KR940008475Y1 - Bracket for scaffoldings - Google Patents

Bracket for scaffoldings Download PDF

Info

Publication number
KR940008475Y1
KR940008475Y1 KR92004582U KR920004582U KR940008475Y1 KR 940008475 Y1 KR940008475 Y1 KR 940008475Y1 KR 92004582 U KR92004582 U KR 92004582U KR 920004582 U KR920004582 U KR 920004582U KR 940008475 Y1 KR940008475 Y1 KR 940008475Y1
Authority
KR
South Korea
Prior art keywords
pipe
support
scaffolding
bracket
lower portion
Prior art date
Application number
KR92004582U
Other languages
Korean (ko)
Other versions
KR930021779U (en
Inventor
유재상
Original Assignee
사재효
주식회사 대종건영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 사재효, 주식회사 대종건영 filed Critical 사재효
Priority to KR92004582U priority Critical patent/KR940008475Y1/en
Publication of KR930021779U publication Critical patent/KR930021779U/en
Application granted granted Critical
Publication of KR940008475Y1 publication Critical patent/KR940008475Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/006Scaffold with cantilevered sections, e.g. to accommodate overhangs or recesses in the facade
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/062Consoles; Brackets specially adapted for attachment to building walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

내용 없음.No content.

Description

건축용 비계 설치구Construction Scaffolding Fixtures

제1도는 종래의 비계 설치구의 설치상태를 도시한 단면도.1 is a cross-sectional view showing an installation state of a conventional scaffolding installation.

제2도는 본 고안에 따른 비계 설치구의 사시도.Figure 2 is a perspective view of the scaffolding installation according to the present invention.

제3도는 본 고안에 따른 비계 설치구의 설치상태를 도시한 단면도.Figure 3 is a cross-sectional view showing the installation state of the scaffolding installation device according to the present invention.

제4도는 본 고안에 따른 비계 설치구의 작동상태를 확대한 부분확대도.4 is an enlarged partial view of the operating state of the scaffolding installation according to the present invention.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

20 : 브라켓트 21 : 걸림돌기20: bracket 21: jamming projection

30 : 이동지지대 31 : 걸림턱30: moving support 31: locking jaw

40 : 스톱퍼 100 : 파이프40: stopper 100: pipe

102 : 고정지지대 301 : 협지판102: fixed support 301: the holding plate

302 : 나사봉 304 : 너트부302: screw rod 304: nut part

본 고안은 건축용 비계설치구에 관한 것으로써, 더욱 상세하게는 건물의 외부공사시 작업자의 안전을 위해 설치되는 발판 및 비계를 설치할때 사용되는 것으로, 그 구조를 개선하여 보다 편리하고 신속하게 설치 및 해체를 할 수 있도록 한 것에 관한 것이다.The present invention relates to a scaffolding installation for building, and more particularly, it is used when installing scaffolding and scaffolding which is installed for the safety of the worker during the external construction of a building, and the structure is improved and installed more conveniently and quickly. It is about making it possible to dismantle.

종래의 비계설치구는 첨부도면 제1도에 도시한 바와같이 비계 또는 안전망을 설치하기 위해 전방지지대(102)를 건물의 발코니(200)에 걸어서 선단의 협지판(301)을 가지는 나사봉(302)을 후단의 핸들(303)을 이용하여 후방지지대(103) 하부의 너트부에 나사결합식으로 조이도록 한 것이다.Conventional scaffolding installation is a screw rod 302 having a holding plate 301 of the front end by hanging the front support 102 on the balcony 200 of the building to install the scaffold or safety net as shown in Figure 1 of the accompanying drawings It is to be screwed to the nut portion of the lower rear support 103 using the rear handle 303.

그러나 이와같은 종래고안은 전방지지대(102) 및 후방지지대(103) 모두가 파이프(100)에 고정설치된 것으로 각각의 지지대 사이에 삽입되는 발코니(200) 벽면의 두께가 얇은 경우에는 나사봉(302) 후단의 핸들(303)의 돌림횟수가 많아져 비계설치구의 설치시 매우 많은 힘과 시간이 소요되는 문제점이 있었다.However, such a conventional design is that both the front support 102 and the rear support 103 is fixed to the pipe 100, the screw rod 302 when the thickness of the wall of the balcony 200 is inserted between each support is thinner The number of turns of the handle 303 on the rear end is increased so that a lot of force and time are required when installing the scaffolding installation.

따라서 본 고안은 상기한 바와같은 문제점을 해결하기 위한 것으로서 본 고안의 목적은 후방의 지지대를 이동가능토록 설치하고 파이프의 하부에 설치된 브라켓트에 다수의 걸림돌기를 설치하여 발코니 벽면의 두께에 따라 지지대를 이동시켜 그 조임 및 해체 작업을 간단 신속하게 이룰 수 있도록 한 건축용 비계설치구를 제공함에 있다.Therefore, the present invention is to solve the problems as described above, the object of the present invention is to install the support of the rear to move and to install a plurality of projections on the bracket installed on the lower part of the pipe to move the support according to the thickness of the balcony wall It is to provide a scaffolding installation for building that can be fastened and dismantled quickly and easily.

상기와 같은 목적을 달성하기 위한 본 고안에 따른 건축용 비계설치구의 특징은 고정지지대의 후방으로 이동가능토록 설치된 이동지지대의 내주연으로 걸림턱을 형성하고 그 후방의 파이프 하부에 설치된 브라켓트에는다수의 걸림돌기를 형성하고 파이프 말단에는 스톱퍼를 형성하여된 것에 있다.Features of the construction scaffolding installation according to the present invention for achieving the above object is to form a locking jaw by the inner circumference of the movable support installed to be movable to the rear of the fixed support, and a large number of obstacles in the bracket installed in the lower pipe of the rear A group is formed and a stopper is formed in a pipe end.

이하 이 고안에 따른 건축용 비계설치구의 바람직한 실시예를 첨부된 도면에 의거하여 보다 상세히 설명하면 다음과 같다.Hereinafter, a preferred embodiment of the construction scaffolding installation according to the present invention will be described in detail with reference to the accompanying drawings.

도면 제2도 및 제3도에 도시한 바와같이, 파이프(100)에 용접결합되고 하부는 버팀대(400)에 의해 지지결합된 고정지지대(102)가 설치구성된 비계설치구에 있어서 상기 파이프(100) 후방 밑면에 설치된 브라켓트(20)의 양측면 각각에는 다수의 걸림돌기(21)가 대향설치되며 그 말단으로는 파이프(100)를 절개 절곡한 스톱퍼(40)를 형성함과 동시에 상기 파이프(100) 후부에 삽입되는 이동지지대(30)의 하부에는 후방으로 핸들(303)과 전방으로 협지판(301)을 구비한 나사봉(302)이 결합되는 너트부(304)를 가지되 이 지지대의 내주연 상부측으로는 상기 1단위의 걸림돌기(21) 사이에 록킹되는 걸림턱(31)을 형성하여 구성된 것이다.As shown in Figures 2 and 3, the pipe 100 in the scaffolding fixture is welded to the pipe 100, the lower portion is provided with a fixed support 102 is supported by a brace 400 A plurality of engaging projections 21 are installed on each side of both sides of the bracket 20 installed at the rear bottom thereof, and at the end thereof, a stopper 40 formed by bending the pipe 100 is formed. A lower portion of the movable support 30 inserted into the rear portion has a nut portion 304 to which the screw rod 302 having the handle 303 and the pincer plate 301 forward is coupled to the rear thereof. The upper side is formed by forming a locking jaw 31 that is locked between the locking projection 21 of the unit.

이와같이 구성되는 본 고안에 따른 건축용 비계설치구의 작용을 설명하면 다음과 같다.Referring to the operation of the building scaffolding installation according to the present invention configured as described above are as follows.

비계 및 안전망을 설치하고자 비계설치구를 발코니에 설치하고자 할시 먼저 고정지지대(102)가 건물의 발코니(200)의 외측벽면에 밀착되도록 한후 이동지지대(30)를 상부로 들어올려 내주연에 형성된 걸림턱(31)이 파이프(100) 하부의 브라켓트(20)에 형성된 걸림돌기(21)로 부터 이격시킨다음 발코니(200)의 내측벽에 위치되도록 이동시킨 다음 이동지지대 내주연에 설치된 걸림턱(31)이 파이프 하부의 브라켓트(20)에 형성된 걸림돌기(21)에 걸리도록 내려놓은 다음 이동지지대(30)의 하부에 설치된 나사봉(302) 후단의 핸들(303)을 조이게 되면 선단의 협지판(301)이 발코니(200)의 내측벽에 압착되어 비계설치구를 고정설치하는 것이다.When installing the scaffolding installation on the balcony to install the scaffolding and safety net First, the fixing support 102 is in close contact with the outer wall surface of the balcony 200 of the building and then lift the movable support 30 to the upper hook formed on the inner circumference The jaw 31 is spaced apart from the locking projection 21 formed in the bracket 20 at the bottom of the pipe 100, and then moved to be positioned on the inner wall of the balcony 200, and then the locking jaw 31 installed at the inner circumference of the moving support. ) Is lowered to be caught by the catching protrusion 21 formed on the bracket 20 at the bottom of the pipe and then tightens the handle 303 at the rear end of the screw rod 302 installed at the lower portion of the movable support 30. 301 is compressed to the inner wall of the balcony 200 to fix the scaffolding installation.

또한 비계설치구의 해체시는 상기한 동작의 역순으로 핸들(303)을 조금만 풀어 이동지지대(30)가 움직일수 있도록 한 후, 이동지지대(30)를 상부로 들어올려 걸림턱(31)을 걸림돌기(21)로 부터 분리이격시켜 손쉽게 해체작업을 행할 수 있게 되는 것이다.In addition, the dismantling of the scaffolding installation to loosen the handle 303 in the reverse order of the above operation so that the movable support 30 can move, then lift the movable support 30 to the upper part to catch the locking jaw 31. Separation is separated from (21) to be able to easily perform the dismantling work.

이상에서와 같이 이 고안에 따른 건축용 비계설치구에 의하면 매우 간단하고 신속히 비계설치구를 설치 및 해체시킬 수 있어 그 작업이 간단신속 하여 건축공정을 신속히 진행시킬 수 있음과 동시에 그 결합력이 확실히되는 효과가 있는 아주 특출한 고안인 것이다.As described above, according to the construction scaffolding installation according to the present invention, the scaffolding installation can be installed and dismantled very simply and quickly. There is a very exceptional design.

Claims (1)

파이프(100)에 용접결합되고 하부는 버팀대(400)에 의해 지지결합된 고정지지대(102)가 설치구성된 비계설치구에 있어서, 상기 파이프(100) 후방 밑면에 설치된 브라켓트(20) 양측면 각각에는 다수의 걸림돌기(21)가 대향설치되며 그 말단으로는 파이프를 절개절곡한 스톱퍼(40)를 형성함과 동시에 상기 파이프(100) 후부에 삽입되는 이동지지대(30)의 하부에는 후방으로 핸들(303)과 전방으로 협지판(301)을 구비한 나사봉(302)이 결합되는 너트부(304)를 가지되, 이 지지대의 내주연 상부측으로는 상기 1단위의 걸림돌기(21) 사이에 록킹되는 걸림턱(31)을 형성하여서 된 것을 특징으로 하는 건축용 비계설치구.In the scaffolding mounting fixture is welded to the pipe 100 and the lower portion is a fixed support 102 is installed, supported by the brace 400, a plurality of brackets on both sides of the bracket 20 installed on the rear bottom of the pipe 100 The engaging projection 21 of the opposite side is formed at the end of the stopper 40 is bent pipe bent at the same time, the handle 303 to the rear of the lower portion of the movable support 30 inserted into the rear of the pipe 100 ) And a nut part 304 to which a screw rod 302 having a pinch plate 301 is forwardly coupled, and is locked between the locking protrusions 21 of the one unit at an upper side of the inner circumference of the support. Scaffolding installation for building, characterized in that by forming the locking step (31).
KR92004582U 1992-03-21 1992-03-21 Bracket for scaffoldings KR940008475Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR92004582U KR940008475Y1 (en) 1992-03-21 1992-03-21 Bracket for scaffoldings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR92004582U KR940008475Y1 (en) 1992-03-21 1992-03-21 Bracket for scaffoldings

Publications (2)

Publication Number Publication Date
KR930021779U KR930021779U (en) 1993-10-16
KR940008475Y1 true KR940008475Y1 (en) 1994-12-21

Family

ID=19330638

Family Applications (1)

Application Number Title Priority Date Filing Date
KR92004582U KR940008475Y1 (en) 1992-03-21 1992-03-21 Bracket for scaffoldings

Country Status (1)

Country Link
KR (1) KR940008475Y1 (en)

Also Published As

Publication number Publication date
KR930021779U (en) 1993-10-16

Similar Documents

Publication Publication Date Title
US7410141B2 (en) Industrial hanger for metal framing
KR940008475Y1 (en) Bracket for scaffoldings
JP2504400Y2 (en) Bracket for fixing scaffold skirting boards
JP4057957B2 (en) Ladder fitting for manhole
KR101596939B1 (en) Manufacturing method for install bracket of dropping prevention net
KR940008489Y1 (en) Post for false railing
JP4022317B2 (en) Bracket for temporary scaffold
KR20120087497A (en) A bracket for balcony extension type
KR940008492Y1 (en) Post for false railing
KR940008473Y1 (en) Bracket for scaffoldings
JPH0725970Y2 (en) Parent rope
KR930005525Y1 (en) Brackets for safty net
KR200260692Y1 (en) A separation and combination type pulley hanger for scaffolding
KR940008490Y1 (en) Post for false railing
JPH0725150U (en) Temporary roof for construction work
AU5966290A (en) A brace
JP2952165B2 (en) Operation rod of hanging bracket for safety net
JP3125149U (en) Roof fall prevention device
KR100931532B1 (en) Apparatus for fixing gang form system
AU2002301442B2 (en) Scaffolding System
KR200201540Y1 (en) Clamp for scaffold
JPH0640773Y2 (en) Temporary scaffolding equipment
JP3574509B2 (en) Prop mounting bracket
KR200252406Y1 (en) Safety Handrail Clamp for Wall Attachment
KR940008474Y1 (en) Bracket for scaffoldings

Legal Events

Date Code Title Description
A201 Request for examination
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20011222

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee