Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inst Fizica Aplicata StiintefiledCriticalInst Fizica Aplicata Stiinte
Priority to MD95-0177ApriorityCriticalpatent/MD1259C2/ro
Publication of MD950177ApublicationCriticalpatent/MD950177A/ro
Publication of MD1259B2publicationCriticalpatent/MD1259B2/ro
Publication of MD1259C2publicationCriticalpatent/MD1259C2/ro
Method for the reduction of the peak load of energy supply network systems as well as a device for the limitation of the power input of a consumer unit fed of an energy supply connection
Metodo y aparato para transferencia entre fuentes de energia electrica que bloquean adaptativamente la transferencia hasta que el voltaje de carga decae a un valor seguro.