NL8502696A NL8502696A NL8502696A NL8502696A NL 8502696 A NL8502696 A NL 8502696A NL 8502696 A NL8502696 A NL 8502696A NL 8502696 A NL8502696 A NL 8502696A NL 8502696 A NL8502696 A NL 8502696A
Authority
NL
Netherlands
Prior art keywords
walls
production unit
concrete
mixture
side walls
Prior art date
Application number
NL8502696A
Other languages
Dutch (nl)
Original Assignee
Jacob Penseel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jacob Penseel filed Critical Jacob Penseel
Priority to NL8502696A priority Critical patent/NL8502696A/en
Publication of NL8502696A publication Critical patent/NL8502696A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/002Producing shaped prefabricated articles from the material assembled from preformed elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0091Transformable moulds allowing the change of shape of an initial moulded preform by preform deformation or the change of its size by moulding on the preform
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/40Moulds; Cores; Mandrels characterised by means for modifying the properties of the moulding material
    • B28B7/42Moulds; Cores; Mandrels characterised by means for modifying the properties of the moulding material for heating or cooling, e.g. steam jackets, by means of treating agents acting directly on the moulding material

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The method produces partitions, particularly of concrete, by casting in a mould and allowing to set. The concrete is poured into a mould having two or more hinging sidewalls, the bottom and sides of the which contain stiffening tubes forming a closed circuit which can be connected to a heater from which a heat-transfer medium is delivered, the mixture being delivered onto the extended walls and bottom with the aid of the enclosing strips, smoothed and compacted. After setting, the walls are swung up into the vertical position.

Description

.........—w* • ·.........— w * • ·

Werkwijze voor het ter plaatse produceren van monteerbare scheidingswanden alsmede daarvoor toegepaste produktie-eehheid.A method for the production on site of mountable partition walls and the production unit used therefor.

De uitvinding heeft betrekking op een werkwijze voor het produceren van scheidingswanden, in het bijzonder van beton, voorzien van bouwaansluitingen, door een voormengsel in de juiste vorm te brengen en te laten uitharden, alsmede op een voor deze werkwijze toegepaste 5 prodüktie-eenheid.The invention relates to a method for producing dividing walls, in particular of concrete, provided with construction connections, by shaping a pre-mixture and allowing it to harden, as well as a production unit used for this method.

Scheidingswanden, in het bijzonder niet-dragende scheidingswanden, worden in de fabriek geproduceerd en naar de bouwplaats vervoerd.Partitions, in particular non-load-bearing partitions, are produced in the factory and transported to the construction site.

Dergelijke scheidingswanden worden meestal vervaardigd van lichte of zware betonprodukten ten behoeve van geïndustrialiseerde sociale 10 woningbouw. Dergelijke platen die bestemd zijn voor scheidingswanden die verschillende afmetingen kunnen bezitten, zoals bij voorbeeld 5 cm, 7 cm en 10 cm, uit licht of zwaar beton, en die verschillende eigen gewichten kunnen hebben, worden algemeen vervaardigd door in horizontale malbodems de specie te storten, te persen en af te wal-15 sen, waarna de platen naar klimaatkamers worden getransporteerd om daar onder optimale en geconditioneerde omstandigheden te verharden.Such partitions are usually made of light or heavy concrete products for industrialized public housing. Such slabs intended for partitions which may have different dimensions, such as, for example, 5 cm, 7 cm and 10 cm, of light or heavy concrete, and which can have different own weights, are generally manufactured by pouring the mortar into horizontal mold bases , pressing and rolling, after which the plates are transported to climatic chambers to harden there under optimal and conditioned conditions.

In de als wanden fungerende platen kunnen verder ingestorte elektra-leidingen en universeeldozen alsmede niet-universeeldozen, hijshaken binnen en buiten de wandafmetingen, sparingen ten behoeve van door-20 koppelen van elektra- en ventilatiekanalen worden voorzien. Na de verharding worden de platen machinaal gekanteld en in rekken vertikaal opgeslagen op het tasveld om daar op natuurlijke wijze verder te verharden. Vervolgens worden de wanden in trailers met bij voorbeeld een laadcapaciteit tot enige tientallen tonnen in vertikale stand 25 naar het werk vervoerd om daar te worden gelost en opgeslagen of direkt in het werk te worden gemonteerd. Bij de montage worden de wandelementen hetzij gemonteerd voordat de vloerplaten worden aangebracht of de wanden worden in montagevolgorde in de bodem opgeslagen en na het aanbrengen van de vloeren gemonteerd. In de gietbouw wor-30 den de wanden na het storten gemonteerd met speciaal daarvoor ontwikkelde transport/montagewagens. De wanden worden op ruwe doch vlak afgewerkte vloeren gesteld op biggen. Aan het plafond worden de wanden bevestigd door de hijsankers vast te lassen aan een in de vloer aan tebrengen staafje betonijzer. De onderlinge aansluitingen ge- S5 6 2 3 9 6 ____.· '-cï - 2 - schieden door middel van schroeven in nylon pluggen. Het ondersabe-len van de wanden wordt uitgevoerd in cement/zandspecie. De naden tussen de wanden onderling en het plafond worden gedicht en afgewerkt met een cement- of gipsprodukt of waar nodig een elastische 5 voegpasta. Het is duidelijk dat dergelijke wanden op maat kunnen worden gemaakt met bij voorbeeld ingestorte elektraleidingen, aan twee kanten een goed afgewerkt behangklaar oppervlak bezitten en voldoen aan de normen voor geluidsisolatie en brandwerendheid. Zij kunnen daarbij snel in het werk worden gemonteerd en zijn algemeen toepas-10 baar zodat op de bouwplaats tijdsbesparingen worden verkregen door verhoging van de bouwsnelheid. Voorts heeft men een schone uitvoering op de bouwplaats door het ontbreken van hak- en breekwerk en.vocht-inbreng. Niettemin hebben dergelijke scheidingswanden, in het bijzonder licht en zwaar betonscheidingswanden, het nadeel dat zij in 15 de fabriek moeten worden vervaardigd onder geconditioneerde omstandigheden, een betrekkelijk grote opslagruimte nodig is voor de conditionering in klimaatkamers en het transport duur is. De platen moeten in vertikale toestand worden getransporteerd waarbij gedurende transport gemakkelijk beschadigingen kunnen optreden. Aldus zijn 20 extra reparaties nodig hetgeen de prijs verhoogt.In the plates acting as walls, further collapsed electrical lines and universal boxes as well as non-universal boxes, lifting hooks inside and outside the wall dimensions, recesses for coupling of electricity and ventilation channels can be provided. After the hardening, the plates are tilted mechanically and stored in racks vertically on the bag field for further hardening there. Subsequently, the walls are transported to the work in trailers with, for example, a loading capacity of up to several tens of tons in vertical position, to be unloaded there and stored or mounted directly in the work. During installation, the wall elements are either mounted before the floor slabs are installed or the walls are stored in the order of assembly in the soil and mounted after the floors have been installed. In the casting construction, the walls are mounted after pouring with specially developed transport / assembly wagons. The walls are placed on piglets on rough but flat finished floors. The walls are attached to the ceiling by welding the lifting anchors to a reinforcing bar to be installed in the floor. The interconnections are S5 6 2 3 9 6 ____. · - - - - - by means of screws in nylon plugs. The subsurface of the walls is carried out in cement / sand mortar. The seams between the walls and the ceiling are sealed and finished with a cement or plaster product or, where necessary, an elastic joint paste. It is clear that such walls can be custom-made with, for example, collapsed electrical cables, have a well-finished wallpaper surface on both sides and meet the standards for sound insulation and fire resistance. They can be mounted quickly in the work and are generally applicable, so that time savings are obtained on the construction site by increasing the construction speed. Furthermore, the construction site is clean due to the lack of chopping, breaking and moisture input. Nevertheless, such partitions, in particular light and heavy concrete partitions, have the disadvantage that they have to be factory-produced under conditioned conditions, a relatively large storage space is required for conditioning in climatic chambers and transportation is expensive. The plates must be transported in a vertical position, which can easily cause damage during transport. Thus, 20 additional repairs are required, which increases the price.

De onderhavige uitvinding voorziet in een werkwijze voor het produceren van scheidingswanden, in het bijzonder van beton, die ten opzichte van de bekende werkwijzen kostenbesparend is doordat geen opslag of transport van het produkt nodig is en derhalve geen tran-25 sportschade kan optreden. ·(The present invention provides a method for producing partition walls, in particular of concrete, which is cost-saving compared to the known methods in that no storage or transport of the product is required and therefore no transport damage can occur. (

Het is een doel van de uitvinding de produktie en montage van de scheidingswanden in een op elkaar aangepast tempo te laten verlopen en de tijdsduur tussen de vervaardiging van de wanden en het gebruik ervan te verkorten.It is an object of the invention to have the production and assembly of the partition walls proceed at an adjusted pace and to shorten the time between the manufacture of the walls and their use.

30 Het is een volgend doel van de uitvinding te voorzien in een pro duktie -eenheid waarmee op de bouwplaats in de tijdsperioden dat een scheidingswand nodig is ter plaatse een dergelijke scheidingswand kan worden geproduceerd. Voorts wordt beoogd de produktie-eenheid als een transportcontainer uit te voeren zodat men ook op afgelegen plaatsen 35 de mogelijkheid bezit scheidingswanden aan te brengen zonder op een fabriek aangewezen te zijn.It is a further object of the invention to provide a production unit with which such a partition can be produced on site during the periods in which a partition wall is required. It is also intended to design the production unit as a transport container, so that it is also possible to provide partition walls at remote locations without having to rely on a factory.

Aldus voorziet de uitvinding in een werkwijze voor het produceren 8502 395 *—Jfr- - 3 - van scheidingswanden, in het bijzonder van beton, voorzien van bouw-aansluitingen door een betonvoormengsel in de juiste vorm te brengen en te laten uitharden die daardoor is gekenmerkt, dat het mengsel in de juiste vorm wordt gestort in een produktie-eenheid met ten minste 5 twee of meer schamierbare opklapbare zijwanden, waarvan de bodem en zijwanden verstijvingskokers bevatten die een gesloten circuit vormen en aansluitbaar zijn op een verwarmingseenheid voor het laten circuleren van een thermisch medium, het mengsel op de uitgelegde wanden en eventueel de bodem in de juiste vorm wordt gegoten met behulp 10 van lijsten, men het mengsel op op zichzelf bekende wijze gladstrijkt en verdicht, waarna de platen na de noodzakelijke hardingstijd, die door verwarming is versneld, door verplaatsing van de wanden van de produktie-eenheid tot een nagenoeg vertikale toestand in nagenoeg vertikale stand worden verwijderd. De produktie-eenheid is bij voor-15 keur uitgevoerd in de vorm van een transporteerbare container. De wanden van de container zijn scharnierend uitgevoerd, bij voorkeur alle wanden waarbij deze wanden bij een stand van ca. 75-85°, bij voorkeur 80° in bij voorbeeld uitzetijzers worden gevangen ter vergemakkelijking van het lossen van de verharde wand. Op deze wijze 20 kunnen de verharde wanden in nagenoeg vertikale toestand worden verwijderd en ter plaatse opgesteld waardoor eventuele breuk bij eventueel horizontaal transport van de platen wordt voorkomen. De prodük-tie-eenheid is bij voorkeur rechthoekig van vorm, zoals bij trans-portcontainers gebruikelijk is, maar het is duidelijk dat ook ande-25 re vormen bruikbaar zijn wanneer daaraan behoefte is. Voorwaarde is dat de eenheid steeds als container bruikbaar is en aldus gemakkelijk transporteerbaar is. De wandvlakken en bij voorkeur ook de malbodem zijn verstijfd door middel van kokerprofielen, die onderling zijn verbonden en daardoor een gesloten circuit vormen met aansluitingen 30 op een verwarmingseenheid. Dit gesloten circuit geeft het voordeel dat door circulatie van een verwarmingsmedium, zoals heet water, stoom, hete lucht en dergelijke de verharding van het mengsel wordt versneld, zodat men, tevens wanneer men een snelhardend betonmengsel gebruikt, in staat is de hardingstijd van de wand en het moment van 35 gebruik op elkaar aan te passen. Wanneer men in de ochtend de plaat giet is het mogelijk in de middag reeds de scheidingswand te plaatsen.The invention thus provides a method for producing 8502 395 * -Jfr- - 3 - partitions, in particular of concrete, provided with construction connections by shaping and hardening a concrete premix characterized by it that the mixture is poured in the correct form into a production unit having at least two two or more hinged hinged side walls, the bottom and side walls of which comprise stiffening sleeves which form a closed circuit and which can be connected to a heating unit for circulating a thermal medium, the mixture is poured onto the laid out walls and possibly the bottom in the correct form with the aid of moldings, the mixture is smoothed and compacted in a manner known per se, after which the plates are accelerated after heating, which has accelerated by heating by moving the walls of the production unit to a substantially vertical position in a substantially vertical position deleted. The production unit is preferably designed in the form of a transportable container. The walls of the container are hinged, preferably all walls, with these walls being caught in, for example, expansion irons at a position of about 75-85 °, preferably 80 °, to facilitate the release of the paved wall. In this way, the hardened walls can be removed in a virtually vertical state and arranged on site, so that any breakage during possible horizontal transport of the plates is prevented. The production unit is preferably rectangular in shape, as is usual in transport containers, but it is clear that other shapes can also be used when needed. The condition is that the unit can always be used as a container and is thus easy to transport. The wall surfaces and preferably also the mold bottom are stiffened by means of tubular profiles, which are mutually connected and thereby form a closed circuit with connections to a heating unit. This closed circuit gives the advantage that the hardening of the mixture is accelerated by circulation of a heating medium, such as hot water, steam, hot air and the like, so that, even when using a fast-setting concrete mixture, the hardening time of the wall is possible and adjust the time of use. When the plate is poured in the morning, it is possible to install the partition in the afternoon.

Het is duidelijk dat men door op deze wijze te werk te gaan, waarbijIt is clear that by proceeding in this manner, where

«K » Λ * A«K» Λ * A

55,-690 - 4 - in de bouwplaat reeds tevoren de bouwaansluitingen zijn aangebracht, ook op afgelegen plaatsen zeer snel kan werken, waarbij tevens het voordeel aanwezig is dat geen hooggeschoolde arbeidskrachten noodzakelijk zijn. Bij de produktie-eenheid behoren uiteraard ook hulpmidde-5 len zoals een mortelmenger, oppervlaktewals, handgereedschappen en evenaar om de vervaardiging van de scheidingswanden vlot te laten verlopen.55, -690 - 4 - the construction connections have already been made in the building board, can also work very quickly in remote places, while there is also the advantage that no highly skilled labor is required. The production unit naturally also includes auxiliary means such as a mortar mixer, surface roller, hand tools and equator for smooth production of the partition walls.

De uitvinding is tevens gericht op een produktie-eenheid ten ge-bruike in de > werkwijze van de uitvinding die is uitgevoerd als een 10 produktiecontainer, met ten minste twee schamierbare zijwanden, welke verder voorzien zijn van verstijvingskokers die een gesloten circuit vormen en aansluitbaar zijn op een verwarmingseenheid voor het laten circuleren van een thermisch medium. In een veelgebruikte uitvoering zijn de afmetingen van de produktiecontainer 6 x 2,5 x 2,5 meter, 15 waarbij het uitgeslagen oppervlak ongeveer 7,5 x 11 meter bedraagt.The invention is also directed to a production unit for use in the method of the invention, which is designed as a production container, with at least two hinged side walls, which are further provided with stiffening sleeves which form a closed circuit and are connectable on a heating unit to circulate a thermal medium. In a commonly used embodiment, the dimensions of the production container are 6 x 2.5 x 2.5 meters, the spread area being approximately 7.5 x 11 meters.

De binnenzijde van de wanden wordt bij voorkeur uitgevoerd als een malbodem, waarbij zij aan het grondvlak scharnieren tot bij voorkeur een stand van ca. 80° waarin zij in uitzetijzers worden gevangen in verband met het lossen van de verharde wand.The inside of the walls is preferably constructed as a mold bottom, hinged on the base surface to preferably a position of about 80 ° in which they are caught in expanding irons in connection with the release of the paved wall.

20 Aan de hand van de tekening wordt de produktie-eenheid van de uit vinding verder toegelicht. In de tekening is figuur 1 een perspektivisch aanzicht van de produktie-eenheid in de vorm van een transportcontainer, figuur 2 de produktie-eenheid in uitgeslagen toestand, terwijl 25 figuur 3 schematisch de stand aangeeft dat twee zijwanden in een stand van ca. 80° zijn gescharnierd op het moment van het lossen van de wand.The production unit of the invention will be further elucidated with reference to the drawing. In the drawing, figure 1 is a perspective view of the production unit in the form of a transport container, figure 2 shows the production unit in the expanded state, while figure 3 schematically shows the position of two side walls in a position of approx. 80 ° are hinged when the wall is released.

In figuur 1 is schematisch een produktiecontainer aangegeven, waarvan een gangbare maat 6 x 2,5 x 2,5 meter is.Figure 1 diagrammatically shows a production container, the usual size of which is 6 x 2.5 x 2.5 meters.

30 In figuur 2 zijn alle vier zijwanden 2, 3, 4 en 5 uitgeslagen waarbij de scharnierverbindingen schematisch door 7 zijn aangeduid.In figure 2 all four side walls 2, 3, 4 and 5 are knocked out, the hinge connections being indicated schematically by 7.

In deze stand wordt op vier oppervlakken van de zijwanden eventueel 6 ook op het oppervlak van de bodem het voormengsel aangebracht. Men maakt hierbij gebruik van lijsten waarmee de mallen worden afgebakend. 35 Eventueel kan de bodem ook als loopruimte worden benut. Nadat de lijsten zijn aangebracht, het mengsel is gestort en door een oppervlaktewals of op andere wijze is verdicht en gladgemaakt laat men de ge- 8502 69 6 •βϋ ............................11^?' - 5 - goten platen uitharden. Door de platen wordt hierbij een verwarmings-medium gecirculeerd hetgeen ter wille van de overzichtelijkheid niet in de tekening is aangegeven.In this position, the premix is also applied to four surfaces of the side walls, if desired also on the surface of the bottom. Use is made of lists with which the molds are demarcated. 35 The floor can also be used as walking space. After the moldings have been applied, the mixture has been poured and compacted and otherwise smoothed by a surface roller or 8502 69 6 • βϋ .................. .......... 11 ^? ' - 5 - harden gutter plates. A heating medium is circulated through the plates, which is not indicated in the drawing for the sake of clarity.

In figuur 3 wordt de toestand weergegeven dat de platen zijn ver-5 hard; de zijwanden worden nu in een stand van 80° geplaatst, gevangen in uitzetijzers waarna de verharde wand wordt gelost. Hiervoor kan men een bouwkraan of containerkraan benutten. Op deze wijze kan de scheidingswand onmiddellijk ter plaatse worden aangebracht zonder dat gevaren optreden van beschadiging of breuk.Figure 3 shows the condition that the plates are hardened; the side walls are now placed in a position of 80 °, caught in expanding irons after which the paved wall is unloaded. A construction crane or container crane can be used for this. In this way, the partition can be immediately installed on site without the risk of damage or breakage.

10 In figuur 2 is het uitgeslagen oppervlak ca. 7,5 x 11 meter. In figuur 3 is alleen van twee wanden een stand van 80° aangegeven? uiteraard kunnen ook de twee andere wanden, wanneer zij als malbodem hebben gefungeerd, in de 80° stand worden gescharnierd.10 In figure 2, the spread out area is approx. 7.5 x 11 meters. Figure 3 only shows a position of 80 ° for two walls? the two other walls can of course also be hinged in the 80 ° position when they have served as mold bases.

Men kan met de werkwijze en inrichting van de uitvinding schei-15 dingswanden fabriceren die uit de bekende standaardtypes bestaan zoals 5 cm licht beton, 5 cm zwaar beton, 7 cm licht beton, 7 cm zwaar beton, 10 cm zwaar beton. Bij voorkeur worden wanden toegepast die aan de luchtgeluidsisolatie-eisen voldoen conform NEN 1070, bij voorbeeld type dB -20 en type dB-Stil, -17 en -15. De werkwijze van 20 de onderhavige uitvinding is echter ook reeds bruikbaar voor de vervaardiging van wanden uit zand en cement zonder verdere hulpmiddelen behalve water tot diktes van 5 cm. Voor derde-wereldlanden heeft dit uiteraard grote voordelen.Partitions can be manufactured with the method and device of the invention which consist of the known standard types such as 5 cm light concrete, 5 cm heavy concrete, 7 cm light concrete, 7 cm heavy concrete, 10 cm heavy concrete. Preferably, walls are used that meet the airborne sound insulation requirements in accordance with NEN 1070, for example type dB -20 and type dB-Stil, -17 and -15. However, the method of the present invention can also already be used for the production of walls from sand and cement without further auxiliaries except water up to thicknesses of 5 cm. This obviously has great advantages for third world countries.

8302 69 68302 69 6

Claims (11)

1. Werkwijze voor het produceren van scheidingswanden, in het bijzonder van beton, voorzien van bouwaansluitingen door een beton-voormengsel in de juiste vorm te brengen en te laten uitharden, met het kenmerk, dat het mengsel in de juiste vorm wordt gegoten in een 5 produktie-eenheid met ten minste twee of meer schamierbare opklapbare zijwanden, waarvan de bodem en zijwanden verstijvingskokers bevatten die onderling een gesloten circuit vormen en aansluitbaar zijn op een verwarmingseenheid voor het laten circuleren van een thermisch medium, het mengsel op de uitgelegde wanden en eventueel de 10 bodem in de vorm wordt gegoten met behulp van lijsten, het mengsel op op zichzelf bekende wijze wordt gladgestreken en verdicht, waarna de platen, na de noodzakelijke hardingstijd gevormd, door verplaatsing van de wanden van de produktie-eenheid tot een nagenoeg vertikale toestand in nagenoeg vertikale stand worden verwijderd.1. Method for producing partitions, in particular of concrete, provided with construction connections by bringing a concrete premix into the correct shape and allowing it to harden, characterized in that the mixture is poured in the correct shape into a production unit with at least two or more hinged hinged side walls, the bottom and side walls of which have stiffening sleeves which form a closed circuit with one another and which can be connected to a heating unit for circulating a thermal medium, the mixture on the laid walls and possibly the 10, the base is poured into the mold by means of moldings, the mixture is smoothed and compacted in a manner known per se, after which the plates, after the necessary hardening time has been formed, are displaced by moving the walls of the production unit to a substantially vertical position almost vertical position can be removed. 2. Werkwijze volgens conclusie 1, met het kenmerk, dat de produk tie-eenheid is uitgevoerd in de vorm van een transporteerbare container.Method according to claim 1, characterized in that the production unit is in the form of a transportable container. 3. Werkwijze volgens conclusies 1-2, met het kenmerk, dat de banden van de eenheid schamierbaar zijn en bij een stand van 75-85° 20 vastzetbaar zijn.Method according to claims 1-2, characterized in that the straps of the unit are pivotable and can be locked at a position of 75-85 °. 4. Werkwijze volgens conclusies 1-3, met het kenmerk, dat de produktie-eenheid rechthoekig van vorm is.Method according to claims 1-3, characterized in that the production unit is rectangular in shape. 5. Werkwijze volgens conclusies 1-4, met het kenmerk, dat tijdens het vormen de produktie-eenheid wordt verwarmd door middel van een 25 in het gesloten circuit circulerend thermisch medium, zoals heet water of stoom of lucht.5. A method according to claims 1-4, characterized in that during production the production unit is heated by means of a thermal medium circulating in the closed circuit, such as hot water or steam or air. 6. Werkwijze volgens conclusies 1-5, met het kenmerk, dat men uitgaat van een snelhardend betonmengsel.6. Method according to claims 1-5, characterized in that a fast-setting concrete mixture is used. 7. Werkwijze volgens conclusies 1-6, met het kenmerk, dat men de 30 scheidingswanden rechtstreeks op de bouwplaats produceert.7. Process according to claims 1-6, characterized in that the partition walls are produced directly on the construction site. 8. Produktie-eenheid ten gebruike bij de werkwijze volgens conclusies 1-7, met het kenmerk, dat deze is opgebouwd uit een container met vlakke bodem waaraan de zijwanden scharnierend zijn bevestigd, waarbij de wanden en bodem verstijvingskokers bevatten die een gesloten 35 circuit vormen en aansluitbaar zijn op een verwarmingseenheid. 85 0 2 69 8 - 7 -8. Production unit for use in the method according to claims 1-7, characterized in that it is built up from a flat bottom container to which the side walls are hinged, the walls and bottom comprising stiffening tubes forming a closed circuit. and connectable to a heating unit. 85 0 2 69 8 - 7 - 9. Produktie-eenheid volgens conclusie 8, met het kenmerk, dat deze is uitgevoerd als een transporcontainer.Production unit according to claim 8, characterized in that it is designed as a transport container. 10. Produktie-eenheid volgens conclusies 8-9, met het kenmerk, dat deze rechthoekig van vorm is.Production unit according to claims 8-9, characterized in that it is rectangular in shape. 11. Produktie-eenheid volgens conclusies 8-10, met het kenmerk, dat de zijwanden in een stand van 75-85° vastzetbaar zijn. 85 02 S3 6Production unit according to claims 8-10, characterized in that the side walls can be locked in a position of 75-85 °. 85 02 S3 6
NL8502696A 1985-10-03 1985-10-03 Concrete partition prodn. method - involves pouring onto sides and bottom of mould and swinging sides up after setting NL8502696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NL8502696A NL8502696A (en) 1985-10-03 1985-10-03 Concrete partition prodn. method - involves pouring onto sides and bottom of mould and swinging sides up after setting

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL8502696A NL8502696A (en) 1985-10-03 1985-10-03 Concrete partition prodn. method - involves pouring onto sides and bottom of mould and swinging sides up after setting
NL8502696 1985-10-03

Publications (1)

Publication Number Publication Date
NL8502696A true NL8502696A (en) 1987-05-04

Family

ID=19846662

Family Applications (1)

Application Number Title Priority Date Filing Date
NL8502696A NL8502696A (en) 1985-10-03 1985-10-03 Concrete partition prodn. method - involves pouring onto sides and bottom of mould and swinging sides up after setting

Country Status (1)

Country Link
NL (1) NL8502696A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995013172A1 (en) * 1992-05-08 1995-05-18 Quickcell Technology Pty. Ltd. Method of manufacturing precast concrete units
US5817248A (en) * 1994-05-24 1998-10-06 Forlini; Emidio J. Mold for structural blocks
WO2009095884A3 (en) * 2008-02-01 2009-12-03 Compact-Habit, S. L. Method and installation for manufacturing hollow, prismatic, modular reinforced-concrete elements, and element obtained therefrom

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995013172A1 (en) * 1992-05-08 1995-05-18 Quickcell Technology Pty. Ltd. Method of manufacturing precast concrete units
US5817248A (en) * 1994-05-24 1998-10-06 Forlini; Emidio J. Mold for structural blocks
WO2009095884A3 (en) * 2008-02-01 2009-12-03 Compact-Habit, S. L. Method and installation for manufacturing hollow, prismatic, modular reinforced-concrete elements, and element obtained therefrom
ES2330911A1 (en) * 2008-02-01 2009-12-16 Compact-Habit, S.L. Method and installation for manufacturing hollow, prismatic, modular reinforced-concrete elements, and element obtained therefrom
US8652379B2 (en) 2008-02-01 2014-02-18 Compact-Habit, S.L. Method and system for manufacturing hollow reinforced concrete modular elements and element obtained therefrom

Similar Documents

Publication Publication Date Title
US3847521A (en) Hinged roof and sidewall forms for a monolithic structure
CA2227258C (en) Apparatus and process for casting large concrete boxes
US2595123A (en) Method of constructing buildings
KR102039238B1 (en) Formwork
US6767000B2 (en) Manufacturing platform
US3956859A (en) Foundation of a heated building without a cellar
NL8502696A (en) Concrete partition prodn. method - involves pouring onto sides and bottom of mould and swinging sides up after setting
US20050284098A1 (en) Lightweight concrete composite wall panels
US4077757A (en) Concrete panel making apparatus
US4206163A (en) Jobsite apparatus for horizontal casting and vertical stacking of thick insulated concrete panels
EP3194680B1 (en) A building wall and its method for manufacture
US4519568A (en) Apparatus for constructing modular pre-cast concrete buildings
BE1000796A7 (en) METHOD FOR SITE PRODUCTION OF CONSTRUCTIVE concrete slabs, APPLIED THEM AND PRODUCTION UNIT AS IS OBTAINED concrete slabs.
US2630614A (en) Casting form
US6083334A (en) Process for the production of heat insulation panels for large panel construction
US1383732A (en) Method and apparatus for house construction
NL1013055C2 (en) Industrial prefabricated, modular floor slab element for buildings, especially for homes.
EP1655120A1 (en) Floorplate having a walkable mirror surface
RU2101169C1 (en) Mold for manufacture of concrete heating devices
US2870517A (en) Apparatus for making concrete building segments
US4784365A (en) Apparatus for nest-casting of concrete elements
US3514068A (en) Installation for manufacturing molded elements
EP0096051B1 (en) Nest-casting of concrete elements
NL9302246A (en) Facade construction, as well as building provided with the facade construction and building element applicable in the facade construction.
PL193778B1 (en) Device for producing wall elements

Legal Events

Date Code Title Description
BV The patent application has lapsed