NO346286B1 - Rigless drilling and wellhead installation - Google Patents

Rigless drilling and wellhead installation Download PDF

Info

Publication number
NO346286B1
NO346286B1 NO20210299A NO20210299A NO346286B1 NO 346286 B1 NO346286 B1 NO 346286B1 NO 20210299 A NO20210299 A NO 20210299A NO 20210299 A NO20210299 A NO 20210299A NO 346286 B1 NO346286 B1 NO 346286B1
Authority
NO
Norway
Prior art keywords
vessel
pressure housing
assembly
bottom hole
high pressure
Prior art date
Application number
NO20210299A
Other languages
Norwegian (no)
Other versions
NO20210299A1 (en
Inventor
Vidar Strand
Jarle Hvidsten
Knut Inge Dahlberg
Anders Berggreen
Original Assignee
Vetco Gray Scandinavia As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Publication of NO20210299A1 publication Critical patent/NO20210299A1/en
Application filed by Vetco Gray Scandinavia As filed Critical Vetco Gray Scandinavia As
Priority to NO20210299A priority Critical patent/NO346286B1/en
Publication of NO346286B1 publication Critical patent/NO346286B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/038Connectors used on well heads, e.g. for connecting blow-out preventer and riser
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/30Energy from the sea, e.g. using wave energy or salinity gradient

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Sewage (AREA)
  • Road Paving Structures (AREA)

Description

The present invention relates to methods and systems for establishing a well foundation as well as drilling and installation of a surface casing without use of a drilling rig. More specifically it relates to methods for establishing a well foundation subsea using a vessel instead of a drilling rig.
WO 2007/042830 A1 describes a method of securing a load bearing structure for power generating equipment using water current energy, to the bed of a sea, river or estuary. The method comprises placing the load bearing structure on the bed; forming a pile-receiving hole in the bed by means of drilling equipment which is connected to a surface vessel by flexible lines only so that the weight of the drilling equipment is supported by the bed, the drilling equipment being guided by the load bearing structure, and the load bearing structure resisting any non-vertical loads imparted to the drilling equipment; and withdrawing the drilling equipment and installing an attachment pile within the formed hole.
WO 2018/143824 A1 concerns a structure for supporting a flow-control apparatus on a seabed foundation for a well. The flow-control apparatus is configured for performing at least one operation in a wellbore of the well. The structure comprises: a first section comprising a first bore, the first section configured to be connected to the flow-control apparatus; and a second section comprising a second bore, the second section configured to be connected to the subsea foundation. The first and second sections are connected together through a joint which is made up by means of a connector. The first and second bores are arranged longitudinally end to end, for transmitting a load through the joint from the flow-control apparatus to the subsea foundation.
When oil fields are established on the seabed, it is common practice to place a drilling rig at the oil field and do the drilling of wells from this drilling rig. The rigs are stable and provided with equipment to compensate for wind and waves to ensure the well drilling process is performed in a controlled way.
However, drilling with a drilling rig is expensive due to high day rates. It can also be time consuming, as the rig has to be transported to the field and anchored up before drilling can start. Delays may happen due to weather conditions or other unexpected incidents during transport and anchoring of the rig. It is also to some extent overkill to establish a drilling rig for some parts of the operation, especially the first part of the process when the well foundation is established. This initial well establishing process can be drilled in open water without any well control.
After years with large oil fields at acceptable depths and relatively close to land, the focus is now more on smaller fields which also can be more remotely placed as the development in petroleum technology makes is possible and viable to explore these options. At the same time, there is an increase in smaller oil companies trying to enter the petroleum marked by taking over oil fields with presumed marginal income expectations.
The development of smaller fields in more demanding environment also increases the focus on simplification and cost savings. In this context, there is a need to look at the drilling operation, which present a substantial cost even before production has started. This can be an unaffordable obstacle especially for smaller companies or marginal fields.
A further problem that can arise during establishment of a well is release of shallow gas.
It is therefore an object of the present invention to provide methods and systems that will reduce the total cost of a well, thereby enabling exploitation of fields previously regarded as not viable.
Another object of the invention is to provide for a quick escape of an installation vessel in an event of release of shallow gas.
Another object of the invention is to provide a method for establishing well foundation, as well as drilling and installation of a surface casing using a vessel, and thereby without any use of a drilling rig.
Yet another object of the invention is to provide systems for establishing well foundation, as well as for drilling and installation of a surface casing without use of a drilling rig.
According to a first aspect of the present invention, this is achieved with methods using a vessel, and not a rig, for establishing well foundation, and for drilling and installation of a surface casing.
According to a second aspect of the invention, this is achieved with systems using such methods.
The main features of the present invention are given in the independent claims. Additional features of the invention are given in the dependent claims.
A method for establishing a well foundation without use of a drilling rig can comprise the following steps:
• A subsea node, such as e.g. a suction anchor or a subsea template, is installed as a foundation during a rig-less installation and/or drilling operation;
• A bottom hole assembly (BHA) having a drill bit motor and a kelly bushing adapter allows a non-rotating kelly pipe or string to travel freely up and down (i.e. to freely travel axially) and prevents it from rotation; here a kelly pipe is a pipe that is not round in order to prevent rotation. The kelly bushing adapter allows the kelly pipe to freely travel axially, but prevents it from rotation. The kelly bushing adapter can be configured to lock into one from the group consisting of: a suction anchor, a low pressure housing and/or a high pressure housing. As mentioned before, at this stage, the bottom hole assembly (BHA) above the drill motor can move freely axially, but will not rotate.
• The non-rotating kelly pipe or string and the kelly bushing adapter transfer the reactive torque produced from the rotating drill bit to the subsea node (e.g. the suction anchor) and into the seabed.
These and other aspects of the invention are apparent from and will be further elucidated, by way of example(s), with reference to the drawings, wherein:
Fig. 1-5 show a well hole drilling method according to the present invention. Fig. 6-10 illustrate a casing running and cementing method according to the present invention.
A subsea node 1 is provided for the drilling method. The subsea node 1 forms an outer protective casing for the drilling equipment and will provide a means for anchoring drilling equipment and/or well foundation to the seabed. The subsea node 1 is typically completed with a wellhead assembly comprising an outer well housing or low pressure housing (LPH) 2 and an inner well housing or high pressure housing (not shown). The outer well housing 2 can be provided with an outer conductor piping. The subsea node 1 can be completed with the wellhead assembly prior to or after completion of the well drilling.
The subsea node 1 is preinstalled in a separate operation on a seabed 12. The completion of the subsea node 1 with the low pressure housing (LPH) 2 is often done onshore prior to any other offshore operation while the high pressure housing (not shown) is installed after drilling of the first section of the well.
It is possible to drill the first section of the well without BOP. However, when the well is approaching high pressure subterranean structures, a BOP has to be installed on the subsea node 1.
Drilling at first a part of a well 20 with a vessel 18 and without a BOP, will reduce the cost of each well by limiting the rig time for well drilling and simplify the structure requirement for this first drilling part. Thereafter a rig can arrive and install the BOP directly at a preinstalled wellhead. It is also a safe method as the vessel 18 doesn't need to be straight above the well centre and can easily escape in an event of release of shallow gas.
Fig. 1:
An onshore preassembled drilling assembly according to the present invention comprises a bottom hole assembly (BHA) 5. This BHA 5 can typically comprise a drill bit with stabilizers, a drilling motor, which can be, but is not limited to, for example a drilling motor 6, a kelly bushing adapter 3, a non-rotating or non-circular string or pipe 7, which can be, but is not limited to, for example one piece of a kelly string, a side entry sub 8 with a swivel and a lifting sub 9.
The drilling assembly is lifted into the sea and lowered down on a cable 11 of a vessel crane 19 into the subsea node 1 and the LPH 2. In this context, the cable 11 can be a cable, wire, rope or chain.
The BHA 5 is lowered into the subsea node 1 and the kelly bushing adapter 3 is locked to the subsea node 1. And more particularly, torque keys of the kelly bushing adapter 3 are aligned with the subsea node 1 and then the kelly bushing adapter 3 is locked to the low pressure housing or well housing 2 using a locking mechanism 4. When the kelly bushing adapter 3 is locked to the subsea node 1 and the bottom hole assembly 5, the bottom hole assembly 5 is prevented from rotational movement or moving sideways, but is allowed to move vertically.
The locking mechanism 4 can be any locking device that can be remotely operated or be configured to be operated by a remotely operated (underwater) vehicle (ROV). The locking mechanism 4 locks the kelly bushing 3 to the subsea node 1 or well housing 2.
Fig. 2A-2B:
While the drilling assembly weight is set down, a fluid is pumped through a hose 10 into the side entry sub 8 down the kelly string 7 in order to drive the drilling motor 6 that spins the drill bit. The fluid can be provided from the vessel 18 or a fluid reservoir on the seabed. The drill bit of the BHA 5 can be driven hydraulically from a high volume pump (not shown) on the vessel 18 (fig.2A).
A pump 24 for drill cutting removal can be used for the circulation of the fluid. The pump can be positioned on the seabed 12 as shown in fig.2B.
The hose 10 can be, but is not limited to, for example a black eagle hose, a coil tubing or any flexible hosing. The fluid can be any drilling fluid.
The reactional force that is created between the BHA 5 and the seabed 12 under the ground will be absorbed by the kelly bushing adapter 3 and transferred via the LPH 2 to the subsea node 1.
Drill cuttings returns are escaping through cement return ports 23 on the LPH 2 with or without a drill cutting disposal pump system 24.
Fig. 3:
Once the total depth is reached, the drilling assembly will be pulled back using the cable 11 of the hoisting mechanism 19 on the vessel 18. The hoisting mechanism can be a crane or winch.
When the drilling motor 6 reaches the kelly bushing adapter 3, or any other catch device if used, the kelly bushing adapter 3 will be unlocked by opening the locking mechanism 4.
Fig. 4:
When the kelly bushing adapter 3 is unsecured, the whole drilling assembly will be pulled up. On fig.4, the kelly bushing adapter 3 is attached to the bottom hole assembly 5. When the locking mechanism 4 is unlocked, the kelly bushing adapter 3 is released from the subsea node 1 or the well housing 2.
However, in another embodiment, the kelly bushing adapter 3 can be part of the subsea node assembly. In this embodiment, the kelly bushing adapter 3 will remain on the seabed when the locking mechanism 4 is unlocked, while the bottom hole assembly is raised to the vessel.
Fig. 5:
The whole drilling assembly is then pulled to the water surface by pulling back on the cable 11 leaving the drilled well hole / borehole 20 ready for running a surface casing assembly.
Fig. 6:
The surface casing assembly is usually prepared onshore into one unit and comprises: a high pressure housing (HPH) 13 and a surface casing 21 with a check valve 22, a HPH running tool 15, a cement stinger 14, a side entry sub 16 with a swivel and a lifting sub 17.
The hose 10 from the vessel 18 is connected to the side entry sub 16.
The whole surface casing assembly is dispatched from the vessel 18 and lowered down on the wire 11 of the vessel crane 19.
Fig. 7A-7B:
The surface casing assembly is stabbed into the LPH 2 and run in the hole 20 on the wire 11. Finally, the HPH 13 latches and locks into the LPH 2.
Under the running-in step, circulation of seawater or other suitable fluid in the well hole 20 can be done using a pump on the vessel 18 (fig.7A), down the hose 10, through the side entry sub 16 and through the HPH running tool 15.
Alternatively, the pump 24 on the seabed can be used for the circulation of the seawater or the suitable fluid through the well hole 20 (fig.7B).
Fig. 8:
The surface casing 21 is cemented in place by pumping cement from the vessel 18, through the hose 10, into the side entry sub 16, through the HPH running tool 15 and down the cement stinger 14.
Cement returns are coming back out through the check valve 22, along outside of the surface casing assembly, and finally the cement returns are flown out through the ports 23 in the LPH 2.
Fig. 9:
The HPH running tool 15 is released and then pulled out of the hole 20 together with the lifting sub 17, the side entry sub 16 and the cement stinger 14 using the vessel crane wire 11.
Fig. 10:
Left on the seabed 12 is a well 20 ready for a floating drilling unit to latch a BOP on to the HPH or wellhead 13.
Finally, the vessel 18 can move to a next well to be made.
It is not compulsory to remove the complete bottom hole assembly 5 from the well 20. In some situations, parts of or the complete bottom hole assembly is sacrificed in the well. In these situations, the cable 11 between the bottom hole assembly 5 and the vessel 18 is cut and the vessel can prepare to drill a new well and/or move to a new location.
In some occasions, a special kelly bushing has to be made if a kelly bushing, that is longer than what the vessel 18 can handle, is needed. Separate pipe sections or lengths can thus be connected together at or on the vessel 18, for example while running all this into the sea. For about a 50 meters hole, potentially a one piece pipe can be used, as mentioned before.
Depending on the length, the surface casing can be deployed as one assembly, if not it can be made up on the vessel 18 and then run into the sea, similar to what is done on a drilling rig.
The weight on the drill bit can be adjusted by a hive compensated crane on the vessel 18. This means that the crane 19 can have some hive compensating equipment thereon.
The total string weight should be configured to give sufficient weight to the bit in order to be able to carry on and/or fulfil the operations.
If the string is not very long, the whole string can be made up onshore and deployed straight from the back deck of the vessel 18 by the crane 19.
If a deeper hole is required, the string can be built of joints in the vessel moon pool. Thus, some handling equipment should be provided by the subsea contractor.
Additional modifications, alterations and adaptations of the present invention will suggest themselves to those skilled in the art without departing from the scope of the invention as defined in the following patent claims.

Claims (15)

C L A I M S
1. Method for establishing a well foundation and drilling of a borehole (20) using a vessel (18), the method comprising:
- preinstalling a subsea node (1) on a seabed (12);
- lowering a bottom hole assembly (5) from the vessel (18) down into the sea using hoisting means on the vessel (18);
- setting the bottom hole assembly (5) into the subsea node (1);
- coupling the bottom hole assembly (5) to the subsea node (1) using a kelly bushing adapter (3) having a locking mechanism (4) ensuring vertical movement and preventing rotation of the bottom hole assembly (5);
- setting weight in bottom hole assembly (5),
- pumping a fluid from a pump (24) on the vessel (18) or on the seabed (12) through a hose (10) into the bottom hole assembly (5) and down a non-rotating string (7) in order to drive a drilling motor (6) of the bottom hole assembly (5);
- drilling a part of the borehole (20) with the vessel (18).
2. Method according to claim 1, further comprising one of the steps of:
- pulling the bottom hole assembly (5) back to the vessel (18) using the hoisting means on the vessel (18), or
- sacrificing the bottom hole assembly (5) in the borehole (20),
when a desired depth of the borehole (20) is reached.
3. Method according to claim 1, further comprising the step of:
- returning drill cuttings escaping through cement return ports (23) in the subsea node (1).
4. Method according to claim 1, wherein the bottom hole assembly (5) comprises a drill bit, a drilling motor (6), a non-rotating string (7), a side entry sub (8) and a lifting sub (9).
5. Method according to claim 1, wherein the hoisting means comprise a cable (11) and a crane or winch (19).
6. Method according to claim 2, wherein the pulling back step comprises:
- unlocking the kelly bushing adapter (3) by opening the locking mechanism (4) when the drilling motor (6) reaches the kelly bushing adapter (3);
- pulling the bottom hole assembly (5) further up thus freeing the kelly bushing adapter (3) from the low pressure housing (2); and
- pulling the bottom hole assembly (5) further up to the water surface by using the hoisting means on the vessel (18),
thus leaving the drilled borehole (20) ready for running a surface casing (21) or a low pressure housing (2) with an outer conductor piping thereafter.
7. Method according to any one of claims 1-6, wherein the method further comprises:
- adjusting the weight on the drill bit by a hive compensating equipment arranged on the vessel (18) or bottom hole assembly (5) and cooperating with the crane or winch (19) on the vessel.
8. Method for installation of a surface casing (21) using a vessel (18), the method comprising:
- preparing a well casing assembly, a high pressure housing running tool (15), a cement stinger (14), a high pressure housing side entry sub (16) and a high pressure housing lifting sub (17) into one unit onshore or on a vessel (18);
- connecting a hose (10) from the vessel (18) to the side entry sub (16) of the surface casing assembly;
- dispatching the well casing assembly from the vessel (18);
- lowering the well casing assembly by means of a crane or winch (19) on the vessel (18);
- stabbing the well casing assembly into the low pressure housing (2) and running it into the borehole (20) supported by the wire (11);
- latching and locking a high pressure housing (13) of the well casing assembly into the low pressure housing (2);
- cementing the surface casing (21) in place by pumping cement from the vessel (18), through the hose (10), into the side entry sub (16), through the high pressure housing running tool (15) and down and out of the cement stinger (14); - releasing the high pressure housing running tool (15); and
- pulling out of the borehole (20) together with the lifting sub (17), the side entry sub (16) and the cement stinger (14) by using the hoisting means on the vessel (18).
9. Method according to claim 8, wherein the well casing assembly is a surface casing assembly comprising the high pressure housing (13) and the surface casing (21) or a conductor assembly comprising low pressure housing (2) and outer conductor piping.
10. Method according to claim 8 or 9, wherein cement returns are coming back out through a check valve (22) of the surface casing (21), along outside of the surface casing assembly, and finally the cement returns go out through ports (23) in the low pressure housing (2).
11. System for establishing a well foundation and drilling of a borehole (20) using a vessel (18), the system comprising:
- a subsea node (1) comprising a low pressure housing (2) and configured to be preinstalled on a seabed (12);
- a bottom hole assembly (5) comprising a drill bit, a drilling motor (6), a kelly bushing adapter (3), a non-rotating string (7), a side entry sub (8) and a lifting sub (9) and configured to be lifted from a vessel (18) and lowered down into the sea by means of a hoisting means on the vessel (18); where the bottom hole assembly (5) is configured to be set into the subsea node (1) with the low pressure housing (2);
- a locking mechanism (4) configured to lock and unlock the kelly bushing adapter (3) to one from the group consisting of: the low pressure housing (2), a suction anchor and a high pressure housing (13); and
- a pump being configured to pump a fluid through a hose (10) into the side entry sub (8) and down the non-rotating string (7) in order to drive the drilling motor (6) in order to drill a desired depth of the borehole (20) thus drilling a part of the borehole (20) with the vessel (18).
12. System according to claim 11, wherein the pump (24) is configured to be arranged on the vessel (18) or on the seabed (12).
13. System according to claim 11 or 12, wherein the locking mechanism (4) is configured to be operated by a remotely operated vehicle (ROV).
14. System according to any one of claims 11-13, wherein the system further comprises a hive compensating equipment being arranged on the vessel (18) and configured to cooperate with the crane (19) thereon in order to be adjusting the weight on the drill bit.
15. System for installation of a surface casing (21) using a vessel (18), the system comprising:
- a surface casing assembly comprising a high pressure housing (13), a surface casing (21), a high pressure housing running tool (15), a cement stinger (14), a high pressure housing side entry sub (16) and a high pressure housing lifting sub (17), where the surface casing assembly is configured to be dispatched from a vessel (18) and then lowered down on a wire (11) of a crane (19) on the vessel (18) and is further configured to be stabbed into a subsea node (1) with a low pressure housing (2) and to be run into a borehole (20) on the wire (11); and
- a hose (10) from the vessel (18) and connected to the side entry sub (16) of the surface casing assembly;
wherein the high pressure housing (13) of the surface casing assembly is configured to be locked into the low pressure housing (2);
wherein the cement stinger (14) is configured to cement the surface casing (21) in place in the borehole (20) by means of a pump configured to pump cement from the vessel (18), through the hose (10), into the side entry sub (16) and through the high pressure housing running tool (15); and
wherein the high pressure housing running tool (15) is configured to be released and pulled out of the borehole (20) together with the lifting sub (17), the side entry sub (16) and the cement stinger (14) by using the wire (11) of the crane (19) on the vessel (18).
NO20210299A 2021-03-08 2021-03-08 Rigless drilling and wellhead installation NO346286B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NO20210299A NO346286B1 (en) 2021-03-08 2021-03-08 Rigless drilling and wellhead installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO20210299A NO346286B1 (en) 2021-03-08 2021-03-08 Rigless drilling and wellhead installation

Publications (2)

Publication Number Publication Date
NO20210299A1 NO20210299A1 (en) 2020-08-19
NO346286B1 true NO346286B1 (en) 2022-05-23

Family

ID=76033800

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20210299A NO346286B1 (en) 2021-03-08 2021-03-08 Rigless drilling and wellhead installation

Country Status (1)

Country Link
NO (1) NO346286B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007042830A1 (en) * 2005-10-14 2007-04-19 Tidal Generation Limited Installation of underwater anchorages
WO2018143824A1 (en) * 2017-02-06 2018-08-09 New Subsea Technology As A structure for supporting a flow-control apparatus on a seabed foundation for a well, a subsea assembly, a method of assembling the structure and a method of deploying and installing the structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007042830A1 (en) * 2005-10-14 2007-04-19 Tidal Generation Limited Installation of underwater anchorages
WO2018143824A1 (en) * 2017-02-06 2018-08-09 New Subsea Technology As A structure for supporting a flow-control apparatus on a seabed foundation for a well, a subsea assembly, a method of assembling the structure and a method of deploying and installing the structure

Also Published As

Publication number Publication date
NO20210299A1 (en) 2020-08-19

Similar Documents

Publication Publication Date Title
EP2593609B1 (en) Pile system and method of making a pile
AU2010276206B2 (en) Offshore drilling system
US20240141731A1 (en) Rigless drilling and wellhead installation
US8186457B2 (en) Offshore casing drilling method
US7775304B2 (en) Apparatus and method for driving casing or conductor pipe
CN1252373C (en) Well managment System
US6659182B1 (en) Retrievable suction embedment chamber assembly
US5379844A (en) Offshore platform well system
US3252528A (en) Method of drilling from a fully floating platform
AU2018435946A1 (en) Methods and systems for drilling a multilateral well
EP1567724A2 (en) Method and apparatus for sub-sea pile-driving
US3315742A (en) Offshore deep drilling method from a floating platform
NO346286B1 (en) Rigless drilling and wellhead installation
US3341398A (en) Offshore deep drilling method from a floating platform
CA3226403A1 (en) Offshore drilling apparatus and methods
US20230220739A1 (en) Rigless method to partially lift or retrieve wellbore tubing strings from platform and subsea wells