NL1014031C2 - Fixing construction as well as method for applying it. - Google Patents

Fixing construction as well as method for applying it. Download PDF

Info

Publication number
NL1014031C2
NL1014031C2 NL1014031A NL1014031A NL1014031C2 NL 1014031 C2 NL1014031 C2 NL 1014031C2 NL 1014031 A NL1014031 A NL 1014031A NL 1014031 A NL1014031 A NL 1014031A NL 1014031 C2 NL1014031 C2 NL 1014031C2
Authority
NL
Netherlands
Prior art keywords
fastening
column
fixing
construction according
construction
Prior art date
Application number
NL1014031A
Other languages
Dutch (nl)
Inventor
Robertus Cornelis Maria V Rijn
Original Assignee
R C M Ankertec B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by R C M Ankertec B V filed Critical R C M Ankertec B V
Priority to NL1014031A priority Critical patent/NL1014031C2/en
Priority to EP01200028A priority patent/EP1114904B1/en
Priority to AT01200028T priority patent/ATE307945T1/en
Priority to DE60114252T priority patent/DE60114252T2/en
Application granted granted Critical
Publication of NL1014031C2 publication Critical patent/NL1014031C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2261Mounting poles or posts to the holder on a flat base

Abstract

Fixing structure (1,31) for joining a column (12) or the like to a concrete structure (14) which is to be poured. Two or more anchor components (3,4) are fixed to a fixing plate which is also provided with adjusting means. The plate is cast into the concrete with the anchor components. The column or the like is brought into the correct position with the aid of the adjusting means. The gap between the column and the concrete structure is then sealed with a sealing strip (17) and the space within said strip is filled with casting concrete. <IMAGE>

Description

Bevestigingsconstructie alsmede werkwijze voor het aanbrengen daarvan.Fixing construction as well as method for applying it.

De onderhavige uitvinding heeft betrekking op een bevestigingsconstructie om een kolom of dergelijke met een te storten betonconstructie te verbinden, 5 omvattende ten minste twee op afstand liggende in te storten ankerdelen, welke ankerdelen voorzien zijn van schroefdraad voor bevestiging van die kolom of dergelijke, waarbij bevestigingsconstructie omvat een bevestigingsorgaan waarin die ankerdelen aangebracht zijn.The present invention relates to a fastening construction for connecting a column or the like to a concrete structure to be poured, comprising at least two spaced apart anchor parts, which anchor parts are threaded for fastening that column or the like, wherein the fastening construction comprises a fastening member in which said anchor parts are arranged.

Een dergelijke constructie is bekend uit US 5505033A. Daarin wordt de voet van 10 een kolom op een betonnen blok geplaatst en wordt met behulp van ingestorte trekankers de kolom gepositioneerd.Such a construction is known from US 5505033A. In it, the base of a column is placed on a concrete block and the column is positioned using collapsed tension anchors.

In de algemene stand der techniek worden voor het bevestigen van een kolom of dergelijke aan een betonnen constructie twee of meer ankers in de betonnen constructie gestort. Deze ankers zijn in het algemeen aan het uiteinde van schroefdraad voorzien 15 waarop later moeren aangebracht worden om de kolom vast te zetten. De afstand van de ankers moet vanzelfsprekend overeenkomen met de afstand van de gaten aangebracht in de voetplaat van de kolom en daartoe worden bij het storten de ankers met behulp van een houten mal op afstand gehouden.In the general state of the art, two or more anchors are poured into the concrete construction for attaching a column or the like to a concrete structure. These anchors are generally threaded at the end to which nuts are later fitted to secure the column. The distance of the anchors must, of course, correspond to the distance of the holes made in the base plate of the column, and for this purpose the anchors are kept at a distance by means of a wooden mold when pouring.

Na het storten wordt een dergelijke mal door uitbikken of dergelijke verwijderd. 20 Vervolgens worden moeren op het schroefdraad gebracht. Het is ook mogelijk dat deze moeren reeds aanwezig zijn. Daarna wordt de kolom geplaatst waarbij deze rust op de moeren. Aan de bovenzijde van de kolom worden weer verdere moeren aangebracht om de kolom vast te zetten. Door het stellen van de moeren die de kolom dragen, kan het juist positioneren van de kolom verzekerd worden. Vervolgens wordt de ruimte 25 tussen de voet van de kolom en het beton onderzadeld. Dit onderzadelen vindt plaats door met behulp van een kneedbaar betonmateriaal de desbetreffende ruimte op te vullen. Dit is een nauwkeurige en tijdrovende bezigheid. Immers, verzekerd moet worden dat de ruimte tussen de kolom en de gestorte constructie volledig gevuld wordt met beton omdat daar later het gewicht van de kolom en de eventueel daardoor gedragen 30 verdere constructie overgebracht moet worden. Een algemeen gebruikelijke werkwijze is het aanbrengen aan drie zijden van een vierkante kolom van een zwaar voorwerp zoals een tegel of dergelijke waarna aan de nog open zijde de mortel met een houten klos of dergelijke aangeklopt wordt om zo voldoende verdichting te bereiken. Begrepen 1014031 2 wordt dat dit enerzijds een tijdrovende werkzaamheid is maar anderzijds een weinig controleerbare activiteit.After pouring, such a mold is removed by punching or the like. 20 Then nuts are placed on the screw thread. It is also possible that these nuts are already present. The column is then placed, resting on the nuts. At the top of the column, further nuts are fitted to fix the column. Correct positioning of the column can be ensured by adjusting the nuts that support the column. Then the space between the base of the column and the concrete is saddled. This saddling takes place by filling the space in question with the aid of a kneadable concrete material. This is an accurate and time consuming activity. After all, it must be ensured that the space between the column and the poured construction is completely filled with concrete, because later the weight of the column and any further construction that may be carried by it must be transferred there. A commonly used method is the application on three sides of a square column of a heavy object such as a tile or the like, after which on the still open side the mortar is beaten with a wooden block or the like in order to achieve sufficient compaction. It is understood that on the one hand this is a time consuming activity but on the other hand a little controllable activity.

Door gebruik van de houten mal en het hierboven beschreven onderzadelen is het bevestigen van een kolom of dergelijke aan een betonnen constructie een tijdrovende 5 werkzaamheid.By using the wooden mold and the under saddles described above, attaching a column or the like to a concrete structure is a time-consuming activity.

Het is het doel van de onderhavige uitvinding dit nadeel te vermijden en in een bevestigingsconstructie te voorzien waarmee op snelle en doelmatige wijze een kolom geplaatst en gesteld kan worden.The object of the present invention is to avoid this drawback and to provide a fastening construction with which a column can be placed and set in a quick and efficient manner.

Dit doel wordt bij een hierboven constructie verwezenlijkt doordat dat 10 bevestigingsorgaan tussen de opname voor die ankerdelen is voorzien van stelmiddelen voor die kolom of dergelijke, welke stelmiddelen een ten opzichte van dat orgaan naar buiten (boven) te brengen drager omvatten. Door het gebruik van een bevestigingsorgaan waaraan de ankerdelen bevestigd zijn alsmede daarin aangebrachte stelmiddelen kunnen enerzijds op zeer nauwkeurige wijze de ankers gepositioneerd 15 worden voor het storten en kan anderzijds op zeer nauwkeurige wijze de kolom gesteld worden zonder dat het tijdrovend stellen van moeren op de ankers nodig is. Bovendien is het mogelijk na het onderzadelen enige spanning op de moeren van de ankers aan te brengen zodat de constructie onder voorspanning staat.This object is achieved in an above construction in that said fixing member between the accommodation for said anchor parts is provided with adjusting means for that column or the like, which adjusting means comprise a carrier to be brought out (top) with respect to that element. By using a fixing member to which the anchor parts are attached and adjusting means arranged therein, on the one hand, the anchors can be positioned in a very accurate manner and, on the other hand, the column can be positioned in a very accurate manner without the time-consuming setting of nuts on the anchors. is needed. In addition, it is possible to apply some tension to the nuts of the anchors after under saddling, so that the construction is under pretension.

Het bevestigingsorgaan kan een plaatvormig orgaan omvatten. Indien echter het 20 ontstaan van holtes door de aanwezigheid van lucht onder de plaat gevreesd wordt, is het mogelijk de plaat uit te voeren als een of meer stripvormige delen. Bij de uitvoering met stripvormige delen is het mogelijk in verschillende stripvormige delen te voorzien die aan elkaar bevestigd worden. Daardoor kan op eenvoudige wijze in aanpassing aan de steekafstand tussen de ankerdelen voorzien worden.The fastening member can comprise a plate-shaped member. However, if the formation of cavities is feared by the presence of air under the plate, it is possible to design the plate as one or more strip-shaped parts. In the version with strip-shaped parts, it is possible to provide different strip-shaped parts which are attached to each other. As a result, adaptation to the pitch distance between the anchor parts can be provided in a simple manner.

25 De plaat en/of andere constructie waarmee de ankerdelen in de gewenste positie geplaatst worden, kan al dan niet verwijderbaar zijn. Met name indien kunststof delen gebruikt worden, is verwijderbaarheid op eenvoudige wijze te verwezenlijken. Dit vindt plaats na het instorten van de stelmiddelen. Bovendien kan bij toepassing van kunststofdelen in combinatie met stalen ankerdelen op eenvoudige wijze vergrendeling 30 van de ankerdelen aan de kunststofplaat of strip verwezenlijkt worden. Onder kunststof dienen zowel harde kunststoffen als blijvend deformeerbare kunststoffen zoals rubberachtige materialen verstaan te worden. Met name rubberachtige materialen kunnen zeer eenvoudig verwijderd worden.The plate and / or other construction with which the anchor parts are placed in the desired position may or may not be removable. Removability can be achieved in a simple manner, particularly if plastic parts are used. This takes place after the adjusting means have collapsed. Moreover, when plastic parts are used in combination with steel anchor parts, locking of the anchor parts to the plastic plate or strip can be realized in a simple manner. Plastic should be understood to mean both hard plastics and permanently deformable plastics such as rubber-like materials. Rubber-like materials in particular can be removed very easily.

1014031 31014031 3

Bij voorkeur omvatten de bevestigingsmiddelen een of meer draag- of stelhouten opgenomen in een huls of andere constructie in het bevestigingsorgaan.Preferably, the mounting means comprise one or more carrying or adjusting wood housed in a sleeve or other construction in the mounting member.

Door het naar buiten bewegen van een dergelijke draag- of stelhout kan de positie van de kolom geregeld worden. Tegendruk kan opgewekt worden door de 5 bevestigingsmoeren op de draadankers aan te brengen. Deze bevestigingsmoeren zijn essentieel voor de latere bevestiging van de kolom aan de bevestigingsconstructie.The position of the column can be adjusted by moving out such a carrying or adjusting wood. Back pressure can be generated by applying the 5 fixing nuts to the wire anchors. These fixing nuts are essential for the later fixing of the column to the fixing construction.

Het aanbrengen van beton kan nog verder vereenvoudigd worden indien dun gietbaar beton of ander uithardbaar materiaal gebruikt wordt dat een behoorlijk dragende functie heeft. In een dergelijk geval wordt volgens de uitvinding voorgesteld om 10 met behulp van een afdichtlijst een bekisting om de ruimte tussen de onderzijde van de kolom en de bovenzijde van de betonconstructie te vormen en deze met een dun vloeibaar materiaal vol te storten. Deze afdichtlijst kan uit kunststofmateriaal al dan niet versterkt met metallische materialen bestaan en met behulp van een kleef- of kitlaag aan de betonconstructie tijdelijk bevestigd worden. Bovendien is het op deze wijze moge-15 lijk een krimparme mortel toe te passen zodat het gevaar van niet volledig dragen zoals in de stand der techniek voor kan komen bij toepassing van verhoudingsgewijs kneedbaar dik vloeibaar beton niet langer aanwezig is.The application of concrete can be further simplified if thin castable concrete or other curable material is used that has a considerable load-bearing function. In such a case, it is proposed according to the invention to form a form using a sealing strip to form the space between the bottom of the column and the top of the concrete construction and to fill it with a thin liquid material. This sealing strip can consist of plastic material, reinforced or not reinforced with metallic materials, and temporarily attached to the concrete construction by means of an adhesive or sealant layer. Moreover, it is possible in this way to use a low-shrinkage mortar, so that the risk of incomplete wearing, as can be found in the prior art, is no longer present when using relatively kneadable thick liquid concrete.

Begrepen dient te worden dat de in te storten ankerdelen elke in de stand der techniek bekende constructies kunnen omvatten. Het is mogelijk dat deze zich niet 20 boven de plaat uitstrekken en bijvoorbeeld van schroefdraad voorziene hulzen omvatten. Daardoor wordt, indien de stelmiddelen verzonken in de plaat aangebracht zijn of later aangebracht worden, het mogelijk de bevestigingsplaten “in te storten” en vervolgens de omgeving rond de bevestigingsplaat te vlaggen, bijvoorbeeld door vlinderen.It is to be understood that the anchor parts to be cast in can comprise any constructions known in the prior art. These may not extend above the plate and include, for example, threaded sleeves. As a result, if the adjusting means are sunk into the plate or are fitted later, it becomes possible to "collapse" the mounting plates and then flag the area around the mounting plate, for example by butterfly-flying.

25 De uitvinding heeft eveneens betrekking op een werkwijze voor het plaatsen van een kolom omvattende het instorten van een hierboven beschreven bevestigingsconstructie gevolgd door het om de bevestigingsconstructie aanbrengen van de hierboven beschreven afdichtlijst waarna de ruimte binnen die lijst met een uithardbare gietmassa gevuld wordt.The invention also relates to a method for placing a column comprising the collapse of a fastening construction described above, followed by fitting the sealing strip described above around the fastening construction, after which the space within that strip is filled with a curable casting mass.

30 De uitvinding zal hieronder nader aan de hand van een in de tekening afgebeeld uitvoeringsvoorbeeld verduidelijkt worden. Daarbij toont: fig. 1 schematisch in zijaanzicht een uitvoering van een bevestigingsconstructie volgens de uitvinding; 1014031 4 fig. 2 de bevestigingsconstructie volgens fig. 1 na het instorten in beton en tijdens het stellen van een kolom; fig. 3 een afdichtlijst volgens een uitvoering van de onderhavige uitvinding; fig. 4 de plaatsing van de afdichtlijst op de betonnen constructie tijdens het in-5 storten van een dun vloeibaar betonachtig materiaal, fig. 5 schematisch in perspectief een variant van de bevestigingsconstructie volgens de voorgaande figuren; en fig. 6 een doorsnede van de in fig. 5 getoonde constructie.The invention will be explained in more detail below with reference to an illustrative embodiment shown in the drawing. In the drawing: Fig. 1 shows a schematic side view of an embodiment of a fastening construction according to the invention; 1014031 4 fig. 2 the fastening construction according to fig. 1 after collapsing in concrete and during the setting of a column; Fig. 3 shows a sealing strip according to an embodiment of the present invention; Fig. 4 shows the placement of the sealing strip on the concrete structure during the pouring of a thin liquid concrete-like material, Fig. 5 schematically shows in perspective a variant of the fastening construction according to the previous figures; and FIG. 6 is a sectional view of the construction shown in FIG. 5.

In fig. 1 is de bevestigingsconstructie volgens de uitvinding in het geheel met 1 10 aangegeven. In fig. 1 is de meest eenvoudige uitvoering getoond waarbij slechts twee ankerdelen 3 en 4 afgebeeld zijn. Deze zijn met behulp van moeren 6 vooraf en permanent aan plaat 2 bevestigd. Daarbij zijn de moeren verhoudingsgewijs zwakke kunststof moeren of andere verschuifbare constructie. Begrepen zal worden dat deze bevestiging aan plaat 2 ook door lassen, persen of enig andere methode plaats kan vinden. In het 15 getoonde voorbeeld is ankerdeel 3 voorzien van een omgezet einde en is ankerdeel 4 voorzien van een boutkop 10. Begrepen zal worden dat eveneens twee dezelfde ankeruiteinden gebruikt kunnen worden. Bij toepassing van ankerdeel 4, dat evenals ankerdeel 3 voorzien is van een schroefdraad 5, kan gebruik gemaakt worden van een boutachtige constructie. Dit heeft als voordeel dat een verhoudingsgewijs hoogwaardig 20 staalsoort op eenvoudig verkrijgbare wijze toegepast kan worden. Immers, ankerdeel 3 zal in het algemeen uit een staal met geringe sterkte (minder dan 50 kg/mm2) vervaardigd worden terwijl een bout zonder hoge kosten een sterkte van meer dan 80 kg/mm2 kan hebben.In Fig. 1 the fastening construction according to the invention is indicated in its entirety by 1. Fig. 1 shows the simplest embodiment in which only two anchor parts 3 and 4 are shown. These are pre-attached permanently to plate 2 using nuts 6. In addition, the nuts are relatively weak plastic nuts or other sliding construction. It will be understood that this attachment to plate 2 can also take place by welding, pressing or any other method. In the example shown, anchor part 3 is provided with a turned end and anchor part 4 is provided with a bolt head 10. It will be understood that two same anchor ends can also be used. When using anchor part 4, which, like anchor part 3, is provided with a screw thread 5, use can be made of a bolt-like construction. This has the advantage that a relatively high-quality steel grade can be used in an easily obtainable manner. After all, anchor part 3 will generally be made of a steel of low strength (less than 50 kg / mm2), while a bolt can have a strength of more than 80 kg / mm2 without high costs.

De bevestigingsplaat 2 kan van enig in de stand der techniek bekend materiaal 25 zijn maar zal in het algemeen uit staal bestaan. Bevestigingsplaat 2 is in het hart daarvan voorzien van een op enigerlei wijze daaraan bevestigde van schroefdraad voorziene huls 8. Daarin kan een stelhout 7 opgenomen worden.The mounting plate 2 may be of any material 25 known in the art, but will generally consist of steel. Fixing plate 2 is provided in its center with a threaded sleeve 8 attached in some way to it.

Omdat de afstand tussen de boutgaten van kolommen en andere constructies genormeerd is, kan de bevestigingsconstructie 1 kant en klaar op het werk aangeleverd 30 worden. Vervolgens wordt deze zoals getoond in fig. 2 op enigerlei wijze geplaatst in een te storten betonnen constructie. Met 16 is een overige wapeningsstaaf aangegeven en met 15 een draadverbinding met plaat 2 die dient om de bevestigingsconstructie tijdens het storten van beton 14 op zijn plaats te houden.Since the distance between the bolt holes of columns and other structures is standardized, the fastening construction can be delivered ready-made to the job. Then, as shown in Fig. 2, it is placed in some way in a concrete structure to be poured. 16 indicates another reinforcing bar and 15 a wire connection to plate 2 which serves to keep the fastening construction in place during pouring of concrete 14.

1014031 51014031 5

Nadat het beton gestort is en (enigszins) uitgehard, wordt kolom 12 geplaatst. Door de nauwkeurige positionering van de ankerdelen 3 en 4 ten opzichte van plaat 2 zullen de openingen in kolom 12 altijd overeenkomen met de desbetreffende ankerdelen. Vooraf kan stelhout 7 naar buiten gebracht worden zodat verzekerd wordt dat de 5 kolom op de juiste hoogte geplaatst wordt. Het zuiver verticaal stellen van de kolom is verhoudingsgewijs eenvoudig omdat de stelhout 7 zich in het hart van de plaat 2 bevindt. Bij het stellen met bout 7 zullen de zwakke moeren 8 ten opzichte van de draad verschoven worden. Door het opdraaien van moeren 13 kan in een stevige en stelbare verbinding voorzien worden. Plaat 2 is voldoende sterk om de drukkracht afkomstig 10 van draagbout 7 van de kolom op te nemen.After the concrete has been poured and (slightly) cured, column 12 is placed. Due to the accurate positioning of the anchor parts 3 and 4 relative to plate 2, the openings in column 12 will always correspond to the respective anchor parts. Adjusting wood 7 can be brought out in advance to ensure that the 5 column is placed at the correct height. The vertical adjustment of the column is relatively simple because the adjusting wood 7 is located in the center of the plate 2. When adjusting with bolt 7, the weak nuts 8 will be displaced relative to the thread. By tightening nuts 13, a firm and adjustable connection can be provided. Plate 2 is strong enough to absorb the compressive force from the column support bolt 7.

Begrepen zal worden dat meer dan twee ankers aanwezig kunnen zijn. Eventueel kan meer dan een stelhout 7 aanwezig zijn.It will be understood that more than two anchors may be present. More than one adjusting wood 7 may optionally be present.

In fig. 3 is een afdichtlijst afgebeeld die in het geheel met 17 aangegeven is. Deze bestaat uit een basisdeel 18 dat aan de onderzijde daarvan van een hecht- of kleeflaag 15 21 voorzien is. Met 20 is een opstaand deel afgebeeld dat uit een eenvoudig deformeer- baar kunststof of metallisch materiaal kan bestaan. Met 19 zijn inkepingen in het basisdeel 18 aangegeven waardoor dit gebogen kan worden zoals getoond wordt aan de hand van fig. 4.Fig. 3 shows a sealing strip, which is indicated in its entirety by 17. It consists of a base part 18 which is provided with an adhesive or adhesive layer 21 on the underside thereof. Reference number 20 shows an upright part which may consist of a simple deformable plastic or metallic material. 19 indicates notches in the base part 18, so that it can be bent as shown with reference to Fig. 4.

Fig. 4 toont de constructie volgens fig. 2 bij het aanbrengen van de afdichtlijst 17. 20 Met een zodanige afdichting wordt bereikt dat het mogelijk is in de ruimte tussen de onderzijde van kolom 12 en de bovenzijde van de gestorte betonnen vloer een verhoudingsgewijs dun vloeibaar gietbeton in te brengen. Dit is met 22 aangegeven. Een dergelijk beton heeft een bijzonder lage krimp zodat na het uitharden daarvan de kolom direct op het gestorte betonnen deel rust.Fig. 4 shows the construction according to FIG. 2 when the sealing strip 17 is fitted. 20 Sealing is achieved in such a way that it is possible in the space between the bottom of column 12 and the top of the poured concrete floor to use a proportionally thin liquid poured concrete in to bring. This is indicated by 22. Such a concrete has a particularly low shrinkage, so that after curing thereof the column rests directly on the poured concrete part.

25 Begrepen zal worden dat op deze wijze het tijdrovende vervaardigen van een mal, het verwijderen van de houten mal na het beton storten en het opbrengen van onderste draagmoeren op de ankerdelen voor het dragen van de kolom vermeden wordt. Door het werken met een dun vloeibaar beton kan op snelle en effectieve wijze verzekerd worden dat de volledige ruimte tussen de onderzijde van de kolom en de betonnen 30 vloer volledig gevuld is met beton zodat het maximale overdracht van draagkrachten verwezenlijkt wordt. Hierdoor kan enerzijds een aanzienlijke tijdbesparing en anderzijds een aanzienlijke verbetering van de kwaliteit van het opgeleverde produkt verkregen worden.It will be understood that in this way the time-consuming production of a mold, the removal of the wooden mold after pouring the concrete and the application of lower supporting nuts to the anchor parts for supporting the column are avoided. By working with a thin liquid concrete it can be ensured in a quick and effective manner that the entire space between the bottom of the column and the concrete floor is completely filled with concrete, so that the maximum transfer of load-bearing capacity is achieved. This means that on the one hand a considerable time saving and on the other hand a considerable improvement in the quality of the delivered product can be obtained.

1014031 61014031 6

In fig. 5 en 6 is een verdere variant van de bevestigingsconstructie volgens de uitvinding afgebeeld. Deze is in het geheel met 31 aangegeven. De ankerstaven zijn met 3 aangegeven. Deze bevestigingsconstructie bestaat uit een bevestigingsorgaan 30 opgebouwd uit strippen 32 en 33 die met behulp van bouten 38 met elkaar verbonden 5 zijn. Strip 32 is centraal voorzien van een schroefdraadbus 36 waarin een bout 37 geschroefd kan worden die als stelhout dient. Door het variëren van de strippen 32 en 33 kan in een veelheid van verschillende afmetingen voorzien worden. Gebleken is dat de steekafstand van de openingen 34 in de strippen 32 van constructie tot constructie zeer sterk wisselt. Op deze wijze kan zonder dat verdere maatregelen noodzakelijk zijn, 10 bij het in voorraad houden van een zeer beperkte groep strippen 32, 33 een breed scala verschillende steekafstanden bestreken worden.Figures 5 and 6 show a further variant of the fastening construction according to the invention. This is indicated in its entirety by 31. The anchor rods are indicated with 3. This fastening construction consists of a fastening member 30 built up of strips 32 and 33 which are connected to each other by means of bolts 38. Strip 32 is centrally provided with a threaded bush 36 into which a bolt 37 can be screwed which serves as adjusting wood. A variety of different sizes can be provided by varying the strips 32 and 33. It has been found that the pitch distance of the openings 34 in the strips 32 varies greatly from construction to construction. In this way, without further measures being necessary, a wide range of different spacing distances can be covered when stocking a very limited group of strips 32, 33.

De hier afgebeelde strippen kunnen uit kunststof materiaal bestaan. Deze kunnen zodanig uitgevoerd zijn, dat de ankers 3 daardoor gedrukt kunnen worden maar daardoor wel klemmend vastgehouden worden. Andere constructies zijn mogelijk 15 bijvoorbeeld hulsconstructies die om de draadankers aangrijpen en zowel van boven als van onderen daarop geschoven worden en daartussen het stripvormige deel 32 klemmend aangrijpen. Andere constructies voor het klemmend opnemen van de draadankers 3 zijn voorstelbaar. Dergelijke constructies kunnen bovendien zodanig uitgevoerd zijn dat de strippen 32, 34 na het instorten van de ankerdelen 3 op 20 eenvoudige wijze verwijderbaar zijn. Zo is het bevestigingsorgaan 30 opnieuw te gebruiken. Daarbij is het vanzelfsprekend essentieel dat de draadbus 36 in het gestorte beton achterblijft zodat stellen mogelijk blijft. Dergelijke varianten kunnen eveneens bij de uitvoering in de voorgaande figuren toegepast worden.The strips shown here can consist of plastic material. These can be designed in such a way that the anchors 3 can be pressed thereby, but are thereby clampedly held. Other constructions are possible, for example, sleeve constructions which engage around the wire anchors and are slid thereon from above as well as from below and clampingly engage the strip-shaped part 32 therebetween. Other constructions for clamping the wire anchors 3 are conceivable. Moreover, such constructions can be designed in such a way that the strips 32, 34 can be easily removed after the anchor parts 3 have collapsed. The fastening member 30 can thus be reused. It is of course essential that the threaded bush 36 remains in the poured concrete so that adjustment remains possible. Such variants can also be used in the embodiment in the previous figures.

Vanzelfsprekend is het mogelijk de uitstekende schroefdraaddelen tijdens trans-25 port en opslag maar ook tijdens het instorten met hulsvormige kunststof doppen of dergelijke te beschermen.It is of course possible to protect the protruding threaded parts during transport and storage, but also during the collapse with sleeve-shaped plastic caps or the like.

Deze en verdere varianten en wijzigingen van de hierboven beschreven constructie zijn voor de hand liggend voor degene bekwaam in de stand der techniek na het lezen van voorgaande beschrijving en liggen binnen het bereik van de bijgaande conclu-30 sies.These and further variants and modifications of the above-described construction are obvious to those skilled in the art after reading the foregoing description and are within the scope of the appended claims.

f Ö f 4031,f Ö f 4031,

Claims (11)

1. Bevestigingsconstructie (31) om een kolom (12) of dergelijke met een te storten betonconstructie (14) te verbinden, omvattende ten minste twee op afstand lig- 5 gende in te storten ankerdelen (3, 4), welke ankerdelen voorzien zijn van schroefdraad (5) voor bevestiging van die kolom of dergelijke, waarbij de bevestigingsconstructie omvat een bevestigingsorgaan (2, 30) waarin die ankerdelen aangebracht zijn, met het kenmerk, dat bevestigingsorgaan tussen de opname voor die ankerdelen is voorzien van stelmiddelen voor die kolom of dergelijke, welke stelmiddelen een ten opzichte van dat 10 orgaan naar buiten (boven) te brengen drager (7, 37) omvatten.Fixing structure (31) for connecting a column (12) or the like to a concrete structure (14) to be poured, comprising at least two spaced apart anchor parts (3, 4), which anchor parts are provided with screw thread (5) for fastening said column or the like, the fastening construction comprising a fastening member (2, 30) in which said anchor parts are arranged, characterized in that the fastening member between the accommodation for said anchor parts is provided with adjusting means for that column or the like , which adjusting means comprise a carrier (7, 37) which can be brought out (above) relative to said member. 2. Bevestigingsconstructie volgens conclusie 1, waarbij het in te storten deel van een ankerdeel (4) als van kop (10) voorziene bout is uitgevoerd.Fixing construction according to claim 1, wherein the part of an anchor part (4) to be cast is constructed as a bolt provided with head (10). 3. Bevestigingsconstructie volgens een van de voorgaande conclusies, waarbij dat bevestigingsorgaan een plaatvormig deel voorzien van openingen voor het opnemen van die ankerdelen omvat.Fixing construction according to any one of the preceding claims, wherein said fixing member comprises a plate-shaped part provided with openings for receiving said anchor parts. 4. Bevestigingsconstructie volgens een van de conclusies 1 of 2, waarbij dat 20 bevestigingsorgaan een stripvormig deel (33) omvat voorzien van openingen (34) voor het opnemen van die ankerdelen (3).Fixing construction according to either of claims 1 or 2, wherein said fixing member comprises a strip-shaped part (33) provided with openings (34) for receiving said anchor parts (3). 5. Bevestigingsconstructie volgens conclusie 4, omvattende ten minste twee met elkaar verbonden stripvormige delen (32,33). 25Fixing construction according to claim 4, comprising at least two mutually connected strip-shaped parts (32,33). 25 6. Bevestigingsconstructie volgens een van de voorgaande conclusies, waarbij dat bevestigingsorgaan na het instorten van die stelmiddelen verwijderbaar is.Fixing construction according to one of the preceding claims, wherein said fixing member is removable after collapsing said adjusting means. 7. Bevestigingsconstructie volgens een van de voorgaande conclusies, waarbij 30 dat bevestigingsorgaan middelen voor het tijdelijk bevestigen daarvan aan overige wapeningsdelen van de te storten constructie omvat. 1014031Fastening construction according to one of the preceding claims, wherein said fastening member comprises means for temporarily fastening it to other reinforcement parts of the construction to be poured. 1014031 8. Bevestigingsconstructie volgens een van de voorgaande conclusies omvattende een afdichtlijst (17).Fixing construction according to one of the preceding claims, comprising a sealing strip (17). 9. Bevestigingsconstructie volgens conclusie 8, waarbij die afdichtlijst een 5 horizontaal basisdeel (18) en een in hoofdzaak verticaal daarvan uitstekend afdichtdeel (20) omvat.Fastening construction according to claim 8, wherein said sealing strip comprises a horizontal base part (18) and a substantially vertical projecting sealing part (20) thereof. 10. Bevestigingsconstructie volgens conclusie 8 of 9, waarbij dat basisdeel van hechtmiddelen (21) voorzien is. 10Fixing construction according to claim 8 or 9, wherein said base part is provided with adhesive means (21). 10 11. Werkwijze voor het plaatsen van een kolom, omvattende het in beton storten van een bevestigingsconstructie volgens een van de conclusies 1-7, gevolgd door het om de bevestigingsconstructie aanbrengen van een afdichtlijst volgens een van de conclusies 8-10, waarna de ruimte binnen die lijst met een uithardbare gietmassa 15 gevuld wordt. 1014031Method for placing a column, comprising pouring a fastening construction according to any one of claims 1-7 into concrete, followed by placing a sealing strip according to one of claims 8-10 around the fastening construction, after which the space has that list is filled with a curable casting compound 15. 1014031
NL1014031A 2000-01-06 2000-01-06 Fixing construction as well as method for applying it. NL1014031C2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
NL1014031A NL1014031C2 (en) 2000-01-06 2000-01-06 Fixing construction as well as method for applying it.
EP01200028A EP1114904B1 (en) 2000-01-06 2001-01-05 Fixing structure and method for the installation thereof
AT01200028T ATE307945T1 (en) 2000-01-06 2001-01-05 MOUNTING DESIGN AND INSTALLATION PROCEDURES
DE60114252T DE60114252T2 (en) 2000-01-06 2001-01-05 Fixing construction and installation procedure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1014031A NL1014031C2 (en) 2000-01-06 2000-01-06 Fixing construction as well as method for applying it.
NL1014031 2000-01-06

Publications (1)

Publication Number Publication Date
NL1014031C2 true NL1014031C2 (en) 2001-07-11

Family

ID=19770563

Family Applications (1)

Application Number Title Priority Date Filing Date
NL1014031A NL1014031C2 (en) 2000-01-06 2000-01-06 Fixing construction as well as method for applying it.

Country Status (4)

Country Link
EP (1) EP1114904B1 (en)
AT (1) ATE307945T1 (en)
DE (1) DE60114252T2 (en)
NL (1) NL1014031C2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007018335B4 (en) * 2007-04-18 2015-09-03 Wolfgang Freimoser Foundation for a mast
DE102009037473B4 (en) * 2009-07-13 2020-12-03 Apple Inc. Interior work
DE102011117629A1 (en) * 2011-11-04 2013-05-08 Weinor Gmbh & Co. Kg Post support, has flange attached at base plate at adjusted inclination against base plate by circumferentially-distributed fastening screws, where inclination of support is adjusted against base plate by adjustable distance unit
US10590672B2 (en) * 2017-10-13 2020-03-17 Salesforce.Com, Inc. Post installation bracket
AT521639B1 (en) * 2018-08-22 2020-07-15 European Trans Energy Gmbh Steel mast
US10774562B1 (en) * 2019-07-29 2020-09-15 Alumiworks, Inc. Railing anchor
US11933062B2 (en) * 2019-10-29 2024-03-19 Philip John Elpers Vibration damping anchoring system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3323765A (en) * 1965-07-06 1967-06-06 Harsco Corp Support for lighting standards
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3323765A (en) * 1965-07-06 1967-06-06 Harsco Corp Support for lighting standards
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement

Also Published As

Publication number Publication date
EP1114904A1 (en) 2001-07-11
DE60114252D1 (en) 2005-12-01
ATE307945T1 (en) 2005-11-15
DE60114252T2 (en) 2006-07-13
EP1114904B1 (en) 2005-10-26

Similar Documents

Publication Publication Date Title
US5956922A (en) Wall forming system and method of forming a wall of hardenable material
US5809722A (en) Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors
AU2007214294B2 (en) Sidewall construction of a casting mold
NL1014031C2 (en) Fixing construction as well as method for applying it.
KR102143636B1 (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
FI116476B (en) support elements
JPH11500798A (en) How to build a suspended floor
KR20160124047A (en) Supporting Apparatus For Beam Form
US6513785B1 (en) Concrete deck forming apparatus and method
AU2020202012A1 (en) A concrete formwork brace
KR101014195B1 (en) Prestessed Composite beam having Profiled Steel Web
US5234188A (en) Structural supporting system for concrete construction forms
US20100243857A1 (en) Concrete hanger bracket
AU2414001A (en) Method of constructing formwork and an element for casting concrete components
KR200442551Y1 (en) Bracket for supporting a mold
KR101518034B1 (en) manufacturing method for concrete column having self-restraint features
KR20000017809A (en) Over Brige Gentlever Slide Steel Form
CA1172229A (en) Skid for heavy machinery and method for constructing same
KR200378317Y1 (en) slab table mould
KR20190000607U (en) Safety railing for Form Meong-yeoi
KR20020053795A (en) A mold supporting device of slab
KR102554569B1 (en) Column fixing band for slab mold installation
NL1031964C1 (en) Method for placing a mounting device on an already placed foundation element and a mounting device intended for use in the method.
KR200163719Y1 (en) Over Brige Gentlever Slide Steel Form
JP3347937B2 (en) Method of assembling concrete formwork, formwork fixing tool used for this method, and positioning tool for level adjustment material

Legal Events

Date Code Title Description
PD2B A search report has been drawn up
VD1 Lapsed due to non-payment of the annual fee

Effective date: 20060801