Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/900,855external-prioritypatent/US7566987B2/en
Application filed by Lutron Electronics CofiledCriticalLutron Electronics Co
Publication of MX2009002885ApublicationCriticalpatent/MX2009002885A/en
Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a lighting control system operable to power up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting loads are each turned on as part of a startup sequence at predetermined times after an output voltage of the power distribution system has stabilized. The lighting control system is operable to begin the startup sequence in response to receiving a control signal representative that the power distribution system has stabilized. The lighting loads are each controlled by a lighting control module, which is operable to wait for a predetermined amount of time for the startup sequence to begin before turning on the lighting loads.
MX2009002885A2006-09-142007-09-14Method of powering up a plurality of loads in sequence.
MX2009002885A
(en)