NO20031776D0 - Null-boringskomplettering og produksjonssystem - Google Patents
Null-boringskomplettering og produksjonssystemInfo
- Publication number
- NO20031776D0 NO20031776D0 NO20031776A NO20031776A NO20031776D0 NO 20031776 D0 NO20031776 D0 NO 20031776D0 NO 20031776 A NO20031776 A NO 20031776A NO 20031776 A NO20031776 A NO 20031776A NO 20031776 D0 NO20031776 D0 NO 20031776D0
- Authority
- NO
- Norway
- Prior art keywords
- zero
- production system
- drilling completion
- drilling
- completion
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
- E21B21/103—Down-hole by-pass valve arrangements, i.e. between the inside of the drill string and the annulus
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/063—Valve or closure with destructible element, e.g. frangible disc
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
- E21B33/16—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes using plugs for isolating cement charge; Plugs therefor
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- General Factory Administration (AREA)
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/126,397 US6729393B2 (en) | 2000-03-30 | 2002-04-19 | Zero drill completion and production system |
Publications (3)
Publication Number | Publication Date |
---|---|
NO20031776D0 true NO20031776D0 (no) | 2003-04-16 |
NO20031776L NO20031776L (no) | 2003-10-20 |
NO325056B1 NO325056B1 (no) | 2008-01-21 |
Family
ID=22424592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20031776A NO325056B1 (no) | 2002-04-19 | 2003-04-16 | Null-boringskomplettering og produksjonssystem |
Country Status (5)
Country | Link |
---|---|
US (2) | US6729393B2 (no) |
AU (1) | AU2003203751B2 (no) |
CA (1) | CA2425783C (no) |
GB (1) | GB2388855B (no) |
NO (1) | NO325056B1 (no) |
Families Citing this family (59)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2349735C2 (ru) * | 2002-10-02 | 2009-03-20 | Бейкер Хьюз Инкорпорейтед | Заканчивание скважины за один спуск насосно-компрессорной колонны |
US7063152B2 (en) * | 2003-10-01 | 2006-06-20 | Baker Hughes Incorporated | Model HCCV hydrostatic closed circulation valve |
US7337840B2 (en) * | 2004-10-08 | 2008-03-04 | Halliburton Energy Services, Inc. | One trip liner conveyed gravel packing and cementing system |
US7387165B2 (en) * | 2004-12-14 | 2008-06-17 | Schlumberger Technology Corporation | System for completing multiple well intervals |
US20060283791A1 (en) * | 2005-06-17 | 2006-12-21 | Ross Colby M | Filter valve for fluid loss device |
WO2007009247A1 (en) * | 2005-07-19 | 2007-01-25 | Tesco Corporation | A method for drilling and cementing a well |
US7647990B2 (en) * | 2005-10-05 | 2010-01-19 | Tesco Corporation | Method for drilling with a wellbore liner |
US7500516B2 (en) * | 2005-10-06 | 2009-03-10 | Vetco Gray Inc. | System, method, and apparatus for accessing outlets in a two-stage diverter spool assembly |
NO326033B1 (no) * | 2007-01-08 | 2008-09-01 | Hpi As | Anordning ved nedihulls toveis overtrykksventil |
WO2008091345A1 (en) | 2007-01-25 | 2008-07-31 | Welldynamics, Inc. | Casing valves system for selective well stimulation and control |
US20080251253A1 (en) * | 2007-04-13 | 2008-10-16 | Peter Lumbye | Method of cementing an off bottom liner |
GB0722995D0 (en) * | 2007-11-23 | 2008-01-02 | Simonian Sam | Completion arrangement |
US7950461B2 (en) * | 2007-11-30 | 2011-05-31 | Welldynamics, Inc. | Screened valve system for selective well stimulation and control |
US7886849B2 (en) * | 2008-02-11 | 2011-02-15 | Williams Danny T | System for drilling under-balanced wells |
WO2011057416A1 (en) | 2009-11-13 | 2011-05-19 | Packers Plus Energy Services Inc. | Stage tool for wellbore cementing |
CA2799940C (en) | 2010-05-21 | 2015-06-30 | Schlumberger Canada Limited | Method and apparatus for deploying and using self-locating downhole devices |
CN101864921B (zh) * | 2010-06-11 | 2013-05-01 | 大港油田集团有限责任公司 | 水平井的完井、采油管柱及其完井、采油工艺 |
US9611719B2 (en) * | 2011-05-02 | 2017-04-04 | Peak Completion Technologies, Inc. | Downhole tool |
CA3019456A1 (en) * | 2011-05-02 | 2012-11-02 | Peak Completion Technologies, Inc. | Downhole tool |
US9567832B2 (en) | 2011-05-02 | 2017-02-14 | Peak Completion Technologies Inc. | Downhole tools, system and method of using |
US9441440B2 (en) * | 2011-05-02 | 2016-09-13 | Peak Completion Technologies, Inc. | Downhole tools, system and method of using |
EP2737167A4 (en) * | 2011-05-30 | 2015-07-22 | Packers Plus Energy Serv Inc | DRILL HOLE CEMENT TOOL WITH SINGLE-SIDE FLOW |
US8267178B1 (en) | 2011-09-01 | 2012-09-18 | Team Oil Tools, Lp | Valve for hydraulic fracturing through cement outside casing |
US9080422B2 (en) * | 2011-09-02 | 2015-07-14 | Schlumberger Technology Corporation | Liner wiper plug with bypass option |
US9238953B2 (en) | 2011-11-08 | 2016-01-19 | Schlumberger Technology Corporation | Completion method for stimulation of multiple intervals |
WO2013138896A1 (en) | 2012-03-22 | 2013-09-26 | Packers Plus Energy Services Inc. | Stage tool for wellbore cementing |
US9074437B2 (en) * | 2012-06-07 | 2015-07-07 | Baker Hughes Incorporated | Actuation and release tool for subterranean tools |
US9650851B2 (en) | 2012-06-18 | 2017-05-16 | Schlumberger Technology Corporation | Autonomous untethered well object |
US10107076B2 (en) * | 2012-11-21 | 2018-10-23 | Peak Completion Technologies, Inc | Downhole tools, systems and methods of using |
US8567509B1 (en) * | 2013-04-04 | 2013-10-29 | Petroquip Energy Services, Llp | Downhole tool |
CN104213867B (zh) * | 2013-06-04 | 2018-02-27 | 中国石油化工股份有限公司 | 一种多功能水井封隔器 |
US9476282B2 (en) | 2013-06-24 | 2016-10-25 | Team Oil Tools, Lp | Method and apparatus for smooth bore toe valve |
US9631468B2 (en) | 2013-09-03 | 2017-04-25 | Schlumberger Technology Corporation | Well treatment |
US20150083421A1 (en) * | 2013-09-16 | 2015-03-26 | Target Completions, LLC | Mandrel-less Launch Toe Initiation Sleeve (TIS) |
CN106030025A (zh) * | 2013-09-16 | 2016-10-12 | 塔吉特科普利森公司 | 无芯轴的发射杆趾启动套筒(tis) |
US11649691B2 (en) | 2013-11-22 | 2023-05-16 | Target Completions, LLC | IPacker bridge plug with slips |
CN105822252B (zh) * | 2015-01-04 | 2018-09-04 | 中国石油天然气股份有限公司 | 固井管柱组合及固井方法 |
CN105298431A (zh) * | 2015-10-13 | 2016-02-03 | 中国石油天然气股份有限公司 | 一种水平井触动封隔分段完井工艺管柱 |
CA3020992A1 (en) * | 2015-10-20 | 2017-04-27 | Modern Wellbore Solutions Ltd. | Apparatus and methods for cementing of wellbores |
BR112019011958B1 (pt) * | 2017-03-06 | 2023-09-26 | Halliburton Energy Services, Inc. | Método para completar um poço em uma única manobra e método para completação de manobra única de um poço em um furo aberto |
MY201395A (en) * | 2017-03-06 | 2024-02-21 | Halliburton Energy Services Inc | Liner conveyed compliant screen system |
AU2017402601B2 (en) * | 2017-03-08 | 2023-04-13 | Halliburton Energy Services, Inc. | Tubing assembly for hydraulic shifting of sleeve without tool movement |
WO2018190819A1 (en) * | 2017-04-12 | 2018-10-18 | Halliburton Energy Services, Inc. | Multi-position inflow control device |
WO2019218073A1 (en) * | 2018-05-16 | 2019-11-21 | 1966109 Alberta Ltd. | Well string staging tool |
CN109458158B (zh) * | 2018-12-29 | 2024-06-11 | 德州众凯石油科技有限公司 | 一种用于煤层气水平井的开采装置及方法 |
US11434723B2 (en) * | 2020-01-24 | 2022-09-06 | Odessa Separator, Inc. | Sand lift tool, system and method |
US20230258054A1 (en) * | 2020-07-30 | 2023-08-17 | Innovex Downhole Solutions, Inc. | Stage tool |
WO2022132172A1 (en) * | 2020-12-18 | 2022-06-23 | Halliburton Energy Services, Inc. | Production valve having washpipe free activation |
CN112943161B (zh) * | 2021-01-14 | 2022-11-04 | 中国石油天然气股份有限公司 | 一种侧钻井免悬挂可丢手固井完井装置 |
CN115247545B (zh) * | 2021-04-27 | 2024-07-05 | 中国石油化工股份有限公司 | 一种免钻塞注水泥完井用传压工具及方法 |
US11566489B2 (en) | 2021-04-29 | 2023-01-31 | Halliburton Energy Services, Inc. | Stage cementer packer |
US11519242B2 (en) * | 2021-04-30 | 2022-12-06 | Halliburton Energy Services, Inc. | Telescopic stage cementer packer |
US11898416B2 (en) | 2021-05-14 | 2024-02-13 | Halliburton Energy Services, Inc. | Shearable drive pin assembly |
US12024977B2 (en) * | 2021-11-17 | 2024-07-02 | Forum Us, Inc. | Stage collar and related methods for stage cementing operations |
US11965397B2 (en) | 2022-07-20 | 2024-04-23 | Halliburton Energy Services, Inc. | Operating sleeve |
US11873696B1 (en) | 2022-07-21 | 2024-01-16 | Halliburton Energy Services, Inc. | Stage cementing tool |
US12006787B2 (en) * | 2022-08-17 | 2024-06-11 | Summit Casing Services, Llc | Delayed opening fluid communication valve |
US11702904B1 (en) | 2022-09-19 | 2023-07-18 | Lonestar Completion Tools, LLC | Toe valve having integral valve body sub and sleeve |
US11873698B1 (en) | 2022-09-30 | 2024-01-16 | Halliburton Energy Services, Inc. | Pump-out plug for multi-stage cementer |
Family Cites Families (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1912578A (en) * | 1931-11-10 | 1933-06-06 | Halliburton Erle Palmer | Method of and apparatus for recovering fluids from underground strata |
US2083625A (en) * | 1935-07-01 | 1937-06-15 | Grant John | Method of depositing foraminate beds around well casings |
US3270814A (en) | 1964-01-23 | 1966-09-06 | Halliburton Co | Selective completion cementing packer |
US3552718A (en) * | 1968-03-01 | 1971-01-05 | Otis Eng Co | Sliding sleeve valve and operator therefor |
US3768562A (en) | 1972-05-25 | 1973-10-30 | Halliburton Co | Full opening multiple stage cementing tool and methods of use |
US3865188A (en) * | 1974-02-27 | 1975-02-11 | Gearhart Owen Industries | Method and apparatus for selectively isolating a zone of subterranean formation adjacent a well |
US3948322A (en) * | 1975-04-23 | 1976-04-06 | Halliburton Company | Multiple stage cementing tool with inflation packer and methods of use |
US4105069A (en) | 1977-06-09 | 1978-08-08 | Halliburton Company | Gravel pack liner assembly and selective opening sleeve positioner assembly for use therewith |
US4602684A (en) | 1984-11-13 | 1986-07-29 | Hughes Tool Company | Well cementing valve |
US4603741A (en) * | 1985-02-19 | 1986-08-05 | Hughes Tool Company | Weight actuated tubing valve |
US4834176A (en) * | 1988-04-11 | 1989-05-30 | Otis Engineering Corporation | Well valve |
US5024273A (en) | 1989-09-29 | 1991-06-18 | Davis-Lynch, Inc. | Cementing apparatus and method |
US5117910A (en) | 1990-12-07 | 1992-06-02 | Halliburton Company | Packer for use in, and method of, cementing a tubing string in a well without drillout |
US5183114A (en) * | 1991-04-01 | 1993-02-02 | Otis Engineering Corporation | Sleeve valve device and shifting tool therefor |
US5314015A (en) * | 1992-07-31 | 1994-05-24 | Halliburton Company | Stage cementer and inflation packer apparatus |
FR2703102B1 (fr) * | 1993-03-25 | 1999-04-23 | Drillflex | Procédé de cimentation d'un tubage déformable à l'intérieur d'un puits de forage ou d'une canalisation. |
US5443124A (en) * | 1994-04-11 | 1995-08-22 | Ctc International | Hydraulic port collar |
US5497840A (en) | 1994-11-15 | 1996-03-12 | Bestline Liner Systems | Process for completing a well |
US5526878A (en) * | 1995-02-06 | 1996-06-18 | Halliburton Company | Stage cementer with integral inflation packer |
US5595246A (en) | 1995-02-14 | 1997-01-21 | Baker Hughes Incorporated | One trip cement and gravel pack system |
US5598890A (en) | 1995-10-23 | 1997-02-04 | Baker Hughes Inc. | Completion assembly |
US5738171A (en) | 1997-01-09 | 1998-04-14 | Halliburton Company | Well cementing inflation packer tools and methods |
US5960881A (en) | 1997-04-22 | 1999-10-05 | Jerry P. Allamon | Downhole surge pressure reduction system and method of use |
GB2360802B (en) | 2000-03-30 | 2002-05-22 | Baker Hughes Inc | Zero drill completion and production system |
-
2002
- 2002-04-19 US US10/126,397 patent/US6729393B2/en not_active Expired - Fee Related
-
2003
- 2003-04-16 AU AU2003203751A patent/AU2003203751B2/en not_active Ceased
- 2003-04-16 NO NO20031776A patent/NO325056B1/no not_active IP Right Cessation
- 2003-04-17 GB GB0309014A patent/GB2388855B/en not_active Expired - Fee Related
- 2003-04-17 CA CA002425783A patent/CA2425783C/en not_active Expired - Fee Related
-
2004
- 2004-02-05 US US10/772,628 patent/US7237611B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
AU2003203751A1 (en) | 2003-11-06 |
US20040154798A1 (en) | 2004-08-12 |
AU2003203751B2 (en) | 2009-11-12 |
NO325056B1 (no) | 2008-01-21 |
CA2425783A1 (en) | 2003-10-19 |
CA2425783C (en) | 2006-02-07 |
US7237611B2 (en) | 2007-07-03 |
NO20031776L (no) | 2003-10-20 |
GB0309014D0 (en) | 2003-05-28 |
US6729393B2 (en) | 2004-05-04 |
GB2388855B (en) | 2004-10-20 |
US20020166665A1 (en) | 2002-11-14 |
GB2388855A (en) | 2003-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20031776D0 (no) | Null-boringskomplettering og produksjonssystem | |
DE60333589D1 (de) | Kommunikationssystem and kommunikationsverfahren | |
NO20031775D0 (no) | Oppblåsbar pakning og fremgangsmåte | |
NO20032220D0 (no) | Löfteverktöy II og fremgangsmåte for anvendelse av samme | |
DK1448865T3 (da) | Udtræksstige og tilhörende produktionsfremgangsmåder | |
NO20035272D0 (no) | Intelligent perforerende brönnsystem og fremgangsmåte | |
BRPI0313238A2 (pt) | método | |
DK1475721T3 (da) | Brugerautentificeringsfremgangsmåde og brugerautentificeringssystem | |
DK3246399T3 (da) | Alfavirus-partikler og fremgangsmåder til fremstilling | |
DK1628749T3 (da) | Anordninger og fremgangsmåder til biomateriel produktion | |
NO20044915L (no) | C-aryl-glukosid SGLT2 inhibitorer og metode | |
NO20055778D0 (no) | Folgesystem og assosiert fremgangsmate | |
IS2504B (is) | Fosfónóoxýkínasólínafleiður og lyfjafræileg notkun þeirra | |
IS7594A (is) | Laxófoxifen tafla og húðun hennar | |
DK1511734T3 (da) | Forbindelser, præparater og fremgangsmåder | |
ATA7262002A (de) | Fertigungssystem | |
DK1601744T3 (da) | Forgasningsapparat og fremgangsmåde | |
IS8489A (is) | Umritunarstillar og aðferðir þeirra | |
NO20052188D0 (no) | System og fremgangsmate for fremstilling av polysulfid | |
NO20044012D0 (no) | Fremgangsmate og et system | |
NO20034120D0 (no) | Plastfat og fremgangsmåte for dets fremstilling | |
IS6327A (is) | Hreinsuð kítín og framleiðsluaðferð fyrir þau | |
DK1565574T3 (da) | Produkt og fremgangsmåde | |
FI20020461A0 (fi) | Tiedonsiirtomenetelmä ja -järjestelmä | |
DK1408059T3 (da) | Latex og fremstilling heraf |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM1K | Lapsed by not paying the annual fees |