NL2028326B1 - Methods and associated systems for manufacturing composite barrel structures - Google Patents

Methods and associated systems for manufacturing composite barrel structures Download PDF

Info

Publication number
NL2028326B1
NL2028326B1 NL2028326A NL2028326A NL2028326B1 NL 2028326 B1 NL2028326 B1 NL 2028326B1 NL 2028326 A NL2028326 A NL 2028326A NL 2028326 A NL2028326 A NL 2028326A NL 2028326 B1 NL2028326 B1 NL 2028326B1
Authority
NL
Netherlands
Prior art keywords
composite
panels
station
composite material
composite panels
Prior art date
Application number
NL2028326A
Other languages
Dutch (nl)
Inventor
B Moore Matthew
B Stone Patrick
Original Assignee
Boeing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Boeing Co filed Critical Boeing Co
Priority to NL2028326A priority Critical patent/NL2028326B1/en
Priority to EP22168763.5A priority patent/EP4086163A1/en
Application granted granted Critical
Publication of NL2028326B1 publication Critical patent/NL2028326B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64FGROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT; DESIGNING, MANUFACTURING, ASSEMBLING, CLEANING, MAINTAINING OR REPAIRING AIRCRAFT, NOT OTHERWISE PROVIDED FOR; HANDLING, TRANSPORTING, TESTING OR INSPECTING AIRCRAFT COMPONENTS, NOT OTHERWISE PROVIDED FOR
    • B64F5/00Designing, manufacturing, assembling, cleaning, maintaining or repairing aircraft, not otherwise provided for; Handling, transporting, testing or inspecting aircraft components, not otherwise provided for
    • B64F5/10Manufacturing or assembling aircraft, e.g. jigs therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64CAEROPLANES; HELICOPTERS
    • B64C1/00Fuselages; Constructional features common to fuselages, wings, stabilising surfaces or the like
    • B64C2001/0054Fuselage structures substantially made from particular materials
    • B64C2001/0072Fuselage structures substantially made from particular materials from composite materials

Abstract

A method for manufacturing a composite barrel structure includes fabricating a first plurality of composite panels that are assemblable into a first partial composite barrel section. The 5 fabricating includes assembling a first layup of composite material and, concurrently, assembling at least one additional layup. The fabricating further includes heating the first layup with the at least one additional layup. A system for fabricating a plurality of panels that are assemblable into partial barrel sections includes a first workstation for fabricating a first plurality of composite panels that are assemblable into a first partial composite barrel section. The first workstation 10 includes a first assembly station configured to concurrently assemble a first layup of composite material and at least one additional layup and a first heating station configured to heat the first layup concurrently With the at least one additional layup to yield the first plurality of composite panels.

Description

METHODS AND ASSOCIATED SYSTEMS FOR MANUFACTURING COMPOSITE
BARREL STRUCTURES Field This application relates to the manufacturing of composite structures and, more specifically, to concurrent manufacturing of two or more composite barrel structures. Background Manufacturing of fuselage components typically requires a large factory footprint and is time consuming. While it is desirable to achieve high laydown rates and short takt time, current advanced material and fuselage production exhibits, for example, laydown rates of less than 454 kilograms per hour (1000 Ibs) and takt times over 6 hours. Current solutions to improve laydown rates and takt time face downfalls including likelihood to impose a recurring burden on operations that are not be sustainable in the long run that represent significant technology challenges. Accordingly, those skilled in the art continue with research and development efforts in the field of manufacturing large composite barrel structures.
Summary Disclosed are methods for manufacturing a composite barrel structure. In one example, the disclosed method for manufacturing a composite barrel structure includes fabricating a first plurality of composite panels that are assemblable into a first partial composite barrel section. The fabricating the first plurality of composite panels includes assembling a first layup of composite material. The fabricating the first plurality of composite panels further includes, concurrently with the assembling the first layup, assembling at least one additional layup of the composite material. The fabricating the first plurality of composite panels further includes heating the first layup together with the at least one additional layup.
Also disclosed are systems for fabricating a plurality of panels that are assemblable into partial barrel sections. In one example, the disclosed system for fabricating a plurality of panels that are assemblable into partial barrel sections includes a first workstation for fabricating a first plurality of composite panels that are assemblable into a first partial composite barrel section. The first workstation includes a first assembly station configured to concurrently assemble a first layup of composite material and at least one additional layup of the composite material. The first workstation further includes a first heating station configured to heat the first layup concurrently with the at least one additional layup to vield the first plurality of composite panels.
Other examples of the disclosed methods and systems will become apparent from the following detailed description, the accompanying drawings, and the appended clauses.
Also disclosed are ornamental designs for an aircraft fuselage.
Brief description of the Drawings
Some examples of the present disclosure are described with reference to the accompanying drawings.
The same reference number represents the same element or the same type of element on all drawings.
FIG. 1 is a flow chart of a method for manufacturing a composite barrel structure; FIG. 2 is a top plan view of a system for fabricating a plurality of panels that are assemblable into partial barrel sections;
FIG. 3 is a perspective view of a portion of the system of FIG. 2; FIG. 4 is a perspective view of a portion of the system of FIG. 2; FIG. 5 is a perspective view of a portion of the system of FIG. 2: FIG. 6 is a perspective view of a portion of the system of FIG. 2; FIG. 7 is a perspective view of a portion of the system of FIG. 2;
FIG. 8 is a perspective view of a portion of the system of FIG. 2; FIG. 9 is a perspective view of a portion of the system of FIG. 2; FIG. 10 is a perspective view of a portion of the system of FIG. 2; FIG. 11 is a perspective view of a portion of the svstem of FIG. 2; FIG. 12 is a perspective view of a portion of the system of FIG. 2;
FIG. 13 1s a block diagram of a system for fabricating a plurality of panels that are assemblable into patrial barrel sections; FIG. 14 is a perspective view of a partial barrel section; FIG. 15 is a perspective view of a full barrel structure; FIG. 16 is a block diagram of aircraft production and service methodology;
FIG. 17 is a schematic illustration of an aircraft; Fig. 18 is a perspective view of a first example aircraft fuselage in accordance with the disclosed design; Fig. 19 is a front elevational view of the aircraft fuselage of Fig. 18; Fig. 20 is a rear elevational view of the aircraft fuselage of Fig. 18:
Fig. 21 is a left side view of the aircraft fuselage of Fig. 18; Fig. 22 is a right side view of the aircraft fuselage of Fig. 18;
Fig. 23 is top plan view of the aircraft fuselage of Fig. 18: Fig. 24 is a bottom plan view of the aircraft fuselage of Fig. 18; Fig. 25 is a perspective view of a second example aircraft fuselage in accordance with the disclosed design: Fig. 26 is a front elevational view of the aircraft fuselage of Fig. 25; Fig. 27 is a rear elevational view of the aircraft fuselage of Fig. 25; Fig. 28 is a left side view of the aircraft fuselage of Fig. 25: Fig. 29 is a right side view of the aircraft fuselage of Fig. 25: Fig. 30 is top plan view of the aircraft fuselage of Fig. 25; and Fig. 31 is a bottom plan view of the aircraft fuselage of Fig. 25. Description The following detailed description refers to the accompanying drawings, which illustrate specific examples described by the present disclosure.
Other examples having different structures and operations do not depart from the scope of the present disclosure.
Like reference numerals may refer to the same feature, element, or component 1n the different drawings.
Illustrative, non-exhaustive examples, of the subject matter according to the present disclosure are provided below.
Reference herein to “example” means that one or more feature, structure, element, component, characteristic, and/or operational step described in connection with the example is included in at least one aspect, embodiment, and/or implementation of the subject matter according to the present disclosure.
Thus, the phrases “an example,” “another example,” “one or more examples,” and similar language throughout the present disclosure may, but do not necessarily, refer to the same example.
Further, the subject matter characterizing any one example may. but does not necessarily, include the subject matter characterizing any other example.
Moreover, the subject matter characterizing any one example may be, but is not necessarily, combined with the subject matter characterizing any other example.
As used herein, a system, apparatus, device, structure, article, element, component, or hardware “configured to” perform a specified function is indeed capable of performing the specified function without any alteration, rather than merely having potential to perform the specified function after further modification.
In other words, the system, apparatus, device, structure, article, element, component, or hardware “configured to” perform a specified function is specifically selected, created, implemented, utilized, programmed, and/or designed for the purpose of performing the specified function.
As used herein, “configured to” denotes existing characteristics of a system, apparatus, structure, article, element, component, or hardware that enable the system, apparatus, structure, article, element, component, or hardware to perform the specified function without further modification. For purposes of this disclosure, a system, apparatus, device, structure, article, element, component, or hardware described as being “configured to” perform a particular function may additionally or alternatively be described as being “adapted to” and/or as being “operative to” perform that function.
For the purpose of this disclosure, the terms “coupled.” “coupling,” and similar terms refer to two or more elements that are joined, linked, fastened, attached, connected, put in communication, or otherwise associated (e.g.. mechanically, electrically, fluidly, optically, electromagnetically) with one another. In various examples, the elements may be associated directly or indirectly. As an example, element A may be directly associated with element B. As another example, element A may be indirectly associated with element B. for example, via another element C. It will be understood that not all associations among the various disclosed elements are necessarily represented. Accordingly, couplings other than those depicted in the figures may also exist. References throughout the present specification to features, advantages, or similar language used herein do not imply that all of the features and advantages that may be realized with the examples disclosed herein should be, or are in, any single example. Rather, language referring to the features and advantages is understood to mean that a specific feature, advantage, or characteristic described in connection with an example is included in at least one example. Thus, discussion of features, advantages, and similar language used throughout the present disclosure may, but do not necessarily, refer to the same example.
The disclosed method 100 and system 600 allow for parallel fabrication and processing of composite airplane parts to increase throughput within a reduced, compressed factory footprint. Parallel processing may allow for lavup of composite material on, for example, 28 layup positions. In one example, the composite material includes thermoplastic resins. The parallel processing may include laying down a plurality of composite plies of laminate at various orientations as determined by one or more numerical control programs.
In one example, the disclosed method 100 and system 600 may increase production from a typical rate of about 15 aircrafts per month to over 80 aircrafts per month within a reduced footprint. In one example, the disclosed method 100 and system 600 utilize a panelized concept to aircraft production as opposed to an incremental pulse concept. In one example, the method 100 includes fabricating a first plurality panels in parallel and then curing the first plurality of panels in parallel prior to bolting them together to form a half barrel section.
Referring to FIG. 1, disclosed is a method 100 for manufacturing 105 a composite barrel structure 700, see FIG. 15. The method 100 comprises fabricating 120 a first plurality of composite panels
710. The first plurality of composite panels 710 are assemblable into a first partial composite barrel section 712, see FIG. 14. In one example, the first partial composite barrel section 712 is approximately half of a full barrel structure 750, see FIG. 15 illustrating when joined longitudinally to a counterpart half barrel section. In another example, the first partial barrel section 712 is an upper half barrel section. Still referring to FIG. 1, the fabricating 120 the first plurality of composite panels 710 occurs in a first workstation 200, see FIG. 3. In one example, the fabricating 120 the first plurality of 5 composite panels 710 is automated such that a computer 900, see FIG. 13, is in communication with the first workstation 200, see FIG. 2. The computer 900 may utilize one or more numerical control program 910 to direct fabrication and movement of the first plurality of composite panels 710 throughout the first workstation 200. Still referring to FIG. 1, the fabricating 120 the first plurality of composite panels 710 includes assembling 130 a first lavup of composite material 715. In one example, the assembling 130 a first layup of composite material utilizes at least one layup machine 205 located in a first assembly station 210, see FIG. 3, for assembling a composite preform. The assembling 130 may further include, after material layup of the first layup of composite material 715, bagging the first layup of composite material 715.
Referring to FIG. 2, the at least one layup machine 205 is configured to layup composite material 229 onto two or more first surfaces 207, see FIG. 13. In one example, the two or more first surfaces 207 include a tool 215 or mandrel 213 213. In another example, the at least one layup machine 205, see FIG. 3, is an automated fiber placement machine 205a in communication with the computer 900. In one example, each of the two or more first surfaces 207 is prepped for approximately 1 hour at 21 positions 217. Each of the two or more first surfaces 207 is configured for assembling 130 a first layup of composite material 715 to vield one panel of the first plurality of composite panels 710.
Referring to FIG. 1, the fabricating 120 the first plurality of composite panels 710 includes assembling 135 at least one additional first layup of composite material 717 concurrently with the assembling 130 the first layup of composite material 715. In one example, the assembling 135 at least one additional first layup of composite material 717 concurrently with the assembling 130 the first layup of composite material 715 utilizes at least one layup machine 205, see FIG. 3. The assembling 135 is performed such that the first layup of composite material 715 and the at least one additional first layup of composite material 717 are fabricated in parallel. The at least one layup machine 205 is configured to layup composite material 229 onto a tool 215 or mandrel 213. In one example, the at least one layup machine 205 is an automated fiber placement machine 205a in communication with the computer 900.
Referring to FIG. 1, in one or more examples, the fabricating 120 the first plurality of composite panels 710 includes assembling 135 at least two of the additional first layup of composite material 717 concurrently, in parallel with the assembling 130 the first layup of composite material 715. The assembling 130 the first layup of composite material 715 in parallel with the assembling 135 at least two of the additional first layup of composite material 717 in parallel yields three preforms for further assembling 180 into a first partial barrel section 712. In one example, the assembling 135 at least two of the additional first layup of composite material 717 concurrently with the assembling 130 the first layup of composite material 715 utilizes at least one layup machine 205, see FIG. 3. The at least one layup machine 205 is configured to lavup composite material 229 onto a tool 215 or mandrel 213. In one example, the at least one layup machine 205 is an automated fiber placement machine 205a in communication with the computer 900. Referring to FIG. 1, the fabricating 120 the first plurality of composite panels 710 includes heating 140 the first layup of composite material 715 together with the at least one additional layup of composite material 717. In one example, the heating 140 comprises applying pressure to the first layup of composite material 715 and the at least one additional layup of composite material 717. In another example, the heating 140 comprises pneumatically applying pressure to the first layup of composite material 715 and the at least one additional layup of composite material 717. In yet another example, the heating 140 comprises mechanically applying pressure to the first layup of composite material 715 and the at least one additional layup of composite material 717. The heat and pressure would be compressive force during layup of the preform often applied by roller after the composite material 229 is placed upon the mandrel 213 and/or the prior placed layer, however, there are a number of ways contemplated to apply the heat during the layup including, heaters, infrared or any other suitable means.
After preform completion, the first plurality of composite panels 710 are, in parallel, bagged and inserted into the autoclave 222 to be heated/cured to form a composite fuselage panel structure prepared for further processing including, for example, trimming, washing, inspecting and painting.
Referring to FIG. 4, the curing, including heating 140, the first layup of composite material 715 in parallel together with the at least one additional first layup of composite material 717 occurs in an atleast one autoclave 222 located in a first heating station 220. In one example, the heating 140 the first layup of composite material 715 occurs in one autoclave 222 and heating 140 the at least one additional first layup of composite material 717 occurs in a separate autoclave 222, both located within the first heating station 220. The method 100 allows for multiple preforms to be processed at the same time, in parallel, in the autoclave 222 to increase through put of the curing process.
In one example, the first plurality of composite panels 710 are stacked in a complementary configuration (such as nesting) within the autoclave 222 for parallel curing.
The first layup of composite material 715 and the at least one additional first lavup of composite material 717 may be arranged in a horizontal stacked arrangement for parallel heating.
After heating 140, the first lavup of composite material 715 and the at least one additional layup of composite material 717 are debagged prior to further fabrication.
Referring to FIG. 1, in one or more examples, the fabricating 120 the first plurality of composite panels 710 includes trimming 150 off manufacturing excess created during layup on the first plurality of composite panels 710 after heating 140. In one example, the trimming 150 occurs in a first trimming station 225, see FIG. 5, configured to trim the first plurality of composite panels
710. In one example, the trimming 150 takes approximately 5 minutes to approximately 25 minutes. In another example, the trimming 150 takes approximately 8 minutes to approximately 22 minutes. In another example, the trimming 150 takes approximately 10 minutes to approximately 20 minutes. In one example, the trimming 150 occurs at approximately 0.5” to approximately 1.57 per second. In another example, the trimming 150 occurs at approximately 1” per second.
Referring to FIG. 1, in one or more examples, the fabricating 120 the first plurality of composite panels comprises washing 160 the first plurality of composite panels 710 after heating 140. In one non-limiting example. the washing 160 comprises applying ultrasound energy to the first plurality of composite panels 710. The washing 160 occurs in a first washing station 230, see FIG. 2, configured to wash the first plurality of composite panels 710.
Referring to FIG. 1, in one or more examples, the fabricating 120 the first plurality of composite panels 710 comprises inspecting 165 the first plurality of composite panels 710. In one example, the inspecting 165 is performed concurrently with the washing 160 such that the first washing station 230 and the first inspection station 237 a part of a single unit, for example, a hybrid wash station. In another example, the inspecting 165 is performed consecutively with the washing 160 such that the first plurality of composite panels 710 are washed, transported out of the first washing station 230, then pass through the first inspection station 237. In one example, the first inspection station 237 is configured to perform nondestructive inspection (NDI). In another example, the first inspection station 237 is configured to perform inspecting 165 with automated robotic scanners and scanner heads.
Referring to FIG. 1, in one or more examples, the fabricating 120 the first plurality of composite panels 710 comprises painting 170 the first plurality of composite panels 710. In one example, the painting 170 occurs in a first painting station 240. In another example, the first painting station 240 is coupled with a first cure station 240a configured for curing 173 the first plurality of composite panels 710 after the painting 170.
Referring to FIG. 1, the method 100 comprises assembling 180 the first plurality of composite panels 710 to yield a first partial composite barrel section 712. In one example, the assembling 180 includes fastening the first plurality of composite panels 710 together to vield a first partial composite barrel section 712. The fastening the first plurality of composite panels 710 may be achieved with a butt splice and a splice plate. In another example, the assembling 180 comprises splicing the first plurality of composite panels 710. In another example, the assembling 180 includes using flex tracks 800 to join the first plurality of composite panels 710 into first partial barrel section 712. In vet another example, the assembling 180 includes using a mechanical fastener, an adhesive, or both to join the first plurality of composite panels 710 into first partial barrel section 712.
The first partial composite barrel section 712 may be approximately half of a full barrel structure 750, see FIG. 15. The assembling 180 the first plurality of composite panels 710 occurs in a first joining station 250 configured to join the first plurality of composite panels 710 to yield the first partial composite barrel section 712.
Referring to FIG. 1, in one or more examples, the method 100 includes fabricating 122 a second plurality of composite panels 720. The second plurality of composite panels 720 are assemblable into a second partial composite barrel section 722. In one example, the second partial composite barrel section 722 is approximately half of a full barrel structure 750, see FIG. 15 when joined longitudinally to a counterpart half barrel section. In another example, the second partial composite barrel section 722 is a lower half barrel section.
Still referring to FIG. 1, the fabricating 122 the second plurality of composite panels 720 occurs in a second workstation 300. In one example, the fabricating 122 the second plurality of composite panels 720 is automated such that a computer 900 is in communication with the second workstation 300. The computer may utilize one or more numerical control program 910 to direct fabrication and movement of the first plurality of composite panels 710 throughout the second workstation 300.
Sull referring to FIG. 1, the fabricating 122 comprises assembling 132 a second layup of composite material 725. In one example, the assembling 132 a second layup of composite material 725 utilizes at least one layup machine 205 located in a second assembly station 310 for assembling a composite preform. The at least one layup machine 205 is configured to layup composite material 229 onto two or more second surfaces 209 such that there is a one-to-one relationship between each layup machine 205 and each of the two or more second surface 209.
In one example, the two or more second surfaces 209 include a tool 215 or mandrel 213. In another example, the at least one layup machine 205 is an automated fiber placement machine 2054 in communication with the computer 900. In one example, each surface of the two or more second surfaces 209 is prepped for approximately 1 hour at 21 positions. Each surface or mandrel of the two or more second surfaces 209 is configured for assembling 132 a second layup of composite material 725 to yield one panel of the second plurality of composite panels 720. The assembling 132 may further include, after material layup of the second layup of composite material 725, bagging the second layup of composite material 725.
Referring to FIG. 1, the fabricating 122 the second plurality of composite panels 720 includes assembling 134 at least one additional second layup of composite material 727 concurrently with the assembling 132 the second layup of composite material 725. In one example, the assembling
134 at least one additional second lavup of composite material 727 concurrently with the assembling 132 the second layup of composite material 725 utilizes at least one layup machine
205. The at least one layup machine 205 is configured to layup composite material 229 onto a tool 215 or mandrel 213. In one example, the at least one layup machine 205 1s an automated fiber placement machine 2054 in communication with the computer 900.
In another example, the fabricating 122 the second plurality of composite panels 720 includes assembling 134 at least two of the additional second layup of composite material 727 concurrently, in parallel with the assembling 132 the second layup of composite material 725. In one example, the assembling 134 at least two of the additional second layup of composite material 727 concurrently with the assembling 132 the second layup of composite material 725 utilizes at least one layup machine 205. The assembling 132 in parallel with the assembling 134 yields three preforms for further assembling 182 into a second partial barrel section 722. The at least one layup machine 205 is configured to layup composite material 229 onto a tool 215 or mandrel 213. In one example, the at least one layup machine 205 is an automated fiber placement machine 2054 in communication with the computer 900. Referring to FIG. 1, the fabricating 122 includes heating 142 the second layup of composite material 725 together with the at least one additional second layup of composite material 727. In one example, the heating 142 comprises applying pressure to the second layup of composite material 725 and the at least one additional second layup of composite material 727. In another example, the heating 142 comprises pneumatically applying pressure to the second layup of composite material 725 and the at least one additional second layup of composite material 727. In yet another example, the heating 142 comprises mechanically applving pressure to the second layup of composite material 725 and the at least one additional second lavup of composite material
727. The heat and pressure would be compressive force during layup of the preform, often applied by roller after the composite material 229 is placed upon the mandrel 213 and/or the prior placed layer. Several means of applying the heat during the lavup are contemplated including using heaters, infrared, or any other suitable means. After preform completion, the second layup of composite material 725 together with the at least one additional second layup of composite material 727 are bagged, in parallel, and inserted into the autoclave 222 for curing/heating 142 to form a composite fuselage panel structure ready for further processing including trimming, washing, inspecting and painting. In one example, the curing including heating 142 the second layup of composite material 725 together with the at least one additional second layup of composite material 727 occurs in an at least one autoclave 222 located in a second heating station 320. In one example, the heating 142 the second layup of composite material 725 occurs in one autoclave 222 and heating 142 the at least one additional second layup of composite material 727 occurs in a separate autoclave 222,
both located within the second heating station 320. Heating 142 multiple preforms in parallel saves time and increases throughput of the curing process. The stacking of the second layup of composite material 725 together with the at least one additional second layup of composite material 727 includes any suitable arrangement including, for example, a complementary configuration such as nesting within the autoclave 222. The second layup of composite material 725 and the at least one additional second layup of composite material 727 may be arranged in a horizontal stacked arrangement for parallel heating 142. After heating 142, the second layup of composite material 725 and the at least one additional second layup of composite material 727 are debagged prior to further fabrication.
Referring to FIG. 1, in one or more examples, the fabricating 122 comprises trimming 152 off manufacturing excess creating during layup of the second plurality of composite panels 720 after heating 142. In one example, the trimming 152 occurs in a second trimming station 325, see FIG. 2, configured to trim the second plurality of composite panels 720. In one example, the trimming 152 takes approximately 5 minutes to approximately 25 minutes. In another example, the trimming 152 takes approximately 8 minutes to approximately 22 minutes. In yet another example, the trimming 152 takes approximately 10 minutes to approximately 20 minutes. In one example, the trimming 152 occurs at approximately 0.5” to approximately 1.5” per second. In another example, the trimming 152 occurs at approximately 17 per second.
Referring to FIG. 1, in one or more examples, the fabricating 122 includes washing 162 the second plurality of composite panels 720 after heating 142. In one example, the washing 162 includes applying ultrasound energy to the second plurality of composite panels 720. The washing 162 occurs in a second washing station 330, see FIG. 2, configured to wash the second plurality of composite panels 720.
Referring to FIG. 1, in one or more examples, the fabricating 122 the second plurality of composite panels 720 comprises inspecting 167 the second plurality of composite panels 720. In one example, the inspecting 167 is performed concurrently with the washing 162 such that the second washing station 330 and the second inspection station 337 a part of a single unit, for example, a hybrid wash station. In another example, the inspecting 167 is performed consecutively with the washing 162 such the second plurality of composite panels 720 are washed, transported out of the second washing station 330, then pass through the second inspection station 337. In one example, the second inspection station 337 is configured to perform nondestructive inspection (NDI). In another example, the second inspection station 337 is configured to perform inspecting 167 with automated robotic scanners and scanner heads.
Referring to FIG. 1, in one or more examples, the fabricating 122 the second plurality of composite panels 720 comprises painting 172 the second plurality of composite panels 720. In one example, the painting 172 occurs in a second painting station 340, see FIG. 2. In another example, the second painting station 340 is coupled with a second cure station 340a configured for curing 174 the second plurality of composite panels 720 after the painting 172. Referring to FIG. 1, in one or more examples, the fabricating 122 the second plurality of composite panels 720 comprises assembling 182 the second plurality of composite panels 720 to yield a second partial composite barrel section 722. The second partial barrel structure 722 may be half of a full barrel structure 750. In one example, the assembling 182 includes fastening the second plurality of composite panels 720 together to vield a second partial composite barrel section 722. The fastening the second plurality of composite panels 720 may be achieved with a butt splice and a splice plate. In another example, the assembling 182 the second plurality of composite panels 720 comprises splicing the second plurality of composite panels 720 with flex tracks 800. In another example, the assembling 182 the second plurality of composite panels 720 comprises splicing the second plurality of composite panels 720 with a mechanical fastener, an adhesive, or both. Referring to FIG. 1, in one or more examples, the method 100 comprises assembling 190 the first partial composite barrel section 712 and the second partial composite barrel section 722 to yield the composite barrel structure 700. In one example, the composite barrel structure 700 is a full barrel structure 750. In one example, the assembling 190 the first partial composite barrel section 712 and the second partial composite barrel section 722 comprises splicing the first partial composite barrel section 712 and the second partial composite barrel section 722 with flex tracks
800. In another example, the assembling 190 the first partial composite barrel section 712 and the second partial composite barrel section 722 comprises splicing the first partial composite barrel section 712 and the second partial composite barrel section 722 with a mechanical fastener, an adhesive, or both. FIG. 2 illustrates a system 600 for fabricating a plurality of panels that are assemblable into partial barrel sections. The system 600 includes a plurality of stations configured to perform the method 100 as shown and described herein. The plurality of stations are configured to communicate and work together via a computer 900 and at least one numerical control program 910. The movement of the plurality of panels throughout the system 600 is automated. In one example, the plurality of panels move throughout the system 600 via a transport system 610. Referring to FIG. 2, the system 600 for fabricating a plurality of panels that are assemblable into partial barrel sections comprises a first workstation 200. First workstation 200 is configured for fabricating a first plurality of composite panels 710 that are assemblable into a first partial composite barrel section 712. First workstation 200 includes more than one substation (for example, 210, 220, 225, etc.) to facilitate assembly of the first plurality of composite panels 710. Referring to FIG. 2 and FIG. 3, the first workstation 200 comprises a first assembly station 210 configured to concurrently assemble a first layup of composite material 715 and at least one additional layup of the composite material 717. In one example, the first assembly station 210 is configured to concurrently assemble a first layup of composite material 715 and at least two of the additional layup of the composite material 717. The first assembly station 210 may further be configured to bag the first layup of composite material 715 and at least two of the additional layup of composite material 717.
Referring to FIG. 3 and FIG. 4, the first workstation 200 comprises a first heating station 220 configured to heat the first layup of composite material 715 concurrently with the at least one additional layup of composite material 717 to vield the first plurality of composite panels 710. In one example, the first heating station 220 is configured to heat the first layup of composite material 715 concurrently with at least two of the additional layup of composite material 717 to yield the first plurality of composite panels 710. In one or more examples, the first heating station 220 comprises at least one autoclave 222. In another example, the first heating station 220 comprises two or more of autoclave 222. In one example, the first heating station 220 comprises a mechanical press 231. In one example, the first heating station 220 is configured to apply pressure and heat to yield the first plurality of composite panels 710 as part of the cure cycle. The pressure applied may be pneumatic or mechanical. The pressure applied may further be consolidating pressure. Referring to FIG. 5, the first workstation 200 includes a first trimming station 225 configured to trim the first plurality of composite panels 710. The first trimming station 225 may be further configured to drill assembly holes into the first plurality of composite panels 710 in conjunction with trimming to facilitate further fabrication. The first plurality of panels 710 are supported in at least one holding fixture 615 in the trimming station 225. In one example, the holding fixture 615 is a panel holding fixture 227.
Referring to FIG. 6, the first workstation 200 includes a first washing station 230 configured to wash the first plurality of composite panels 710. In one example, the first washing station 230 comprises wash elements. In another example, the first washing station 230 includes spray wash elements. The first washing station 230 may include a clamshell type enclosure 232 to contain the first plurality of composite panels 710.
Still referring to FIG. 6, the first workstation 200 includes a first inspection station 237 configured to inspect the first plurality of composite panels 710. The first inspection station 237 may perform NDI and include automated robotic scanners and scanner heads. The NDI may be performed in at least 7 positions for each panel of the first plurality of composite panels 710. In one example, the first inspection station 237 is coupled with the first washing station 230 such that the first plurality of composite panels 710 may be inspected and washed concurrently or consecutively.
Referring to FIG. 7, the first workstation 200 includes as least one includes holding fixture 615 for handling and transportation of the first layup of composite material 715 of the first plurality of composite panels 710. The holding fixture 615 is configured to move laterally and vertically as well as facilitate rotation of the first plurality of composite panels 710.
Referring to FIG. 8, the first workstation 200 comprises a first painting station 240 configured to paint the first plurality of composite panels 710. In one example, the first painting station 240 includes paint robots configured to laydown coating at approximately 1.9 square meters (20 ft.) per minute. The first painting station 240 may be coupled with a first cure station 240a, see FIG. 9, configured to cure the first plurality of composite panels 710 after painting. In one example, the first cure station 240a is an enclosed and heated such that it is configured to accelerate paint cure to approximately 1 hour. The temperature in the first cure station 240a is approximately 37.8 °C (100 °F) to approximately 48.9 °C (120 °F).
Referring to FIG. 2. the first workstation 200 includes a first panel drill station 245. In one example, the first panel drill station 245 is configured to trim and drill the first plurality of composite panels 710. The first panel drill station 245 is configured to drill holes necessary for further assembly of the first plurality of composite panels 710. The first panel drill station 245 is further configured to digitize and predictively perform assembly order of operations. In one example, the digitization includes predictively performing splice straps for a horizontal splice of the first plurality of composite panels 710. Further, the first panel drill station 245 is configured to predrill longitudinal splices such that they only require fastener installation downstream. Referring to FIG. 2 and FIG. 10, the first workstation 200 comprises a first joining station 250 configured to join the first plurality of composite panels 710 to yield the first partial composite barrel section 712. In one example, the first joining station 250 utilizes flex tracks 800 to splice the first plurality of composite panels 710. In one example, 1/3 panels are longitudinally joined with butt splices that in some embodiments are joined with flex track fastener drilling and installing devices that move on tracks placed upon the panels themselves after the panels are located relative to each other, tacked into place and then the flex track drill and fastener install progresses down the splice to splice the splice plate to each ofthe 1/3 skin panels it is bridgingly joined. Further, at the first joining station 250, much of the interior structure is added to the joined structure, such as frame installation, ceiling components, windows and doors in upper half barrel section and floor components and/or doors in the lower half barrel section. The open down position of the half barrel sections allow easy worker/robot access to the interior the half barrel section from the shop floor. This is more efficient as the structure is brought to where the tools and workers are positioned. Current assembly processes where a full barrel section is assembled and then frames and other interior structure is added requires all workers, tools and materials to be brought into the barrel and set up each time relative to the structure. This is very inefficient as it is being built up and torn down on a regular basis. This process adds a lot of non-value added time to the process. When the lower half barrel section is at the point where it should be advanced to the next work station, then the lower half barrel section progresses to the FIG. 11 device where it is inverted into an open up position from the open down position. Then the open up lower half barrel section is ready to be longitudinally joined to the open down upper half barrel section. Referring to FIG. 2 and FIG. 11, the first workstation 200 comprises a first rotation station 255. The first rotation station 255 includes a holding fixture 615 for handling and transportation of the first partial composite barrel section 712. In one example, the holding fixture 615 is rotating fixture 255a configured to rotate the first partial composite barrel section 712 for further processing and assembly. Referring to FIG. 2, in one or more examples, the system 600 comprises a second workstation 300 for fabricating a second plurality of composite panels 720 that are assemblable into a second partial composite barrel section 722.
Referring to FIG. 2, in one or more examples, the second workstation 300 comprises a second assembly station 310 configured to concurrently. in parallel assemble a second layup of composite material 725 and at least one additional second layup of the composite material 727. In one example, the second assembly station 310 is configured to concurrently assemble a second layup of composite material 725 and at least two of the additional second layup of the composite material
727. The second assembly station 310 may further be configured to bag the second layup of composite material 725 and at least two of the additional second layup of composite material 727. The second assembly station 310 includes at least one layup machine 205 is configured to layup composite material 229 onto two or more second surfaces 209 in parallel. In one example, the two or more second surfaces 209 include a tool 215 or mandrel 213. In another example, the at least one layup machine 205 is an automated fiber placement machine 205a in communication with the computer 900 such that a one-to-one relationship exists between each at least one layup machine 205 and each of the two or more second surface 209. For example, three of the two or more second surfaces 209 may be paired with three of the at least one layup machine 205 to assemble, in parallel, three preforms for further assembly into a second partial composite barrel section 722.
In one example, each surface of the two or more second surfaces 209 is prepped for approximately 1 hour at 21 positions 217. Each first surface 207 or mandrel of the two or more second surfaces 209 is configured for assembling a second layup of composite material 725 to yield one panel of the second plurality of composite panels 720.
Referring to FIG. 2, in one or more examples, the second workstation 300 comprises a second heating station 320 configured to heat the second layup concurrently with the at least one additional layup to vield the second plurality of composite panels 720 as part of the cure cycle. In one example, the second heating station 320 is configured to apply heat and pressure to the second plurality of composite panels 720. In one example, the second heating station 320 comprises an autoclave. In another example, the second heating station comprises a mechanical press 231.
Referring to FIG. 2, in one or more examples, the second workstation 320 comprises a second trimming station 325 configured to trim the second plurality of composite panels 720. The second trimming station 325 may be further configured to drill assembly holes into the second plurality of composite panels 720 in conjunction with trimming to facilitate further fabrication.
Referring to FIG. 2, in one or more examples, the second workstation 300 comprises a second washing station 330 configured to wash the second plurality of composite panels 720. In one non- limiting example. the second washing station 330 comprises ultrasonic wash elements. In another example, the second washing station 330 comprises spray wash elements. The second washing station 330 includes a clamshell type enclosure 232 to contain the second plurality of composite panels 720. Referring to FIG. 2, in one or more examples, the second workstation 300 comprises a second painting station 340 configured to paint the second plurality of composite panels 720. In one example, the second painting station 340 includes paint robots configured to lavdown coating at approximately 1.9 square meters (20 ft.)per minute. The second painting station 340 may be coupled with a second cure station 34024 configured to cure the second plurality of composite panels 720 after painting. In one example, the second cure station 3402 is an enclosed and heated such that it is configured to accelerate paint cure to approximately 1 hour. The temperature in the second cure station 3404 is approximately 37.8 °C (100 °F) to approximately 48.9 °C (120 °F). Referring to FIG. 2, the second workstation 300 includes a second panel drill station 345. In one example, the second panel drill station 345 is configured to trim and drill the second plurality of composite panels 720. The second panel drill station 345 is configured to drill holes necessary for further assembly of the second plurality of composite panels 720. The second panel drill station 345 is further configured to digitize and predictively perform assembly order of operations. In one example, the digitization includes predictively performing splice straps for a horizontal splice of the second plurality of composite panels 720. Further, the second panel drill station 345 is configured to predrill longitudinal splices such that they only require fastener installation downstream. Referring to FIG. 2, in one or more examples, the second workstation 300 comprises a second joining station 350 configured to join the second plurality of composite panels 720 to yield the second partial composite barrel section 722. In one example, the second joining station 350 utilizes flex tracks 800 to splice the second plurality of composite panels 720. In another example, the second joining station 350 utilizes at least one of a mechanical faster or adhesive to join the second plurality of composite panels 720 to vield the second partial composite barrel section 722. As shown in FIG. 2, the second workstation 300 comprises a second rotation station 355. The second rotation station 355 includes a holding fixture 615 for handling and transportation the second partial composite barrel section 722. In one example, the holding fixture 615 is rotating fixture 255a configured to rotate the second partial composite barrel section 722 for further processing and assembly. Referring to FIG. 2, in one or more examples, the system 600 comprises a full joining station 275 configured to join the first partial barrel section 712 and the second partial barrel section 722 to yield a full barrel structure 750. In one example, the full barrel structure 750 is an airplane component. In one example, the full barrel structure 750 comprises six panels or six layups of composite material. The full joining station 275 utilizes one or more mechanical fastener or adhesive to join the first partial barrel section 712 and the second partial barrel section 722. In one example, the mechanical fastener includes flex tracks 800.
Referring to FIG. 2, the system 600 for fabricating a plurality of panels that are assemblable into partial barrel sections comprises a third workstation 400. Third workstation 400 is configured for fabricating a first plurality of composite panels 710 that are assemblable into a first partial composite barrel section 712. Third workstation 400 includes more than one substation to facilitate assembly of the first plurality of composite panels 710.
Referring to FIG. 2, the third workstation 400 comprises a third assembly station 410 configured to concurrently assemble a third lavup of composite material 715 and at least one additional layup of the composite material 717. In one example, the third assembly station 410 1s configured to concurrently assemble a third layup of composite material 715 and at least two of the additional layup of the composite material 717. The third assembly station 410 may further be configured to bag the first layup of composite material 715 and at least two of the additional layup of composite material 717.
Referring to FIG. 2, the third workstation 400 comprises a third heating station 420 configured to heat the third layup of composite material 715 concurrently with the at least one additional layup of composite material 717 to vield the first plurality of composite panels 710. In one example, the third heating station 420 1s configured to heat the third layup of composite material 715 concurrently with at least two of the additional layup of composite material 717 to vield the first plurality of composite panels 710. In one or more examples, the third heating station 420 comprises at least one autoclave 222. In another example, the third heating station 420 comprises two or more of autoclave 222. In one example, the third heating station 420 comprises a mechanical press 231. In one example, the third heating station 420 is configured to apply pressure and heat to yield the first plurality of composite panels 710. The pressure applied may be pneumatic or mechanical. The pressure applied may further be consolidating pressure.
Referring to FIG. 2, the third workstation 400 includes a third trimming station 425 configured to trim the first plurality of composite panels 710. The third trimming station 425 may be further configured to drill the first plurality of composite panels 710 in conjunction with trimming to facilitate further fabrication.
Referring to FIG. 2, the third workstation 400 includes a third washing station 430 configured to wash the first plurality of composite panels 710. In one example, the third washing station 430 comprises ultrasonic wash elements. In another example, the third washing station 430 includes spray wash elements. The third washing station 430 may include a clamshell type enclosure 232 to contain the first plurality of composite panels 710. Still referring to FIG 2, the third workstation 400 includes a third inspection station 437 configured to inspect the first plurality of composite panels 710. The third inspection station 437 may perform NDI and include automated robotic scanners and scanner heads. In one example, the third inspection station 437 is coupled with the third washing station 430 such that the first plurality of composite panels 710 may be inspected and washed concurrently or consecutively. Illustrated in FIG. 2. the third workstation 400 comprises a third painting station 440 configured to paint the first plurality of composite panels 710. In one example, the third painting station 440 includes paint robots configured to laydown coating at approximately 1.9 square meters (20 ft.) per minute. The third painting station 440 may be coupled with a third cure station 440a configured to cure the first plurality of composite panels 710 after painting. In one example, the third cure station 440a 1s an enclosed and heated such that it is configured to accelerate paint cure to approximately 1 hour. The temperature in the third cure station 440a is approximately 37.8 °C (100 °F) to approximately 48.9 °C (120 °F). Referring to FIG. 2, the third workstation 400 includes a third panel drill station 245. In one example, the third panel drill station 445 is configured to trim and drill the first plurality of composite panels 710. The third panel drill station 445 is configured to drill holes necessary for further assembly of the first plurality of composite panels 710. The third panel drill station 445 1s further configured to digitize and predictively perform assembly order of operations. In one example, the digitization includes predictively performing splice straps for a horizontal splice of the first plurality of composite panels 710. Further, the third panel drill station 445 is configured to predrill longitudinal splices such that they only require fastener installation downstream. Still referring to FIG. 2, the third workstation 400 comprises a third joining station 450 configured to join the first plurality of composite panels 710 to yield the first partial composite barrel section
712. In one example, the third joining station 450 utilizes flex tracks 800 to splice the first plurality of composite panels 710. As shown in FIG. 2, the third workstation 400 comprises a third rotation station 455. The third rotation station 455 includes a holding fixture 615 for handling and transportation the first partial composite barrel section 712. In one example, the holding fixture 615 is rotating fixture 255a configured to rotate the first partial composite barrel section 712 for further processing and assembly.
Referring to FIG. 2, the system 600 for fabricating a plurality of panels that are assemblable into partial barrel sections comprises a fourth workstation 500. Fourth workstation 500 is configured for fabricating a second plurality of composite panels 720 that are assemblable into a second partial composite barrel section 722. Fourth workstation 500 includes more than one substation to facilitate assembly of the second plurality of composite panels 720. Referring to FIG. 2, the fourth workstation 500 comprises a fourth assembly station 510 configured to concurrently assemble a fourth layup of composite material 715 and at least one additional layup of the composite material 717. In one example, the fourth assembly station 510 is configured to concurrently assemble a fourth layup of composite material 715 and at least two of the additional layup of the composite material 717. The fourth assembly station 510 may further be configured to bag the second layup of composite material 725 and at least two of the additional second layup of composite material 727. Referring to FIG. 2, the fourth workstation 500 comprises a fourth heating station 520 configured to heat the fourth layup of composite material 715 concurrently with the at least one additional layup of composite material 717 to yield the second plurality of composite panels 720. In one example, the fourth heating station 520 is configured to heat the fourth layup of composite material 715 concurrently with at least two of the additional layup of composite material 717 to yield the second plurality of composite panels 720. In one or more examples, the fourth heating station 520 comprises at least one autoclave 222. In another example, the fourth heating station 520 comprises two or more of autoclave 222. In one example, the fourth heating station 520 comprises a mechanical press 231. In one example, the fourth heating station 520 is configured to apply pressure and heat to yield the second plurality of composite panels 720. The pressure applied may be pneumatic or mechanical.
The pressure applied may further be consolidating pressure.
Referring to FIG. 2, the fourth workstation 500 includes a fourth trimming station 525 configured to trim the second plurality of composite panels 720. Referring to FIG. 2, the fourth workstation 500 includes a fourth washing station 530 configured to wash the second plurality of composite panels 720. In one example, the fourth washing station 530 comprises ultrasonic wash elements.
In another example, the fourth washing station 530 comprises spray wash elements.
In another example. the fourth washing station 530 includes spray wash elements.
The fourth washing station 530 may include a clamshell type enclosure 232 to contain the second plurality of composite panels 720. Still referring to FIG 2, the fourth workstation 500 includes a fourth inspection station 537 configured to inspect the second plurality of composite panels 720. The fourth inspection station 537 may perform NDI and include automated robotic scanners and scanner heads.
In one example, the fourth inspection station 537 is coupled with the fourth washing station 530 such that the second plurality of composite panels 720 may be inspected and washed concurrently or consecutively. Illustrated in FIG. 2. the fourth workstation 500 comprises a fourth painting station 540 configured to paint the second plurality of composite panels 720. In one example, the fourth painting station 540 includes paint robots configured to laydown coating at approximately 1.9 square meters (20 ft.) per minute. The fourth painting station 540 may be coupled with a fourth cure station 540a configured to cure the second plurality of composite panels 720 after painting. In one example, the fourth cure station 540a is an enclosed and heated such that it is configured to accelerate paint cure to approximately 1 hour. The temperature in the fourth cure station 540a is approximately 37.8 °C (100 °F) to approximately 48.9 °C (120 °F).
Referring to FIG. 2, the fourth workstation 500 includes a fourth panel drill station 245. In one example, the fourth panel drill station 545 is configured to trim and drill the second plurality of composite panels 720. The fourth panel drill station 545 is configured to drill holes necessary for further assembly of the second plurality of composite panels 720. The fourth panel drill station 545 is further configured to digitize and predictively perform assembly order of operations. In one example, the digitization includes predictively performing splice straps for a horizontal splice of the second plurality of composite panels 720. Further, the fourth panel drill station 545 is configured to predrill longitudinal splices such that they only require fastener installation downstream.
Still referring to FIG. 2, the fourth workstation 500 comprises a fourth joining station 550 configured to join the second plurality of composite panels 720 to yield the second partial composite barrel section 722. In one example, the fourth joining station 550 utilizes flex tracks 800 to splice the second plurality of composite panels 720.
The disclosed system 600 allows production rates to increase, and even double what is possible through use of parallel processing.
Examples of the subject matter disclosed herein mav be described in the context of aircraft manufacturing and service method 1100 as shown in FIG. 16 and aircraft 1102 as shown in FIG.
17. During pre-production, illustrative method 1100 may include specification and design (block 1104) of aircraft 1102 and material procurement (block 1106). During production, component and subassembly manufacturing (block 1108) and system integration (block 1110) of aircraft 1102 may take place. Thereafter, aircraft 1102 may go through certification and delivery (block 1112) to be placed in service (block 1114). While in service, aircraft 1102 may be scheduled for routine maintenance and service (block 1116). Routine maintenance and service may include modification, reconfiguration, refurbishment, etc. of one or more systems of aircraft 1102.
Each of the processes of illustrative method 1100 may be performed or carried out by a system integrator, a third party, and/or an operator {(¢.g.. a customer). For the purposes of this description,
a system integrator may include, without limitation, any number of aircraft manufacturers and major-system subcontractors; a third party may include, without limitation, any number of vendors, subcontractors, and suppliers; and an operator may be an airline, leasing company, military entity, service organization, and so on.
Asshown in FIG. 17, aircraft 1102 produced by illustrative method 1100 may include airframe
1118 with a plurality of high-level systems 1120 and interior 1122. Examples of high-level systems 1120 include one or more of propulsion system 1124, electrical system 1126, hydraulic system 1128, and environmental system 1130. Any number of other systems may be included.
Although an agrospace example is shown, the principles disclosed herein may be applied to other industries,
such as the automotive industry.
Accordingly, in addition to aircraft 1102, the principles disclosed herein may apply to other vehicles, eg. land vehicles, marine vehicles, space vehicles, etc.
Apparatus(es) and method(s) shown or described herein may be employed during any one or more of the stages of the manufacturing and service method 1100. For example, components or subassemblies corresponding to component and subassembly manufacturing (block 1108) may be fabricated or manufactured in a manner similar to components or subassemblies produced while aircraft 1102 is in service (block 1114). Also, one or more examples of the apparatus(es). method(s), or combination thereof may be utilized during production stages (block 1108 and block 1110), for example, by substantially expediting assembly of or reducing the cost of aircraft 1102. Similarly, one or more examples of the apparatus or method realizations, or a combination thereof,
may be utilized, for example and without limitation, while aircraft 1102 is in service (block 1114) and/or during maintenance and service (block 1116). Also disclosed is the ornamental design for an aircraft fuselage as shown in Figs. 18-31. Broken lines in the Figs. 18-31 show environment that forms no part of the clauseed design.
Different examples of the apparatus(es) and method (s) disclosed herein include a variety of components, features, and functionalities.
It should be understood that the various examples of the apparatus(es) and method (s). disclosed herein, may include any of the components, features, and functionalities of any of the other examples of the apparatus(es) and method (s) disclosed herein in any combination.
Many modifications of examples, set forth herein, will come to mind of one skilled in the art,
having the benefit of the teachings, presented in the foregoing descriptions and the associated drawings.
Therefore, it is to be understood that the subject matter, disclosed herein, is not to be limited to the specific examples illustrated and that modifications and other examples are intended to be included within the scope of the appended clauses.
Moreover, although the foregoing description and the associated drawings describe examples of the subject matter, disclosed herein, in the context of certain illustrative combinations of elements and/or functions, it should be appreciated that different combinations of elements and/or functions may be provided by altemative implementations without departing from the scope of the appended claims.
Accordingly, parenthetical reference numerals in the appended claims are presented for illustrative purposes only and are not intended to limit the scope of the claimed subject matter to the specific examples provided herein.
The disclosure also includes the following clauses, which clauses correspond exactly in English to the appended Dutch language “Conclusies”. Clauses
1. A method (100) for manufacturing (105) a composite barrel structure (700), the method (100) comprising: fabricating (120) a first plurality of composite panels that are assemblable into a first partial composite barrel section (712), the fabricating (120) the first plurality of composite panels (710) comprising: assembling (130) a first layup of composite material (715); concurrently with the assembling (130) the first layup of composite material (715), assembling (135) at least one additional layup of composite material (717); and heating (140) the first layup of composite material (713) together with the at least one additional layup of composite material (717).
2. The method (100) of clause 1, wherein the fabricating (120) the first plurality of composite panels (710) comprises: concurrently with the assembling (130) the first layup of composite material (715), assembling (135) at least two of the additional layup of composite material (717).
3. The method (100) of clause 1 or 2, wherein the assembling (130) comprises: laying up composite material on two or more first surfaces (207).
4. The method (100) of any one of the clauses 1, 2 or 3, wherein the heating (140) comprises: applying pressure to the first layup of composite material (715) and the at least one additional layup of composite material (717).
5. The method (100) of clause 4, wherein the applying pressure comprises pneumatically applying pressure.
6. The method (100) of clause 4, wherein the applying pressure comprises mechanically applying pressure.
7. The method (100) of any one of the clauses 4-6, wherein the pressure applied is consolidating pressure.
8. The method (100) of any one of the clauses 1-7, wherein the fabricating (120) the first plurality of composite panels (710) comprises: trimming (150) the first plurality of composite panels (710) after heating (140).
9. The method (100) of any one of the clauses 1-8, wherein the fabricating (120) the first plurality of composite panels (710) comprises: washing (160) the first plurality of composite panels (710) after heating (140).
10. The method (100) of clause 9, wherein the washing (160) comprises applying ultrasound energy to the first plurality of composite panels (710).
11. The method (100) of any one of the clauses 1-10, wherein the fabricating (120) the first plurality of composite panels comprises (710): painting (170) the first plurality of composite panels (710).
12. The method (100) of any one of the clauses 1-11, wherein the fabricating (120) the first plurality of composite panels (710) is automated.
13. The method (100) of any one of the clauses 1-12 further comprising: assembling (180) the first plurality of composite panels (710) to vield the first partial composite barrel section (712).
14. The method (100) of clause 13, wherein the assembling (180) the first plurality of composite panels (710) comprises fastening the first plurality of composite panels (710) together to yield the first partial composite barrel section (712).
15. The method (100) of clause 13 or 14, wherein the assembling (180) comprises splicing the first plurality of composite panels (710) with flex tracks. 16, The method (100) of clause 13, 14 or 15, wherein the assembling (180) comprises fastening the first plurality of composite panels (710) with a butt splice and a splice plate.
17. The method (100) of any one of the clauses 1-16, wherein the first partial composite barrel section (712) is an upper half barrel section.
18. The method (100) of any one of the clauses 1-17, further comprising:
fabricating (122) a second plurality of composite panels (720) that are assemblable into a second partial composite barrel section (722), the fabricating (122) the second plurality of composite panels (720) comprising: assembling (132) a second layup of composite material (725); concurrently with the assembling (132) the second layup of composite material (725), assembling (134) at least one additional second layup of composite material (727); and heating (142) the second layup of composite material (725) together with the at least one additional second layup of composite material (727).
19. The method (100) of clause 18, wherein the fabricating (122) the second plurality of composite panels (720) comprises: concurrently with the assembling (132) the second layup of composite material (725), assembling at least two of the additional second layup of composite material (727).
20. The method (100) of clause 18 or 19, wherein the assembling (132) the second layup of composite material (725) comprises: laying up composite material on two or more second surfaces (209).
21. The method (100) of clause 18, 19 or 20, wherein the heating (142) comprises: applving pressure to the second layup of composite material (725) and the at least one additional second layup of composite material (727).
22. The method (100) of clause 21, wherein the applying pressure comprises pneumatically applying pressure.
23. The method (100) of clause 21, wherein the applving pressure comprises mechanically applying pressure.
24. The method (100) of any one of the clauses 18-23, wherein the fabricating (122) the second plurality of composite panels (720) comprises: trimming (152) the second plurality of composite panels (720) after heating (142).
25. The method (100) of any one of the clauses 18-24, wherein the fabricating (122) the second plurality of composite panels (720) comprises: washing (162) the second plurality of composite panels (720) after heating (142).
26. The method (100) of clause 25, wherein the washing (162) comprises applying ultrasound energy to the second plurality of composite panels (720).
27. The method (100) of any one of the clauses 18-26, wherein the fabricating (122) the second plurality of composite panels (720) comprises: painting (172) the second plurality of composite panels (720).
28. The method (100) of any one of the clauses 18-27. further comprising: assembling (182) the second plurality of composite panels (720) to yield the second partial composite barrel section (722).
29. The method (100) of any one of the clauses 18-28, wherein the second partial composite barrel section (722) is a lower half barrel section.
30. The method (100) of clause 28 or 29, wherein the assembling (182) comprises fastening the second plurality of composite panels (720) with a butt splice and a splice plate.
31. The method (100) of clause 28, 29 or 30, wherein the assembling (182) comprises fastening the first plurality of composite panels (710) together to vield the first partial composite barrel section (712).
32. The method (100) of any one of the clauses 28-31, wherein the assembling (182) the second plurality of composite panels (720) comprises splicing the second plurality of composite panels (720) with flex tracks (800).
33. The method (100) of any one of the clauses 28-32, further comprising: assembling (190) the first partial barrel section (712) and the second partial barrel section (722) to yield the composite barrel structure (700).
34. The method (100) of clause 33, wherein the first partial barrel section (712) is an upper half barrel section and the second partial barrel section (722) is a lower half barrel section.
35. The method (100) of clause 18-34, wherein the fabricating (122) the second plurality of composite panels (720) is automated.
36. A system (600) for fabricating a plurality of panels that are assemblable into partial barrel sections, the system (600) comprising: a first workstation (200) for fabricating (120) a first plurality of composite panels (710) that are assemblable into a first partial composite barrel section (712), the first workstation (200) comprising: a first assembly station (210) configured to concurrently assemble a first layup of composite material (715) and at least one additional layup of composite material (717); and a first heating station (220) configured to heat the first layup of composite material (715) concurrently with the at least one additional layup of composite material (717) to yield the first plurality of composite panels (710).
37. The system (600) of clause 36, wherein the first heating station (220) comprises an autoclave (222).
38. The system (600) of clause 36 or 37, wherein the first heating station (220) comprises a mechanical press (231).
39. The system (600) of clause 36, 37 or 38, wherein the first workstation (200) further comprises: a first trimming station (225) configured to trim the first plurality of composite panels (710).
40. The system (600) of any one of the clauses 36-39, wherein the first workstation (200) further comprises: a first washing station (230) configured to wash the first plurality of composite panels (710).
41. The system (600) of clause 40, wherein the first washing station (230) comprises ultrasonic wash elements.
42. The system (600) of any one of the clauses 36-41, wherein the first workstation (200) further comprises: a first painting station (240) configured to paint the first plurality of composite panels (710).
43. The system (600) of any one of the clauses 36-42, wherein the first workstation (200) further comprises:
a first joining station (250) configured to join the first plurality of composite panels (710) to vield the first partial composite barrel section (712).
44. The system (600) of any one of the clause 36-43, further comprising: a second workstation (300) for fabricating (122) a second plurality of composite panels (720) that are assemblable into a second partial composite barrel section (722), the second workstation (300) comprising: a second assembly station (310) configured to concurrently assemble a second layup of composite material (725) and at least one additional second layup of composite material (727); and a second heating station (320) configured to heat the second layup of composite material (725) concurrently with the at least one additional second layup of composite material (727) to yield the second plurality of composite panels (720).
45. The system (600) of clause 44, wherein the second heating station (320) comprises an autoclave (222).
46. The system (600) of clause 44 or 45, wherein the second heating station (320) comprises a mechanical press (231).
47. The system (600) of clause 44, 45 or 46, wherein the second workstation (300) further comprises: a second trimming station (325) configured to trim the second plurality of composite panels (720).
48. The system (600) of any one of the clauses 44-47, wherein the second workstation (300) further comprises: a second washing station (330) configured to wash the second plurality of composite panels (720).
49. The system (600) of clause 48, wherein the second washing station (330) comprises ultrasonic wash elements.
50. The system (600) of any one of the clause 44-49, wherein the second workstation (300) further comprises:
a second painting station (340) configured to paint the second plurality of composite panels (720).
51. The system (600) of any one of the clause 44-50, wherein the second workstation (300) further comprises: a second joining station (350) configured to join the second plurality of composite panels (720) to yield the second partial composite barrel section (722).
52. The system (600) of clause 44-51, further comprising: a full joining station (275) configured to join the first partial barrel section (712) and the second partial barrel section (722) to yield a full barrel structure (750).
53. The system (600) of clause 52, wherein the first workstation (200), the second workstation (300), and the full joining station (275) are automated.

Claims (53)

CONCLUSIESCONCLUSIONS 1. Werkwijze (100) voor het vervaardigen (105) van een composiet vatconstructie (700), de werkwijze (100) omvattende: het vervaardigen (120) van een eerste veelvoud van composietpanelen die assembleerbaar zijn tot een eerste gedeeltelijke composiet vatgedeelte (712), waarbij het fabriceren (120) van het eerste veelvoud van composietpanelen (710) omvat: het assembleren (130) van een eerste laag composietmateriaal (715); het gelijktijdig met het assembleren (130) van de eerste laag composietmateriaal (715) assembleren (135) van ten minste één extra laag composietmateriaal (717); en het verwarmen (140) van de eerste laag van composietmateriaal (715) samen met de ten minste ene aanvullende laag van composietmateriaal (717).A method (100) of manufacturing (105) a composite vessel structure (700), the method (100) comprising: manufacturing (120) a first plurality of composite panels assembleable into a first partial composite vessel section (712) wherein manufacturing (120) the first plurality of composite panels (710) comprises: assembling (130) a first layer of composite material (715); simultaneously assembling (130) the first layer of composite material (715) assembling (135) at least one additional layer of composite material (717); and heating (140) the first layer of composite material (715) together with the at least one additional layer of composite material (717). 2. Werkwijze (100) volgens conclusie 1, waarbij het vervaardigen (120) van het eerste veelvoud composietpanelen (710) omvat: het gelijktijdig met het assembleren (130) van de eerste laag van composietmateriaal (715) assembleren (135) van ten minste twee van de aanvullende lagen van composietmateriaal (717).The method (100) of claim 1, wherein manufacturing (120) the first plurality of composite panels (710) comprises: simultaneously assembling (130) the first layer of composite material (715) assembling (135) at least two of the additional layers of composite material (717). 3. Werkwijze (100) volgens conclusie 1 of 2, waarbij het samenstellen (130) omvat: het leggen van composietmateriaal op twee of meer eerste oppervlakken (207).The method (100) of claim 1 or 2, wherein the assembling (130) comprises: laying composite material on two or more first surfaces (207). 4. Werkwijze (100) volgens één van de conclusies 1, 2 of 3, waarbij het verwarmen (140) omvat: het uitoefenen van druk op de eerste laag van composietmateriaal (715) en de ten minste één aanvullende laag van composietmateriaal (717).The method (100) of any one of claims 1, 2 or 3, wherein the heating (140) comprises: applying pressure to the first layer of composite material (715) and the at least one additional layer of composite material (717) . 5. Werkwijze (100) volgens conclusie 4, waarbij het uitoefenen van druk het pneumatisch uitoefenen van druk omvat.The method (100) of claim 4, wherein applying pressure comprises applying pressure pneumatically. 6. Werkwijze (100) volgens conclusie 4, waarbij het uitoefenen van druk het mechanisch uitoefenen van druk omvat.The method (100) of claim 4, wherein applying pressure includes applying pressure mechanically. 7. Werkwijze (100) volgens één van de conclusies 4-6, waarbij de uitgeoefende druk consoliderende druk is.The method (100) of any one of claims 4-6, wherein the applied pressure is consolidating pressure. 8. Werkwijze (100) volgens één van de conclusies 1-7, waarbij het vervaardigen (120) van het eerste veelvoud composietpanelen (710) omvat: het bijsnijden (150) van het eerste veelvoud composietpanelen (710) na het verwarmen (140).The method (100) of any of claims 1-7, wherein manufacturing (120) the first plurality of composite panels (710) comprises: trimming (150) the first plurality of composite panels (710) after heating (140) . 9. Werkwijze (100) volgens één van de conclusies 1-8, waarbij het vervaardigen (120) van het eerste veelvoud composietpanelen (710) omvat: het wassen (160) van het eerste veelvoud composietpanelen (710) na het verwarmen (140).The method (100) of any of claims 1-8, wherein manufacturing (120) the first plurality of composite panels (710) comprises: washing (160) the first plurality of composite panels (710) after heating (140) . 10. Werkwijze (100) volgens conclusie 9, waarbij het wassen (160) het toepassen van ultrageluidsenergie op het eerste veelvoud composietpanelen (710) omvat.The method (100) of claim 9, wherein the washing (160) includes applying ultrasound energy to the first plurality of composite panels (710). 11. Werkwijze (100) volgens één van de conclusies 1-10, waarbij het vervaardigen (120) van het eerste veelvoud composietpanelen omvat (710): het schilderen (170) van het eerste veelvoud composietpanelen (710).The method (100) of any of claims 1-10, wherein manufacturing (120) the first plurality of composite panels (710) comprises: painting (170) the first plurality of composite panels (710). 12. Werkwijze (100) volgens één van de conclusies 1-11, waarbij het vervaardigen (120) van het eerste veelvoud composietpanelen (710) is geautomatiseerd.The method (100) of any of claims 1-11, wherein the manufacturing (120) of the first plurality of composite panels (710) is automated. 13. Werkwijze (100) volgens één van de conclusies 1-12 verder omvattende: het samenstellen (180) van het eerste veelvoud composietpanelen (710) om het eerste gedeeltelijke composiet vatgedeelte (712) te verkrijgen.The method (100) of any of claims 1-12 further comprising: assembling (180) the first plurality of composite panels (710) to obtain the first partial composite vessel portion (712). 14. Werkwijze (100) volgens conclusie 13, waarbij het assembleren (180) van het eerste veelvoud van composietpanelen (710) het aan elkaar bevestigen van het eerste veelvoud van composietpanelen (710) omvat om het eerste gedeeltelijke composietvatgedeelte (712) te verkrijgen.The method (100) of claim 13, wherein assembling (180) the first plurality of composite panels (710) includes attaching the first plurality of composite panels (710) together to form the first partial composite vessel portion (712). 15. Werkwijze (100) volgens conclusie 13 of 14, waarbij het assembleren (180) het verbinden van het eerste veelvoud composietpanelen (710) met buigsporen omvat.The method (100) of claim 13 or 14, wherein assembling (180) includes connecting the first plurality of composite panels (710) with flex tracks. 16. Werkwijze (100) volgens conclusie 13, 14 of 15, waarbij het assembleren (180) het bevestigen van het eerste veelvoud composietpanelen (710) met een stompe verbinding en een verbindingsplaat omvat.The method (100) of claim 13, 14 or 15, wherein assembling (180) includes attaching the first plurality of composite panels (710) with a butt joint and a joint board. 17. Werkwijze (100) volgens één van de conclusies 13-16, waarbij de eerste gedeeltelijk composiet vatgedeelte (712) een bovenste halve vatgedeelte is.The method (100) of any of claims 13-16, wherein the first partially composite vessel section (712) is an upper half vessel section. 18. Werkwijze (100) volgens één van de conclusies 13-17, verder omvattende: het vervaardigen (122) van een tweede veelvoud van composietpanelen (720) die assembleerbaar zijn tot een tweede gedeeltelijk composiet vatgedeelte (722), waarbij het fabriceren (122) van het tweede veelvoud van composietpanelen (720) omvat: het assembleren (132) van een tweede laag composietmateriaal (725); het gelijktijdig met het assembleren (132) van de tweede laag composietmateriaal (725) assembleren (134) van ten minste één extra tweede laag composietmateriaal (727); en het verwarmen (142) van de tweede laag van composietmateriaal (725) samen met de ten minste ene aanvullende tweede laag van composietmateriaal (727).The method (100) of any one of claims 13 to 17, further comprising: manufacturing (122) a second plurality of composite panels (720) assembleable into a second partial composite vessel portion (722), wherein said fabricating (122 ) of the second plurality of composite panels (720) includes: assembling (132) a second layer of composite material (725); simultaneously assembling (132) the second layer of composite material (725) assembling (134) at least one additional second layer of composite material (727); and heating (142) the second layer of composite material (725) along with the at least one additional second layer of composite material (727). 19. Werkwijze (100) volgens conclusie 18, waarbij het vervaardigen (122) van het tweede veelvoud composietpanelen (720) omvat: het gelijktijdig met het assembleren (132) van de tweede laag composietmateriaal (725) assembleren van ten minste twee van de aanvullende tweede laag composietmateriaal (727).The method (100) of claim 18, wherein manufacturing (122) the second plurality of composite panels (720) comprises: simultaneously assembling (132) the second layer of composite material (725) assembling at least two of the additional second layer of composite material (727). 20. Werkwijze (100) van conclusie 18 of 19, waarbij het assembleren (132) van de tweede laag composietmateriaal (725) omvat: het leggen van composietmateriaal op twee of meer tweede oppervlakken (209).The method (100) of claim 18 or 19, wherein assembling (132) the second layer of composite material (725) comprises laying composite material on two or more second surfaces (209). 21. Werkwijze (100) volgens conclusie 18, 19 of 20, waarbij het verwarmen (142) omvat: het uitoefenen van druk op de tweede laag composietmateriaal (725) en de ten minste één extra tweede laag composietmateriaal (727).The method (100) of claim 18, 19 or 20, wherein the heating (142) comprises: applying pressure to the second layer of composite material (725) and the at least one additional second layer of composite material (727). 22. Werkwijze (100) volgens conclusie 21, waarbij het uitoefenen van druk het pneumatisch uitoefenen van druk omvat.The method (100) of claim 21, wherein applying pressure comprises applying pressure pneumatically. 23. Werkwijze (100) volgens conclusie 21, waarbij het uitoefenen van druk het mechanisch uitoefenen van druk omvat.The method (100) of claim 21, wherein applying pressure includes applying pressure mechanically. 24. Werkwijze (100) volgens één van de conclusies 18-23, waarbij het vervaardigen (122) van het tweede veelvoud composietpanelen (720) omvat: het bijsnijden (152) van het tweede veelvoud composietpanelen (720) na verwarming (142).The method (100) of any of claims 18-23, wherein manufacturing (122) the second plurality of composite panels (720) comprises: trimming (152) the second plurality of composite panels (720) after heating (142). 25. Werkwijze (100) volgens één van de conclusies 18-24, waarbij het vervaardigen (122) van het tweede veelvoud composietpanelen (720) omvat: het wassen (162) van het tweede veelvoud composietpanelen (720) na het verwarmen (142).The method (100) of any of claims 18-24, wherein manufacturing (122) the second plurality of composite panels (720) comprises: washing (162) the second plurality of composite panels (720) after heating (142) . 26. Werkwijze (100) volgens conclusie 25, waarbij het wassen (162) het toepassen van ultrageluidsenergie op het tweede veelvoud composietpanelen (720) omvat.The method (100) of claim 25, wherein the washing (162) includes applying ultrasound energy to the second plurality of composite panels (720). 27. Werkwijze (100) volgens één van de conclusies 18-26, waarbij het vervaardigen (122) van het tweede veelvoud composietpanelen (720) omvat: het schilderen (172) van het tweede veelvoud composietpanelen (720).The method (100) of any of claims 18-26, wherein manufacturing (122) the second plurality of composite panels (720) comprises: painting (172) the second plurality of composite panels (720). 28. Werkwijze (100) volgens één van de conclusies 18-27, verder omvattende: het assembleren (182) van het tweede veelvoud composietpanelen (720) om het tweede gedeeltelijk composiet vatgedeelte (722) te verkrijgen.The method (100) of any of claims 18-27, further comprising: assembling (182) the second plurality of composite panels (720) to obtain the second partially composite vessel portion (722). 29. Werkwijze (100) volgens één van de conclusies 18-28, waarbij het tweede gedeeltelijk composiet vatgedeelte (722) een onderste halve vatgedeelte is.The method (100) of any of claims 18-28, wherein the second partially composite vessel portion (722) is a lower half vessel portion. 30. Werkwijze (100) volgens conclusie 28 of 29, waarbij het assembleren (182) het bevestigen van het tweede veelvoud composietpanelen (720) met een stompe verbinding en een verbindingsplaat omvat.The method (100) of claim 28 or 29, wherein assembling (182) includes attaching the second plurality of composite panels (720) with a butt joint and a joint plate. 31. Werkwijze (100) volgens conclusie 28, 29 of 30, waarbij het assembleren (182) het aan elkaar bevestigen van het eerste veelvoud van composietpanelen (710) omvat om het eerste gedeeltelijk composiet vatgedeelte (712) te verkrijgen.The method (100) of claim 28, 29 or 30, wherein assembling (182) includes attaching the first plurality of composite panels (710) together to form the first partially composite vessel portion (712). 32. Werkwijze (100) volgens één van de conclusies 28-31, waarbij het assembleren (182) van het tweede veelvoud van composietpanelen (720) het samenvoegen van het tweede veelvoud van composietpanelen (720) met buigsporen (800) omvat.The method (100) of any one of claims 28 to 31, wherein assembling (182) the second plurality of composite panels (720) includes assembling the second plurality of composite panels (720) with bending tracks (800). 33. Werkwijze (100) volgens één van de conclusies 28-32, verder omvattende: het assembleren (190) van het eerste gedeeltelijke vatgedeelte (712) en het tweede gedeeltelijke vatgedeelte (722) om de composiet vatconstructie (700) te verkrijgen.The method (100) of any one of claims 28 to 32, further comprising: assembling (190) the first partial vessel portion (712) and the second partial vessel portion (722) to obtain the composite vessel structure (700). 34. Werkwijze (100) volgens conclusie 33, waarbij het eerste gedeeltelijke vatgedeelte (712) een bovenste halve vatgedeelte is en het tweede gedeeltelijke vatgedeelte (722) een onderste halve vatgedeelte is.The method (100) of claim 33, wherein the first partial vessel portion (712) is an upper half vessel portion and the second partial vessel portion (722) is a lower half vessel portion. 35. Werkwijze (100) volgens conclusie 18-34, waarbij het vervaardigen (122) van het tweede veelvoud composietpanelen (720) is geautomatiseerd.The method (100) of claims 18-34, wherein the manufacturing (122) of the second plurality of composite panels (720) is automated. 36. Systeem (600) voor het fabriceren van een veelvoud van panelen die kunnen worden geassembleerd tot gedeeltelijke vatgedeeltes, waarbij het systeem (600) omvat: een eerste werkstation (200) voor het vervaardigen (120) van een eerste veelvoud van composietpanelen (710) assembleerbaar zijn tot een eerste gedeeltelijk composiet vatgedeelte (712), het eerste werkstation (200) omvat: een eerste assemblagestation (210) dat is geconfigureerd om gelijktijdig een eerste laag composietmateriaal (715) en ten minste één extra laag composietmateriaal (717) te assembleren; en gen eerste verwarmingsstation (220) dat is geconfigureerd om de eerste laag composietmateriaal (715) gelijktijdig met de ten minste ene aanvullende laag composietmateriaal (717) te verwarmen om het eerste veelvoud composietpanelen (710) te verkrijgen.36. A system (600) for manufacturing a plurality of panels that can be assembled into partial vessel sections, the system (600) comprising: a first workstation (200) for manufacturing (120) a first plurality of composite panels (710 ) are assembleable into a first partially composite vessel portion (712), the first workstation (200) includes: a first assembly station (210) configured to simultaneously assemble a first layer of composite material (715) and at least one additional layer of composite material (717). assemble; and a first heating station (220) configured to heat the first layer of composite material (715) simultaneously with the at least one additional layer of composite material (717) to obtain the first plurality of composite panels (710). 37. Systeem (600) volgens conclusie 36, waarbij het eerste verwarmingsstation (220) een autoclaaf (222) omvat.The system (600) of claim 36, wherein the first heating station (220) comprises an autoclave (222). 38. Systeem (600) volgens conclusie 36 of 37, waarbij het eerste verwarmingsstation (220) een mechanische pers (231) omvat.The system (600) of claim 36 or 37, wherein the first heating station (220) comprises a mechanical press (231). 39. Systeem (600) volgens conclusie 36, 37 of 38, waarbij het eerste werkstation (200) verder omvat: een eerste trimstation (225) dat is mgericht om het eerste veelvoud composietpanelen (710) bij te snijden.The system (600) of claim 36, 37 or 38, wherein the first workstation (200) further comprises: a first trimming station (225) adapted to trim the first plurality of composite panels (710). 40. Systeem (600) volgens één van de conclusies 36-39, waarbij het eerste werkstation (200) verder omvat: een eerste wasstation (230) dat is ingericht om het eerste veelvoud composietpanelen (710) te wassen.The system (600) of any of claims 36-39, wherein the first workstation (200) further comprises: a first wash station (230) configured to wash the first plurality of composite panels (710). 41. Systeem (600) volgens conclusie 40, waarbij het eerste wasstation (230) ultrasone waselementen omvat.The system (600) of claim 40, wherein the first wash station (230) includes ultrasonic wash elements. 42. Systeem (600) volgens één van de conclusies 36-41, waarbij het eerste werkstation (200) verder omvat: gen eerste verfstation (240) dat is ingericht voor het schilderen van het eerste veelvoud composietpanelen (710).The system (600) of any one of claims 36 to 41, wherein the first workstation (200) further comprises: a first paint station (240) configured to paint the first plurality of composite panels (710). 43. Systeem (600) volgens één van de conclusies 36-42, waarbij het eerste werkstation (200) verder omvat: een eerste verbindingsstation (230) ingericht voor verbinden van het eerste veelvoud composietpanelen (710) om het eerste gedeeltelijk composiet vatgedeelte (712) te verkrijgen.The system (600) of any one of claims 36-42, wherein the first workstation (200) further comprises: a first connecting station (230) adapted to connect the first plurality of composite panels (710) around the first partially composite vessel portion (712 ) to obtain. 44. Svsteem (600) volgens één van de conclusies 36-43, verder omvattende: een tweede werkstation (300) voor het fabriceren (122) van een tweede veelvoud van composietpanelen (720) die assembleerbaar zijn tot een tweede gedeeltelijk composiet vatgedeelte (722), het tweede werkstation (300) omvattende: een tweede assemblagestation (310) dat is ingericht om gelijktijdig een tweede laag van composietmateriaal (725) en ten minste één aanvullende tweede laag van composietmateriaal (727) te assembleren; en een tweede verwarmingsstation (320) geconfigureerd om de tweede laag composietmateriaal (725) gelijktijdig met de ten minste ene aanvullende tweede laag composietmateriaal (727) te verwarmen om het tweede veelvoud composietpanelen (720) te verkrijgen.The system (600) of any one of claims 36-43, further comprising: a second workstation (300) for fabricating (122) a second plurality of composite panels (720) assembleable into a second partial composite vessel portion (722 ), the second workstation (300) comprising: a second assembly station (310) configured to simultaneously assemble a second layer of composite material (725) and at least one additional second layer of composite material (727); and a second heating station (320) configured to heat the second layer of composite material (725) simultaneously with the at least one additional second layer of composite material (727) to obtain the second plurality of composite panels (720). 45. Systeem (600) volgens conclusie 44, waarbij het tweede verwarmingsstation (320) een autoclaaf (222) omvat.The system (600) of claim 44, wherein the second heating station (320) comprises an autoclave (222). 46. Systeem (600) volgens conclusie 44 of 45, waarbij het tweede verwarmingsstation (320) een mechanische pers (231) omvat.The system (600) of claim 44 or 45, wherein the second heating station (320) comprises a mechanical press (231). 47. Systeem (600) volgens conclusie 44, 45 of 46, waarbij het tweede werkstation (300) verder omvat: een tweede trimstation (325) dat 1s ingericht om het tweede veelvoud composietpanelen (720) bij te snijden.The system (600) of claim 44, 45 or 46, wherein the second workstation (300) further comprises: a second trim station (325) configured to trim the second plurality of composite panels (720). 48. Systeem (600) volgens één van de conclusies 44-47, waarbij het tweede werkstation (300) verder omvat: een tweede wasstation (330) dat is ingericht voor het wassen van het tweede veelvoud composietpanelen (720).The system (600) of any of claims 44-47, wherein the second workstation (300) further comprises: a second wash station (330) configured to wash the second plurality of composite panels (720). 49. Systeem (600) volgens conclusie 48, waarbij het tweede wasstation (330) ultrasone waselementen omvat.The system (600) of claim 48, wherein the second wash station (330) includes ultrasonic wash elements. 50. Systeem (600) volgens één van de conclusies 44-49, waarbij het tweede werkstation (300) verder omvat: een tweede verfstation (340) dat is ingericht voor het schilderen van het tweede veelvoud composietpanelen (720).The system (600) of any of claims 44-49, wherein the second workstation (300) further comprises: a second paint station (340) configured to paint the second plurality of composite panels (720). 51. Systeem (600) volgens één van de conclusies 44-50, waarbij het tweede werkstation (300) verder omvat: een tweede verbindingsstation (350) dat is ingericht om het tweede veelvoud composietpanelen (720) te verbinden om het tweede gedeeltelijk composiet vatgedeelte (722) te verkrijgen.The system (600) of any of claims 44-50, wherein the second workstation (300) further comprises: a second connecting station (350) configured to connect the second plurality of composite panels (720) to the second partially composite vessel portion (722). 52. Systeem (600) volgens conclusie 44-51, verder bestaande uit: een volledig verbindingsstation (275) dat is ingericht om het eerste gedeeltelijke vatgedeelte (712) en het tweede gedeeltelijke vatgedeelte (722) te verbinden om een volledige vatconstructie (750) te verkrijgen.The system (600) of claims 44-51, further comprising: a complete connecting station (275) configured to connect the first partial vessel section (712) and the second partial vessel section (722) to form a complete vessel assembly (750) to obtain. 53. Systeem (600) volgens conclusie 52. waarbij het eerste werkstation (200), het tweede werkstation (300) en het volledige verbindingsstation (275) zijn geautomatiseerd.The system (600) of claim 52, wherein the first workstation (200), the second workstation (300), and the entire connecting station (275) are automated.
NL2028326A 2021-05-07 2021-05-28 Methods and associated systems for manufacturing composite barrel structures NL2028326B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NL2028326A NL2028326B1 (en) 2021-05-28 2021-05-28 Methods and associated systems for manufacturing composite barrel structures
EP22168763.5A EP4086163A1 (en) 2021-05-07 2022-04-19 Methods and associated systems for manufacturing composite barrel structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2028326A NL2028326B1 (en) 2021-05-28 2021-05-28 Methods and associated systems for manufacturing composite barrel structures

Publications (1)

Publication Number Publication Date
NL2028326B1 true NL2028326B1 (en) 2022-12-12

Family

ID=77838900

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2028326A NL2028326B1 (en) 2021-05-07 2021-05-28 Methods and associated systems for manufacturing composite barrel structures

Country Status (1)

Country Link
NL (1) NL2028326B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090148647A1 (en) * 2007-12-07 2009-06-11 The Boeing Company Method of Fabricating Structures Using Composite Modules and Structures Made Thereby
US9511548B1 (en) * 2013-10-16 2016-12-06 The Boeing Company Systems and methods for assembling a skin of a composite structure
US20200331634A1 (en) * 2019-04-18 2020-10-22 The Boeing Company Method of fabricating a composite structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090148647A1 (en) * 2007-12-07 2009-06-11 The Boeing Company Method of Fabricating Structures Using Composite Modules and Structures Made Thereby
US9511548B1 (en) * 2013-10-16 2016-12-06 The Boeing Company Systems and methods for assembling a skin of a composite structure
US20200331634A1 (en) * 2019-04-18 2020-10-22 The Boeing Company Method of fabricating a composite structure

Similar Documents

Publication Publication Date Title
EP2444240B1 (en) Composite manufacturing method using an assembly of composite modules
US10542363B2 (en) Automated production of acoustic structures
KR102341145B1 (en) Metrology-based system for operating a flexible manufacturing system
JP5616050B2 (en) Method and apparatus for connecting composite structural members, and structural member made by the method and apparatus
US20150266147A1 (en) System and Method for Assembly Manufacturing
US10773830B2 (en) Flexible track manufacturing system and method
US11685128B2 (en) System and method for fabricating a composite structure
US20220152759A1 (en) Composite assembly for unhardened fuselage components
NL2028326B1 (en) Methods and associated systems for manufacturing composite barrel structures
US11911978B2 (en) Methods and associated systems for manufacturing composite barrel structures
EP4086163A1 (en) Methods and associated systems for manufacturing composite barrel structures
US11801576B2 (en) Aircraft assembly formed of mating half barrel sections and the method of assembling the same
US11724346B2 (en) Moving line assembly of airframes
CN114516417A (en) Assembly line manufacturing and assembly of aircraft wings
NL2020976B1 (en) Flexible track manufacturing system and method
US20230219307A1 (en) Composite Fuselage Fabrication
NL2028121B1 (en) Moving line assembly of airframes
US20220153439A1 (en) Mirrored fabrication and assembly of aircraft wings
NL2027387B1 (en) Assembly line fabrication and assembly of aircraft wings
NL2027417B1 (en) Fabrication line, systems, and methods for fuselage sections
US11891193B2 (en) Assembly line fabrication and assembly of aircraft wings
NL2027396B1 (en) Composite wing panels and fabrication method
NL2027415B1 (en) Fabrication line, systems, and methods for fuselage sections
US11643224B2 (en) Assembly line fabrication and assembly of aircraft wings
NL2028123B1 (en) Mirrored fabrication and assembly of aircraft wings