KR950004504B1 - Gas boiler - Google Patents

Gas boiler Download PDF

Info

Publication number
KR950004504B1
KR950004504B1 KR1019920009063A KR920009063A KR950004504B1 KR 950004504 B1 KR950004504 B1 KR 950004504B1 KR 1019920009063 A KR1019920009063 A KR 1019920009063A KR 920009063 A KR920009063 A KR 920009063A KR 950004504 B1 KR950004504 B1 KR 950004504B1
Authority
KR
South Korea
Prior art keywords
hot water
water
heating
unit
flow switch
Prior art date
Application number
KR1019920009063A
Other languages
Korean (ko)
Other versions
KR930023669A (en
Inventor
주재웅
이황의
Original Assignee
린나이코리아주식회사
최창선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 린나이코리아주식회사, 최창선 filed Critical 린나이코리아주식회사
Priority to KR1019920009063A priority Critical patent/KR950004504B1/en
Publication of KR930023669A publication Critical patent/KR930023669A/en
Application granted granted Critical
Publication of KR950004504B1 publication Critical patent/KR950004504B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices

Abstract

A three-way valve for a hot water boiler, which is generally switched over a hot water position or a room heating position, is provided for preventing dust or blockage from sticking onto it. Dust or blockage is easily stuck on the flow way of the valve when the valve is settled at a hot water position for a long time in summer. The change-over operation of the valve is automatically carried out and returned back to the original position when the longer working time than the preset time at a hot water position is detected by a detection part (112) of a microprocessor. A following work command part (115) sends out a command signal for carrying out the change-over operation to a valve operating part (16) via a controller (117) and a D/A converter (15).

Description

삼방변의 이물질 고착방지 방법How to prevent foreign matter from adhering to trilateral

제1도는 본 발명을 수행하는 제어부의 블럭 구성도.1 is a block diagram of a control unit for carrying out the present invention.

제2도는 본 발명이 적용된 가스보일러의 전체 개략구성도.2 is an overall schematic configuration diagram of a gas boiler to which the present invention is applied.

제3도는 본 발명 방법을 설명하기 위한 플로우챠트.3 is a flowchart for explaining the method of the present invention.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

10' : 마이컴 11 : 입력장치10 ': microcomputer 11: input device

12 : 발진기 13 : 수류스위치 온/오프 입력부12: oscillator 13: water flow switch on / off input unit

14 : 데이타 송수신부 15 : D/A 변환기14: data transmission and reception unit 15: D / A converter

16 : 삼방변 구동부 44 : 삼방변16: triangular driving portion 44: triangular

111 : 온수·난방겸용/온수전용 판별부 112 : 일방향 연속사용 판단부111: hot water, heating combined / hot water determination unit 112: one-way continuous use determination unit

113 : 타이머 114 : 계수부113: timer 114: counter

115 : 차기이행 명령부 116 : 연소/소화 구동부115: next execution command unit 116: combustion / fire extinguishing drive unit

117 : 구동부품 제어부117: drive part control unit

본 발명은 보일러에 설치되어 난방 및 온수를 일측방향으로 절체시켜 주는 삼방변에 이물질이 고착되는 것을 방지하기 위한 삼방변의 이물질 고착방지 방법에 관한 것으로 특히, 온수전용으로 사용되는 여름철에 삼방변이 온수측으로만 장기간 절체되어 있음으로 인해 발생되는 이물질의 고착현상을 사전에 방지시켜 이로인한 누수의 발생으로 난방수와 온수의 비정상적인 가열화를 미연에 방비할 수 있도록한 삼방변의 이물질 고착방지 방법에 관한 것이다.The present invention relates to a method for preventing foreign matter from adhering to three sides to prevent foreign matters from adhering to the three sides, which are installed in a boiler to transfer heating and hot water in one direction. However, the present invention relates to a method for preventing foreign matters from adhering to the trilateral side, which prevents the abnormal heating of heating water and hot water by preventing the sedimentation of foreign matters caused by long-term transfer.

1관 2수로 또는 2관 2수로 방식의 보일러에 설치된 삼방변은 난방 및 온수사용중 각각의 운전지시에 따라 온수측 또는 난방측의 통수구를 막아주게 되는데, 장기간 사용하게 되면 삼방변 내부를 순환하고 있는 순환수내에 포함되어 있는 각종 칼슘성분 및 각종 난방배관과 순환수에서 발생되는 이물질이 고무볼이 없는 통수구의 주연부 및 삼방변내에 부착되고 시간이 경과되면서 단단하게 굳어지고 점점 커지게 된다.The three-way toilet installed in the one-pipe two-channel or two-pipe two-channel boiler blocks the water outlet or the water outlet on the heating side according to each operation instruction during the heating and hot water use. Various calcium components contained in the circulating water and foreign matters generated from the various heating pipes and the circulating water are attached to the periphery and three-sided sides of the water ball without the rubber ball, and harden and become larger as time passes.

이때, 종래의 보일러에서는 난방·온수겸용(겨울철)으로 사용시나, 온수전용(여름철)으로 사용시 일방향으로 절체되어 연속적으로 사용하고 있는 시간을 계수하여 소정시간이 경과되면, 삼방변을 현재의 방향에서 타방향으로 이동시켜 주므로 삼방변내의 통수구등에 부착되어 아직 미경화된 상태인 이물질을 짓눌러 제거시킨후 원상태로 복구시켜 주었다.At this time, in a conventional boiler, when used as a heating and hot water (winter season), or when using only for hot water (summer season), it is changed in one direction and counts the continuously used time. Since it moves in the other direction, it was attached to the water outlet in the three sides and crushed and removed the uncured foreign substance, and then restored to its original state.

그러나, 실제로 난방·온수를 겸용하여 사용되는 것을 사용모드에서는 실제로 사용자가 난방과 온수를 겸용으로 사용하므로 삼방변이 난방측과 온수측 방향으로 자주 이동되어 굳이 삼방변의 방향이동을 소정시간 이후 강제로 이동시키지 않더라도 칼슘성분 및 각종 이물질이 삼방변의 통수구나 그의 내부에 고착될 시간적 여유가 없어 삼방변내에 이물질이 고착되지 않게 되고, 온수만을 전용으로 사용사고 난방을 실시하지 않는 여름 사용모드에서는 항상 삼방변의 온수측이 열려져 있고 난방측이 닫혀져 있는 상태이므로 장기간이 경과되더라도 난방측의 통수구에는 이물질이 고착되지 않으나 온수측의 통수구 선단에는 상기 상태에서 장기간 경과시 이물질이 고착되므로 이후 사용자가 연속온수 사용중 난방모드로 전환시키게 되면 삼방변의 온수측 통수구가 막히게 될때, 통수구의 선단에 이물질이 고착 경화되어 있으므로 통수구가 완전히 막히지 않게 되어 그 사이로 가열수가 빠져나가게 되고, 이로 말미암아 난방사용중 온수측 통수구로 누수가 발생되어 2차 열교환기나 2중관내에 있는 직수의 가열이 비정상적으로 이루어지게 되는 문제점이 있었다.In practice, however, the user uses both heating and hot water in the use mode. In this mode, the user uses both heating and hot water, so the three sides are frequently moved toward the heating and hot water sides. Even if you do not make calcium components and various foreign matters, there is no time for the three-sided water to pass through or fixed inside of them so that the foreign matters do not stick in the three-way toilet. Since the side is open and the heating side is closed, foreign matter does not adhere to the water inlet on the heating side even after a long time elapses. When you switch to mode, the triangular on When the water inlet is blocked, foreign matter is fixed and hardened at the tip of the water inlet, so that the water inlet is not completely blocked, and the heated water flows out between them. There was a problem that the heating of the direct water in the abnormally made.

본 발명은 이와 같은 종래의 문제점을 해소시키기 위하여 안출한 것으로, 온수를 전용으로 사용하는 여름 선택모드에서 수류스위치가 '온'되었다가 '오프'되거나, '오프'된 상태를 유지하게 되면 그때부터 소정시간을 계수하여 소정시간이 경과될때까지 수류스위치가 재차 '온'이 되지 않으면 온수측에 있는 삼방변을 난방측으로 절체시켜 주므로서, 온수측으로 삼방변이 장기간 철체되어 있음으로 인해 발생되는 이물질의 고착현상에 의한 누수를 사전에 방지시킬 수 있게 되어 난방수와 온수의 비정상적인 가열화를 미연에 방지할 수 있으므로 제품의 신뢰도를 더욱더 향상시킬 수 있는데 그 목적이 있으며, 이를 첨부된 도면에 의거하여 상세히 설명하면 다음과 같다.The present invention has been made in order to solve such a conventional problem, and when the water flow switch is 'on' and 'off' or 'off' in the summer selection mode using hot water exclusively from then on If the water flow switch does not turn on again until the predetermined time is counted and the water flow switch is not turned on again, the three-sided valve on the hot water side is transferred to the heating side. It is possible to prevent the leakage due to the phenomenon in advance to prevent abnormal heating of the heating water and hot water in advance, so that the reliability of the product can be further improved, and the purpose thereof is described in detail with reference to the accompanying drawings. Is as follows.

먼저, 본 발명 방법이 적용되는 가스보일러(100)는 제2도에 나타낸 바와 같이 입력장치(11)가 외부에 연결된 케이싱(101)안에 설치되어 보일러의 전반적인 동작을 제어하는 제어부(10)와; 난방이나 급탕을 위한 온수를 데우기 위해 가스를 연소시키는 연소기(20)와, 난방순환수를 저장하는 팽창탱크(30)와; 온수와 냉수의 순환을 위한 서로 다른 경로를 지니고 있는 보조열교환기(40)와를 상호결합 구성된다.First, the gas boiler 100 to which the method of the present invention is applied includes a control unit 10 installed in a casing 101 to which an input device 11 is connected to the outside as shown in FIG. 2 to control the overall operation of the boiler; A combustor 20 for combusting gas to warm hot water for heating or hot water supply, and an expansion tank 30 for storing heating circulation water; The secondary heat exchanger 40 has mutually different paths for circulation of hot and cold water.

이때, 상기 연소기(20)의 케이싱(21)내에는 다수개의 버너로 이루어진 버너군(22)이 형성되고, 그의 상측 방향에는 과열을 방지시키기 위한 온도퓨즈(24')가 부착된 주열교환기(24)가 설치되어 그곳을 통과하는 물을 상기 버너군(22)이 가열하게 되며, 상기 연소기 케이싱(21)의 바닥면에는 연소용 공기를 공급하는 송풍기(23)가 설치되고, 상기 버너군(22)의 근방에는 버너군(22)을 점화하는 스파커(25)에 연결된 스파커 플러그(26)와 버너군(22)의 착화를 감지하는 프레임로드(27)가 설치되며, 상기 연소기 케이싱(21)의 상면에는 배기가스를 배출시키기 위한 배기부(28)가 보일러 케이싱(101)을 뚫고 형성되어 있다.At this time, a burner group 22 including a plurality of burners is formed in the casing 21 of the combustor 20, and a main heat exchanger 24 having a temperature fuse 24 ′ attached thereto in order to prevent overheating. Is installed and the burner group 22 heats the water passing therethrough, and a blower 23 for supplying combustion air is installed at the bottom of the combustor casing 21, and the burner group 22 is installed. In the vicinity of), a spark rod 26 connected to the sparker 25 for igniting the burner group 22 and a frame rod 27 for detecting ignition of the burner group 22 are installed, and the combustor casing 21 An exhaust portion 28 for discharging the exhaust gas is formed through the boiler casing 101 on the upper surface of the).

또한 상기 버너군(22)의 하방에는 가스를 공급시키기 위한 가스관(50)이 설치되는데 여기에는 통전시 가스를 통과시키는 2개의 전자변(51),(52)과 가스공급량을 조절하기 위한 비례변(53)이 가스공급 경로에 대하여 가스관(50)의 상류로부터 설치되어진다.In addition, a gas pipe 50 for supplying gas is installed below the burner group 22, and there are two electron valves 51 and 52 for passing the gas when energizing and a proportional valve for adjusting the gas supply amount ( 53 is provided upstream of the gas pipe 50 with respect to the gas supply path.

그리고, 상기 팽창탱크(30)에는 온돌바닥을 회전한 난방수를 환수하는 것으로 과압배기밸브(33')가 설치된 환수관(33) 및 상기 주열교환기(24)에 물을 공급하는 물공급관(34)이 설치되는데 이때 상기 물공급관(34)에는 물의 순환을 위한 순환펌프(35)가 아래방향에 설치되어진다.In addition, the expansion tank (30) to return the heating water rotated on the bottom floor, the return pipe 33 is installed with an overpressure exhaust valve (33 ') and the water supply pipe 34 for supplying water to the main heat exchanger (24) In this case, the water supply pipe 34 is provided with a circulation pump 35 for circulating water in a downward direction.

한편, 상기 보조열교환기(40)에는 상기 주열교환기(24)로부터 유입되는 온수를 안내하는 온수관(41)과 수도를 통해 물을 방출하는 것으로 동결방지히터(42')가 부착된 온수방출관(42), 가스보일러의 외부로부터의 찬물을 유입하는 것으로, 필터(43') 및 환수관(33')에 연결되어 보조열교환기(40)를 순환한 물이 환수되도록 하는 보조간(46)이 설치되는데, 이때 상기 물공급관(34)은 삼방변(44)을 통하여 온수관(41)과 난방을 위한 물이 통과되는 난방온수 공급관(45)에 연결되어진다.On the other hand, the auxiliary heat exchanger (40) is a hot water pipe 41 for guiding the hot water introduced from the main heat exchanger 24 and the hot water discharge pipe with a freeze prevention heater (42 ') by discharging water through the tap water. (42), the auxiliary passage 46 for introducing cold water from the outside of the gas boiler to be connected to the filter 43 'and the return pipe 33' so that the water circulated through the auxiliary heat exchanger 40 can be returned. The water supply pipe 34 is connected to the hot water supply pipe 45 through which the water for heating and the hot water pipe 41 pass through the three-way side 44.

또한, 주열교환기(24)를 통과하는 상기 물공급관(34)에는 잔화방지 바이메탈(34')과 출탕온도를 측정하는 더어미스터(34")가 물의 흐름에 대하여 상류로부터 각각 설치되고, 상기 환수관(33)과 직수유입관(43) 사이에는 물탱크(30)에 물이 부족할때 물을 보충해 주기 위한 수동물보급변(54)이 설치되며, 외부적인 상황에 의해 난방온수관(45)으로 물이 흐르지 못할때 비등을 방지하기 위한 바이패스관(55)은 상기 환수관(33)과 난방온수 공급관(45) 사이에 연결되고, 보일러의 외부온도를 감지하는 저온감지 바이메탈(56)은 보일러 케이싱(101)의 내벽에 설치되어지고, 에어헤드(60)와 압력계(61)가 일체로 설치된 상기 물공급관(34)의 중간부와 삼방변(44)의 입구 사이를 연결하는 관에는 차압스위치(70)와 마이크로 스위치(71)가 설치되어진다.In addition, the water supply pipe (34) passing through the main heat exchanger (24) is provided with a debris prevention bimetal (34 ') and a demister (34 ") for measuring the tapping temperature, respectively, from upstream with respect to the flow of water. Between the 33 and the direct inflow pipe 43, the aquatic supply side 54 for replenishing water when the water tank 30 is insufficient water is installed, the heating hot water pipe 45 by the external situation Bypass pipe (55) for preventing boiling when water does not flow into the connection between the return pipe 33 and the heating hot water supply pipe 45, the low temperature detection bimetal 56 for sensing the outside temperature of the boiler is Differential pressure is provided on the inner wall of the boiler casing 101 and connects the middle portion of the water supply pipe 34 and the inlet of the three-way side 44, in which the air head 60 and the pressure gauge 61 are integrally installed. The switch 70 and the micro switch 71 are provided.

그리고 상기 제어부(10)는 제1도에 나타낸 바와 같이 마이컴(10')을 중심으로 하는 제어회로로서 마이컴(10')내에는 수류스위치(43") 온/오프 입력부(13)로부터 소정의 수류스위치신호를 입력받고, 데이타 송수신부(14)를 통해 입력되는 입력장치(11)의 출력신호를 각각 입력받아 온수·난방겸용 또는 온수전용모드인지를 판별하는 온수·난방겸용/온수전용 판별부(111)와; 발진기(12)에 의해 구동되는 타이머(113)의 출력신호를 계수하는 계수부(114)와 상기 온수·난방겸용/온수전용 판별부(111)로부터 소정신호를 각각 입력받아 온수 또는 난방중 어느 한쪽만 소정시간이상 연속적으로 사용하는지의 여부를 판단하는 일방향 연속사용 판단부(112)와; 상기 일방향 연속사용 판단부(112)를 입력받아 차기에 수행할 소정명령을 출력시켜 주는 차기이행 명령부(115)와; 상기 차기이행 명령부(115)의 출력신호를 입력받아 연소 및 소화에 따른 소정신호를 출력시켜 주는 연소/소화 구동부(116)와; 상기 차기이항 명령부(115)와 연소/소화 구동부(116)의 출력신호를 각각 입력받아 해당되는 구동부품을 제어하기 위한 소정신호를 출력시켜 주는 구동부품 제어부(117)와; 상기 구동부품 제어부(117)의 출력신호를 입력받아 D/A 변환기(15)를 통해 소정의 아날로그 신호로 변환시킨 다음 삼방변 구동부(16)를 통해 삼방변(44)를 구동시켜 주는 출력신호군(118)과를 상호연결 구성하여서 된 것이다.As shown in FIG. 1, the control unit 10 is a control circuit centering on the microcomputer 10 'and a predetermined water flow from the current switch 43 "on / off input unit 13 in the microcomputer 10'. Hot water, heating combined / hot water determination unit for receiving a switch signal, and receives the output signal of the input device 11 input through the data transmission and reception unit 14, respectively, to determine whether the hot water, heating combined or hot water dedicated mode ( And a predetermined signal from the counting unit 114 that counts the output signal of the timer 113 driven by the oscillator 12 and the hot / heating / heating / hot water determining unit 111, respectively. A one-way continuous use determination unit 112 for determining whether only one of the heating units is continuously used for a predetermined time or more, and a next command for receiving the one-way continuous use determination unit 112 and outputting a predetermined command to be executed next time; A transition instruction unit 115; A combustion / extinguishing driver 116 which receives an output signal of the next execution command unit 115 and outputs a predetermined signal according to combustion and extinguishing; A driving component controller 117 for receiving an output signal and outputting a predetermined signal for controlling a corresponding driving component, and receiving the output signal of the driving component controller 117 through the D / A converter 15; By converting into a predetermined analog signal and then the output signal group 118 for driving the three-sided 44 through the three-way drive unit 16 is configured to interconnect.

또한 상기 입력장치(11)내에는 온수·난방겸용 또는 온수전용모드인지를 선택하는 온수·난방겸용/온수전용 선택부(lla)와; 상기 온수·난방겸용/온수전용 선택부(11a)에서 출력되는 소정 신호를 입력받아 선택된 모드간 온수·난방겸용 또는 온수전용모드중 어느 모드인지를 인식하는 온수·난방겸용/온수전용 인식부(11b)와; 상기 온수·난방겸용/온수전용 인식부(11b)와 운전스위치 온/오프 인식부(11c)로부터 소정신호를 각각 입력받아 데이타 송,수신부(14)를 통해 소정의 구동신호를 출력시켜 주는 구동부(11d)를 구비하여서 된 것이다.In addition, the input device 11 includes a selection unit (lla) for hot water / heating / heating / hot water for selecting whether to use hot water / heating or hot water only mode; Hot water, heating combined / hot water only recognition unit 11b for receiving a predetermined signal output from the hot water, heating combined / hot water dedicated selection unit 11a to recognize which mode among the selected hot water, heating combined or hot water dedicated mode (11b) )Wow; Driver for receiving a predetermined signal from the hot water, heating combined / hot water recognition unit 11b and the operation switch on / off recognition unit 11c respectively and outputs a predetermined drive signal through the data transmission and reception unit 14 ( 11d).

한편 본 발명 방법은 제3도에 나타낸 바와 같이 전원코드가 '온'이 되고(S1), 온수를 전용으로 사용하는 여름모드가 선택된(S2에서 YES) 상태에서 운전스위치가 '온'이 되고(S3에서 YES) 수류스위치(43")가 '온'이 되어(S4에서 YES) 온수를 사용하게 되면, 수류스위치가 '오프'되는지를 계속 검출(S6)하여 '오프'되거나, 상기 과정(S3,S4)에서 운전스위치 또는 수류스위치가 '오프'된 상태이면 소정시간을 계수하면서(S7) 소정시간이 경과되기 전에 수류스위치 '온'되는지 또는 난방사용모드로 전환되는지를 검출(S8)하여 소정시간 계수중 수류스위치가 '온'이 되면(S8에서 YES), 소정시간의 계수를 취소(S9)하고 여름모드 선택 검출과정(S2)으로 되돌아가되, 상기에서 소정시간이 경과될 때까지 수류스위치가 '오프'된 상태를 유지하고 난방사용모드가 선택되지 않으면(S8에서 NO), 삼방변을 난방방향으로 일정시간동안 절체시킨 다음 원상태로 복귀(S10)시키면서, 삼방변 이동중 수류스위치가 '온'이 되는지를 재차 검출하여(S11) 아직도 '오프'상태이면 수류스위치가 '온'되었는지를 검출하는 상기 과정(S4)으로 되돌아가고, 삼방변 이동중 수류스위치가 '온'이 되었으면 삼방변을 온수측으로 절체(S12)시켜 온수사용모드(S5)로 되돌아가는 과정으로 이루어진 것이다.Meanwhile, in the method of the present invention, as shown in FIG. YES at S3) When the water flow switch 43 "is turned on (YES at S4) and hot water is used, it is continuously detected (S6) whether the water flow switch is 'off', or the process (S3). In operation S4, when the operation switch or the water flow switch is in the 'off' state, the predetermined time is counted (S7) and whether the water flow switch is turned on or switched to the heating use mode before the predetermined time elapses (S8) is determined. When the water flow switch is turned 'on' during the time counting (YES in S8), the counting time is canceled (S9) and the flow returns to the summer mode selection detecting process (S2), but the water flow until the predetermined time has elapsed. If the switch remains 'off' and the heating mode is not selected (S8 NO), transfer the three-way in the heating direction for a certain time and then return to the original state (S10), while detecting whether the water flow switch is 'on' again during the movement of the three-way (S11) if the water flow switch is still 'off' Returning to the process (S4) of detecting whether it is 'on', and if the water flow switch is 'on' during the three-way movement, the three-sided switch to the hot water side (S12) is made of a process of returning to the hot water use mode (S5). .

이와 같은 과정으로 이루어진 본 발명의 작용효과를 설명하면 다음과 같다.Referring to the effect of the present invention made of such a process as follows.

먼저, 보일러의 전원코드가 '온'이 되면(S1), 마이컴(10')내의 온수·난방겸용/온수전용 판별부(11)에서는 입력장치(11)에서 출력되는 소정신호를 입력받아 온수를 전용으로 사용하는 여름모드인가 또는 운전스위치 및 수류스위치(43")가 '온'이 되었는지를 순차적으로 검출하게 된다.First, when the power cord of the boiler is' on '(S1), the determination unit 11 for hot water, heating combined / hot water in the microcomputer 10' receives a predetermined signal output from the input device 11 to receive hot water. Whether the summer mode is exclusively used or whether the operation switch and the water flow switch 43 ″ are turned on is sequentially detected.

이때, 사용자가 입력장치(11)를 통해 여름모드를 선택하게 되면, 차기이행 명령부(115)에서는 구동부품 제어부(117), 출력신호군(118), D/A 변환기(15) 및 삼방변 구동부(16)를 통해 삼방변(44)의 방향을 온수방향으로 이동시켜 주게 된다.At this time, when the user selects the summer mode through the input device 11, the next execution command unit 115, the drive component control unit 117, the output signal group 118, the D / A converter 15 and the trilateral side Through the driving unit 16 is to move the direction of the three-sided 44 in the warm water direction.

이와 같은 상태에서 운전스위치가 '온'이 되고 수류스위치(43")가 '온'이 되면 연소/소화 구동부(116)를 통해 소정의 연소신호를 출력시키게 되므로 연소동작이 수행하게 되어 사용자가 온수를 계속사용할 수 있게 된다.In this state, when the operation switch is turned 'on' and the water flow switch 43 'is turned' on ', a predetermined combustion signal is output through the combustion / digestion driving unit 116, so that the combustion operation is performed. Will continue to be available.

이때, 온수·난방겸용/온수전용 판별부(111)에서는 입력장치(11)에서 출력되는 소정신호를 입력받아 수류스위치(43")가 '오프'되는지의 여부를 계속 검출하게 되는데, 만약 온수사용모드에서 수류스위치(43")가 '오프'되거나, 상기에서 운전스위치 또는 수류스위치가 '오프'된 상태에 있다면, 일방향 연속사용 판단부(112)의 출력신호에 의해 제어를 받는 계수부(114)에서는 타이머(113)의 출력신호를 계수하기 시작하게 된다.At this time, the determination unit 111 for hot / heating combined / hot water only receives a predetermined signal output from the input device 11 and continuously detects whether the water flow switch 43 ″ is 'off'. In the mode, when the water flow switch 43 "is 'off' or the operation switch or the water flow switch is in the" off "state, the counter 114 controlled by the output signal of the one-way continuous use determination unit 112 is ) Starts counting the output signal of the timer 113.

상기에서와 같이 계수부(114)에서 소정시간을 계수하고 있는 동안 일방향 연속사용 판단부(112)에서는 온수·난방겸용/온수전용 판별부(111)의 출력신호를 입력받아 수류스위치(43")가 '온'이 되는지 또는 온수사용 모드에서 난방사용모드로 전환되는지의 여부를 계속 판별하게 되는데, 만약 소정시간이 경과되기 전에 수류스위치(43")가 '온'이 되면 사용자가 온수를 재차 사용하는 중이므로 계수부(114)를 리세트시켜 소정시간의 계수를 취소(S9)시키되, 소정시간이 경과되었는데도 불구하고 수류스위치(43")가 '오프'된 상태를 유지하고 온수사용모드를 지속하면(S8에서 NO), 온수방향에 있는 삼방변(44)의 방향을 일정시간동안 난방모드로 전환시켜 주었다가 일정시간이 경과되면 원상태로 복귀(S10)시키므로서 삼방변의 난방측 통수구에 이물질이 고착되어 경화되는 것을 사전에 방지시킬 수 있어 고착된 이물질에 의해 누수되는 현상을 미연에 방지할 수 있는 것이다.While counting the predetermined time in the counting unit 114 as described above, the one-way continuous use determining unit 112 receives the output signal of the hot / heating combined use / hot water determining unit 111 and the water flow switch 43 ″. Is continuously turned on or switched from the hot water use mode to the heating use mode. If the water flow switch 43 "is turned on before a predetermined time has elapsed, the user uses hot water again. Since the counter 114 is reset to cancel the counting of the predetermined time (S9), even though the predetermined time has elapsed, the water flow switch 43 " (NO in S8), the direction of the three-way side 44 in the hot water direction is switched to the heating mode for a certain time, and after a certain time is returned to its original state (S10), foreign matter in the heating side of the three sides of the water inlet Sticking and curing It can be prevented in advance to prevent the phenomenon of water leakage by the stuck foreign matter in advance.

한편, 상기에서 삼방변(44)의 방향을 일정시간동안 난방모드로 전환시켜 주고 있는 동안 수류스위치(43")가 재차 '온이 되면 남은시간에 관계없이 삼방변의 방향을 온수측으로 절체해 주므로서 온수사용에는 아무런 지장을 주지않게 된다.On the other hand, while switching the direction of the three-way (44) in the heating mode for a predetermined time in the above, if the water flow switch 43 "is turned on again, the direction of the three-way side to the hot water side, regardless of the remaining time The use of hot water will not interfere.

또한 본 발명 방법은 1관 2수로식 또는 2관 2수로식 보일러중 그 어느방식을 구비한 보일러에 적용시켜도 동일한 효과를 얻을 수 있다.In addition, the method of the present invention can be applied to a boiler having any one of a one-pipe two-channel or two-pipe two-channel boiler to obtain the same effect.

이상에서 설명한 바와 같이 본 발명에 의하면 온수를 전용으로 사용하는 여름선택 모드에서 수류스위치가 '온'되었다가 '오프'되거나, '오프'된 상태를 유지하게 되면 그때부터 소정시간을 계수하여 소정시간이 경과될때까지 수류스위치가 재차 '온'이 되지 않으면 온수측에 있는 삼방변을 일정시간 난방측으로 절체시켜주되, 소정시간 계수중 수류스위치가 '온'이되면 소정시간의 계수를 취소시키고 일정시간이내에 수류스위치가 재차'온'이 되면 난방측에 있는 삼방변을 즉시 온수측으로 절체시켜 주므로서, 삼방변이 온수측으로 장기간 절체되어 있음으로 인해 발생되는 이물질의 고착현상에 의한 누수를 사전에 방지시킬 수 있게 되어 난방수와 온수의 비정상적인 가열화를 미연에 방지할 수 있으므로 제품의 신뢰도를 더욱더 향상시킬 수 있는 것이다.As described above, according to the present invention, when the water flow switch is 'on' and 'off' or 'off' in the summer selection mode using hot water exclusively, the predetermined time is counted from that time. If the water flow switch does not turn on again until this time passes, the three-way valve on the hot water side is transferred to the heating side for a predetermined time.If the water flow switch turns on during the predetermined time counting, the predetermined time count is canceled and When the water flow switch is turned on again, the three-sided valve on the heating side is immediately transferred to the hot water side, so that leakage due to the sticking phenomenon of foreign substances caused by long-term transfer of the three-sided valve to the hot water side can be prevented. It is possible to prevent abnormal heating of heating water and hot water in advance, so that the reliability of the product can be further improved. The.

Claims (3)

전원이 '온'된 상태에서 사용자의 입력장치(11) 조작에 의해 여름모드가 선택되면 시스템의 전반적인 제어기능을 수행하는 마이컴(10')내의 차기이행 명령부(115)에서 각 기능부품들에 온수사용모드에 따른 연소운전신호를 출력하고, 여름모드가 선택되지 않으면 온수 및 난방겸용모드에 따른 연소운전신호를 출력시켜 주는 보일러 제어방법에 있어서, 상기 마이컴(10')내에 설치된 온수·난방겸용/온수전용 판별부(111)에서 온수만을 전용으로 사용하는 온수모드임을 인식하고 난 후, 수류스위치 온/오프 입력부(13) 및 입력장치(11)의 출력신호를 통해 수류스위치 및 운전스위치의 상태를 검출한 결과 '오프'된 상태에서 있으면 일방향 연속사용 판단부(112)의 출력신코에 의해 제어를 받는 계수부(114)를 통해 그 시간을 계수하여 일정시간 이상 그 상태가 유지되면 차기이행 명령부(115)에서 구동부품 제어부(l17), 출력신호군(118) 및 D/A 변환기(15)를 통해 삼방변 구동부(16)에 소정의 출력신호를 발생시키도록 하여 온수방향에 있는 삼방변(44)의 방향이 일정시간 동안 난방방향으로 절체되었다가 다시 원상복귀되도록 하는 과정으로 이루어진 것을 특징으로 하는 삼방변의 이물질 고착방지 방법.When the summer mode is selected by the user's manipulation of the input device 11 while the power is' on ', the next execution command unit 115 in the microcomputer 10' performs overall control of the system. In the boiler control method for outputting the combustion operation signal according to the hot water use mode, and outputs the combustion operation signal according to the combined mode of hot water and heating when the summer mode is not selected, the hot water and heating combined use installed in the microcomputer 10 ' After recognizing that the hot water mode uses only hot water exclusively for the hot water determination unit 111, the state of the water flow switch and the operation switch through the output signals of the water flow switch on / off input unit 13 and the input device 11. As a result of the detection, if the state is 'off', the time is counted through the counting unit 114 controlled by the output signal of the one-way continuous use determining unit 112, and the state is maintained for a predetermined time or more. Hot water direction by generating a predetermined output signal to the tri-directional drive unit 16 through the driving part control unit l17, the output signal group 118 and the D / A converter 15 in the surface kick-off command unit 115 The three-way direction in the direction of the three-sided (44) is transferred to the heating direction for a predetermined time, the method of preventing foreign matter seizure of the three-sided, characterized in that consisting of a process to return to the original. 제1항에 있어서, 상기 계수부(114)에서 수류스위치 및 운전스위치의 '오프'시간을 계수하던 중 운전스위치와 수류스위치가 '온'이 되면, 지금까지 계수된 소정시간의 계수값이 취소되고, 다음에 수류스위치가 재차 '오프'된 이후 또는 운전스위치가 '오프'된 이후부터 다시 계수를 수행함을 특징으로 하는 삼방변의 이물질 고착방지 방법.According to claim 1, wherein when the operation switch and the water flow switch is 'on' while counting the 'off' time of the water flow switch and the operation switch in the counter 114, the count value of the predetermined time counted so far is canceled. And then counting again after the water flow switch is 'off' again or after the operation switch is 'off'. 제1항에 있어서, 상기 삼방변(44)의 방향을 일정시간 동안 난방방향으로 절체시키고 있던중 수류스위치가 '온'이 되면, 계수부(114)에서 수행중인 일정시간의 계수를 취소시키고 삼방변을 즉시 온수측으로 절체시키는 것을 특징으로 하는 삼방변의 이물질 고착방지 방법.According to claim 1, When the water flow switch is 'on' while the direction of the three-way side 44 is switched in the heating direction for a predetermined time, the counter of the predetermined time being performed in the counter 114 cancels the three-way Method of preventing foreign matter sticking to the trilateral side, characterized in that immediately switching the side to the hot water side.
KR1019920009063A 1992-05-27 1992-05-27 Gas boiler KR950004504B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019920009063A KR950004504B1 (en) 1992-05-27 1992-05-27 Gas boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019920009063A KR950004504B1 (en) 1992-05-27 1992-05-27 Gas boiler

Publications (2)

Publication Number Publication Date
KR930023669A KR930023669A (en) 1993-12-21
KR950004504B1 true KR950004504B1 (en) 1995-05-01

Family

ID=19333703

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019920009063A KR950004504B1 (en) 1992-05-27 1992-05-27 Gas boiler

Country Status (1)

Country Link
KR (1) KR950004504B1 (en)

Also Published As

Publication number Publication date
KR930023669A (en) 1993-12-21

Similar Documents

Publication Publication Date Title
JP2689797B2 (en) Instant hot water heater
KR950004504B1 (en) Gas boiler
KR950004505B1 (en) Three way valve transfer method for boiler
KR930001848B1 (en) Antifreezing method in gas boiler
JP3834423B2 (en) One can multi-channel combustion equipment
KR950009122B1 (en) Boiler safety operation method
KR950000934B1 (en) Heating method of gas boiler
JP3811561B2 (en) One can two water channel type water heater
KR930001843B1 (en) Control method of gas boiler
KR930010243B1 (en) Combustion control method for gas boiler
JP3822739B2 (en) One can two water channel combustion equipment
KR930010244B1 (en) Circulation pump control method for gas boiler
KR930001847B1 (en) Control method of gas boiler
KR920009090B1 (en) Gas boiler control
KR100472066B1 (en) Oil boiler's initial temperature export hot water temperature control device and method
JP2515056B2 (en) Water heater controller
KR950000936B1 (en) Gas boiler control method
JPH1183157A (en) Bathtub water heater
KR940003124B1 (en) Control method and device of combustion
JP3345302B2 (en) Combustion heating device
JP3798134B2 (en) One can two water heater
JP3591888B2 (en) Heating equipment
KR930001845B1 (en) Combustion control method in gas boiler reignition
KR950004506B1 (en) Freezing control method for boiler
KR920009089B1 (en) Gas boiler control

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
G160 Decision to publish patent application
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110502

Year of fee payment: 17

EXPY Expiration of term