NO171688C - PROCEDURE FOR THE MANUFACTURING OF ELEVATED SHALL-CREAMED CONCRETE CONSTRUCTIONS AND INSTALLATIONS FOR IMPLEMENTING THE PROCEDURE - Google Patents
PROCEDURE FOR THE MANUFACTURING OF ELEVATED SHALL-CREAMED CONCRETE CONSTRUCTIONS AND INSTALLATIONS FOR IMPLEMENTING THE PROCEDUREInfo
- Publication number
- NO171688C NO171688C NO910317A NO910317A NO171688C NO 171688 C NO171688 C NO 171688C NO 910317 A NO910317 A NO 910317A NO 910317 A NO910317 A NO 910317A NO 171688 C NO171688 C NO 171688C
- Authority
- NO
- Norway
- Prior art keywords
- procedure
- creamed
- installations
- elevated
- shall
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/067—Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
- E01D21/065—Incremental launching
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO910317A NO171688C (en) | 1991-01-28 | 1991-01-28 | PROCEDURE FOR THE MANUFACTURING OF ELEVATED SHALL-CREAMED CONCRETE CONSTRUCTIONS AND INSTALLATIONS FOR IMPLEMENTING THE PROCEDURE |
EP92300692A EP0500221A1 (en) | 1991-01-28 | 1992-01-27 | Method and apparatus for constructing long span, shell-shaped, substantially horizontal concrete structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO910317A NO171688C (en) | 1991-01-28 | 1991-01-28 | PROCEDURE FOR THE MANUFACTURING OF ELEVATED SHALL-CREAMED CONCRETE CONSTRUCTIONS AND INSTALLATIONS FOR IMPLEMENTING THE PROCEDURE |
Publications (4)
Publication Number | Publication Date |
---|---|
NO910317D0 NO910317D0 (en) | 1991-01-28 |
NO910317L NO910317L (en) | 1992-07-29 |
NO171688B NO171688B (en) | 1993-01-11 |
NO171688C true NO171688C (en) | 1993-04-21 |
Family
ID=19893826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO910317A NO171688C (en) | 1991-01-28 | 1991-01-28 | PROCEDURE FOR THE MANUFACTURING OF ELEVATED SHALL-CREAMED CONCRETE CONSTRUCTIONS AND INSTALLATIONS FOR IMPLEMENTING THE PROCEDURE |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0500221A1 (en) |
NO (1) | NO171688C (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2910687B1 (en) | 2014-02-25 | 2016-09-21 | DOKA GmbH | Device and method for the fabrication of a tunnel having multiple tunnel sections |
AT519368B1 (en) * | 2017-02-21 | 2018-06-15 | Sdo Zt Gmbh | Underwater tunnel |
DE102017203772A1 (en) * | 2017-03-08 | 2018-09-13 | Peri Gmbh | Concrete tube and scarfing device and method of making such a concrete tube |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1247369B (en) * | 1963-07-19 | 1967-08-17 | Holzmann Philipp Ag | Method for making an underwater tunnel |
DE2743273C2 (en) * | 1977-09-27 | 1981-04-23 | Dyckerhoff & Widmann AG, 8000 München | Process for the production of elongated structures, in particular multi-span bridge structures made of reinforced or prestressed concrete |
DE3700938A1 (en) * | 1987-01-15 | 1988-07-28 | Strabag Bau Ag | MANUFACTURING DEVICE FOR MANUFACTURING A LONG STRETCHED CONSTRUCTION |
-
1991
- 1991-01-28 NO NO910317A patent/NO171688C/en unknown
-
1992
- 1992-01-27 EP EP92300692A patent/EP0500221A1/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
NO910317L (en) | 1992-07-29 |
EP0500221A1 (en) | 1992-08-26 |
NO171688B (en) | 1993-01-11 |
NO910317D0 (en) | 1991-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO901132L (en) | BUILDING ELEMENT AND A PROCEDURE FOR THE PREPARATION OF THIS. | |
NO923526D0 (en) | PROCEDURE FOR THE MANUFACTURING OF NAFTA | |
NO921777D0 (en) | PROCEDURE FOR THE MANUFACTURE OF ISOPARAFFINES | |
DE69328137D1 (en) | building | |
NO913621D0 (en) | CEMENT MIXTURE AND PROCEDURE FOR MAKING THE MIXTURE. | |
NO920249L (en) | VESSEL HOW AND PROCEDURE FOR BUILDING THIS | |
NO890045D0 (en) | BAATSKROG AND PROCEDURES FOR THE MANUFACTURING AND COATING OF THEREOF. | |
FI915242A (en) | Rf-screening of the kretskort | |
NO914481D0 (en) | PROCEDURE FOR MANUFACTURING AND USING SUBSTITUTED AZOLS | |
NO902372D0 (en) | DEVICE FOR THE CONSTRUCTION AND INSTALLATION OF WINDOWS. | |
NO172472C (en) | PROCEDURE AND PROCEDURE FOR MANUFACTURING THEREOF | |
NO932850L (en) | Procedure for the manufacture of steel | |
DK147492D0 (en) | PROCEDURE AND PLANT FOR MANUFACTURING CEMENT CLINKS | |
NO171688C (en) | PROCEDURE FOR THE MANUFACTURING OF ELEVATED SHALL-CREAMED CONCRETE CONSTRUCTIONS AND INSTALLATIONS FOR IMPLEMENTING THE PROCEDURE | |
NO168594C (en) | PROCEDURE FOR BUILDING THE HENGEBRO | |
NO924668D0 (en) | PROCEDURE FOR THE MANUFACTURE OF NON-BURNED BUILDING MATERIALS | |
NO874619L (en) | EQUIPMENT AND EQUIPMENT FOR POSITIONING OF THE INSTALLATIONS AND THE PROCEDURE. | |
DE69120685D1 (en) | SUPER LADDER AND MANUFACTURING METHOD | |
ATA76092A (en) | BUILDING | |
NO921607D0 (en) | PROCEDURE FOR THE MANUFACTURING OF AOLABLE PHOSPHATATED GUAR | |
NO165357C (en) | PROCEDURE FOR THE MANUFACTURING AND INSTALLATION OF SUBMITTED ROERBRO. | |
NO884412D0 (en) | PROCEDURE AND DEVICE FOR THE CONSTRUCTION OF OFFSHORE SYSTEMS. | |
NO920191D0 (en) | BUILDINGS AND PROCEDURES FOR THE MANUFACTURING OF BUILDINGS, AND COMPONENTS AND BUILDING GROUPS | |
NO905119D0 (en) | BUILDING PROCEDURE AND DEVICE FOR IMPLEMENTING THE PROCEDURE. | |
NO912820D0 (en) | BUILDING ELEMENT FOR MOEBLER E.L., AND PROCEDURE OF THE FORMING OF THE ELEMENT. |