Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vpec IncfiledCriticalVpec Inc
Priority to MYPI20093526priorityCriticalpatent/MY150742A/en
Publication of MY150742ApublicationCriticalpatent/MY150742A/en
Supply And Distribution Of Alternating Current
(AREA)
Abstract
THE ELECTRIC POWER SUPPLY AND DEMAND CONTROL DEVICE (104) JUDGES WHETHER OR NOT ELECTRIC POWER SHORTAGE IS OCCURRED OR WHETHER OR NOT ELECTRIC POWER SURPLUS IS OCCURRED IN THE ELECTRIC POWER SUPPLIER AND DEMANDER (11) PROVIDED WITH THE ELECTRIC POWER SUPPLY AND DEMAND CONTROL DEVICE (51) BASED ON DATA ON TOTAL ELECTRIC ENERGY, THE AMOUNT OF MAXIMUM ELECTRIC POWER DEMANDED, AND THE AMOUNT OF TOTAL ELECTRIC POWER DEMANDED OF THE FOLLOWING DAY IN EACH ELECTRIC POWER SUPPLIER AND DEMANDER, PREDICTED BY A NEURAL NETWORK; RECEIVES ELECTRIC POWER FROM OTHER ELECTRIC POWER SUPPLIERS AND DEMANDERS (12 TO 15) PROVIDED WITH THE POWER GENERATION DEVICES (101 AND 151) AND/OR THE ELECTRICAL STORAGE DEVICES (102 AND 152) IN THE CASE WHERE ELECTRIC POWER SHORTAGE IS OCCURRED IN THE ELECTRIC POWER SUPPLIER AND DEMANDER (11); AND CONTROLS TO DELIVER ELECTRIC POWER TO OTHER ELECTRIC POWER SUPPLIERS AND DEMANDERS (12 TO 15) IN THE CASE WHERE ELECTRIC POWER SURPLUS IS OCCURRED IN THE ELECTRIC POWER SUPPLIER AND DEMANDER (11).
MYPI200935262007-03-262007-03-26Electric power system
MY150742A
(en)