NO20092917L - Intelligent kompletteringsdesign for et reservoar - Google Patents
Intelligent kompletteringsdesign for et reservoarInfo
- Publication number
- NO20092917L NO20092917L NO20092917A NO20092917A NO20092917L NO 20092917 L NO20092917 L NO 20092917L NO 20092917 A NO20092917 A NO 20092917A NO 20092917 A NO20092917 A NO 20092917A NO 20092917 L NO20092917 L NO 20092917L
- Authority
- NO
- Norway
- Prior art keywords
- reservoir
- processor
- steam injection
- injection well
- completion design
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2406—Steam assisted gravity drainage [SAGD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
Abstract
Oppfinnelsen angår en fremgangsmåte for å utføre intelligent kompletteringsdesign for et reservoar inne i et felt som har minst ett brønnsted med en dampinjeksjonsbrønn som gjennomtrenger en undergrunnsformasjon for feltet for å ekstrahere fluid fra reservoaret deri. Fremgangsmåten involverer å erverve måledata for undergrunnsformasjonen tilknyttet dampinjeksjonsbrønnen, å generere, ved å benytte en prosessor i en datamaskin, en reservoarmodell basert på måledataene, å avgjøre, ved å benytte prosessoren, en geologisk profil nærliggende dampinjeksjonsbrønnen ved å benytte reservoarmodellen, å identifisere, ved å bruke prosessoren, en lokalisering langs dampinjeksjonsbrønnen basert på den geologiske profilen i henhold til et forutbestemt kriterium, og å definere og lagre, ved å benytte prosessoren, en dampinjeksjonskonfigurasjon basert på lokaliseringen. 1
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US9369308P | 2008-09-02 | 2008-09-02 | |
US12/542,817 US8260595B2 (en) | 2008-09-02 | 2009-08-18 | Intelligent completion design for a reservoir |
Publications (1)
Publication Number | Publication Date |
---|---|
NO20092917L true NO20092917L (no) | 2010-03-03 |
Family
ID=41723621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20092917A NO20092917L (no) | 2008-09-02 | 2009-09-01 | Intelligent kompletteringsdesign for et reservoar |
Country Status (2)
Country | Link |
---|---|
US (1) | US8260595B2 (no) |
NO (1) | NO20092917L (no) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2279329A2 (en) * | 2008-03-20 | 2011-02-02 | BP Corporation North America Inc. | Management of measurement data being applied to reservoir models |
GB2496529A (en) * | 2010-06-24 | 2013-05-15 | Chevron Usa Inc | A system and method for conformance control in a subterranean reservoir |
US9540911B2 (en) * | 2010-06-24 | 2017-01-10 | Schlumberger Technology Corporation | Control of multiple tubing string well systems |
TWI497333B (zh) * | 2011-06-14 | 2015-08-21 | Giant Mfg Co Ltd | 自行車適配產生方法、自行車適配系統與電腦程式產品 |
US10934811B2 (en) | 2014-08-22 | 2021-03-02 | Chevron U.S.A. Inc. | Flooding analysis tool and method thereof |
GB2556486B (en) * | 2015-07-31 | 2021-07-07 | Landmark Graphics Corp | System and method to reduce fluid production from a well |
US10815759B2 (en) | 2016-09-28 | 2020-10-27 | Halliburton Energy Services, Inc. | Performing steam injection operations in heavy oil formations |
US10891407B2 (en) | 2017-03-28 | 2021-01-12 | Saudi Arabian Oil Company | System and method for automated-inflow control device design |
CN110952967B (zh) * | 2018-09-27 | 2021-09-28 | 中国石油天然气股份有限公司 | 稠油开采方法 |
CN111852445B (zh) * | 2020-07-07 | 2023-09-15 | 中国石油大学(华东) | 智能油田注采实时优化与调控系统及方法 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6321840B1 (en) * | 1988-08-26 | 2001-11-27 | Texaco, Inc. | Reservoir production method |
US6787758B2 (en) * | 2001-02-06 | 2004-09-07 | Baker Hughes Incorporated | Wellbores utilizing fiber optic-based sensors and operating devices |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US7066284B2 (en) * | 2001-11-14 | 2006-06-27 | Halliburton Energy Services, Inc. | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell |
US6860147B2 (en) * | 2002-09-30 | 2005-03-01 | Alberta Research Council Inc. | Process for predicting porosity and permeability of a coal bed |
US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
CA2483896C (en) * | 2003-10-06 | 2008-02-26 | Dennis A. Beliveau | Applications of waste gas injection into natural gas reservoirs |
MX2007016586A (es) * | 2005-07-27 | 2008-03-04 | Exxonmobil Upstream Res Co | Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos. |
US8352227B2 (en) * | 2006-10-30 | 2013-01-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
WO2008106476A1 (en) * | 2007-02-27 | 2008-09-04 | Schlumberger Technology Corporation | System and method for waterflood performance monitoring |
US8775141B2 (en) * | 2007-07-02 | 2014-07-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US8061444B2 (en) * | 2008-05-22 | 2011-11-22 | Schlumberger Technology Corporation | Methods and apparatus to form a well |
-
2009
- 2009-08-18 US US12/542,817 patent/US8260595B2/en not_active Expired - Fee Related
- 2009-09-01 NO NO20092917A patent/NO20092917L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
US8260595B2 (en) | 2012-09-04 |
US20100051280A1 (en) | 2010-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20092917L (no) | Intelligent kompletteringsdesign for et reservoar | |
NO20080922L (no) | Bronnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner | |
EA201170574A1 (ru) | Выполняемый в окне статистический анализ для обнаружения аномалий в наборах геофизических данных | |
MX343973B (es) | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. | |
GB2462974A (en) | Valuing future information under uncertainty | |
NO20083767L (no) | Fremgangsmate for kvantifisering av reservoarkonnektivitet ved anvendelse av fluid-reisetid | |
ATE406502T1 (de) | Verfahren zur erleichterung eines bohrlochbetriebes | |
MY158575A (en) | Methods to estimate downhole drilling vibration indices from surface measurement | |
NO20093266L (no) | Fremgangsmate for a estimere produktivitet fra formasjoner ved hjelp av kjernemagnetiske resonansmalinger | |
NO20090492L (no) | Fremgangsmåter for å oppdage, forhindre og bøte på tapt sirkulasjonsfluid | |
NO20090149L (no) | Framgangsmate for a tilveiebringe og tolke seismoelektriske og elektroseismiske data | |
NO20100713L (no) | Anordning og fremgangsmate for kartlegging av borehull | |
MY179810A (en) | Zero equivalent circulating density drilling method | |
MX367584B (es) | Método de calibración de la geometría de fractura a los eventos microsísmicos. | |
NO20040926L (no) | Fremgangsmate og system for bestemmelse av formasjonsegenskaper og stress in situ. | |
NO20090939L (no) | Anordning og fremgangsmate for a beregne belastninger og bevegelse av deler nede i bronnen | |
EP2848964A3 (en) | Combining downhole fluid analysis and petroleum systems modeling | |
NO20091895L (no) | Fremgangsmate for pavisning av en siderand av et reservoar | |
MX2008010963A (es) | Metodo y sistema de planificacion de pozo. | |
EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
BRPI0918767A2 (pt) | método para determinar saturação de água em uma formação de subsuperfície, e instrumento de perfilagem de poço. | |
EA201070902A1 (ru) | Способ и система для прогнозирования свойств подземного пласта | |
EA201270258A1 (ru) | Способы оценки амплитуды вибраций на забое при бурении по результатам измерений на поверхности | |
GB2508766A (en) | Estimation of depletion or injection induced reservoir stresses using time-lapse sonic data in cased holes | |
NO20091512L (no) | Fremgangsmater for nedihulls dybdeberegning og relatert system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |