KR940021837A - Prefabricated Piers and Column Structures and Construction Methods - Google Patents
Prefabricated Piers and Column Structures and Construction Methods Download PDFInfo
- Publication number
- KR940021837A KR940021837A KR1019930003168A KR930003168A KR940021837A KR 940021837 A KR940021837 A KR 940021837A KR 1019930003168 A KR1019930003168 A KR 1019930003168A KR 930003168 A KR930003168 A KR 930003168A KR 940021837 A KR940021837 A KR 940021837A
- Authority
- KR
- South Korea
- Prior art keywords
- shape
- shear
- segment
- pillars
- force
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/005—Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은 교량 및 기둥의 기초위에 설치되는 교각 및 기둥을 기초에 매설되는 기초부, 기둥부, 교각 및 기둥의 머리부로 나누어 공장제작하여 신속함은 물론 안전하고 견고하게 연결할 수 있는 교각 및 기둥구조와 그 연결방법에 관한 것으로 각 부재의 연결부는 상하가 凸凹(제3도) 형태를 취하고 휨모멘트, 축력, 전단력을 안전하게 전달할 수 있고 설치가 신속, 간편하고 경제적인 5개의 위치가 서로 다른 전단키(15), (16), (17), (18), (19)로 구성됨을 특징으로 한다.The present invention is divided into the foundations, pillars, piers and the head of the pillars buried on the foundation and the pillars and pillars installed on the foundation of bridges and pillars pier and pillar structure that can be connected quickly and safely and securely And the connection method of each member. The connecting part of each member has the shape of upper and lower (3rd degree), and it can safely transmit bending moment, axial force and shear force, and it is quick, easy and economical to install five different shear keys. 15), (16), (17), (18), and (19).
Description
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is an open matter, no full text was included.
제2도는 제1도에서의 연결부 상세도,2 is a detailed view of the connection portion in FIG.
제3도는 연결부 조립상태를 보인 제2도의 단면도.3 is a cross-sectional view of FIG. 2 showing the assembled state of the connecting portion.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019930003168A KR960001730B1 (en) | 1993-03-04 | 1993-03-04 | Assembling pier, the pier structure, and its working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019930003168A KR960001730B1 (en) | 1993-03-04 | 1993-03-04 | Assembling pier, the pier structure, and its working method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR940021837A true KR940021837A (en) | 1994-10-19 |
KR960001730B1 KR960001730B1 (en) | 1996-02-03 |
Family
ID=19351587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019930003168A KR960001730B1 (en) | 1993-03-04 | 1993-03-04 | Assembling pier, the pier structure, and its working method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR960001730B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020065413A (en) * | 2002-06-15 | 2002-08-13 | 김태균 | Pier omitted |
CN112609565A (en) * | 2021-01-13 | 2021-04-06 | 安徽六安公路桥梁工程有限公司 | Steel pipe concrete prefabricated bridge pier |
CN112942078A (en) * | 2021-02-03 | 2021-06-11 | 中国地震局工程力学研究所 | L-shaped joint assembly type splicing pier |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100605302B1 (en) * | 2005-12-05 | 2006-07-28 | (주)동림컨설턴트 | Fabricated pier |
KR100787119B1 (en) * | 2006-06-15 | 2007-12-21 | 차진이 | Pier having Precast Concrete Pipe |
KR101328695B1 (en) * | 2006-12-19 | 2013-11-14 | 재단법인 포항산업과학연구원 | Assembling-type pier |
-
1993
- 1993-03-04 KR KR1019930003168A patent/KR960001730B1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020065413A (en) * | 2002-06-15 | 2002-08-13 | 김태균 | Pier omitted |
CN112609565A (en) * | 2021-01-13 | 2021-04-06 | 安徽六安公路桥梁工程有限公司 | Steel pipe concrete prefabricated bridge pier |
CN112942078A (en) * | 2021-02-03 | 2021-06-11 | 中国地震局工程力学研究所 | L-shaped joint assembly type splicing pier |
Also Published As
Publication number | Publication date |
---|---|
KR960001730B1 (en) | 1996-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790424B (en) | The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof | |
CN2784490Y (en) | Prestress connection node for beam column of assembled concrete frame structure | |
KR101204040B1 (en) | precast concrete member and assembled concrete abutment of bridge | |
KR100766888B1 (en) | Fabricated bridge using pile pillars coupled by pillar connecting member as the coping of pier, omitting the foundation and constructing method thereof | |
KR940021837A (en) | Prefabricated Piers and Column Structures and Construction Methods | |
CN208717720U (en) | A kind of bridge substructure using ultra-tough fiber concrete | |
CN108661196B (en) | Assembled self-resetting swing steel-wood combined structure and method | |
JP4017766B2 (en) | Hollow cylindrical body and its construction method | |
JP3882633B2 (en) | Steel pipe damper and rocking foundation structure using the same | |
CN110924522B (en) | Steel plate interface connecting structure and connecting method for reinforced concrete beam and column | |
KR100756517B1 (en) | Hollow type composite pier | |
CN114263093A (en) | Fully-prefabricated assembled bridge and construction method | |
JP3297413B2 (en) | Damping frame with friction damping mechanism | |
CN112012356B (en) | Embedded shear-energy consumption dual-function sleeve reinforced beam-column joint | |
KR200205092Y1 (en) | A reinforced earthquake-proof device | |
CN112942364A (en) | Self-balancing large-span deep foundation pit prestressed beam system | |
WO2020112053A2 (en) | Multiple friction joint pile system | |
KR100466017B1 (en) | The Method of Reinforce Steel Box Girder type Bridge and The Structure thereof | |
JPS61229018A (en) | Pile head securing high strength concrete composite pile | |
Yashinsky | Recent Changes to Seismic Design Practice in California | |
CN218667094U (en) | Pier is assembled to function recoverable prefabricated segment | |
JP2005090208A (en) | Precast multi-step driving type underwater wall connection work method | |
JP2006097429A (en) | Structure | |
GB2289494A (en) | Improvements in or relating to foundations | |
CN210482043U (en) | Ultrahigh-toughness concrete anti-seismic bridge tower structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
G160 | Decision to publish patent application | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20020201 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |