Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services IncfiledCriticalHalliburton Energy Services Inc
Priority to MYPI2016000424ApriorityCriticalpatent/MY174115A/en
Priority claimed from PCT/US2013/063815external-prioritypatent/WO2015053747A1/en
Publication of MY174115ApublicationCriticalpatent/MY174115A/en
In one example, an integrated well survey management and planning tool is implemented by a computer system (100). The tool can receive (402) survey data describing a well being drilled from a surface to a subterranean geological target to be reached by drilling the well. The well is associated with a target trajectory on which the well is to be drilled from the surface to the subterranean geological target. Based, at least in part, on the survey data and the target trajectory, the tool determines ( 404) an uncertainty indicator indicating an uncertainty in drilling the well on the target trajectory, and displays (406) the uncertainty indicator in a user interface (114). Fig. 1
MYPI2016000424A2013-10-082013-10-08Integrated well survey management and planning tool
MY174115A
(en)