KR910006575A - Basement piling construction method and its piles. - Google Patents

Basement piling construction method and its piles. Download PDF

Info

Publication number
KR910006575A
KR910006575A KR1019890012966A KR890012966A KR910006575A KR 910006575 A KR910006575 A KR 910006575A KR 1019890012966 A KR1019890012966 A KR 1019890012966A KR 890012966 A KR890012966 A KR 890012966A KR 910006575 A KR910006575 A KR 910006575A
Authority
KR
South Korea
Prior art keywords
pile
basement
piles
piling
ground
Prior art date
Application number
KR1019890012966A
Other languages
Korean (ko)
Other versions
KR930005459B1 (en
Inventor
유안호 리
Original Assignee
유안호 리
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유안호 리 filed Critical 유안호 리
Priority to KR1019890012966A priority Critical patent/KR930005459B1/en
Publication of KR910006575A publication Critical patent/KR910006575A/en
Application granted granted Critical
Publication of KR930005459B1 publication Critical patent/KR930005459B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/20Caisson foundations combined with pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

내용 없음No content

Description

지하실 말뚝박기 시공방법 및 그 말뚝.Basement piling construction method and its piles.

본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음As this is a public information case, the full text was not included.

제1도는 이 발명의 방법의 실시례에 있어서의 지하실구조체의 평면도,1 is a plan view of a basement structure in an embodiment of the method of the present invention,

제2도는 본 발명의 방법의 실시례에 있어서의 지하실 구조체와 말뚝박기장치의 배설 관계도,2 is a diagram illustrating the relationship between the basement structure and the pile driving device in the embodiment of the method of the present invention,

제4도는 제3도의 말뚝의 단면도,4 is a cross-sectional view of the pile of FIG.

제5도는 이 방법에 의한 말뚝박기 시공 형태를 나타내는 단면도.Fig. 5 is a sectional view showing the pile construction form by this method.

Claims (5)

지상에서 미리 형성한 지하실구조체(10)를 지하에 가라앉히는 방법으로서, 구조체(10)에 복수개의 말뚝박기장치(20)를 균일하게 배설, 고정하고, 그 복수개의 말뚝박기장치(20)에 의해 복수개의 말뚝(30)을 각각 지반의 적어도 구조체(10)의 자체무게 이상의 부하를 지지할 수 있는 위치에 박아 넣은뒤, 그 박아넣은 복수개의 말뚝(30)에 의해 구조체(10)을 지지한채, 지반을 굴삭하여 파낸 흙을 제거하면서 복수개의 말뚝박기장치(20)의 지지력을 동시에 해제하여 구조체(10)를 가라앉히는 지하실 말뚝박기 시공방법.As a method of sinking the basement structure 10 previously formed on the ground in the basement, a plurality of pile drivers 20 are uniformly arranged and fixed to the structure 10, and by the plurality of pile drivers 20 After each of the plurality of piles 30 are driven in a position capable of supporting a load of at least the weight of the structure 10 of the ground, respectively, and then the structure 10 is supported by the plurality of piled-in piles, Method of piling the basement piling to sink the structure 10 by simultaneously releasing the supporting force of the plurality of piling device 20 while removing the soil excavated by excavating the ground. 제1항에 있어서, 상기 복수개의 말뚝(30)을 소정 위치까지 박아 넣은뒤, 상기 지반굴삭과 구조체 가라앉힘을 반복하여 구조체(10)를 소정위치까지 가라앉힘을 지하실 말뚝박기 시공 방법 및 그 말뚝The method of claim 1, wherein the plurality of piles 30 are driven to a predetermined position, and the ground excavation and the structure sinking are repeated to sink the structure 10 to a predetermined position, and the pile 제2항에 있어서, 설계위치까지 복수번으로 나뉘도록, 상기 말뚝박기와 굴삭, 가라앉힘의 수순을 반복하여 구조체를 그 설계위치까지 가라앉히는 지하실 말뚝박기 시공 방법 및 그 말뚝.The method of claim 2, wherein the pile piling, excavation, and sinking procedure is repeated so as to be divided into a plurality of design positions to sink the structure to the design position and the pile. 착탈 가능하게 직력 연결함에 의해 연장할 수 있는 복수의 마디부분(31)(32)으로 이루어지는 말뚝(10).A pile (10) consisting of a plurality of node portions (31) (32) that can be extended by attaching or detaching a straight line. 제4항에 있어서, 상기 말뚝 전체를 거의 속이 빈 형태로 하여, 그 중공(中空)부분의 상기 말뚝(30)의 각마디부분(31,32)의 사이에 각각 서로 끼워 맞추면서 볼트(316)로 조여 고정할 수 있는 플랜지구조(311,312,313)를 형성하여 이루어지는 말뚝.5. The bolt 316 according to claim 4, wherein the entire pile is almost hollow, and each of the joint portions 31, 32 of the hollow portion 30 is fitted with each other. Pile formed by forming a flange structure (311, 312, 313) that can be tightened. ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.※ Note: The disclosure is based on the initial application.
KR1019890012966A 1989-09-07 1989-09-07 Pile-drive working system and a pile for under ground structure KR930005459B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019890012966A KR930005459B1 (en) 1989-09-07 1989-09-07 Pile-drive working system and a pile for under ground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019890012966A KR930005459B1 (en) 1989-09-07 1989-09-07 Pile-drive working system and a pile for under ground structure

Publications (2)

Publication Number Publication Date
KR910006575A true KR910006575A (en) 1991-04-29
KR930005459B1 KR930005459B1 (en) 1993-06-22

Family

ID=19289717

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019890012966A KR930005459B1 (en) 1989-09-07 1989-09-07 Pile-drive working system and a pile for under ground structure

Country Status (1)

Country Link
KR (1) KR930005459B1 (en)

Also Published As

Publication number Publication date
KR930005459B1 (en) 1993-06-22

Similar Documents

Publication Publication Date Title
US4728225A (en) Method of rehabilitating a waterfront bulkhead
US4242013A (en) Method for forming a hole in the earth
KR910006575A (en) Basement piling construction method and its piles.
JPH11209996A (en) Footing structure of cylindrical towery structure
JPH0381422A (en) Caisson method
JP2005083149A (en) Reinforcement method for foundation and reinforcement structure of foundation
JP2987371B2 (en) Underground diaphragm wall
JPS5844119A (en) Stabilization work for sheathing wall
JPH06173278A (en) Foundation structure for building structure
JPS59118924A (en) Penetration of steel sheet pile
JP2761911B2 (en) Early support method
JPH06173284A (en) Construction method for self-standing continuous wall
SU1763580A1 (en) Foundation of earthquake-proof building, structure
JP2753750B2 (en) Split vertical shield machine
KR930023261A (en) How to install the truck lift device
JPS64440Y2 (en)
SU658225A1 (en) Method of erecting pile foundation
SU585249A1 (en) Highway road bed
JPS59367Y2 (en) Subsidence prevention device for poles, piles, etc.
JPS55136337A (en) Reinforcing method for existing structure, footing, ground and the like
SU1548340A1 (en) Method of installing anchor inventory pile
CN113293798A (en) Construction method of shallow-buried open-cut tunnel penetrating urban road obliquely
JPH0213605A (en) Construction method for caisson and quay wall made utilizing it
JPH01318692A (en) True-circle holder for segment
JPH09256451A (en) Water permeable gutter block, water permeable gutter with earth retaining wall and construction method therefor

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
G160 Decision to publish patent application
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 19990617

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee