KR890005354A - Concrete pouring method in underground continuous wall construction - Google Patents

Concrete pouring method in underground continuous wall construction Download PDF

Info

Publication number
KR890005354A
KR890005354A KR870010750A KR870010750A KR890005354A KR 890005354 A KR890005354 A KR 890005354A KR 870010750 A KR870010750 A KR 870010750A KR 870010750 A KR870010750 A KR 870010750A KR 890005354 A KR890005354 A KR 890005354A
Authority
KR
South Korea
Prior art keywords
concrete
bag
excavation
excavator
stabilizer
Prior art date
Application number
KR870010750A
Other languages
Korean (ko)
Other versions
KR910003746B1 (en
Inventor
박노철
이덕수
Original Assignee
박노철
주식회사 금토개발
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박노철, 주식회사 금토개발 filed Critical 박노철
Priority to KR1019870010750A priority Critical patent/KR910003746B1/en
Publication of KR890005354A publication Critical patent/KR890005354A/en
Application granted granted Critical
Publication of KR910003746B1 publication Critical patent/KR910003746B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Abstract

내용 없음No content

Description

본체로 이용하는 지하 연속벽 축조에서의 콘크리트 타설 방법Concrete pouring method in underground continuous wall construction

본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음As this is a public information case, the full text was not included.

제 1 도는 엘레멘트 굴삭후 본 발명에 따른 불투수성 포대의 사용을 설명한 도면.1 illustrates the use of an impervious bag according to the invention after element excavation.

제 2 도 포대 내부에 철근을 넣고 콘크리트를 타설하는 방법을 설명한 도면.2 is a view for explaining how to put the reinforcement in the bag and cast concrete.

Claims (4)

벤토나이트계 또는 폴리머계로 이루어진 안정액을 사용하여 각 엘레멘트(element)를 굴삭해 굴삭부를 형성하고 ; 굴삭부의 크기와 동일한 형태의 유연하고 활동(滑動)이 가능한 PP, PE 또는 RVC 포대와 같은 불투수성 포대를 굴삭부 상부에 설치하고 ; 배출관을 통해 굴삭부 내의 안정액 굴삭부 저면의 슬라임을 배출시키면서 배출되는 안정액의 양과 동일한 양의 약제를 포대에 넣어 포대가 안정액의 배출과 연동되어 굴삭부 벽면을 따라 원활히 내려가도록 하고 ; 배출관을 인양하고 포대 내부에 조립된 철근을 넣은 다음 콘크리트를 타설하고 ; 콘크리트가 굴삭부 저면에 적당량 채워지면 포대 저면에 설치된 수밀성 개구부를 개방하여 콘크리트가 저면의 암반과 밀착하여 일체화되도록 하고 ; 콘크리트를 계속 타설하면서 이와 동시에 포대를 굴삭부 밖으로 인발하여 타설된 콘크리트가 굴삭부 벽면과 밀착되도록 하는 단계를 이루어짐을 특징으로 하는 본체로 이용하는 콘크리트 지하 연속벽 축조에서의 콘크리트 타설방법.Excavating each element by using a stabilizer made of bentonite or polymer to form an excavation portion; An impervious bag, such as a flexible, movable PP, PE or RVC bag, of the same size as the excavator, is installed on the top of the excavator; The lubricating agent discharges the slime at the bottom of the stabilizer in the excavating portion through the discharge pipe, and puts the same amount of medicine into the bag so as to smoothly descend along the wall of the excavator in conjunction with the discharge of the stabilizer; Lift the discharge pipe, put the assembled reinforcing bar inside the bag and cast concrete; When the concrete is filled in the bottom of the excavation portion, the watertight openings provided in the base of the bag are opened to allow the concrete to be intimately integrated with the rock on the bottom; A method of placing concrete in a continuous concrete wall construction using a main body, characterized in that the step of continuing to cast concrete and at the same time draw the bag out of the excavation to ensure that the concrete is in close contact with the wall of the excavation. 제 1 항에 있어서, 포대의 내부에 넣은 약제가 주제인 폴리아크릴아미드 75~85중량%와 N-알킬 치환 아크릴아미드 또는 N,N-비스(카복시메틸)아크릴아미드와 같은 이의 유도체나 가수분해물, 또는 이를 주성분으로 한 공중합물이나, 셀롤로스 고분자물에서 1~2종을 배합한 액상의 배합물인 재료분리 방지제인 방법.2. A pharmaceutical according to claim 1, wherein the drug contained in the bag is 75 to 85% by weight of the main polyacrylamide and derivatives or hydrolyzates thereof such as N-alkyl substituted acrylamide or N, N-bis (carboxymethyl) acrylamide, Or a material separation preventing agent which is a copolymer containing the same as a main component or a liquid formulation in which 1-2 kinds of cellulose polymers are blended. 제 1 항에 있어서, 굴삭부내 콘크리트 타설시 불투수성 포대를 굴삭부 밖으로 인발하는 대신에 굴삭부내에 방치된 상태로 하여 콘크리트를 타설함으로써 방수막의 역할을 하도록 하는 방법.The method according to claim 1, wherein when placing concrete in the excavated portion, the impermeable bag is left in the excavated portion instead of drawing out of the excavated portion to cast the concrete to serve as a waterproof membrane. 제 1 항에 있어서, 불투수성 포대 내부에 약제를 투입하고 콘크리트를 타설하는 대신에 불투수성 포대 내부에 물을 투입하고 수경성 콘크리트를 타설하는 방법.The method according to claim 1, wherein water is poured into the impermeable bag and the hydraulic concrete is poured instead of pouring the medicine into the impermeable bag and placing the concrete. ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.※ Note: The disclosure is based on the initial application.
KR1019870010750A 1987-09-28 1987-09-28 Concrete construction method for underground serial wall KR910003746B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019870010750A KR910003746B1 (en) 1987-09-28 1987-09-28 Concrete construction method for underground serial wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019870010750A KR910003746B1 (en) 1987-09-28 1987-09-28 Concrete construction method for underground serial wall

Publications (2)

Publication Number Publication Date
KR890005354A true KR890005354A (en) 1989-05-13
KR910003746B1 KR910003746B1 (en) 1991-06-10

Family

ID=19264798

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019870010750A KR910003746B1 (en) 1987-09-28 1987-09-28 Concrete construction method for underground serial wall

Country Status (1)

Country Link
KR (1) KR910003746B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030012449A (en) * 2001-08-01 2003-02-12 원 회 양 Method of construction for filling up concrete by using the sack for foundation of fabric in under the water.
KR100445321B1 (en) * 2001-05-11 2004-08-18 김건수 The method of construction for fundamental formative of bent in under the water.

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284205B (en) * 2016-08-30 2018-10-16 北京矿冶研究总院 Method for building dam by hydraulic flushing of tailings of mold bag edge stems

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100445321B1 (en) * 2001-05-11 2004-08-18 김건수 The method of construction for fundamental formative of bent in under the water.
KR20030012449A (en) * 2001-08-01 2003-02-12 원 회 양 Method of construction for filling up concrete by using the sack for foundation of fabric in under the water.

Also Published As

Publication number Publication date
KR910003746B1 (en) 1991-06-10

Similar Documents

Publication Publication Date Title
US4592846A (en) Method and reservoir for in-ground containment of liquid waste
PE20001410A1 (en) METHOD FOR FILLING CAVITIES WITH ADDED MATERIAL
KR880001504A (en) Method and method for monitoring leakage resistance of storage facility
KR890005354A (en) Concrete pouring method in underground continuous wall construction
CN107989054A (en) It is a kind of applied to underwater flush type cushion cap without bottom concrete steel lifted trunk structure
GB935797A (en)
CN211904141U (en) Accelerator collimation permanent bedrock point structure
CN108487229A (en) Artificial pore-forming method after strong rock-soluble foundation pre-grouting treatment
CN207144015U (en) A kind of anti-leakage structure of Novel underground diaphragm wall
JP2869605B2 (en) Top measuring device for cast concrete
Warren RETENTION BASIN FAILURES IN CARBONATE TERRANES 1
CN109537576A (en) Diaphram wall chance alters the strong runoff solution cavity construction of Lian Shifu sand and a kind of continuous underground wall structure
CN220650146U (en) Environmental protection administers water pollution detection sampling equipment
JP2002061166A (en) Underground cavity filling method and filling bag
JPH0617421A (en) Construction method for underground continuous cut-off wall
KR960011006A (en) Concrete pouring in trench using Styropole ball
FR2359265A1 (en) CONSTRUCTION PROCESS OF A TANK
SU1502715A1 (en) Sinkable well
CN207619971U (en) A kind of portable hydraulic reclamation Quick drainage structure
JP3835516B2 (en) Pile foundation construction method at waste disposal site
JPS63304821A (en) Construction work of underground continuous cut-off wall
JP2000303428A (en) Cut-off method using impervious sheet
EP0391736A3 (en) Underwater wall construction
JPS5685021A (en) Driving method of pile
JP2544347B2 (en) Embedded Pile with a bag

Legal Events

Date Code Title Description
A201 Request for examination
G160 Decision to publish patent application
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 19950609

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee