for prøve-flensen inkluderer et longitudinalt spor 50d som er tilpasset x for å motta en korresponderende longitudinal kam 46 på hver side av flensen av lagerstrømningslinjen. Videre terminerer side-flatene 50c i holdekammer eller ører 50e, som strekker seg- innover mot de horisontale holdeinnretninger 45b av de tilnærmet T-formede låsedelene 45 som er montert på strømningslinjeflensen. 40a. Ørene 50e på sideplatene 50c av prøveflensen tjener til å holde de horisontale låsedelene 45b inne og derved yte av de korresponderende horisontale sporpartiene på de T-formede sporene, slik som 17b i delen 17a av innrettingssidekanalen. Dette gjør at strømningslinjeflensen 40 kan fjernes ved en vertikal løftekraft før fjerning av prøveflensenheten 50. En sentermon-teringsplate 50f er sveiset eller på annen måte festet til topp-platen 50b av prøveflensen for fjernbar festing av prøveflens-enheten 50 med flensen 40a av lagerstrømningslinjen og for festing av prøveflensenheten 50 til bæreenheten 4l. The sample flange 50 includes a plate 50a adapted for placement near the front side 40d of the bearing flow line. A top plate 50b and two side plates 50c are respectively mounted to the top and sides 40e of the flow line flange so that the flow line flange can be positioned over the top and sides of the bearing flow line flange. The side plates 50c of the sample flange include a longitudinal groove 50d adapted to x to receive a corresponding longitudinal cam 46 on each side of the flange of the bearing flow line. Furthermore, the side surfaces 50c terminate in holding chambers or ears 50e, which extend inwards towards the horizontal holding devices 45b of the approximately T-shaped locking parts 45 which are mounted on the flow line flange. 40a. The lugs 50e on the side plates 50c of the test flange serve to retain the horizontal locking portions 45b and thereby yield the corresponding horizontal groove portions of the T-shaped grooves, such as 17b in the portion 17a of the alignment side channel. This allows the flow line flange 40 to be removed by a vertical lifting force prior to removal of the sample flange assembly 50. A center mounting plate 50f is welded or otherwise attached to the top plate 50b of the sample flange for removably attaching the sample flange assembly 50 to the flange 40a of the bearing flow line and for attaching the test flange unit 50 to the carrier unit 4l.

Den fjernbare dreieforbindelsesinnretningen 44The removable pivot connection device 44

sørger for en avtagbar dreibar forbindelse mellom anbringelsesf lensen 42 og strømningslinjef lensen 40a. Den avtagb.are drei- provides a removable pivotable connection between the mounting flange 42 and the flow line flange 40a. The removable rotating

bare forbindelsesinnretning 44 frigjør videre prøveflensen 50only connecting device 44 further releases the test flange 50

fra prøveposisjonen som illustrert i figur 19. En bevegelig avtagbar pinne, generelt angitt ved tallet 513er montert i sideplatene 42a og 42b av anbringelsesflensen og strekker seg gjen- from the test position as illustrated in Figure 19. A movable removable pin, generally designated by the numeral 513, is mounted in the side plates 42a and 42b of the mounting flange and extends re-

nom de oppovergående ørene 40d og 40c av lagerstrømningslinje-flensen for å sørge for en avtagbar forbindelse mellom anbring- nom the upward ears 40d and 40c of the bearing flowline flange to provide a remov-

elsesflensen 42 og strømningslinjeflensen 40a. Den avtagbare forbindeisesinnretningen inkluderer følgende elementer som er montert for bevegelse som en avtagbar pinneenhet. En aktiver-ingspinne 51a er glidbart montert i bæreflaten 42b. Aktiva-toren.51a blir operert ved å'aktivisere den hydrauliske kraftenheten 52 som inkluderer en stangdel 52a i posisjon for å the else flange 42 and the flow line flange 40a. The removable connecting device includes the following elements which are mounted for movement as a removable pin assembly. An activation pin 51a is slidably mounted in the support surface 42b. The activator 51a is operated by activating the hydraulic power unit 52 which includes a rod part 52a in position to

stikke frem slik at den kontakter og i virkeligheten beveger eller forflytter aktiveringspinnen 51a.. Aktiver.ingspinnen 51a er festet til en første forbindelsesplate 51b som er plassert mellom sentermonteringsplaten 50f av prøveflensen og sidemonteringsplaten 42b av anbringelsesflensen. Forbindelsesplaten 51b er festet til en holdepinne 51c som.strekker seg gjennom den bueformede spalten 50g i sentermonteringsplaten 50f av prøveflensen og som ytterligere strekker seg gjennom.side-monter ingsplaten 42a av anbringelsesf lensen. E-n andre for- v bindelsesplate 51b er festet til holdepinnen 51c på utsiden av sidemonteringsplaten 42a av anbringelsesflensen. Forbindelsesplaten er også festet til en fjernbar pinne 51e som i figur 18 protrude so that it contacts and actually moves or displaces the activation pin 51a. The activation pin 51a is attached to a first connection plate 51b which is located between the center mounting plate 50f of the test flange and the side mounting plate 42b of the mounting flange. The connection plate 51b is attached to a retaining pin 51c which extends through the arcuate slot 50g in the center mounting plate 50f of the test flange and which further extends through the side mounting plate 42a of the mounting flange. A second connecting plate 51b is attached to the retaining pin 51c on the outside of the side mounting plate 42a of the attachment flange. The connection plate is also attached to a removable pin 51e as in figure 18

■strekker seg inn i en åpning i den oppståend-e øredelen 40b av flensen. Den første forbindelsesplaten 51b'-av den fjernbare pinneénheten 51 er festet til -en fjernbar pinne 51f som strekker seg gjennom en åpning i den oppstående øredelen-40c på flensdelen 40a av lagerstrømningslinjen. Ytterligere er en-holdepinne og en hylsekombinasjon 51g festet til den første forbindelsesplaten 51b og strekker seg gjennom en åpning 51h i sentermonteringsplaten 51f av prøveflensen. ■extends into an opening in the emerging ear part 40b of the flange. The first connection plate 51b' of the removable pin unit 51 is attached to a removable pin 51f extending through an opening in the upstanding ear portion 40c of the flange portion 40a of the bearing flow line. Furthermore, a holding pin and a sleeve combination 51g is attached to the first connection plate 51b and extends through an opening 51h in the center mounting plate 51f of the test flange.

Den fjernbare pinnen eller forbindelsesenheten 51 fester på en fjernbar måte anbringelses flensenheten 42 og prøve-flensenheten 50 med flensen 40 av lagerstrømningslinjen. Den sammenbundne' posisjon er illustrert i figur 18. Etter at strøm-ningslinjef lensen 40a har blitt anbragt i en posisjon av tilnærmet fullstendig innretting i innrettingskanalen 17a med strømnings linjeflensen 22 av oljerørsaggregatet, blir den hydrauliske sylinderenheten 42a aktivisert fra et fjerntliggende sted for å drive stangen 52a i kontakt med aktiviseringspinnen 51a for derved å bevege hele den fjernbare pinneénheten til en frigjørings-posisjon hvor frigjøringspinnene -51e og 51f har blitt beveget ut av henholdsvis de oppstående ørene "40b og 40c av strømningslinje-flensen. Bevegelse av frigjøringspinnene 51e og 51f ut av de opp stående ørepartiene 40b og 40c frigjør hele bæreenheten 4l, inkludert anbringelsesflensen og prøveflensen, for å kunne føre vekk den anbragte strømningslinjeflensen 40a, og denne vil bli anbragt på en måte som skal bli beskrevet nedenfor. The removable pin or connector assembly 51 removably attaches the mounting flange assembly 42 and the test flange assembly 50 with the flange 40 of the stock flow line. The 'connected' position is illustrated in Figure 18. After the flow line flange 40a has been placed in a position of almost complete alignment in the alignment channel 17a with the flow line flange 22 of the oil pipe assembly, the hydraulic cylinder assembly 42a is actuated from a remote location to operate the rod 52a in contact with the actuating pin 51a to thereby move the entire removable pin assembly to a release position where the release pins 51e and 51f have been moved out of the upstanding ears 40b and 40c of the flow line flange, respectively. Movement of the release pins 51e and 51f out of the raised ear portions 40b and 40c release the entire support unit 4l, including the mounting flange and the test flange, to be able to lead away the mounted flow line flange 40a, and this will be mounted in a manner to be described below.

Før fjerning av prøveflensenheten 50 blir strøm-ningslinjef lensene S-l, S-2 og S-3 prøvet individuelt for å be-stemme om det er noen lekkasjer eller andre problemer i strøm-ningslinjene som har blitt lagt fra leggeprammen L ned til borehullet. Man må være klar over at noen av.de tidligere benyttede prøver ikke sørget for prøving av de nedlagte strømningslinjene S-l, S-2 og S-3 før etter forbindelsen med oljerørsaggregatet. Prior to removal of the test flange assembly 50, the flow line flanges S-1, S-2 and S-3 are tested individually to determine if there are any leaks or other problems in the flow lines that have been laid from the laying barge L down to the borehole. One must be aware that some of the previously used samples did not provide for testing the closed flow lines S-1, S-2 and S-3 until after the connection with the oil pipe assembly.

Ved imidlertid å benytte prøveflensenheten ifølge foreliggende oppfinnelse,.kan strømningslinjene S-l, S-2 og S-3 bli prøvet før det etableres forbindelse, og derved isoleres et hvilket som helst problem med strømningslinjene før forbindelse med den gjenværende del av systemet. However, by using the test flange assembly according to the present invention, the flow lines S-1, S-2 and S-3 can be tested before connection is established, thereby isolating any problem with the flow lines before connection with the remaining part of the system.

Med henvisning til figur 19, inkluderer prøveflens-enheten 50 en sentral passasje 53 som strekker seg longitudinalt med strømningslinjeplaten 50a for å sørge for fluidumforbindelse mellom hver av strømningslinjene S-l, S-2 og S-3. Passende te-ringer, slik som 50h, hindrer at sjøvann trenger inn mellom platedelen 50a og flensenheten 40a. En pinne 54 som kan lage avtrykk og som har en konusformet spiss 54a, er montert inn i baksiden 53a av passasjen eller boringen 53 på linje med lager-strømningslinjen S-l. Spissen 54a som kan lage avtrykk, .er tilpasset til å motta en blokk av bløtt materiale slik som bly, som er montert til -en passende metallkloss eller annet trykkdiffer-ensutstyr som blir pumpet gjennom strømningslinjen S-l fra over-, flaten ned til prøveflensenheten 50. Dersom deri bløte materialblokken blir pumpet hele veien gjennom strømningslinjen S-l fra overflaten og ned til strømningslinjeflensen, vil den komme i kontakt med spissen 54a, som kan lage avtrykk, og derved dannes det et konusformet avtrykk i blokken. Reversert sirkulasjon gjennom en eller begge av de andre strømningslinjene S-2 og S-3 vil bevege den bløte materialblokken med det konusformede avtryk-ket, ut av strømningslinjen S-l slik at operatørene kan finne ut at blokken i virkeligheten har beveget seg hele veien gjennom hele strømningslinjen S-l, og derved forsikre seg om at det ikke Referring to Figure 19, the test flange assembly 50 includes a central passage 53 extending longitudinally with the flow line plate 50a to provide fluid communication between each of the flow lines S-1, S-2 and S-3. Appropriate tee rings, such as 50h, prevent seawater from penetrating between the plate part 50a and the flange unit 40a. An impression-making pin 54 having a cone-shaped tip 54a is fitted into the back 53a of the passage or bore 53 in line with the bearing flow line S-1. The impression-making tip 54a is adapted to receive a block of soft material such as lead, which is mounted to a suitable metal block or other pressure differential equipment which is pumped through the flow line S-1 from the upper surface down to the test flange assembly 50 If the block of material soaked in it is pumped all the way through the flow line S-1 from the surface down to the flow line flange, it will come into contact with the tip 54a, which can make an impression, and thereby a cone-shaped impression is formed in the block. Reverse circulation through one or both of the other flow lines S-2 and S-3 will move the soft block of material with the conical impression out of the flow line S-1 so that the operators can determine that the block has actually traveled all the way through the flow line S-l, thereby making sure that it does not

er noen hindringer i strømningslinjen S-l på noe sted..are there any obstacles in the flow line S-l at any place..

Et annet sted 55 hvor det kan lages avtrykk og som har en meiselformet spiss 55a, er montert på baksiden 53a av passasjen 53 for å motta og sørge for et meiselformet avtrykk i Another impression-making location 55 having a chisel-shaped tip 55a is mounted on the rear side 53a of the passage 53 to receive and provide a chisel-shaped impression in

en blokk av bløtt materiale som blir pumpet gjennom strømnings-linjen S-2. Pinnen 56 som kan lage avtrykk, er montert på bak-platen 53a av passasjen 53 i prøveflensenheten på linje med a block of soft material being pumped through flow line S-2. The pin 56 which can make an impression is mounted on the back plate 53a of the passage 53 in the test flange assembly in line with

strømningslinjen S-3 for å motta og for å lage et ringformet avtrykk'i en blikk av bløtt materiale ved hjelp av deri ringformede spissen 56a. Således kan hver av strømningslinjene S-l, S-2 og S-3 bli uavhengig prøvet fra overflaten for å.gi forsik-ring om at det■ikke er noen hindringer i strømningslinjene. Etter slik prøving blir prøveflensenheten 50 fjernet sammen med hele bæreenheten 4l fra tilknytning til strømningslinjef lensen 40 for å frigjøre strømningslinjeflensen 40 for forbindelse til strømningslinjeflensen 22 av oljerørsaggregatet. the flow line S-3 to receive and to make an annular impression in a sheet of soft material by means of therein annular tip 56a. Thus, each of the flow lines S-1, S-2 and S-3 can be independently sampled from the surface to ensure that there are no obstructions in the flow lines. After such testing, the test flange assembly 50 is removed together with the entire carrier assembly 41 from connection to the flow line flange 40 to release the flow line flange 40 for connection to the flow line flange 22 of the oil pipe assembly.

Detaljene av konstruksjonen av lagerstrømningslinjen S har nå blitt beskrevet. Flensen 40 av lagerstrømningslinjen The details of the construction of the stock flow line S have now been described. The flange 40 of the bearing flow line

har blitt beskrevet som avtagbart forbundet til en bæreinnret-ning som er tilpasset til å virke sammen med trekkutstyret P has been described as being removably connected to a carrying device which is adapted to work together with the traction equipment P

for strømningslinjer for en faktisk anbringelse av flensen 40for flow lines for an actual placement of the flange 40

av lagerstrømningslinjen i en posisjon i innrettingskanalen 17of the bearing flow line in a position in the alignment channel 17

som i det vesentlige er helt på linje med strømningslinjeflensen 22 av oljerørsaggregatet. For å fullføre denne manipulasjonen which is substantially completely aligned with the flow line flange 22 of the oil pipe assembly. To complete this manipulation

av lagerstrømningslinjen S til en posisjon med endelig innretting for forbindelse med strømningslinjeflensen 22 av oljerørsaggre-gatet, har det blitt funnet opp et trekkutstyr P for strømnings-linjer av spesiell konstruksjon og for spesiell bruk. of the bearing flow line S to a position of final alignment for connection with the flow line flange 22 of the oil pipe aggregate gate, a pulling device P has been invented for flow lines of special construction and for special use.

Anbringelsesenheten eller trekkenheten P for strøm-ningslinjer inkluderer en hovedrammeseksjon 60 som terminerer i føringshylser"6l og 62 som er tilpasset for montasje'over førings-konstruks j onens føringssøyler 11. Hovedrammeseksjonen. 60 inkluderer en sentral platedel 60a som er forbundet til en horisontalt-gående rørdel 60b som er sveiset til føringshylsene 6l og -62. The flow line application or pulling unit P includes a main frame section 60 which terminates in guide sleeves 61 and 62 which are adapted for mounting over the guide columns 11 of the guide structure. The main frame section 60 includes a central plate part 60a which is connected to a horizontal running pipe part 60b which is welded to the guide sleeves 6l and -62.

En forbindende underdel 60c er sveiset eller på annen måte festet'ved toppen av rammeplaten 60a for forbindelse med et passende fremdrif tsutstyr slik som en f reindriftsenhet for et bprerør re-presentert ved tallet 64. Rammeplatedelen 60a har en utsparing 60d for montering av en traktenhet som er generelt angitt ved tallet 65, for å manipulere bæreenheten 4l som er festet sammen med.flensen 40 av lagerstrømningslinjen. Horisontalt anbragte støtteplater 66a og.66b er sveiset eller på annen måte montert til bunnen av rammeplaten 60a på hver siden av det utsparte areale 60d for å sørge for støtte for den dreibare montering av traktenheten 65. Rammeplaten 60a har dermed på hver side utsparingen 60d, påmontert- anbringelseshjørneplater 67a og 67b som er anbragt for innføring i anbringelsesspaltene 18a og 19a på innréttings-kanaldelene 17a og 17b. På denne måten er hele trekkutstyret P for strømningslinjer plassert og innrettet med hensyn til innrettingsenheten B for strømningslinjer under nedsenkingen til innrettingsenheten B for strømningslinjer. A connecting lower part 60c is welded or otherwise fixed to the top of the frame plate 60a for connection with a suitable propulsion device such as a pure drive unit for a bpre tube represented by the numeral 64. The frame plate part 60a has a recess 60d for mounting a funnel assembly which is generally indicated by the numeral 65, to manipulate the carrier assembly 41 which is fixed together with the flange 40 of the bearing flow line. Horizontally placed support plates 66a and 66b are welded or otherwise mounted to the bottom of the frame plate 60a on each side of the recessed area 60d to provide support for the rotatable mounting of the funnel assembly 65. The frame plate 60a thus has on each side the recess 60d, fitted mounting corner plates 67a and 67b which are arranged for insertion into the mounting slots 18a and 19a of the fitting channel parts 17a and 17b. In this way, the entire flow line pulling equipment P is positioned and aligned with respect to the flow line alignment unit B during the immersion of the flow line alignment unit B.

En hydraulisk enhet 68 er montert ved hjelp av en hvilken som helst passende innretning til rammeplaten 60a i nærheten av en bevegelig låsedel 69, som også- er dreibart montert .til rammedelen 60a. Trekkutstyret P for strømningslinjer kan benyttes som et fremdriftsutstyr for å bevege innrettingsenheten B for strømlinjer nedover. Ved bruk som et fremdriftsutstyr, A hydraulic unit 68 is mounted by any suitable means to the frame plate 60a in the vicinity of a movable locking part 69, which is also rotatably mounted to the frame part 60a. The flow line traction device P can be used as a propulsion device to move the flow line alignment unit B downwards. When used as a propulsion device,

er låsedelen 69 låst inne i den utformede utsparing i kanalen l4b i innrettingsenheten B for strømningslinjer. Borerøret, repre-sentert ved 64, blir deretter benyttet til å gi en nedoverrettet bevegelse på føringslinjene 12 av trekkenheten for strømnings-linjer som har innrettingsenheten B for strømningslinjer festet til seg. Når innrettingsenheten B for strømningslinjer er plassert på føringskonstruksjonen G for strømningslinjer som tidligere beskrevet, blir den hydrauliske sylinderenheten 68 aktivisert til å dreie den bevegelige låsen 69 ut av sporet i kanal 14b slik at .trekkutstyret P kan bli returnert til overflaten for installasjon av oljerørsaggregat P. the locking part 69 is locked in the designed recess in the channel 14b in the aligning unit B for flow lines. The drill pipe, represented at 64, is then used to provide a downward movement on the guide lines 12 of the flowline pulling unit having the flowline alignment unit B attached thereto. When the flowline alignment assembly B is positioned on the flowline guide structure G as previously described, the hydraulic cylinder assembly 68 is actuated to rotate the movable latch 69 out of the slot in the channel 14b so that the pulling equipment P can be returned to the surface for installation of the oil pipe assembly P .

Traktenheten 65 er utstyrt for å trekke bæreenheten 4l. og flensen 40 for lagerstrømningslinjen innover til en posisjon som er delvis på linje med hensyn til strømningslinjeflensen 20a av oljerørsaggregatet og deretter til slutt til en posisjon med fullstendig innretting med denne. Traktenheten 65 virker-sammen med en fjernstyrt hydraulisk kraftinnretning 70 for å bevege flensen 40 for lagerstrømningslinjen til posisjonen med endelig innretting med flensen 20 av oljerørsaggregatet. The hopper unit 65 is equipped to pull the carrier unit 4l. and bearing flowline flange 40 inwardly to a position partially aligned with flowline flange 20a of the oil tube assembly and then finally to a position fully aligned therewith. The hopper assembly 65 works in conjunction with a remote hydraulic power device 70 to move the flange 40 of the bearing flow line to the position of final alignment with the flange 20 of the oil tube assembly.

Med henvisning til figurene 3, 5, 10, 12-16 og .21-22, inkluderer traktenheten 65 følgende elementer. Traktenheten 65 inkluderer en trakthylse 65a som er forbundet ved passende innretning med en forstørret traktflensdel 65b. len forstørrede traktflensdelen 65b inkluderer en konusformet eller avkortet kjegleformet mottagelsesoverflate 65c tilpasset for å motta anbringelsesf lensen 42c. Det er sørget for innrettingshull 65b og. 65e i den konusformede ringformede overflaten 65c for å motta innrettingspinner 42b og 42e som strekker seg lateralt fra anbringelsesf lensen 42c. Traktdelen 65a er montert på rammedelen 60a for dreibar bevegelse mellom en oppoverhellende posisjon, slik som illustrert i figur 53og en nedoverhellende posisjon, Referring to Figures 3, 5, 10, 12-16 and .21-22, the hopper assembly 65 includes the following elements. The funnel assembly 65 includes a funnel sleeve 65a which is connected by suitable means to an enlarged funnel flange portion 65b. The enlarged funnel flange portion 65b includes a conical or frustoconical receiving surface 65c adapted to receive the mounting flange 42c. Alignment holes 65b and. 65e in the conical annular surface 65c to receive alignment pins 42b and 42e extending laterally from the mounting flange 42c. The funnel part 65a is mounted on the frame part 60a for rotatable movement between an upwardly inclined position, as illustrated in figure 53, and a downwardly inclined position,

slik som illustrert i figurene 15, 16 og 21. Den dreibare monteringen av traktenheten inkludert traktenheten 655blir utført ved festingen av. vertikalplater slik som 71a på rammeplaten 60a y på hver side av utsparingen 60d. De vertikale platene har åp-■ ninger tilpasset for å motta pinner som strekker seg utover for dreibar kontakt med trakthylsen 65a. Pinnene som er plassert på hver side av trakthylsen 65a, er angitt ved tallet 72. De vertikale støtteplatene 71 strekker seg nedover og danner kontakt med og blir understøttet av de horisontale støtteplatene 66a og 66b som tidligere har blitt beskrevet som festet til bunnen av rammedelen 60a på hver side av utsparingen 60d. En støtteplate 73 for traktenheten er sveiset eller på annen måte montert til as illustrated in Figures 15, 16 and 21. The rotatable assembly of the funnel assembly including the funnel assembly 655 is accomplished by the attachment of. vertical plates such as 71a on the frame plate 60a y on each side of the recess 60d. The vertical plates have openings adapted to receive outwardly extending pins for pivotable contact with the funnel sleeve 65a. The pins located on each side of the funnel sleeve 65a are indicated by the numeral 72. The vertical support plates 71 extend downwardly and contact and are supported by the horizontal support plates 66a and 66b previously described as being attached to the bottom of the frame part 60a on each side of the recess 60d. A support plate 73 for the hopper assembly is welded or otherwise fitted to it

toppen av trakthylsen 65a og inkluderer sideplater 73a som dreier med den dreibart monterte trakthylsen 65a. Hydrauliske kraftsylindre 74 er montert på hver side. av utsparingen 60d i rammedelen 60a og strekker seg utover for dreibar forbindelse med støtte-platen 73 for å sørge for fjernstyrt hydraulisk kraft for å bevege hele traktenheten 65 mellom den oppover hellende posisjon og den nedover hellende posisjon. De hydrauliske kraftenhetene 74. er dreibart montert ved pinne- og øref orbindelser, slik- som the top of the funnel sleeve 65a and includes side plates 73a which rotate with the rotatably mounted funnel sleeve 65a. Hydraulic power cylinders 74 are mounted on each side. of the recess 60d in the frame member 60a and extends outwardly for pivotal connection with the support plate 73 to provide remote hydraulic power to move the entire hopper assembly 65 between the upwardly inclined position and the downwardly inclined position. The hydraulic power units 74. are rotatably mounted by pin and ear connections, such as

7-4a, til støtteplatene 66b og 66a. Det er også laget passende pinne- og øreforbindelser 74b mellom de hydrauliske kraftenhetene 74 .og sidestøtteplatene 73a sammen med trakthylsen 65a. 7-4a, to the support plates 66b and 66a. Appropriate pin and ear connections 74b have also been made between the hydraulic power units 74 and the side support plates 73a together with the funnel sleeve 65a.

Låseinnretningen 75 inkluderer et låseutstyr 75aThe locking device 75 includes a locking device 75a

som er montert inne i den hule traktseksjonen 65a for glidbar bevegelse med hensyn til traktseksjonen 65a. Hylsen -75a inkluderer en konusformet endedel 75b tilpasset for å danne sete for en korresponderende konusformet del 73a av prøveenheten 43. which is mounted inside the hollow funnel section 65a for sliding movement with respect to the funnel section 65a. The sleeve -75a includes a conical end portion 75b adapted to seat a corresponding conical portion 73a of the sample unit 43.

Låseinnretning 75c :er montert inne i det hule borehullet 75b av låsehylsen eller låseutstyret 75a for å låse den konusformede nesen 43c fast- i-borehullet 75d slik at hele prøveenheten 43 og anbringelsesflensenheten som er forbundet til denne, er bevege- Locking device 75c is mounted inside the hollow bore 75b of the locking sleeve or locking device 75a to lock the conical nose 43c in the bore 75d so that the entire test unit 43 and the attachment flange unit connected thereto are movable

lig med bevegelse av låseutstyret 75a. Låseutstyret 75a blir beveget hydraulisk ved hjelp av hydrauliske sylinderenheter 76 montert på hver side av traktseksjonen 65a. De hydrauliske sylindérenhetene 76 er passende montert til traktseksjonen 65a equal to movement of the locking device 75a. The locking device 75a is moved hydraulically by means of hydraulic cylinder units 76 mounted on each side of the funnel section 65a. The hydraulic cylinder assemblies 76 are suitably mounted to the hopper section 65a

på passende forbindelsesstolper som er forbundet til traktseksjonen 65a.. De hydrauliske kraftenhetene\er altså festet til en bakre utstyrsplate 75e som er montert på baksiden av låseutstyret eller låsehylsen 75a. Fremskaffelsen av hydraulisk fluidum on suitable connecting posts which are connected to the hopper section 65a.. The hydraulic power units are thus attached to a rear gear plate 75e which is mounted on the back of the locking gear or locking sleeve 75a. The procurement of hydraulic fluid

under trykk til kraftenhetene 76 sørger for glidbar bevegelse av' låseutstyret 75a ut av traktseksjonen 65a, og derved trekkes an- -'. bringelsesflensenheten 42 inn i traktdelen 65a og 65b. under pressure to the power units 76 provide for sliding movement of the locking device 75a out of the funnel section 65a, thereby pulling on. the bringing flange unit 42 into the funnel part 65a and 65b.

Wiren W er ført gjennom traktenheten inkludert traktseksjonen 65a og gjennom låserøret 75a og strekker seg oppover til operasjonsfartøyet på overflaten. Det er sørget for et skivenettverk 77 for å endre retningen på wiren fra sin retning gjennom traktenheten 65 og til en retning som strekker seg oppover til vannoverflaten. Skivenettverket 77 inkluderer en første skive 77a montert på den bakre rørplaten 75e. Denne The wire W is passed through the hopper assembly including the hopper section 65a and through the locking tube 75a and extends upwards to the operating vessel on the surface. A disk network 77 is provided to change the direction of the wire from its direction through the funnel assembly 65 and to a direction extending upwards to the water surface. The disk network 77 includes a first disk 77a mounted on the rear tube plate 75e. This

første skiven 77a er montert slik for bevegelse med låseutstyret 75a. En andre skive 77b er .montert på en støtteplate 77b festet sammen med traktseksjonen 65a. En tredje skive 77d er i virkeligheten montert på rammeplaten 60a for trekkutstyret for til slutt å rette wiren W oppover mot overflatefartøyet V. Hver av skivene er naturligvis montert -for rotasjon på en vel kjent måte. slik at wiren kan bli manipulert fra overflaten for å trekke bære- ( enheten 4l og flensen for lagerstrømningslinjen'innover til en posisjon med delvis innretting med hensyn til strømningslinje-flensen 22 av oljerørsaggregatet. first disc 77a is mounted in this way for movement with the locking device 75a. A second disk 77b is mounted on a support plate 77b fixed together with the funnel section 65a. A third sheave 77d is actually mounted on the frame plate 60a of the traction equipment to ultimately direct the wire W upwards towards the surface vessel V. Each of the sheaves is of course mounted for rotation in a well known manner. so that the wire can be manipulated from the surface to pull the support assembly 41 and the bearing flowline flange inward to a position of partial alignment with respect to the flowline flange 22 of the oil pipe assembly.

Traktseksjonen 65a inkluderer to sirkulære eller spiralformede overflater 49, hvorav en er illustrert i figur 14, The funnel section 65a includes two circular or helical surfaces 49, one of which is illustrated in Figure 14,

og som begynner ved frontenden 65a' ved bunnen av traktseksjonen og krummer seg etter en skrueformet vei og terminerer ved den bakre enden 65c av traktseksjonen 65a ved toppen av denne. De doble spiralformede overflatene 49 er tilpasset for å motta en vertikal innrettingspinne 43f som strekker seg utover fra hoved- and which begins at the front end 65a' at the bottom of the funnel section and curves along a helical path and terminates at the rear end 65c of the funnel section 65a at the top thereof. The double helical surfaces 49 are adapted to receive a vertical alignment pin 43f extending outwardly from the main

neseseksjonen 43b. På denne måten blir nesen 43a for prøveen-heten 43 hevet etter kamprinsippet eller gradvis presset til en vertikal posisjon etterhvert som låseutstyret 75a trekker nesen 43a av prøveenheten 43 videre innover slik at hele bæreenheten blir låst for bevegelse med traktenheten 65 og strømningslinje-, flensen 40 befinner seg i en vertikal posisjon for plassering mellom innretningskanaldelene 17a og 17b. nose section 43b. In this way, the nose 43a of the sample unit 43 is raised according to the comb principle or gradually pushed to a vertical position as the locking device 75a pulls the nose 43a of the sample unit 43 further inward so that the entire carrier unit is locked for movement with the funnel unit 65 and the flow line flange 40 is in a vertical position for placement between the device channel parts 17a and 17b.

Med spesiell henvisning til figurene 10, 12-16 ogWith particular reference to figures 10, 12-16 and

21 og 22, virker trekkutstyret P for strømningslinjer til å bevege bæreenheten 4l og flensen 40 av lagerstrømningslinjen til en posisjon med endelig innretting mellom innrettingskanaldelene 17a og 17b på følgende}-måte. Wiren W blir forbundet mellom overflatefartøyet V, traktenheten 65 og den konusformede nesedelen 4.3c før lagerstrømningslinjen S blir lagt eller- senket ned i vannet fra leggeprammen L. Lagerstrømningslinjen S blir lagt eller strukket utover fra leggeprammen L på en kjent måte. og strømningslinjen S blir endelig plassert slik at enden av strøm-ningslinjen som inkluderer bæreenheten 4l og flensen 40 av lager-strømningslinjen i det vesentlige blir plassert nær innrettingsenheten B for strømningslinjer. På dette tidspunkt-har oljerørs-aggregatet T og innrettingsenheten B for strømningslinjer allerede blitt senket langs føringslinjene 12 og anbragt på førings-konstruks j onen og innrettingsenheten B for strømningslinjer. 21 and 22, the flow line puller P acts to move the carrier assembly 4l and the flange 40 of the bearing flow line to a position of final alignment between the alignment channel portions 17a and 17b in the following} manner. The wire W is connected between the surface vessel V, the funnel unit 65 and the cone-shaped nose part 4.3c before the storage flow line S is laid or lowered into the water from the laying barge L. The storage flow line S is laid or stretched outwards from the laying barge L in a known manner. and the flow line S is finally positioned so that the end of the flow line including the carrier unit 41 and the flange 40 of the bearing flow line is placed substantially close to the flow line alignment unit B. At this time, the oil pipe assembly T and the alignment unit B for flow lines have already been lowered along the guide lines 12 and placed on the guide construction and the alignment unit B for flow lines.

Wiren W strekker seg fra skiven 77d og danner forbindelse med en hvilken som helst passende wirekontrollinnretning som er i stand til å utøve en sterk trekkraft på wiren etter at trekkutstyret P for strømningslinjer er blitt senket og anbragt. The wire W extends from the sheave 77d and connects to any suitable wire control device capable of exerting a strong pulling force on the wire after the flow line pulling equipment P has been lowered and positioned.

Trekkutstyret. P for strømningslinjer blir senket langs- føringslinjene 12 ved hjelp av fremdriftsutstyr 64 for borerør eller ved hjelp av andre passende innretninger. Dersom det blir benyttet fremdriftsutstyr for borerør, kan wiren W bli anbragt inne i borerøret. Trekkutstyret for strømningslinjen blir innrettet med og anbragt på innrettingsenheten for strøm-ningslinjen på følgende måte. Sid.eføringshyIsene 6l og 62 blir montert over føringssøylene 11 som har mottatt føringshylsene fra både innrettingsenheten for strømningslinjer og oljerørsaggre-gatet. Anbringelseshjørnene 67a og 67b er anbragt i .henholdsvis spaltene l8a og 19a i innrettingskanaldelene 17a og 17b, og sørger derved for korrekt sentring av trekkutstyret P på innrettingsenheten B for strømningslinjer. Etter at trekkutstyret P The traction equipment. P for flow lines is lowered along the guide lines 12 by means of drill pipe propulsion equipment 64 or by means of other suitable devices. If propulsion equipment for drill pipe is used, the wire W can be placed inside the drill pipe. The traction equipment for the flow line is aligned with and placed on the alignment unit for the flow line in the following way. The side guide housings 61 and 62 are mounted above the guide columns 11 which have received the guide sleeves from both the alignment unit for flow lines and the oil pipe assembly. The attachment corners 67a and 67b are placed in the slots 18a and 19a, respectively, in the alignment channel parts 17a and 17b, and thereby ensure correct centering of the pulling equipment P on the alignment unit B for flow lines. After the pulling equipment P

er anbragt, blir trekkinnretningen for wiren ved overflaten aktivisert for å trekke wiren inntil et innsnitt eller annet forbind-elsespunkt på wiren blir festet ved trekkapparatet på overflaten slik at den innledende anbringelsesoppgaven kan.begynne. is placed, the wire pulling device at the surface is activated to pull the wire until a notch or other connection point on the wire is attached to the surface puller so that the initial placement task can begin.

Trekkapparatet for wiren ved overflaten blir aktivisert for å utøve en oppoverrettet trekkraft på wiren gjennom fremdriftsutstyret 64 for borerør for derved å bevirke at prøve-enheten 43, anbringelsesflensenheten 42 og flensen 40a av lager-strømningslinjen blir beveget innover mot de oppover skrånende traktseksjonene 65a og 65b'. Wiren blir trukket fra overflaten inntil nesen 43a av prøveenheten 43 blir trukket inn i .traktseksjonen 65a og videre inn i låsehylsen 75a og blir låst ved låse-elementet 75c. Ved dette tidspunktet har hele bæreenheten 41 The wireline pulling apparatus at the surface is activated to exert an upward pulling force on the wireline through the drill pipe propulsion equipment 64 to thereby cause the sample assembly 43, the mounting flange assembly 42 and the bearing flowline flange 40a to be moved inwardly toward the upwardly sloping hopper sections 65a and 65b '. The wire is pulled from the surface until the nose 43a of the sample unit 43 is pulled into the funnel section 65a and further into the locking sleeve 75a and is locked by the locking element 75c. At this point, the entire carrier unit has 41

med flensen 40 av lagerstrømningslinjen blitt beveget til en posisjon med delvis innretting med hensyn til strømningslinje--flensen 22 av oljerørsaggregatet. with flange 40 of the bearing flow line having been moved to a position of partial alignment with respect to flow line--flange 22 of the oil tube assembly.

Når trekkutstyret P ble anbragt på innrettingsenheten B for strømningslinjer, ble en andre hydraulisk terminal 78 som er montert på rammedelen 60a til trekkutstyret, plassert inn i den andre hydrauliske terminalen 29 på oljerørsaggregatet When the traction equipment P was placed on the flow line alignment unit B, a second hydraulic terminal 78 mounted on the frame part 60a of the traction equipment was placed into the second hydraulic terminal 29 of the oil pipe assembly

T. Hydraulisk forbindelse ble etablert mellom den andre hydrauliske terminalforbindelse 78 på trekkutstyret P ved bruk av innrettingspinner slik som 78a, illustrert i figur 17, som blir plassert inn i innrettingsborehull 29a på terminalforbindelsen til oljerørsaggregatet. Plasseringen av innrettingspinnene 78a inne i innrettingsborehullene 29a.tjener til å danne hydraulisk forbindelse mellom den klubbformede hydrauliske terminaldelen 78b og den hylseformede hydrauliske terminaldelen 29b på oljerørs-aggregatet T. Den andre hydrauliske terminalen 78a.på trekkutstyret blir forbundet ved passende fluidumlinjer med overflaten. Derved kan hydraulisk fluidum under trykk bli tilført gjennom T. Hydraulic connection was established between the second hydraulic terminal connection 78 on the draw gear P using alignment pins such as 78a, illustrated in Figure 17, which are placed into alignment bore holes 29a on the terminal connection to the oil pipe assembly. The placement of the alignment pins 78a within the alignment bores 29a serves to form a hydraulic connection between the club-shaped hydraulic terminal portion 78b and the sleeve-shaped hydraulic terminal portion 29b of the oil tube assembly T. The other hydraulic terminal 78a of the traction equipment is connected by appropriate fluid lines to the surface. Thereby hydraulic fluid under pressure can be supplied through

den andre klubbformede hydrauliske terminalen på trekkutstyret til den hylseformede hydrauliske terminalen på oljerørsaggregatet og til de hydrauliske mekanismene montert sammen med oljerørs-aggregatet slik som den hydrauliske kraftenheten 30 for manipulering av flensen 22 av oljerørsaggregatet. Dette eliminerer nødvendigheten av å måtte føre inn igjen den konvensjonelle the other club-shaped hydraulic terminal of the traction equipment to the sleeve-shaped hydraulic terminal of the oil pipe assembly and to the hydraulic mechanisms mounted together with the oil pipe assembly such as the hydraulic power unit 30 for manipulating the flange 22 of the oil pipe assembly. This eliminates the need to reinsert the conventional one

hydrauliske terminalen som er montert ved den øvre de.len 21a'the hydraulic terminal which is mounted at the upper part 21a'

av hovedhuset 21 av oljerørsaggregatet. Montert sammen med den andre hydrauliske terminalen 78 finnes en serie av hydrauliske fluidumsforbindelser som strekker seg fra over- of the main housing 21 of the oil pipe assembly. Mounted together with the second hydraulic terminal 78 is a series of hydraulic fluid connections extending from the upper

flaten og nedover- til hydraulisk fluidumforbindelse med de forskjellige hydrauliske kraftenhetene som er montert på the surface and downward to hydraulic fluid connection with the various hydraulic power units mounted on it

selve trekkutstyret P slik som den traktformede hydrauliske dreieenheten 74 og de hydrauliske låseenhetene 76. the traction equipment P itself such as the funnel-shaped hydraulic turning unit 74 and the hydraulic locking units 76.

Ved dette tidspunktet er bæreenheten 4l og flensenAt this point, the carrier unit 4l and the flange

40 av lagerstrømningslinjen delvis innrettet med hensyn til 40 of the stock flow line partially aligned with respect to

flensen 22 av oljerørsaggregatet. De hydrauliske kraftenheteneflange 22 of the oil pipe assembly. The hydraulic power units

76 blir nå aktivisert ved anvendelsen av hydraulisk fluidum fra 76 is now activated by the application of hydraulic fluid from

overflatefartøyet V for å bevege låseutstyret 75a ut fra traktseksjonen 65a for derved å trekke den sylindriske anbringelsesdelen 42f inn i traktseksjonen 65a. De hydrauliske sylindér-enhtene 76 beveger låseutstyret 75a inntil anbringelsesflensen 42c blir låst mot den ringformede konusformede endedelen 65b the surface vessel V to move the locking device 75a out from the hopper section 65a to thereby draw the cylindrical mounting part 42f into the hopper section 65a. The hydraulic cylinder units 76 move the locking device 75a until the locating flange 42c is locked against the annular conical end portion 65b

av trakten. Når anbringelsesflensenheten blir beveget innover, kontakter bolten eller innrettingspinnen 43f på nesen 43a en av de to skrueoverflåtene 49 og roterer derved gradvis nesen og resten av bæreenheten 4l til en vertikal posisjon. •Kontakten mellom innrettingspinnen 43f og en av de skrueformede overflatene 49 bevirker at prøveenheten 43 og anbringelsesf lensenheten og flensen av lagerstrømningslinjen blir beveget til en vertikal posisjon dersom den ikke allerede er i en vertikal posisjon, på grunn av den begrensede dreieforbindelsen mellom nesen 42a og forbindelsesmutteren 42i av anbringelsesf lensenheten 42. Når innrettingspinnen 43 har nådd den øvre endedelen 65c av den'skrueformede overflate 49, er anbringelsesflensen 42c i en posisjon slik at innrettingspinnene 42d og 42e er ført inn i innrettingsåpningene 65d og 65e i traktflensdelen .65b. Således blir nesen 43 og. anbringelses f lensen 42c beveget helt inn i en låst posisjon med hensyn til traktseksjonene 65a.og 65b slik at anbringelsesflensenheten blir låst for bevegelse med traktseksjonene 65a og 65b. of the tract. As the mounting flange assembly is moved inward, the bolt or alignment pin 43f on the nose 43a contacts one of the two screw surfaces 49, thereby gradually rotating the nose and the rest of the support assembly 4l to a vertical position. • The contact between the alignment pin 43f and one of the helical surfaces 49 causes the test assembly 43 and the mounting flange assembly and the flange of the bearing flow line to be moved to a vertical position if it is not already in a vertical position, due to the limited rotational connection between the nose 42a and the union nut 42i of the positioning flange assembly 42. When the alignment pin 43 has reached the upper end portion 65c of the helical surface 49, the positioning flange 42c is in a position such that the alignment pins 42d and 42e are inserted into the alignment openings 65d and 65e in the funnel flange portion 65b. Thus the nose becomes 43 and. the mounting flange 42c is fully moved into a locked position with respect to the funnel sections 65a and 65b so that the mounting flange assembly is locked for movement with the funnel sections 65a and 65b.

Med anbringelsesflensen 42c låst mot traktendesek-sjonen 65b, blir de hydrauliske sylindrene 74 aktivisert ved fjernkontroll til å skråstille traktseksjonene 65a og 65b ned over til de nederste skråttstilte posisjonene som er illustrert i figurene 15 og 16. Med henvisning til figur-16, inkluderer sidemonteringsplatene 42a og 42b for anbringelsesflensenheten 42 anbringelsesplater 80c og 80d (som er sveiset eller på annen måte festet til platene 42a og 42b) som er tilpasset for å anbringes henholdsvis på de øvre fronthjørnene 80a og 8.0b av innrettingskanaldelene 17a og 17b'. Anbringelseshjørnene 80a og 80b sørger for et rettvinklet anbringelseshjørne tilp.asset for å motta innsnittene 80 på hver av platene 80c og 80d. With the mounting flange 42c locked against the hopper end section 65b, the hydraulic cylinders 74 are actuated by remote control to tilt the hopper sections 65a and 65b down to the lower inclined positions illustrated in Figures 15 and 16. Referring to Figure 16, the side mounting plates include 42a and 42b for the mounting flange assembly 42 mounting plates 80c and 80d (which are welded or otherwise attached to the plates 42a and 42b) which are adapted to be mounted on the upper front corners 80a and 8.0b, respectively, of the alignment channel portions 17a and 17b'. The mounting corners 80a and 80b provide a right-angled mounting corner adapted to receive the notches 80 on each of the plates 80c and 80d.

Hver av innsnittene 80 inkluderer to anbririgelsesskuldre eller overflater som møtes i en rett vinkel. Denne anbringelsen av de rettvinklede innsnittene .80 av sidemonteringsplatene 42a,og 42b på anbringelseshjørnene 80a og 80b, tjener til å plassere flensdelen 40a i innrettingskanalen 17 mellom innrettingskanaldelene 17a og 17b. Strømningslinjen S inkludert strømnings-linjene S-l, S-2 og S-3>blir deretter manipulert til en horisontal posisjon, slik som illustrert i figur 15, slik at flense-delen 40a blir beveget til en i det vesentlige vertikal posisjon inne i innrettingskanalen og de vertikale låsedeler 45a beveges til vertikal posisjon i de T-formede spaltene 17c og 17d i inn-rettingskanaldelen. Dersom det er ønskelig, kan strømningslinjene S-l, S-2 og'S-3 bli beveget til en horisontal posisjon før drei-ingen av traktseksjonene 65a og 65b nedover til den nederste skråttstilte pdsisjon. I dette tilfellet vil den aktuelle drei-ing av traktenheten 65 anbringe strømningslinjeflensen i en i det vesentlige vertikal posisjon og de vertikale låsedelene 45a vil beveges inn i de T-formede spaltene 17c og 17c ved. anbringelsen av anbringelsesinnsnittene 80 mot hjørnedelene 17f og 17g. Når låsedelene 45a blir trykket utover av de tidligere fjærinn-retningene og inn i de vertikale delene av de T-formede spaltene 17c og 17d, er strømningslinjeflensen 40 i en posisjon av i det vesentlige fullstendig innretting med strømningslinjeflensen 22 av oljerørsaggregatet. Bevegelsen av strømningslinjeflensen Each of the recesses 80 includes two attachment shoulders or surfaces which meet at a right angle. This placement of the right-angled notches 80 of the side mounting plates 42a and 42b on the mounting corners 80a and 80b serves to position the flange portion 40a in the alignment channel 17 between the alignment channel portions 17a and 17b. The flow line S including the flow lines S-1, S-2 and S-3> is then manipulated to a horizontal position, as illustrated in Figure 15, so that the flange portion 40a is moved to a substantially vertical position within the aligning channel and the vertical locking parts 45a are moved to the vertical position in the T-shaped slots 17c and 17d in the alignment channel part. If desired, the flow lines S-1, S-2 and S-3 may be moved to a horizontal position prior to turning the funnel sections 65a and 65b downward to the lower inclined section. In this case, the relevant rotation of the funnel assembly 65 will place the flow line flange in a substantially vertical position and the vertical locking members 45a will be moved into the T-shaped slots 17c and 17c at. the placement of the placement notches 80 against the corner parts 17f and 17g. When the locking members 45a are pushed outward by the previous spring alignments and into the vertical portions of the T-shaped slots 17c and 17d, the flowline flange 40 is in a position of substantially complete alignment with the flowline flange 22 of the oil pipe assembly. The movement of the flow line flange

40 fra posisjonen med delvis innretting til posisjonen med fullstendig innretting har blitt fullført ved fjernkontrollerte hydrauliske mekanismer i motsetning til bruken av bare en wire. En av de mange fordelene med bruken av traktenheten 65a med dens hydrauliske aktiviserte kraftsylindre slik som 74, er at bruken av wiren for å danne denne endelige anbringelsesbevegelsen, blir 40 from the partially aligned position to the fully aligned position has been accomplished by remote controlled hydraulic mechanisms as opposed to the use of just a wire. One of the many advantages of using the hopper assembly 65a with its hydraulically actuated power cylinders such as 74 is that the use of the wire to produce this final positioning motion is

■ eliminert. Således er det ikke nødvendig å opprettholde noen form.for ledning under strekk mellom overflatefartøyet V og trekkutstyret P for .strømningslinjer under denne endelige inn-rettingsoperasjonen. I stedet for beveger i virkeligheten kraftinnretningen som aktiviseres fra .overflaten, men som er plassert i sin helhet på trekkutstyret, bæreenheten 4l til den endelige låste posisjon og inn i den endelige anbringelsesposisjon på innrettingskanalen 17a og 17b. Med henvisning til figur 20 har flensen 20 av lagerstrømningslinjen ut overgående- laterale ører 8la og 8lb som er tilpasset for<;>anbringelse på anbringelses-overflåtene 18a og 19a av innrettingskanalene. Disse lateralt utovergående ørene 8la og 8lb tjener til å virke sammen med innsnittene 80 for endelig vertikal plassering av strømningslinje-flensen 40a med; hensyn til flensen 22 av oljerørsaggregatet. ■ eliminated. Thus, it is not necessary to maintain any form of wire under tension between the surface vessel V and the towing equipment P for flow lines during this final alignment operation. Instead, the power device which is actuated from the surface, but which is located entirely on the traction equipment, actually moves the carrier unit 4l to the final locked position and into the final position of placement on the alignment channels 17a and 17b. Referring to Figure 20, the flange 20 of the bearing flow line has transition lateral ears 81a and 81b which are adapted for mounting on the mounting surfaces 18a and 19a of the alignment channels. These laterally outwardly extending ears 8la and 8lb serve to cooperate with the notches 80 for final vertical positioning of the flow line flange 40a with; regard to the flange 22 of the oil pipe assembly.

Den uavhengige prøvingen av strømningslinjene S-l, S-2 og S-33hvor prøveenheten 50. for strømningslinjer blir benyttet, blir i virkeligheten utført på dettetidspunkt. Etter at det har blitt funnet ut at strømningslinjene S-l, S-2 og S-3 ikke har hindringer eller besitter andre problemer, kan prøveen-heten 50 for strømningslinjer bli fjernet for å preparere flensen 40 av lagerstrømningslinjen for forbindelse til strømningslinje-flensen 22 av oljerørsaggregatet. Først blir den hydrauliske sylinderenheten 52 aktivisert for å bevege den avtagbare dreibare forbindelsesinnretningen fra den forbundne posisjon ifølge figur 18 til den frigjorte posisjon ifølge figur 20 for derved å frigjøre forbindelsen mellom anbringelsesflensenheten 42 og The independent testing of the flow lines S-1, S-2 and S-33 in which the flow line test unit 50 is used is actually performed at this time. After the flow lines S-1, S-2, and S-3 have been determined to be free of obstructions or other problems, the flow line test unit 50 may be removed to prepare the stock flow line flange 40 for connection to the flow line flange 22 of the oil pipe assembly. First, the hydraulic cylinder assembly 52 is actuated to move the removable pivotable connector from the connected position of Figure 18 to the released position of Figure 20 to thereby release the connection between the mounting flange assembly 42 and

.strømningslinjeflensen 40a. Med henvisning til figur 21 blir deretter hele trekkutstyret P for strømningslinjer hevet oppover, langs føringssøylene 11 for derved å løfte av prøveflensenheten 50 fra flensdelen 40a av lagerstrømningslinjen. De longitudi-nale sporane 50d i sideplatene 50c av prøveflensenheten 50 hviler .the flow line flange 40a. With reference to Figure 21, the entire pulling equipment P for flow lines is then raised upwards, along the guide columns 11 to thereby lift off the test flange unit 50 from the flange part 40a of the bearing flow line. The longitudinal grooves 50d in the side plates 50c of the test flange assembly 50 rest

på flensdelkammen 46 mens prøveflensenheten blir løftet utover. Avløftingen av prøveflensenheten 50 fra flensen 40a av lager-strømningslinjen frigjør den horisontale låseinnretningen 45b inn i de horisontale delene av de T-formede spaltene 17d og 17e i innrettingskanalen. Som tidligere beskrevet frigjør ikke den avtagbare dreibare forbindelsesinnretningen 44 prøveflensenheten 50 fra sin forbindelse med anbringelsesflensenheten 42, og denne on the flange part cam 46 while the test flange assembly is lifted outwards. The lifting of the test flange assembly 50 from the flange 40a of the bearing flow line releases the horizontal locking device 45b into the horizontal portions of the T-shaped slots 17d and 17e in the alignment channel. As previously described, the removable swivel connector 44 does not release the test flange assembly 50 from its connection with the mounting flange assembly 42, and this

gjenværende forbindelsen er naturligvis nødvendig for faktisk å kunne løfte opp prøveflensenheten. I den hensikt å forklare, forårsakes den virkelige gjenværende forbindelsen mellom anbringelsesf lensenheten 42 og prøveflensenheten 50 av bibeholdelsen av pinnene 51c og 51g i den sentrale monteringsplate 50f av prøve-flensenheten 50. the remaining connection is of course necessary to actually lift up the test flange assembly. For the purpose of explanation, the actual remaining connection between the mounting flange unit 42 and the test flange unit 50 is caused by the retention of the pins 51c and 51g in the central mounting plate 50f of the test flange unit 50.

Etter at prøveflensenheten 50 har blitt løftet fullstendig vekk fra flensen 40 av lagerstrømningslinjen, se figur 22, blir de hydrauliske kraftenhetene '74 aktivisert til igjen å heve traktenheten 65 til sin øvre posisjon. Hevingen av hele traktenheten til sin øvre posisjon beveger prøveflensenheten ut av veien slik at trekkutstyret T for strømningslinjer igjen kan bli senket ned og anbringes på innrettingsenheten B for strøm-ningslinjer. På dette tidspunkt er strømningslinjeflenseh 22\-av oljerørsaggregatet og flensen 40 av lagerstrømningslinjen i det vesentlige fullstendig innrettet mellom innrettingskanaldelene 17a og-17b og klar for forbindelse. After the test flange assembly 50 has been lifted completely away from the flange 40 of the bearing flow line, see Figure 22, the hydraulic power units '74 are activated to again raise the hopper assembly 65 to its upper position. The raising of the entire funnel assembly to its upper position moves the test flange assembly out of the way so that the flow line drawing equipment T can again be lowered and placed on the flow line alignment unit B. At this time, flow line flange 22 of the oil tube assembly and flange 40 of the bearing flow line are substantially fully aligned between alignment channel portions 17a and 17b and ready for connection.

Den fjernbare forseglingsplateenheten 23 er avtagbart og forseglet montert til frontsiden 22f av strømnings-linjeflensen 22d av oljerørsaggregatet. Den fjernbare forseg-lingsplatéenhet 23 inkluderer en forseglingsplate 23a som har forseglede forbindelsesringer 23b, .23c, 23d og 23e plassert i åpninger i forseglingsplaten. Forbindelsesringen -23b er mon- The removable seal plate unit 23 is removable and sealed mounted to the front side 22f of the flow line flange 22d of the oil pipe assembly. The removable seal plate assembly 23 includes a seal plate 23a having sealed connection rings 23b, 23c, 23d and 23e located in openings in the seal plate. The connecting ring -23b is mon-

tert i en åpning 23f i forseglingsplaten og er forseglet inne i denne ved 0-ring 23g. Forbindelsesringen 23b inkluderer ringformede kamdeler 23h og 23y som strekker seg utover fra begge sider av forseglingsplaten for å gripe inn i korresponderende spor som er konsentrisk plassert omkring endene av strømnings-linjene. i strømningslinjeflensene 22 og 40. På denne måten kan en forseglet forbindelse bli dannet mellom strømningslinjene s.lik som strømningslinjen F-l i strømningslinjef lensen 22 av oljerørsaggregatet og strømningslinjen S-l i flensen 40 av lagerstrømningslinjen. Forseglingsplaten 23 er avtagbar for erstatning eller reparering på en måte som vil bli beskrevet nedenfor. tert in an opening 23f in the sealing plate and is sealed inside this by 0-ring 23g. The connecting ring 23b includes annular cam portions 23h and 23y extending outward from both sides of the sealing plate to engage corresponding grooves concentrically located around the ends of the flow lines. in the flow line flanges 22 and 40. In this way, a sealed connection can be formed between the flow lines s.like the flow line F-1 in the flow line flange 22 of the oil pipe assembly and the flow line S-1 in the flange 40 of the bearing flow line. The sealing plate 23 is removable for replacement or repair in a manner that will be described below.

Den forseglede fluidumforbindelsen mellom strøm-ningslinjef lensen 22 av oljerørsaggregatet og flensen 40 av lagerstrømningslinjen blir dannet ved strømningslinjeforbind- eisen 26 som er illustrert i figurene 8, 9 og 23-26. Forbindelsesinnretningen 26 inkluderer to sideplater 26a og 26b som er festet til en kraftstempelenhet 27. Kraftstempelenheten 27 inkluderer et stasjonært stempel 27a som er montert på flensdelen 22d av oljerørsaggregatet og som strekker seg oppover fra dette. The sealed fluid connection between the flow line flange 22 of the oil tube assembly and the bearing flow line flange 40 is formed by the flow line connection 26 which is illustrated in Figures 8, 9 and 23-26. The connecting device 26 includes two side plates 26a and 26b which are attached to a power piston assembly 27. The power piston assembly 27 includes a stationary piston 27a which is mounted on the flange portion 22d of the oil tube assembly and which extends upwardly therefrom.

En sylinder 27b er montert over det stasjonære stemplet 27a iA cylinder 27b is mounted above the stationary piston 27a i

et forseglet forhold til dette ved hjelp av forseglingsringer slik som 27c, og sørger derved for et forseglet kammer 27d tilpasset for å motta hydraulisk fluidum under trykk. Tilførsel av hydraulisk fluidum inn i kammeret 27d på den måten som er illustrert i figur 8, bevirker at den hydrauliske hylsen 27b beveger seg oppover til frigjøringsposisjonen illustrert på figuren. I frigjøringsposisjonen blir de festede glideplatene 26a og 26b beveget til den øvre f rigj øringspos is j onen som er vist i figurene 8, 9>25 og 26. Tilførsel av.hydraulisk fluidum under det stasjonære stemplet 27 i kammeret 27d beveger den bevegelige sylinderen nedover til forbindelsesposisjonen som er illustrert i figurene 23 og 24. Hver av sideplatene 26a og 26b inkluderer avstandsplasserte innovergående øredeler eller Låseinnretninger 26d og 26e som har en inngangsutsparing. 26f mellom seg. a sealed relationship thereto by means of sealing rings such as 27c, thereby providing a sealed chamber 27d adapted to receive hydraulic fluid under pressure. Supply of hydraulic fluid into the chamber 27d in the manner illustrated in Figure 8 causes the hydraulic sleeve 27b to move upwardly to the release position illustrated in the figure. In the release position, the fixed slide plates 26a and 26b are moved to the upper release position shown in Figures 8, 9, 25 and 26. Supply of hydraulic fluid below the stationary piston 27 in the chamber 27d moves the movable cylinder downwards to the connection position illustrated in Figures 23 and 24. Each of the side plates 26a and 26b includes spaced inwardly extending lugs or latches 26d and 26e having an entrance recess. 26f between them.

Flensdelen 40a av lagerstrømningslinjen"inkluderer utovergående øredeler 40g og 40h som strekker seg utover fra flensdelsidene 40e av strømningslinjen. En inngangsutsparing 40i blir således dannet mellom det øvre øre 40g og det nedre øre. 40h. The flange portion 40a of the bearing flow line" includes outwardly extending ear portions 40g and 40h which extend outwardly from the flange portion sides 40e of the flow line. An entrance recess 40i is thus formed between the upper ear 40g and the lower ear 40h.

Med sideplatene 26a og 26b i den øvre frigjørings-posisjonen,. illustrert i figur 8, kan den hydrauliske kraftenheten 30 bli aktivisert gjennom den andre terminalforbindelsen, illustrert i figur 17, for å bevege strømningslinjeflensen 22 With the side plates 26a and 26b in the upper release position, . illustrated in Figure 8, the hydraulic power unit 30 may be actuated through the second terminal connection, illustrated in Figure 17, to move the flow line flange 22

av oljerørsaggregatet og forseglingsplateenheten 23 festet til denne, for inngrep med flensen 40 av lagerstrømningslinjen som er fullstendig på linje med denne. En forseglet fluidumforbindelse blir dannet mellom forseglingsplateenheten 23 og flensdelen' 40a av lagerstrømningslinjen ved innsettingen av forbindelses-ringkammene slik som 23i, inn i korresponderende spor som omgir strømningslinjene slik som S-l. Innrettingspinner 22i og 22j er plassert i innrettingshull 40j- og 40k. Innrettingspirinene 22i og 22j kan være konusformet for å sikre deres innføring inn i hul-lene, som også kan være konusformede. of the oil tube assembly and the seal plate assembly 23 attached thereto, for engagement with the flange 40 of the bearing flow line which is completely aligned therewith. A sealed fluid connection is formed between the seal plate assembly 23 and the flange portion' 40a of the bearing flow line by the insertion of the connecting ring cams such as 23i into corresponding grooves surrounding the flow lines such as S-1. Alignment pins 22i and 22j are placed in alignment holes 40j and 40k. The alignment pins 22i and 22j can be cone-shaped to ensure their introduction into the holes, which can also be cone-shaped.

Sideplatene 26a og 26b i den øvre frigjøringsposi-sjonen er på linje med flensdelen 40 av lagerstrømningslinjen slik at de øvre utovergående ørene 40g passerer gjennom sideplateut-sparingene 26f når forseglingsplaten 23 kommer i virkelig kontakt med frontsiden 40d av flensdelen 40a av lagerstrømningslinjen. Sideplateørene 26d og 26e har passert over flensørene 40h og 40i The side plates 26a and 26b in the upper release position are aligned with the flange portion 40 of the bearing flow line so that the upper outwardly extending ears 40g pass through the side plate recesses 26f when the seal plate 23 comes into actual contact with the front face 40d of the flange portion 40a of the bearing flow line. The side plate ears 26d and 26e have passed over the flange ears 40h and 40i

av lagerstrømningslinjen og er på den andre siden av disse.of the stock flow line and is on the other side of these.

Denne posisjonen er illustrert i figur 24. Hydraulisk fluidumThis position is illustrated in figure 24. Hydraulic fluid

blir deretter ført inn i kammeret 27 under det stasjonære stemp-is then introduced into the chamber 27 under the stationary piston

let 27c og beveger derved sylinderen 27b nedover og bevirker således at sideplatene beveges nedover til forbindelsesposisjonen i figur 24. I forbindelsesposisjonen kontakter sideplateørene 26d let 27c and thereby moves the cylinder 27b downwards and thus causes the side plates to be moved downwards to the connection position in Figure 24. In the connection position the side plate ears 26d

og 26e som strekker seg innover, flensørene 40g og 40h av lager- ■ strømningslinjen og låser strømningslinjeflensen 22 av oljerørs- and 26e which extend inwardly, the flanges 40g and 40h of the stock flow line and lock the flow line flange 22 of the oil pipe

aggregatet, plateenheten 23 av oljerørsaggregatet og flensen 40 av lagerstrømningslinjen i fluidumforseglet forbindelse. Man må legge merke til at sideplateørene 26d og 26e av forbindelsesinnretningen inkluderer indre kantf ormede' overflater slik som 26d' . som danner kontakt med komplementære kamformede overflater slik som 40h' på sidene av flensdelen 40a for å bevirke at strømnings-linj ef lensen 22 av oljerørsaggregatet beveges videre for å danne kontakt med forseglingsplateenheten og flensen 40 av lagerstrøm-ningslinjen når sideplatene blir beveget nedover til forbindelses-posis j onen. the assembly, the plate assembly 23 of the oil pipe assembly and the flange 40 of the bearing flow line in a fluid sealed connection. It should be noted that the side plate ears 26d and 26e of the connecting device include internal edge-shaped surfaces such as 26d'. which makes contact with complementary cam-shaped surfaces such as 40h' on the sides of the flange portion 40a to cause the flow line flange 22 of the oil tube assembly to be moved further to make contact with the seal plate assembly and the flange 40 of the bearing flow line as the side plates are moved down into connection -position j onen.

Forbindelsen av strømningslinjeflensen 22 av olje-■ rørsaggregatet med forseglingsplateenheten 23 og flensen 40 av lagerstrømningslinjen ved forbindelsesinnretningen 26 fullfører fluidumforbindelsen mellom oljerørsaggregatet T og lagerstrøm-ningslinjen S slikat oljefluidum kan bli overført fra borehullet til et lagerområde. Etter at flensene 22 og 40 har blitt bundet sammen på en forseglet måte, kan trekkutstyret P for strømnings-linjer bli fjernet langs føringslinjene 12 for derved å etterlate apparatet som illustrert i figur 1. The connection of the flow line flange 22 of the oil pipe assembly with the seal plate unit 23 and the flange 40 of the bearing flow line at the connection device 26 completes the fluid connection between the oil pipe assembly T and the bearing flow line S slick oil fluid can be transferred from the wellbore to a bearing area. After the flanges 22 and 40 have been bonded together in a sealed manner, the flow line puller P can be removed along the guide lines 12 to leave the apparatus as illustrated in Figure 1.

Det kan være ønskelig fra tid til tid å inspisere, reparere eller erstatte forseglingsplateenheten 23 som danner den forseglede fluidumforbindelsen mellom strømningslinjeflensen 22 og 40. Forseglingsplateenheten 23 kan bli fjernet.ved hjelp It may be desirable from time to time to inspect, repair or replace the seal plate assembly 23 which forms the sealed fluid connection between the flow line flanges 22 and 40. The seal plate assembly 23 may be removed using

av avtagerutstyret 90b som er illustrert 1 figurene 25 og 26.of the take-off device 90b which is illustrated in figures 25 and 26.

Først blir hydraulisk fluidum under trykk anvendt på forbind- elseskammeret 27d over det stasjonære stemplet 27a for å bevege den bevegelige sylinderen 27b oppover for derved å bevege.forbindelsesplatene 26a og 26b oppover til den øvre frigjørings-posisjonen. I frigjøringsposisjonen som altså er posisjonen' First, hydraulic fluid under pressure is applied to the connection chamber 27d above the stationary piston 27a to move the movable cylinder 27b upward to thereby move the connection plates 26a and 26b upward to the upper release position. In the release position which is therefore the position'

som tillater forbindelse av de to flensene, blir utsparingen 26f i forbindelsessideplatene 26a og 26b rettet inn med flens-øret 40g av lagerstrømningslinjen .slik at forbindelsesplatene 26a og 26b, såvel som flensen 22, kan bli beveget vekk fra flensen 40. Bevegelse av strømningslinjeflensen 22 av oljerørsaggregatet allowing connection of the two flanges, the recess 26f in the connecting side plates 26a and 26b is aligned with the flange ear 40g of the bearing flow line so that the connecting plates 26a and 26b, as well as the flange 22, can be moved away from the flange 40. Movement of the flow line flange 22 of the oil pipe assembly

vekk fra flensen 40 av lagerstrømningslinjen blir utført ved aktivisering av den hydrauliske kraftenheten 3-0 som beveger strøm--ningslinjeflensen 22 av oljerørsaggregatet i retning av pilen 93 og derved fører strømningslinjeflensen av oljerørsaggregatet til-bake og-vekk fra flensen av lagerstrømningslinjen. Naturligvis er alle bevegelsene av flensen 22 innenfor begrensningene som innrettingskanalen 17 utgjør ved dette tidspunkt. away from the flange 40 of the bearing flow line is performed by activating the hydraulic power unit 3-0 which moves the flow line flange 22 of the oil pipe assembly in the direction of arrow 93 and thereby leads the flow line flange of the oil pipe assembly back and away from the flange of the bearing flow line. Naturally, all the movements of the flange 22 are within the constraints imposed by the alignment channel 17 at this point.

Etter at strømningslinjeflensen 22 av oljerørsaggre-gatet har blitt beveget vekk fra flensen av lagerstrømningslinjen til posisjonen som er illustrert i figur 25, blir avtagerutstyret 90 .senket nedover på et hvilket som helst passende fremdriftsut-styt og blir plassert mellom de to flensene 22 og 40. Fremdriftsutstyret 90 inkluderer en konusformet pinne 90a som er konusformet for å kunne settes inn i dens hull 90g på forseglingsplaten 23a. Fremdriftsutstyret 90 inkluderer videre en lukkeinnretning 91 som inkluderer to sidelåsdeler 91a tilpasset for å lukkes After the flow line flange 22 of the oil tube aggre gate has been moved away from the flange of the bearing flow line to the position illustrated in Figure 25, the take-off device 90 is lowered downward on any suitable propulsion device and is placed between the two flanges 22 and 40 The drive gear 90 includes a cone-shaped pin 90a which is cone-shaped to be inserted into its hole 90g on the seal plate 23a. The propulsion device 90 further includes a closing device 91 which includes two side locking parts 91a adapted to be closed

over sideører-23n som strekker seg utover fra siden av forseglingsplatedelen 23a. over side lugs 23n extending outward from the side of the sealing plate portion 23a.

Låsedelene 91a er dreibart montert på avtagerutstyret 90b ved passende pinneforbindelser ved 91b. Låsedelene 91a strekker seg utover i en lateral retning mot forseglingsplateenheten 23 og inkluderer avtagerskulderen 91c og 91d som er maskinert i bunnpartiet av låsedelene. Låsedelene 91a blir holdt i en i det vesentlige lateral posisjon ved pinner 90c som strekker seg utover fra sidene av avtagerutstyret 90b. The locking parts 91a are rotatably mounted on the take-off equipment 90b by suitable pin connections at 91b. The locking members 91a extend outward in a lateral direction towards the seal plate unit 23 and include the take-off shoulders 91c and 91d which are machined into the bottom portion of the locking members. The locking members 91a are held in a substantially lateral position by pins 90c extending outwards from the sides of the take-off device 90b.

For å fjerne forseglingsplateenheten 23, blir den hydrauliske kraftinnretningen 30 aktivisert for å bevege strøm-■'ningslinjeflensen 22 av oljerørsaggregatet bakover og vekk fra flensen 40 av lagerstrømningslinjen. Etter at strømnings linjeflensen 40 av oljerørsaggregatet har blitt beveget til posi sjonen som er illustrert i figur 25, blir avtagerutstyret 90 satt inn mellom de to flensene 22 og 40. To remove the seal plate assembly 23, the hydraulic power device 30 is actuated to move the flow line flange 22 of the oil tube assembly rearward and away from the bearing flow line flange 40. After the flow line flange 40 of the oil pipe assembly has been moved to the position illustrated in figure 25, the take-off device 90 is inserted between the two flanges 22 and 40.

Med avtagerutstyret 90 plassert mellom strømnings-linjeflensen 22 av oljerørsaggregatet og 45. av lagerstrømnings-. linjen blir den hydrauliske kraftenheten 30 aktivisert for å bevege strømningslinjeflensen 22 av oljerørsaggregatet mot avtagerutstyret 90 og flensen 40 av lagerstrømningslinjen. Flensen 22 blir beveget til en posisjon for kontakt med avtagerutstyret , 90 slik at innrettingspinnen 22j blir satt inn i det korresponderende hullet 90a i delen 90b av avtagerutstyret. Låsedelene 91a blir beveget over sideørene 23n av forseglingsplaten når kraftenheten 30 beveger strømningslinjeflensen 22 og forseglings-' plateenheten 23 slik at det dannes kontakt med avtagerutstyret 90. Overflatene.91c og 91d av.låaseinnretningen blir beveget oppover-og over sideørene 23n til en sammenhuket posisjon med disse. With the take-off device 90 placed between the flow-line flange 22 of the oil pipe assembly and 45 of the bearing flow-. line, the hydraulic power unit 30 is activated to move the flow line flange 22 of the oil pipe assembly towards the take-off equipment 90 and the flange 40 of the bearing flow line. The flange 22 is moved to a position for contact with the take-off equipment, 90 so that the alignment pin 22j is inserted into the corresponding hole 90a in the part 90b of the take-off equipment. The locking parts 91a are moved over the side ears 23n of the sealing plate when the power unit 30 moves the flow line flange 22 and the sealing plate assembly 23 so that contact is made with the take-off device 90. The surfaces 91c and 91d of the locking device are moved up and over the side ears 23n to a crouched position with these.

Den hydrauliske sylinderenheten 30 blir deretter aktivisert for igjen å flytte strømningslinjeflensen- 22 av olje-rørsaggregatet bakover i retning av pilen 93- Når strømnings-linjeflensen 22 av oljerørsaggregatet blir flyttet bakover av kraften av den hydrauliske sylinderenheten 30, holder låseinnretningene 91 platedelen,23 av oljerørsaggregatet med avtagerutstyret og bevirker derved en skyvning av to sikringsstiftfor-bindelser 94 (figur 9) mellom strømningslinjeflensen 40a og platedelen 23a av oljerørsaggregatet. Sikringsstiftforbindelsene 94 inkluderer en første forbindelsespinne 94a som i virkelig- The hydraulic cylinder unit 30 is then activated to again move the flow line flange 22 of the oil pipe assembly rearward in the direction of the arrow 93- When the flow line flange 22 of the oil pipe assembly is moved rearward by the force of the hydraulic cylinder unit 30, the locking devices 91 hold the plate part,23 off the oil pipe assembly with the take-off equipment and thereby causes a push of two securing pin connections 94 (figure 9) between the flow line flange 40a and the plate part 23a of the oil pipe assembly. The fuse pin connectors 94 include a first connector pin 94a which in actual

heten forbinder platedelen 23a av oljerørsaggregatet til strøm-ningslinjef lensen 22a av oljerørsaggregatet. En fjærbelastet heat connects the plate part 23a of the oil pipe assembly to the flow line flange 22a of the oil pipe assembly. A spring loaded

■sikringsstift 94b blir presset fjærende inn i et spor i forbind- , elsespinnen 94a. Fastholdelsen av forseglingsplatedelen 23a med låsedelene 91a bevirker en' forsikringskraft som rettes mot sik-ringsstiftene 94b og som derved forårsaker at disse forskyves og frigjør forbindelsen mellom strømningslinjeflensen 22a av olje-rørsaggregatet og forseglingsplaten 23a. Dette frigjør -forseglingsplateenheten 23 for flytting med avtagerutstyret. Avtagerutstyret 90 opprettholder et tak på forseglingsplateenheten 23 ved en kombinasjon av låsedelene 91a og pinnen 22j som er satt inn i delen 90b av avtagerutstyret. En annen forseglingsplateen-het 23 kan bli ført langs et passende fremdriftsutstyr og satt inn mellom strømningslinjeflensen 20 av oljerørsaggregatet og ■securing pin 94b is pressed springily into a groove in the connecting pin 94a. The retention of the sealing plate part 23a with the locking parts 91a causes a securing force which is directed against the securing pins 94b and which thereby causes them to displace and release the connection between the flow line flange 22a of the oil pipe assembly and the sealing plate 23a. This frees the sealing plate assembly 23 for movement with the take-off equipment. The take-off device 90 maintains a cover on the sealing plate unit 23 by a combination of the locking parts 91a and the pin 22j which is inserted into the part 90b of the take-off device. Another sealing plate unit 23 may be passed along a suitable propulsion device and inserted between the flow line flange 20 of the oil pipe assembly and

flensen 40 av lagerstrømningslinjen ved å reversere trinnene i fremgangsmåten som nettopp er beskrevet for fjerning av utstyr. Sammendrag av arbeidsgangen. flange 40 of the stock flow line by reversing the steps of the equipment removal procedure just described. Summary of the workflow.

Apparatet A av foreliggende oppfinnelse blir benyttet for å danne en forseglet fluidumforbindelse mellom et oljerørs-aggregat T plassert på et undersjøisk borehull og en undervanns-strømningslinje som har blitt lagt til siden av borehullet. Sammendraget av arbeidsgangen inkludert. fremgangsmåten for å The apparatus A of the present invention is used to form a sealed fluid connection between an oil pipe assembly T placed on a subsea well and an underwater flow line that has been added to the side of the well. The summary of the workflow included. the procedure to

danne forbindelsen mellom borehullet og lagerområdet som er plassert på et annet sted, kan bli summert som følger. forming the connection between the borehole and the storage area located at another location can be summed up as follows.

Etter at borehullet har blitt boret og det har blitt bestemt at borehullet er en ønsket produksjonskilde, kan en før-ingskonstruksjon G for en strømningslinje bli senket ned fra overflatefartøyet V og montert til borehullet for å sørge for . j et føringssystem langs føringslinjene 12 som strekker seg til overflatefartøyet for de forskjellige arbeidsoppgavene som kan følge. Etter at en bestemmelse har blitt tatt med hensyn til retningen for å nærme seg med lagerstrømningslinjen S til borehullet, blir innrettingsenheten B for strømningslinjer senket ned.langs to'av føringslinjene 12 og ned til to nærliggende før-ingssøyler 11 som vil vende mot strømningslinjen S når denne blir lagt. Innrettingsenheten B for strømningslinjen blir ført nedover ved å benytte plasseringsenheten eller trekkutstyret P After the well has been drilled and it has been determined that the well is a desired source of production, a flowline guide structure G can be lowered from the surface vessel V and fitted to the well to provide . j a guidance system along the guidance lines 12 that extend to the surface vessel for the various work tasks that may follow. After a determination has been made as to the direction of approach with the bearing flow line S to the wellbore, the flow line alignment unit B is lowered along two of the guide lines 12 and down to two adjacent guide columns 11 which will face the flow line S when this is added. The alignment unit B for the flow line is guided downwards using the positioning unit or the pulling device P

for strømningslinjer ifølge foreliggende oppfinnelse.. Etter at innrettingsenheten B for strømningslinjer på en passende måte for flow lines according to the present invention.. After the aligning unit B for flow lines in a suitable way

er blitt anbragt på føringskonstruksjonen og låseinnretningenehave been placed on the guide structure and the locking devices

16 har huket seg bort på rammedelene lia av føringskonstruk-sjonen, kan den hydrauliske sylinderutløseren 68 bli aktivisert for å frigjøre låsen 69 fra kanaldelen l4b slik at trekkut- 16 has crouched away on the frame parts 1a of the guide construction, the hydraulic cylinder release 68 can be activated to release the lock 69 from the channel part 14b so that the

styret P for strømningslinjen kan bli returnert til overflaten. the guide P of the flow line may be returned to the surface.

Oljerørsaggregatet T blir deretter ført langs før-ingslinjene 12 i posisjon på føringskonstruksjonen G og innrettingsenheten B for strømningslinjer. Oljerørsaggregatet T blir plassert slik at. strømningslinjef lensen 22 av oljerørsaggregatet blir satt inn i innrettingskanalen 17 mellom innrettingskanal-~delene 17a og 17b. De krumme strømningslinjene F-l, F-2 og F-3 The oil pipe assembly T is then guided along the guide lines 12 into position on the guide structure G and alignment unit B for flow lines. The oil pipe assembly T is placed so that. the flow line flange 22 of the oil pipe assembly is inserted into the alignment channel 17 between the alignment channel parts 17a and 17b. The curved flow lines F-1, F-2 and F-3

er montert for glidbar bevegelse ved sine endedeler ved hjelp, av muffeinnretningen 24 som er montert i føringshyIsen 25- Dette tillater endog en viss aksial bevegelse av strømningslinjene og •strømningslinjeflensen 22 når strømningslinjeflensen er plassert mellom innrettingsdelene 17a og 17b, dersom det skulle være nød-vendig. is mounted for sliding movement at its end parts by means of the sleeve device 24 which is mounted in the guide housing 25. This even allows a certain axial movement of the flow lines and the flow line flange 22 when the flow line flange is placed between the aligning parts 17a and 17b, should there be an emergency turn around.

Lagerstrømningslinjen S blir nå lagt fra leggeprammen L ned til innrettingsenheten•B for strømningslinjer. En wire W The stock flow line S is now laid from the laying barge L down to the alignment unit•B for flow lines. A wire W

er forbundet til prøveenheten 43 når strømningslinjen blir lagt under vann. Wiren W strekker seg til overflatefartøyet V og gjennom traktenheten 65' av trekkutstyret P for strømningslinjer, som på dette tidspunkt er anbragt på. innrettingsenheten B for strømningslinjer. Fremgangsmåten for å bringe strømningslinjen S i nærheten av innrettingsenheten B og trekkutstyret P for strømningslinjer kan bli variert dersom det er ønskelig. Strekk-^' utstyret P for strømningslinjer blir deretter senket langs før-ingslinjene 12 og ned på innrettingsenheten B for strømnings-linjer .og blir anbragt på denne. På dette tidspunkt strekker v wiren W seg fra prøveenheten 43, gjennom traktseksjonene 65a og 65b, gjennom låserøret eller hylsen 75a og langs skivene 77a, is connected to the sample unit 43 when the flow line is submerged. The wire W extends to the surface vessel V and through the funnel unit 65' of the draft equipment P for flow lines, which at this point is placed on. alignment unit B for flow lines. The procedure for bringing the flow line S in the vicinity of the aligning unit B and the flow line pulling equipment P can be varied if desired. The tensioning equipment P for flow lines is then lowered along the guide lines 12 and onto the aligning unit B for flow lines and is placed on this. At this point, the v wire W extends from the test unit 43, through the funnel sections 65a and 65b, through the locking tube or sleeve 75a and along the washers 77a,

77b og 77d oppover til overflatefartøyet (gjennom .fremdrif tsut-styret 64 til borerøret) og blir forbundet til en passende kon-trollinnretning for wiren på overflatefartøyet. Denne kontrollinnretningen for wiren blir deretter operert til å trekke wiren W for derved å bevege prøveenheten 43/anbringelsesenheten 4l og flensen 40 av lagerstrømningslinjen som er festet sammen med denne, innover mot traktenheten 65 inntil nesedelen 43a blir låst inn i låsehylsen 75a ved låsedelene 75c. 77b and 77d up to the surface vessel (through the propulsion tsut guide 64 to the drill pipe) and are connected to a suitable control device for the wire on the surface vessel. This wire control device is then operated to pull the wire W to thereby move the test unit 43/applicator unit 4l and the flange 40 of the stock flow line attached thereto inwardly towards the funnel unit 65 until the nose part 43a is locked into the locking sleeve 75a by the locking parts 75c.

Hydraulisk kraft blir deretter anvendt via den hydrauliske sylinderenheten '76 for å bevege låserøret 75 bakover Hydraulic power is then applied via the hydraulic cylinder assembly '76 to move the locking tube 75 rearward

og ut av traktseksjonen 65 for derved å trekke i anbringelses-sylinderen 42f og anbringe anbringelsesflensen 42c opp på anbringelses seks j onen 65b til trakten med anbringelsespinnene 42d og 42e satt inn i anbringelseshullene 65d og 65e'. Etter hvert som prøveenheten 43 blir beveget innover, vil den vertikale innrettingspinnen 43f danne kontakt med en av to skrueformede overflater 49 som terminerer ved bakre topp 65c av traktseksjonen 65a. Dersom strømningslinjeflensen 40 således ikke er i en vertikal posisjon, vil innrettingspinnen 43b på, prøvedelen 43a danne kontakt med en av de skrueformede sporene og gradvis rotere til en vertikal posisjon.. Den dreibare forbindelsen mellom prøvedelen 43a og forbindelsespinnemutteren 421 tillater at prøveenheten og and out of the hopper section 65 to thereby pull the attachment cylinder 42f and attach the attachment flange 42c onto the attachment socket 65b to the hopper with the attachment pins 42d and 42e inserted into the attachment holes 65d and 65e'. As the sample assembly 43 is moved inwardly, the vertical alignment pin 43f will make contact with one of two helical surfaces 49 terminating at the rear apex 65c of the funnel section 65a. Thus, if the flow line flange 40 is not in a vertical position, the alignment pin 43b on the sample part 43a will make contact with one of the helical grooves and gradually rotate to a vertical position. The rotatable connection between the sample part 43a and the connecting pin nut 421 allows the sample unit and

anbringelsesflensenheten blir trukket inn i traktseksjonene 65a og 65b, selv om prøveenheten 43, anbringelsesflensenheten 42, strømlinjeflensen 40 og strømningslinjene S-l, S-2 og S-3 er så mye som 30° ut av innretting med innrettingskanaldelene 17a og 17b. the mounting flange assembly is drawn into the funnel sections 65a and 65b, even though the sample assembly 43, mounting flange assembly 42, streamline flange 40, and flow lines S-1, S-2, and S-3 are as much as 30° out of alignment with the alignment channel portions 17a and 17b.

Etter at anbringelsesflensenheten har blitt låst sammen med traktseksjonene 65a og 65b,' som illustrert i detalj i figur 14, blir hydrauliske kraftsylindre 74 senket til den nederste skråttstilte posisjon i figur 15, hvor anbringelses innsnittene 80 anbringes på og hviler mot anbringelseshjørnene 80a og 80b på henholdsvis'innrettingskanalene 17a og 17b. Lagerstrømnings-linjene S-l, S-2 og S-3 blir nå beveget til en i det vesentlige horisontal posisjon dersom de ikke allerede er i en slik horison- " tal posisjon. Med anbringelsesinnsnittene 80 på bæreenheten anbragt på innrettingskanalene og strømningslinjene i en horisontal posisjon, blir de'vertikale holdeinnretningene 45a satt inn i v de vertikale delene av de i det vesentlige T-formede utsparingene 17c og 17d i innrettingskanaldelene 17a og 17b. After the attachment flange assembly has been locked together with the funnel sections 65a and 65b,' as illustrated in detail in Figure 14, hydraulic power cylinders 74 are lowered to the bottom inclined position in Figure 15, where the attachment notches 80 are placed on and rest against the attachment corners 80a and 80b of alignment channels 17a and 17b, respectively. The bearing flow lines S-1, S-2 and S-3 are now moved to a substantially horizontal position if they are not already in such a horizontal position. With the mounting notches 80 on the carrier unit positioned on the alignment channels and the flow lines in a horizontal position , the vertical holding devices 45a are inserted into v the vertical parts of the substantially T-shaped recesses 17c and 17d in the alignment channel parts 17a and 17b.

Strømningslinjene S-l, S-2 og S-3 blir deretter uavhengig prøvet ved å benytte strømnings linjeprøveenheten 50. Etter at det har blitt avgjort at strømningslinjene er fri for hindringer, blir prøveenheten 50 for strømningslinjer og anbringelsesflensenheten 42 frigjort fra forbindelsen med flensen 40 av lagerstrøm-ningslinjen ved de avtagbare forbindelsesinnretningene 51 som er illustrert i forbindelsesposisjonen i figur 18 og i frigjørings-posisjonen i figur 20. The flow lines S-1, S-2, and S-3 are then independently sampled using the flow line test assembly 50. After it has been determined that the flow lines are free of obstructions, the flow line test assembly 50 and the mounting flange assembly 42 are released from connection with the flange 40 by stock flow line at the removable connection devices 51 which are illustrated in the connection position in Figure 18 and in the release position in Figure 20.

Det kan nevnes at de horisontale holdeinnretningene 45b som strekker seg utover fra flensdelen 40a av lagerstrømnings- • linjen, blir .presset innover ved holdeørene 50e på sideplatene 50c av prøveflensenheten 50, inntil prøveflensenheten 50 blir fjernet.' Grunnen til at de horisontale holdeinnretningene 45b blir holdt på plass, er for å sørge for fjerning av flensen 40 av lagerstrømningslinjen, i det tilfellet det skulle oppstå et problem. Med en gang de horisontale låseinnretnlngene 45b har blitt frigjort for å bli satt inn i de horisontale delene av de T-formede spaltene 17c og 17d, blir naturligvis flensdelen i det vesentlige låst i posisjon og kan ikke bli beveget uten at det foretas noe mer. It may be mentioned that the horizontal retaining devices 45b extending outward from the flange portion 40a of the bearing flow line are pressed inwards by the retaining ears 50e on the side plates 50c of the test flange unit 50, until the test flange unit 50 is removed. The reason the horizontal retainers 45b are held in place is to provide for removal of the flange 40 from the bearing flow line, should a problem arise. Of course, once the horizontal locking devices 45b have been released to be inserted into the horizontal portions of the T-shaped slots 17c and 17d, the flange portion is substantially locked in position and cannot be moved without further action.

Etter frigjøring ved frigjøringsforbindelsesinnret-ningen 51, blir hele trekkutstyret P trukket oppover for derved å trekke prøve flensenheten helt vekk fra strømnings linjeflensen. De hydrauliske sylindrene 74 blir deretter aktivisert for å dreie-traktenheten til en oppoverrettet skråstilt posisjon for å bevege prøveflensenheten '50 ut av deigen. Trekkutstyret blir deretter igjen anbragt på innrettingsenheten B for strømningslinjer. After release by the release connection device 51, the entire pulling equipment P is pulled upwards to thereby pull the sample flange assembly completely away from the flow line flange. The hydraulic cylinders 74 are then actuated to rotate the funnel assembly to an upwardly inclined position to move the sample flange assembly '50 out of the dough. The pulling equipment is then again placed on the alignment unit B for flow lines.

Med henvisning til figurene 8-9 og 23-24, blir den hydrauliske sylinderen 30 aktivisert for å bevege forbindelsesinnretningen 26 til en slik posisjon at forbindelsesplatene 26a og 26b kan bli beveget nedover til forbindelsesposisjonen over flensørene 40h og 40i av lagerstrømningslinjen som tidligere beskrevet. Dette fullfører forbindelsen mellom lagerstrømnings-linjene S-l, S-2 og S-3 med strømningslinjene F-l, F-2 og F-3 av oljerørsaggregatet. Referring to Figures 8-9 and 23-24, the hydraulic cylinder 30 is actuated to move the connecting device 26 to such a position that the connecting plates 26a and 26b can be moved downward to the connecting position above the flanges 40h and 40i of the bearing flow line as previously described. This completes the connection between the bearing flow lines S-1, S-2 and S-3 with the flow lines F-1, F-2 and F-3 of the oil tube assembly.

Man må forstå at apparatet ifølge foreliggende oppfinnelse, kan bli benyttet til å forbinde et hvilket som helst antall av strømningslinjer, selv om det bare har blitt beskrevet tre på oljerørsaggregatet T og på lagerstrømningslinjen S i den utføringen, som er beskrevet her. Apparatet A av foreliggende oppfinnelse, egner seg spesielt for å danne fluidumforbindelser på dybder under vann hvor dykkere ikke kan arbeide. Imidlertid må man forstå at apparatet A- kan bli benyttet på alle dybder. It must be understood that the apparatus according to the present invention can be used to connect any number of flow lines, although only three have been described on the oil pipe assembly T and on the bearing flow line S in the embodiment described here. The apparatus A of the present invention is particularly suitable for forming fluid connections at depths under water where divers cannot work. However, it must be understood that the device A- can be used at all depths.

Kilden for hydraulisk kraft har generelt blitt beskrevet som om .den skulle befinne seg på overflatefartøyet V. Man må forstå at deler eller hele den hydrauliske kraften i virkeligheten kan være plassert på delene av apparatet A som er plassert på borehullet, dersom dette er ønskelig. The source of hydraulic power has generally been described as if it were to be located on the surface vessel V. It must be understood that part or all of the hydraulic power may actually be located on the parts of the apparatus A located on the wellbore, if this is desired.

Ovenstående fremleggelse og beskrivelse av oppfinnelsen illustrerer og gir eksempler på oppfinnelsen og forskjellige endringer både i fremgangsmåtene, prosessene og teknikkene og i detaljene av_de forskjellige illustrerte trinnene kan bli gjort uten å avvike fra ånden i oppfinnelsen. • For eksempel har føringskonstruksjonen blitt fremlagt som om det er nødvendig å benytte føringslinjer 12 for å senke ned de forskjellige utstyrs-enhetene som er fremlagt her. Man må'forstå at de- andre førings-konstruks j onene kan bli benyttet for å lede noen deler eller alt utstyret fra overflaten til borehullet. The above presentation and description of the invention illustrates and gives examples of the invention and various changes both in the methods, processes and techniques and in the details of the various illustrated steps can be made without deviating from the spirit of the invention. • For example, the guide structure has been presented as if it is necessary to use guide lines 12 to lower the various equipment units presented here. It must be understood that the other guide constructions can be used to guide some or all of the equipment from the surface to the borehole.

Claims (38)

1. Anordning for selektiv dannelse av fluidumforbindelse til et borehull, som er boret ned i en formasjon som er dekket av vann, karakterisert ved at den består av: et nettverk for kontroll av fluidumstrømmen fra et borehull og som kan plasseres ved et borehull som er boret på sjøbunnen, og hvor nettverket for kontroll av fluidumstrømmen fra borehullet inkluderer første strømningslinjeinnretning for å overføre borehullsfluidum ut av borehullet; andre strømningslinjeinnretning som strekker seg fra et fjerntliggende sted til borehullet, og hvor. den andre strømningslinjeinnretningen blir senket ned i vannet for forbindelse med den første strømningslinjeinnretningen, slik at borehullsfluidum blir overført gjennom nettverket for kontroll av fluidumstrømmen fra borehullet og den første og den andre strømningslinjeinnretningen til et fjerntliggende sted; plass.eringsinnretning for wire for montering ved borehullet og bruk av wireapparat for å bevege den andre strøm-ningslinjeinnretningen til en.posisjon for første befestigelse med plasseringsinnretningen for wire, og i denne posisjon blir den andre strømningslinjeinnretningen delvis rettet inn med den første strømningslinjeinnretningen; fjernstyrt kraftinnretning for montering ved borehullet for å danne kontakt med og bevege den andre strømnings-linjeinnretningen. fra overnevnte.posisjon for første befestigelse til en låst posisjon i plasseringsinnretningen for wire og for å bevege plasseringsinnretningen for wire og den andre strøm-ningslinjeinnretningen til en posisjon hvor den andre strømnings-linjeinnretningen i det vesentlige er fullstendig rettet inn med den første strømningslinjeinnretningen for forbindelse med denne; og forbindelsesinnretning for strømningslinjer for operativt, å kunne forbinde den første og den andre strømnings-linjeinnretningen hvorved borehulls fluidum blir overført fra borehullet og gjennom den først.e og den andre strømningslinje-innretningen.1. Device for the selective formation of a fluid connection to a borehole, which has been drilled into a formation that is covered by water, characterized in that it consists of: a network for controlling the fluid flow from a borehole and which can be located at a borehole drilled on the seabed, and where the network for controlling the fluid flow from the borehole includes first flow line means for transferring borehole fluid out of the borehole; other flowline facility extending from a remote location to the wellbore, and where. the second flowline device is lowered into the water for connection with the first flowline device so that wellbore fluid is transferred through the network to control fluid flow from the wellbore and the first and second flowline devices to a remote location; wireline placement device for mounting at the borehole and using wireline apparatus to move the second flowline device to a position for first engagement with the wireline placement device, and in this position the second flowline device is partially aligned with the first flowline device; remote power device for mounting at the borehole to contact and move the second flowline device. from the above first attachment position to a locked position in the wire positioning device and to move the wire positioning device and the second flow line device to a position where the second flow line device is substantially fully aligned with the first flow line device for connection with this one; and flowline connection means for operatively connecting the first and second flowline means whereby wellbore fluid is transferred from the wellbore and through the first and second flowline means. 2. Konstruksjon i overensstemmelse med krav-1, karakterisert ved at den inkluderer: en støtteinnretning for borehull, montert ved borehullet; en innrettingsenhet for strømningslinjer for nedsenking' til støtteinnretningen for borehullet; og innrettingsenhet for strømningslinjer som inkluderer innretninger som virker sammen med de fjernstyrte kraftinnretningene for en faktisk innretting av den første og den andre strømningslinjeinnret-ningen for forbindelse.2. Construction in accordance with claim-1, characterized in that it includes: a borehole support device, mounted at the borehole; a submergence flowline alignment unit for the wellbore support; and flow line alignment unit including means operative with the remote power means for actual alignment of the first and second flow line devices for connection. 3. Konstruksjon i overensstemmelse med krav 2, karakterisert ved at den inkluderer at den første strømningslinjeinnretningen terminerer i en første forbindelses- \' flens; at den andre strømningslinjeinnretning terminerer i en andre forbindelsesf lens; og at. innrettingsenheten for strømnings-linjer inkluderer en innrettingskanal for å motta første og andre forbindelsesflenser.3. Construction in accordance with claim 2, characterized in that it includes that the first flow line device terminates in a first connecting flange; that the second flow line device terminates in a second connecting flange; and that. the flow line alignment assembly includes an alignment channel for receiving first and second connecting flanges. 4. Konstruksjon i overensstemmelse med krav 1, karakterisert ved at plasseringsinnretningen for.' wire og kraftinnretningen for fjernstyring inkluderer: en plasseringsenhet for strømningslinjer som blir senket ned til en posisjon i nærheten av nettverket for kontroll av fluidum fra borehullet; at plasseringsenheten for strømningslinjer inkluderer en traktenhet som har en wire som strekker seg gjennom denne og er festet med den andre strømningslinjeinn-retningen, og hvor wiren kan strekke seg til en kon-trollinnretning for wire som er plassert ved overflaten av sjøen for å kontrollere bevegelsen av wiren; og at traktenheten og kontrollinnretningen for wire inkluderer innretninger som trekker den andre strøm-ningslinjeinnretningen innover og i posisjon for befestigelse til traktenheten, og hvor posisjonen av den andre strømningslinjeinnretningen er delvis rettet inn med hensyn til den første strømnings-linjeinnretningen.4. Construction in accordance with claim 1, characterized in that the placement device for.' wire and the power device for remote control includes: a placement unit for flow lines which are lowered to a position near the wellbore fluid control network; that the flow line location assembly includes a funnel assembly having a wire extending therethrough this and is attached with the second flow line device, and where the wire can extend to a wire control device located at the surface of the sea to control the movement of the wire; and that the funnel assembly and the wire control device include means that pull the second flow line device inwardly and into position for attachment to the funnel unit, and wherein the position of the second flow line device is partially aligned with respect to the first flow line device. 5- Konstruksjon i overensstemmelse med krav 4, karakterisert ved at den fjernstyrte kraftinn-rettingen inkluderer: f esteinnretning for befestigelse av den andre strøm-ningslinjeinnretningen til traktenheten; og låseinnretninger for å bevege den andre strømnings-linjeinnretningen videre innover i traktenheten til en låst posisjon hvor den -andre strømningslinjeinn-retningen forblir delvis rettet inn med hensyn til den første strømningslinjeinnretningen.5- Construction in accordance with claim 4, characterized in that the remote-controlled power arrangement includes: fastening device for fastening the second flow line device to the funnel unit; and locking means for moving the second flow line means further into the funnel assembly to a locked position where the -second flow line orientation remains partially aligned with respect to the first flow line device. 6. Konstruksjon i overenstemmeIse med krav 5, karakterisert ved at låseinnretningen inkluderer: en festeåkenhet montert for bevegelse i traktenheten og, innretning montert i tilknytning til denne for å feste den andre strømningslinjeinnretningen for bevegelse med festeåkenheten; og en fjernstyrt hydraulisk sy Underenhet forbundet med festeåkenheten for å bevege åket og den andre strøm- v ningslinjeenheten til den låste posisjon hvor den andre strømningslinjeinnretningen er bevegelig med traktenheten.6. Construction in accordance with claim 5, characterized in that the locking device includes: an attachment yoke assembly mounted for movement in the hopper assembly and means mounted adjacent thereto for attaching the second flow line assembly for movement with the attachment yoke assembly; and a remote hydraulic sewing Subassembly connected to the attachment yoke assembly to move the yoke and the second flow line assembly to the locked position where the second flow line assembly is movable with the hopper assembly. 7- Konstruksjon i overensstemmelse med krav 5>karakterisert ved at traktenheten har i det vesentlige skrueformet overflate, for å lede den andre strømnings-linjeinnretningen til en vertikal posisjon.7- Construction in accordance with claim 5> characterized in that the funnel unit has an essentially helical surface, to guide the second flow line device to a vertical position. 8. Konstruksjon i overensstemmelse med krav 4, karakterisert ved at den inkluderer' en andre hydraulisk terminal montert sammen med nettverket for kontroll av fluidumstrøm; og en bevegelig hydraulisk tilførselsterminal montert sammen med plasseringsenheten for strømningslinjer og som kan forbindes med den andre hydrauliske terminalen, og hvor den bevegelige hydrauliske tilførselsterminalen har fluidumlinjer som strekker seg til havoverflaten.8. Construction in accordance with claim 4, characterized in that it includes a second hydraulic terminal mounted together with the network for controlling fluid flow; and a movable hydraulic supply terminal mounted together with the flow line location unit and connectable to the second hydraulic terminal, and wherein the movable hydraulic supply terminal has fluid lines extending to the sea surface. 9. Konstruksjon i overensstemmelse med krav 4, karakterisert ved at den andre strømningslinjeinn-retningen inkluderer: en eller flere andre strømningslinjer som kan strekke seg.utover under vann mellom borehullet og overflaten; en eller flere av de andre strømningslinjer for fluidum terminerer i en andre strømningslinjeflens for fluidumforbindelse til den første strømningslinjeinnretningen; og en bæreenhet som er festet til den andre strøm-ningslinjef lensen, og hvor wiren er festet til bæreenheten hvorved bevegelse av wiren kontrollerer bevegelse av en eller flere, andre strømningslinjer og andre strømningslinjeflenser.9. Construction in accordance with claim 4, characterized in that the second flow line device includes: one or more other flow lines which may extend underwater between the borehole and the surface; one or more of the second fluid flow lines terminate in a second fluid flow line flange for fluid connection to the first flow line device; and a support unit which is attached to the second flow line flange, and where the wire is attached to the support unit whereby movement of the wire controls movement of one or more other flow lines and other flow line flanges. 10. Konstruksjon i overensstemmelse med krav 9, karakterisert ved at bæreenheten inkluderer: en anbringelsesflénsenhet som er dreibart festet til den andre strømningslinjef lensen ; og en prøveenhet' som er montert til anbringelsesflensenheten for dreibar bevegelse med hensyn til anbringelsesflensenheten, og hvor wiren er festet til prøveenheten hvorved bevegelse av wiren kontrollerer bevegelse av anbringelsesflensenheten og prøveenheten.10. Construction in accordance with claim 9, characterized in that the support unit includes: an attachment flange assembly rotatably attached to the second flow line flange; and a test unit' mounted to the mounting flange unit for rotatable movement with respect to the mounting flange unit, and wherein the wire is attached to the test unit whereby movement of the wire controls movement of the mounting flange unit and the test unit. 11. Konstruksjon i overensstemmelse med krav 10, J karakterisert ved at den inkluderer: at wiren som er festet til prøveenheten, er tilpasset til å trekke prøveenheten innover inn i traktenheten slik at den andre strømningslinjeflensen som er forbundet med anbringel- .sesflensenheten og prøveenheten kommer i en posisjon med delvis innretting med den første strømningslinjeinnretningen; festeinnretning for å feste prøveenheten til traktenheten ; og låseinnretning for å bevege prøveenheten ytterligere innover i traktenheten slik at anbringelsesflensenheten blir anbragt i en låst posisjon for bevegelse med traktenheten.11. Construction in accordance with claim 10, J characterized in that it includes: that the wire attached to the sample assembly is adapted to pull the sample assembly inward into the funnel assembly so that the second flow line flange connected to the attachment .the sess flange assembly and the sample assembly come into a position of partial alignment with the first flow line assembly; attachment means for attaching the sample unit to the funnel unit; and locking means for moving the sample assembly further into the hopper assembly so that the mounting flange assembly is placed in a locked position for movement with the hopper assembly. 12.. Konstruksjon i overensstemmelse med krav 11, karakterisert ved at den inkluderer: at anbringelsesflensenheten er dreibart bevegelig med hensyn til den andre strømningslinjeflensen med anbringelsesflensenheten i den låste posisjon med traktenheten; og dreieinnretning for traktenheten for å dreie traktenheten nedover slik at den i det vesentlige retter inn den . andre strømnings linjeflensen med den første strømningslinjeinn-retningen.12.. Construction in accordance with claim 11, characterized in that it includes: that the mounting flange assembly is pivotally movable with respect to the second flow line flange with the mounting flange assembly in the locked position with the funnel assembly; and turning means for the hopper assembly to pivot the hopper assembly downward so as to substantially align it. the second flow line flange with the first flow line arrangement. 13. Konstruksjon i overensstemmelse med krav 12, karakterisert ved at den inkluderer: en støtteinnretning for.borehull for montering til borehullet;. , en innrettingsenhet for strømningslinjer som monteres på støtteinnretningen for borehullet og som inkluderer en innrettingskanal for å motta den første strømningslinjeinnret-ningen; og hvor dreieinnretningen for traktenheten dreier traktenheten nedover slik at den andre strømningslinjeflensen blir anbragt i innrettingskanalen i en i det vesentlige fullstendig innretting med den første strømningslinjeinnretningen.13. Construction in accordance with claim 12, characterized in that it includes: a borehole support device for mounting to the borehole; , a flowline alignment assembly mounted on the wellbore support assembly and including an alignment channel for receiving the first flowline assembly; and wherein the turning means for the hopper assembly rotates the hopper assembly downward so that the second flow line flange is disposed in the alignment channel in substantially complete alignment with the first flow line means. 14. Konstruksjon i overensstemmelse med krav 13, karakterisert vedat den inkluderer at den andre strømningslinjeflensen inkluderer låseinnretninger ved å anbringe den andre strømningslinjeflensen i innrettingskanalen i en i det vesentlige innrettet posisjon.14. Construction in accordance with claim 13, characterized in that it includes that the second flow line flange includes locking devices by placing the second flow line flange in the alignment channel in a substantially aligned position. 15. Konstruksjon i'overensstemmelse med krav 5, karakterisert ved at den inkluderer innretninger for å dreie traktenheten nedover med den andre strøm-ningslinjeinnretningen i den låste posisjon for å anbringe den andre strømningslinjeinnretningen fullstendig på linje med den første strømningslinjeinnretningen.15. Construction in accordance with claim 5, characterized in that it includes means for pivoting the funnel assembly downwardly with the second flow line device in the locked position to bring the second flow line device fully in line with the first flow line device. 16. Konstruksjon i overensstemmelse med krav 93karakterisert ved at den inkluderer en prøve-flensenhet som er montert sammen med den andre strømnings linjeflensen for å prøve den ene eller flere andre strømningslinjer før forbindelsen med den første strømningslinjeinnretningen.16. Construction in accordance with claim 93 characterized in that it includes a test flange assembly which is mounted together with the second flow line flange to test the one or more other flow lines prior to connection with the first flow line device. 17. Konstruksjon i overensstemmelse med krav 16, karakterisert ved at den inkluderer: at den andre strømningslinjeinnretningen inkluderer to andre strømningslinjer; og at prøveflensenheten inkluderer innretninger som sørger for fluidumforbindelse mellom de to andre strømnings-linjene for å prøve strømningslinjene.17. Construction in accordance with claim 16, characterized in that it includes: that the second flow line device includes two other flow lines; and that the test flange unit includes devices that provide fluid connection between the two other flow lines in order to test the flow lines. 18. ' Konstruksjon i overensstemmelse med krav 17, karakterisert ved at den inkluderer avtrykksinn-retning montert i prøveflensenheten for å lage et avtrykk i et bløtt materiale som blir pumpet fra overflaten gj.ennom en av de to strømningslinjer for å prøve flensenheten.18. Construction in accordance with claim 17, characterized in that it includes impression means mounted in the test flange assembly for making an impression in a soft material which is pumped from the surface through one of the two flow lines to test the flange assembly. 19. Konstruksjon i overensstemmelse med krav 17, karakterisert ved at prøveflensenheten inkluderer: en prøveflens som er festet sammen med den andre strømningslinjeflensen; og innretning for å frigjøre prøveflensen fra befestigelsen til den andre strømningslinjeflensen.19. Construction in accordance with claim 17, characterized in that the test flange unit includes: a test flange which is fixed together with the second flow line flange; and means for releasing the sample flange from the attachment to the second flow line flange. 20. Konstruksjon i overensstemmelse med krav 11, karakterisert ved at den inkluderer bærefrigjøringsinnretning for å frigjøre anbringelsesflensenheten fra befestigelsen til den andre strømningslinjeflensen hvorved bæreenheten blir befridd for påfølgende fjerning med traktenheten.\20. Construction in accordance with claim 11, characterized in that it includes carrier release means for releasing the mounting flange assembly from the attachment to the second flow line flange, thereby freeing the carrier assembly for subsequent removal with the funnel assembly.\ 21. Konstruksjon i overensstemmelse med krav 12,- karakterisert ved at den inkluderer en prøveflens som er festet til den andre strømnings linjeflensen for å prøve den ene eller flere strømningslinjer, og hvor prøveflensen videre er festet til anbringelsesf lensenheten; og f rigj øringsinnretning for .; å frigjøre prøveflensen fra befestigelsen til den andre strøm-nings lin j e f lensen hvorved prøveflensen blir fjernbar med anbringelsesf lensenheten .21. Construction in accordance with claim 12, characterized in that it includes a test flange which is attached to the second flow line flange to test the one or more flow lines, and wherein the test flange is further attached to the mounting flange assembly; and release device for .; to release the test flange from the attachment to the second flow line j e f flange whereby the test flange becomes removable with the attachment flange unit. 22. Konstruksjon i overensstemmelse med krav 1, karakterisert ved at den inkluderer: at den første strømningslinjeinnretningen terminerer i en første strømningslinjeflens som støtter en eller flere første strømningslinjer; at den andre strømningslinjeinnretningen terminerer i •en andre strømningslinjeflens som støtter en eller flere andre strømningslinjer; at forbindelsesinnretningen for strømningslinjer forbinder den første og den andre strømningslinjeflensen for fluidumforbindelse mellom disse; at den andre strømningslinjeflensen har et.sideøre; og at forbindelsesinnretningen for strømningslinjer inkluderer en forbindelsesplate som er utstyrt med et plateøre, og hvor forbindelsesplaten er montert på den første streSmningslinje-flensen for bevegelse mellom en frigjøringsposisjon hvor den første og den andre strømningslinjeflensen er separerbare og i en sammenlåst posisjon hvor øret pa forbindelsesplaten'kontakter side-øret av den andre strømningslinjeflensen hvorved en eller flere første'strømningslinjer blir sammenbundet i fluidumforbindelse med en eller flere andre strømningslinjer' med sideplaten i den sammenlåste posisjonen.22. Construction in accordance with claim 1, characterized in that it includes: that the first flow line means terminates in a first flow line flange supporting one or more first flow lines; that the second flow line device terminates in •a second flow line flange supporting one or more other flow lines; that the flow line connection means connects the first and second flow line flanges for fluid communication therebetween; that the second flow line flange has a side ear; and that the flow line connection means includes a connection plate provided with a plate ear, and wherein the connection plate is mounted on the first flow line flange for movement between a release position where the first and second flow line flanges are separable and in an interlocked position where the ear on the connection plate contacts the side ear of the second flow line flange whereby one or more first flow lines are joined in fluid communication with one or more second flow lines with the side plate in the interlocked position. 23- Konstruksjon i overensstemmelse med krav 13, karakterisert ved en første strømningslinjeinn-retning som inkluderer en eller flere første strømningslinjer som terminerer i en første strømningslinjeflens, strømnings linjeflensen er montert for glidbar bevegelse i innrettingskanalen; hydraulisk kraftinnretning for å bevege den første strømningslinjeflensen mot og vekk fra den andre, strømnings-linj ef lensen ; og forbindelsesinnretning for strømningslinjer som inkluderer innretning for å føye. sammen den første og den andre strømningslinjeflensen for fluidumforbindelse mellom disse.23- Construction in accordance with claim 13, characterized by a first flow line arrangement including one or more first flow lines terminating in a first flow line flange, the flow line flange being mounted for sliding movement in the alignment channel; hydraulic power means for moving the first flow line flange toward and away from the second flow line flange; and connecting means for flow lines including means for joining. together the first and second flow line flanges for fluid communication therebetween. 24. Konstruksjon i overensstemmelse med krav 23, karakterisert ved at innretningen for å føye sammen strømningslinjeflensene inkluderer: et øre som strekker seg fra den andre strømnings-linj ef lensen ; en forbindelsesplate som er montert på den første strømningslinjeflensen for bevegelse mellom en frigjøringsposi-sjon og en sammenlåst posisjon og hvor forbindelsesplaten' har et påmontert øre; og innretning for å bevege forbindelsesplaten til en sammenlåst posisjon hvor ørene er låst sammen for å hindre sepa-rering av strømningslinjeflensene.24. Construction in accordance with claim 23, characterized in that the device for joining the flow line flanges includes: an ear extending from the second flow line lens; a connection plate mounted on the first flow line flange for movement between a release position and an interlocked position and wherein the connection plate has an attached ear; and means for moving the connecting plate to an interlocked position where the lugs are interlocked to prevent separation of the flow line flanges. 25- Konstruksjon i overensstemmelse med krav 23, karakterisert ved at den inkluderer en første strømningslinjeflens som har avtagbart påmontert en forseglingsplate som sørger for en forseglet fluidumforbindelse mellom en eller flere første strømningslinjer og en eller flere andre strømningslinjer med. den første og den andre strømningslinje-flensen sammenføyd.25- Construction in accordance with claim 23, characterized in that it includes a first flow line flange which has a removably mounted sealing plate which ensures a sealed fluid connection between one or more first flow lines and one or more other flow lines with. the first and second flow line flanges joined together. 26. Konstruksjon i overensstemmelse med krav 25, karakterisert ved at den inkluderer: en hydraulisk kraftinnretning som beveger den første strømningslinjeflensen ut av sammenføyingen med den andre strøm-ningslinjeflensen; og avtagerutstyr for frémdrift fra vannets overflate til et punkt som i det vesentlige er mellom den første og den andre strømningslinjeflensen, og hvor avtagerutstyret inkluderer innretninger for å kontakte forseglingsplaten for fjerning.26. Construction in accordance with claim 25, characterized in that it includes: a hydraulic power device which moves the first flow line flange out of joint with the second flow line flange; and removal equipment for propulsion from the surface of the water to a point substantially between the first and second flow line flanges, and wherein the removal equipment includes means for contacting the seal plate for removal. 27. Konstruksjon i overensstemmelse med krav 26, karakterisert ved at den inkluderer en hydraulisk kraftinnretning for å bevege den første strømningslinjeflensen vekk fra avtagerutstyret for å frigjøre den første strømnings-linjeflensen fra befestigelse med forseglingsplaten.27. Construction in accordance with claim 26, characterized in that it includes hydraulic power means for moving the first flow line flange away from the take-off device to release the first flow line flange from attachment with the seal plate. 28. Fremgangsmåte for å lage' en undervannsforbindelse mellom et borehull som er boret inn i en formasjon som ligger på havbunnen, karakterisert ved at den innbe-fatter trinnene: nedsenking fra vannoverflaten av en innrettingsenhet for strømningslinjer og anbringelse av innrettingsenheten for strømningslinjer med en støtteinnretning for borehullet montert ved borehullet; nedsenking av et nettverk for fluidumstrøm og anbringelse av nettverket for fluidumstrøm hvor nettverket inkluderer en første strømningslinjeinnretning for å overTøre fluidum fra borehullet; nedsenking av en pla.sseringsenhet for strømnings-linjer med en wire forbundet til den andre strømningslinjeinnret-ning og anbringelse av plasseringsenheten for strømningslinjer i nærheten av innrettingsenheten for strømningslinjer; betjening av wiren fra overflaten for å trekke wiren og den andre strømningslinjeinnretningen som er festet til denne, innover mot plasseringsenheten for strømningslinjer inntil den andre strømningslinjeinnretningen er i en posisjon med delvis innretting med den første strømningslinjeinnretningen; benyttelse av hydraulisk kraft for å bevege den andre strømningslinjeinnretningen til en låst posisjon med plasseringsenheten for strømningslinjer' og deretter manipulering av plasseringsenheten for strømningslinjer for å anbringe den andre strømningslinjeinnretningen i en posisjon av i det vesentlige fullstendig innretting med den første strømningslinjeinnret-ningen; og sammenføying av den første og den andre innrettede strømningslinjeinnretningen i en fluidumforbindelse.28. Method for creating an underwater connection between a borehole that has been drilled into a formation located on the seabed, characterized in that it includes the steps: submerging from the water surface a flowline alignment unit and locating the flowline alignment unit with a wellbore support device mounted at the wellbore; submerging a fluid flow network and positioning the fluid flow network, the network including a first flow line device for transferring fluid from the wellbore; submerging a flow line placement unit with a wire connected to the second flow line arrangement and placing the flow line placement unit near the flow line placement unit; operating the wire from the surface to pull the wire and the second flowline device attached thereto inwardly toward the flowline positioning assembly until the second flowline device is in a position of partial alignment with the first flowline device; using hydraulic power to move the second flow line device into a locked position with the flow line positioning assembly and then manipulating the flow line positioning assembly to place the second flow line assembly in a position of substantially full alignment with the first flow line assembly; and joining the first and second aligned flow line devices in a fluidic connection. 29. Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer trinnene med nedsenking'av innrettingsenheten for strømningslinjer til pias- seringsenheten for strømningslinjer og deretter fjerning av plasseringsenheten for strømningslinjer før nedsenking av nettverket for fluidumstrøm.29. A method in accordance with claim 28, characterized in that it includes the steps of immersing the flow line alignment unit into the flow line placement unit and then removing the flow line placement unit prior to immersing the fluid flow network. 30. Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer trinnet med fremskaffelse av en innrettingskanal for å motta den første og den andre strømningslinjeinnretningen i fullstendig innretting for sammenføying.30. A method according to claim 28, characterized in that it includes the step of providing an alignment channel to receive the first and second flow line devices in full alignment for joining. 31. Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer trinnet med benyttelse av en traktenhet hvor wiren strekker seg gjennom denne for å trekke den andre strømningslinjeinnretningen delvis innenfor traktenheten slik at den andre strømningslinjeinnret-ningen blir delvis rettet inn med den første strømningslinjeinn-retningen.31. Method in accordance with claim 28, characterized in that it includes the step of using a funnel unit where the wire extends through it to pull the second flow line device partially within the funnel unit so that the second flow line device is partially aligned with the first flow line device - the direction. 32. Fremgangsmåte i overensstemmelse med krav 30, karakterisert ved at den inkluderer trinnet med anbringelse av den første strømningslinjeinnretningen i innret tingskanalen når nettverket for fluidumstrøm blir anbragt med' føringskonstruksjonen for borehullet og innrettingsenheten for strømningslinjer.32. Method in accordance with claim 30, characterized in that it includes the step of placing the first flow line device in the device the ting channel when the network for fluid flow is placed with the guide structure for the borehole and the alignment unit for flow lines. 33- Fremgangsmåte i overensstemmelse med krav 32, karakterisert ved at den inkluderer trinnet med-anbringelse av den andre strømningslinjeinnretningen i kanalen for å plassere den andre strømningslinjeinnretningen i fullstendig innretting for sammenføying med den første strømnings-linjeinnretningen.33- Method according to claim 32, characterized in that it includes the step of placing the second flow line device in the channel to place the second flow line device in full alignment for joining with the first flow line device. 34. Fremgangsmåte i overensstemmelse med krav 31, karakterisert ved at den inkluderer trinnet med benyttelse av traktenheten for å gripe den delvis innrettede andre, strømningslinjeinnretning og bevege den andre strømnings-linjeinnretningen inn i en posisjon med i det vesentlige fullstendig innretting.34. A method in accordance with claim 31, characterized in that it includes the step of using the funnel assembly to grip the partially aligned second flow line device and move the second flow line device into a position of substantially complete alignment. 35- Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer trinnet med prøving av den andre strømningslinjeinnretningen før sammenføy-ingen med den første strømningslinjeinnretningen.35- Method in accordance with claim 28, characterized in that it includes the step of testing the second flow line device before the joining with the first flow line device. 36. Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer trinnene med fremskaffelse av hydraulisk kraft direkte til plasseringsutstyret for strømningslinjer og til nettverket for fluidumstrøm.36. Method according to claim 28, characterized in that it includes the steps of providing hydraulic power directly to the placement equipment for flow lines and to the network for fluid flow. 37- Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer bevegelse av den andre strømningslinjeinnretningen til en vertikal posisjon når den andre strømningslinjeinnretningen blir beveget til posisjonen med i det vesentlige fullstendig innretting.37- Method according to claim 28, characterized in that it includes moving the second flow line device to a vertical position when the second flow line device is moved to the position of substantially complete alignment. 38. Fremgangsmåte i overensstemmelse med krav 28, karakterisert ved at den inkluderer trinnet med fjerning av plasseringsenheten for strømningslinjer etter at. den andre strømningslinjeinnretningen er føyd sammen med den første strømningslinjeinnretningen.38. A method according to claim 28, characterized in that it includes the step of removing the placement unit for flow lines after that. the second flow line device is joined with the first flow line device. 39- Anordning for selektivt å danne fluidumforbindelse til et borehull som er boret ned i en formasjon som .ligger på havbunnen, karakterisert ved at den består av: et nettverk for kontroll av fluidumstrøm fra et borehull hvor nettverket kan plasseres ved et borehull som er boret på havbunnen, og hvor nettverket' for kontroll av fluidum-strøm fra borehullet inkluderer første strømningslinjeinnretning for å overføre fluidum fra borehullet ut fra borehullet; en' andre strømningslinjeinnretning som kan strekke seg. fra et fjerntliggende sted til borehullet, og hvor den andre strømningslinjeinnretningen blir senket ned i vannet for. forbindelse med den første strømningslinjeinnretningen slik at fluidumet fra borehullet blir overførbart gjennom nettverket for kontroll av fluidumstrøm fra borehullet og den første og den andre strøm-ningslinjeinnretningen til et fjerntliggende sted;- en plasseringsinnretning for wire for montering ved . borehullet og benyttelse av wireapparatet for å bevege den andre strømningslinjeinnretningen til en posisjon med delvis innretting med hensyn til den første strømningslinjeinnretningen; en kraftinnretning som kan fjernstyres for montering ved borehullet for å kontakte og bevege den andre strømningslinje-innretningen til en posisjon med i det vesentlige fullstendig innretting for sammenføying med den første strømningslinjeinnret- ■ lingen; og prøveinnretning som er montert sammen med den andre strømningslinjeinnretningen for å prøve den andre strømnings-linjeinnretningen før sammenføyingen med den første strømnings- linjeinnretningen.39- Device for selectively forming a fluid connection to a borehole which has been drilled into a formation lying on the seabed, characterized in that it consists of: a network for controlling fluid flow from a borehole where the network can be located at a borehole drilled on the seabed, and where the network for controlling fluid flow from the borehole includes first flow line means for transferring fluid from the borehole out of the borehole; a second extendable flow line device. from a remote location to the borehole, and where the second flowline device is lowered into the water for. connection with the first flow line device so that the fluid from the borehole becomes transferable through the network for controlling fluid flow from the borehole and the first and the second flow line device to a remote location;- a placement device for wire for assembly at . the wellbore and using the wire apparatus to move the second flowline device to a position of partial alignment with respect to the first flowline device; a power device which can be remotely controlled for mounting at the wellbore to contact and move the second flowline device to a position of substantially complete alignment for joining with the first flowline device; ■ the ling; and test device which is mounted together with the other the flowline device to test the second flowline device prior to joining the first flowline device the line device.
NO750545A 1975-02-18 1975-02-18 NO750545L (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
NO750545A NO750545L (en) 1975-02-18 1975-02-18
NO762419A NO762419L (en) 1975-02-18 1976-07-09
NO762418A NO762418L (en) 1975-02-18 1976-07-09

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO750545A NO750545L (en) 1975-02-18 1975-02-18

Publications (1)

Publication Number Publication Date
NO750545L true NO750545L (en) 1976-08-19

Family

ID=19882092

Family Applications (1)

Application Number Title Priority Date Filing Date
NO750545A NO750545L (en) 1975-02-18 1975-02-18

Country Status (1)

Country Link
NO (1) NO750545L (en)

Similar Documents

Publication Publication Date Title
US4625796A (en) Well pipe stabbing and back-up apparatus
NO330839B1 (en) Packing system and procedure for setting this
US4077671A (en) Subterranean drilling and slurry mining method
US3973625A (en) Underwater connection apparatus
JPS5944478B2 (en) Method for connecting submarine pipes and equipment used therefor
NO342509B1 (en) System and method for driving pipe elements into wellbores
JPS6114396B2 (en)
US3716100A (en) Apparatus for aligning and connecting flowlines
NO338674B1 (en) Device and method for extracting a plug in a channel in a wellhead assembly on the seabed and method for completing the subsea well.
NO325533B1 (en) Ring chamber valve for rudder
NO303081B1 (en) Method and apparatus for installing a sand control device in an oil / gas well
NO332032B1 (en) Underwater wellhead assembly and method of completing an underwater well
US3866677A (en) Underwater connection apparatus
NO313432B1 (en) System and method for interconnecting two functional units that can move relative to each other, especially in underwater installations
NO792509L (en) METHOD AND APPARATUS FOR HORIZONTAL POSITION OF OFFSHORE BROENNER
NO743604L (en)
NO177805B (en) Device at a branch well, and tubular service tool for placement in a selected branch well string
NO166706B (en) PROCEDURE FOR CONVERSION OF ALCOHOLS TO HYDROCARBONES.
NO750545L (en)
NO762419L (en)
NO762418L (en)
NO821231L (en) DEVICE FOR FITTING TWO PARTS TO BE CONNECTED
US3924446A (en) Underwater connection apparatus
NO129013B (en)
CN113504067A (en) Geological survey sampling device convenient to sample