MX2012010158A - Fracturacion de una formacion subterranea de esfuerzos alterados. - Google Patents
Fracturacion de una formacion subterranea de esfuerzos alterados.Info
- Publication number
- MX2012010158A MX2012010158A MX2012010158A MX2012010158A MX2012010158A MX 2012010158 A MX2012010158 A MX 2012010158A MX 2012010158 A MX2012010158 A MX 2012010158A MX 2012010158 A MX2012010158 A MX 2012010158A MX 2012010158 A MX2012010158 A MX 2012010158A
- Authority
- MX
- Mexico
- Prior art keywords
- subterranean formation
- well bore
- injection
- altered
- formation
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 title abstract 7
- 238000002347 injection Methods 0.000 abstract 7
- 239000007924 injection Substances 0.000 abstract 7
- 239000012530 fluid Substances 0.000 abstract 2
- 230000011664 signaling Effects 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/114—Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Earth Drilling (AREA)
- Control Of Turbines (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Un pozo en una formación subterránea incluye un subsistema de señalización (114) acoplado comunicablemente a herramientas de inyección (212) instaladas en el pozo. Cada herramienta de inyección controla un flujo de fluido en un intervalo (118a, 118b, 118c, 118d) de la formación con base en un estado de la herramienta de inyección. Los esfuerzos en la formación subterránea se alteran con la creación de fracturas (302a, 302b) en la formación. Se envían señales de control desde el pozo a la superficie a través del subsistema de señalización (114) a las herramientas de inyección (212) para modificar los estados de una o más de las herramientas de inyección. Se inyecta fluido en la formación subterránea de esfuerzos alterados a través de las herramientas de inyección para crear una red de fracturas en la formación subterránea. En algunas implementaciones, el estado de cada herramienta de inyección se puede manipular selectivamente y repetidamente con base en señales transmitidas desde el pozo a la superficie, en algunas implementaciones, se modifican los esfuerzos y/o se crea la red de fracturas a lo largo de una porción sustancial y/o toda la longitud de un pozo horizontal.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/715,226 US8210257B2 (en) | 2010-03-01 | 2010-03-01 | Fracturing a stress-altered subterranean formation |
PCT/GB2011/000277 WO2011107732A2 (en) | 2010-03-01 | 2011-03-01 | Fracturing a stress-altered subterranean formation |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2012010158A true MX2012010158A (es) | 2013-01-14 |
Family
ID=44504670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2012010158A MX2012010158A (es) | 2010-03-01 | 2011-03-01 | Fracturacion de una formacion subterranea de esfuerzos alterados. |
Country Status (8)
Country | Link |
---|---|
US (1) | US8210257B2 (es) |
EP (1) | EP2542758A2 (es) |
CN (1) | CN102884277B (es) |
AR (1) | AR080334A1 (es) |
AU (1) | AU2011222763B9 (es) |
CA (1) | CA2791758C (es) |
MX (1) | MX2012010158A (es) |
WO (1) | WO2011107732A2 (es) |
Families Citing this family (73)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US9796918B2 (en) | 2013-01-30 | 2017-10-24 | Halliburton Energy Services, Inc. | Wellbore servicing fluids and methods of making and using same |
US8631872B2 (en) | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US9016376B2 (en) | 2012-08-06 | 2015-04-28 | Halliburton Energy Services, Inc. | Method and wellbore servicing apparatus for production completion of an oil and gas well |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
US20130180722A1 (en) * | 2009-12-04 | 2013-07-18 | Schlumberger Technology Corporation | Technique of fracturing with selective stream injection |
US8490704B2 (en) * | 2009-12-04 | 2013-07-23 | Schlumberger Technology | Technique of fracturing with selective stream injection |
WO2011093902A1 (en) | 2010-02-01 | 2011-08-04 | Halliburton Energy Services, Inc. | Method and apparatus for sealing an annulus of a wellbore |
US9069099B2 (en) * | 2010-02-02 | 2015-06-30 | Schlumberger Technology Corporation | Method and apparatus for monitoring acoustic activity in a subsurface formation |
US20110284214A1 (en) * | 2010-05-19 | 2011-11-24 | Ayoub Joseph A | Methods and tools for multiple fracture placement along a wellbore |
GB201020358D0 (en) * | 2010-12-01 | 2011-01-12 | Qinetiq Ltd | Fracture characterisation |
US8967262B2 (en) * | 2011-09-14 | 2015-03-03 | Baker Hughes Incorporated | Method for determining fracture spacing and well fracturing using the method |
CN103362487A (zh) * | 2012-03-29 | 2013-10-23 | 中国石油天然气股份有限公司 | 一种低渗透油藏水平井的分段压裂方法 |
GB2503903B (en) * | 2012-07-11 | 2015-08-26 | Schlumberger Holdings | Fracture monitoring and characterisation |
US9151147B2 (en) | 2012-07-25 | 2015-10-06 | Stelford Energy, Inc. | Method and apparatus for hydraulic fracturing |
US9394774B2 (en) | 2012-08-20 | 2016-07-19 | Texas Tech University System | Methods and devices for hydraulic fracturing design and optimization: a modification to zipper frac |
WO2014036742A1 (en) * | 2012-09-10 | 2014-03-13 | Schlumberger Canada Limited | Method for transverse fracturing of a subterranean formation |
US10436002B2 (en) | 2012-10-04 | 2019-10-08 | Texas Tech University System | Method for enhancing fracture propagation in subterranean formations |
CN102979495B (zh) * | 2012-12-28 | 2016-06-29 | 中国石油集团渤海钻探工程有限公司 | 裸眼水平井多簇限流压裂管柱及其压裂方法 |
CN103075138B (zh) * | 2013-01-10 | 2015-09-23 | 中国海洋石油总公司 | 一种水平井分段压裂、分段采油一体化管柱 |
US9297250B2 (en) | 2013-03-14 | 2016-03-29 | Halliburton Energy Services, Inc. | Controlling net treating pressure in a subterranean region |
US9217318B2 (en) | 2013-03-14 | 2015-12-22 | Halliburton Energy Services, Inc. | Determining a target net treating pressure for a subterranean region |
CN104213891B (zh) * | 2013-06-05 | 2017-11-07 | 中国石油天然气股份有限公司 | 老井重复改造用连续油管可控封隔器工艺管柱 |
CA2820742A1 (en) * | 2013-07-04 | 2013-09-20 | IOR Canada Ltd. | Improved hydrocarbon recovery process exploiting multiple induced fractures |
WO2015030837A1 (en) * | 2013-08-27 | 2015-03-05 | Halliburton Energy Services, Inc. | Simulating fluid leak-off and flow-back in a fractured subterranean |
US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
US9551208B2 (en) | 2013-08-26 | 2017-01-24 | Halliburton Energy Services, Inc. | Identifying uncertainty associated with a stimulated reservoir volume (SRV) calculation |
US9529104B2 (en) | 2013-08-26 | 2016-12-27 | Halliburton Energy Services, Inc. | Indentifying a stimulated reservoir volume from microseismic data |
US9903189B2 (en) | 2013-08-26 | 2018-02-27 | Halliburton Energy Services, Inc. | Real-time stimulated reservoir volume calculation |
US9523275B2 (en) | 2013-08-26 | 2016-12-20 | Halliburton Energy Services, Inc. | Identifying an axis of a stimulated reservoir volume for a stimulation treatment of a subterranean region |
US9529103B2 (en) | 2013-08-26 | 2016-12-27 | Halliburton Energy Services, Inc. | Identifying overlapping stimulated reservoir volumes for a multi-stage injection treatment |
US9574443B2 (en) | 2013-09-17 | 2017-02-21 | Halliburton Energy Services, Inc. | Designing an injection treatment for a subterranean region based on stride test data |
US9702247B2 (en) | 2013-09-17 | 2017-07-11 | Halliburton Energy Services, Inc. | Controlling an injection treatment of a subterranean region based on stride test data |
US9500076B2 (en) | 2013-09-17 | 2016-11-22 | Halliburton Energy Services, Inc. | Injection testing a subterranean region |
CA2863764A1 (en) * | 2013-09-19 | 2015-03-19 | Shell Internationale Research Maatschappij B.V. | Phased stimulation methods |
US9926769B2 (en) | 2013-11-07 | 2018-03-27 | Baker Hughes, A Ge Company, Llc | Systems and methods for downhole communication |
US9366124B2 (en) * | 2013-11-27 | 2016-06-14 | Baker Hughes Incorporated | System and method for re-fracturing multizone horizontal wellbores |
US10221667B2 (en) | 2013-12-13 | 2019-03-05 | Schlumberger Technology Corporation | Laser cutting with convex deflector |
WO2015089458A1 (en) | 2013-12-13 | 2015-06-18 | Schlumberger Canada Limited | Creating radial slots in a wellbore |
EP3084124B1 (en) | 2013-12-18 | 2019-05-08 | ConocoPhillips Company | Method for determining hydraulic fracture orientation and dimension |
AR099425A1 (es) | 2014-02-19 | 2016-07-20 | Shell Int Research | Método para proveer fracturas múltiples en una formación |
WO2015147873A1 (en) * | 2014-03-28 | 2015-10-01 | MBJ Water Partners | Use of ionized fluid in hydraulic fracturing |
GB2531982B (en) * | 2014-06-11 | 2020-06-03 | Advantek Int Corporation | Quantifying a reservoir volume and pump pressure limit |
MX2017000006A (es) | 2014-06-30 | 2017-06-20 | Advantek Int Corp | Generacion de lechadas y eliminacion de residuos por bombeo a presion hacia una formacion de subsuperficie. |
US9976402B2 (en) | 2014-09-18 | 2018-05-22 | Baker Hughes, A Ge Company, Llc | Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool |
US9708906B2 (en) * | 2014-09-24 | 2017-07-18 | Baker Hughes Incorporated | Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool |
EP3212884B1 (en) | 2014-10-30 | 2021-03-03 | Services Petroliers Schlumberger | Method of creating radial slots in a subterranean formation |
US9695681B2 (en) * | 2014-10-31 | 2017-07-04 | Baker Hughes Incorporated | Use of real-time pressure data to evaluate fracturing performance |
US10626706B2 (en) * | 2014-11-19 | 2020-04-21 | Halliburton Energy Services, Inc. | Junction models for simulating proppant transport in dynamic fracture networks |
US10301913B2 (en) | 2014-12-31 | 2019-05-28 | Halliburton Energy Services, Inc. | Optimizing running operations |
WO2016108893A1 (en) | 2014-12-31 | 2016-07-07 | Halliburton Energy Services, Inc. | Optimizing completion operations |
WO2016108883A1 (en) * | 2014-12-31 | 2016-07-07 | Halliburton Energy Services, Inc. | Optimizing stimulation and fluid management operations |
US20170328179A1 (en) * | 2014-12-31 | 2017-11-16 | Halliburton Energy Services, Inc. | Hydraulic Fracturing Apparatus, Methods, and Systems |
US20160201440A1 (en) * | 2015-01-13 | 2016-07-14 | Schlumberger Technology Corporation | Fracture initiation with auxiliary notches |
RU2591999C1 (ru) * | 2015-04-21 | 2016-07-20 | Шлюмберже Текнолоджи Б.В. | Способ ориентирования трещин гидравлического разрыва в подземном пласте, вскрытом горизонтальными стволами |
US10190582B2 (en) | 2015-10-28 | 2019-01-29 | Caterpillar Inc. | Systems and methods for collecting high frequency data associated with a pump by utilizing an FPGA controller |
CN107304670A (zh) * | 2016-04-19 | 2017-10-31 | 中国石油天然气股份有限公司 | 分段改造管柱 |
CA3023453A1 (en) * | 2016-07-08 | 2018-01-11 | Landmark Graphics Corporation | Geological settings prone to casing deformation post hydraulic fracture injection |
US20200325751A1 (en) * | 2016-07-08 | 2020-10-15 | Landmark Graphics Corporation | Mitigation of casing deformation associated with geological settings prone to casing deformation post hydraulic fracture injection |
CN106194141A (zh) * | 2016-08-19 | 2016-12-07 | 中国石油天然气股份有限公司 | 基于体积压裂下缝网形成的工艺方法 |
WO2018102274A1 (en) | 2016-11-29 | 2018-06-07 | Conocophillips Company | Engineered stress state with multi-well completions |
US10753181B2 (en) | 2016-11-29 | 2020-08-25 | Conocophillips Company | Methods for shut-in pressure escalation analysis |
CN106837283A (zh) * | 2017-01-09 | 2017-06-13 | 胡少斌 | Co2基纳米聚能混相流的压裂驱替高温裂解一体化系统 |
US11091994B2 (en) | 2017-02-08 | 2021-08-17 | Schlumberger Technology Corporation | Method of refracturing in a horizontal well |
CN106761606B (zh) * | 2017-02-14 | 2019-03-15 | 中国石油大学(北京) | 对称式布缝的异井异步注co2采油方法 |
US11215034B2 (en) | 2017-04-19 | 2022-01-04 | Landmark Graphics Corporation | Controlling redistribution of suspended particles in non-Newtonian fluids during stimulation treatments |
WO2019014090A2 (en) * | 2017-07-10 | 2019-01-17 | Texas Tech University System | METHODS AND SYSTEMS FOR HYDRAULIC BALLOON FRACTURES AND COMPLEX END FLOODING |
US11209558B2 (en) | 2018-05-09 | 2021-12-28 | Conocophillips Company | Measurement of poroelastic pressure response |
BR112021001196A2 (pt) | 2018-07-27 | 2021-04-27 | Baker Hughes Holdings Llc | sistema de injeção de fluido distribuído para furos de poço |
WO2020190942A1 (en) | 2019-03-18 | 2020-09-24 | Magnetic Variation Services, Llc | Steering a wellbore using stratigraphic misfit heat maps |
US11946360B2 (en) | 2019-05-07 | 2024-04-02 | Magnetic Variation Services, Llc | Determining the likelihood and uncertainty of the wellbore being at a particular stratigraphic vertical depth |
CN111077576A (zh) * | 2019-12-12 | 2020-04-28 | 天地科技股份有限公司 | 地面压裂的监测方法 |
Family Cites Families (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4828028A (en) | 1987-02-09 | 1989-05-09 | Halliburton Company | Method for performing fracturing operations |
US4797821A (en) | 1987-04-02 | 1989-01-10 | Halliburton Company | Method of analyzing naturally fractured reservoirs |
US4836280A (en) | 1987-09-29 | 1989-06-06 | Halliburton Company | Method of evaluating subsurface fracturing operations |
US5050674A (en) | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
US5005643A (en) | 1990-05-11 | 1991-04-09 | Halliburton Company | Method of determining fracture parameters for heterogenous formations |
US5111881A (en) | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5472049A (en) * | 1994-04-20 | 1995-12-05 | Union Oil Company Of California | Hydraulic fracturing of shallow wells |
US5558161A (en) | 1995-02-02 | 1996-09-24 | Halliburton Company | Method for controlling fluid-loss and fracturing high permeability subterranean formations |
US6070664A (en) | 1998-02-12 | 2000-06-06 | Halliburton Energy Services | Well treating fluids and methods |
US6481494B1 (en) | 1997-10-16 | 2002-11-19 | Halliburton Energy Services, Inc. | Method and apparatus for frac/gravel packs |
US6659184B1 (en) | 1998-07-15 | 2003-12-09 | Welldynamics, Inc. | Multi-line back pressure control system |
US6179052B1 (en) | 1998-08-13 | 2001-01-30 | Halliburton Energy Services, Inc. | Digital-hydraulic well control system |
US6567013B1 (en) | 1998-08-13 | 2003-05-20 | Halliburton Energy Services, Inc. | Digital hydraulic well control system |
US6470970B1 (en) | 1998-08-13 | 2002-10-29 | Welldynamics Inc. | Multiplier digital-hydraulic well control system and method |
US6552665B1 (en) * | 1999-12-08 | 2003-04-22 | Schlumberger Technology Corporation | Telemetry system for borehole logging tools |
DE60041791D1 (de) | 2000-05-22 | 2009-04-23 | Welldynamics Inc | Hydraulisch betätigte dosiervorrichtung zur benutzung in einem unterirdischen bohrloch |
US20040011534A1 (en) | 2002-07-16 | 2004-01-22 | Simonds Floyd Randolph | Apparatus and method for completing an interval of a wellbore while drilling |
US6795773B2 (en) | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US6702019B2 (en) | 2001-10-22 | 2004-03-09 | Halliburton Energy Services, Inc. | Apparatus and method for progressively treating an interval of a wellbore |
US6772837B2 (en) | 2001-10-22 | 2004-08-10 | Halliburton Energy Services, Inc. | Screen assembly having diverter members and method for progressively treating an interval of a welibore |
US6907936B2 (en) | 2001-11-19 | 2005-06-21 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US6776238B2 (en) | 2002-04-09 | 2004-08-17 | Halliburton Energy Services, Inc. | Single trip method for selectively fracture packing multiple formations traversed by a wellbore |
US7021384B2 (en) | 2002-08-21 | 2006-04-04 | Packers Plus Energy Services Inc. | Apparatus and method for wellbore isolation |
US7108067B2 (en) | 2002-08-21 | 2006-09-19 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US7025134B2 (en) | 2003-06-23 | 2006-04-11 | Halliburton Energy Services, Inc. | Surface pulse system for injection wells |
US7114560B2 (en) | 2003-06-23 | 2006-10-03 | Halliburton Energy Services, Inc. | Methods for enhancing treatment fluid placement in a subterranean formation |
US7013980B2 (en) | 2003-08-19 | 2006-03-21 | Welldynamics, Inc. | Hydraulically actuated control system for use in a subterranean well |
US7445045B2 (en) | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US7210856B2 (en) | 2004-03-02 | 2007-05-01 | Welldynamics, Inc. | Distributed temperature sensing in deep water subsea tree completions |
US6995683B2 (en) | 2004-03-12 | 2006-02-07 | Welldynamics, Inc. | System and method for transmitting downhole data to the surface |
US7225869B2 (en) | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
GB0407982D0 (en) | 2004-04-08 | 2004-05-12 | Wood Group Logging Services In | "Methods of monitoring downhole conditions" |
US20110141846A1 (en) | 2004-04-21 | 2011-06-16 | Pinnacle Technologies, Inc. | Microseismic fracture mapping using seismic source timing measurements for velocity calibration |
US7159468B2 (en) | 2004-06-15 | 2007-01-09 | Halliburton Energy Services, Inc. | Fiber optic differential pressure sensor |
US7090153B2 (en) | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7391675B2 (en) | 2004-09-17 | 2008-06-24 | Schlumberger Technology Corporation | Microseismic event detection and location by continuous map migration |
US20060070740A1 (en) * | 2004-10-05 | 2006-04-06 | Surjaatmadja Jim B | System and method for fracturing a hydrocarbon producing formation |
US7543635B2 (en) * | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
US7228908B2 (en) | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
US7273099B2 (en) | 2004-12-03 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods of stimulating a subterranean formation comprising multiple production intervals |
US7788037B2 (en) | 2005-01-08 | 2010-08-31 | Halliburton Energy Services, Inc. | Method and system for determining formation properties based on fracture treatment |
US20060201674A1 (en) | 2005-03-10 | 2006-09-14 | Halliburton Energy Services, Inc. | Methods of treating subterranean formations using low-temperature fluids |
CA2604654C (en) | 2005-04-20 | 2011-08-30 | Welldynamics, Inc. | Direct proportional surface control system for downhole choke |
WO2006124024A1 (en) | 2005-05-13 | 2006-11-23 | Welldynamics, Inc. | Single line control module for well tool actuation |
US7431090B2 (en) | 2005-06-22 | 2008-10-07 | Halliburton Energy Services, Inc. | Methods and apparatus for multiple fracturing of subterranean formations |
US7325597B2 (en) | 2005-07-15 | 2008-02-05 | Welldynamics, B.V. | Safety valve apparatus for downhole pressure transmission systems |
CA2618848C (en) | 2005-08-15 | 2009-09-01 | Welldynamics, Inc. | Pulse width modulated downhole flow control |
US7343975B2 (en) | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
US7946340B2 (en) * | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
US20070272407A1 (en) | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US7478676B2 (en) | 2006-06-09 | 2009-01-20 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US7575062B2 (en) | 2006-06-09 | 2009-08-18 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US8874376B2 (en) | 2006-10-06 | 2014-10-28 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
CN201057037Y (zh) * | 2007-06-27 | 2008-05-07 | 吉林石油集团有限责任公司 | 水平井一次上提压裂管柱 |
US7580796B2 (en) | 2007-07-31 | 2009-08-25 | Halliburton Energy Services, Inc. | Methods and systems for evaluating and treating previously-fractured subterranean formations |
US7647183B2 (en) | 2007-08-14 | 2010-01-12 | Schlumberger Technology Corporation | Method for monitoring seismic events |
US20090125280A1 (en) | 2007-11-13 | 2009-05-14 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US8960292B2 (en) * | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
CN101560877A (zh) * | 2008-12-31 | 2009-10-21 | 中国石油化工股份有限公司胜利油田分公司采油工艺研究院 | 水平井封隔器分段压裂工艺管柱 |
US8386226B2 (en) * | 2009-11-25 | 2013-02-26 | Halliburton Energy Services, Inc. | Probabilistic simulation of subterranean fracture propagation |
-
2010
- 2010-03-01 US US12/715,226 patent/US8210257B2/en active Active
-
2011
- 2011-02-28 AR ARP110100610A patent/AR080334A1/es active IP Right Grant
- 2011-03-01 WO PCT/GB2011/000277 patent/WO2011107732A2/en active Application Filing
- 2011-03-01 CA CA2791758A patent/CA2791758C/en active Active
- 2011-03-01 MX MX2012010158A patent/MX2012010158A/es active IP Right Grant
- 2011-03-01 CN CN201180022151.1A patent/CN102884277B/zh not_active Expired - Fee Related
- 2011-03-01 EP EP11707896A patent/EP2542758A2/en not_active Withdrawn
- 2011-03-01 AU AU2011222763A patent/AU2011222763B9/en active Active
Also Published As
Publication number | Publication date |
---|---|
WO2011107732A2 (en) | 2011-09-09 |
EP2542758A2 (en) | 2013-01-09 |
US8210257B2 (en) | 2012-07-03 |
CN102884277B (zh) | 2016-03-09 |
AR080334A1 (es) | 2012-03-28 |
AU2011222763B9 (en) | 2015-05-21 |
AU2011222763A1 (en) | 2012-10-04 |
AU2011222763B2 (en) | 2015-04-23 |
WO2011107732A3 (en) | 2012-05-18 |
CA2791758C (en) | 2014-08-19 |
CA2791758A1 (en) | 2011-09-09 |
US20110209868A1 (en) | 2011-09-01 |
CN102884277A (zh) | 2013-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2012010158A (es) | Fracturacion de una formacion subterranea de esfuerzos alterados. | |
CA2778326C (en) | Simulating injection treatments from multiple wells | |
AU2019283850A1 (en) | Method for improved design of hydraulic fracture height in a subterranean laminated rock formation | |
MY163607A (en) | Water injection systems and methods | |
MX2009008437A (es) | Fluido de perforacion a base de silicato y metodos para estabilizar formaciones sin consolidar. | |
GB2483591A (en) | Water injection systems and methods | |
GB2449010A (en) | Managed pressure and/or temperature drilling system and method | |
WO2011070453A3 (en) | Method for increasing fracture area | |
MX351601B (es) | Método y dispositivo de velocidad de penetración de impulso mejorado. | |
WO2010020747A3 (en) | High rate stimulation method for deep, large bore completions | |
MX2010008130A (es) | Determinar propiedades de una estructura subterranea durante fracturacion hidraulica. | |
MX2011013429A (es) | Metodos para tratar un pozo. | |
MX2009011686A (es) | Herramienta de chorro hidraulico para ambientes ultra erosivos. | |
WO2007100956A3 (en) | Initiation and propagation control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments | |
WO2010092352A3 (en) | Method and apparatus for multi-zone stimulation | |
MX2012008174A (es) | Fluidos de tratamiento para control de humectacion de multiples tipos de roca y metodos asociados. | |
WO2013055691A3 (en) | Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well | |
MY167151A (en) | Water injection systems and methods | |
WO2013055677A3 (en) | System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well | |
WO2011008544A3 (en) | Wellbore laser operations | |
MX337002B (es) | Modulo de comunicacion para filtracion con grava de trayectoria alternativa, y metodo para completar un sondeo. | |
MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
EP2354437A3 (en) | Methods and systems for orienting in a wellbore | |
PL2069607T3 (pl) | Sposoby i układy do stymulacji odwiertu z wykorzystaniem wielokierunkowego szczelinowania | |
GB2472708A (en) | Control of downhole devices in a wellbore |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant or registration |