NO20101424L - Fremgangsmate for a bestemme et sett med netto naverdier for a pavirke boring av en bronn og oke produksjon - Google Patents
Fremgangsmate for a bestemme et sett med netto naverdier for a pavirke boring av en bronn og oke produksjonInfo
- Publication number
- NO20101424L NO20101424L NO20101424A NO20101424A NO20101424L NO 20101424 L NO20101424 L NO 20101424L NO 20101424 A NO20101424 A NO 20101424A NO 20101424 A NO20101424 A NO 20101424A NO 20101424 L NO20101424 L NO 20101424L
- Authority
- NO
- Norway
- Prior art keywords
- determining
- procedure
- well
- increase production
- reservoir
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title abstract 2
- 238000000034 method Methods 0.000 title abstract 2
Classifications
-
- E21B41/0092—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Earth Drilling (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Chemically Coating (AREA)
Abstract
En fremgangsmåte er vist for modellering av et første reservoar under boring av et brønnhull inn i et motsvarende andre reservoar, der det første reservoaret har flere stasjoner, omfattende det å: bestemme flere verdier for netto nåverdi svarende henholdsvis til de flere stasjonene i det første reservoaret; og bore brønnhullet inn i det motsvarende andre reservoaret i samsvar med de flere verdiene for netto nåverdi.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/148,415 US7966166B2 (en) | 2008-04-18 | 2008-04-18 | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
PCT/US2009/039459 WO2009129060A1 (en) | 2008-04-18 | 2009-04-03 | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20101424L true NO20101424L (no) | 2010-11-17 |
NO340109B1 NO340109B1 (no) | 2017-03-13 |
Family
ID=41199418
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20101424A NO340109B1 (no) | 2008-04-18 | 2010-10-14 | Fremgangsmåte for å bestemme et sett med netto nåverdier for å påvirke boring av en brønn og øke produksjon |
NO20161926A NO340861B1 (no) | 2008-04-18 | 2016-12-02 | Fremgangsmåte for å bestemme et sett med netto nåverdier for å påvirke boring av en brønn og øke produksjon |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20161926A NO340861B1 (no) | 2008-04-18 | 2016-12-02 | Fremgangsmåte for å bestemme et sett med netto nåverdier for å påvirke boring av en brønn og øke produksjon |
Country Status (5)
Country | Link |
---|---|
US (1) | US7966166B2 (no) |
GB (2) | GB2472543B (no) |
MX (1) | MX2010010988A (no) |
NO (2) | NO340109B1 (no) |
WO (1) | WO2009129060A1 (no) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8793111B2 (en) * | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
US8527248B2 (en) * | 2008-04-18 | 2013-09-03 | Westerngeco L.L.C. | System and method for performing an adaptive drilling operation |
US9719341B2 (en) | 2009-05-07 | 2017-08-01 | Schlumberger Technology Corporation | Identifying a trajectory for drilling a well cross reference to related application |
EP2534606B1 (en) | 2010-02-12 | 2019-02-27 | Exxonmobil Upstream Research Company | Method and computer program for creating history-matched simulation models and corresponding method for producing hydrocarbons from a field |
US8532968B2 (en) * | 2010-06-16 | 2013-09-10 | Foroil | Method of improving the production of a mature gas or oil field |
FR2980897B1 (fr) * | 2011-09-30 | 2014-08-22 | Total Sa | Procede de validation d'image d'entrainement pour la modelisation geostatistique multipoint du sous-sol |
WO2013052735A1 (en) | 2011-10-06 | 2013-04-11 | Landmark Graphics Corporation | Systems and methods for subsurface oil recovery optimization |
US10430872B2 (en) * | 2012-05-10 | 2019-10-01 | Schlumberger Technology Corporation | Method of valuation of geological asset or information relating thereto in the presence of uncertainties |
US9262713B2 (en) | 2012-09-05 | 2016-02-16 | Carbo Ceramics Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
WO2014039036A1 (en) * | 2012-09-05 | 2014-03-13 | Stratagen, Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
US9085958B2 (en) | 2013-09-19 | 2015-07-21 | Sas Institute Inc. | Control variable determination to maximize a drilling rate of penetration |
US9163497B2 (en) | 2013-10-22 | 2015-10-20 | Sas Institute Inc. | Fluid flow back prediction |
CN105849363B (zh) * | 2013-12-06 | 2019-10-18 | 哈利伯顿能源服务公司 | 控制井底组合件的计算机实施方法和井筒系统 |
US10138717B1 (en) * | 2014-01-07 | 2018-11-27 | Novi Labs, LLC | Predicting well performance with feature similarity |
CN105443119A (zh) * | 2014-08-19 | 2016-03-30 | 中国石油化工股份有限公司 | 一种获取油气藏储量规模阈值的方法 |
US10365405B2 (en) * | 2015-01-26 | 2019-07-30 | Schlumberger Technology Corporation | Method for determining formation properties by inversion of multisensor wellbore logging data |
US10401808B2 (en) | 2015-01-28 | 2019-09-03 | Schlumberger Technology Corporation | Methods and computing systems for processing and transforming collected data to improve drilling productivity |
US9990588B2 (en) * | 2015-03-19 | 2018-06-05 | Hitachi, Ltd. | System for predicting amount of production and method for predicting amount of production |
US10012064B2 (en) | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
US11454102B2 (en) | 2016-05-11 | 2022-09-27 | Baker Hughes, LLC | Methods and systems for optimizing a drilling operation based on multiple formation measurements |
CN106640053B (zh) * | 2016-11-18 | 2019-11-08 | 中国石油天然气股份有限公司 | 一种随钻测量数据自动接收与处理的方法及装置 |
US11680480B2 (en) | 2021-05-25 | 2023-06-20 | Saudi Arabian Oil Company | Multi-layer gas reservoir field development system and method |
CN115110921B (zh) * | 2022-07-18 | 2023-07-14 | 中煤科工集团重庆研究院有限公司 | 一种用于渗透各向异性本煤层瓦斯保压驱替抽采方法 |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5842149A (en) * | 1996-10-22 | 1998-11-24 | Baker Hughes Incorporated | Closed loop drilling system |
US5992519A (en) * | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US6775578B2 (en) * | 2000-09-01 | 2004-08-10 | Schlumberger Technology Corporation | Optimization of oil well production with deference to reservoir and financial uncertainty |
US7512543B2 (en) * | 2002-05-29 | 2009-03-31 | Schlumberger Technology Corporation | Tools for decision-making in reservoir risk management |
CA2506883C (en) | 2002-11-23 | 2013-11-19 | Schlumberger Technology Corporation | Method and system for integrated reservoir and surface facility networks simulations |
US7181380B2 (en) * | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
FR2855633B1 (fr) | 2003-06-02 | 2008-02-08 | Inst Francais Du Petrole | Methode d'aide a la prise de decision pour la gestion d'un gisement petrolier en presence de parametres techniques et economiques incertains |
US7725302B2 (en) * | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
US7337660B2 (en) * | 2004-05-12 | 2008-03-04 | Halliburton Energy Services, Inc. | Method and system for reservoir characterization in connection with drilling operations |
US7366616B2 (en) | 2006-01-13 | 2008-04-29 | Schlumberger Technology Corporation | Computer-based method for while-drilling modeling and visualization of layered subterranean earth formations |
US7809538B2 (en) | 2006-01-13 | 2010-10-05 | Halliburton Energy Services, Inc. | Real time monitoring and control of thermal recovery operations for heavy oil reservoirs |
US8620715B2 (en) | 2006-06-10 | 2013-12-31 | Schlumberger Technology Corporation | Method including a field management framework for optimization of field development and planning and operation |
-
2008
- 2008-04-18 US US12/148,415 patent/US7966166B2/en active Active
-
2009
- 2009-04-03 MX MX2010010988A patent/MX2010010988A/es active IP Right Grant
- 2009-04-03 GB GB1019338.1A patent/GB2472543B/en active Active
- 2009-04-03 WO PCT/US2009/039459 patent/WO2009129060A1/en active Application Filing
- 2009-04-03 GB GB1217564.2A patent/GB2492011B/en active Active
-
2010
- 2010-10-14 NO NO20101424A patent/NO340109B1/no unknown
-
2016
- 2016-12-02 NO NO20161926A patent/NO340861B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
GB2492011A (en) | 2012-12-19 |
NO20161926A1 (no) | 2016-12-02 |
NO340109B1 (no) | 2017-03-13 |
GB201217564D0 (en) | 2012-11-14 |
GB2472543B (en) | 2013-03-20 |
GB2472543A (en) | 2011-02-09 |
US20090260880A1 (en) | 2009-10-22 |
WO2009129060A1 (en) | 2009-10-22 |
NO340861B1 (no) | 2017-07-03 |
US7966166B2 (en) | 2011-06-21 |
GB2492011B (en) | 2013-04-24 |
MX2010010988A (es) | 2010-11-05 |
GB201019338D0 (en) | 2010-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20101424L (no) | Fremgangsmate for a bestemme et sett med netto naverdier for a pavirke boring av en bronn og oke produksjon | |
WO2012064626A3 (en) | Apparatus and method for automated drilling of a borehole in a subsurface formation | |
WO2012145494A3 (en) | System and method for drilling a borehole using streaming reference data | |
EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
MX2015008405A (es) | Perforacion de un pozo con prediccion de la composicion y el peso del lodo de fluido sedimentado. | |
EA201390899A1 (ru) | Переходное звено для соединения эксцентричных путей потока с концентричными путями потока | |
MX2010006749A (es) | Sistemas y metodos para modelar trayectorias de pozos perforados. | |
EA201290816A1 (ru) | Система и способ оптимизации скорости бурения | |
GB2467074A (en) | A method of training neural network models and using same for drilling wellbores | |
WO2012106348A3 (en) | Method of minimizing wellbore instability | |
WO2010056641A3 (en) | Pilot reamer with composite framework | |
EA201490462A1 (ru) | Жидкости для скважин, способы их получения и их применение | |
MY167133A (en) | Well completion | |
WO2007106244A3 (en) | Method for quantifying reservoir connectivity using fluid travel times | |
GB201120916D0 (en) | Method for assessing the performance of a drill bit configuration, and for comparing the performance of different drill bit configurations for drilling | |
MX342515B (es) | Inyeccion de fluido en las seleccionadas de multiples zonas con herramientas de pozos selectivamente sensibles a patrones magneticos. | |
WO2009083769A3 (en) | Downhole fluid analysis | |
EA201070265A1 (ru) | Способ управления калибрующим элементом бурового долота и буровое долото | |
DE602005023190D1 (no) | ||
NO341575B1 (no) | Fremgangsmåte for måling av overtrykk i et undergrunnsreservoar krysset av et borehull | |
WO2012134705A3 (en) | Single trip liner setting and drilling assembly | |
NO20100053L (no) | System og fremgangsmate for logging med vaier-boreror | |
EA201001323A1 (ru) | Долото ударного действия для роторного бурения грунта и способ его работы | |
WO2011031481A3 (en) | Apparatus and methods for controlling bottomhole assembly temperature during a pause in drilling boreholes | |
WO2008157773A3 (en) | Targeted measurements for formation evaluation and reservoir characterization |