NL2021383B1 - Crane, method for assembling a crane and method for disassembling a crane - Google Patents

Crane, method for assembling a crane and method for disassembling a crane Download PDF

Info

Publication number
NL2021383B1
NL2021383B1 NL2021383A NL2021383A NL2021383B1 NL 2021383 B1 NL2021383 B1 NL 2021383B1 NL 2021383 A NL2021383 A NL 2021383A NL 2021383 A NL2021383 A NL 2021383A NL 2021383 B1 NL2021383 B1 NL 2021383B1
Authority
NL
Netherlands
Prior art keywords
mast
receiving device
section
crane
axis
Prior art date
Application number
NL2021383A
Other languages
Dutch (nl)
Inventor
Helmens Wessel
Lamphen Nicolaas
Adrian Joachim Van Den Broek Anton
Original Assignee
Mammoet Holding B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mammoet Holding B V filed Critical Mammoet Holding B V
Priority to NL2021383A priority Critical patent/NL2021383B1/en
Priority to US17/259,695 priority patent/US11807503B2/en
Priority to CN201980049456.8A priority patent/CN112533859B/en
Priority to JP2021528322A priority patent/JP7475345B2/en
Priority to PCT/NL2019/050462 priority patent/WO2020022881A1/en
Priority to EP19749460.2A priority patent/EP3826955B1/en
Priority to CA3106951A priority patent/CA3106951A1/en
Application granted granted Critical
Publication of NL2021383B1 publication Critical patent/NL2021383B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/344Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes adapted for transport purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention pertains to a crane, a method for assembling a crane and a method for disassembling a crane. The crane according to the invention comprises: - a first mast which is tiltable relative to the crane base around a first mast pivot axis into an inclined mast operating position - a receiving device, which is adapted to receive the mast section of the first mast, which receiving device has a receiving device central axis parallel to the central mast axis, and a mast section guide which is adapted to guide movement of the mast section relative to the receiving device in the direction of the receiving device central axis, wherein the receiving device is connected to the crane base and tiltable along with the first mast relative to the crane base around the first mast pivot axis.

Description

Figure NL2021383B1_D0001
Θ 2021383 ©B1 OCTROOI (2?) Aanvraagnummer: 2021383 (51) Int. Cl.:
B66C 23/34 (2018.01) (22) Aanvraag ingediend: 24 juli 2018 (62) Afsplitsing van aanvraag , ingediend (30) Voorrang:
Q Aanvraag ingeschreven:
januari 2020 (43) Aanvraag gepubliceerd:
47) Octrooi verleend:
januari 2020 (45) Octrooischrift uitgegeven:
januari 2020 (54) Crane, method for assembling (57) The invention pertains to a crane, a method for assembling a crane and a method for disassembling a crane.
The crane according to the invention comprises:
- a first mast which is tiltable relative to the crane base around a first mast pivot axis into an inclined mast operating position
- a receiving device, which is adapted to receive the mast section of the first mast, which receiving device has a receiving device central axis parallel to the central mast axis, and a mast section guide which is adapted to guide movement of the mast section relative to the receiving device in the direction of the receiving device central axis, wherein the receiving device is connected to the crane base and tiltable along with the first mast relative to the crane base around the first mast pivot axis.
(73) Octrooihouder(s):
Mammoet Holding B.V. te UTRECHT (72) Uitvinder(s):
Wessel Helmens te STOLWIJK Nicolaas Lamphen te VIANEN
Anton Adrian Joachim van den Broek te RIJEN (74) Gemachtigde:
ir. J.C. Volmer c.s. te Rijswijk a crane and method for disassembling a crane
Figure NL2021383B1_D0002
NLB1 2021383
Dit octrooi is verleend ongeacht het bijgevoegde resultaat van het onderzoek naar de stand van de techniek en schriftelijke opinie. Het octrooischrift komt overeen met de oorspronkelijk ingediende stukken.
P33649NL00/NBL
Crane, method for assembling a crane and method for disassembling a crane
The invention pertains to the field of hoisting cranes and hoisting devices, in particular large cranes of modular design wherein the crane is transported in disassembled condition to a site where a hoisting job is to be performed and then assembled.
In the field, large lattice boom cranes are used which are assembled on the site at which they are to be operated. Usually, the main boom and/or the back mast of the crane are assembled whilst lying on the ground, and then hoisted and/or pulled up into their operating position. A quite common problem is that limited space is available at the site to build up the crane, e.g. when a new reactor vessel is to be installed at an existing petrochemical plant.
Several solutions to this problem have been proposed.
For example, EP3301064 describes an apparatus for lifting heavy loads. In this apparatus, a ground-standing erection facility is provided, which allows to build up the masts of a crane in a vertical direction instead of lying on the ground (i.e. in horizontal direction). A mast section is arranged in the erection facility, and then moved vertically upwards. Then, a next mast section is arranged in the erection facility, underneath the previous mast section, and connected to this previous mast section. By repeating this process, a crane mast is assembled until it reaches its full length. The erection facility holds the mast in a vertical position during the assembly of the mast. Mast guides have to be used for this, because the mast sections have to be able to move in vertical direction relative to the erection facility.
The mast or masts can be tiltably connected to a base or base frame. This allows to tilt the mast or masts into an inclined operating position, which is usually required for this kind of crane. However, before the mast can be tilted into the inclined operating position, the mast has to be disconnected from the erection facility which during assembly held the mast in a vertical position. In particular, the mast guides have to be disconnected from the mast.
The disassembly of a mast in accordance with EP3301064 takes place in the opposite way of the assembly. So, the mast is brought into the vertical position again, and fixed in this position relative to the erection facility. Then the lowest mast section is removed from the mast. The mast is then lowered, so the next mast section can be removed. Again, the mast guides have to engage the mast in order to guide its vertical downward movement relative to the erection facility.
So, the mast guides have to be designed and operated in such a way that they can be connected and disconnected from the mast, and to not be in the way when the mast is titled away from the vertical construction position into the inclined operating position. This
-2complicates the design of the apparatus and increases the time required for assembly and disassembly of the mast at the site where the hoisting job is to be carried out.
It is the object of the invention to provide a crane which is suitable for efficient assembly and disassembly at a site where limited space is available. Furthermore, the object of the invention is to provide a practical method for assembling and for disassembling such a crane.
The object of the invention is obtained by a crane, which comprises:
- a crane base,
- a first mast having a central mast axis, wherein the first mast comprises a mast section, and the first mast is tiltable relative to the crane base around a first mast pivot axis within a range of angular positions, which range of angular positions includes a mast construction position and an inclined mast operating position, wherein the first mast pivot axis extends perpendicular to the central mast axis,
- a receiving device, which is adapted to receive the mast section of the first mast, which receiving device has a receiving device central axis which is perpendicular to the first mast pivot axis and parallel to the central mast axis, and a mast section guide which is adapted to guide movement of the mast section relative to the receiving device in the direction of the receiving device central axis,
- a transfer device, which is adapted to move the mast section of the first mast relative to the receiving device in the direction of the receiving device central axis from a receiving position into a transfer position,
- a locking device, which is adapted to releasably lock the position of the mast section of the first mast relative to the receiving device in the transfer position,
- a first mast fixing device, which is adapted to releasably fix the first mast in the mast construction position, wherein the receiving device is connected to the crane base and tiltable along with the first mast relative to the crane base around the first mast pivot axis.
The crane according the invention comprises a crane base. The crane base can for example be the chassis of a crawler crane, and/or a foot assembly of e.g. a ringer crane. The crane base is for example arranged on a support surface of a working area. The support surface is for example a part of the ground which is provided with loose steel plates for better consistency.
The crane according to the invention has a first mast which comprises a mast section. Optionally, the first mast comprises multiple mast sections.
-3The first mast has a central axis, which extends in the longitudinal direction of the first mast. The first mast is tiltable relative to the crane base around a first mast pivot axis within a range of angular positions. The first mast pivot axis extends perpendicular to the central mast axis. The first mast pivot axis extends for example in horizontal direction.
The range of angular positions includes a mast construction position and an inclined mast operating position. The mast construction position is the angular position of the first mast when the first mast is assembled. The mast operating position is the angular position which the first mast has or can have when a load is lifted by the crane during a hoisting operation.
In the inclined mast operating position, the central axis of the first mast extends in a direction which is at angle other than 0° and also other than 90° from the vertical direction. For example, in the inclined mast operating position, the central axis of the first mast extends under and angle between 5° and 75° relative to the vertical direction. The crane according to the invention is suitable for being operated with the first mast in an inclined mast operating position. In exceptional cases, the mast operating position may be vertical, e.g. during a part of the hoisting job, but still the first mast has an inclined mast operating position as long as the crane is suitable for being operated with the first mast in an inclined mast operating position.
This inclined mast operating position makes the crane according to the invention different from e.g. a tower crane or revolving tower crane, in which the mast is always at a vertical position during operation of the crane. The forces that occur in the first mast of the crane according to the invention are very different from the forces in the upright mast of a tower crane.
The crane according to the invention further comprises a receiving device, which is adapted to receive the mast section of the first mast. During the assembly of the first mast, the receiving device receives a mast section which is to be added to the first mast. In embodiments in which the first mast comprises multiple mast section, the receiving device successively receives multiple mast sections.
The receiving device has a receiving device central axis which is perpendicular to the first mast pivot axis and parallel to the central mast axis.
The receiving device further comprises a mast section guide which is adapted to guide movement of the mast section relative to the receiving device in the direction of the receiving device central axis. For example, the mast section guide extends in a direction which is parallel to the central mast axis and to the receiving device central axis.
-4The crane according to the invention further comprises a transfer device. The transfer device is adapted to move the mast section of the first mast relative to the receiving device in the direction of the receiving device central axis from a receiving position into a transfer position.
The receiving position of the mast section of the first mast is the position this mast section has relative to the receiving device when it is arranged in the receiving device prior to but ready for transfer to the transfer position. In general, the mast section is engaged by the mast section guide (either directly or indirectly) in the receiving position.
The transfer position of the mast section of the first mast is the position this mast section has when the receiving device is ready to receive a subsequent mast section of the first mast in the receiving position.
The receiving position and the transfer position are offset from each other in the direction of the receiving device central axis.
The transfer device is for example provided with one or more hydraulic cylinders and/or one or more cables to bring the mast section from the receiving position to the transfer position.
Optionally, the transfer device is mounted onto the receiving device. Alternatively, the transfer device is for example mounted on the crane base.
Optionally, the transfer device engages the mast section, either directly or indirectly.
The crane according to the invention further comprises a locking device, which is adapted to releasably lock the position of the mast section of the first mast relative to the receiving device in the transfer position. The locking device therewith prevents that a mast section slides back from the transfer position into the receiving position. When the locking device locks the mast section in the transfer position, a subsequent mast section can be safely placed in the receiving position in the receiving device.
For example, the locking device may comprises moveable pens which block movement of the mast section from the transfer position towards the receiving position. The pens may for example be hydraulically or pneumatically operated.
Optionally, the locking device is mounted onto the receiving device. Alternatively, the locking device is for example mounted on the crane base.
The locking device may for example release the mast section from the transfer position when a subsequent mast section pushes the mast section further in a direction parallel to the receiving device central axis during the further assembly of the first mast.
The crane according to the invention further comprises a first mast fixing device, which is adapted to releasably fix the first mast in the mast construction position. During the
-5assembly and optionally also during disassembly of the first mast, the first mast fixing device holds the first mast in the mast construction position. When the first mast is to be tilted into the inclined mast operating position, the first mast fixing device releases the first mast to allow the tilting of the first mast.
In accordance with the invention, the receiving device is connected to the crane base and tiltable along with the first mast relative to the crane base around the first mast pivot axis.
So, the receiving device moves along with the first mast when the first mast is tilted into the inclined mast operating position. The receiving device central axis remains parallel to the central mast axis. Both the receiving device and the first mast tilt about the same pivot axis.
The mast section guide forms part of the receiving device and therewith also tilts along with the first mast. This way, the mast section guide does not have to be disconnected from and moved out of the way of the first mast before tilting the first mast into the inclined mast operating position. This allows a simpler and smaller construction, and also save time and effort during assembly and disassembly of the crane.
In an embodiment, the first mast comprises a lower mast section which is connected to the crane base and tiltable relative to the crane base around the first mast pivot axis.
In this embodiment, the mechanical loads that are exerted on the first mast during operation of the crane are borne by the first mast, and not or only to a limited extent by the receiving device. This allows a relatively light design of the receiving device, including the mast section guide.
In an alternative embodiment, the lowest mast section of the first mast is not directly connected to the crane base, but connected to the crane base via the receiving device. In this embodiment, the lowest mast section is for example fixed in the transfer position.
In an embodiment, the central mast axis of the first mast extends vertically when the first mast is in the construction position.
“Vertically” means exactly vertical or a small deviation from exactly vertical, e.g. a deviation of 5° maximum.
Advantages of this embodiment are that the first mast is not or hardly subjected to bending forces during assembly and disassembly of the first mast, and that a relatively small space at the hoisting site is sufficient to assemble the crane.
In an alternative embodiment, the central mast axis of the first mast extends at an angle relative to the vertical, which angle is not 0° and also not 90,° when the first mast is in the construction position.
-6In an embodiment, the crane further comprises a second mast.
For example, the first mast is a main boom and the second mast is a back mast. Alternatively, the first mast is a back mast and the second mast is the main boom.
Optionally, the second mast has a central second mast axis, and is tiltable relative to the crane base around a second mast pivot axis which extends perpendicular to the central second mast axis. Optionally, the second mast is tiltable relative to the crane base around the second mast pivot axis within a range of angular positions, which range includes a second mast construction position and an inclined second mast operating position.
Optionally, the second mast comprises a mast section. Optionally, the second mast comprises multiple mast sections.
Optionally, the second mast pivot axis and the first mast pivot axis are parallel to each other.
Optionally, the second mast pivot axis and the first mast pivot axis are movable relative to each other in a direction towards and away from each other.
Optionally, the first mast pivot axis and the second mast pivot axis are positioned close to each other, e.g. the distance between the first mast pivot axis and the second mast pivot axis is less than 5 meters, optionally less than 3 meters. This allows a small footprint of the crane, which is advantageous when the crane has to be used at hoisting locations where there is little space for the crane.
In an embodiment, the crane comprises a second mast having a central mast axis, wherein the second mast comprises a mast section, and the second mast is tiltable relative to the crane base around a second mast pivot axis within a range of angular positions, which range of angular positions includes a mast construction position and an inclined mast operating position, wherein the second mast pivot axis extends perpendicular to the central mast axis,
In this embodiment, the crane further comprises a second mast receiving device, which is adapted to receive a mast section of the second mast. The second mast receiving device has a second mast receiving device central axis which is perpendicular to the second mast pivot axis and parallel to the central mast axis of the second mast, and a second mast section guide which is adapted to guide movement of the mast section of the second mast relative to the second mast receiving device in the direction of the second mast receiving device central axis.
In this embodiment, the crane further comprises a second mast transfer device, which is adapted to move the mast section of the second mast relative to the second mast receiving
-7device in the direction of the second mast receiving device central axis from a receiving position into a transfer position.
In this embodiment, the crane further comprises a locking device, which is adapted to releasably lock the position of the mast section of the second mast relative to the second mast receiving device in the transfer position.
In this embodiment, the crane further comprises a second mast fixing device, which is adapted to releasably fix the second mast in the mast construction position.
In this embodiment, the second mast receiving device is connected to the crane base and tiltable along with the second mast relative to the crane base around the second mast pivot axis.
Optionally, the second mast fixing device is adapted to releasably fix the second mast of the crane in the mast construction position by engaging the second mast receiving device and/or the second mast.
Optionally, the second mast fixing device is adapted to function as a boom stop when the second mast is in the inclined operating position.
In an embodiment, a mast section of the first mast is provided with at least a part of a hoisting system. For example, a mast section can be provided with at least a part of the hoisting system, e.g., with sheaves for a hoisting cable and/or a hoisting block and/or hoisting hook or other connector. For example, the top mast section or an intermediate mast section may be provided with at a least a part of the hoisting system. The hoisting system may be used for hoisting loads during the operation of the crane. Alternatively or in addition, the hoisting system may comprise a cable which in the assembled crane form a guy wire between the first mast and a second mast.
This is advantageous because the hoisting system can also be used to assemble a second mast of the crane.
In an embodiment, the first mast comprises multiple mast sections. For example, the first mast may comprises a top mast section, multiple intermediate mast sections and optionally a lower mast section.
The top mast section may be provided with at least a part of a hoisting system. The lower mast section may be tiltably connected to the crane base.
In this embodiment, the receiving device is optionally adapted to successively receive multiple mast sections.
In an embodiment, the first mast comprises a tilting member which allows an upper portion of the first mast to tilt away from the central mast axis of the first mast.
-8In embodiments in which the crane comprises a second mast, optionally the second mast comprises a tilting member which allows an upper portion of the second mast to tilt away from the central mast axis of the second mast. Optionally, the first mast or the second mast is provided with a tilting member. Alternatively, both the first mast and the second mast are provided with a tilting member.
For example, a tilting member as described in NL 2019511 could be used.
This allows the use of the crane in confined areas, where limited space is available for the crane and/or for operating the crane.
Optionally, the tilting member may be provided with at a least a part of a hoisting system. This is for example and additional hoisting system which can be used for assembly and/or disassembly of a second mast of the crane. Alternatively or in addition, the tilting member may be provided with a cable system which in the assembled crane forms a guy wire between the first mast and the second mast, and which optionally can also be used for assembly and/or disassembly of a second mast of the crane.
In an embodiment, the first mast fixing device is adapted to releasably fix the first mast in the mast construction position by engaging the receiving device and/or the first mast.
In an embodiment, the first mast fixing device is adapted to function as a boom stop when the first mast is in the inclined operating position.
In an embodiment, the crane is provided with a cable system having multiple sheaves, and wherein at a sheave of the cable system is arranged on the receiving device.
The cable system can for example be part of the hoisting system and/or the rigging of the crane.
In an embodiment, the crane is provided with a winch, which winch is arranged on the receiving device.
The winch can for example be part of the hoisting system and/or the rigging of the crane.
In an embodiment, the crane is provided with a cable system having multiple sheaves, and wherein at a sheave of the cable system is arranged on the crane base.
The cable system can for example be part of the hoisting system and/or the rigging of the crane.
-9In an embodiment, the crane is provided with a winch, which winch is arranged on the crane base.
The winch can for example be part of the hoisting system and/or the rigging of the crane.
The invention further pertains to a method for assembling a crane, which crane comprises a first mast having a central mast axis, wherein the first mast comprises a mast section, and the first mast is tiltable relative to the crane base around a first mast pivot axis within a range of angular positions, which range includes a mast construction position and an inclined mast operating position, wherein the first mast pivot axis extends perpendicular to the central mast axis, which method comprises the following steps:
- tiltably connecting a receiving device which is adapted to receive a mast section of the first mast and which has a receiving device central axis to a crane base, therewith making the receiving device tiltable relative to the crane base around the first mast pivot axis, which first mast pivot axis extends perpendicular to the receiving device central axis,
- fixing the receiving device in a position in which the receiving device central axis is parallel to the central mast axis of the first mast in the mast construction position,
- arranging a mast section of a first mast of the crane in the receiving device,
- moving the mast section of the first mast relative to the receiving device in the direction of the receiving device central axis from a receiving position into a transfer position, wherein the mast section of the first mast is in an angular position which corresponds to the first mast construction position,
- locking the position of the mast section relative to the receiving device in the transfer position to build up the first mast,
- releasing the fixing of the receiving device and tilting the receiving device and the first mast together around the first mast pivot axis into an angular position which corresponds to the inclined mast operating position.
The crane which is assembled in accordance with the method according to the invention is a crane which comprises a first mast having a central mast axis, wherein the first mast comprises a mast section, and the first mast is tiltable relative to the crane base around a first mast pivot axis within a range of angular positions, which range includes a mast construction position and an inclined mast operating position, wherein the first mast pivot axis extends perpendicular to the central mast axis.
- 10For example, the crane which is assembled by the method according to the invention is a crane according to the invention.
In the method according to the invention, a receiving device - which is adapted to receive a mast section of the first mast and which has a receiving device central axis - is titlably connected to a crane base. The receiving device is tiltable relative to the crane base around the first mast pivot axis. The first mast pivot axis extends perpendicular to the receiving device central axis.
Then, the receiving device is fixed in a position in which the receiving device central axis is parallel to the central mast axis of the first mast in the mast construction position. The first mast is not present or fully present at this stage of the method, but the receiving device is fixed in a position in which the receiving device central axis is parallel to the direction the central mast axis of the first mast will be in when the first mast is in the mast construction position.
Then, a mast section of a first mast of the crane is arranged in the receiving device.
Then, the mast section of the first mast is moved, e.g. by a transfer device, relative to the receiving device in the direction of the receiving device central axis from a receiving position into a transfer position. When a transfer device is used, the transfer device may engage the mast section either directly or indirectly.
The receiving position of the mast section of the first mast is the position this mast section has relative to the receiving device when it is arranged in the receiving device prior to but ready for transfer to the transfer position. In general, the mast section is engaged by the mast section guide (either directly or indirectly) in the receiving position.
The transfer position of the mast section of the first mast is the position this mast section has when the receiving device is ready to receive a subsequent mast section of the first mast in the receiving position. The receiving position and the transfer position are offset from each other in the direction of the receiving device central axis.
When the transfer device moves the mast section from the receiving position to the transfer position, the mast section of the first mast is in an angular position which corresponds to the first mast construction position.
Then, the position of the mast section relative to the receiving device is locked (e.g. by locking means) in the transfer position to build up the first mast. When the mast section is locked in the transfer position, a subsequent mast section can be arranged in the receiving device if this is desired.
Then, the fixing of the receiving device is released. The receiving device and the first mast are then tilted together around the first mast pivot axis into an angular position which corresponds to the inclined mast operating position.
-11 In an embodiment of the method according to the invention, a first mast is built up which comprises multiple mast sections.
In this embodiment of the method according to the invention, after the step of locking the position of the mast section relative to the receiving device in the transfer position and before the step of releasing the fixing of the receiving device and tilting the receiving device and the mast section of the first mast together around the first mast pivot axis into an angular position which corresponds to inclined mast operating position, a further mast section of a first mast of the crane is arranged in the receiving device.
This further mast section of the first mast is connected to the mast section of the first mast that is locked in the transfer position. The mast section of the first mast in the transfer position is then unlocked. It comes to rest upon the further mast section.
Then, the further mast section of the first mast is moved relative to the receiving device (e.g. by a transfer device) in the direction of the receiving device central axis from a receiving position into the transfer position. When the transfer device moves the mast section from the receiving position to the transfer position, the mast section of the first mast is in an angular position which corresponds to the first mast construction position. The mast section which was in the transfer position is therewith moved away from the transfer position in a direction that is parallel to the central mast axis to further build up the first mast.
The position of the further mast section is then locked (e.g. by a locking device) relative to the receiving device in the transfer position.
The steps of this embodiment are optionally repeated as often as necessary to obtain the desired length of the first mast.
In a variant of this embodiment, the top mast section is arranged in the transfer position by an external crane. It is then locked into the transfer position such that further mast sections may be added by the receiving device and optionally the transfer device to further build up the first mast. This variant may be advantageous if the top mast section has equipment attached to it (e.g. a part of the hoisting system) which makes it hard, complex or even impossible to be handled by the receiving device.
In an embodiment of the method according to the invention, a lower mast section is added to the first mast. This lower mast section is connected to the crane base and tiltable relative to the crane base around the first mast pivot axis. In this embodiment, the mechanical loads that are exerted on the first mast during operation of the crane are borne by the first mast, and not or only to a limited extent by the receiving device. This allows a relatively light design of the receiving device, including the mast section guide.
- 12In this embodiment of the method according to the invention, after the step of locking the position of the mast section relative to the receiving device in the transfer position and before the step of releasing the fixing of the receiving device and tilting the receiving device and the mast section of the first mast together around the first mast pivot axis into an angular position which corresponds to inclined mast operating position, a lower mast section of a first mast of the crane is arranged in the receiving device.
The lower mast section of the first mast is connected to the mast section or further mast section of the first mast that is locked in the transfer position to further build up the first mast,
The lower mast section of the first mast is connected to the crane base and made tiltable relative to the crane base around the first mast pivot axis.
In an embodiment of the method according to the invention, a crane is assembled in which at least one mast section of the first mast comprises at least a part of a hoisting system. This part of the hoisting system can then be used to build up a second mast of the crane, which second mast comprises a mast section.
In this embodiment of the invention, a hoisting cable which is connected to the at least part of the hoisting system of the mast section of the first mast is connected to a mast section of a second mast.
The mast section of the second mast is connected to the crane base (either directly or via one or more mast sections between this particular mast section and the crane base) to build up the second mast and the second mast is made tiltable relative to the crane base around a second mast pivot axis, which is parallel to the first mast pivot axis.
Optionally, in this embodiment of the method according to the invention, the step of connecting a hoisting cable which is connected to the at least part of the hoisting system of the mast section of the first mast to a mast section of a second mast takes place before releasing the fixing of the receiving device and tilting the receiving device and the mast section of the first mast together around the first mast pivot axis into an angular position which corresponds to the inclined mast operating position.
Optionally, in this embodiment of the method according to the invention, the method further comprises the step of moving the second mast pivot axis and the first mast pivot axis relative to each other in a direction towards each other.
Optionally, in this embodiment of the method according to the invention, the method further comprises the step of tilting the second mast into an inclined second mast operating position. This takes place for example before the first mast is tilted into the inclined mast operating position together with the receiving device.
- 13Optionally, this embodiment of the method according to the invention can be carried out as follows: first, the first mast is build up to its desired length by connecting the desired number of mast sections.
Then, the top mast section of the second mast is connected to the hoisting system, e.g. by lowering a hook or connector of the hoisting system and connecting the hook or connector to the top mast section of the second mast.
Then, the top mast section is moved upwards into a position which allows to connect a further mast section to the top mast section of the second mast, in particular to the lower edge of this top mast section. Such a further mast section is then arranged below the top mast section of the second mast and connected to this top mast section of the second mast.
If the desired length of the second mast requires that more further mast sections are added, then the top mast section and further mast section (s) which are connected thereto are lifted higher and further mast sections are added and connected to the mast sections of the second mast which are already hanging from the hook or connector of the hoisting system..
Optionally, the last mast section that is added is the lower mast section of the second mast. This lower mast section is connected to the lowest of the mast sections that are suspended from the hook or connector of the hoisting system and the lower mast section of the second mast is connected to the crane base and made tiltable relative to the crane base around the second mast pivot axis.
In an embodiment of the method according to the invention, a crane is assembled which comprises a second mast, which second mast has a central mast axis, wherein the second mast comprises a mast section, and the second mast is tiltable relative to the crane base around a second mast pivot axis within a range of angular positions, which range of angular positions includes a mast construction position and an inclined mast operating position, wherein the second mast pivot axis extends perpendicular to the central mast axis.
In this embodiment, method comprises the following steps:
- tiltably connecting a second mast receiving device which is adapted to receive a mast section of the second mast and which has a second mast receiving device central axis to a crane base, therewith making the second mast receiving device tiltable relative to the crane base around the second mast pivot axis, which second mast pivot axis extends perpendicular to the receiving device central axis,
- fixing the second mast receiving device in a position in which the second mast receiving device central axis is parallel to the central mast axis of the second mast in the mast construction position,
- arranging a mast section of a second mast of the crane in the second mast receiving device,
- moving the mast section of the second mast relative to the second mast receiving device in the direction of the second mast receiving device central axis from a receiving position into a transfer position, wherein the mast section of the second mast is in an angular position which corresponds to the second mast construction position,
- locking the position of the mast section relative to the second mast receiving device in the transfer position to build up the second mast,
- releasing the fixing of the second mast receiving device and tilting the second mast receiving device and the second mast together around the second mast pivot axis into an angular position which corresponds to the inclined mast operating position.
So, the second mast may be built up in the same way as the first mast.
Optionally, in the step of fixing the second mast receiving device in a position in which the second mast receiving device central axis is parallel to the central mast axis of the second mast in the mast construction position, the second mast receiving device is fixed in a position in which the second receiving device central axis extends vertically.
In an alternative embodiment, the central mast axis of the second mast extends at an angle relative to the vertical, which angle is not 0° and also not 90,° when the second mast is in the construction position.
In a variant of this embodiment, the second mast is build up before the first mast is finished. For example, intermediate mast sections are added the first mast and the second mast simultaneously. Alternatively, intermediate mast sections are added to the first mast and the second mast in an alternating way, for example first an intermediate mast section is added to the first mast, then an intermediate mast section is added to the second mast, and then optionally an intermediate mast section is added to the first mast again.
In an embodiment of the method according to the invention, in the step of fixing the receiving device in a position in which the receiving device central axis is parallel to the central mast axis of the first mast in the mast construction position, the receiving device is fixed in a position in which the receiving device central axis extends vertically.
In an alternative embodiment, the central mast axis of the first mast extends at an angle relative to the vertical, which angle is not 0° and also not 90,° when the first mast is in the construction position.
In an embodiment of the method according to the invention, the method further comprises the step of tilting an upper portion of the first mast away from the central mast axis of the first mast.
- 15In an embodiment of the method according to the invention, the method further comprises the step of tilting an upper portion of a second mast away from the central mast axis of the second mast.
The invention further pertains to a method for disassembling a crane, which crane is a crane according to the invention, which method comprises the following steps:
- tilting the receiving device and the first mast together around the first mast pivot axis into an angular position which corresponds to the mast construction position,
- fixing the receiving device in a position in which the receiving device central axis is parallel to the central mast axis of the first mast in the mast construction position,
- removing a mast section of the first mast which is present in the receiving device from the receiving device.
In an embodiment of the method for disassembling a crane according to the invention, the method further comprises the following steps:
- after the step of fixing the receiving device in a position in which the receiving device central axis is parallel to the central mast axis of the first mast in the mast construction position, and prior to the step of removing the mast section of the first mast which is present in the receiving device from the receiving device, releasing the locking of the mast section which is in the transfer position and moving this mast section from the transfer position into the receiving position in the receiving device,
- then, still prior to the step of removing the mast section of the first mast which is present in the receiving device from the receiving device, locking the position of a subsequent mast section relative to the receiving device in the transfer position.
The invention will be described in more detail below under reference to the drawing, in which in a non-limiting manner exemplary embodiments of the invention will be shown. The drawing shows in:
Fig. 1: schematically, a first embodiment of a crane according to the invention,
Fig. 2: schematically, a second embodiment of a crane according to the invention,
Fig. 3 : schematically, a first stage of a first embodiment of the method according to the invention, in side view.
Fig. 4: the stage of fig. 3 in front view,
Fig. 5 : schematically, a subsequent stage of a first embodiment of the method according to the invention, in side view.
Fig. 6: the stage of fig. 5 in front view,
- 16Fig. 7: the first mast as assembled in accordance with the first embodiment of the method according to the invention, in side view,
Fig. 8: the first mast as assembled in accordance with the first embodiment of the method according to the invention, in front view,
Fig. 9: a subsequent stage in the first embodiment of the method according to the invention,
Fig. 10: a further subsequent stage in the first embodiment of the method according to the invention,
Fig. 11: a further subsequent stage in the first embodiment of the method according to the invention.
Fig. 12: a step in a first variant of the first embodiment of the method according to the invention,
Fig. 13: a subsequent step in the first variant of the first embodiment of the method according to the invention,
Fig. 14: a step in a second variant of the first embodiment of the method according to the invention,
Fig. 15: a step in a second embodiment of the method according to the invention.
In the drawing, the same reference numerals are used for the same or similar parts of various embodiments of the crane.
Fig. 1 shows, schematically, an embodiment of a crane 1 according to the invention.
The crane 1 of fig. 1 comprises a crane base 2. The crane base 2 can for example be the chassis of a crawler crane, and/or a foot assembly of e.g. a ringer crane. The crane base 2 is arranged on a support surface 3 of a working area.
The crane according to the invention has a first mast 10 which in the embodiment of fig. 1 comprises multiple mast sections 11. In this embodiment, a top mast section 12, multiple intermediate mast sections 13 and a lower mast section 14 are present.
The first mast 10 has a central axis 15, which extends in the longitudinal direction of the first mast 10. The first mast 10 is tiltable relative to the crane base 2 around a first mast pivot axis 16 within a range of angular positions. The first mast pivot axis 16 extends perpendicular to the central mast axis 15. In the embodiment of fig. 1, the first mast pivot axis 16 extends in horizontal direction.
The range of angular positions of the first mast 10 includes a mast construction position and an inclined mast operating position. The mast construction position is the angular position of the first mast when the first mast is assembled. The mast operating position is the angular position which the first mast has or can have when a load is lifted by the crane during a
- 17hoisting operation. Fig. 1 shows the crane 1 with the first mast 10 in a mast operating position. The crane 1 according to fig. 1 is suitable for hoisting a load when the first mast 10 is in the inclined mast operating position shown in fig. 1.
In the embodiment of fig. 1, the first mast 10 is the main boom of the crane 1.
In the embodiment of fig. 1, the lower mast section 14 is connected to the crane base 2 and tiltable relative to the crane base 2 around the first mast pivot axis 15. Therewith, the mechanical loads that are exerted on the first mast 10 during operation of the crane 1 are borne fully or almost fully by the first mast 10.
In the embodiment of fig.1, the crane 1 further comprises a second mast 20. In this embodiment, the second mast 20 is a back mast.
The second mast 20 has a central second mast axis 25, and is tiltable relative to the crane base2 around a second mast pivot axis 26 which extends perpendicular to the central second mast axis 25. The second mast 20 is tiltable relative to the crane base 2 around the second mast pivot axis 26 within a range of angular positions, which range optionally includes a second mast construction position and an inclined second mast operating position.
In the embodiment of fig. 1, the first mast pivot axis 16 and the second mast pivot axis 26 are positioned close to each other. This allows a small footprint of the crane 1, which is advantageous when the crane 1 has to be used at hoisting locations where there is little space for the cranel.
The second mast 20 comprises multiple mast sections 21, including a top mast section 22, multiple intermediate mast sections 23 and a lower mast section 24. The lower mast section 24 is tiltably connected to the crane base 2.
In the embodiment of fig. 1, the crane 1 further comprises a receiving device 30, which is adapted to receive a mast section 11, 12, 13, 14 of the first mast 10. During the assembly of the first mast 10, the receiving device 30 receives a mast section 11, 12, 13,14 which is to be added to the first mast 10. In the embodiment of fig. 1, the receiving device 30 successively receives multiple mast sections 11, 12, 13,14.
The receiving device 30 has a receiving device central axis 35 which is perpendicular to the first mast pivot axis16 and parallel to the central mast axis 15. In the embodiment of fig. 1, the central mast axis 15 and the receiving device mast axis 25 are coaxial with each other.
The receiving device 30 further comprises a mast section guide 31 which is adapted to guide movement of the mast section 11, 12, 13, 14 relative to the receiving device 30 in the direction of the receiving device central axis 30. In the embodiment of fig. 1, the mast section
- 18guide 31 extends in a direction which is parallel to the central mast axis 15 and to the receiving device central axis 35.
The crane 1 according to fig. 1 further comprises a transfer device 40. The transfer device 40 is adapted to engage the mast section 11, 12, 13, 14 of the first mast 10 (either directly or indirectly) and move the mast section 11, 12, 13, 14 of the first mast 10 relative to the receiving device 30 in the direction of the receiving device central axis 35 from a receiving position into a transfer position.
The transfer device 40 is for example provided with one or more hydraulic cylinders and/or one or more cables to bring the mast section from the receiving position to the transfer position.
In the embodiment of fig. 1, the transfer device is mounted onto the receiving device 30.
The crane 1 according to fig. 1 further comprises a locking device 50, which is adapted to releasably lock the position of the mast section 11, 12, 13,14 of the first mast 10 relative to the receiving device 30 in the transfer position. The locking device 50 therewith prevents that a mast section 11, 12, 13, 14 slides back from the transfer position into the receiving position. When the locking device 50 locks the mast section 11, 12, 13, 14 in the transfer position, a subsequent mast section 11, 13, 14 can be safely placed in the receiving position in the receiving device 30.
For example, the locking device 40 may comprises moveable pens which block movement of the mast section 11,12, 13, 14 from the transfer position towards the receiving position. The pens may for example be hydraulically or pneumatically operated.
In the embodiment of fig. 1, the locking device 50 is mounted onto the receiving device 30.
The crane 1 according to fig. 1 further comprises a first mast fixing device 60, which is adapted to releasably fix the first mast 10 in the mast construction position. During the assembly and optionally also during disassembly of the first mast 10 , the first mast fixing device 60 holds the first mast in the mast construction position. When the first mast 10 is to be tilted into the inclined mast operating position, the first mast fixing device 60 releases the first mast 10 to allow the tilting of the first mast 10. In the embodiment of fig. 1, the first mast fixing device 60 engages the receiving device 30 when the first mast 10 is in the mast construction position.
In the embodiment of fig. 1, the first mast fixing device 60 is adapted to function as a boom stop when the first mast 10 is in the inclined operating position.
- 19In crane 1 of fig. 1, the receiving device 30 is connected to the crane base 2 and tiltable along with the first mast 10 relative to the crane base 2 around the first mast pivot axis 16.
So, the receiving device 30 moves along with the first mast 10 when the first mast 10 is tilted into the inclined mast operating position. The receiving device central axis 35 remains parallel to and coaxial with the central mast axis 15. Both the receiving device 30 and the first mast tilt 10 about the same pivot axis 16.
The mast section guide 31 forms part of the receiving device 30 and therewith also tilts along with the first mast 10. This way, the mast section guide 31 does not have to be disconnected from and moved out of the way of the first mast 10 before tilting the first mast 10 into the inclined mast operating position.
In the embodiment of fig. 1, the top mast section 12 of the first mast 10 is provided with at least a part of a hoisting system 70. The hoisting system is used for hoisting loads during the operation of the crane 1, and it can also be used for assembling the second mast 20 of the crane 1.
In the embodiment of fig. 1, the hoisting system 70 of the crane 1 is provided with a cable system having multiple sheaves. A sheave 71 of the cable system is arranged on the receiving device 30. The hoisting device 70 further comprises a winch 72. Also the winch 72 is arranged on the receiving device 30.
Fig. 2 shows, schematically, a second embodiment of a crane according to the invention. In fig. 2, the same reference numerals are used as in fig. 1 for the same or similar parts of the crane 1.
The crane 1 of fig. 2 comprises a crane base 2. The crane base 2 can for example be the chassis of a crawler crane, and/or a foot assembly of e.g. a ringer crane. The crane base 2 is arranged on a support surface 3 of a working area.
The crane according to the invention has a first mast 10 which in the embodiment of fig. 2 comprises multiple mast sections 11. In this embodiment, a top mast section 12, multiple intermediate mast sections 13 and a lower mast section 14 are present.
The first mast 10 has a central axis 15, which extends in the longitudinal direction of the first mast 10. The first mast 10 is tiltable relative to the crane base 2 around a first mast pivot axis 16 within a range of angular positions. The first mast pivot axis 16 extends perpendicular to the central mast axis 15. In the embodiment of fig. 2, the first mast pivot axis 16 extends in horizontal direction.
The range of angular positions of the first mast 10 includes a mast construction position and an inclined mast operating position. The mast construction position is the angular position of the first mast when the first mast is assembled. The mast operating position is the angular
-20position which the first mast has or can have when a load is lifted by the crane during a hoisting operation. Fig. 2 shows the crane 1 with the first mast 10 in a mast operating position. The crane 1 according to fig. 2 is suitable for hoisting a load when the first mast 10 is in the inclined mast operating position shown in fig. 2.
In the embodiment of fig. 2, the first mast 10 is the main boom of the crane 1.
In the embodiment of fig. 2, the first mast 10 comprises a tilting member 17 which allows an upper portion 18 of the first mast 10 to tilt away from the central mast axis 15 of the first mast 10.
In the embodiment of fig. 2, the upper portion 18 of the first mast 10 comprises the top mast section 12 and one intermediate mast section 13, but a different number of intermediate mast sections 13 is possible as well. It is also possible that the upper mast section 18 comprises only the top mast section 12.
For example, the tilting member 17 is a tilting member as described in NL 2019511.
In the embodiment of fig. 2, the lower mast section 14 is connected to the crane base 2 and tiltable relative to the crane base 2 around the first mast pivot axis 16. Therewith, the mechanical loads that are exerted on the first mast 10 during operation of the crane 1 are borne fully or almost fully by the first mast 10.
In the embodiment of fig.1, the crane 1 further comprises a second mast 20. In this embodiment, the second mast 20 is a back mast.
The second mast 20 has a central second mast axis 25, and is tiltable relative to the crane base2 around a second mast pivot axis 26 which extends perpendicular to the central second mast axis 25. The second mast 20 is tiltable relative to the crane base 2 around the second mast pivot axis 26 within a range of angular positions, which range optionally includes a second mast construction position and an inclined second mast operating position.
In the embodiment of fig. 2, the first mast pivot axis 16 and the second mast pivot axis 26 are positioned close to each other. This allows a small footprint of the crane 1, which is advantageous when the crane 1 has to be used at hoisting locations where there is little space for the cranel.
The second mast 20 comprises multiple mast sections 21, including a top mast section 22, multiple intermediate mast sections 23 and a lower mast section 24. The lower mast section 24 is tiltably connected to the crane base 2.
In the embodiment of fig. 2, the crane 1 further comprises a receiving device 30, which is adapted to receive a mast section 11, 12, 13, 14 of the first mast 10. During the assembly
-21 of the first mast 10, the receiving device 30 receives a mast section 11, 12, 13,14 which is to be added to the first mast 10. In the embodiment of fig. 2, the receiving device 30 successively receives multiple mast sections 11, 12, 13,14.
The receiving device 30 has a receiving device central axis 35 which is perpendicular to the first mast pivot axis16 and parallel to the central mast axis 15. In the embodiment of fig. 2, the central mast axis 15 and the receiving device mast axis 25 are coaxial with each other.
The receiving device 30 further comprises a mast section guide 31 which is adapted to guide movement of the mast section 11, 12, 13, 14 relative to the receiving device 30 in the direction of the receiving device central axis 30. In the embodiment of fig. 2, the mast section guide 31 extends in a direction which is parallel to the central mast axis 15 and to the receiving device central axis 35.
The crane 1 according to fig. 2 further comprises a transfer device 40. The transfer device 40 is adapted to engage the mast section 11, 12, 13, 14 of the first mast 10 (either directly or indirectly) and move the mast section 11, 12, 13, 14 of the first mast 10 relative to the receiving device 30 in the direction of the receiving device central axis 35 from a receiving position into a transfer position.
The transfer device 40 is for example provided with one or more hydraulic cylinders and/or one or more cables to bring the mast section from the receiving position to the transfer position.
In the embodiment of fig. 2, the transfer device is mounted onto the receiving device 30.
The crane 1 according to fig. 2 further comprises a locking device 50, which is adapted to releasably lock the position of the mast section 11, 12, 13, 14 of the first mast 10 relative to the receiving device 30 in the transfer position. The locking device 50 therewith prevents that a mast section 11, 12, 13, 14 slides back from the transfer position into the receiving position. When the locking device 50 locks the mast section 11, 12, 13, 14 in the transfer position, a subsequent mast section 11, 13, 14 can be safely placed in the receiving position in the receiving device 30.
For example, the locking device 40 may comprises moveable pens which block movement of the mast section 11, 12, 13, 14 from the transfer position towards the receiving position. The pens may for example be hydraulically or pneumatically operated.
In the embodiment of fig. 2, the locking device 50 is mounted onto the receiving device 30.
The crane 1 according to fig. 2 further comprises a first mast fixing device 60, which is adapted to releasably fix the first mast 10 in the mast construction position. During the assembly and optionally also during disassembly of the first mast 10 , the first mast fixing
-22device 60 holds the first mast in the mast construction position. When the first mast 10 is to be tilted into the inclined mast operating position, the first mast fixing device 60 releases the first mast 10 to allow the tilting of the first mast 10. In the embodiment of fig. 2, the first mast fixing device 60 engages the receiving device 30 when the first mast 10 is in the mast construction position.
In the embodiment of fig. 1, the first mast fixing device 60 is adapted to function as a boom stop when the first mast 10 is in the inclined operating position.
In crane 1 of fig. 2, the receiving device 30 is connected to the crane base 2 and tiltable along with the first mast 10 relative to the crane base 2 around the first mast pivot axis 16.
So, the receiving device 30 moves along with the first mast 10 when the first mast 10 is tilted into the inclined mast operating position. The receiving device central axis 35 remains parallel to and coaxial with the central mast axis 15. Both the receiving device 30 and the first mast tilt 10 about the same pivot axis 16.
The mast section guide 31 forms part of the receiving device 30 and therewith also tilts along with the first mast 10. This way, the mast section guide 31 does not have to be disconnected from and moved out of the way of the first mast 10 before tilting the first mast 10 into the inclined mast operating position.
In the embodiment of fig. 2, the top mast section 12 of the first mast 10 is provided with at least a part of a hoisting system 70. The hoisting system is used for hoisting loads during the operation of the crane 1, and it can also be used for assembling the second mast 20 of the crane 1.
In the embodiment of fig. 2, the hoisting system 70 of the crane 1 is provided with a cable system having multiple sheaves. A sheave 71 of the cable system is arranged on the receiving device 30. The hoisting device 70 further comprises a winch 72. Also the winch 72 is arranged on the receiving device 30.
Fig. 3 shows a first stage of a first embodiment of the method according to the invention, in side view. Fig. 4 shows the stage of fig. 3 in front view.
In the stage of the embodiment of the method according to the invention as shown in fig. 3 and fig. 4, a crane base 2 has been arranged on a support surface 3 of a working area. The crane base 2 can for example be the chassis of a crawler crane, and/or a foot assembly of e.g. a ringer crane.
-23A receiving device 30 which is adapted to receive a mast section 11, 12, 13, 14 of the first mast 10 of a crane, e.g. a crane according to the invention, and which has a receiving device central axis 35, is tiltably connected to the crane base 2. The receiving device 30 is tiltable relative to the crane base 2 around first mast pivot axis 16. The first mast pivot axis 16 extends perpendicular to the receiving device central axis 35.
A transfer device 40, a locking device 50, a sheave 71 of hoisting system 70 and a winch of hoisting system 70 are arranged on the receiving device 30. The transfer device 40 comprises hydraulic cylinders 41.
The receiving device 30 is fixed in a position in which the receiving device central axis 35 is parallel to the central mast axis 15 of the first mast 10 in the mast construction position. The first mast 10 is not fully present at this stage of the method, but the receiving device 30 is fixed in a position in which the receiving device central axis 35 is parallel to the direction the central mast axis 15 of the first mast 10 will be in when the first mast is in the mast construction position. First mast fixing device 60 engages the receiving device 30 in order to fix the receiving device 30 in this position.
In this embodiment, the mast construction position is vertical, i.e. the central mast axis 15 of the first mast 10 extends vertically when the first mast 10 is in the mast construction position. In this embodiment therefore, the receiving device 30 is fixed in a position in which the receiving device central axis 35 extends vertically.
In the stage of fig. 3 and fig. 4, a mast section 11 of a first mast 10 of the crane is arranged in the receiving device 30. In this example, the mast section 11 is a top mast section 12.
The top mast section 12 comprises a part of hoisting system 70. The hoisting system 70 further comprise sheave 71 and winch 72. Hoisting cable 73 runs over winch 71, sheave 71 and is connected to the parts of the hoisting system 70 on the top mast section 12.
Fig. 3 and fig. 4 show the top mast section 12 in the receiving position. The top mast section 12 is engaged by the mast section guides 31.
In the embodiment of the method as shown in fig. 3 -11, there is sufficient space in the receiving device 30, to arrange an intermediate mast section 13 below the top mast section 12 which is in the receiving position. This is however not necessary. In other embodiments, the receiving position may be closer to the crane base 2.
In the example of fig.3 and fig. 4, in the receiving position, the mast section guide 31 (which in this example comprises two guide elements, arranged on opposite sides of the
-24receiving device 30) engages the top mast section 12 which is arranged in the receiving device 30.
Fig. 5 shows a subsequent stage of a first embodiment of the method according to the invention, in side view. Fig. 6 shows the stage of fig. 5 in front view.
In this stage of the first embodiment of the method according to the invention, the top mast section 12 of the first mast 10 is moved by a transfer device 40 relative to the receiving device 30 in the direction of the receiving device central axis 35 from the receiving position into a transfer position. Fig. 5 and fig. 6 show the top mast section 12 in the transfer position. In this example, the top mast section 12 projects from the receiving device 30. The transfer device 40, which comprises hydraulic cylinders 41, engages the top mast section 12 directly. In an alternative embodiment, the transfer device may engage the top mast section 12 indirectly, for example by engaging a part of the first mast 10 which is connected to the top mast section 12.
When the transfer device 40 moves the top mast section 12 from the receiving position to the transfer position, the top mast section 12 of the first mast 10 is in an angular position which corresponds to the first mast construction position, which is in this embodiment vertical.
When the top mast section 12 is in the transfer position, the position of the top mast section 12 relative to the receiving device 30 is locked by locking device 50 in the transfer position to build up the first mast 10.
In this embodiment, a subsequent mast section, which is in this case an intermediate mast section 13, is connected to the top mast section 12 before the top mast section 12 is moved from the receiving position into the transfer position. This way, when the top mast section 12 is moved into the transfer position, the intermediate mast section 13 that is attached to the top mast section 12 is at the same time moved into the receiving position in the receiving device 30.
When the intermediate mast section 13 is held in the receiving position, the top mast section may be released by the locking device 50 so that it can be moved further upwards when more mast sections are added to the first mast 10.
The intermediate mast section 13 is then moved from the receiving position into the transfer position. This movement takes place in the direction of the receiving device central axis 35. The position of the intermediate mast section 13 is then locked by the locking device 50 relative to the receiving device 30 in the transfer position.
-25When the transfer device 40 moves the intermediate mast section 13 from the receiving position to the transfer position, the intermediate mast section 13 of the first mast 10 is in an angular position which corresponds to the first mast construction position, in this example vertical. The top mast section 12 which was in the transfer position is therewith moved away from the transfer position in a direction that is parallel to the central mast axis 15 to further build up the first mast 10.
From the situation shown in fig. 5 and fig. 6, further intermediate mast sections 13 may be added to further build up the first mast 10.
In the embodiment of fig. 3 -11, a further intermediate mast section 13* of the first mast 10 is connected to the intermediate mast section directly above it. In the situation shown in fig. 5, the further intermediate mast section 13* is connected to the intermediate mast section 13 which is in the first mast 10 just below the top mast section 12.
The intermediate mast section 13 is then moved from the receiving position into the transfer position. The further intermediate mast section 13* moves along with the intermediate mast section 13, and is therewith arranged in the receiving position in the receiving device 30. The intermediate mast 13 section is locked in the transfer position.
These steps are repeated as often as necessary to obtain the desired length of the first mast 10.
In the embodiment of fig. 3 -11, a lower mast section 14 is added to the first mast 10. This lower mast section 14 is connected to the crane base 2 and tiltable relative to the crane base 2 around the first mast pivot axis 16. In this embodiment, the mechanical loads that are exerted on the first mast during operation of the crane 1 are borne by the first mast 10, and not or only to a limited extent by the receiving device 30.
The lower mast section 14 is the last mast section that is added to the first mast 10. It is arranged in the receiving device 30 and connected to the lowest of the intermediate mast sections 13* of the first mast. This lowest of the intermediate mast sections 13* of the first mast is for example at that time locked in the transfer position. Alternatively, another mast section is at that time locked in the transfer position, and the lower mast section is connected to that locked mast section via the lowest intermediate mast section.
The lower mast section of the first mast is connected to the crane base 2 and made tiltable relative to the crane base 2 around the first mast pivot axis 16.
This results in the situation that is shown in fig. 7 and fig. 8. Fig. 7 shows the first mast in side view, fig. 8 shows the first mast in front view.
-26Fig. 9 shows a subsequent stage in the first embodiment of the method according to the invention.
In the embodiment of fig. 3 -11, the first mast 10 comprises at least a part of a hoisting system 70. This part of the hoisting system 70 can be used to build up the second mast 20 of the crane 1. The hoisting system comprises a cable 73 and a connector 74. The second mast 20 in this example comprises multiple mast sections 21, including a top mast section 22, multiple intermediate mast sections 23 and a lower mast section 24. The second mast 20 is tiltable around a second mast pivot axis 26, which is parallel to the first mast pivot axis 16.
As shown in fig. 9, in this embodiment, the top mast section 22 of the second mast 20 is connected to the hoisting system 70, e.g. by lowering the connector 74 of the hoisting system 70 and connecting the connector to the top mast section of the second mast.
Then, this top mast section 22 is moved upwards into a position which allows to connect an intermediate mast section 23 to the top mast section 22 of the second mast 20, in particular to the lower edge of this top mast section 22. The intermediate mast section 23 is then arranged below the top mast section 22 of the second mast 20 and connected to this top mast section 22 of the second mast 20.
In this embodiment, more intermediate mast sections 23 are added. The top mast section 22 and intermediate mast sections 23 which are connected thereto are lifted higher and further intermediate mast sections 23 are added and connected to the mast sections 21, 22, 23 of the second mast 20 which are already hanging from the connector 74 of the hoisting system 70.
The last mast section 21 that is added is the lower mast section 24 of the second mast
20. This lower mast section 24 is connected to the lowest of the intermediate mast sections 22 that are suspended from the connector 74 of the hoisting system 70 and the lower mast section 24 of the second mast 20 is connected to the crane base 2 and made tiltable relative to the crane base 2 around the second mast pivot axis 26.
Fig. 10 shows a further subsequent stage in the first embodiment of the method according to the invention.
In this stage, the second mast 20 is tilted around the second mast pivot axis 26 into its second mast operating position, which is an inclined second mast operating position (i.e. an angular position which is at an angle other than 0° and also other than 90° relative to the vertical).
The second mast pivot axis 26 is then optionally moved toward the first mast pivot axis
16.
-27Fig. 11 shows a further subsequent stage in the first embodiment of the method according to the invention.
In this stage, the fixing of the receiving device 30 is released. The receiving device 30 and the first mast 10 are tilted together around the first mast pivot axis 16 into an angular position which corresponds to the inclined mast operating position.
Fig. 12 and fig. 13 pertain to a first variant of the first embodiment of the method in accordance with fig. 3 -11.
In the variant of fig. 12 and fig. 13, the initial steps of the assembly of the crane are carried out in conformity with fig. 3-8.
After carrying out the steps as described in relation to fig. 3 - 8, in this variant a subsequent step is carried out, which is shown in fig. 12.
In the variant of fig. 12 -13, the first mast 10 comprises at least a part of a hoisting system 70. This part of the hoisting system 70 can be used to build up the second mast 20 of the crane 1. The hoisting system comprises a cable 73 and a connector 74. The second mast 20 in this example comprises multiple mast sections 21, including a top mast section 22, multiple intermediate mast sections 23 and a lower mast section 24. The second mast 20 is tiltable around a second mast pivot axis 26, which is parallel to the first mast pivot axis 16.
As shown in fig. 12, in this variant, the top mast section 22 of the second mast 20 is connected to the hoisting system 70, e.g. by lowering the connector 74 of the hoisting system 70 and connecting the connector to the top mast section of the second mast.
Then, this top mast section 22 is moved upwards into a position which allows to connect an intermediate mast section 23 to the top mast section 22 of the second mast 20, in particular to the lower edge of this top mast section 22. The intermediate mast section 23 is then arranged below the top mast section 22 of the second mast 20 and connected to this top mast section 22 of the second mast 20.
In this embodiment, more intermediate mast sections 23 are added. The top mast section 22 and intermediate mast sections 23 which are connected thereto are lifted higher and further intermediate mast sections 23 are added and connected to the mast sections 21, 22, 23 of the second mast 20 which are already hanging from the connector 74 of the hoisting system 70.
Either before, during or after the connection of the top mast section 22 of the second mast 20 is to the hoisting system 70 and/or the connection and addition of one or more intermediate mast sections 23, a lower mast section 24 is connected to the crane base 2 and made tiltable relative to the crane base 2 around the second mast pivot axis 26.
-28In this embodiment, the second mast pivot axis 26 is already in the position relative to the first mast pivot axis 16 that it will have during operation of the crane 1.
The lower mast section 24 of the second mast 20 may be arranged in an inclined position, as is shown in fig. 12.
Fig. 13 shows a subsequent step in this variant of the first embodiment.
In this step, a first upper part 24a of the lower mast section 24 is pivotably connected to a first lower part 23a of the lowest of the intermediate sections 23. This results in the situation shown in fig. 13.
Then, the top mast section 22 and the intermediate mast sections 23 (which are all connected to each other) are tilted relative to the lower mast section 24, which results in a tilting of the central mast axis 25 of the second mast 20. This tilting for example takes place around the connection between first upper part 24a of the lower mast section 24 and a first lower part 23a of the lowest of the intermediate sections 23.
When this tilting is done, a second upper part 24b of the lower mast section 24 and a second lower part 23b of the lowest of the intermediate sections 23 are connected to each other, preferably in a non-tiltable way.
This results in the situation which is shown in fig. 11.
It is noted that in the variant of fig. 12 and fig. 13, the hoisting system 70 of the crane 1 is provided with a cable system having multiple sheaves. In this variant, a sheave 71 of the cable system is arranged on the crane base 2. The hoisting device 70 further comprises a winch 72. Also the winch 72 is arranged on the crane base 2. The position of the sheave 71 and the winch is not specifically coupled to the variant shown in fig. 12 and fig. 13, the same position can be applied in other embodiments of the method and the crane according to the invention as well. Likewise, it is possible to arrange sheave 71 an winch 72 on the receiving device 30 in the variant of fig. 12 and fig. 13 as well.
Fig. 14 shows a second variant of the first embodiment of the method according to the invention.
In the variant of fig. 14, the central mast axis 15 of the first mast 10 extends at an angle relative to the vertical, which angle is not 0° and also not 90,° when the first mast 10 is in the construction position.
Fig. 14 shows an alternative for the stage of the first embodiment of the method according to the invention which is shown in fig. 3 and fig. 4.
-29In the variant of fig. 14, a crane base 2 has been arranged on a support surface 3 of a working area. The crane base 2 can for example be the chassis of a crawler crane, and/or a foot assembly of e.g. a ringer crane.
A receiving device 30 which is adapted to receive a mast section 11, 12, 13, 14 of the first mast 10 of a crane, e.g. a crane according to the invention, and which has a receiving device central axis 35, is tiltably connected to the crane base 2. The receiving device 30 is tiltable relative to the crane base 2 around first mast pivot axis 16. The first mast pivot axis 16 extends perpendicular to the receiving device central axis 35.
A transfer device 40 and a locking device 50, are arranged on the receiving device 30. The transfer device 40 for example comprises hydraulic cylinders 41. A sheave 71 of hoisting system 70 and a winch of hoisting system 70 are arranged on the crane base 2 in this example, but alternatively they may be arranged on the receiving device 30.
The receiving device 30 is fixed in a position in which the receiving device central axis 35 is parallel to the central mast axis 15 of the first mast 10 in the mast construction position. The first mast 10 is not fully present at this stage of the method, but the receiving device 30 is fixed in a position in which the receiving device central axis 35 is parallel to the direction the central mast axis 15 of the first mast 10 will be in when the first mast is in the mast construction position. First mast fixing device 60 engages the receiving device 30 in order to fix the receiving device 30 in this position.
In this embodiment, the mast construction position is inclined, i.e. the central mast axis 15 of the first mast 10 extends at an angle relative to the vertical which angle is not 0°or 90° when the first mast 10 is in the mast construction position. In this embodiment therefore, the receiving device 30 is fixed in a position in which the receiving device central axis 35 extends under the same angle as the central mast axis 15.
In the stage of fig. 14, a mast section 11 of a first mast 10 of the crane is arranged in the receiving device 30. In this example, the mast section 11 is a top mast section 12.
The top mast section 12 comprises a part of hoisting system 70. The hoisting system 70 further comprise sheave 71 and winch 72. Hoisting cable 73 runs over winch 71, sheave 71 and is connected to the parts of the hoisting system 70 on the top mast section 12.
Fig. 14 shows the top mast section 12 in the receiving position. The top mast section 12 is engaged by the mast section guides 31.
In this second variant of the first embodiment of the method according to the invention, there is sufficient space in the receiving device 30, to arrange an intermediate mast section below the top mast section 12 which is in the receiving position. This is however not necessary. In other embodiments, the receiving position may be closer to the crane base 2.
In this second variant of the first embodiment of the method according to the invention, in the receiving position, the mast section guide (which in this example comprises two guide elements, arranged on opposite sides of the receiving device 30) engages the top mast section 12 which is arranged in the receiving device 30.
Fig. 15 shows a step in a second embodiment of the method according to the invention.
In this embodiment, the crane 1 which is assembled comprises a first mast 10 and a second mast 20.
In this embodiment, at least a part of the first mast 10 of the crane 1 is assembled as shown in fig. 3-6. Optionally, the entire first mast 10 is assembled as is shown in fig. 3-8.
Then, the second mast 20 is assembled. This is done in the same way as the assembly of the first mast 10.
In this embodiment, a second mast receiving device 30-2 is pivotably connected to the crane base 2. The second mast receiving device 30-2 is adapted to receive a mast section 22, 23 of the second mast 10, and has a second mast receiving device central axis 35-2. Therewith, the second mast receiving device 35-2 is made tiltable relative to the crane base 2 around the second mast pivot axis 26. The second mast pivot axis 26 extends perpendicular to the receiving device central axis 35-2. In this embodiment, the second mast pivot axis 26 extends parallel to the first mast pivot axis 16, i.e. in horizontal direction.
Then, the second mast receiving device 35-2 is fixed in a position in which the second mast receiving device central axis 35-2 is parallel to the central mast axis 25 of the second mast 20 in the mast construction position by a second mast fixing device 60-2. The second mast fixing device 60-2 can be connected to the crane base 2, for example in a similar way as the first mast fixing device 60 is shown in fig. 15. Alternatively, the second mast fixing device 60-2 connected the second mast receiving device 30-2 to the receiving device 30 which is associated with the first mast 10.
In this embodiment, the central mast axis 25 of the second mast 20 extends in vertical direction in the mast construction position. Optionally, the central mast axis 25 of the second mast 20 in the mast construction position of the second mast 20 extends parallel to the central mast axis 15 of the first mast 10 in the mast construction position of the first mast 10.
Then, the top mast section 22 of a second mast 20 of the crane 1 is arranged in the second mast receiving device 30-2.
The top mast section 22 of the second mast 20 is moved relative to the second mast receiving device 35-2 in the direction of the second mast receiving device central axis 35-2
-31 from a receiving position into a transfer position. The top mast section 22 of the second mast 20 is in an angular position which corresponds to the second mast construction position.
When the top mast section 22 of the second mast 20 is in the transfer position, the position of the top mast section 22 of the second mast 20 relative to the second mast receiving device 30-2 is locked by the second mast locking device 50-2 in the transfer position to build up the second mast 10.
Optionally, a subsequent mast section, which is in this case an intermediate mast section 23 of the second mast 20, is connected to the top mast section 22 of the second mast 20 before the top mast section 22 of the second mast 20 is moved from the receiving position into the transfer position. This way, when the top mast section 22 is moved into the transfer position, the intermediate mast section 23 that is attached to the top mast section 22 is at the same time moved into the receiving position in the second mast 20 receiving device 30-2.
When the intermediate mast section 23 of the second mast 20 is held in the receiving position, the top mast section 22 of the second mast 20 may be released by the locking device 50-2 so that it can be moved further upwards when more mast sections are added to the second mast 20.
The intermediate mast section 23 of the second mast 20 is then moved from the receiving position into the transfer position. This movement takes place in the direction of the second mast receiving device central axis 35-2. The position of the intermediate mast section 23 is then locked by the locking device 50-2 relative to the second mast receiving device 3020 in the transfer position.
When the transfer device 40-2 which is associated with the second mast 20 moves the intermediate mast section 23 from the receiving position to the transfer position, the intermediate mast section 23 of the second mast 20 is in an angular position which corresponds to the second mast construction position, in this example vertical. The top mast section 22 of the second mast 20 which was in the transfer position is therewith moved away from the transfer position in a direction that is parallel to the central mast axis 25 of the second mast 20 to further build up the second mast 20.
Further intermediate mast sections 23 may be added to further build up the second mast 20.
Then, a lower mast section is added to the second mast 20. This lower mast section 14 is connected to the crane base 2 and tiltable relative to the crane base 2 around the second mast pivot axis 26.
-32Then, the fixing of the second mast receiving device 30-2 is released and the second mast receiving device 35-2 and the second mast 20 are tilted together around the second mast pivot axis 26 into an angular position which corresponds to the inclined mast operating position.
So, the second mast may 20 be built up in the same way as the first mast.
Optionally, in the step of fixing the second mast receiving device 30-2 in a position in which the second mast receiving device central axis 35-2 is parallel to the central mast axis 25 of the second mast 20 in the mast construction position, the second mast receiving device 30-2 is fixed in a position in which the second receiving device central axis 35-2 extends vertically.
In an alternative embodiment, the central mast axis 25 of the second mast 20 extends at an angle relative to the vertical, which angle is not 0° and also not 90,° when the second mast 20 is in the construction position.
In a variant of this embodiment, the second mast 20 is build up before the first mast 10 is finished. For example, intermediate mast sections 13, 23 are added the first mast 10 and the second mast 20 simultaneously. Alternatively, intermediate mast sections 13, 23 are added to the first mast 10 and the second mast 20 in an alternating way, for example first an intermediate mast section 13 is added to the first mast 10, then an intermediate mast section 23 is added to the second mast 20, and then optionally an intermediate mast section 13 is added to the first mast 10 again.
The crane 1 may then be further assembled as shown in fig. 10 and 11.
The crane 1 which has been assembled in accordance with the first or second embodiment of the method according to the invention, including the variants of the first embodiment as described above, can be disassembled in accordance the method according to the invention for disassembling a crane.
In an embodiment of the method according to the invention for disassembling a crane 1, the starting point is the situation as shown in fig. 11.
From this situation, the receiving device 30 and the first mast 10 are tilted together around the first mast pivot axis 16 into an angular position which corresponds to the mast construction position. The receiving device 30 is fixed in a position in which the receiving device central axis 35 is parallel, in this example coaxial, to the central mast axis 15 of the first mast 10 in the mast construction position This results in the situation of fig. 10.
-33Then, the second mast 20 is brought into an upright position and disconnected from the second mast pivot axis 26 and/or from the crane base 2. The second mast 20 can be first brought into the upright position and then disconnected, or vice versa. This results in the situation of fig. 10.
Then, the second mast can be disassembled by disconnecting the mast sections 21, 24, 233, 22 from each other, e.g. while gradually lowering the connector 74. When the second mast is disassembled, the situation of fig. 7 and fig. 8 results.
Then, if there is a mast section 11, 12, 13, 14 of the first mast present in the receiving position in the receiving device 30, the mast section just above that mast section in the receiving position is locked in the transfer position, e.g. by the locking device 50.
The mast section in the receiving device 30 is then disconnected from the remainder of the first mast 10 and removed from the receiving device 30.
Then, the position of the mast section in the transfer position is unlocked and that mast section is moved from the transfer position into the receiving position, e.g. by the transfer device 40. The mast section just above that mast section in the receiving position is locked in the transfer position, e.g. by the locking device 50.
The mast section in the receiving device 30 is then disconnected from the remainder of the first mast 10 and removed from the receiving device 30.
This is repeated until the first mast is disassembled.
If desired, the receiving device 30 can be disconnected from the crane base 2.

Claims (16)

CONCLUSIESCONCLUSIONS 1. Kraan, welke kraan (1) omvat:A tap, which tap (1) comprises: - een kraanbasis (2).- a crane base (2). - een eerste mast (10), die een centrale mast-as (15) heeft, waarbij de eerste mast (10) een mastsectie (11, 12, 13, 14) omvat, en de eerste mast (10) zwenkbaar is ten opzichte van de kraanbasis (2) om een eerste mastzwenkas (16) in een bereik van hoekposities, welk bereik van hoekposities een mastconstructiepositie en een schuine mastwerkpositie omvat, waarbij de eerste mastzwenkas (16) zich loodrecht op de centrale mast-as (15) uitstrekt,- a first mast (10) having a central mast axis (15), the first mast (10) comprising a mast section (11, 12, 13, 14), and the first mast (10) being pivotable with respect to of the crane base (2) about a first mast pivot axis (16) in a range of angular positions, which range of angular positions comprises a mast construction position and an inclined mast work position, the first mast pivot axis (16) extending perpendicular to the central mast axis (15) , - een ontvangstinrichting (30), die is ingericht om de mastsectie (11, 12, 13, 14) van de eerste mast (10) te ontvangen, welke ontvangstinrichting (30) een centrale ontvangstinrichtingsas (35) heeft die loodrecht is ten opzichte van de eerste mastzwenkas (16) en evenwijdig met de centrale mast-as (15), en een mastsectiegeleiding (31) die is ingericht om beweging van de mastsectie (11, 12, 13, 14) ten opzichte van de ontvangstinrichting (30) in de richting van de centrale ontvangstinrichtingsas (35) te geleiden,- a receiving device (30) adapted to receive the mast section (11, 12, 13, 14) from the first mast (10), which receiving device (30) has a central receiving device axis (35) that is perpendicular to the first mast pivot axis (16) and parallel to the central mast axis (15), and a mast section guide (31) adapted to move the mast section (11, 12, 13, 14) relative to the receiving device (30) guide the direction of the central receiving device axis (35), - een overdrachtsinrichting (40), die is ingericht om de mast sectie (11, 12, 13, 14) van de eerste mast (10) ten opzichte van de ontvangstinrichting (30) in re richting van de centrale ontvangstinrichtingsas (35) te bewegen van een ontvangstpositie naar een overdrachtspositie,- a transfer device (40) adapted to move the mast section (11, 12, 13, 14) of the first mast (10) relative to the receiving device (30) in the direction of the central receiving device axis (35) from a receiving position to a transfer position, - een vergrendelingsinrichting (50), die is ingericht om de positie van de mastsectie (11, 12, 13, 14) van de eerste mast (10) ten opzichte van de ontvangstinrichting (3) vrijgeefbaar te vergrendelen in de overdrachtspositie,- a locking device (50), which is adapted to releasably lock the position of the mast section (11, 12, 13, 14) of the first mast (10) relative to the receiving device (3) in the transfer position, - een eerste mast fixeerinrichting, die is ingericht om de eerste mast (10) vrijgeefbaar te fixeren in de mastconstructiepositie, waarbij de ontvangstinrichting (3) verbonden is met de kraanbasis (2) en zwenkbaar samen met de eerste mast (10) ten opzichte van de kraanbasis (2) om de eerste mastzwenkas (16).- a first mast fixing device, which is adapted to releasably fix the first mast (10) in the mast construction position, the receiving device (3) being connected to the crane base (2) and pivotable together with the first mast (10) relative to the crane base (2) about the first mast pivot axis (16). 2. Kraan volgens conclusie 1, waarbij de eerste mast (10) een onderste mastsectie (14) omvat die verbonden is met de kraanbasis (2) en zwenkbaar is ten opzichte van de kraanbasis (2) om de eerste mastzwenkas (16).The crane of claim 1, wherein the first mast (10) comprises a lower mast section (14) connected to the crane base (2) and pivotable with respect to the crane base (2) about the first mast pivot axis (16). 3. Kraan volgens een van de voorgaande conclusies, waarbij de centrale mast-as (15) van de eerste mast (10) zich verticaal uitstrekt als de eerste mast (10) zich in de constructiepositie bevindt.Crane according to one of the preceding claims, wherein the central mast axis (15) of the first mast (10) extends vertically when the first mast (10) is in the construction position. 4. Kraan volgens een van de voorgaande conclusies, waarbij een mastsectie van de eerste mast (10) is voorzien van ten minste en deel van een hijssysteem (70).Crane according to one of the preceding claims, wherein a mast section of the first mast (10) is provided with at least one part of a hoisting system (70). 5. Kraan volgens een van de voorgaande conclusies, waarbij de kraan (1) verder een tweede mast (20) omvat, waarbij optioneel de eerst mast (10) een hoofdmast is een de tweede mast (20) een achtermast.Crane according to one of the preceding claims, wherein the crane (1) further comprises a second mast (20), optionally the first mast (10) being a main mast and the second mast (20) a rear mast. 6. Kraan volgens een van de voorgaande conclusies, waarbij de eerste mast (10) een kantelelement (17) omvat die het mogelijk maakt dat een bovenste deel (18) van de eerste mast (10) weg kantelt van de centrale mast-as (15) van de eerste mast (10).Crane according to one of the preceding claims, wherein the first mast (10) comprises a tilting element (17) that makes it possible for an upper part (18) of the first mast (10) to tilt away from the central mast axis ( 15) from the first mast (10). 7. Werkwijze voor het opbouwen van een kraan, welke kraan een eerste mast (10) omvat die een centrale mast-as (15) heeft, waarbij de eerste mast (10) een mastsectie (11, 12, 13, 14) omvat, en de eerste mast zwenkbaar is ten opzichte van de kraanbasis (2) om een eerste mastzwenkas (16) in een bereik van hoekposities, welk bereik van hoekposities een mastconstructiepositie en een schuine mastwerkpositie omvat, waarbij de eerste mastzwenkas (16) zich loodrecht op de centrale mast-as (15) uitstrekt, welke werkwijze de volgende stappen omvat:A method for constructing a crane, which crane comprises a first mast (10) that has a central mast axis (15), the first mast (10) comprising a mast section (11, 12, 13, 14), and the first mast is pivotable relative to the crane base (2) about a first mast pivot axis (16) in a range of angular positions, which range of angular positions includes a mast construction position and an inclined mast work position, the first mast pivot axis (16) perpendicular to the central mast axis (15), which method comprises the following steps: - zwenkbaar verbinden van een ontvangstinrichting (30) die is ingericht om een mastsectie (11, 12, 13, 14) van de eerste mast (10) te ontvangen en die een centrale ontvangstrinrichtingsas (35) heeft met een kraanbasis (2), daarbij de ontvangstinrichting (30) zwenkbaar makend ten opzichte van de kraanbasis (2) om een de eerste mastzwenkas (16), welke eerste mastzwenkas (16) zich loodrecht op de centrale ontvangstinrichtingsas (35 )uitstrekt,- pivotally connecting a receiving device (30) adapted to receive a mast section (11, 12, 13, 14) from the first mast (10) and having a central receiving device axis (35) with a crane base (2), thereby making the receiving device (30) pivotable with respect to the crane base (2) about a first mast pivot axis (16), which first mast pivot axis (16) extends perpendicular to the central receiving device axis (35), - het fixeren van de ontvangstinrichting (3) in een positie waarin de centrale ontvangstinrichtingsas (35) evenwijdig is met de centrale mast-as (15) van de eerste mast (10) in de mastconstructiepositie,- fixing the receiving device (3) in a position in which the central receiving device axis (35) is parallel to the central mast axis (15) of the first mast (10) in the mast construction position, - het aanbrengen van een mastsectie (11, 12, 13, 14) van de eerste mast (10) van de kraan (1) in de ontvangstinrichting (30),- arranging a mast section (11, 12, 13, 14) of the first mast (10) of the crane (1) in the receiving device (30), - het bewegen van de mastsectie (11, 12, 13, 14) van de eerste mast (10) ten opzichte van de ontvangstinrichting (30) in de richting van de centrale ontvangstinrichtingsas (35) van een ontvangstpositie naar een overdrachtspositie, waarbij de mastsectie van de eerste mast (10) zich in een hoekpositie bevindt die correspondeert met de eerste mastconstructiepositie,- moving the mast section (11, 12, 13, 14) of the first mast (10) relative to the receiving device (30) in the direction of the central receiving device axis (35) from a receiving position to a transfer position, the mast section of the first mast (10) is in an angular position corresponding to the first mast construction position, - het vergrendelen van de positie van de mast sectie (11, 12, 13, 14) ten opzichte van de ontvangstinrichting (30) in de overdrachtspositie om de eerste mast (10) op te bouwen,- locking the position of the mast section (11, 12, 13, 14) relative to the receiving device (30) in the transfer position to build up the first mast (10), - het losmaken van de fixatie van de ontvangstinrichting (30) en het zwenken van de ontvangstinrichting (30) en de eerste mast (10) samen om de eerste mastzwenkas (16) in een hoekpositie die correspondeert met de schuine mastwerkpositie.- releasing the fixation of the receiving device (30) and pivoting the receiving device (30) and the first mast (10) together about the first mast pivot axis (16) in an angular position corresponding to the inclined mast working position. 8. Werkwijze volgens conclusie 7, waarbij de werkwijze verder de volgende stappen omvat:The method of claim 7, wherein the method further comprises the following steps: - na de stap van het vergrendelen van de positie van de mastsectie (11, 12, 13, 14) ten opzichte van de ontvangstinrichting (30) in de overdrachtspositie en voor de stap van het losmaken van de fixatie van de ontvangstinrichting (30) en het zwenken van de ontvangstinrichting (30) en de eerste mast (10) samen om de eerste mastzwenkas (16) in een hoekpositie die correspondeert met de schuine mastwerkpositie, het aanbrengen van een verdere mastsectie (13, 14) van en eerste mast (10) van de kraan (1) in de ontvangstinrichting (30).- after the step of locking the position of the mast section (11, 12, 13, 14) relative to the receiving device (30) in the transfer position and before the step of releasing the fixation from the receiving device (30) and pivoting the receiving device (30) and the first mast (10) together about the first mast pivot axis (16) in an angular position corresponding to the inclined mast work position, arranging a further mast section (13, 14) of a first mast (10) ) of the tap (1) in the receiving device (30). - het verbinden van de verdere mastsectie (13, 14) van de eerste mast (10) aan de mastsectie (11, 12, 13) die is vergrendeld in de overdrachtspositie,- connecting the further mast section (13, 14) of the first mast (10) to the mast section (11, 12, 13) that is locked in the transfer position, - het ontgrendelen van de mastsectie (11, 12, 13) van de eerste mast (10) in de overdrachtspositie,- unlocking the mast section (11, 12, 13) of the first mast (10) in the transfer position, - het bewegen van de verdere mastsectie (13, 14) van de eerste mast (10) ten opzichte van de ontvangstinrichting (30) in de richting van de centrale ontvangstinrichtingsas (35) van een ontvangstpositie naar een overdrachtspositie, waarbij de mastsectie van de eerste mast (10) zicht in een hoekpositie bevindt die correspondeert met de eerste mastconstructiepositie, en daarbij het bewegen van de mastsectie (11, 12, 13) die zich in de overdrachtspositie bevond uit de overdrachtspositie in een richting die evenwijdig is aan de centrale mast-as (15) om verder de eerste mast (10) op te bouwen,- moving the further mast section (13, 14) of the first mast (10) relative to the receiving device (30) in the direction of the central receiving device axis (35) from a receiving position to a transfer position, the mast section of the first mast mast (10) is in an angular position corresponding to the first mast construction position, and thereby moving the mast section (11, 12, 13) that was in the transfer position from the transfer position in a direction parallel to the central mast shaft (15) to further build the first mast (10), - het vergrendelen van de positie van de verdere mastsectie (13, 14) ten opzichte van de ontvangstinrichting (30) in de overdrachtspositie.- locking the position of the further mast section (13, 14) relative to the receiving device (30) in the transfer position. 9. Werkwijze volgens een van de conclusies 7-8, waarbij de werkwijze verder de volgende stappen omvat:The method of any one of claims 7 to 8, wherein the method further comprises the following steps: - na de stap van het vergrendelen van de positie van de mastsectie (11, 12, 13, 14) ten opzichte van de ontvangstinrichting (30) in de overdrachtspositie en voor de stap van het losmaken van de fixatie van de ontvangstinrichting (30) en het zwenken van de ontvangstinrichting (30) en de eerste mast (10) samen om de eerste mastzwenkas (16) in een hoekpositie die correspondeert met de schuine mastwerkpositie, het aanbrengen van een onderste mastsectie (14) van een eerste mast (10) van de kraan (1) in de ontvangstinrichting,- after the step of locking the position of the mast section (11, 12, 13, 14) relative to the receiving device (30) in the transfer position and before the step of releasing the fixation from the receiving device (30) and pivoting the receiving device (30) and the first mast (10) together about the first mast pivot axis (16) in an angular position corresponding to the inclined mast working position, arranging a lower mast section (14) of a first mast (10) of the tap (1) in the receiving device, - het verbinden van de onderste mastsectie (14) van de eerste mast (10) met de mast sectie of verdere mastsectie van de eerste mast (10) die is vergrendeld in de overdrachtspositie om de eerste mast (10) verder op te bouwen,- connecting the lower mast section (14) of the first mast (10) to the mast section or further mast section of the first mast (10) that is locked in the transfer position to further build the first mast (10), - het verbinden van de onderste mastsectie (14) van de eerste mast (10) met de kraanbasis (2) en het zwenkbaar maken van de onderste mastsectie (14) van de eerste mast (10) ten opzichte van de kraanbasis (2) om de eerste mastzwenkas (16).- connecting the lower mast section (14) of the first mast (10) to the crane base (2) and making the lower mast section (14) of the first mast (10) pivotable relative to the crane base (2) to the first mast pivot axis (16). 10. Werkwijze volgens een van de conclusies 7-9, waarbij ten minste een mastsectie van de eerste mast (10) ten minste een deel van een hijssysteem (70) omvat, welke werkwijze verder de volgende stappen omvat:A method according to any of claims 7-9, wherein at least one mast section of the first mast (10) comprises at least a part of a hoisting system (70), which method further comprises the following steps: - het verbinden van een hijskabel (73) die verbonden is met het ten minste deel van het hijssysteem van de mastsectie van de eerste mast (10) met een mastsectie (21, 22, 23, 14) van een tweede mast (20),- connecting a hoisting cable (73) connected to the at least part of the hoisting system of the mast section of the first mast (10) to a mast section (21, 22, 23, 14) of a second mast (20), - het verbinden van de mastsectie (21, 22, 23, 24) van de tweede mast (20) met de kraanbasis (2) om de tweede mast (20) op te bouwen en het zwenkbaar maken van de tweede mast (20) ten opzichte van de kraanbasis (2) om een tweede mastzwenkas (26) die evenwijdig is aan de eerste mastzwenkas (16).- connecting the mast section (21, 22, 23, 24) of the second mast (20) to the crane base (2) to build up the second mast (20) and making the second mast (20) pivotable with respect to the crane base (2) about a second mast pivot axis (26) that is parallel to the first mast pivot axis (16). 11. Werkwijze volgens conclusie 10,The method of claim 10, Waarbij de stap van het verbinden van een hijskabel (73) die verbonden is met het ten minste deel van het hijssysteem van de mastsectie van de eerste mast (10) met een mastsectie (21, 22, 23, 14) van een tweede mast (20) plaatsvindt voor het losmaken van de fixatie van de ontvangstinrichting (30) en het zwenken van de ontvangstinrichting (30) en de eerste mast (10) samen om de eerste mastzwenkas (16) in een hoekpositie die correspondeert met de schuine mastwerkpositie.The step of connecting a hoisting cable (73) connected to the at least part of the hoisting system of the mast section of the first mast (10) to a mast section (21, 22, 23, 14) of a second mast ( 20) takes place for loosening the fixation of the receiving device (30) and pivoting the receiving device (30) and the first mast (10) together about the first mast pivot axis (16) in an angular position corresponding to the inclined mast working position. 12. Werkwijze volgens conclusie 10, waarbij de werkwijze verder de stap omvat van het zwenken van de tweede mast (20) naar een schuine tweede mast werkpositie.The method of claim 10, wherein the method further comprises the step of pivoting the second mast (20) to an inclined second mast working position. 13. Werkwijze volgens een van de conclusies 7-11, waarbij in de stap van het fixeren van de ontvangstinrichting (3) in een positie waarin de centrale ontvangstinrichtingsas (35) evenwijdig is met de centrale mast-as (15) van de eerste mast (10) in de mastconstructiepositie, de ontvangstinrichting (30) wordt gefixeerd in een positie waarbij de centrale ontvangstinrichtingsas (35) zich verticaal uitstrekt.A method according to any of claims 7-11, wherein in the step of fixing the receiving device (3) in a position in which the central receiving device axis (35) is parallel to the central mast axis (15) of the first mast (10) in the mast construction position, the receiving device (30) is fixed in a position where the central receiving device axis (35) extends vertically. 14. Werkwijze volgens een van de conclusies 7-13, A method according to any of claims 7-13, - 38waarbij de werkwijze verder de stap omvat van het weg kantelen van een bovenste deel (18) van de eerste mast (10) van de centrale mast-as (15) van de eerste mast (10).- The method further comprising the step of tilting away an upper part (18) of the first mast (10) from the central mast axis (15) of the first mast (10). 15. Werkwijze voor het demonteren van een kraan, welke kraan een kraan (1) volgens conclusie 1 is, welke werkwijze de volgende stappen omvat:A method of dismantling a crane, which crane is a crane (1) according to claim 1, which method comprises the following steps: - het zwenken van de ontvangstinrichting (30) en de eerste mast (10) samen om de eerste mastzwenkas (16) in een hoekpositie die correspondeert met de mastconstructiepositie,- pivoting the receiving device (30) and the first mast (10) together about the first mast pivot axis (16) in an angular position corresponding to the mast construction position, - het fixeren van de ontvangstinrichting (30) in een positie waarbij de centrale ontvangstinrichtingsas (35) evenwijdig is met de centrale mast-as (15) van de eerste mast (10) in de mastconstructiepositie,- fixing the receiving device (30) in a position where the central receiving device axis (35) is parallel to the central mast axis (15) of the first mast (10) in the mast construction position, - het verwijderen van een mastsectie van de eerste mast (10) die aanwezig is in de ontvangstinrichting (30) uit de ontvangstinrichting (30).- removing a mast section from the first mast (10) present in the receiving device (30) from the receiving device (30). 16. Werkwijze volgens conclusie 15, welke verder de volgende stappen omvat:The method of claim 15, further comprising the steps of: - na de stap van het fixeren van de ontvangstinrichting (30) in een positie waarbij de centrale ontvangstinrichtingsas (35) evenwijdig is met de centrale mast-as (15) van de eerste mast (10) in de mastconstructiepositie, en voor de stap van het verwijderen van een mastsectie van de eerste mast (10) die aanwezig is in de ontvangstinrichting (30) uit de ontvangstinrichting (30), het ontgrendelen van de mastsectie die zich in de overdrachtspositie bevindt en het bewegen van deze mastsectie van de overdrachtspositie naar de ontvangstpositie in de ontvangstinrichting (30),- after the step of fixing the receiving device (30) in a position where the central receiving device axis (35) is parallel to the central mast axis (15) of the first mast (10) in the mast construction position, and before the step of removing a mast section from the first mast (10) present in the receiving device (30) from the receiving device (30), unlocking the mast section that is in the transfer position and moving this mast section from the transfer position to the receiving position in the receiving device (30), - dan, nog steeds voor de stap van het verwijderen van een mastsectie van de eerste mast (10) die aanwezig is in de ontvangstinrichting (30) uit de ontvangstinrichting (30), het vergrendelen van de positie van een volgende mastsectie ten opzichte van de ontvangstinrichting (30) in de overdrachtspositie.- then, still before the step of removing a mast section from the first mast (10) present in the receiving device (30) from the receiving device (30), locking the position of a next mast section relative to the receiving device (30) in the transfer position. oO 1/121/12
Figure NL2021383B1_C0001
Figure NL2021383B1_C0001
Figure NL2021383B1_C0002
Figure NL2021383B1_C0002
2/122/12
Figure NL2021383B1_C0003
Figure NL2021383B1_C0003
3/123/12
Figure NL2021383B1_C0004
Figure NL2021383B1_C0004
ΓΜΓΜ
Figure NL2021383B1_C0005
Figure NL2021383B1_C0005
Fig. 3 Fig. 4 oFIG. 3, FIG. 4 o 4/124/12
Figure NL2021383B1_C0006
Figure NL2021383B1_C0006
Figure NL2021383B1_C0007
Figure NL2021383B1_C0007
5/125/12
Figure NL2021383B1_C0008
Figure NL2021383B1_C0008
Fig. 7 Fig. 8FIG. 7 FIG. 8 6/126/12
Figure NL2021383B1_C0009
Figure NL2021383B1_C0009
7/127/12
Figure NL2021383B1_C0010
Figure NL2021383B1_C0010
Fig. 10 oFIG. 10 o
Figure NL2021383B1_C0011
Figure NL2021383B1_C0011
8/128/12
Figure NL2021383B1_C0012
Figure NL2021383B1_C0012
9/129/12
Figure NL2021383B1_C0013
Figure NL2021383B1_C0013
Fig. 12FIG. 12 10/1210/12
Figure NL2021383B1_C0014
Figure NL2021383B1_C0014
Fig. 13FIG. 13 11/1211/12
Figure NL2021383B1_C0015
Figure NL2021383B1_C0015
Fig. 14FIG. 14 12/1212/12
Figure NL2021383B1_C0016
Figure NL2021383B1_C0016
Fig. 15FIG. 15
NL2021383A 2018-07-24 2018-07-24 Crane, method for assembling a crane and method for disassembling a crane NL2021383B1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
NL2021383A NL2021383B1 (en) 2018-07-24 2018-07-24 Crane, method for assembling a crane and method for disassembling a crane
US17/259,695 US11807503B2 (en) 2018-07-24 2019-07-19 Crane, method for assembling a crane and method for disassembling a crane
CN201980049456.8A CN112533859B (en) 2018-07-24 2019-07-19 Crane, method for assembling a crane and method for disassembling a crane
JP2021528322A JP7475345B2 (en) 2018-07-24 2019-07-19 Crane, crane assembly method, and crane disassembly method
PCT/NL2019/050462 WO2020022881A1 (en) 2018-07-24 2019-07-19 Crane, method for assembling a crane and method for disassembling a crane
EP19749460.2A EP3826955B1 (en) 2018-07-24 2019-07-19 Crane, method for assembling a crane and method for disassembling a crane
CA3106951A CA3106951A1 (en) 2018-07-24 2019-07-19 Crane, method for assembling a crane and method for disassembling a crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2021383A NL2021383B1 (en) 2018-07-24 2018-07-24 Crane, method for assembling a crane and method for disassembling a crane

Publications (1)

Publication Number Publication Date
NL2021383B1 true NL2021383B1 (en) 2020-01-30

Family

ID=63638261

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2021383A NL2021383B1 (en) 2018-07-24 2018-07-24 Crane, method for assembling a crane and method for disassembling a crane

Country Status (1)

Country Link
NL (1) NL2021383B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL6806515A (en) * 1967-05-10 1968-11-11
EP2695844A1 (en) * 2012-08-09 2014-02-12 PROTEA Sp. z o.o. Mobile built-up folding crane
WO2018052283A1 (en) * 2016-09-19 2018-03-22 Gustomsc Resources B.V. Extendable boom with a locking system and method for operating an extendable boom of a crane
EP3301064A1 (en) * 2016-09-29 2018-04-04 Mammoet Holding B.V. Apparatus for lifting heavy loads

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL6806515A (en) * 1967-05-10 1968-11-11
EP2695844A1 (en) * 2012-08-09 2014-02-12 PROTEA Sp. z o.o. Mobile built-up folding crane
WO2018052283A1 (en) * 2016-09-19 2018-03-22 Gustomsc Resources B.V. Extendable boom with a locking system and method for operating an extendable boom of a crane
EP3301064A1 (en) * 2016-09-29 2018-04-04 Mammoet Holding B.V. Apparatus for lifting heavy loads

Similar Documents

Publication Publication Date Title
US3777900A (en) Building crane
CN107191676A (en) Construction method of buried pipeline
EP3826955B1 (en) Crane, method for assembling a crane and method for disassembling a crane
US4856662A (en) Pedestal crane and method of assembling and erecting it
US20180086611A1 (en) Apparatus for Lifting Heavy Loads
EP1842822A2 (en) Crane and method of assembling it
NL2021383B1 (en) Crane, method for assembling a crane and method for disassembling a crane
WO2018026320A1 (en) System and method for securing, moving and placing a pile or heavy elongated object
EP1673304B1 (en) A mobile crane
RU2788960C2 (en) Crane, method for assembly of crane and method for disassembly of crane
US20060226105A1 (en) Mobile crane
EP4087809A1 (en) A mobile heavy lift crane system
KR20220137687A (en) Methods and hoisting yokes for lifting long objects
EP3375747A1 (en) Tower crane
JP2011252318A (en) Load receiving platform and its transferring method
EP3375746A1 (en) Tower crane
NL2018785B1 (en) Crane, method for assembling a crane and method for disassembling a crane
RU2730730C1 (en) Operating method of boom self-propelled crane and device for implementation thereof
EP3615468B1 (en) Crane, method for assembling a crane and method for disassembling a crane
EP4293177A2 (en) System and method for concrete forming
DE2930906A1 (en) DEVICE FOR CONTROLLING AND OVERHAULING THE INTERIOR OF TAPERED CHIMNEYS
RU2599083C2 (en) Setting-service device for ground equipment of space rocket systems
SU178461A1 (en) TWO-THREAD CRANE ON COLUMNS FOR INSTALLATION FROM ASSEMBLED CONSTRUCTION ELEMENTS OF CONSTRUCTIONS
CN116177362A (en) Lifting appliance