KR920008319Y1 - Fabric form met for improving ground - Google Patents

Fabric form met for improving ground Download PDF

Info

Publication number
KR920008319Y1
KR920008319Y1 KR2019880017241U KR880017241U KR920008319Y1 KR 920008319 Y1 KR920008319 Y1 KR 920008319Y1 KR 2019880017241 U KR2019880017241 U KR 2019880017241U KR 880017241 U KR880017241 U KR 880017241U KR 920008319 Y1 KR920008319 Y1 KR 920008319Y1
Authority
KR
South Korea
Prior art keywords
mat
bag
ground
sand
turret
Prior art date
Application number
KR2019880017241U
Other languages
Korean (ko)
Other versions
KR900008477U (en
Inventor
이종학
Original Assignee
한국물산주식회사
이종학
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국물산주식회사, 이종학 filed Critical 한국물산주식회사
Priority to KR2019880017241U priority Critical patent/KR920008319Y1/en
Publication of KR900008477U publication Critical patent/KR900008477U/en
Application granted granted Critical
Publication of KR920008319Y1 publication Critical patent/KR920008319Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0075Textiles
    • E02D2300/0076Textiles non-woven
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)

Abstract

내용 없음.No content.

Description

연약지반 보강용 포대매트Soft ground reinforcement bag mat

제1도는 본 고안에 따른포대매트의 부분 사시도.1 is a partial perspective view of a bag mat according to the present invention.

제2도는 포대매트들 사이를 연결하는 상태를 나타낸 사시도.2 is a perspective view showing a state of connecting between the mats.

제3도는 본 고안의 포대매트의 사용상태도.3 is a state of use of the bag mat of the present invention.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

10 : 포대매트 12 : 포대부10: turret mat 12: turret

14 : 투수부 16 : 주입구14: pitcher 16: injection hole

18 : 연결공18: connector

본 고안은 2중직으로 제조하되 그 중 일부를 상하가 분리되는 직포를 형성하도록 분리 직조하여 모래등을 수납할 수 있도록 하여, 항만방파제 공사 또는 해안 간척 매립을 위한 방조제 축조등의 토목공사 현장에서 연약한 지반을 보강할 수 있도록 한 포대매트에 관한 것으로서, 이는 건설 중장비의 통과를 용이하게 하거나 또는 그위에 적하되는 암석등의 성토층의 하중으로 인하여 국부적인 또는 전반적인 전단에 의한 파괴와 하꼐 즉시침하가 발생하는 것을 방지할 수 있도록 모래가 갖고 있는 고유의 전단 강도를 이용하여 하중을 균등하게 분산시킴으로써 지반을 보강할 수 있는 것이다.The present invention is made of double weave, but some of them can be separated weaving to form a woven fabric to separate the top and bottom to accommodate the sand, soft at the site of civil works such as harbor breakwater construction or seawall construction for reclamation of coastal reclamation It relates to a turret mat for reinforcing the ground, which facilitates the passage of heavy construction equipment or causes loads of rock layers such as rocks to be loaded on it, causing local or general shear failure and immediate settlement. So that the ground can be reinforced by evenly distributing the load by using the inherent shear strength of the sand to prevent it.

예컨대 방조제 축조 공사등과 같이 연약한 기초 지반상에 성토를 하여 구조물을 축조할 시에는 암석등의 성토재를 이용하여 기초지반을 보강한 후 구조물을 축조하게 된다. 그러나, 구조물을 연약한 기초 지반상에 축조할때 암석등을 침하시키면 즉시 침하가 발생하거나, 성토재의 투하시 지반을 다질수 없어 성토재 자체의 밀도가 적게되어 연약지반과 접촉시 성토재의 전단 강도가 매우 약하여 상재 하중에 의한 기초지반토와의 혼입이 발생하여 성토재 지반은 연약한 상태가 되며 상재 하중 크기에 따라 혼입 깊이도 달라져, 성토량이 증가하고 공사 기간도 길어지게 된다. 이러한 단점을 해소하기 위해 구조물 축조시 매트등을 지반상에 포설하고 그 위에 암석등의 성토층을 적하시킴으로써, 투하할 재료의 양을 절감하고 따라서 공사기간도 단축시키고자 하는 시도가 있었다.For example, when constructing a structure by laying the ground on a soft foundation such as a construction of a seawall construction, the structure is constructed after reinforcing the foundation ground using a fill material such as rock. However, when the structure is settled on the soft foundation ground, the settlement occurs immediately if it is settled on the ground, or the ground material itself can not be compacted. It is weak and mixed with the foundation soil due to the loading of soil, and the ground of soil is in a weak state. The depth of mixing is also changed according to the size of the loading of the soil, so the amount of filling is increased and the construction period is longer. In order to solve these disadvantages, there was an attempt to reduce the amount of material to be dropped and thus shorten the construction period by laying mats on the ground and dropping rock layers on the ground when constructing structures.

그러나, 상기와 같이 매트등을 지반상에 미리 포설하고 그 위에 암석등의 성토재를 투하시키는 경우에, 조류에 의하여 포설된 매트가 이동되거나, 성토재료의 하중 및 기초 지반의 연약한 상태에 따라 집중 하중을 받아 즉시 침하가 발생되어 성토재료가 함몰되고 혼입 깊이도 달라지는 등의 문제점이 있었다. 이러한 단점을 해결하기 위해 특허공보 제78-184호 및 실용신안공보 제82-83호에 기재돈 것과 같은 매트형 부재를 사용하는 방법 및 물품이 안출되었다. 그러나, 상기 방법은 실용신안 공보 제82-83호에서 지적하고 있는 바와 같은 단점을 가지며, 상기 실용신안공보에 기재된 고안도 모래를 포대 매트 내로 압송할시 압입력 및 성토재 투하시의 충격등에 의해 포대 봉합부가 파괴되어 전체가 하나의 포대를 구성하게 되어 집중하중을 받을 경우 모래층이 이동하게 되어 모래가 갖고 있는 고유 전단 강도를 발휘할 수 없게 되거나, 또는 각각의 포대부의 높이가 일정치 않게 되고, 재봉에 의한 포대매트들 사이의 연결부가 취약하게 되는등의 단점이 있다. 또한, 상기 고안에 기재된 포대 매트는 하층 상에 하층보다 긴 길이를 갖는 상층을 적층한 후 상층에 주름을 형성하고 등간격으로 재봉하여서 포대부를 마련하는데, 이는 주름부를 일정하게 하지 않으면 모래 주입시 그 높이가 상이하게되고, 전술한 재봉부의 파열시에는 그 높이가 더욱 일정하게 되지 않고 그 형태도 상호 상이하게 된다. 상기 고안에 따른 포대 매트는 별개의 상하층을 재봉으로 상호 재봉한 것이기 때문에, 재봉에 의한 고유 취약성에 따라 상기와 같이 모래를 압입할때 그 파열 현상을 피하기가 어려우며, 작업이 번거롭고 또한 경비가 많이 들게 된다. 부가해서, 상기 고안에 따른 포대 매트는 통상적으로 이토층으로 되어진 수중연약지반상에 설치되기 때문에, 탁류에 의해 주입공을 식별하기가 어렵게 된다.However, when the mat or the like is laid in advance on the ground as described above, and the soil material such as rocks is dropped thereon, the mat laid by the algae is moved, or the concentrated load depends on the load of the fill material and the soft state of the foundation ground. There was a problem that settlement occurs immediately after receiving the land material is immersed and the mixing depth is also changed. In order to solve this disadvantage, a method and an article using a mat-like member such as those disclosed in Patent Publication Nos. 78-184 and Utility Model Publication Nos. 82-83 have been devised. However, the above method has the disadvantages as pointed out in Utility Model Publication No. 82-83, and the turbulence caused by pressure input and impact on the discharge of landfill material is transported when the sand of the inventive design described in Utility Model Publication is pushed into the bag mat. When the suture is broken and the whole constitutes one bag, when the concentrated load is applied, the sand layer moves, so that the inherent shear strength of the sand cannot be exerted, or the height of each bag is not constant. There is a disadvantage such as a weak connection between the mat mats. In addition, the bag mat described in the above invention is to form a pleat in the upper layer by laminating the upper layer having a longer length than the lower layer on the lower layer and sewing at equal intervals, if the pleated portion is not constant, The heights are different, and when the above-described rupture of the sewing portion is made, the height is not even more constant, and the shape is also different from each other. Since the bag mat according to the above invention is to sew a separate upper and lower layers by sewing, it is difficult to avoid the rupture phenomenon when injecting the sand as described above according to the inherent fragility caused by the sewing, the work is cumbersome and expensive Will be heard. In addition, since the bag mat according to the above invention is usually installed on a soft ground of water made of an earth layer, it becomes difficult to identify the injection hole by turbidity.

본 고안은 상기한 종래의 기술에 비해 보다 염가이고 효율적인 연약지반 보강용의 포대매트를 제공하기 위한 것으로서 첨부도면을 참조로하여 설명하면 다음과 같다.The present invention is to provide a more inexpensive and efficient soft ground reinforcement mat than the prior art described above with reference to the accompanying drawings as follows.

제1도는 본 고안에 따른 포대 매트(10)의 일부를 사시도로 도시한 것으로서, (12)는 포대부, (14)는 포대부사이의 투수부, (16)은 모래 주입구, (18)은 연결끈 등을 수납하는 연결공이다.1 is a perspective view of a portion of the bag mat 10 according to the present invention, (12) is a bag portion, (14) a pitcher between the bag portion, (16) sand inlet, (18) It is a connection hole for storing the connection string.

포대 매트(10)은 합성 수지, 예컨대 나일론, 폴리에스터, 폴리에틸렌 또는 폴리프로필렌으로 직조한 직포로 되어진다. 제직시, 포대부(12)는 상하층을 분리되도록 별도로 직조하고 투수부(14)는 상하층을 함께 직조하여 2중직으로 한다. 포대매트(10)을 연약지반 상에 포설할시 지반내의 공극수는 투수층(14)를 통하여 포대매트 상부로 유출된다. 이와 같이 포대 매트를 2중직 직포로 구성함으로써 투수부(14)와 포대부(12) 사이에 재봉부가 필요없기 때문에 선행 기술에서 문제가 되었던 재봉부의 파괴와 같은 문제점은 나타나지 않게 된다. 포대부의 개구된 양측면은 제직시에 상하층을 함께 직조하거나 제직후 재봉등의 적절한 방법으로 폐쇄한다.The bag mat 10 is made of a woven fabric made of synthetic resin such as nylon, polyester, polyethylene or polypropylene. When weaving, the bag 12 is separately woven to separate the upper and lower layers, and the permeable portion 14 is woven together to form the upper and lower layers together. When the bag mat 10 is laid on the soft ground, the pore water in the ground flows out through the permeable layer 14 to the top of the bag mat. Since the bag mat is composed of a double woven fabric as described above, there is no need for the sewing portion between the pitcher 14 and the bag 12, so that problems such as destruction of the sewing portion, which has been a problem in the prior art, do not appear. The open sides of the bag are closed by a suitable method such as weaving the upper and lower layers together during weaving or sewing after weaving.

제조할 수 있는 직포의 폭은 직기의 크기에 따라 결정된다. 따라서, 단위 포대 매트의 폭은 현존 직기를 사용할 경우 4m이상을 초과하기는 어렵다. 이에 반해 예컨대 방조제 축조등과 같은 건설 현장에서 필요로 하는 직포 매트의 폭은 구조물의 설치면적에 따라 수십미터 또는 그 이상이 된다. 따라서 단위 포대 매트들을 연결하여 상당한 크기의 포대매트를 마련하여야만 된다. 이를 위해, 본 발명의 공법에 사용되는 포대 매트(10)에는 그 측면연부에 연결끈등을 인접 포대 매트들을 연결할 수 있으므로, 현장에서 용이한 방법으로 필요한 폭의 포대 매트를 제공할 수 있게 된다. 도면에는 포대매트의 일측면에만 연결공(18)을 마련하는 것으로 도시하였으나, 이는 필요에 따라 포대 매트의 양측면, 또는 주연부 전체에 마련할 수도 있다. 연결공(18)은 포대매트(10)이 제직된 후 공지의 적절한 방법을 사용하여 마련한다. 연결공(18)을 마련함으로써, 현장에서 재봉에 의해 포대 매트들을 상호 연결하는 종래의 방법에 비해서는 월등히 용이하고 효율적인 작업을 가능하게 하며, 연결부의 결합성을 향상시키게 된다.The width of the woven fabric that can be produced depends on the size of the loom. Therefore, the width of the unit bag mat is hard to exceed 4m or more when using existing looms. On the other hand, the width of the woven mat required at the construction site, such as for example, a masonry construction, is several tens of meters or more depending on the installation area of the structure. Therefore, unit bag mats must be connected to provide a bag of considerable size. To this end, the bag mat 10 used in the construction method of the present invention can be connected to the adjacent bag mats, such as connecting straps on the side edges, it is possible to provide a bag mat of the required width in an easy way in the field. Although the drawing shows that the connection hole 18 is provided only on one side of the bag mat, this may be provided on both sides of the bag mat, or the entire periphery as needed. The connection hole 18 is prepared by using a suitable method known after the bag mat 10 is woven. By providing the connection hole 18, the work is much easier and more efficient than the conventional method of interconnecting the bag mats by sewing in the field, and improves the coupling of the connection.

토목공사시에 지반별 특성에 따라 성토량 및 구조물의 하중을 고려하여 역학적 이론을 토대로 모래충 두께에 필요한 포대부(12)의 크기를 정하고 구조물의 설치 면적에 필요한 폭의 포대 매트(10)을 마련하여 보강할 연약지반상에 위치시킨후, 제3도에 도시한 바와 같이 펌프카 등과 같은 압송 장치를 사용하여 모래 또는 이토를 주입구(16)을 통해 충전시킨다. 모래등이 완전히 충진된 후에는 주입구(16)을 끈으로 묶어 밀폐시킨다. 모래등을 충전하기 전에 포대 매트(10)은 평면 형상이 되나, 주입구(16)은 수중에서 매트 표면으로 부터 부유되기 때문에, 혼탁한 수중에서도 식별이 용이하게 된다. 또한, 주입구(16)은 모래등이 완전히 충전되면 기둥을 형성하게 되어, 적하된 암석등의 이동을 방지하는 부가적인 역할을 하게 된다.In consideration of the soil volume and the load of the structure according to the characteristics of each ground during civil works, the size of the bag 12 for the thickness of the sand worm is determined based on the mechanical theory, and the bag mat 10 having the width required for the installation area of the structure is prepared. After being placed on the soft ground to be reinforced, sand or soil is filled through the inlet 16 using a pumping device such as a pump car as shown in FIG. After the sand is completely filled, the inlet 16 is sealed with a string. The bag mat 10 is flat in shape before filling the sand lamp, but since the inlet 16 is suspended from the mat surface in the water, identification is easy even in turbid water. In addition, the injection hole 16 forms a column when the sand is completely filled, thereby playing an additional role of preventing the movement of the loaded rock and the like.

도면에서는 포대부(12)가 원통형으로 구성되고 포대부들 사이에는 투수부(14)가 포대부(12)와 평행하게 연장되는 것으로 도시하였으나, 투수부(14)를 연속된 대편 형상이 아닌 점 형태로 하여, 포대부(12)가 전체 포대 매트에 걸쳐 상호 연통되도록 할수도 있다. 이와같이 포대매트(10)을 구성하는 경우에는 주입구(16)을 각각의 포대부에 마련할 필요는 없으며 단지 매트의 크기에 따라 적정수로 마련하기만 하면 된다.Although the bag 12 is formed in a cylindrical shape and the pitcher 14 extends in parallel with the bag 12 between the bag portions, the pitcher 14 is not a continuous counterpart shape. As a result, the bag portions 12 may be in communication with each other over the entire bag mat. Thus, when the bag mat 10 is configured, it is not necessary to provide the injection hole 16 in each bag part, but only a proper number according to the size of the mat.

포대 매트(10)에 모래를 완전히 충전시킨후에, 암석등을 투하여서 성토작업을 하게 된다. 본 고안에 따른 포대 매트는 그 두께가 전체에 걸쳐 일정하기 때문에, 선행기술에서와 같은 부분침하 현상은 나타나지 않고 하중을 모래의 고유 전단강도에 의해 균등하게 분산시키기 때문에, 해안 매립을 위한 토목공사 현장등에서, 성토재의 혼입 및 기초지반의 함몰정도를 감소시켜 매우 경제적으로 사용할 수 있게 된다.After the bag mat 10 is completely filled with sand, the work is carried out by pouring rocks and the like. Since the bag mat according to the present invention has a constant thickness throughout, there is no partial subsidence as in the prior art, and evenly distributes the load by the inherent shear strength of sand, so that the civil engineering site for landfill In the back, it is possible to use very economically by reducing the level of mixing of the fill material and the depression of the foundation ground.

Claims (2)

상호 평행하게 교호로 배설된 포대부(12) 및 투수부(14)를 형성하도로 2개의 직포를 부분적으로 2중직이되도록 제직하여 마련하는 연약 지반 보강용 포대 매트에 있어서, 각 포대부(12)에 포대부(12)로부터 돌추된 주입구(16)을 마련한 것을 특징으로 하는 연약 지반 보강용 포대 매트.In the fabric mat for soft ground reinforcement which is prepared by weaving two woven fabrics to be partially doubled to form the bag portion 12 and the permeable portion 14 alternately disposed in parallel to each other, each bag portion 12 The mat for soft ground reinforcement characterized in that the injection hole 16 protruded from the bag portion 12 is provided in the). 제1항에 있어서, 포대 매트(10)의 일측면 이상에 각 포대 매트를 상호 연결하기 위한 연결공(18)들을 마련한 것을 특징으로 하는 포대 매트.The turret mat according to claim 1, wherein connecting holes (18) are provided on at least one side of the turret mat (10) for interconnecting the turret mats.
KR2019880017241U 1988-10-25 1988-10-25 Fabric form met for improving ground KR920008319Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019880017241U KR920008319Y1 (en) 1988-10-25 1988-10-25 Fabric form met for improving ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019880017241U KR920008319Y1 (en) 1988-10-25 1988-10-25 Fabric form met for improving ground

Publications (2)

Publication Number Publication Date
KR900008477U KR900008477U (en) 1990-05-01
KR920008319Y1 true KR920008319Y1 (en) 1992-11-16

Family

ID=19280514

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019880017241U KR920008319Y1 (en) 1988-10-25 1988-10-25 Fabric form met for improving ground

Country Status (1)

Country Link
KR (1) KR920008319Y1 (en)

Also Published As

Publication number Publication date
KR900008477U (en) 1990-05-01

Similar Documents

Publication Publication Date Title
US5320455A (en) Geocell with facing panel
US7314336B2 (en) Fine-grained fill reinforcing apparatus and method
CA2974437C (en) Improved containment dike
US4521131A (en) Lightweight semi-flexible dike
US3396542A (en) Method and arrangements for protecting shorelines
BRPI0611412A2 (en) lightweight mattress protection and filtering element
US5823709A (en) Interconnected block system
US5040572A (en) Revetment mattress
US3890802A (en) Reinforced dike
KR920008319Y1 (en) Fabric form met for improving ground
JP2005163309A (en) Method for surface layer treatment of soft ground, and surface layer treatment bag body and surface layer treatment reinforcing material used for the same
KR100774551B1 (en) Tube type mat for preventing erosion and method of preventing erosion using the tube type mat
JPS6311710A (en) Earthquake-proofing and reinforcing work for existing structure
KR970007577B1 (en) Zigzag type fiber bag for protecting bank
JP4115922B2 (en) Civil engineering structure forming bag and civil engineering structure using this civil engineering structure forming bag
KR20090118296A (en) Geotextile tube and method for constructing the tube
KR920002866Y1 (en) Improving sand mat for foundation ground
JP4146929B2 (en) Gabion block connection structure
KR100614907B1 (en) Member for Constructing Breast Wall and Method of Constructing the Breast Wall
KR101233123B1 (en) fabric form for slope construction
GB1603510A (en) Casing for a matress for lining or facing a land surface
KR100280958B1 (en) Drainage-type (freshwater) fiber bands and revetment method using the same
KR100748080B1 (en) Interception fabric form and interception wall construction method using the same
KR102539696B1 (en) Geotextile mats for protection slop and construction method using the same
CN219080275U (en) Discrete pile framework bag for reinforcing flow plastic soft foundation

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 19981017

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee