NO344439B1 - Method of installing an offshore transformer assembly - Google Patents

Method of installing an offshore transformer assembly Download PDF

Info

Publication number
NO344439B1
NO344439B1 NO20180099A NO20180099A NO344439B1 NO 344439 B1 NO344439 B1 NO 344439B1 NO 20180099 A NO20180099 A NO 20180099A NO 20180099 A NO20180099 A NO 20180099A NO 344439 B1 NO344439 B1 NO 344439B1
Authority
NO
Norway
Prior art keywords
transformer
offshore
transformer assembly
assembly
main structure
Prior art date
Application number
NO20180099A
Other languages
Norwegian (no)
Other versions
NO20180099A1 (en
Inventor
Ole Johan Bjerknes
Andreas Jo Falk Fredborg
Original Assignee
Aker Solutions As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aker Solutions As filed Critical Aker Solutions As
Priority to NO20180099A priority Critical patent/NO344439B1/en
Priority to PCT/EP2019/051347 priority patent/WO2019141841A1/en
Publication of NO20180099A1 publication Critical patent/NO20180099A1/en
Publication of NO344439B1 publication Critical patent/NO344439B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/25Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/08Cooling; Ventilating
    • H01F27/10Liquid cooling
    • H01F27/12Oil cooling
    • H01F27/14Expansion chambers; Oil conservators; Gas cushions; Arrangements for purifying, drying, or filling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0043Placing the offshore structure on a pre-installed foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Description

METHOD OF INSTALLING AN OFFSHORE TRANSFORMER ASSEMBLY
Technical Field
[0001] The present invention relates to installation of an offshore transformer assembly, such as used in association with offshore wind parks or electrification of offshore hydrocarbon production facilities. Other applications may for instance include gas to wire solutions, where an offshore electric power generation facility running on gas is used to produce electricity that is guide to land.
Background Art
[0002] For offshore power distribution systems, such as used in association with offshore wind parks, it is known to arrange transformer substations on an offshore structure, such as a jacket resting on the seabed. Such offshore structures need to be large and robust, as transformers are large and heavy equipment.
[0003] Subsea transformers are presently available up to the 20 MVA range with 18/30(36) kV wet-mate connectors and/or 76/132(145) kV dry-mate connectors for the corresponding subsea ac-power cable interfaces. The typical power limitations and cost-levels associated with subsea transformers call for more cost-effective options for a highly competitive energy sector gradually expanding offshore.
[0004] Moreover, due to the size and weight of transformers, heavy lifting and transport equipment is needed when installing or replacing such offshore transformers.
[0005] Offshore wind parks can typically have transformers of 100, 200 or even 300 MVA.
[0006] Publication EP2553174 addresses this problem with a solution where the transformer can be transported to a position below a jack-up platform with a barge, so that strand jacks on the platform can lift the transformer up to the platform.
[0007] Publication CN204663059U discloses another marine transformer substation, where a transformer is arranged on top of an offshore jacket structure.
[0008] Publication WO2001046583 discloses an offshore wind power installation with a tower and a rotor head. Connected to the tower body, some distance below the rotor head, there are arranged subsystems such as a switchgear and//or a transformer.
[0009] Publication US20080164966 shows a transformer arranged below the sea surface, having a conduit extending from the transformer to above the sea surface.
[0010] Solutions of the prior art require heavy lifting equipment to hoist the transformers into their operation positions.
[0011] An object of the present invention may be to provide a method of installing an offshore transformer substation assembly that alleviates one or more challenges associated with the prior art solutions.
Summary of invention
[0012] According the present invention, there is provided a method of installing an offshore transformer assembly with a power range above 20 MVA and/or with a mass of more than 50 metric tons onto an offshore main structure which extends vertically from a distance below the sea surface to a distance above the sea surface, and which comprises a transformer landing section at a distance below the sea surface. According to the present invention, the method comprises the following steps:
a) transporting the offshore transformer assembly with a floating transport means, such as a vessel or a barge, to the location of the offshore main structure at sea, wherein the offshore transformer assembly is arranged at a first vertical elevation during said transport;
b) after step a), landing the offshore transformer assembly on the transformer landing section, thereby lowering the offshore transformer assembly to a second vertical level which is lower than the first vertical level;
c) after step a), connecting dry-mate connectors of the offshore transformer assembly with dry-mate connectors of the offshore main structure at a position above the sea surface.
[0013] With the present invention, a solution is provided where the heavy part of a transformer assembly, namely the transformer itself, comprising inter alia electrical windings and a core, is arranged at a low vertical elevation. For the main structure that shall carry the weight of the transformer, this means that its upper part needs to be less robust. Moreover, the main structure will need less space on the upper portion, since it needs not receive the transformer there.
[0014] Furthermore, by arranging the lower portion of the transformer assembly, namely the transformer itself and the surrounding encapsulation, into the sea and below the sea surface, water will be displaced and thus reduce the effective weight of the transformer assembly. This also results in a reduced structural demand for the main structure that carries the transformer.
[0015] Yet another advantage with the present invention, is that in some embodiments, the surrounding sea water will provide sufficient cooling of the transformer. Thus, in such embodiments one may avoid a cooling means, which otherwise would have to be installed on the carrying main structure, typically at the top of the structure together with the transformer. To obtain sufficient cooling of the transformer, it is advantageous to produce the encapsulation and the conduit of a material that exhibits a high thermal conductivity, such as metal. In that way, cold seawater may cool the oil inside the enclosure and inside the conduit.
[0016] For transformer embodiments typically with a power range above 50 MVA and/or with a mass of more than 50 metric tons, there are only a few proven topside transformers that can be replaced with the permanent crane(s) of the offshore installation / offshore platform.
[0017] For larger transformers, typically with a power range of above 100 MVA and/or with a mass of more than 100 metric tons, there are few or perhaps no proven topside alternatives, where one can replace the transformer with the permanent crane(s) of the offshore installation / offshore platform.
[0018] Notably, in offshore wind farm facilities, permanent topside cranes are considered to be a maintenance burden, which one seeks to avoid.
[0019] In some smaller embodiments, as could be representative for a wellhead platform (WHP) or an unmanned wellhead platform (UWP) or an unattended installation (UI) or a normally unattended installation (NUI), the transformer could be quite small and serve a minimalistic topside. A transformer embodiment rated for 10 MVA or 5 MVA or 1 MVA would typically be possible to lift topside with a crane. However, with the present invention, topside footprint savings is still obtained even with such small transformers, and hence still constituting a significant technical advantage. For installations based on a walk-to-work design philosophy without, or with only minimalistic crane capacities, it could be an enabler to have the transformers located below the water-line and still have topside cable terminations on it.
Brief description of drawings
[0020] While the present invention has been described in general terms above, a more detailed and non-limiting example of embodiment will be given in the following with reference to the appended drawings, in which
Fig. 1 is a cross section side view of an offshore transformer assembly according to the invention;
Fig. 2 is a perspective view of an offshore transformer installation, where two transformer assemblies are installed on a main structure at sea;
Fig. 3 is a cross section side view of an embodiment substantially corresponding to the embodiment shown in Fig.2;
Fig. 4 is a perspective view of a ship that is installing a transformer assembly according to the invention;
Fig. 5 is an enlarged perspective view of a portion of the main structure;
Fig. 6 is a perspective view of a transformer assembly and the main structure in a situation where the transformer assembly is being landed;
Fig. 7 is a perspective view corresponding to Fig.6, where the transformer assembly is nearly landed;
Fig. 8 is a side view of an offshore transformer installation;
Fig. 9 is a principle cross section side view through a main structure in the form of a spar platform, wherein a transformer assembly is landed on the main structure;
Fig. 10 is a principle top view of a part of a semi-submersible platform equipped with a transformer assembly; and
Fig. 11 is a principle top view of a part of a semi-submersible platform with a transformer assembly.
Detailed description of the invention
[0021] Fig. 1 shows an electric offshore transformer assembly 10. The assembly has a transformer 11 arranged inside a watertight encapsulation 13. A conduit 15 extends upwards from the encapsulation 13. The inside of the conduit 15 is in fluid communication with the inside of the encapsulation 13, so that it constitutes a prolongation of the encapsulated chamber inside the encapsulation 13.
[0022] The conduit 15 may advantageously be a rigid pipe. It may however in some embodiments be in the form of a flexible tube.
[0023] The encapsulation 13 has an aperture 17, to which the lower and open end of the conduit 15 is connected, thereby connecting the inside of the conduit 15 with the inside of the encapsulation 13. While the aperture 17 in the shown embodiment constitutes a wide-open opening between the interior of the conduit 15 and the inside of the encapsulation 13, in other embodiments there may be arranged for instance a baffle in the opening.
[0024] In the shown embodiment, the aperture 17, to which the conduit 15 connects, is arranged in an upper face or roof of the encapsulation 13. In other embodiments however, the aperture 17 may be arranged elsewhere on the encapsulation 13, such as in a side wall.
[0025] To the transformer 11, which in the shown embodiment is an electric three phase transformer, has a primary side and a secondary side. To the primary side there are connected three primary electric cables 19a. To the secondary side there are connected three secondary electric cables 19b.
[0026] As shown in Fig.1, the primary and secondary electric cables 19a, 19b extend upwards through the aperture 17 and through the conduit 15. In embodiments where the aperture 17 is not wide-open, such as with a baffle, there will still be one or more openings for guiding the primary and secondary electric cables through the aperture.
[0027] At the top of the conduit 15 there is a conduit head 21. At the conduit head 21, the primary electric cables 19a are terminated in a set of primary connectors 23a. Correspondingly, the secondary electric cables 19b are terminated in a set of secondary connectors 23b. The primary and secondary connectors 23a, 23b can advantageously be dry-mate connectors, configured to be connected with connector counterparts (not shown) in a dry environment (i.e. not in a body of water).
[0028] In the shown embodiment, the primary and secondary connectors 23a, 23b are arranged at a primary exit port 27a and a secondary exit port 27b, respectively. In alternative embodiments, the primary and secondary electric cables 19a, 19b may exit the conduit 15 at the primary and secondary exit ports 27a, 27b, respectively, and extend a further distance until their terminations at the primary and secondary connectors 23a, 23b. In such embodiments the primary and secondary connectors 23a, 23b are more flexible, as they are connected to the rest of the assembly 10 via the primary and secondary electric cables 19a, 19b. In order to prevent oil from exiting the conduit, a (not shown) sealing means must be arranged at the primary and secondary exit ports 27a, 27b. Such a sealing means will seal against the primary and secondary connectors 23a, 23b and/or against the primary and secondary cables 19a, 19b.
[0029] While in the shown embodiment, the primary and secondary exit ports 27a, 27b are arranged at different positions on the conduit 15, they may in other embodiments be arranged at the same location.
[0030] The vertical distance between the position of the interface between the transformer 11 and the primary and secondary cables 19a, 19b, and the primary and/or secondary exit ports 27a, 27b, may be more than 5 meters, and advantageously more than 10 meters.
[0031] The volume inside the encapsulation 13 and the conduit 15 is filled with oil to cool the transformer 11 and to electrically insulate. On top of the conduit head 21 there is arranged an oil conservator tank 25. The upper surface level 27 of the oil is arranged inside the oil conservator tank 25. Inside the oil conservator tank 25, there may be arranged a compressible gas bladder (not shown) to allow for some variation of oil volume.
[0032] In some embodiments, in addition to oil, other insulation means, such as paper, may be arranged in between the primary and secondary electric cables 19a, 19b inside the conduit 15. Moreover, as will be appreciated by the skilled person, the electric cables themselves are provided with insulating jackets / layers.
[0033] Fig. 2 shows an offshore installation 100 standing on a seabed (not shown). The offshore installation 100 comprises a main structure 101. In the shown embodiment, the main structure 101 is in form of a jacket. In other embodiments, the main structure 101 can be a floating structure, such as a spar platform or a semisubmersible. Thus, although the following example embodiment is given with a jacket 101 standing on the seabed, the discussed features may also be present with any other type of main structure 101.
[0034] The main structure 101 shown in Fig.2 extends from the seabed and vertically upwards beyond the sea surface 103, which is indicated in the drawing.
[0035] In this embodiment, two electric offshore transformer assemblies 10, such as the assembly shown in Fig.1, are installed on the main structure 101. The main structure 101 comprises a transformer landing section 105, onto which the two transformer assemblies 10 are landed.
[0036] On the transformer landing section 105, there is provided a landing guiding means 107, which facilitates the installation of the transformer assembly 10 in the correct position. In the embodiment shown in Fig.2, the landing guiding means 107 comprises upwardly facing guide funnels that are configured to receive downwardly extending transformer assembly feet 29 (Fig.5) arranged on the lower side of the transformer assembly 10.
[0037] In the embodiment shown in Fig.2, the main structure 101 has a balcony-like transformer landing section 105, which extends some distance laterally out from the main portion of the main structure 101. Notably, the transformer landing section 105 and the main structure 101 is designed so that a transformer assembly 10 may land by being lowered in a vertical direction towards the transformer landing section 105.
[0038] On an upper deck 108 of the main structure 101, there is arranged a control arrangement 109. The control arrangement 109 may comprise various components such as switchgears, gauges, and control means.
[0039] Electrical input cables and output cables 111 enters the control arrangement 109. In an embodiment where the offshore installation 100 is used in association with an offshore wind park, the input cables 111 may typically be cables that conduct electric current from a plurality of wind power towers (not shown) and into the control arrangement 109. Moreover, the output cables 111 may typically be conducting stepped-up electric power for export to a grid or other consumer. Thus, the imported power may be stepped up in the transformers 11 in the transformer assemblies 10.
[0040] Fig. 3 shows a cross section side view of an embodiment that substantially corresponds with the embodiment shown in Fig.2.
[0041] In some embodiments, the primary and/or secondary electric cables 19a, 19b that extend upwards inside the conduit 15 may be supported within the conduit. In other embodiments, they may be loosely arranged within the conduit 15.
[0042] In Fig.3 there is indicated dry-mate connectors 123a, 123b that are part of the offshore installation 100. The dry-mate connectors 123a, 123b are configured to be connected to the primary and secondary connectors 23a, 23b of the transformer assembly 10. The dry-mate connectors 123a, 123b are connected to the control arrangement 109 with electric cables.
[0043] The transformers may in some embodiments have a mass of more than 100 metric tons. Hence, the center of gravity of the offshore installation 100, with one or more transformers 13 installed on it, will be substantially affected by the weight of the transformer. By positioning the one or more transformers 13 at a vertical distance below the sea surface 103 and thus below the upper deck of the main structure 101, the center of gravity is significantly lower than with prior art solutions, where the transformers are arranged at a higher level.
[0044] In the perspective view of Fig.2, a conduit guiding means 110 is shown, located substantially at the vertical elevation of the upper deck 108. The conduit guiding means 110 will be connected to the conduit 15 after having installed the transformer assembly 10 into position, resting on the transformer landing section 105. The conduit guiding means 110 retains the conduit 15 in its correct position.
Moreover, in embodiments where the conduit 15 is flexible, the upper portion of the conduit 15 may be suspended in the conduit guiding means 110.
[0045] When transporting a transformer assembly 10 according to the invention at sea, for installation, it can be transported in different manners. Notably, common for the different ways of transporting the transformer assembly, is that one does not need to hoist it a substantial vertical distance upwards, since it shall be installed with the transformer 11 itself below the sea surface.
[0046] Hence, if transported on the deck of for instance a barge or vessel, one will need a lifting means that can move the transformer assembly off the deck and into the sea. Such a lifting means can be a crane on the barge itself, or it can be another vessel provided with a crane.
[0047] In some embodiments it will be possible to transport the transformer assembly 10 in a position where it is partially immersed into the sea. Such an embodiment is shown in Fig.4. Here, a ship 200, which in the shown embodiment is a modified anchor handling vessel, is used for transport and installation of the offshore transformer assembly 10. In such an embodiment, the transformer assembly 10 may be hung off at the stern of the ship 200, with the transformer 11 below the sea surface 103 and with the upper part of the conduit 15 above the sea surface. When lowering the transformer assembly 10 down towards the installed position, it can be lowered with a winch (not shown) on the ship 200.
[0048] In the embodiment shown in Fig.4, a pair of winch wires 201 extend from two (not shown) winches on the ship, over two lifting beams 203, and down to the transformer assembly 10. In embodiments like this, the operator does not need to hoist the transformer assembly out of the sea at all, when at the installation site.
[0049] Fig. 5 to Fig.7 show the process of landing a transformer assembly 10 onto the transformer landing section 105 of the main structure 101 in greater detail. The transformer assembly 10 can be hoisted by means of the ship 200 as shown in Fig. 4, or by any other suitable means, such as a ship with a crane (not shown).
[0050] Fig. 5 depicts a portion of the main structure 101, such as a jacket resting on the sea bed. The transformer landing section 105 extends laterally, like a balcony, out from the main body of the main structure 101. In this shown embodiment, the main structure 101 is configured to receive two transformer assemblies 10. The transformer landing section 105 is provided with the landing guiding means 107, as were discussed above. The landing guiding means 107 are configured to receive transformer assembly feet 29, which are indicated in Fig.6.
[0051] The main structure 101 further comprises landing alignment means 113, which in the shown embodiment are in the form of substantially vertically extending rails. The landing alignment means 113 of the main structure 101 is configured to engage with a transformer assembly alignment means 31 of the transformer assembly 10. In the embodiment shown in Fig.6 and Fig.7, the transformer assembly alignment means 31 are formed as two bars that extend laterally out from the transformer assembly 10, to form an angle that constitutes a corner. When lowering the transformer assembly 10 down towards the transformer landing section 105, the landing alignment means 113 of the main structure 101 is received in the corner, and thus facilitating correct alignment of the transformer assembly 10 with respect to the main structure 101. In the embodiment shown in Fig.4, a somewhat different solution is disclosed.
[0052] In the situation shown in Fig.7, the transformer assembly 10 is still being lowered down towards the transformer landing section 105, and the transformer assembly feet 29 have barely entered into the receiving landing guiding means 107. The transformer assembly alignment means 31 are still in sliding engagement with the landing alignment means 113 of the main structure 101.
[0053] During all the situations shown in Fig.5 to Fig.7, the transformer 11 of the transformer assembly 10 may remain below the sea surface (which is not shown in these figures). The primary and secondary exit ports 27a, 27b (Fig.1) may however always remain above the sea surface.
[0054] Fig. 8 depicts an advantageous embodiment of the present invention.
According to this solution, two electric offshore transformer assemblies 10 are arranged on the main structure 101. Contrary to the embodiment shown in Fig.2, however, one transformer assembly 10 is arranged on respective sides of the main structure 101. In this manner, the weight of the two assemblies is distributed more evenly on the main structure 101. In similar embodiment, one may of course arrange more than two transformer assemblies 10 to the main structure. For instance, two on one side and one on the opposite side, or even four or more transformer assemblies 10.
[0055] There is also provided an offshore transformer structure 101 that has at least two transformer landing sections 105, and wherein at least two of the transformer landing sections are arranged at opposite sides of the offshore transformer structure.
[0056] The main structure 101, namely the offshore transformer structure, can be in form of a floating spar platform 201. Such an embodiment is depicted in Fig.9, which shows a principle cross section side view through a cylindrical main body part of such a spar platform 201. In this embodiment, the transformer landing section 205 is arranged in a niche in the main structure 201. In this way, the transformer assembly 10 will be protected from supply ships, inter alia, which approaches the spar platform.
[0057] The sea surface 103 is indicated in Fig.9, at a vertical position between the encapsulation 13 and the conduit head 21 of the transformer assembly 10.
[0058] As can be appreciated from the embodiment depicted in Fig.9, the entire transformer assembly 10 is arranged within the outer perimeter of the cylindrical shape of the main structure 201 of the spar platform. It will be clear to the skilled person, however, that in other embodiments, the transformer landing section 205 may extend out from the cylindrical shape of the main structure 201.
[0059] The skilled person will appreciate that also such a spar platform may comprise more than one transformer landing sections 205, which in some embodiments may be arranged on opposite sides of the main structure 201.
[0060] Fig. 10 and Fig.11 depict top views of a corner section of a floating semisubmersible platform (a “semi”). The semi has a plurality of columns 301, extending vertically between a pontoon and an upper deck section (not shown).
[0061] In the embodiment according to Fig.10, a transformer landing section 305 is arranged such that the transformer assembly 10, when landed, extends beyond the perimeter of the column 301. In the embodiment according to Fig.11, however, the transformer landing section 305 is designed in such way that the entire transformer assembly 10 can be arranged within the perimeter of the main shape of the column 301. This is similar to the depicted embodiment in Fig.9, which shows the spar platform 201.

Claims (1)

Claim
1. Method of installing an offshore transformer assembly (10) with a power range above 10 or even 20 MVA and/or a mass of more than 50 metric tons onto an offshore main structure (101) which extends vertically from a distance below the sea surface (103) to a distance above the sea surface, and which comprises a transformer landing section (105) at a distance below the sea surface,
wherein the offshore transformer assembly (10) comprises an encapsulation (13) and a transformer (11) inside the encapsulation, primary cables (19a) are connected to a primary side of the transformer and secondary cables (19b) connect to a secondary side of the transformer, the primary and secondary cables (19a, 19b) extend out of the encapsulation through an encapsulation aperture (17), wherein the offshore transformer assembly (10) further comprises a conduit (15) which is arranged with a sealed connection to the encapsulation aperture (17), wherein the primary and secondary cables extend from the transformer (11) and upwards through the conduit (15), and at least to an exit port (27a, 27b) at a vertical distance above the transformer, wherein the method comprises the following steps:
a) transporting the offshore transformer assembly (10) with a floating transport means (200), such as a vessel or a barge, to the location of the offshore main structure (101) at sea, wherein the offshore transformer assembly (10) is arranged at a first vertical elevation during said transport;
b) after step a), landing the offshore transformer assembly (10) on the transformer landing section (105), thereby lowering the offshore transformer assembly (10) to a second vertical level which is lower than the first vertical level;
c) after step a), connecting dry-mate connectors (23a, 23b) of the offshore transformer assembly (10) with dry-mate connectors of the offshore main structure (101) at a position above the sea surface (103),
characterized in that step a) comprises transporting the offshore transformer assembly (10) with the transformer (11) in a position below the sea surface (103) and with the upper portion of the conduit (15) in a position above the sea surface.
NO20180099A 2018-01-22 2018-01-22 Method of installing an offshore transformer assembly NO344439B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NO20180099A NO344439B1 (en) 2018-01-22 2018-01-22 Method of installing an offshore transformer assembly
PCT/EP2019/051347 WO2019141841A1 (en) 2018-01-22 2019-01-21 Offshore transformer assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO20180099A NO344439B1 (en) 2018-01-22 2018-01-22 Method of installing an offshore transformer assembly

Publications (2)

Publication Number Publication Date
NO20180099A1 NO20180099A1 (en) 2019-07-23
NO344439B1 true NO344439B1 (en) 2019-12-09

Family

ID=65199414

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20180099A NO344439B1 (en) 2018-01-22 2018-01-22 Method of installing an offshore transformer assembly

Country Status (2)

Country Link
NO (1) NO344439B1 (en)
WO (1) WO2019141841A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2586799B (en) 2019-09-03 2022-01-12 Aker Solutions As Offshore power distribution
EP4039968A1 (en) * 2021-02-05 2022-08-10 Siemens Gamesa Renewable Energy A/S Method for connecting a component of a power conversion circuit of a wind turbine
EP4063646A1 (en) * 2021-03-25 2022-09-28 ABB Schweiz AG Power collection system for subsea transfer of power from offshore power generation units
CN113808809B (en) * 2021-09-13 2023-09-05 国网安徽省电力有限公司天长市供电公司 Protective device for power grid transformer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080164966A1 (en) * 2004-12-27 2008-07-10 Siemens Aktiengesellschaft Electrical Component With A Cooling Circuit For Underwater Operation
WO2013114138A2 (en) * 2012-02-02 2013-08-08 Wfs Technologies Limited Improved subsea installation deployment
US9377009B2 (en) * 2013-10-17 2016-06-28 Siemens Aktiengesellschaft Single piece electric assembly for connecting an off-shore wind turbine with an electric subsea cable, wind turbine, wind turbine cluster and method for mounting such an electric assembly to a wind turbine tower

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19962453C1 (en) 1999-12-22 2001-07-12 Aerodyn Eng Gmbh Offshore wind turbine with interchangeable containers
WO2011120591A1 (en) 2010-04-02 2011-10-06 Areva T&D Uk Limited Off-shore transformer station with exchangeable transformer assembly
CN204663059U (en) 2015-05-26 2015-09-23 中国能源建设集团广东省电力设计研究院有限公司 Maritime transformer station
GB201510222D0 (en) * 2015-06-11 2015-07-29 Tidal Energy Ltd Underwater structure and underwater structure installation and removal method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080164966A1 (en) * 2004-12-27 2008-07-10 Siemens Aktiengesellschaft Electrical Component With A Cooling Circuit For Underwater Operation
WO2013114138A2 (en) * 2012-02-02 2013-08-08 Wfs Technologies Limited Improved subsea installation deployment
US9377009B2 (en) * 2013-10-17 2016-06-28 Siemens Aktiengesellschaft Single piece electric assembly for connecting an off-shore wind turbine with an electric subsea cable, wind turbine, wind turbine cluster and method for mounting such an electric assembly to a wind turbine tower

Also Published As

Publication number Publication date
NO20180099A1 (en) 2019-07-23
WO2019141841A1 (en) 2019-07-25

Similar Documents

Publication Publication Date Title
WO2019141841A1 (en) Offshore transformer assembly
EP2863053B1 (en) Single piece electric assembly for connecting an off-shore wind turbine with an electric subsea cable and mounting method therefor
CN110040212B (en) Floating connector system for an offshore energy converter device and method for installing the same
KR101835192B1 (en) Converter station with diode rectifier
RU2549362C2 (en) Subsea module for production of electric energy
KR20220058921A (en) maritime power distribution
US20120257973A1 (en) Offshore wind turbine having a support system for interchangeable containers, the support system being combined with a wave run-up deflector and method of manufacturing same
US20200370541A1 (en) An offshore arrangement, a connecting device, and a method for providing an electrical offshore connection
SE539439C2 (en) Wave energy converter switching station in a wave power station
US10738431B2 (en) Connection structure for a marine installation, marine installation and method of erecting a marine installation
CN105009392A (en) Method for installing of wet mateable connection assembly for electrical and/or optical cables
CN106223668A (en) A kind of offshore boosting station being applicable to floating expelling pathogens by strengthening vital QI installation
CN202509477U (en) Jack-up offshore booster station used in offshore wind power plant
CN215717622U (en) Novel wet-dragging self-installation type offshore transformer substation and seabed big data center integral structure
Schachner Power connections for offshore wind farms
NO347378B1 (en) Offshore transformer assembly
JP2022544482A (en) Floating wind turbine with integrated electrical substation
CN104993408A (en) Offshore booster station
CN202068113U (en) Fixed offshore booster station for offshore wind farm
EP2365136B1 (en) Offshore installation and method for connecting cabling and/or piping thereto
CN114837478B (en) Wet-towed self-installation type offshore substation and seabed big data center integral structure and installation method
CN203866804U (en) Bottom-sitting type offshore booster station
CN205490293U (en) Float formula contravariant power generation facility that steps up
WO2024085772A1 (en) Floating electricity distribution platform for electricity distribution at offshore locations comprising a semi-submersible hull
CN109038380B (en) Offshore booster station