KR910001396Y1 - Irrigation canal jointer - Google Patents
Irrigation canal jointer Download PDFInfo
- Publication number
- KR910001396Y1 KR910001396Y1 KR2019880011707U KR880011707U KR910001396Y1 KR 910001396 Y1 KR910001396 Y1 KR 910001396Y1 KR 2019880011707 U KR2019880011707 U KR 2019880011707U KR 880011707 U KR880011707 U KR 880011707U KR 910001396 Y1 KR910001396 Y1 KR 910001396Y1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- water pipe
- movable
- rod
- guide rod
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B13/00—Irrigation ditches, i.e. gravity flow, open channel water distribution systems
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
내용 없음.No content.
Description
제1도는 본 고안의 사시도.1 is a perspective view of the present invention.
제2도는 제1도의 측면도.2 is a side view of FIG.
제3도는 용수로관의 조인트작동을 설명하기 위한 본 고안의 정면도로서. (a)는 작동전의 상태도. (b)는 용수로관이 조인트된 상태도.3 is a front view of the present invention for explaining the joint operation of the water pipe. (a) is a state diagram before operation. (b) is a state in which water pipes are jointed.
제4도는 클램핑기구 부분의 사시도.4 is a perspective view of a clamping mechanism portion.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
1 : 고정지지대 2 : 이동지지대1: fixed support 2: moving support
3 : 접속봉 4 : 유압실린더3: connecting rod 4: hydraulic cylinder
5 : 피스턴로드 6 : 이동안내봉5: Piston Road 6: movement guide
7 : 받침대 11 : 가이드봉7: pedestal 11: guide rod
13 : 이동편 14 : 클램핑기구13: moving piece 14: clamping mechanism
15 : 지지판 16 : 작동편15: support plate 16: operating piece
18 : 가압판 19 : 연결봉18: pressure plate 19: connecting rod
20 : 캠레버 22 : 로울러20: cam lever 22: roller
본 고안은 농업용수나 공업용수를 논밭이나 고장으로 공급하기 위해 사용되는 용수로관을 간편하게 연결, 시공할 수 있도록 구성된 용수로관 조인터(Jointer)에 관한 것이다.The present invention relates to a waterway pipe jointer (Jointer) configured to easily connect and construct a waterway pipe used for supplying agricultural water or industrial water to paddy fields or breakdowns.
종래에는 용수로관이 설치될 현장(저수지에서 논밭사이 또는 하천으로부터 공장사이등)에서 직접 거푸집을 제작하여 콘크리트를 타설, 양생하였으나 이러한 경우 콘크리트의 내구성 및 강도가 떨어지기 쉬운 품질 관리상의 문제점이 있고, 시공이 복잡함에 따라 공사기간이 지연되어 설치비용이 많이들게 되며, 특히 콘크리트 양생은 동절기에 매우 불리하기 때문에 시공시기에 제한을 받게된다.Conventionally, the concrete is cast and cured by directly forming the formwork at the site where the water pipes are installed (between reservoirs or between rivers and factories), but in this case, there is a problem in quality control that the durability and strength of the concrete tend to fall. As the construction is complicated, the construction period is delayed and the installation cost is high. Especially, concrete curing is very disadvantageous in winter, which limits the construction time.
따라서 근래에는 소정의 길이로 된 조립식 용수로관을 공장에서 미리 제작한후 이들을 설치현장으로 옮겨 연질, 시공하는 경우가 많으며, 이러한 경우 현장에서 직접 거푸집을 제작, 시공하는 것에 비해 용수로관의 품질관리가 용이하고 시공시기에 제한을 받지않게 되는 장점이 있다.Therefore, in recent years, prefabricated water pipes having a predetermined length are manufactured at the factory in advance, and these are often moved to the installation site for softness and construction. There is an advantage that it is easy and not restricted in construction time.
그러나 용수로관은 상당한 무게를 가지고 있고, 또 각 관의 연결부분에는 콘크리이트의 양생시 일체로 매설된 누수방지 패킹이 있어 연결, 시공시 이들 패킹부분을 강제끼워 맞춤과 같은 수단에 의해 결합하면서 연결하여야 하므로 시공시 많은 인원이 필요해진다.However, the waterway pipe has a considerable weight, and the connection part of each pipe has leak-proof packing which is embedded at the time of curing of concrete. Many people are required for construction.
본 고안은 종래의 이와같은 문제점을 해소하기 위해 기계적인 장치에 의해 각 관을 연결할 수 있게 한것인바, 이를 첨부도면에 의해 더욱 상세히 설명하면 다음과 같다.The present invention is to solve the problems of the prior art to connect each tube by a mechanical device, which will be described in more detail by the accompanying drawings as follows.
첨부도면 제1도와 제2도는 본 고안의 사시도와 측면도로서, 본고안 조인터는 좌, 우 한쌍의 고정지지대(1)와 이동지지대(2), 각 지지대(1)(2)의 하단부에 분해, 결합이 가능하게 결합되어 용수로관(23)의 내측면과 직접 접촉되는 접속봉(3), 각 지지대(1) (2) 사이에 설치된 유압실린더(4), 각 지지대(1) (2) 상단에 지지대와 직교하는 방향으로 끼워져 고정된 이동안내봉(6), 각 이동안내봉(6)의 양측에 결합되어 용수로관의 클램핑작동을 하는 4개의 클램핑(Clamping)기구(14), 지지대(1)(2)의 상방에 설치된 받침대(7), 받침대(7)위에 고정된 오일탱크(8)와 조작레버(9) 및 전환레버(10), 받침대(7)의 일측에 고정된 한쌍의 가이드봉(11), 가이드봉(11)의 끝부분에 고정된 스토퍼판(12), 가이드봉(11)에 이동 가능하게 끼워진 상대로 이동지지대(2)의 상단에 고정된 이동편(13)으로 구성된다.1 and 2 are a perspective view and a side view of the present invention, and the joint design is disassembled at the lower left and right pairs of the fixed support 1, the movable support 2, and the respective support 1, 2; , Connecting rod (3), hydraulic cylinder (4) installed between each support (1) (2) in direct contact with the inner surface of the water pipe (23) so as to be coupled to each other, each support (1) (2) The moving guide rods 6 inserted in the direction orthogonal to the supports at the top and fixed, the four clamping mechanisms 14 coupled to both sides of each of the movement guide rods 6 for clamping operation of the water pipes, 1) (2) installed on the pedestal (7), a pair of oil tank (8) fixed on the pedestal (7) and the operating lever (9) and the switching lever (10), fixed to one side of the pedestal (7) The guide rod 11, the stopper plate 12 fixed to the end of the guide rod 11, and the movable piece 13 fixed to the upper end of the movable support 2 relative to the guide rod 11 so as to be movable. phrase It is made.
2개의 지지대(1)(2)중 고정지지대(1)는 받침대(7)와 고정되고 있고 이동지지대(2)는 받침대(7)의 일측 가이드봉(11)에 끼워진 이동편(13)에 고정되어 있으며, 유압실린더(4)는 받침대(7) 상방에 설치된 오일탱크(8)와 호오스(도시는 생략함)로 연결되어 전환레버(10) 및 조작레버(9)의 작동에 따라 피스톤로드(5)가 진퇴함과 동시에 이동지지대(2)가 이동하게 된다(전환레버와 조작레버에 의해 유압실린더를 작동시키는 구조는 공지의 구조임).Of the two supports 1 and 2, the fixed support 1 is fixed to the pedestal 7 and the movable support 2 is fixed to the moving piece 13 fitted to one guide rod 11 of the pedestal 7. The hydraulic cylinder 4 is connected to the oil tank 8 and the hose (not shown) installed above the pedestal 7 so that the piston rod (according to the operation of the switching lever 10 and the operating lever 9) At the same time as 5) moves forward, the movable support 2 moves (the structure for operating the hydraulic cylinder by the switching lever and the operation lever is a known structure).
각 이동안내봉(6)에 설치된 클램핑기구(14)는 제4도와 같이 이동 안내봉(6)에 이동 가능하게 끼워진 지지판(15), 이 지지판(15)에 힌지축(17)으로 결합된 좌,우 한쌍의 작동편(16))의 하단부에 조정 가능하게 결합된 가압판(18), 각 작동편(16) 사이에 연결된 연결봉(19), 연결봉(19)의 끝부분에 결합된 상태로 일측 작동편과 접속된 켐레버(20)등으로 구성되어 있으며, 연결봉(19)의 중간부분에는 볼트(도시는 생략함) 가 접속되어 용수로관 리브의 두께가 규격에 따라 변화하여도 연결봉(19) 사이의 볼트를 조정하는 수단에 의해 용수로관 리브의 두께 변화에 상관없이 클램핑이 가능하다.The clamping mechanism 14 installed in each of the movement guide rods 6 includes a support plate 15 movably fitted to the movement guide rod 6 as shown in FIG. 4, and a left side coupled to the support plate 15 by a hinge shaft 17. Pressing plate 18 adjustablely coupled to the lower end of the pair of right operating piece (16), the connecting rod 19 connected between each operating piece 16, one side in the state coupled to the end of the connecting rod (19) It consists of a cam lever 20, etc. connected to the working piece, and a connecting rod 19 is connected to a bolt (not shown) in the middle of the connecting rod 19 so that the rib of the water pipe can be changed according to the standard. By means of adjusting the bolts in between, clamping is possible regardless of the thickness change of the water channel pipe ribs.
따라서 캠레버(20)를 아래방향으로 누르면 캠레버(20)의 회전에 의해 각 작동편(16)이 내측방향으로 오무라 들어 용수로관(23)을 크램핑하게 되며, 지지판(15)은 조임나사(21)에 의해 이동안내봉(6)과 걸합되어 있어 용수로관의 규격폭에 따라 클램핑기구(14) 사이의 거리를 자유롭게 가변시킬 수 있다.Therefore, when the cam lever 20 is pushed downward, the operation pieces 16 are moved inwardly by the rotation of the cam lever 20 to clamp the water pipe 23, and the support plate 15 is tightened. It is engaged with the movement guide rod 6 by the screw 21, it is possible to freely vary the distance between the clamping mechanism 14 according to the standard width of the water pipe.
또 지지판(15)의 다른 일측에는 로울러(22)가 결합되어 있으며. 이 로울러(22)는 시공시 용수로관의 상면에 얹혀지게 되어 있다.The roller 22 is coupled to the other side of the support plate 15. The roller 22 is mounted on the upper surface of the water pipe during construction.
도면중 설명되지 않은 부호 24는 용수로관의 연결부분에 매립된 패킹이다.Reference numeral 24, which is not described in the figure, is a packing embedded in the connection portion of the water pipe.
이와같이 구성된 본 고안의 작동상태와 그 효과를 설명하면 다음과 같다.Referring to the operation state of the present invention configured as described above and its effects are as follows.
먼저 클램핑기구(14)의 지지판(15)과 이동안내봉(6) 사이에 결합된 조임나사(21)를 풀거나 조여 이동안내봉(6)의 양측에 설치된 클램핑기구(14) 사이의 간격을 시공할 용수로관(23)의 폭과 같은 간격으로 조절한후 제2도 및 제3도와 같이 각 지지대(1)(2)를 서로 연결될 2개의 용수로관 위에 올려놓는다.First, loosen or tighten the tightening screw 21 coupled between the support plate 15 of the clamping mechanism 14 and the movement guide rod 6 to thereby close the gap between the clamping mechanisms 14 installed on both sides of the movement guide rod 6. After adjusting at intervals equal to the width of the water flow pipe 23 to be constructed, as shown in Figs. 2 and 3, each support (1) (2) is placed on the two water pipes to be connected to each other.
이때 각 지지대(1)(2) 하단부에 결합된 접속봉(3)이 용수로관의 내측 바닥면에 접속되고 지지판(15)에 설치된 로울러(22)는 용수로관의 상단면에 얹혀져야 하며, 만약 접속봉(3)이 용수로관의 바닥면에 접속되지 않는 경우에는 각 지지대(1)(2)를 절첩하여 접속봉(3)이 바닥면에 닿게하여 준다(접속봉은 용수로관의 단면형상에 따라 여러종류의 규격으로 제조됨).At this time, the connecting rods 3 coupled to the lower ends of the supports 1 and 2 are connected to the inner bottom surface of the water pipe and the rollers 22 installed on the support plate 15 should be placed on the top surface of the water pipe. If the connecting rods 3 are not connected to the bottom of the water pipe, fold each support 1 and 2 so that the connecting rods 3 touch the bottom. Manufactured to different types of specifications).
이렇게 각 지지대(1)(2)의 하단부에 결합된 접속봉(3)이 용수로관(23)의 바닥면에 접속되고 로울러(22)가 용수로관의 상단면에 얹혀진 상태에서는 제2도와 같이 용수로관의 양측 상단부분이 이동안내봉(6)에 설치된 클램핑기구(14) 사이에 위치하게 되며, 이 상태에서 클램핑기구(14)의 캠레버(20)를 회전시키면 용수로관이 클램핑기구에 의해 클램핑된다.In this state, the connecting rods 3 coupled to the lower ends of the supports 1 and 2 are connected to the bottom surface of the water pipe 23 and the roller 22 is mounted on the top surface of the water pipe. Both upper upper ends of the pipe are positioned between the clamping mechanisms 14 installed in the movement guide rod 6, and in this state, when the cam lever 20 of the clamping mechanism 14 is rotated, the water pipe tube is clamped by the clamping mechanism. do.
즉, 제2도와 같은 상태에서 캠레버(20)를 도면상 화살표 방향으로 회전시키면 캠레버(20)와 직접 접속되어있는 작동편(16)이 캠레버(20)에 의해 힌지축(17)을 중심으로 용수로관 방향으로 회전하게 되고 그 반대측에 있는 작동편도 연결봉(19)의 당김작동에 의해 용수로관 방향으로 회전하므로 각 작동편(16)의 끝부분에 회전가능하게 결합된 가압판(18)에 의해 용수로관(23)의 상단부분이 클램핑되는 것이다.That is, when the cam lever 20 is rotated in the direction of the arrow on the drawing in the state as shown in FIG. 2, the operating piece 16 directly connected to the cam lever 20 causes the hinge shaft 17 to be moved by the cam lever 20. It is rotated in the direction of the water pipe tube to the center and the operating piece on the opposite side is also rotated in the water pipe tube direction by the pulling operation of the connecting rod 19 to the pressure plate 18 rotatably coupled to the end of each operating piece (16). By the upper portion of the water pipe 23 is clamped.
이와같이 이동안내봉(6)의 양측에 설치된 4개의 클램핑기구(14)에 의해 일정간격 만큼 떨어진 2개의 용수로관이 클램핑된 상태, 즉 제3도 (a)와 같은 상태에서 오일탱크(8) 상방에 설치된 전환레버(10)와 조작레버(9)에 의해 유압실린더(4)를 작동시켜 피스턴로드(5)를 당겨주면 피스턴로드(5)의 끝부분에 결합된 이동지지대(2)가 당겨짐과 동시에 용수로관이 함께 당겨져 2개의 용수로관은 결합된다.In this way, the two water pipes separated by a predetermined interval by the four clamping mechanisms 14 installed on both sides of the moving guide rod 6 are clamped, that is, above the oil tank 8 in the state shown in FIG. By operating the hydraulic cylinder (4) by the switching lever 10 and the operating lever (9) installed on the pull rod piston rod (5) is pulled the moving support (2) coupled to the end of the piston rod (5) and At the same time, the water pipes are pulled together to join the two water pipes together.
즉. 피스턴로드(5)가 당겨지면 이동지지대(2)에 당기는 힘이 작용하게 되는데, 이동지지대(2)의 상단부에는 이동편(3)이 고정되어 이 이동편(13)이 받침대(7)의 일측에 고정된 가이드봉(11)에 끼워져 있고 이동지지대(2) 하단에 결합된 접속봉(3)은 용수로관(23)의 바닥면에 접속되어 있으므로 이동지지대(2)는 이동편(13)과 함께 가이드봉(11)에 안내되면서 당겨지게 되고, 이동지지대(2)에 삽입 고정된 이동안내봉도 이동지지대(2)와 함께 당겨지게 되며, 이동안내봉(6)의 양측 클램핑기구(14)도 용수로관이 클램핑된 상태로 피스턴로드(5)의 작동에 따라 함께 당겨져 제3도 (b)와 같이 각 용수로관(23)의 연결부분에 매립된 패킹(24)이 강제끼워 맞춤되면서 2개의 용수로관이 연결되는 것이다.In other words. When the piston rod 5 is pulled, a pulling force acts on the movable support 2, and the movable piece 3 is fixed to the upper end of the movable support 2 so that the movable piece 13 is one side of the pedestal 7. The connecting rods 3 fitted to the guide rods 11 fixed to the connecting rods 3 and coupled to the lower ends of the movable supporters 2 are connected to the bottom surface of the water pipe 23. While being guided to the guide rods 11 and being pulled together, the moving guide rods inserted and fixed to the moving support 2 are also pulled together with the moving support 2, and both side clamping mechanisms 14 of the moving guide rods 6 are also pulled. As the water pipe is clamped and pulled together according to the operation of the piston rod 5, the packing 24 embedded in the connection portion of each water pipe 23 is forcedly fitted as shown in FIG. The pipe is connected.
이렇게 2개의 용수로관이 연결, 조립된 후에는 클램핑기구(14)의 캠레버(20)를 제2도 화살표의 반대방향으로 회전시켜 용수로관을 클램핑 상태에서 해제시키고, 또다른 용수로관외 연결을 위해 본고안 조인터를 이동시키게 되는데, 지지판(15)에 설치된 로울러(22)는 클램핑기구(14)의 클램핑 해제상태에서도 항상 용수로관(23)의 상면에 접속되어 있으므로 이 로울러(22)들의 구름마찰에 의해 조인터 전체의 이동이 용이해지며, 전술한바와같은 동일한 작동에 의해 또다른 용수로관을 연결, 조립합 수 있게 된다.After the two water pipes are connected and assembled, the cam lever 20 of the clamping mechanism 14 is rotated in the opposite direction to the arrow of FIG. 2 to release the water pipe from the clamping state, and for another external water pipe connection. In this case, the jointer is moved. The roller 22 installed on the support plate 15 is always connected to the upper surface of the water pipe 23 even in the state in which the clamping mechanism 14 is released. This facilitates the movement of the entire joint, and it is possible to connect and assemble another water pipe by the same operation as described above.
또 연결, 조립된 용수로관의 철거나 이동을 위해 각 용수로관을 분리할 필요가 있을 때에는 전술한 바와는반대로 유압실린더(4)의 피스턴로드(5)가 완전히 후진되이 있는 상태에서 클램핑기구(14)에 의해 용수로관을 클램핑 후 피스턴로드(5)를 전진시켜 각 용수로관을 용이하게 분리시킬 수 있다.In addition, when it is necessary to separate the respective water pipes for the connection or assembly of the water pipes connected or assembled, the clamping mechanism 14 in the state in which the piston rod 5 of the hydraulic cylinder 4 is completely reversed is reversed as described above. After the clamping of the water pipe, the piston rod 5 can be advanced to easily separate each water pipe.
상기 실시예에서는 용수로관이 대략 사다리꼴 단면형상으로 되어있고. 이에따라 각 지지대(1)(2)의 하단부에 대략 "ㄷ"자 상으로 된 접속봉(3)을 결합한 일예를 설명하였으나, 용수로관의 단면형상에 따라 그 형상에 알맞는 접속봉을 결합하고. 또한 이동 안내봉(6)에 설치된 클램핑기구(14)의 간격을 조절하는 수단에 의해 어떠한 형태를 가진 용수로관도 용이하게 연결, 조립할 수 있다.In the above embodiment, the water pipe is substantially trapezoidal in cross section. Accordingly, one example of coupling the connecting rods 3 having a substantially "c" shape to the lower ends of the respective supporters 1 and 2 has been described, but joining the connecting rods suitable for the shape according to the cross-sectional shape of the water pipe. In addition, by means of adjusting the spacing of the clamping mechanism 14 installed in the movement guide rod 6 can be easily connected and assembled with any water pipe.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019880011707U KR910001396Y1 (en) | 1988-07-19 | 1988-07-19 | Irrigation canal jointer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019880011707U KR910001396Y1 (en) | 1988-07-19 | 1988-07-19 | Irrigation canal jointer |
Publications (2)
Publication Number | Publication Date |
---|---|
KR900003036U KR900003036U (en) | 1990-02-07 |
KR910001396Y1 true KR910001396Y1 (en) | 1991-03-04 |
Family
ID=19277636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019880011707U KR910001396Y1 (en) | 1988-07-19 | 1988-07-19 | Irrigation canal jointer |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR910001396Y1 (en) |
-
1988
- 1988-07-19 KR KR2019880011707U patent/KR910001396Y1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR900003036U (en) | 1990-02-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211447798U (en) | House building wall component | |
KR910001396Y1 (en) | Irrigation canal jointer | |
US20210087799A1 (en) | Fixing device and faucet installation device | |
ATE100522T1 (en) | INTERMEDIATE PIPE PRESSING DEVICE. | |
US4519122A (en) | Puller mechanism for assembling pipelines | |
HRP990330B1 (en) | Coupling sleeve provided with locking means for pipes connection | |
EP0196489B1 (en) | Device for joining two pipes together | |
USRE29054E (en) | Apparatus for attaching a hot and cold water plumbing fixture to building water pipes | |
FI59659B (en) | ANORDING WITH ROERKOPPLING FOR TVAERRIKTADE ROERANSLUTNINGAR VID TRANSPORTROER FOER VAETSKA GAS ELLER DYLIKT | |
KR100538980B1 (en) | Stairs facilities structure for building structure | |
CN115143338B (en) | Hydraulic drive-based self-conduction pipeline plugging device | |
KR100576259B1 (en) | Separation protective device of waterworks curving casket | |
CN214999994U (en) | Novel waterproof construction is used in water conservancy construction | |
CN209874498U (en) | Concrete conveying pipe reinforcing apparatus | |
CN218883174U (en) | Rocker type pipeline aligning installation device | |
ATE141677T1 (en) | IMPROVED BAND CLAMP WITH WEDGE-SHAPED, SLOTTED CAMS | |
CN218540362U (en) | Box girder construction that pipeline laid along with bridge | |
CN114233960B (en) | Detachable water guide pipe for assembly type building engineering | |
SU1145205A1 (en) | Device for fitting couplings on asbestos-cement pipes | |
CN215673692U (en) | Adjustable flow divider valve | |
KR200215365Y1 (en) | A liner closely device in old pipe end inside | |
CN217272789U (en) | Self-diversion pipeline plugging device | |
CN2893340Y (en) | Blind hole type plate inserting valve | |
CN221298206U (en) | Combined adjustable steel structure assembly | |
CN219840433U (en) | Steel construction supporting component convenient to dismantle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 19970304 Year of fee payment: 9 |
|
LAPS | Lapse due to unpaid annual fee |