Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by James W FranklinfiledCriticalJames W Franklin
Priority to MYPI9503174priorityCriticalpatent/MY123723A/en
Publication of MY123723ApublicationCriticalpatent/MY123723A/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
APPARATUS FOR ''TOP -DOWN" CONSTRUCTION TECHNIQUE IS DESCRIBED. DECK FORMWORK ASSEMBLIES (12) FOR EACH STRUCTURAL CONCRETE SLAB ARE LOWERED AND SUPPORTED FROM THE LEVEL ABOVE THE SAME. IN THE PREFERRED ARRANGEMENT THE DECK FORMWORK ASSEMBLIES (12) FOR EACH STRUCTURAL SLAB ARE SUPPORTED BY THE CONCRETE SLAB (44) ITSELF ABOVE THE PROPOSED LOCATION OF THE NEW STRUCTURAL SLAB.(FIG.1B)
MYPI95031741995-10-201995-10-20Concrete building frame construction apparatus.
MY123723A
(en)
Building unit for fundamental building constructions and method for forming reinforced concrete respectively concrete piers and method for forming wall structures from building units of small or medium size
PANELS FOR THE CONSTRUCTION OF FORMWORKS WITHOUT THE AID OF EXTERNAL STRUCTURES FOR SUPPORTING THE SAME PANELS, FOR THE CONCRETE CASTING OF VERTICAL WALLS OF VARIOUS THICKNESS INCLUDED BETWEEN TWO HORIZONTAL SLABS, ONE LOWER AND ONE UPPER, ONE