NO20092060L - Procedure for carrying out oilfield production operations - Google Patents

Procedure for carrying out oilfield production operations

Info

Publication number
NO20092060L
NO20092060L NO20092060A NO20092060A NO20092060L NO 20092060 L NO20092060 L NO 20092060L NO 20092060 A NO20092060 A NO 20092060A NO 20092060 A NO20092060 A NO 20092060A NO 20092060 L NO20092060 L NO 20092060L
Authority
NO
Norway
Prior art keywords
procedure
carrying
production operations
lift resource
oilfield production
Prior art date
Application number
NO20092060A
Other languages
Norwegian (no)
Other versions
NO343695B1 (en
Inventor
Kashif Rashid
Andrew John Howell
Andrew Shand
Trevor Tonkin
Luca Letizia
Daniel Lucas-Clements
Original Assignee
Logined Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/711,373 external-priority patent/US7953584B2/en
Priority claimed from US11/952,069 external-priority patent/US8078444B2/en
Application filed by Logined Bv filed Critical Logined Bv
Publication of NO20092060L publication Critical patent/NO20092060L/en
Publication of NO343695B1 publication Critical patent/NO343695B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/20Computer models or simulations, e.g. for reservoirs under production, drill bits

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Eyeglasses (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Medicines Containing Plant Substances (AREA)
  • Transplanting Machines (AREA)
  • Eye Examination Apparatus (AREA)
  • Earth Drilling (AREA)

Abstract

Det offentliggjøres en fremgangsmåte for optimal løfteressursallokering, hvilken inkluderer optimal allokering av løfteressursen under en total løfteressursskranke eller en total produksjonsskranke, idet allokeringstrinnet inkluderer fordeling av løfteressursen mellom alle løftede brønner i et nettverk, for å maksimere en væske/oljemengde ved et slukA method for optimal lift resource allocation is disclosed, which includes optimal allocation of the lift resource under a total lift resource counter or a total production desk, the allocation step including the distribution of the lift resource between all raised wells in a network, to maximize a fluid / oil flow rate.

NO20092060A 2006-12-07 2009-05-27 Procedure for carrying out oilfield production operations NO343695B1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US87342906P 2006-12-07 2006-12-07
US11/711,373 US7953584B2 (en) 2006-12-07 2007-02-27 Method for optimal lift gas allocation
US11/952,069 US8078444B2 (en) 2006-12-07 2007-12-06 Method for performing oilfield production operations
PCT/US2007/086868 WO2008070864A1 (en) 2006-12-07 2007-12-07 A method for performing oilfield production operations

Publications (2)

Publication Number Publication Date
NO20092060L true NO20092060L (en) 2009-09-04
NO343695B1 NO343695B1 (en) 2019-05-13

Family

ID=40863001

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20092060A NO343695B1 (en) 2006-12-07 2009-05-27 Procedure for carrying out oilfield production operations

Country Status (5)

Country Link
BR (1) BRPI0720128A2 (en)
CA (1) CA2671367C (en)
GB (1) GB2457395B (en)
MX (1) MX2009005902A (en)
NO (1) NO343695B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8670966B2 (en) 2008-08-04 2014-03-11 Schlumberger Technology Corporation Methods and systems for performing oilfield production operations
US10443358B2 (en) 2014-08-22 2019-10-15 Schlumberger Technology Corporation Oilfield-wide production optimization
US9951601B2 (en) 2014-08-22 2018-04-24 Schlumberger Technology Corporation Distributed real-time processing for gas lift optimization

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5992519A (en) * 1997-09-29 1999-11-30 Schlumberger Technology Corporation Real time monitoring and control of downhole reservoirs
US6178815B1 (en) * 1998-07-30 2001-01-30 Schlumberger Technology Corporation Method to improve the quality of a formation fluid sample
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
NZ521122A (en) * 2000-03-02 2005-02-25 Shell Int Research Wireless downhole measurement and control for optimising gas lift well and field performance
US6775578B2 (en) * 2000-09-01 2004-08-10 Schlumberger Technology Corporation Optimization of oil well production with deference to reservoir and financial uncertainty
BR0203994B1 (en) * 2001-02-05 2011-10-04 method and apparatus adapted to continuously optimize reservoir, pit and surface net systems.

Also Published As

Publication number Publication date
MX2009005902A (en) 2009-06-19
BRPI0720128A2 (en) 2014-12-09
GB2457395B (en) 2011-08-31
CA2671367A1 (en) 2008-06-12
CA2671367C (en) 2016-07-12
GB0909054D0 (en) 2009-07-01
GB2457395A (en) 2009-08-19
NO343695B1 (en) 2019-05-13

Similar Documents

Publication Publication Date Title
GB2469218A (en) A method for performing oilfield production operations
MX2009001065A (en) Method of designing blowout preventer seal using finite element analysis.
WO2011058325A3 (en) Downhole progressive pressurization actuated tool and method of using the same
WO2010135636A3 (en) Apparatus and method for modeling well designs and well performance
MY148792A (en) Dual-bop and common riser system
NO20092505L (en) Method and apparatus for automated, mechanical-specific-energy (MSE) -based drilling
GB2472543A (en) Method for determining a set of net present values to influence the drilling of a wellbore and increase production
NO20066060L (en) Viscoelastic multi-component surfactant fluid and method of use as a fracturing fluid
BR112021017647A2 (en) Predicting Reservoir Fluid Properties from Mud Gas Data
WO2009079492A3 (en) Systems and methods for modeling wellbore trajectories
MY156650A (en) Multi-modal communication through modal-specific interfaces
MX2012004167A (en) Cooling apparatus and methods for use with downhole tools.
BRPI0719247A2 (en) Method for producing hydrocarbon fluids, and well standard for a hydrocarbon fluid production program.
EA200970272A1 (en) DEPRESSED TUBES FOR APPLICATION IN WELL FLUIDS
NO20053552D0 (en) Control of transient pressure conditions in a wellbore.
GB201315379D0 (en) Method of minimizing wellbore instability
WO2013152074A3 (en) Wellbore information system
MX342717B (en) Cross-linkers for hydraulic fracturing fluid.
GB2505332A (en) Method for characterizing subsurface formations using fluid pressure response during drilling operations
PL1753935T3 (en) Multiple activity rig
ATE545766T1 (en) HIGH PRESSURE SLEEVE FOR DOUBLE BORE HIGH PRESSURE RISER PIPE
WO2009114248A3 (en) Analyzing an oilfield network for oilfield production
NO20092060L (en) Procedure for carrying out oilfield production operations
SG162696A1 (en) Subsea electronic module
RU2012153778A (en) METHOD AND SYSTEM FOR ACCESS TO A WELL IN UNDERGROUND STRESSES