NO20141231A1 - Cement permitting initial liner peak integrity test - Google Patents

Cement permitting initial liner peak integrity test Download PDF

Info

Publication number
NO20141231A1
NO20141231A1 NO20141231A NO20141231A NO20141231A1 NO 20141231 A1 NO20141231 A1 NO 20141231A1 NO 20141231 A NO20141231 A NO 20141231A NO 20141231 A NO20141231 A NO 20141231A NO 20141231 A1 NO20141231 A1 NO 20141231A1
Authority
NO
Norway
Prior art keywords
string
cement
cementing
valve
liner
Prior art date
Application number
NO20141231A
Other languages
Norwegian (no)
Other versions
NO339650B1 (en
Inventor
Barton Sponchia
Lars H Norheim
Brett Hrabovsky
Original Assignee
Archer Oil Tools As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Archer Oil Tools As filed Critical Archer Oil Tools As
Priority to NO20141231A priority Critical patent/NO339650B1/en
Priority to PCT/NO2015/050190 priority patent/WO2016060570A1/en
Publication of NO20141231A1 publication Critical patent/NO20141231A1/en
Publication of NO339650B1 publication Critical patent/NO339650B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • E21B33/146Stage cementing, i.e. discharging cement from casing at different levels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Details Of Valves (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Materials For Medical Uses (AREA)
  • Tires In General (AREA)

Abstract

Sementering utføres etter at en hengertetning er satt først for å sikre trykk integritet av koblingene mellom strengene som skal sementeres og det eksisterende røret. Sementering kan tenkes både ovenfra og ned og nedenfra og opp enten med fluid som returnerer til overflatene i et crossoververktøy eller med det fortrengte fluid squeezed inn i formasjonen. En arbeidsstreng manipulerer crossoververktøyet for å reversere ut etter sementering. For å kjøre inn er en ventilsammentsilling holdt åpen for å tillate sirkulasjon. Arbeidsstrengmanipulasjon tillater i det minste en ventil som holder sementen i annulus å stenge og i det minste en andre ventil til å stenge som påser at reversert fluid ikke forlater sementrøret for å tillate slik strøm å returnere til crossoververktøyet og ut til overflaten. Ventilfrigjøringen kan utføres ved en trykkresponderende hylse i stedet for en stinger på kjørestrengen.Cementing is performed after a hanger seal is set first to ensure pressure integrity of the connections between the strands to be cemented and the existing pipe. Cementing can be conceived both from top to bottom and from bottom to top either with fluid returning to the surfaces of a crossover tool or with the displaced fluid squeezed into the formation. A work string manipulates the crossover tool to reverse out after cementing. To run in, a valve assembly screen is kept open to allow circulation. Work string manipulation allows at least one valve that holds the cement in the annulus to close and at least one other valve to close which ensures that reversed fluid does not leave the cement pipe to allow such current to return to the crossover tool and out to the surface. The valve release can be performed by a pressure-responsive sleeve instead of a stinger on the drive string.

Description

Sementering som tillater initiell linertoppintegritetsttest Cementing allowing initial liner top integrity testing

OPPFINNELSENS OMRÅDE FIELD OF THE INVENTION

Oppfinnelsen angår sementering og mer spesifikt en metode som tillater å sette en linerhengertetning for å bestemme trykkholdbarheten til koblingen før sementering nedenfra og opp eller ovenfra og ned eller med retur eller squeezing inn i formasjonen. The invention relates to cementing and more specifically a method that allows a liner hanger seal to be set to determine the pressure resistance of the coupling prior to cementing from the bottom up or from the top down or with return or squeezing into the formation.

BAKGRUNN FOR OPPFINNELSEN BACKGROUND OF THE INVENTION

Vanligvis i en sementeringsoperasjon henges rørstrengen opp i et eksisterende rør med en ankerdel av en hanger uten å belaste tetningen slik at levert sement kan flytte væsker rundt det satte ankeret. Når sementen er skikkelig plassert er tetningen satt. Trykktestingen av koblingen kan ikke testes før sementen pumpes. Den fortrengte væsken som strømmer gjennom hengertetningen kan ha urenheter inkludert partikler fra sementen som senere kan ødelegge tetningsområdet og dermed ødelegge tetningsarealet og forhindre en tilfredsstillende tetning. I noen tilfeller når slikt skjer kan en annen tetning kjøres inn og settes ovenfor tetningen som ikke skikkelig tetter av for trykket. Dette er en dyr og tidskrevende prosess. Det er mer foretrukket å integritetsteste koblingen før sementeringen begynner og målet for foreliggende oppfinnelse er å fremskaffe utstyr som forenkler en metode for å oppnå dette målet. Typically in a cementing operation, the pipe string is suspended in an existing pipe with an anchor portion of a hanger without stressing the seal so that delivered cement can move fluids around the set anchor. When the cement is properly placed, the seal is set. The pressure testing of the coupling cannot be tested before the cement is pumped. The displaced fluid flowing through the hanger seal may have impurities including particles from the cement which can later destroy the seal area and thus destroy the seal area and prevent a satisfactory seal. In some cases when this happens, another seal can be driven in and placed above the seal that does not properly seal off the pressure. This is an expensive and time-consuming process. It is more preferred to test the integrity of the connection before cementing begins and the aim of the present invention is to provide equipment which simplifies a method for achieving this aim.

Mange ganger når en sementeringsjobb utføres i en ovenfra og ned retning, trykkes simpelthen fluiden inn i formasjonen. Dette er kalt squeeze sementering og er vanligvis utført for vanlige sementeringssko, som ofte er enveis ventilsammenstillinger på bunnen av en streng sementert ved å tillate sement ut av strengen i en konvensjonell sementeringsjobb(nedenfra og opp) men blokkerer retur strømmen. Hvis man foretar en ovenfra og ned sementeringsjobb vil en standard sko blokkere fortrengt væske som forsøker å komme tilbake inn i strengen. Som et resultat er ovenfra og ned sementering utført med squeezing, fortrengt væske inn i formasjonen, og kan påvirke den påfølgende produksjonen. Many times when a cementing job is done in a top-down direction, the fluid is simply pushed into the formation. This is called squeeze cementing and is usually performed for conventional cementing shoes, which are often one-way valve assemblies at the bottom of a string cemented by allowing cement out of the string in a conventional cementing job (from the bottom up) but blocking the return flow. If doing a top-down cementing job, a standard shoe will block displaced fluid trying to get back into the string. As a result, top-down cementation performed with squeezing displaces fluid into the formation and can affect subsequent production.

OM DEN TEKNINSKE LØSNINGEN ABOUT THE TECHNICAL SOLUTION

Metoden i foreliggende oppfinnelse tillater væske å trenge inn i en arbeidsstreng under sementeringen så vel som å forhindre fluid fra overflaten som kommer ned arbeidsstrengen fra å komme ut av rørstrengens nedre ende og fremmer retur av overskuddssement etter en sementeringsjobb. The method of the present invention allows fluid to penetrate a working string during cementing as well as preventing fluid from the surface coming down the working string from exiting the lower end of the pipe string and promotes the return of excess cement after a cementing job.

Med det fremskaffede utstyret kan en sementeringsjobb utføres på standard måte nedenfra og opp, eller den kan utføres i omvendt retning fra topp og ned med fortrengt væske eller med squeeze utførelse, alle mens linerhengertetningen er satt og trykktesting av koblingen i det eksisterende røret kan avklares før sementen pumpes. With the equipment provided, a cementing job can be carried out in the standard way from the bottom up, or it can be carried out in the reverse direction from the top down with displaced liquid or with squeeze execution, all while the liner hanger seal is set and pressure testing of the connection in the existing pipe can be clarified before the cement is pumped.

Denne fleksibiliteten fremskaffes ved en sub med en stabel av ventiler, fortrinnsvis full-åpningsklaffer. En eller flere nedre ventiler holdes åpne under kjøring med en stinger koblet til en kjørestreng eller trykkaktivert hylse. I det minste en øvre ventil er i utgangspunktet holdt åpen for kjøring inn, men, når frigitt til å operere, forhindrer sementen i å strømme inn i rørstrengen. Den nederste klaffeventilen tillater fortrengt fluid å strømme inn i rørstrengen når det pumpes sement ovenfra og ned og holder i mot retur fluid som kommer ned lineren for å fjerne overskytende sement. En sementerings crossover tillater sementen å løpe ut til annulus nær toppen av strengen nedenfor rørhengeren og tetningen. Isolatorer er anordnet for strengen som kan dart aktiveres som back up for å stenge returveien fra crossoveren dersom klaffeventilen ikke frigjøres skikkelig. Alternativt, uten noen indre streng som strekker seg til klaffeventilene, er det anordnet en pakningsanordninge på stingeranordningen som kan dart aktivere klaffeventilene for å stenge av lineren i en nødssituasjon dersom klaffenes aktivering svikter. This flexibility is provided by a sub with a stack of valves, preferably full-opening flaps. One or more lower valves are held open during driving by a stinger connected to a driving string or pressure-activated sleeve. At least one upper valve is initially held open for drive in but, when released to operate, prevents the cement from flowing into the pipe string. The lower flap valve allows displaced fluid to flow into the pipe string when cement is pumped from the top down and prevents return fluid coming down the liner to remove excess cement. A cementing crossover allows the cement to run out to the annulus near the top of the string below the pipe hanger and seal. Insulators are provided for the string which can be dart activated as back up to close the return path from the crossover if the flap valve is not released properly. Alternatively, without any internal string extending to the flap valves, a packing device is provided on the stinger assembly which can dart actuate the flap valves to shut off the liner in an emergency situation if the flap actuation fails.

Disse og andre aspekter av den foreliggende oppfinnelsen vil komme klarere frem ved gjennomgang av beskrivelsen for de foretrukne utførelsene og tilknyttede figurer mens det totale omfang av oppfinnelsen kan utledes fra vedlagte krav. These and other aspects of the present invention will become clearer upon review of the description for the preferred embodiments and associated figures, while the total scope of the invention can be derived from the appended claims.

KORT SAMMENDRAG AV OPPFINNELSEN BRIEF SUMMARY OF THE INVENTION

Oppfinnelsen er en brønnkompletterings metode for å støtte og sementere en rørstreng fra et eksisterende rør og en The invention is a well completion method for supporting and cementing a pipe string from an existing pipe and a

brønnlinersementeringssammenstilling omfattende well liner cementing assembly comprehensive

Mer spesifikt er oppfinnelsen en petroleumsbrønnkompletteringsmetode fro å støtte og sementerte en rørstreng fra et eksisterende rør omfattende å kjøre inn på en kjørestrengrørstreng med henger og pakningssammenstilling for å posisjonere hengeren og pakningen ved den ønskede posisjonen på rørstrengen, sette henger og pakning, trykk teste koblingen mellom strengen og den eksisterende rørstrengen etter å ha satt den, dernest sementere rørstrengen. Oppfinnelsen er også en brønnlinersementeringssammenstilling omfattende en borerørstreng med et rørstrengfrigjøringsverktøy anordnet for å holde en linerhengersettingshylse tilhørende en linerstreng, linerstrengen er utstyrt med en linerhenger og tetningssammenstilling, linerstrengene er forsynt med en annulussementeringsport betjent av et crossoververktøysammenstilling anordnet på borerørstrengen nedenfor rørstrengens frigjøringsverktøy. More specifically, the invention is a petroleum well completion method from supporting and cementing a pipe string from an existing pipe comprising driving onto a driveline pipe string with a hanger and packing assembly to position the hanger and packing at the desired position on the pipe string, placing the hanger and packing, pressure testing the connection between the string and the existing pipe string after setting it, then cement the pipe string. The invention is also a well liner cementing assembly comprising a drill string with a string release tool arranged to hold a liner hanger insert sleeve associated with a liner string, the liner string is equipped with a liner hanger and seal assembly, the liner strings are provided with an annulus cementing port operated by a crossover tool assembly arranged on the drill string below the string release tool.

Linerstrengen er forsynt med nedre ventiler som holdes åpne under innkjøring av sementeringsstingeren anordnet nedenfor The liner string is provided with lower valves which are kept open during the drive-in of the cementing stinger arranged below

crossoververktøysammenstillingen og tetnigssammenstillingen som tillater trykktesting når hengeren er satt i casingen. the crossover tool assembly and the seal assembly which allows pressure testing when the hanger is inserted into the casing.

Sementeringen utføres etter at hengeneren og tetningen er satt for først å forsikre seg om trykkintegritet av koblingen mellom strengene som skal semententeres og det eksisterende røret. Semterering ovenfra og ned eller nedenfra og opp er tenkt enten med fortrengt væske som returnerer til overflaten i et crossoververktøy eller med den fortrengte væsken squeezed inn i formasjonene. En arbeidsstreng manipulerer crossoverern for tilbakeføring etter sementeringen. For å kjøre inn holdes en ventilsammenstilling åpen for å tillate sirkulasjon. Arbeidsstrengpåvirkning tillater i det minste en ventil som holder sementen i annulus å lukke og i det minste en annen ventil til å lukke som hindrer returvæske fra å forlate det sementerte rør for å tillate slik strømning å returnere til crossoveren og ut til overflaten. Ventilfrigjøring kan utføres ved en trykkavhengig hylse istedet for en stinger på kjørestrengen. Cementing is carried out after the hanger and seal have been set to first ensure the pressure integrity of the connection between the strings to be cemented and the existing pipe. Top-down or bottom-up sedimentation is envisioned either with displaced fluid returning to the surface in a crossover tool or with the displaced fluid squeezed into the formations. A working string manipulates the crossover for return after cementing. To drive in, a valve assembly is held open to allow circulation. Working string actuation allows at least one valve that holds the cement in the annulus to close and at least one other valve to close that prevents return fluid from leaving the cemented pipe to allow such flow to return to the crossover and out to the surface. Valve release can be carried out by a pressure-dependent sleeve instead of a stinger on the driving string.

KORT BESKRIVELSE AV FIGURENE BRIEF DESCRIPTION OF THE FIGURES

De vedlagte figurene illustrerer noen utførelser av den krevde oppfinnelsen. Fig. 0 er en forenklet illustrasjonsskisse av en brønnboring med et brønnhode, casing med en casingsko og som strekker seg fra havbunnens overflate, en rørstreng (35) og en kjørestreng (43). FIGURENE, la-le er et kombinert delvis riss og snitt av en linerstreng og strengverktøy. Figuren viser strømningsbanen for fluidsirkulasjon under kjøring med en indre strengstinger (100) i en nedre ende. FIGURENE 2a-2c er et delvis riss og snitt av en linerstreng og strengverktøy og viser inner strengen løftet for sementeringsposisjon med klaffeventiler frigjort og tillater fortrengt fluid inn i strengen fra annulus som blir sementert..FIGURENE 3a-3c tilsvarer 2a-2c med revers strømningsretning etter frigjøring av ventilen for å holde fluid i strengen og å tillatte fjerning av overskuddssement. FIG. 4 er et detaljert kombinert delvis riss og snitt av ventilarrangementet under sirkulasjon ved kjøring inn, og uten stinger i arbeidsstrengen. FIG. 5 er del av FIG. 4 under sementering med de to nedre klaffene (2) frigjort for operasjon. The attached figures illustrate some embodiments of the claimed invention. Fig. 0 is a simplified illustrative sketch of a wellbore with a wellhead, casing with a casing shoe and extending from the surface of the seabed, a pipe string (35) and a driving string (43). THE FIGURES, la-le is a combined partial view and section of a liner string and string tool. The figure shows the flow path for fluid circulation during driving with an inner stringer (100) at a lower end. FIGURES 2a-2c are a partial view and section of a liner string and string tool and show the inside of the string raised for cementing position with flap valves released and allowing displaced fluid into the string from the annulus being cemented..FIGURES 3a-3c correspond to 2a-2c with reverse flow direction after releasing the valve to keep fluid in the string and to allow removal of excess cement. FIG. 4 is a detailed combined partial view and section of the valve arrangement during circulation at run-in, and without stingers in the working string. FIG. 5 is part of FIG. 4 during cementation with the two lower flaps (2) released for surgery.

FIG. 6 er en del av FIG 5 med topp klaffen (1) firgjort til operasjon. FIG. 6 is a part of FIG 5 with the top flap (1) squared for operation.

FIG. 7 er en del av FIG. 6 og viser returstrøm ut for å fjerne overflødig sement. FIG. 8 viser stingeren i variant der ventilene holdes åpne for å tillate strømning ved innkjøring. FIGURENE 9 og 10 viser stingeneren løftet for å tillate de nedre to klaffene (2) å operere med en ovenfra og ned sementeringsstrøm. FIGURENE 11 og 12 er del av FIGURENE 9 og 10 med toppklaffen frigjort for å tillate returstrøm av sement ut. FIG. 7 is a portion of FIG. 6 and shows return flow out to remove excess cement. FIG. 8 shows the stinger in a variant where the valves are kept open to allow flow during entry. FIGURES 9 and 10 show the stinger lifted to allow the lower two flaps (2) to operate with a top-down cementing flow. FIGURES 11 and 12 are part of FIGURES 9 and 10 with the top flap released to allow return flow of cement out.

BESKRIVELSE AV OPPFINNELSEN DESCRIPTION OF THE INVENTION

Oppfinnelsen vil i det følgende bli beskrevet og utførelser av oppfinnelsen bli forklart med referanse til de vedlagte figurene. The invention will be described in the following and embodiments of the invention will be explained with reference to the attached figures.

Før en detaljert beskrivelse av komponentene som muliggjør metoden diskuteres, vil en generell betraktning av metoden utgjøre en introduksjon. En rørstreng som skal sementeres er levert gjennom en eksisterende streng slik at en henger/tetning på strengen som skal sementeres posisjoneres nær den nedre enden av et eksisterende rør. Til forskjell fra tidligere sementeringsmetoder blir både anker og tetning aktivert fra strengene som skal sementeres mot den eksisterende strengen slik at trykktesting av koblingen kan verifiseres før sementeringen begynner. Under innkjøring, for tilfredsstillende posisjonering av hengeren/tetningen, også referert til som linerhenger, når strengene henges opp og tettes som en linerstreng, er sirkulasjon mulig gjennom en nedre ventildel da alle ventilene er åpne. Referanse heretter til "linerhenger" inkluderer konstruksjoner som støtter og tetter en liner eller en casingstreng. Returstrøm kommer opp annulus på utsiden av strengen og kjøres inn. Etter at linerhengeren er fullstendig senket og trykktest er utført kan sementeringen starte. Arbeidsstrengen frigjøres fra den nå satte linerhengeren og trekkes opp for å trekke en stinger fra i det minste en klaffeventil som åpner når fortrengt fluid fra annulus i en ovenfra og ned sementeringsoperasjon trykkes gjennom rørstrengen. Etter at sementen er plassert åpnes en annen klaffeventil som hindrer at sement forlater annulus og strømmer inn i strengene som nettopp er sementert. Strømningseretiningen er snudd fra sementeringsstrinnet gjennom crossoveren hvor strømmen nå er inne i strengen men rundt kjørestrengen. Den første klaffeventilen som ble tillatt å operere ved opptaking blokkerer nå strømmen inne i strengen og rundt kjørestrengen og presser strømmen med overskuddssement tilbake gjennom strengen og til overflaten gjennom crossoveren. Innerstrengen blir deretter fjernet og ovenfra og ned sementeringsjobben med å ta den fortrengte fluidretur til overflatene er komplett. Som et alternativ til å frigjøre ventilene i ventildelen ved bruk av en stinger som løftes ut av dem slik beskrevet over, er en annen måte å benytte trykk sensitive ventiler som utløses ved ulike trykk til først å utløse ventilen som tillater fortrengt retur til strengen som blir sementert og dernest sement plassering i en top down retning til frigjøring av en annen ventil som påser at fluid ikke forlater røret slik at retur av sement ut kan oppnås. I denne utførelsen finnes tilgjengelig en backup, dersom ventil klaffene ikke stenger, å holde sementen i annulus ved å stenge av inne i strengen ved bruk av dart utløsing i en foring. Before a detailed description of the components that make the method possible is discussed, a general consideration of the method will constitute an introduction. A pipe string to be cemented is delivered through an existing string such that a hanger/seal on the string to be cemented is positioned near the lower end of an existing pipe. Unlike previous cementing methods, both anchor and seal are activated from the strings to be cemented against the existing string so that pressure testing of the connection can be verified before cementing begins. During run-in, for satisfactory positioning of the hanger/seal, also referred to as liner hanger, when the strings are suspended and sealed as a liner string, circulation is possible through a lower valve section as all the valves are open. Reference hereafter to "liner hangers" includes structures that support and seal a liner or casing string. Return current comes up the annulus on the outside of the string and is driven in. After the liner hanger has been completely lowered and a pressure test has been carried out, cementing can start. The work string is released from the now set liner hanger and pulled up to draw a stinger from at least one flap valve that opens when displaced fluid from the annulus in a top-down cementing operation is pushed through the string. After the cement is placed, another flap valve is opened, preventing cement from leaving the annulus and flowing into the strings that have just been cemented. The flow direction is reversed from the cementing stage through the crossover where the flow is now inside the string but around the drive string. The first flapper valve allowed to operate at take-up now blocks the flow inside the string and around the drive string and forces the flow of excess cement back through the string and to the surface through the crossover. The inner string is then removed and from top to bottom the cementing job of taking the displaced fluid returns until the surfaces are complete. As an alternative to releasing the valves in the valve section using a stinger which is lifted out of them as described above, another way is to use pressure sensitive valves which are triggered at different pressures to first trigger the valve which allows displaced return to the string which is cemented and then cement placement in a top down direction to release another valve which ensures that fluid does not leave the pipe so that the return of cement out can be achieved. In this design, a backup is available, if the valve flaps do not close, to keep the cement in the annulus by shutting off inside the string using a dart release in a liner.

Etter at sementen har satt seg kan man fese ut inne i strengen for å fjerne sement opp til foringen. After the cement has set, you can drill out inside the string to remove cement up to the liner.

Med introduksjonen ovenfor sammenstillingen med den uttagbare stingeneren (100) strekker seg fra koblingen (16) i Fig. le ned til avfalls og hylsefangeren (4) på den nederste enden. I mellom er en hurtigkoblings (11,12); en<w>no go and shear up locator" (7) og en flottørventil (8). For å kjøre inn hilder stingeren (100) klaffeventilen (1) ansett som andre ventil og den omvendte klaffeventilen (2), ansett som første klaffeventil, som det er illustrert to av med en som backup for den andre, åpne. With the introduction above, the assembly with the removable stinger (100) extends from the coupling (16) in Fig. le down to the waste and sleeve catcher (4) at the lower end. In between is a quick-connect (11,12); a<w>no go and shear up locator" (7) and a float valve (8). To drive in the hilder stinger (100) the flap valve (1) considered as the second valve and the reverse flap valve (2), considered as the first flap valve , of which two are illustrated with one as a backup for the other, open.

Klaffeventil (1) hindrer strømning inn i ledeskoen (6) fra annulus (102) når sement er levert der, fortrinnsvis fra en ovenfra og ned retning. Den motsatte (revers) klaffeventilen (2) tillater fluid fortrengt av den levert sementen å passere inn i skoen (6) og urenhetsledeplaten (5). Huller (194) forsegles med forsegling (9) i kjøreposisjon. Strømningen i stingeren (100) under innkjøring er vist med piler (106) , med piler (108) som viser retur strøm i annulus (102) mot overflaten som forklares nedenfor for Figs la-ld som viser resten av sammenstillingen over Fig le. Flap valve (1) prevents flow into the guide shoe (6) from the annulus (102) when cement is delivered there, preferably from a top-down direction. The opposite (reverse) flap valve (2) allows fluid displaced by the delivered cement to pass into the shoe (6) and impurity guide plate (5). Holes (194) are sealed with seal (9) in driving position. The flow in the stinger (100) during run-in is shown with arrows (106), with arrows (108) showing return flow in the annulus (102) towards the surface which is explained below for Figs la-ld showing the rest of the assembly above Fig le.

Med referanse til fig la ses kjørestrengen (43) som støtter rørstrengenes frigjøringsverktøy (42) som slipper linerhengereren (38) som har en tetning (39). Verktøyet (42) er koblet til linerhengerens setningshylse (40) på en fornuftig måte. I fig lb packoff foringene (37) tilpasset inn i den polerte boringsmottakeren (36) for å stenge av annulusåpningen (110) for å lede sirkulasjonsstrømmen langs banen indikert ved pilene (106, 108). Vist i With reference to fig la, the driving string (43) is seen which supports the pipe string release tool (42) which releases the liner hanger (38) which has a seal (39). The tool (42) is connected to the liner hanger's settling sleeve (40) in a sensible way. In Fig. 1b the packoff liners (37) fit into the polished bore receiver (36) to close off the annulus opening (110) to direct the circulation flow along the path indicated by the arrows (106, 108). Shown in

Fig. lc er liner eller casing er angitt (35) og sementeringsportene er (34). Fig. 1c is liner or casing is indicated (35) and the cementing ports are (34).

(32) og (33) er krager benyttet for posisjonering av crossoververktøyet (25-29) for levering av sement ut gjennom portene (43). Ekspanssjonskoblinger (30) kan også benyttes sammen med crossoververktøysammenstillingen (25-29). Crossoververktøysammenstillingen (25-29) fortsetter videre til koblinegen (18) i Fig. Id og omfatter standardkomponenter så som et kule sete (19), en tilbakeslagsventil (20), et deksel for en dartfanger (21) og en dart fanger uten gjennomstrømning (22). (32) and (33) are collars used for positioning the crossover tool (25-29) for delivering cement out through the ports (43). Expansion joints (30) can also be used with the crossover tool assembly (25-29). The crossover tool assembly (25-29) continues to the coupling leg (18) of Fig. Id and includes standard components such as a ball seat (19), a check valve (20), a dart trap cover (21) and a non-flow dart trap ( 22).

Som vist i Fig. 1 er sirkulasjonen illustrert med piler (106) og tvunget gjennom crossoververktøysammenstillingen (25-29) ned forbi koblingen (18) og gjennom stingeren (100) med hull (104) isolert inntil en utgang gjennom guideskoen (6) etterfulgt av retur til overflaten som illustrert ved pilene (108) rundt utsidene av lineren eller casingen (35). As shown in Fig. 1, the circulation is illustrated by arrows (106) and is forced through the crossover tool assembly (25-29) down past the coupling (18) and through the stinger (100) with hole (104) isolated to an exit through the guide shoe (6) followed by of return to the surface as illustrated by the arrows (108) around the outsides of the liner or casing (35).

Når linerhengeren (38) er ordentlig plassert settes ankeranordningen og tetningen (3)) med hylse (40) og kjøreverktøyet (42) kan løsnes. En trykkintegritetstest kan kjøres på tetningen (39). Kjørestrengen plukkes opp som vist i Fig. 2a-2c. Dette løfter foringen (37) ut av den polerte boringens mottakere (36) som også vist i Fig 2a. Dette justerer også crossoververktøysammenstillingen (25-29) men sementeringsportene (34) som vist i Fig. 2b. Portene (104) i stingeren (100) er nå åpne og stingeren har kommet helt ut av returklaffeventilene (2) og lukkeklaffeventilen (1). Men, hylsen (112) holder fortsatt lukkeklaffeventil (1) åpeni Fig 2c. Som et resultat når sementen pumpes ned kjørestrengen (43) som indikert med pilene (113), krysser strømmen over til utsidene av strengen (35) ved portene (34) i Fig 2b og fortsetter ned annulus (102) inn i ledeskoen (6) som kan ha unike utformede strømningsporter som rommer sementen. Foran sementstrømmen indikert av pilene (113) fluid fortrenges som indikert av pilen e(114) gjennom ventilene (1) og (2), med ventilen (1) holdt åpen under dette trinnet og ventil (2) trykkes åpen av det fortrengte fluidet. Ventilene (2) tillater enveisstrømning inn i ledeskoen (6) men stopper strømmen i retningene av å strømme ut av strengene (35) gjennom ledeskoen (6). When the liner hanger (38) is properly positioned, the anchor device is set and the seal (3)) with sleeve (40) and the driving tool (42) can be detached. A pressure integrity test can be run on the seal (39). The driving line is picked up as shown in Fig. 2a-2c. This lifts the liner (37) out of the receivers (36) of the polished bore as also shown in Fig 2a. This also aligns the crossover tool assembly (25-29) but the cementing ports (34) as shown in Fig. 2b. The ports (104) in the stinger (100) are now open and the stinger has come completely out of the return flap valves (2) and the closing flap valve (1). However, the sleeve (112) still keeps the flap valve (1) open in Fig 2c. As a result, when the cement is pumped down the travel string (43) as indicated by the arrows (113), the flow crosses over to the outside of the string (35) at the ports (34) in Fig 2b and continues down the annulus (102) into the guide shoe (6). which may have uniquely designed flow ports that accommodate the cement. Ahead of the cement flow indicated by arrows (113), fluid is displaced as indicated by arrow e (114) through valves (1) and (2), with valve (1) held open during this step and valve (2) pushed open by the displaced fluid. The valves (2) allow one-way flow into the guide shoe (6) but stop the flow in the directions of flowing out of the strings (35) through the guide shoe (6).

Når sementen er levert i annulus (102), bygges trykket opp og utøver en kraft på hylsen (112) som bryter en brytepinne som ikke er vist som dermed tillater hylsen (112) å be bevege seg nedover bort fra klaffeventilen (1) for å frigjøre den for å operere. Klaffeventil (1) er orientert for å forhindre strømning inn i strengen (35) men åpne ved retur ut for overskuddssement som vist i Fig. 3.. Uansett, ventilene (2) er opererbare for å danne strømningsretning for å snu fra innkommende flow indikert av pilene (116) til returstøm indikert av pilene (118) son reverserer strømmen som passerer gjennom hullene (104). Ovenfra og ned sementeringen utført eller at linerhengeneren er satt og tettet og trykktesting av koblingen til det eksisterende røret er nå ferdig. Ovenfra og ned sementeringene opptrer med fortrengt fluid strømmende mot overflaten gjennom crossoveren som illustrert med operasjonene kan også utføres som en squeeze inn i formasjonene dersom returstrømmningsbanen gjennom crossoverern er avstengt. When the cement is delivered into the annulus (102), pressure builds up and exerts a force on the sleeve (112) which breaks a break pin (not shown) thereby allowing the sleeve (112) to move downwardly away from the flap valve (1) to free it to operate. Flap valve (1) is oriented to prevent flow into string (35) but open on return out to excess cement as shown in Fig. 3. However, valves (2) are operable to form flow direction to reverse from incoming flow indicated of the arrows (116) to return current indicated by the arrows (118) son reverses the current passing through the holes (104). From top to bottom the cementing carried out or that the liner hanger has been set and sealed and pressure testing of the connection to the existing pipe is now complete. From top to bottom the cementings act with displaced fluid flowing towards the surface through the crossover as illustrated with the operations can also be performed as a squeeze into the formations if the return flow path through the crossover is shut off.

Det er en alternativ måte å operere klaffeventilene (1) og (2) uten stingenren (100). I Fig. 4 holder hylsen (3) klaffene (2) åpne for å kjøre in med hullene (120) stengt slik at sirkulasjonsstrøm for innkjøring indikert ved pilene (122) passerer gjennom hylsen (3) så vel som klaffene (1) og (2) og deretter gjennom ledeskoen (6) og tilbake til overflaten i annulus (102) gjennom crossoversammenstillingen som ikke er vist i Fig. 4. Som tidligere holdere hylsen (112) klaffen (1) åpen under innkjøring. I Fig. 5 flyttes hylse (3) med påført trykk for å frigjøre ventilene (2) for å operere på samme måte som tidligere. Sement kommer ovenfra og ned som indikert ved pilene There is an alternative way to operate the butterfly valves (1) and (2) without the stinger cleaner (100). In Fig. 4 the sleeve (3) holds the flaps (2) open for driving in with the holes (120) closed so that circulation flow for driving in indicated by the arrows (122) passes through the sleeve (3) as well as the flaps (1) and ( 2) and then through the guide shoe (6) and back to the surface in the annulus (102) through the crossover assembly not shown in Fig. 4. As before, the sleeve (112) holds the flap (1) open during run-in. In Fig. 5, sleeve (3) is moved with applied pressure to release the valves (2) to operate in the same way as before. Cement comes from the top down as indicated by the arrows

(124) og fortrenger fluid gjennom hullene (!20) og ventilene (1) og (2). Ventilene (2) skjøvet åpne av fortrengt fluid mens ventil (1) er fortsatt holdt åpen. Returnerende strøm vist ved pilene (126) går til overflaten gjennom crossoversammenstillingen som ikke er vist i Fig. 5. I Fig. 6 påfører tilført trykk en kraft på hylsen (112) for å tillate ventilen (1) friheten til å opererer for å hindre sement fra å forlate det omgivende annulus (102). Så fort ventil (1) er i operasjon kommer returstrømmen representert ved pilen e(128) den å åpner ventil (1) men soppes av ventilene (2) og snur til overflaten gjennom crossoverern. I denne utførelsene kan tetningen (37')benyttes som tillegstetning (37) men i en lavere posisjon som vist i Fig le med formål om at dersom ventil (1) svikter kan sementen holdes i annulus (102) ved å slippe en dart inn i tetningen (37') mens den tetningen er plassert i en tilhørende polert boringsmottaker eller er i annen tettende kontakt med strengen (35). Fig. 8 viser et forstørretriss av stingeren (100) som løper gjennom ventilene (1) og (2) for å kjøre inn å tillate sirkulasjon ut gjennom ledeskoen (6) og tilbake til overflates slik illustrert med pilene (130). Figurene 9 og 10 viser ventilene (2) operative etter at stingeren er hevet og pilene (132) er ovenfra og ned sementering mens brønnfluider er fortrengt foran sementen vist med pilene (134).. Figurene 11 og 12 viser ventil (1) operativ etter at sement på grunn av hylse (112) bevegelse slik at sement forhindres fra u-transport tilbake inn i strengen (35). Tilbakestrøm ut, indikert ved pilene (124) and displaces fluid through the holes (!20) and the valves (1) and (2). Valves (2) pushed open by displaced fluid while valve (1) is still held open. Return flow shown by the arrows (126) goes to the surface through the crossover assembly not shown in Fig. 5. In Fig. 6, applied pressure applies a force to the sleeve (112) to allow the valve (1) the freedom to operate to prevent cement from leaving the surrounding annulus (102). As soon as valve (1) is in operation, the return flow represented by the arrow e(128) comes to open valve (1) but is swept by the valves (2) and turns to the surface through the crossover. In this version, the seal (37') can be used as an additional seal (37) but in a lower position as shown in Fig le with the purpose that if valve (1) fails, the cement can be held in the annulus (102) by dropping a dart into the seal (37') while that seal is located in an associated polished bore receiver or is in other sealing contact with the string (35). Fig. 8 shows an enlarged view of the stinger (100) running through the valves (1) and (2) to drive in to allow circulation out through the guide shoe (6) and back to the surface as illustrated by the arrows (130). Figures 9 and 10 show the valves (2) in operation after the stinger is raised and the arrows (132) are from top to bottom cementing while well fluids are displaced in front of the cement shown by the arrows (134). Figures 11 and 12 show valve (1) in operation after that cement due to sleeve (112) movement so that cement is prevented from u-transport back into the string (35). Backflow out, indicated by the arrows

(136), kan trykke ventil (1) åpen mens ventilene (2) blokkerer strøm i retningen av strengen (35) slik at overskytende sement kan strømme gjennom crossoveren som ikke er vist og mot overflatene for fjerning. (136), can push valve (1) open while the valves (2) block flow in the direction of the string (35) so that excess cement can flow through the crossover not shown and toward the surfaces for removal.

En fagmann på området fil sette pris på at mens klaffene er vist for ventilene (1) og (2) kan andre typer ventiler vurderes som kan valgbart opereres på måter annet enn ved strengmanipulasjon eller trykkpåførelser til å danne en kraft for å bevege en hylse. Ventilene (1) og (2) kan ha ekstra backup eller ikke i henhold til hva som er ansett nødvendig av operatøren eller av kostnadshensyn. Utrykket "sement" er ment å beskrive enhver og ethver kjent forseglende materiale. Noen av komponentene har kun blitt nevnt med hensyn på deres funksjon slik som crossoververktøyer eller varierende krage/henger systemer benyttet for posisjonering. Disse komponenene er generelt beskreved på grunn av at dette er velkjente komponenter for en fagperson på området. Posisjon, plassering og operasjon av ventiler slik som klaffene (1) og (2) og hvordan de er integrert i den beskrevne metodene er den virkelige fokus i den krevde metode. One skilled in the art will appreciate that while flaps are shown for valves (1) and (2) other types of valves may be contemplated which may optionally be operated by means other than string manipulation or pressure applications to generate a force to move a sleeve. The valves (1) and (2) may or may not have extra backup according to what is deemed necessary by the operator or for cost reasons. The term "cement" is intended to describe any and all known sealing materials. Some of the components have only been mentioned with regard to their function such as crossover tools or varying collar/hanger systems used for positioning. These components are generally described because these are well-known components to a person skilled in the art. The position, placement and operation of valves such as flaps (1) and (2) and how they are integrated into the described methods is the real focus of the claimed method.

Systemet tillater linerhengeren og dens tetning å bli satt slik at dens trykkintegritetstilkobling til eksisterende rørstreng kan verifisered før start av sementering. Sementering kan dermed utføres ovenfra og ned med fluid fortrengt mot overflaten eller squeezed inn i formasjonen. En standard sementeringsjobb nedenfra og opp kan også utføres. The system allows the liner hanger and its seal to be set so that its pressure integrity connection to the existing pipe string can be verified before starting cementing. Cementing can thus be carried out from the top down with fluid displaced towards the surface or squeezed into the formation. A standard cementing job from the bottom up can also be carried out.

Beskrivelsen ovenfor illustrere den foretrukne utførelsen og mange modifikasjoner kan utledes av de fagmenn på området uten avvikelser fra oppfinnelsen som bestemmes gjennom det bokstavelige eller ekvivalente omfang av kravene nedenfor. The above description illustrates the preferred embodiment and many modifications may be derived by those skilled in the art without departing from the invention as determined by the literal or equivalent scope of the claims below.

Claims (29)

1. En brønnkompletteringsmetode for støtte og sementering av en rørstreng (35) fra et esisterende rør omfattende: kjøre in, på en kjørestreng (43), rørstrengen (35) med en henger (38) og en tetningssammenstillitng (39) for å plassere hengeren (38) og tetningssammenstillitng (39) ved den ønskede posisjonen på det eksisterende røret; sette henger (38) og tetning (39); trykkteste integritet av koblingen mellom strengen (43, 38, 39, 35) og det eksisterende røret etter nevnte setting; sementere rørstrengen (35) etter setting og trykktesting.1. A well completion method for supporting and cementing a string of tubing (35) from an existing pipe comprising: driving in, on a string of tubing (43), the string of tubing (35) with a hanger (38) and a seal assembly (39) to position the hanger (38) and sealing assembly (39) at the desired position on the existing pipe; install hanger (38) and seal (39); pressure testing the integrity of the connection between the string (43, 38, 39, 35) and the existing pipe according to said setting; cement the pipe string (35) after setting and pressure testing. 2. Metoden i henhold til krav 1, omfattende: å utføre sementering av rørstrengen (35) ovenfra og ned.2. The method according to claim 1, comprising: carrying out cementing of the pipe string (35) from top to bottom. 3. Metoden i henhold til krav 2, omfattende: å tillate fluid fortrengt av sementen inn i rørstrengen (35).3. The method according to claim 2, comprising: allowing fluid displaced by the cement into the pipe string (35). 4. Metoden i henhold til krav 2, omfattende: squeezing fluid fortrengt av semententering av rørstrengen (35) inn i de omgivende reologiske formasjonene.4. The method according to claim 2, comprising: squeezing fluid displaced by cementation of the pipe string (35) into the surrounding rheological formations. 5. Metoden i henhold til krav 1, omfattende: utføre sementeringene av rørstrengen (35) nedenfra og opp.5. The method according to claim 1, comprising: carrying out the cementing of the pipe string (35) from the bottom up. 6. Metoden i henhold til krav 1, omfattende: sirkulering av fluid gjennom rørkjørestrengen (43) og rørstrengen (35) under innkjøring, gjennom et utall av åpne ventiler (1,2) anordnet nær en nedre ende av rørstrengen (35).6. The method according to claim 1, comprising: circulating fluid through the pipe run string (43) and the pipe string (35) during run-in, through a number of open valves (1,2) arranged near a lower end of the pipe string (35). 7.. Metoden i henhold til krav 6, omfattende: å i utgangspunktet holde ventilene (1, 2) åpne for å sirkulere fluid.7.. The method according to claim 6, comprising: initially keeping the valves (1, 2) open to circulate fluid. 8. Metoden i henhold til krav 6, omfattende: anordne i det minste en av ventilene (1,2) som en valgbar betjenbar første tilbakeslagsventil (2) som tillater strømning inn i den nedre ende at rørstrengen (35) mens betjening av en andre av ventilene (1, 2) so en valgbar betjenbar andre enveis ventil (1) som forhindrer strømning inn i rørstrengene (35) under operasjon.8. The method according to claim 6, comprising: arranging at least one of the valves (1,2) as a selectable operable first non-return valve (2) which allows flow into the lower end of the pipe string (35) while operating a second of the valves (1, 2) so a selectable operable second one-way valve (1) which prevents flow into the pipe strings (35) during operation. 9. Metoden i henhold til krav 8, omfattende: anordne den andre tilbakeslagsventilen (1) nærmere overflatene enn den første tilbakeslagsventilen (2).9. The method according to claim 8, comprising: arranging the second non-return valve (1) closer to the surfaces than the first non-return valve (2). 10. Metoden i henhold til krav 9, omfattende: anordne de første og andre tilbakeslagsventilene (1, 2) som klaffeventiler.10. The method according to claim 9, comprising: arranging the first and second check valves (1, 2) as flap valves. 11. Metoden i henhold til krav 10, omfattende: holde den første klaffeventilen (2) åpen med stingeren (100) koblet toø em kjøresreng (43); tillate klaffeventilen (2) å operere ved heve stingeren (100) med kjørestrengen (43).11. The method according to claim 10, comprising: keeping the first flap valve (2) open with the stinger (100) connected to the drive chain (43); allow flap valve (2) to operate by raising stinger (100) with drive string (43). 12. Metoden i henhold til krav 10, omfattende: å holde den andre klaffeventilen (1) åpen med en andre klaffeglidehylse (112); bruke tilført trykk i rørstrengen (35) til å forskyve den andre klaffeglidehylsen (112) for å tillate den andre klaffen (1) å operer.12. The method according to claim 10, comprising: holding the second flap valve (1) open with a second flap slide sleeve (112); using applied pressure in the tubing string (35) to displace the second valve slide sleeve (112) to allow the second valve (1) to operate. 13. Metoden i henhold til krav 10, omfattende: å holde den andre klaffen (1) åpen med en glidehylse; å bruke påført trykk i rørstrengen (35) til å forskyve hylsen (112) til å tillate den andre klaffeventilen knyttet til glidehylsen (112) å operere.13. The method according to claim 10, comprising: keeping the second flap (1) open with a sliding sleeve; using applied pressure in the tubing string (35) to displace the sleeve (112) to allow the second poppet valve associated with the sliding sleeve (112) to operate. 14. Metoden i henhold til krav 1, omfattende: utføre hevingen av stingeren (100) etter at fluid har sirkulert ag før motsatt sirkulasjon av sement.14. The method according to claim 1, comprising: performing the raising of the stinger (100) after fluid has circulated ag before reverse circulation of cement. 15. Metoden i henhold til krav 14, omfattende: utføre forskyving av glidehylsen (112) etter sementeringen for å tillate den andre klaffeventilen (1) å holde sementen i et omsluttende annulus (102).15. The method according to claim 14, comprising: performing displacement of the sliding sleeve (112) after the cementing to allow the second flap valve (1) to hold the cement in an enclosing annulus (102). 16. Metoden i henhold til krav 15, omfattende: å benytte den første klaffe ventilen (2) til å omdirigere returstrøm inn i rørstrengen (35) for å fjerne overskytende sement.16. The method according to claim 15, comprising: using the first flap valve (2) to redirect return flow into the pipe string (35) to remove excess cement. 17. Metoden i henhold til krav 61, omfattende: å benytte en crossoververktøy (25-29) i kjørestrengen (43); dirigere retur ut av overskudssementstrøm til utenfor kjørestrengen (43) ved crossoververktøyet (25.29) ag ta retur med overskytende sement gjennom crossoververktøyet (25-29) og ut sil overflatenelokasjonene via en annulær åpning (110) mellom kjørestrengen (43) og rørstrengen (35).17. The method according to claim 61, comprising: using a crossover tool (25-29) in the driving string (43); direct return out of excess cement flow to outside the drive string (43) at the crossover tool (25.29) and take return with excess cement through the crossover tool (25-29) and screen out the surface locations via an annular opening (110) between the drive string (43) and the pipe string (35) . 18. Metoden i henhold til krav 17, omfattende: å fremskaffe ekstra første eller andre klaffeventilen (1, 2).18. The method according to claim 17, comprising: providing the additional first or second flap valve (1, 2). 19. Metoden i henhold til krav 12, omfattende: å holde første klaffeventil (2) åpen med en første klaffeventil glidehylse (3); ved bruk av påført trykk i rørstrengene for å forflytte den første klaffeventil glidehylsen (3) til å aktivere den første klaffeventilen (2) til operasjon.19. The method according to claim 12, comprising: keeping the first flap valve (2) open with a first flap valve slide sleeve (3); using applied pressure in the tubing strings to move the first poppet valve slide sleeve (3) to actuate the first poppet valve (2) for operation. 20. Metoden i henhold til krav 19, omfattende: å bevege den første klaffeventilglidehylsen (3) før den andre klaffeventil glidehylsen (112).20. The method according to claim 19, comprising: moving the first valve slide sleeve (3) before the second valve slide sleeve (112). 21. Metoden i henhold til krav 20, omfattende: sementere etter flytting av den første glidehylsen (3); å bruke den første klaffeventil ne (2) når den er gjort operativ ved å flytte den første klaffeventil glidehylsen (3) for å tillate fortrengt fluid av sementen å strømme inn i rørstrengen (35).21. The method according to claim 20, comprising: cementing after moving the first sliding sleeve (3); using the first flap valve ne (2) when made operative by moving the first flap valve slide sleeve (3) to allow displaced fluid of the cement to flow into the pipe string (35). 22. Metoden i henhold til krav 21, omfattende: å flytte den andre klaffeventilens (1) glidehylse (112) etter at sementen er levert; å benytte den andre klaffeventilen (1) som er gjort operativ ved å flytte den andre klaffeventil glidehylsen (! 12) for å forhindre sement fra annulusrommet (102) rundt rørstrengen å komme inn i rørstrengen (35).22. The method according to claim 21, comprising: moving the slide sleeve (112) of the second flap valve (1) after the cement is delivered; to use the second flap valve (1) which is made operative by moving the second flap valve slide sleeve (! 12) to prevent cement from the annulus space (102) around the pipe string from entering the pipe string (35). 23. Metoden i henhold til krav 21, omfattende: bøye åpen den andre klaffeventilen (1) med returstrøm inn i rørstrengen (35) fra en overflatelokasjon etter sementering; omdirigere returstrømmen i rørstrengen med den første klaffeventilen (2) for å fjerne overskuddssement mot en overflatelokasjon.23. The method according to claim 21, comprising: bending open the second butterfly valve (1) with return flow into the pipe string (35) from a surface location after cementing; redirect the return flow in the pipe string with the first butterfly valve (2) to remove excess cement towards a surface location. 24. Metoden i henhold til krav 19, omfattende: å fremskaffe en valgbart betjenbar tetning i et annulært rom (110) mellom kjørestrengen (43) og rørstrengen (35); å posisjonere tetningen (37') i en tettende posisjon og blokkere kjørestrengene (43) i tilknytning til tetningen (37') for å holde igjen sement i det omgivende annulus (102) dersom den andre klaffeventilen (1) skulle svikte i operasjon.24. The method according to claim 19, comprising: providing an optionally operable seal in an annular space (110) between the drive string (43) and the pipe string (35); to position the seal (37') in a sealing position and block the travel strings (43) adjacent to the seal (37') to retain cement in the surrounding annulus (102) should the second flap valve (1) fail in operation. 25. En petroleumsbrønn liner sementeringssammensetning omfattende -en borestreng (43) men et rørstrengsfrigjøringsverktøy (42) inrettet til å holde en linerhenger settehylse (40) på en linerstreng (35); -linerstrengen (35) er forsynt med en annulussementeringsport (34) betjent av et crossoververktøysammenstilling (25-29) anordnet på borerørstrengen (43) nedenfor en rørstrengsfrigjøringsverktøy (42); -linerstrengen er forsynt med nedre ventiler (1, 2) holdt åpne under inngkjøring av en sementeringsstinger (100) anordnet under crossoververktøysammenstillingen (25-29); tetningssamenstillingen (39) tillater trykktesting mens linerhengeren (38) er satt i casingen.25. A petroleum well liner cementing assembly comprising -a drill string (43) but a string release tool (42) adapted to hold a liner hanger set sleeve (40) on a liner string (35); - the liner string (35) is provided with an annulus cementation port (34) served by a crossover tool assembly (25-29) provided on the drill string (43) below a string release tool (42); - the liner string is provided with lower valves (1, 2) held open during entry by a cementing stinger (100) provided below the crossover tool assembly (25-29); the seal assembly (39) allows pressure testing while the liner hanger (38) is set in the casing. 26. Linersementeringssammensetning i henhold til krav 25, der crossoververktøysammenstillingen (25-29) anordnet for veksling av sementerings seksjons ventilhylsen (34b) til å åpne sementeringsporter (34) men sementeringsstingeren (100) er skjøvet oppover ut av de nedre ventilene (1,2), tillater retur sirkulering inn av sement fra senenteringsportene (34) til linerannulus og tilbake gjennom de nedre ventilene (1, 2) av linerstrengen (35).26. Liner cementing assembly according to claim 25, wherein the crossover tool assembly (25-29) is arranged for switching the cementing section valve sleeve (34b) to open cementing ports (34) but the cementing stinger (100) is pushed upwardly out of the lower valves (1,2 ), allows return circulation of cement from the senentering ports (34) to the liner annulus and back through the lower valves (1, 2) of the liner string (35). 27. Linersementeringssammensetning i henhold til krav 26, der ventilene (1, 2) anordnet for å bli stengt etter tilbakesirkulasjon in av sement, får å tilllate normal utvaskingssirkulasjon av overskytende senent innenfor lineren under crossoververktøyet (25-29) med sementeringsportene (34).27. Liner cementing composition according to claim 26, wherein the valves (1, 2) arranged to be closed after back-circulation in of cement are allowed to allow normal washout circulation of excess senent within the liner below the crossover tool (25-29) with the cementing ports (34). 28. Linersementeringssammensetning i henhold til krav 26, hvor kjørestrengen (43)er anordnet for normal sirkulasjon av sement ned over crossoververktøyssammenstillingen (25-29).28. Liner cementing assembly according to claim 26, wherein the drive string (43) is arranged for normal circulation of cement down over the crossover tool assembly (25-29). 29. Linersementeringssammensetning i henhold til krav 27, hvor kjørestrengen (43) er inrettet til retursirkulasjon ned kjøre stengens (43) annulus inne i den eksisterende tubingen og satte liner (35) under utvasking av overskytende sement,29. Liner cementing composition according to claim 27, where the driving string (43) is arranged for return circulation down the annulus of the driving rod (43) inside the existing tubing and set liner (35) while washing out excess cement,
NO20141231A 2014-10-14 2014-10-14 Cementing that allows initial extension tube integrity test NO339650B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NO20141231A NO339650B1 (en) 2014-10-14 2014-10-14 Cementing that allows initial extension tube integrity test
PCT/NO2015/050190 WO2016060570A1 (en) 2014-10-14 2015-10-14 Cementing method allowing initial liner top pressure integrity confirmation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO20141231A NO339650B1 (en) 2014-10-14 2014-10-14 Cementing that allows initial extension tube integrity test

Publications (2)

Publication Number Publication Date
NO20141231A1 true NO20141231A1 (en) 2016-04-15
NO339650B1 NO339650B1 (en) 2017-01-16

Family

ID=55975040

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20141231A NO339650B1 (en) 2014-10-14 2014-10-14 Cementing that allows initial extension tube integrity test

Country Status (1)

Country Link
NO (1) NO339650B1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8286717B2 (en) * 2008-05-05 2012-10-16 Weatherford/Lamb, Inc. Tools and methods for hanging and/or expanding liner strings
US9303477B2 (en) * 2009-04-02 2016-04-05 Michael J. Harris Methods and apparatus for cementing wells
BR112014016813A8 (en) * 2012-01-06 2017-07-04 Weatherford Lamb Inc gravel filler and end-to-elbow backing cementation in one maneuver
CA2811638C (en) * 2012-04-05 2016-04-26 Key Energy Services, Llc Methods and apparatus for cementing wells

Also Published As

Publication number Publication date
NO339650B1 (en) 2017-01-16

Similar Documents

Publication Publication Date Title
CN101421487B (en) Gravel pack crossover tool with single position multi-function capability
US7134488B2 (en) Isolation assembly for coiled tubing
NO335157B1 (en) System and method for offshore production with well control
US20160102523A1 (en) Cementing method allowing initial liner top pressure integrity confirmation
NO335433B1 (en) The gravel pack method
US20060272825A1 (en) Downhole ball circulation tool
NO20121048A1 (en) Apparatus and method for cementing extension tubes
NO321421B1 (en) Paper filling tool and sludge saver for top-powered rotation system
NO347679B1 (en) Well treatment procedure for pressing and gravel packing
NO329433B1 (en) Method and apparatus for installing casings in a well
NO340326B1 (en) Method and apparatus for isolating a zone in a borehole
NO344129B1 (en) Method and device for hydraulically bypassing a well tool
NO802995L (en) CROSSOVER-VERKTOEY.
US20100230098A1 (en) One Trip Gravel Pack Assembly
US20110120714A1 (en) Method and System for Cementing
US11035200B2 (en) Downhole formation protection valve
NO342075B1 (en) Bypass unit and method for injecting fluid around a well tool
BR112016012887B1 (en) WELL SYSTEM COMPLETION METHOD AND SYSTEM
NO20141231A1 (en) Cement permitting initial liner peak integrity test
US9482074B2 (en) Valve actuating apparatus
AU2007267548B2 (en) Shear type circulation valve and swivel with open port reciprocating feature
NO20200147A1 (en) Combination bottom up and top down cementing with reduced time to set liner hanger/packer after top down cementing
NO811127L (en) DRILL TESTS WITH AUTOMATIC FILLING.
GB2495502A (en) Valve actuating apparatus
NO312210B1 (en) Device for temporarily anchoring and sealing a well pipe, underground, recyclable deflection device and method of placing and recycling an underground tool at an underground location in a well pipe

Legal Events

Date Code Title Description
MM1K Lapsed by not paying the annual fees