NO171233B - PROCEDURE AND APPARATUS FOR TREATMENT OF DRILL - Google Patents

PROCEDURE AND APPARATUS FOR TREATMENT OF DRILL Download PDF

Info

Publication number
NO171233B
NO171233B NO864272A NO864272A NO171233B NO 171233 B NO171233 B NO 171233B NO 864272 A NO864272 A NO 864272A NO 864272 A NO864272 A NO 864272A NO 171233 B NO171233 B NO 171233B
Authority
NO
Norway
Prior art keywords
lifting
drill pipe
unit
drill
rotation
Prior art date
Application number
NO864272A
Other languages
Norwegian (no)
Other versions
NO864272D0 (en
NO864272L (en
NO171233C (en
Inventor
Rune Tenghamn
Original Assignee
Asea Atom Ab
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asea Atom Ab filed Critical Asea Atom Ab
Publication of NO864272D0 publication Critical patent/NO864272D0/en
Publication of NO864272L publication Critical patent/NO864272L/en
Publication of NO171233B publication Critical patent/NO171233B/en
Publication of NO171233C publication Critical patent/NO171233C/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/18Connecting or disconnecting drill bit and drilling pipe

Description

Innenfor offshoreindustrien anvendes ulike konstruk-sjonsløsninger for boring av dype hull for å undersøke og utvinne forekomster av gass og olje. Et boretårn, vanligvis på en bunnplate, er forsynt med organer for forflytning av borekronen og rotasjon av borestrengen. Within the offshore industry, various construction solutions are used for drilling deep holes to investigate and extract deposits of gas and oil. A derrick, usually on a bottom plate, is provided with means for moving the drill bit and rotating the drill string.

Foreliggende oppfinnelse angår en fremgangsmåte og The present invention relates to a method and

en anordning for håndtering av borerør ved boring av dype hull ved undersøkelse og utvinning av forekomster av gass og olje, hvor oppfinnelsen kan muliggjøre en automatisering og effektivisering av boringen som i stor utstrekning for tiden utføres manuelt. Utformingen av oppfinnelsen bidrar også til å redusere høyden av et boretårn og derved senke dettes tyngdepunkt. For å oppnå dette anvendes to samvirk- a device for handling drill pipe when drilling deep holes for the investigation and extraction of deposits of gas and oil, where the invention can enable the automation and efficiency of the drilling which is to a large extent currently carried out manually. The design of the invention also helps to reduce the height of a derrick and thereby lower its center of gravity. To achieve this, two cooperative

ende boretårn/tårndeler som sammen virker som én enhet og hvor de ulike deler arbeider skiftevis og således kan muliggjøre en mer effektiv håndtering av borerørene. end derrick/tower parts that work together as one unit and where the various parts work alternately and can thus enable more efficient handling of the drill pipes.

Fig..lA-5A viser skjematisk opptrekkingen av et borerør, fig. IB, 3B. 4B og 5B viser mer utførlig selve opptrekkingen av borerør, fig. 6 viser et prinsippskjerna for overvåking av de ulike drivenheter. Fig. 1A-5A schematically shows the pulling up of a drill pipe, fig. IB, 3B. 4B and 5B show in more detail the actual pulling up of drill pipe, fig. 6 shows a core principle for monitoring the various drive units.

I det på figurene viste utførelseseksempei fremgår In what is shown in the figures, the execution example appears

de forskjellige arbeidsstillinger for en borerigg som består av to samvirkende tårndeler 4 og 5, plassert på en bunnplate 6. De to tårndeler 4, 5 kan være fastmonterte eller side- the different working positions for a drilling rig consisting of two cooperating tower parts 4 and 5, placed on a bottom plate 6. The two tower parts 4, 5 can be fixed or side-mounted

veis flyttbare, de kan være dreibare eller de kan forflyt- way movable, they can be rotatable or they can move

tes på annet vis på bunnplaten 6. Tårnet kan også forlen- in a different way on the bottom plate 6. The tower can also be extended

ges med en overbygget konstruksjon for å støtte tre borerør-lengder i stedet for en. Ved tårndelene er anordnet løfte- provided with a superstructure to support three lengths of drill pipe instead of one. The tower parts are equipped with lifting

og rotasjonsenheter 1, 2, og ved bunnplaten er anordnet en løfte- og låseenhet 3. Løfte- og rotasjonsenhetene 1, 2 and rotation units 1, 2, and a lifting and locking unit 3 is arranged at the bottom plate. The lifting and rotation units 1, 2

er utformet slik at de fra siden under en dreiebevegelse eller annen bevegelse kan føres inn mot borerøret og gripe dette. Når låsing har skjedd med låseenheten 3 rundt bore-røret, kan rotasjonsenheten overføre et dreiemoment for å are designed so that they can be introduced from the side during a turning movement or other movement towards the drill pipe and grab it. When locking has occurred with the locking unit 3 around the drill pipe, the rotation unit can transmit a torque to

kunne skru i eller ut rørene avhengig av arbeidsstillingen. Løfte- og låseenheten er utformet slik at den kan låse fast be able to screw in or out the pipes depending on the working position. The lifting and locking unit is designed so that it can lock firmly

et rør midt på dette eller nær en rørforbindelse som er noe tykkere enn rørlengden forøvrig, for å siden kunne utføre tunge løft av den komplette borestrengen som består av borerør og a pipe in the middle of this or near a pipe connection that is somewhat thicker than the rest of the pipe length, in order to later carry out heavy lifting of the complete drill string consisting of drill pipe and

for- for-

krone. Ved boring overfører rotasjonsenheten ved senkning et dreiemoment på hele borestrengen uten at noen låsefunksjon griper inn. Løfte-, låse- og rotasjonsenhetene kan f.eks. være donkraftenheter drevet av hydraulisk fluidum under trykk, og de kan sammen med en tangstang, kjede eller kabel, eventuelt en kombinasjon av disse, utføre en låse-, løfte- eller rotasjons-bevegelse. crown. During drilling, the rotation unit transmits a torque on the entire drill string during lowering without any locking function intervening. The lifting, locking and rotation units can e.g. be jacking units driven by hydraulic fluid under pressure, and together with a plier bar, chain or cable, possibly a combination of these, they can perform a locking, lifting or rotating movement.

Ved at det til hver drivenhet er anordnet en overvåkingsenhet 9, kan sentralt anordnes et overvåkingssystem 10 for automatisk overvåking og styring av et komplett arbeidsfor-løp, hvilket betyr at nedsenking og opptrekking av borerør kan skje automatisk såvel som at selve boringen også kan utføres automatisk. By having a monitoring unit 9 arranged for each drive unit, a monitoring system 10 can be arranged centrally for automatic monitoring and control of a complete work process, which means that lowering and pulling up drill pipe can happen automatically as well as that the drilling itself can also be carried out automatically .

Ved inn- og utskruing og den dermed forekommende tiltrekking med momentoverføring kan en spesielt utformet drivenhet være anordnet i forbindelse med tårndelens nedre del for å bedre momentoverføringen til borerøret ved påvirkning av dette i nærheten av dets endetilslutning. When screwing in and out and the resulting tightening with torque transmission, a specially designed drive unit can be arranged in connection with the lower part of the tower part to improve the torque transmission to the drill pipe by influencing it near its end connection.

På fig. la og lb vises hvordan løfte- og rotasjonsenheten 2 begynner sin løfteoperasjon av borerøret 7 samtidig som løfte- og rotasjonsenheten 1 begynner sin nedsenkende opera-sjon mot sin utgangsstilling. Løfte- og låsenheten 3 er intil videre uvirksom. På fig. 2a vises hvordan løfte- og rotasjonsenheten 2 har hevet borerøret en viss distanse samtidig som løfte- og låseenheten 3 har låst seg omkring borestrengen for å følge med i den oppadgående bevegelse. Løfte- og rotasjonsenheten 1 nærmer seg da sin utgangsstilling. På fig. 3a og 3b vises hvordan løfte- og rotasjonsenheten 2 utfører et dreiende moment på borerøretsfor å skru av det første rør, mens løfte- In fig. la and lb show how the lifting and rotating unit 2 begins its lifting operation of the drill pipe 7 at the same time as the lifting and rotating unit 1 begins its lowering operation towards its starting position. The lifting and locking unit 3 is inactive for the time being. In fig. 2a shows how the lifting and rotation unit 2 has raised the drill pipe a certain distance at the same time that the lifting and locking unit 3 has locked itself around the drill string to follow the upward movement. The lifting and rotation unit 1 then approaches its starting position. In fig. 3a and 3b show how the lifting and rotation unit 2 exerts a torque on the drill pipe in order to unscrew the first pipe, while the lifting

og låseenheten 3 låser og holder fast borerøret under slik at dette ikke kan følge dreiebevegelsen. Løfte- og rotasjonsenheten 1 er nå ført frem for å innta sin utgangsstilling og der være klar til å ta imot et nytt borerør. På fig. 4a og 4b vises hvordan det øverste borerør er fraskrudd og ført til siden av løfte- og rotasjonsenheten 2. Løfte- og rotasjonsenheten 1 påbegynner sin heving av det nye borerøret etter at løfte- og boreenheten 3 har frigjort dette...På fig. 5a og 5b vises hvordan løfte- og rotasjonsenheten 1 hever borerøret mens løfte- og låseenheten 3 holdes uvirksom og løfte- og rotasjons- and the locking unit 3 locks and holds the drill pipe underneath so that it cannot follow the turning movement. The lifting and rotation unit 1 is now brought forward to assume its initial position and be ready to receive a new drill pipe. In fig. 4a and 4b show how the uppermost drill pipe is unscrewed and led to the side of the lifting and rotating unit 2. The lifting and rotating unit 1 begins its raising of the new drill pipe after the lifting and drilling unit 3 has released it...In fig. 5a and 5b show how the lifting and rotating unit 1 raises the drill pipe while the lifting and locking unit 3 is kept inactive and the lifting and rotating

enheten 1 senkes. unit 1 is lowered.

Ved nedsenking og boring foregår dette i omvendt rekkefølge. Den første løfte- og rotasjonsenhet 2 senker da et første borerør fra en høyde som tilsvarer dets fulle lengde ned til høyde med bunnplaten 6, idet denne enhet under nedsenkningen i tillegg driver borerøret rundt. I den nedre stilling holder løfte- og låseenheten 3 fast borerøret. Den andre løfte- og rotasjonsenhet 1 fører i sin øvre stilling frem et nytt borerør for iskruing i det første, hvoretter nedsenkning påbegynnes ved boring under rotasjon etter at løfte- og låseenheten 3 er frigitt. I mellomtiden er da løfte- og rotasjonsenheten 2 frigitt og begynner sin opptrekking for i sin øvre stilling å kunne ta imot et nytt borerør osv. For immersion and drilling, this takes place in the reverse order. The first lifting and rotation unit 2 then lowers a first drill pipe from a height corresponding to its full length down to the height of the bottom plate 6, as this unit also drives the drill pipe around during the lowering. In the lower position, the lifting and locking unit 3 holds the drill pipe. In its upper position, the second lifting and rotating unit 1 brings forward a new drill pipe for ice screwing in the first, after which immersion begins by drilling while rotating after the lifting and locking unit 3 has been released. In the meantime, the lifting and rotation unit 2 is released and begins to retract in order to receive a new drill pipe etc. in its upper position.

Claims (7)

1. Fremgangsmåte for håndtering av borerør ved boring av dype hull for undersøkelse og utvinning av gass og olje ved hjelp av organer for heving, rotasjon og låsing av bore-rørene ved boretårn på en bunnplate, karakterisert ved at en første løfte- og rotasjonsenhet (2) som er bevegelig forbundet med én (4) av to samvirkende tårndeler (4, 5), festet eller bevegelige på en bunnplate (6) ved opptrekking løfter et borerør (7) til en viss høyde og hvor deretter en løfte- og låseenhet (3) som er bevegelig forbundet med bunnplaten (6) låser et andre borerør forbundet med det første borerør (7) for at deretter løfte- og rotasjonsenheten (2) skal kunne overføre et dreiemoment til det første borerør for dets fraskruing fra det andre borerør og for deretter å føre det første røret vekk, hvoretter en andre løfte- og rotasjonsenhet (1) som er bevegelig forbundet med den andre (5) av de to samvirkende tårndeler (4, 5) på bunnplaten (6) føres frem og griper om det andre borerør og starter en heving av dette etter at løfte- og låseenheten har frigjort dette, mens den første løfte- og rotasjonsenhet (2) senkes for å innta sin utgangsstilling for å motta et nytt borerør.1. Procedure for handling drill pipes when drilling deep holes for exploration and extraction of gas and oil using means for raising, rotating and locking the drill pipes at derricks on a bottom plate, characterized in that a first lifting and rotation unit ( 2) which is movably connected to one (4) of two cooperating tower parts (4, 5), fixed or movable on a bottom plate (6) when pulled up lifts a drill pipe (7) to a certain height and where then a lifting and locking unit (3) which is movably connected to the bottom plate (6) locks a second drill pipe connected to the first drill pipe (7) so that the lifting and rotation unit (2) can then transmit a torque to the first drill pipe for its unscrewing from the second drill pipe and then to lead the first pipe away, after which a second lifting and rotating unit (1) which is movably connected to the second (5) of the two cooperating tower parts (4, 5) on the bottom plate (6) is brought forward and grips the second drill pipe and starts a raising of this after the lifting and locking unit has released it, while the first lifting and rotating unit (2) is lowered to assume its initial position to receive a new drill pipe. 2. Fremgangsmåte ifølge krav 1, karakterisert ved at den første løfte- og rotasjonsenhet (2) ved senkning og/eller boring senker et første borerør (7) ned til en viss høyde under rotasjon ved boring og hvor deretter løfte- og låseenheten (3) i sin nedre stilling låser borerøret (7) og den andre løfte- og rotasjonsenhet (1) i sin øvre stilling fører frem et bore-rør for iskruing av dette i det første borerørs ende, hvoretter borerørene senkes med eller uten rotasjon etter at løfte- og låseenheten (3) har frigjort borerøret, mens den første løfte- og rotasjonsenhet (2) frigjøres og starter sin heving for å innta sin utgangsstilling for å motta et nytt borerør.2. Method according to claim 1, characterized in that the first lifting and rotation unit (2) during lowering and/or drilling lowers a first drill pipe (7) down to a certain height during rotation during drilling and where then the lifting and locking unit (3 ) in its lower position locks the drill pipe (7) and the second lifting and rotation unit (1) in its upper position brings forward a drill pipe for screwing it into the end of the first drill pipe, after which the drill pipes are lowered with or without rotation after lifting - and the locking unit (3) has released the drill pipe, while the first lifting and rotation unit (2) is released and starts its elevation to assume its starting position to receive a new drill pipe. 3. Anordning for håndtering av borerør ved boring av dype hull for undersøkelse og utvinning av gass og olje, omfattende et boretårn som står på en bunnplate med organer for heving, låsing og rotasjon av borerørene, karakterisert ved at boretårnet består av to innbyrdes samvirkende tårndeler (4, 5) som hver er festet eller horisontalt bevegelige på en bunnplate (6),hvor tårndelene (4, 5) hver har en løfte- og rotasjonsenhet (1, 2) for borerør og som er bevegelig forbundet med tårndelene, og hvor bunnplaten (6) omfatter en løfte- og låseenhet (3) for borerør og som er bevegelig forbundet med bunnplaten.3. Device for handling drill pipes when drilling deep holes for the investigation and extraction of gas and oil, comprising a drill rig that stands on a base plate with means for raising, locking and rotating the drill pipes, characterized in that the drill rig consists of two interacting tower parts (4, 5) which are each fixed or horizontally movable on a bottom plate (6), where the tower parts (4, 5) each have a lifting and rotation unit (1, 2) for drill pipe and which are movably connected to the tower parts, and where the bottom plate (6) comprises a lifting and locking unit (3) for drill pipe and which is movably connected to the bottom plate. 4. Anordning ifølge krav 3, karakterisert ved at løfte- og rotasjonsenhetene (1, 2) og/eller løfte- og låseenheten (3) er fluidumtrykk-drevne.4. Device according to claim 3, characterized in that the lifting and rotation units (1, 2) and/or the lifting and locking unit (3) are fluid pressure driven. 5. Anordning ifølge krav 3, karakterisert ved at løfte- og rotasjonsenhetene (1, 2) og/eller løfte- og låseenheten (3) er elektrisk drevne.5. Device according to claim 3, characterized in that the lifting and rotation units (1, 2) and/or the lifting and locking unit (3) are electrically powered. 6. Anordning ifølge krav 3, karakterisert ved at det til hver drivenhet i løfte- og rotasjonsenhetene (1, 2), i løfte- og låseenheten (3) og i tårndelene (4, 5) er anordnet en overvåkingsenhet (9) forbundet med et sentralt anordnet overvåkingssystem (10) for automatisk overvåking cg styring av senking og heving av borerør og av boringen.6. Device according to claim 3, characterized in that for each drive unit in the lifting and rotation units (1, 2), in the lifting and locking unit (3) and in the tower parts (4, 5) there is a monitoring unit (9) connected to a centrally arranged monitoring system (10) for automatic monitoring and control of the lowering and raising of the drill pipe and the borehole. 7. Anordning ifølge krav 3, karakterisert ved at det er anordnet en drivenhet for momentoverføring ved borerørenes tiltrekking under innskruingen for sammenføyning i forbindelse med tårndelens nedre del.7. Device according to claim 3, characterized in that a drive unit is arranged for torque transmission during the tightening of the drill pipes during the screw-in for joining in connection with the lower part of the tower part.
NO864272A 1985-10-28 1986-10-24 PROCEDURE AND APPARATUS FOR TREATMENT OF DRILL NO171233C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE8505077A SE450144B (en) 1985-10-28 1985-10-28 Drilling tube handling equipment

Publications (4)

Publication Number Publication Date
NO864272D0 NO864272D0 (en) 1986-10-24
NO864272L NO864272L (en) 1987-04-29
NO171233B true NO171233B (en) 1992-11-02
NO171233C NO171233C (en) 1993-02-10

Family

ID=20361945

Family Applications (1)

Application Number Title Priority Date Filing Date
NO864272A NO171233C (en) 1985-10-28 1986-10-24 PROCEDURE AND APPARATUS FOR TREATMENT OF DRILL

Country Status (2)

Country Link
NO (1) NO171233C (en)
SE (1) SE450144B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018117853A1 (en) 2016-12-21 2018-06-28 Mhwirth As System and method for handling a pipe string

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPO726097A0 (en) * 1997-06-11 1997-07-03 Sandvik Intellectual Property Ab Extension drilling system
NO333609B1 (en) 2009-02-26 2013-07-22 West Drilling Products As Method for discharging and inserting a drill string into a borehole and apparatus for use in the practice of the method of drilling
NO336850B1 (en) * 2012-02-22 2015-11-16 West Drilling Products As Device at pipe handling unit as well as methods for insertion and extraction from a borehole of a pipe string

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018117853A1 (en) 2016-12-21 2018-06-28 Mhwirth As System and method for handling a pipe string

Also Published As

Publication number Publication date
NO864272D0 (en) 1986-10-24
SE8505077D0 (en) 1985-10-28
SE450144B (en) 1987-06-09
NO864272L (en) 1987-04-29
SE8505077L (en) 1987-04-29
NO171233C (en) 1993-02-10

Similar Documents

Publication Publication Date Title
EP0185605B1 (en) Top drive drilling systems
CN102913162B (en) Deep-sea sediment continuous pressure maintaining coring submarine drilling machine and operation method
CA1044690A (en) Rotary drilling rig
US4625796A (en) Well pipe stabbing and back-up apparatus
US3722603A (en) Well drilling apparatus
EP2612982B1 (en) Apparatus and method for positioning connection equipment
SU1061700A3 (en) Apparatus for conducting round-trip operations with drill pipes
US3980143A (en) Holding wrench for drill strings
US6412576B1 (en) Methods and apparatus for subterranean drilling utilizing a top drive
NO164557B (en) Device for maneuvering a drill string.
NO337793B1 (en) System and methods for offline interconnection and handling of oilfield pipe lengths on a drilling rig structure
CA1302390C (en) Oil well rig with pipe handling apparatus
NO157630B (en) DRILLING DEVICE WITH A DRIVING UNIT WHICH IS ORGANIZED AT THE UPPER IN A DRILLING EAGLE.
NO342509B1 (en) System and method for driving pipe elements into wellbores
NO143852B (en) PROCEDURE AND DEVICE FOR USE OF DRILLING AND CONSEQUENTIAL REMOVAL OF DRILLING
NO331443B1 (en) Apparatus and method for inserting or removing a rudder string from a subsea wellbore
RU2019135511A (en) DRILLING RIG WITH TOP DRIVE SYSTEM FUNCTIONING IN WELL DRILLING MODE, LIFTING MODE AND BYPASSING MODE
US20120000671A1 (en) Method for Withdrawal and Insertion of a Drill Pipe String in a Borehole and Also a Device for Use When Practising the Method
NO315336B3 (en) Method and apparatus for anti-slip rudder
CA2904632C (en) Systems and methods for tubular engagement and manipulation
NO171233B (en) PROCEDURE AND APPARATUS FOR TREATMENT OF DRILL
EP3942147B1 (en) System and method for subsea well operation
CN211573424U (en) Drill string suspension system for ocean deep drilling operation
CN213016244U (en) Down-the-hole drill casing pipe device of breaking out
CN211201811U (en) Oil pipe lifting and dropping device and system