NO20082622L - Procedure for field-scaled production optimization - Google Patents
Procedure for field-scaled production optimizationInfo
- Publication number
- NO20082622L NO20082622L NO20082622A NO20082622A NO20082622L NO 20082622 L NO20082622 L NO 20082622L NO 20082622 A NO20082622 A NO 20082622A NO 20082622 A NO20082622 A NO 20082622A NO 20082622 L NO20082622 L NO 20082622L
- Authority
- NO
- Norway
- Prior art keywords
- wells
- flow rates
- fluid flow
- system equations
- fluid
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000005457 optimization Methods 0.000 title abstract 2
- 238000004519 manufacturing process Methods 0.000 title 1
- 239000012530 fluid Substances 0.000 abstract 5
- 238000004088 simulation Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Feedback Control In General (AREA)
Abstract
Fremgangsmåte for bedring av fordelingen av fluidstrømningsmengder eller -rater blant flere borede brønner som står i fluidforbindelse med minst ett underjordisk reservoar (24). En målfunksjon og systemligninger settes opp som benytter straff for overskridelse av begrensninger, særlig såkalte myke begrensninger som situasjonsavhengig tillater overskridelse. Slik overskridelse kan det nemlig være behov for for å komme frem til en aksepterbar løsning under optimalisering av målfunksjonen og systemligningene. Fluidstrømningsratene fordeles deretter mellom de enkelte brønner (30), slik det blir bestemt ved optimaliseringen av målfunksjonen og systemligningene. Fluidstrømningsratene mellom de enkelte brønner (30), særlig brønner som fremviser tilsvarende fluidkarakteristikk kan være relatert til hverandre. I den innledende fase kan strømningsraten for de enkelte komponenter (olje, gass og vann) og trykkene i brønnene (30) bestemmes ved hjelp av en første simulering.A method for improving the distribution of fluid flow rates or rates among several drilled wells in fluid communication with at least one underground reservoir (24). A goal function and system equations are set up that use penalties for exceeding constraints, in particular so-called soft constraints that allow situation-based overruns. Such an override may be needed to arrive at an acceptable solution while optimizing the target function and the system equations. The fluid flow rates are then distributed between the individual wells (30), as determined by the optimization of the target function and the system equations. The fluid flow rates between the individual wells (30), in particular wells which exhibit similar fluid characteristics, may be related to each other. In the initial phase, the flow rate of the individual components (oil, gas and water) and the pressures in the wells (30) can be determined by a first simulation.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2005/042470 WO2007058662A1 (en) | 2005-11-21 | 2005-11-21 | Method for field scale production optimization |
Publications (1)
Publication Number | Publication Date |
---|---|
NO20082622L true NO20082622L (en) | 2008-08-13 |
Family
ID=38048944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20082622A NO20082622L (en) | 2005-11-21 | 2008-06-12 | Procedure for field-scaled production optimization |
Country Status (8)
Country | Link |
---|---|
EP (1) | EP1955253A4 (en) |
CN (1) | CN101361080B (en) |
AU (1) | AU2005338352B2 (en) |
BR (1) | BRPI0520693A2 (en) |
CA (1) | CA2630411C (en) |
EA (1) | EA014140B1 (en) |
NO (1) | NO20082622L (en) |
WO (1) | WO2007058662A1 (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8682589B2 (en) * | 1998-12-21 | 2014-03-25 | Baker Hughes Incorporated | Apparatus and method for managing supply of additive at wellsites |
US7379853B2 (en) | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
CA2717373A1 (en) | 2008-04-17 | 2009-12-03 | Exxonmobil Upstream Research Company | Robust optimization-based decision support tool for reservoir development planning |
BRPI0909446A2 (en) | 2008-04-18 | 2015-12-22 | Exxonmobil Upstream Res Co | reservoir development planning methods, decision support for petroleum resource development, development planning optimization, and hydrocarbon production. |
CN102016746A (en) | 2008-04-21 | 2011-04-13 | 埃克森美孚上游研究公司 | Stochastic programming-based decision support tool for reservoir development planning |
EP2811107A1 (en) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Method for selecting and optimizing oil field controls for production plateau |
CA2938694C (en) * | 2014-03-12 | 2021-07-06 | Landmark Graphics Corporation | Modified black oil model for calculating mixing of different fluids in a common surface network |
CN106062713A (en) * | 2014-03-12 | 2016-10-26 | 兰德马克绘图国际公司 | Simplified compositional models for calculating properties of mixed fluids in a common surface network |
AU2015249898B2 (en) * | 2014-04-22 | 2019-07-18 | Blast Motion, Inc. | Initializing an inertial sensor using soft constraints and penalty functions |
CN108229713B (en) * | 2016-12-09 | 2021-11-12 | 中国石油化工股份有限公司 | Optimization design method for multi-layer commingled production scheme of fault block oil reservoir |
CN108729911A (en) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | Optimization devices, systems, and methods for resource production system |
WO2019152912A1 (en) * | 2018-02-02 | 2019-08-08 | Schlumberger Technology Corporation | Method for obtaining unique constraints to adjust flow control in a wellbore |
US11269098B2 (en) | 2018-08-31 | 2022-03-08 | Halliburton Energy Services, Inc. | Sparse deconvolution and inversion for formation properties |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5305209A (en) * | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
WO1999057418A1 (en) * | 1998-05-04 | 1999-11-11 | Schlumberger Evaluation & Production (Uk) Services | Near wellbore modeling method and apparatus |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US7047170B2 (en) * | 2000-04-14 | 2006-05-16 | Lockheed Martin Corp. | Method of determining boundary interface changes in a natural resource deposit |
DZ3413A1 (en) * | 2000-09-12 | 2002-03-21 | Sofitech Nv | EVALUATION OF MULTI-LAYERED AMALGAMATED TANK AND HYDRAULIC FRACTURE PROPERTIES USING AMALGAMATED TANK PRODUCTION DATA AND PRODUCTION LOGGING INFORMATION |
US7379853B2 (en) * | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
US7487133B2 (en) * | 2002-09-19 | 2009-02-03 | Global Nuclear Fuel - Americas, Llc | Method and apparatus for adaptively determining weight factors within the context of an objective function |
CA2501722C (en) * | 2002-11-15 | 2011-05-24 | Schlumberger Canada Limited | Optimizing well system models |
US7337660B2 (en) * | 2004-05-12 | 2008-03-04 | Halliburton Energy Services, Inc. | Method and system for reservoir characterization in connection with drilling operations |
US7809537B2 (en) * | 2004-10-15 | 2010-10-05 | Saudi Arabian Oil Company | Generalized well management in parallel reservoir simulation |
-
2005
- 2005-11-21 EA EA200801405A patent/EA014140B1/en not_active IP Right Cessation
- 2005-11-21 BR BRPI0520693-6A patent/BRPI0520693A2/en not_active IP Right Cessation
- 2005-11-21 CN CN2005800525117A patent/CN101361080B/en not_active Expired - Fee Related
- 2005-11-21 AU AU2005338352A patent/AU2005338352B2/en not_active Ceased
- 2005-11-21 WO PCT/US2005/042470 patent/WO2007058662A1/en active Application Filing
- 2005-11-21 EP EP05849297.6A patent/EP1955253A4/en not_active Withdrawn
- 2005-11-21 CA CA2630411A patent/CA2630411C/en active Active
-
2008
- 2008-06-12 NO NO20082622A patent/NO20082622L/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
EA014140B1 (en) | 2010-10-29 |
CN101361080A (en) | 2009-02-04 |
EA200801405A1 (en) | 2009-12-30 |
CA2630411A1 (en) | 2007-05-24 |
EP1955253A4 (en) | 2016-03-30 |
CA2630411C (en) | 2015-04-21 |
WO2007058662A1 (en) | 2007-05-24 |
AU2005338352B2 (en) | 2012-05-24 |
AU2005338352A1 (en) | 2007-05-24 |
EP1955253A1 (en) | 2008-08-13 |
CN101361080B (en) | 2011-12-14 |
BRPI0520693A2 (en) | 2009-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20082622L (en) | Procedure for field-scaled production optimization | |
EA200900161A1 (en) | METHOD FOR FLOW ADJUSTMENT AND AUTONOMOUS VALVE OR DEVICE FOR FLOW ADJUSTMENT | |
BRPI0821932A2 (en) | Method for injecting a fluid into an oil and / or gas formation or reservoir | |
MY151387A (en) | Circulation control valve and associated method | |
NO20062593L (en) | Method and system for injecting a treatment fluid into a well | |
NO20090567L (en) | Bronnhodesammenstilling | |
SG144893A1 (en) | Apparatus for controlling the inflow of production fluids from a subterranean well | |
GB2464009A (en) | Method for controlling production and douwnhole pressures of a well with multiple subsurface zones and/or branches | |
BRPI0506114A (en) | completion for use in an underground well bore, method for completing an underground well bore, and system for completing an underground well bore | |
MX2008011191A (en) | Wellbore method and apparatus for sand and inflow control during well operations. | |
MY152444A (en) | Apparatus for adjustably controlling the inflow of production fluids from a subterranean well | |
WO2011150048A3 (en) | Intelligent completion system for extended reach drilling wells | |
RU2009131113A (en) | FLOW CONTROL VALVE PLATFORM | |
NO20080082L (en) | Improved flow control method and autonomous valve or flow control device | |
NO20082813L (en) | downhole tool | |
MY149981A (en) | Wellbore method and apparatus for completion, production and injection | |
WO2010011727A3 (en) | Valvetrain oil control system and oil control valve | |
WO2012078780A3 (en) | Bop stack with a universal intervention interface | |
NO20052735L (en) | Horizontal pipe connection tree with improved porting | |
BR0113371A (en) | Well method and tool for filling gravel from a well using low viscosity fluids | |
NO331146B1 (en) | Component for a perforator, method for making the component, perforator and a method for improving fluid flow from a borehole | |
NO20076643L (en) | Gravel packing fluid and method for gravel packing in a well | |
MX2010009871A (en) | System and method for controlling the flow of fluid in branched wells. | |
EP2096254A3 (en) | Control system for an annulus balanced subsurface safety valve | |
NO20085295L (en) | Hydraulic metering valve for operation of downhole tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |