MY178609A - Integrated well survey management and planning tool - Google Patents

Integrated well survey management and planning tool

Info

Publication number
MY178609A
MY178609A MYPI2016700753A MYPI2016700753A MY178609A MY 178609 A MY178609 A MY 178609A MY PI2016700753 A MYPI2016700753 A MY PI2016700753A MY PI2016700753 A MYPI2016700753 A MY PI2016700753A MY 178609 A MY178609 A MY 178609A
Authority
MY
Malaysia
Prior art keywords
well
drilling
tool
uncertainty
survey
Prior art date
Application number
MYPI2016700753A
Inventor
Ronald Johannes Dirksen
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to MYPI2016700753A priority Critical patent/MY178609A/en
Priority claimed from PCT/US2013/063818 external-priority patent/WO2015053748A1/en
Publication of MY178609A publication Critical patent/MY178609A/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

In one example, an integrated well survey management and planning tool is implemented by a computer system (100). The tool can receive (204, 206) a trajectory of a proposed well from a surface to a subterranean geological target to be reached by drilling the well, and a survey plan indicating the number, position and survey type of surveys to be performed on the well while drilling the well. The tool can apply (210) multiple error models based on the survey type for drilling the well. Each error model defines a respective uncertainty in reaching the subterranean geological target by drilling the well along the received trajectory. The tool can display (212), in a user interface (114), the received trajectory of the well and an uncertainty indicator determined by applying the multiple error models. The uncertainty indicator represents a combination of respective uncertainties defined by the multiple error models and indicates an uncertainty in drilling the well on the received trajectory. FIGURE 1
MYPI2016700753A 2013-10-08 2013-10-08 Integrated well survey management and planning tool MY178609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
MYPI2016700753A MY178609A (en) 2013-10-08 2013-10-08 Integrated well survey management and planning tool

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
MYPI2016700753A MY178609A (en) 2013-10-08 2013-10-08 Integrated well survey management and planning tool
PCT/US2013/063818 WO2015053748A1 (en) 2013-10-08 2013-10-08 Integrated well survey management and planning tool

Publications (1)

Publication Number Publication Date
MY178609A true MY178609A (en) 2020-10-18

Family

ID=79730811

Family Applications (1)

Application Number Title Priority Date Filing Date
MYPI2016700753A MY178609A (en) 2013-10-08 2013-10-08 Integrated well survey management and planning tool

Country Status (1)

Country Link
MY (1) MY178609A (en)

Similar Documents

Publication Publication Date Title
GB2537476A (en) Integrated well survey management and planning tool
GB201318210D0 (en) Methods and computing systems for hydrocarbon exploration
GB201317827D0 (en) Computer-Based method for real-time three-dimensional geological model calculation and reservoir navigation
MX2015017673A (en) System and method for selecting a drilling path based on cost.
MX2013004312A (en) Real-time definitive survey while drilling.
MX2014007838A (en) Method and system of planning and/or drilling wellbores.
AR098175A1 (en) REAL-TIME RISK PREDICTION DURING DRILLING OPERATIONS
SA516370635B1 (en) Method and apparatus for automated horizon picking operation on different volumes
GB2535039A (en) Method and analysis for holistic casing design for planning and real-time
GB2491715B (en) Prospect assessment and play chance mapping tools
GB2546046A (en) Structure tensor constrained tomographic velocity analysis
SA518391607B1 (en) Methods of Selecting an Earth Model from a Plurality of Earth Models
GB2547592A (en) Statistical approach to incorporate uncertainties of parameters in simulation results and stability analysis for earth drilling
AR097876A1 (en) REAL-TIME RISK PREDICTION DURING DRILLING OPERATIONS
MX2013008679A (en) Methods and systems regarding models of underground formations.
GB2536123A (en) Integrated oilfield asset modeling using multiple resolutions of reservoir detail
MX2016009813A (en) Estimation and monitoring of casing wear during a drilling operation using casing wear maps.
MX353194B (en) Formation compositional evaluation using normalized differential data.
GB2521297A (en) Method of orienting a second borehole relative to a first borehole
WO2012162433A3 (en) Method and apparatus for determining a location to acquire geophysical data
WO2014018414A3 (en) Stratigraphic modeling using production data density profiles
GB2575418A (en) System and methods for evaluating a formation using pixelated solutions of formation data
GB2569900A (en) Geostatistical analysis of microseismic data in fracture modelling
GB2545292A (en) Planning drilling operations using models and rig market databases
MX2012006245A (en) Non-linear tomography method for main axis of symmetry of anisotropic velocity model and apparatus.