KR850002525Y1 - Toy - Google Patents

Toy Download PDF

Info

Publication number
KR850002525Y1
KR850002525Y1 KR2019830006606U KR830006606U KR850002525Y1 KR 850002525 Y1 KR850002525 Y1 KR 850002525Y1 KR 2019830006606 U KR2019830006606 U KR 2019830006606U KR 830006606 U KR830006606 U KR 830006606U KR 850002525 Y1 KR850002525 Y1 KR 850002525Y1
Authority
KR
South Korea
Prior art keywords
operating
members
mounting
hammer
rod
Prior art date
Application number
KR2019830006606U
Other languages
Korean (ko)
Other versions
KR850001300U (en
Inventor
도모아끼 고다마
Original Assignee
서전기업주식회사
최무현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서전기업주식회사, 최무현 filed Critical 서전기업주식회사
Priority to KR2019830006606U priority Critical patent/KR850002525Y1/en
Publication of KR850001300U publication Critical patent/KR850001300U/en
Application granted granted Critical
Publication of KR850002525Y1 publication Critical patent/KR850002525Y1/en

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63HTOYS, e.g. TOPS, DOLLS, HOOPS OR BUILDING BLOCKS
    • A63H11/00Self-movable toy figures

Landscapes

  • Toys (AREA)

Abstract

내용 없음.No content.

Description

완구toy

첨부도면은 본 고안에 관한 완구의 한가지 실시예를 나타낸 것으로,The accompanying drawings show an embodiment of a toy according to the present invention,

제1도는 전체의 정면도.1 is a front view of the whole.

제2도는 제1조작부재에 있어서의 단면도.2 is a cross-sectional view of the first operating member.

제3도 및 제4도는 제1작동부재에 있어서의 일부단면도.3 and 4 are partial cross-sectional views of the first operating member.

제5도는 제2작동부재에 있어서의 단면도.5 is a cross-sectional view of the second operating member.

제6도는 캡의 사시도.6 is a perspective view of the cap.

제7도 및 제8도는 제2작동부재에 있어서의 단면도.7 and 8 are cross-sectional views of the second operating member.

제9도 및 제10도는 제3조작부재에 있어서의 단면도.9 and 10 are cross-sectional views of the third operating member.

제11도는 보조작동부의 일부파탄 정면도.11 is a partially broken front view of the auxiliary operating unit.

제12도는 제1수동작동부재의 일부파단배면도.12 is a partially broken rear view of the first manual actuating member.

제13도는 제2수동작동부재의 일부파단 배면도이다.13 is a partially broken rear view of the second manual actuating member.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

10 : 제1조작부재 20 : 제2조작부재10: first operating member 20: second operating member

30 : 제3조작부재 11 : 제1봉부재30: third operation member 11: first rod member

21 : 제2봉부재 31 : 제3봉부재21: second rod member 31: third rod member

12 : 제2봉부재 22 : 제2이동부재12: second rod member 22: second moving member

32 : 제3이동부재 13 : 제1작동부재32: third moving member 13: first operating member

23 : 제2작동부재 14 : 제1수동작동부재23: second operating member 14: first manual operating member

24 : 제2수동작동부재 34 : 보조작동부재24: second manual operation member 34: auxiliary operation member

15 : 제1햄머부재 25 : 제2햄머부재15: the first hammer member 25: the second hammer member

35 : 제3햄머부재 16 : 제1조작력 전달부재35: third hammer member 16: the first operating force transmission member

26 : 제2조작력 전달부재 36 : 제3조작력 전달부재26: second operating force transmission member 36: third operating force transmission member

4 : 착설대 5 : 착설부재4: mounting table 5: mounting member

본 고안은 젖먹이유아용의 완구에 관한 것이다.The present invention relates to toys for infants and toddlers.

본 고안의 목적은 조작부재를 조작하여 이동부재를 개재시켜 작동부재를 작동시킴으로써 시각이나 청각을 통하여 젖먹이유아의 운동신경등을 향성시키는 완구를 제공하는데 있다.An object of the present invention is to provide a toy for directing the movement of the infant infant through vision or hearing by operating the operating member via the moving member to operate the operation member.

이하 본 고안에 관한 완구의 한가지 실시예를 첨부도면을 참조하여 설명한다.Hereinafter, one embodiment of the toy according to the present invention will be described with reference to the accompanying drawings.

이 실시예에 있어서 본 고안의 완구는 착설대 4에 제1조작부재 0, 제2조작부재 20, 제3조작부재 30을 설치함과 동시에 그 착설대 4에 환봉의 제1봉부재 11, 제2봉부재 21, 제3봉부재 31의 기단(基端 : 下端)을 직립시켜서 고정한다.In this embodiment, the toy of the present invention is provided with the first operating member 0, the second operating member 20, and the third operating member 30 on the mounting table 4, and the first rod member 11, the first rod member 11, on the mounting table 4. The base end of the two rod member 21 and the third rod member 31 is fixed upright.

그 제1봉부재 11, 제2봉부재 21, 제3봉부재 31에 구상(球狀)의 제1이동부재 12, 제2이동부재 22, 제3이동부재 32를 봉부재 11, 21, 31의 축방향으로 슬라이드자재하게 밖으로 부터 끼운다. 전기한 제1봉부재 11, 제2봉부재 21, 제3봉부재 31의 선단(상단)에 착설부재 5를 설치한다. 이 착설부재 5에 제1작동부재 13 및 제2작동부재 23을 착설시킴과 동시에 이 착설부재 5에 제1수동작동부재 14 및 제2수동작동부재 24를 착설시킨다.The first rod member 11, the second rod member 21, and the third rod member 31 have spherical first moving members 12, second moving members 22, and third moving members 32. Slide in the axial direction of from the outside. The installation member 5 is installed in the front end (upper end) of the 1st rod member 11, the 2nd rod member 21, and the 3rd rod member 31 which were mentioned above. The first operating member 13 and the second operating member 23 are mounted on the mounting member 5, and the first manual operating member 14 and the second manual operating member 24 are mounted on the mounting member 5.

전기한 제3봉부재 31에 보조작동부재 34를 제3이동부재 32의 위에 위치되게 착설한다. 전기한 착설대 4내에 제1햄머부재 15, 제2햄머부재 25, 제3햄머부재 35를 설치하고 이1햄머부재 15, 제2햄머부재 25, 제3햄머부재 35와 전기한 제1조작부재 10, 제2조작부재 20, 제3조작부재 30과의 사이에 제1조작력 전달부재 16, 제2조작력 전달부재 26, 제3조작력 전달부재 36을 개재시키고 있다.The auxiliary actuating member 34 is mounted on the third rod member 31 described above so as to be positioned above the third moving member 32. The 1st hammer member 15, the 2nd hammer member 25, and the 3rd hammer member 35 were installed in the installation table 4 mentioned above, and the 1st hammer member 15, the 2nd hammer member 25, and the 3rd hammer member 35 were installed. The first operating force transmitting member 16, the second operating force transmitting member 26, and the third operating force transmitting member 36 are interposed between the 10 and the second operating member 20 and the third operating member 30.

전기한 착설대 4는 합성수지체의 본체 40과 저판 41로 이루어졌다. 전기한 본체 40은 중공형상을 하고 있으며 상면을 앞쪽부로부터 뒤쪽부(반대쪽)을 향하여 오름구배를 이루며 뒤쪽부에 돌부 400을 형성하고 있다.The above-mentioned mounting table 4 consisted of the main body 40 and the bottom plate 41 of the synthetic resin body. The main body 40 described above has a hollow shape and has an upward slope from the front part toward the rear part (opposite side) and forms a protrusion 400 at the rear part.

전기한 경사면의 중앙에 구상의 철부(凸部) 401, 좌측에 원형의 투공 402, 우측에 정방형의 투공 403을 각각 설치하고 있다.The spherical convex part 401 is provided in the center of the inclined surface mentioned above, the circular perforation 402 is provided in the left side, and the square perforation 403 is provided in the right side, respectively.

전기한 돌부 400상면의 좌우측에 정방형의 투공 404를 설치함과 동시에 3개의 원형의 소투공 405를 설치한다. 전기한 본체 40의 안쪽에 제1착설부 406, 제2착설부 407, 제3착설부 408을 전기한 철부 401, 원형투공 402, 정방형투공 403에 각각 대응시켜서 설치한다.Square circular holes 404 are provided on the left and right sides of the upper surface of the above-described protrusion 400, and three circular small holes 405 are installed. The first mounting part 406, the second mounting part 407, and the third mounting part 408 are installed in correspondence with the convex part 401, the circular hole 402, and the square hole 403, respectively.

전기한 착설대 4의 돌부 400의 정방형의 투공 404에 2본의 지주 42, 42의 기단(하단)을 삽입시켜 고정시키고, 이 2본의 지주 42, 42의 선단(상단)에 전기한 착설부재 5를 고정시킨다.2 pieces of shores 42 and 42 proximal ends (lower ends) are inserted into the square hole 404 of the protrusion 400 of the mounting table 4, and the snowing members posted to the front ends (upper ends) of the two shores 42 and 42. Secure 5

이 착설부재 5는 중앙에 원형부 51, 좌우양측에 운형부(雲形部) 52, 53을 각각 형성시키고 있다. 전기한 제1조작부재 10은 레버형식으로 되어있으며 손잡이부 100과, 반원형상의 착설판부 101과 그 착설부 101에 식설된 계합핀 102로 구성된다.This installation member 5 forms the circular part 51 in the center, and the uneven parts 52 and 53 in the left and right sides, respectively. The first operating member 10 described above is of a lever type and is composed of a handle portion 100, a semicircular mounting plate portion 101 and a engagement pin 102 implanted in the mounting portion 101.

이 착설판부 101을 전기한 제1착설부 406에 핀 103으로 회전가능하게 착설시킴과 동시에 손잡이부 100을 철부 401의 절결부로부터 바깥쪽으로 돌출시킨다. 전기한 제1봉부재 11은 착설대 4의 소투공 405에 삽통시키고 그 하단을 착설대 4의 고정판 409에 고정시키며 한편 상단을 착설부재 5의 원형부 51에 고정시켜서 그 제1봉부재 11에 제1이동부재 12를 슬라이드자제되게 바깥으로 부터 끼운다.The mounting plate portion 101 is rotatably mounted on the first mounting portion 406 with the pin 103, and at the same time, the handle portion 100 protrudes outward from the cutout portion of the convex portion 401. The first rod member 11 is inserted into the small hole 405 of the mounting table 4, and the lower end thereof is fixed to the fixing plate 409 of the mounting table 4, while the upper end is fixed to the circular portion 51 of the mounting member 5, The first moving member 12 is inserted from outside to slide.

전기한 제1햄머부재 15는 관형상을 이루며 외경이 전기한 소투공 405의 지름보다 약간 작은 제1관부, 151과 외경이 전기한 소투공 405의 지름보다 약간 큰 제2관부 152와, 외경이 제2관부 152의 외경보다 큰 계합판부 153을 연속하여 일체적으로 성형시켜서된 것이다.The first hammer member 15 described above has a tubular shape and the outer diameter of the first tube part slightly smaller than the diameter of the small hole 405, the outer diameter of which is slightly larger than the diameter of the small hole 405. The engaging plate portion 153 which is larger than the outer diameter of the second pipe portion 152 is molded continuously and integrally.

이 제1햄머부재 15를 전기한 제1봉부재 11에, 제1봉부재 11의 축방향으로 슬라이드자재되게 그리고 또한 제1관부 151이 그위에 위치하도록 바깥으로부터 끼운다.The first hammer member 15 is inserted into the first rod member 11, which slides in the axial direction of the first rod member 11 and from the outside so that the first pipe portion 151 is positioned thereon.

제1햄머부재 15의 계합판부 153과 고정판 409와의 사이에 압축스프링 154를 개재시키고 제1관부 151과 제2관부 152와의 경계의 단부(段部) 155가 소투공 405의 연부에 계지되도록 구성시킨다. 전기한 제1햄머부재 15와 제1이동부재 12와의 사이에 완충용의 단관 156을 개재시킨다.A compression spring 154 is interposed between the engaging plate portion 153 of the first hammer member 15 and the fixed plate 409 so that the end portion 155 of the boundary between the first pipe portion 151 and the second pipe portion 152 is locked to the edge of the small hole 405. . A short pipe 156 for cushioning is interposed between the first hammer member 15 and the first movable member 12 described above.

전기한 제1조작력 전달부재 16은 링부재 160을 핀 161에 의하여 제1착설부 406에 회전가능하게 착설시키고, 이 링부재 160의 일단부와 제1착설부 406과의 사이에 인장스프링 162를 개재시키고 링부재 160의 일단이 항상 제1조작부재 10의 계합핀 102에 계합되도록 구성시킨다.The first operating force transmitting member 16 described above rotatably installs the ring member 160 to the first mounting portion 406 by the pin 161, and extends the tension spring 162 between one end of the ring member 160 and the first mounting portion 406. It is interposed and configured so that one end of the ring member 160 is always engaged with the engagement pin 102 of the first manipulation member 10.

이 링부재 160의 타단에 계합조(爪) 163을 회전가능하게 착설시켜 이 계합조 162를 전기한 제1햄머부재 15의 계합판부 153의 상면에 계합시킨다. 그리고 링부재 160을 이점쇄선의 상태가 되게하면 계합조 163과 계합판부 153과의 계합상태가 해제되며, 링부재 160을 실선의 상태로 복귀시키면 계합조 163이 계합판부 153의 상면에 계합되도록 구성한다.The engagement tank 163 is rotatably installed at the other end of the ring member 160, and the engagement tank 162 is engaged with the upper surface of the engagement plate portion 153 of the first hammer member 15. When the ring member 160 is brought into the state of the double chain line, the engagement state between the engagement member 163 and the engagement plate portion 153 is released. When the ring member 160 is returned to the solid state, the engagement member 163 is engaged with the upper surface of the engagement plate portion 153. do.

전기한 제1조작부재 13은 원형의 회전판 130을 착설부재 5의 원형부 51의 앞면에 회전축 131에 의하여 회전자재되게 착설시킨다.The first operating member 13 described above installs the circular rotating plate 130 on the front surface of the circular portion 51 of the mounting member 5 so as to be rotated by the rotation shaft 131.

이회전축 131에 치차 132를 고정시키고 원형부 51의 이면에 링부재 133의 일단을 핀 134에 의하여 회동자재되게 착설시키고 이 링부재 133의 타단에 계합조 135를 핀 134로 회동자재되게 그리고 또한 전기한 치차 132에 대향시켜서 착설시키고 전기한 제1봉부재 11에 승강관 136을 제1봉부재 11의 축방향으로 슬라이드자재되게 바깥으로부터 끼운다.The gear 132 is fixed to the rotational shaft 131, and one end of the ring member 133 is pivotally installed on the rear surface of the circular portion 51 by the pin 134, and the engagement bar 135 is rotated to the other end of the ring member 133 by the pin 134 and also electrically The elevating pipe 136 slides in the axial direction of the 1st rod member 11 from the outside to the 1st rod member 11 which was installed and installed facing the gear 132.

전기한 승강관 136의 상부에 계합부 137을 착설하고, 한편 원형부 51의 이면에 하(下)스톱퍼 138을 착설하여, 제3도에 표시한바와 같이 링부재 133의 하면과 승강관 136의 계합부 137이 자중에 의하여 하스톱퍼 138에 계합되도록 구성한다.The engagement part 137 is installed on the upper part of the elevating pipe 136 mentioned above, and the lower stopper 138 is installed on the back surface of the circular part 51, and as shown in FIG. 3, the lower surface of the ring member 133 and the elevating pipe 136 The engaging portion 137 is configured to engage the lower stopper 138 by its own weight.

또 원형부 51의 이면에 상(上)스톱퍼 139를 착설하여 제4도에 표시한 바와같이 승강관 136이 상승하여 그 승강관 136과 계합되는 링부재 133이 회동했을때에 링부재 133의 타단이 상스톱퍼 138에 계합되도록 구성한다.In addition, an upper stopper 139 is installed on the rear surface of the circular portion 51, and as shown in FIG. 4, when the elevating pipe 136 is raised and the ring member 133 engaged with the elevating pipe 136 is rotated, the other end of the ring member 133 is rotated. The upper stopper 138 is configured to engage.

그리고 링부재 133이 제3도의 상태로부터 제4도의 상태로 회동할때에 계합조 135가 치차 132에 계합하여 치차 132 즉 회전판 130을 화살표방향으로 회전시키도록 구성시킨다. 전기한 제2조작부재 20은 다이얼 형식으로 되어있으며, 손잡이부 200과 축부 201과 이축부 201에 고정된 캠 202로 구성되어 있다.And when the ring member 133 rotates from the state of FIG. 3 to the state of FIG. 4, the engagement tank 135 engages with the gear 132, and it is comprised so that the gear 132, ie, the rotation plate 130, may rotate in an arrow direction. The second operation member 20 described above has a dial type, and is composed of a handle portion 200, a shaft portion 201, and a cam 202 fixed to the biaxial portion 201.

전기한 축부 201의 하단을 제2착설부 407에 회전자재하게 착설시킴과 동시에 손잡이부 200을 원형투공 402로 부터 바깥쪽에 돌출시킨다.The lower end of the aforementioned shaft portion 201 is rotatably mounted on the second mounting portion 407 and the handle 200 is protruded outward from the circular hole 402.

전기한 캠 202는 제6도에 표시한 바와같이 상면에 산부 203과 곡부(谷部)204를 교호로 120도마다 설치시키고 있다.As shown in FIG. 6, the cam 202 described above is provided with an upper portion 203 and a curved portion 204 alternately provided every 120 degrees on the upper surface.

전기한 제2봉부재 21은 착설대 4의 소투공 405에 삽통시키고 그 하단을 착설대 4의 고정판 409에 고정시키며 상단을 착설부재 5의 문형부 42의 스톱퍼 231에 고정시키고 이 제2봉부재 21에 제2이동부재 22를 슬라이드자재되게 바깥으로부터 끼운다.The second rod member 21 is inserted into the small hole 405 of the mounting table 4, and the bottom thereof is fixed to the fixing plate 409 of the mounting table 4, and the upper end is fixed to the stopper 231 of the door 42 of the mounting member 5, and the second rod member 21 The second movable member 22 is inserted into the slide freely from the outside.

전기한 제2햄머부재 25는 관형상을 이루며 외경이 전기한 소투공 405의 지름보다 약간 작은 제1관부 251과, 외경이 전기한 소투공 405의 지름보다 약간 큰 제2관부 252와, 외경이 제2관부 252의 외경보다 큰 계합판부 253을 연속하여 일체적으로 성형시켜서된 것이다.The second hammer member 25 described above has a tubular shape and the outer diameter of the first tube part 251 is slightly smaller than the diameter of the small hole 405, the outer diameter of the second tube part 252 is slightly larger than the diameter of the small hole 405, and the outer diameter is The engaging plate portion 253 larger than the outer diameter of the second pipe portion 252 is continuously molded integrally.

이 제2햄머부재 25를 전기한 제2봉부재 21에, 제2봉부재 21의 축방향으로 슬라이드자재하게 그리고 또한 제1관부 251이 그 위에 위치하도록 바깥쪽으로부터 끼운다.The second hammer member 25 is inserted into the second rod member 21, which slides in the axial direction of the second rod member 21 and from the outside so that the first pipe portion 251 is positioned thereon.

이 제2햄머부재 25의 계합판부 253과 고정판 409와의 사이에 압축스프링 254를 개재시키고 제1관부 251과 제2관부 252와의 경계의 단부(段部)255가 소투공 405의 연부에 계지되도록 구성시킨다.The compression spring 254 is interposed between the engaging plate portion 253 and the fixed plate 409 of the second hammer member 25 so that the end portion 255 of the boundary between the first pipe portion 251 and the second pipe portion 252 is locked to the edge of the small hole 405. Let's do it.

전기한 제2조작력 전달부재 26은 링부재 260을 핀 261로 제2착설부 407에 회전가능하게 착설시키고 이 링부재 260의 일단부와 제2착설부 407과의 사이에 인장스프링 262를 개재시키며 링부재 260의 일단이 항상 제2조작부재 20의 캠 202에 계합되도록 구성시킨다.The second operating force transmission member 26 described above installs the ring member 260 rotatably on the second mounting portion 407 with a pin 261, and interposes a tension spring 262 between one end of the ring member 260 and the second mounting portion 407. One end of the ring member 260 is configured to engage the cam 202 of the second operating member 20 at all times.

이 링부재 260의 타단에 계합조 263을 회동자재되게 착설하고, 이 계합조 263을 전기한 제2햄머부재 25의 계합판부 253의 상면에 계합시킨다.The engagement tank 263 is installed at the other end of the ring member 260 so as to be rotated, and the engagement tank 263 is engaged with the upper surface of the engagement plate portion 253 of the second hammer member 25.

그리고 링부재 260을 이점쇄선의 상태가 되게하면 계합조 263과 계합판부 253과의 계합상태가 해제되고, 링부재 260을 실선의 상태로 복귀시키면 계합조 263이 계합판부 253의 상면에 계합되도록 구성한다.When the ring member 260 is brought into the state of the double chain line, the engagement state between the engagement tank 263 and the engagement plate part 253 is released, and when the ring member 260 is returned to the solid line state, the engagement member 263 is engaged with the upper surface of the engagement plate part 253. do.

전기한 제2작동부재 23에서, 벨 230은 착설부재 5의 좌측의 운형부 52의 앞면에 착설시킨다.In the above-mentioned second operating member 23, the bell 230 is mounted on the front face of the clouded portion 52 on the left side of the snowing member 5.

전기한 제2봉부재 21에 승강관 232를 제2봉부재 21의 측방향으로 슬라이드자재되게 바깥쪽으로부터 끼운다.The elevating pipe 232 is inserted into the second rod member 21 described above from the outside so as to slide in the lateral direction of the second rod member 21.

이 승강관 232의 거의 하단부에 외경이 운형부 52의 투공 520의 지름보다 큰 스톱퍼 233을 착설시킴과 동시에 이승강관 232의 상단부에 스프링 234를 개재시켜서 강철구(球)235를 착설하여 이강철구 235를 52의 투공 521로부터 외측으로 돌출시켜서 벨 230내에 위치시킨다.The stopper 233 whose outer diameter is larger than the diameter of the perforation 520 of the tsunami portion 52 is installed at the lower end of the elevating pipe 232, and the steel ball 235 is installed at the upper end of the elevating steel pipe 232 through the spring 234. It protrudes outward from the through hole 521 of 52 and is positioned in the bell 230.

통상은 승강관 232가 자중에 의하여 제7도에 표시한 바와같이 아래로 내려와 있다가 제2이동부재 22의 닿아서 때리면 승강관 232가 제8도에 표시된바와 같이 위로 올라가게 되며, 이에 따라서 강철구 235가 벨 230에 닿아서 벨 230이 울리도록 구성시킨다.Normally, the elevating pipe 232 descends by its own weight, as shown in FIG. 7, and hits the second moving member 22 to raise the elevating pipe 232, as shown in FIG. Configure 235 to ring bell 230 to ring bell 230.

전기한 제3조작부재 30은 눌림단추형식을 이루고있으며, 저부를 개구한 중공상의 직방체의 본체 300에 슬라이드봉부 301을 일체적으로 식설(植設)시키고 또한 계합절결부 304를 형성시킨다.The above-mentioned third operating member 30 is in the form of a push button. The slide bar 301 is integrally implanted into the main body 300 of the hollow rectangular parallelepiped with the bottom open, and the engagement cutout 304 is formed.

이 슬라이드봉부 301을 제3착설부 408의 슬라이드공에 끼워넣음과 동시에 본체 300을 정방향투공 403으로 외측으로 돌출시킨다.The slide rod portion 301 is inserted into the slide hole of the third mounting portion 408 and the main body 300 is projected outward by the forward hole 403.

전기한 본체 300과 제3착설부 408과의 사이에 압축스프링 302를 개재시켜서 본체 300을 항상 위쪽으로 돌출시킨다. 전기한 본체 300의 저부 개구부의 연부에 스톱퍼 303을 바깥쪽으로 돌설시키고 이 스톱퍼 303이 정방형투공 403의 연부에 닿아서 본체 300이 압축스프링 302의 스프링힘에 의하여 착설대 4로부터 벗어나는 것을 방지하도록 구성시킨다.The main body 300 is always protruded upwards through the compression spring 302 between the above-mentioned main body 300 and the 3rd mounting part 408. The stopper 303 is projected outwardly at the edge of the bottom opening of the main body 300 described above, and the stopper 303 touches the edge of the square hole 403 to prevent the main body 300 from escaping from the mounting table 4 by the spring force of the compression spring 302. .

전기한 제3봉부재는 착설대 4의 소투공 405에 삽통시키고 그 하단을 착설대 4의 고정판 409에 고정시키며 상단을 착설부재 5의 우측의 운형부 53에 고정시키고 제3봉부재 31에 제3이동부재 32를 슬라이드자재되게 바깥쪽으로 끼운다.The third rod member is inserted into the small hole 405 of the mounting rod 4, and the lower end thereof is fixed to the fixing plate 409 of the mounting rod 4, and the upper end is fixed to the ridge 53 on the right side of the mounting member 5, and the third rod member 31 3 Slide the movable member 32 outwards.

전기한 제3햄머부재 35는 관형상을 이루며 외경이 전기한 소투공 405의 지름보다 약간 작은 제1관부 351과, 외경이 전기한 소투공 405의 지름보다 약간 큰 계합판부 352를 연속하여 일체적으로 성형하여 된 것이다.The third hammer member 35 described above is formed in a tubular shape and is integrally formed with the first tube part 351 which is slightly smaller than the diameter of the small hole 405 posted outside, and the engaging plate part 352 which is slightly larger than the diameter of the small hole 405 posted outside. It was molded by.

이 제3햄머부재 35를 전기한 제3봉부재 31에 제3봉부재 31의 측방향으로 슬라이드자재되게 그리고 또한 제1관부 351이 그위에 위치하도록 바깥쪽으로부터 끼우고, 제1관부 351을 소투공 405로부터 약간 돌출시킨다.The third hammer member 35 is inserted into the third rod member 31 which slides in the lateral direction of the third rod member 31 and from the outside so that the first pipe portion 351 is positioned thereon. Extrude slightly from perforation 405.

전기한 제3조작력 전달 부재 36은 링부재 360의 말단부를 핀 361에 의하여 제3착설부 408에 회동가능하게 착설시키고, 이 링부재 360의 일단을 전기한 제3조작부재 30의 계합절결부 304에 계합시키며 한편 링부재 360의 타단을 제3햄머부재 35의 계합판부 352에 하면에 계합시킨다.The third operating force transmission member 36 described above installs the distal end portion of the ring member 360 to the third mounting portion 408 by a pin 361 so as to be rotatable, and the engagement cutout portion 304 of the third operating member 30 which posts one end of the ring member 360 is rotated. And the other end of the ring member 360 to the lower surface of the engaging plate portion 352 of the third hammer member 35.

통상의 상태에서는 제3햄머부재 35 및 링부재 360의 타단측은 자중에 의하여 제9도에 표시한 바와같이 아래로 내려온 상태가 되어있다가, 제3조작부재 30을 조작함으로써 제3햄머부재 35 및 링부재 360의 타단축은 제10도에 표시한 바와같이 올라간 상태가 되도록 구성시킨다.In the normal state, the other end sides of the third hammer member 35 and the ring member 360 are brought down by their own weight as shown in FIG. 9, and the third hammer member 35 and The other end axis of the ring member 360 is configured to be in a raised state as shown in FIG.

전기한 보조작동부재 34는 작은새를 본뜬 본체 340과, 내경이 전기한 제3봉부재 31의 외경보다 약간 큰 단관 341로 구성된다.The aforementioned auxiliary operating member 34 is composed of a main body 340, which is modeled after a small bird, and a short pipe 341 whose inner diameter is slightly larger than the outer diameter of the third rod member 31.

전기한 본체 340의 복부에 공동부(空洞部)342를 형성하며 한편 단관 341에 돌부 343을 일체적으로 돌설시키고 이 돌부 343의 선단을 본체 340의 공동부 342에 삽입시켜서 돌부 343을 본체 340에 핀 344로 회동가능하게 착설시킴과 동시에 돌부 343과 본체 340과의 사이에 스프링 345를 개재시킨다.A cavity 342 is formed in the abdomen of the main body 340 described above, while the protrusion 343 is integrally protruded from the end pipe 341, and the tip of the protrusion 343 is inserted into the cavity 342 of the main body 340 to insert the protrusion 343 into the main body 340. It is installed so as to be able to rotate with the pin 344, and the spring 345 is interposed between the protrusion 343 and the main body 340.

전기한 제1수동작동부재 14는 비행기의 형상을 본뜬 본체 140의 착설부재 5의 우측의 운형부 53에 회전축 141에 의하여 회동자재되게 착설하고, 이회전축 141에 치차 142를 고정시킨다.The first manual operation member 14 described above is pivotally mounted by the rotating shaft 141 on the ridge portion 53 on the right side of the mounting member 5 of the main body 140 in the shape of an airplane, and fixes the gear 142 on the rotating shaft 141.

한편, 운형부 53의 이면에 판스프링 143의 일단을 고정시키고 이판스프링 143의 선단을 치차 142에 교합시킨다.On the other hand, one end of the leaf spring 143 is fixed to the rear surface of the cloud portion 53, and the tip of the leaf spring 143 is engaged with the gear 142.

전기한 제2수동작동부재 24는 작은 새의 형상을 본뜬 본체 240을 착설부재 5의 좌측의 운형부 52에 회전축 241에 의하여 회동자재되게 그리고 또한 벨 230에 대향시켜서 설치한다.The second manual operation member 24 described above is provided with the main body 240, which is shaped like a small bird, by rotating the shaft 241 on the clouding portion 52 on the left side of the snowing member 5 and facing the bell 230.

전기한 본체 240에 판스프링 242를 고정시키고 이 판스프링 242의 선단을 운형부 52의 이면의 계합부 243에 계합시킨다.The leaf spring 242 is fixed to the main body 240 described above, and the front end of the leaf spring 242 is engaged with the engaging portion 243 on the rear surface of the cloud portion 52.

이 실시예에 있어서 본고안의 완구는 이상과 같이 구성되었는바, 이하 그 놀이방법에 대하여 설명한다. 먼저, 제1조작부재 10의 손잡이부 100를 잡고 인장스프링 162의 스프링힘에 대항하여 제1조작부재 10을 이점쇄선으로 표시한바와 같이 넘어지게 한다. (제2도) 그러면 제1조작부재 10의 계합핀 102와 계합되는 제1조작력 전달부재 16의 링부재 160이 핀 161을 중심으로하여 화설표방향으로 회동된다.In this embodiment, the toy of the present invention is constructed as described above. The play method will be described below. First, the handle 100 of the first operating member 10 is grasped so that the first operating member 10 falls as indicated by the double-dotted line against the spring force of the tension spring 162. (Fig. 2) Then, the ring member 160 of the first operating force transmission member 16 engaged with the engagement pin 102 of the first operating member 10 is rotated in the direction of the arrow centered on the pin 161.

이 링부재 160의 회동에 따라서 링부재 160의 계합조 163과 계합하는 제1햄머부재 15는 압축스프링 154의 스프링힘에 대항하여 내려간다. 그리고 링부재 160 및 제1햄머부재 15가 이점쇄선으로 표시한 상태가 되면 링부재 160의 계합조 163과 제1햄머부재 15의 계합판부 153과의 계합상태가 해제되고 압축스프링154의 탄성복귀력에 의하여 제1햄머부재 15는 힘차게 상승하여 착설대 4의 돌부 400위에 재치된 제1이동부재 12를 완충단관 156을 개재시켜 위로 쳐올린다.As the ring member 160 rotates, the first hammer member 15 engaging with the engagement tank 163 of the ring member 160 descends against the spring force of the compression spring 154. When the ring member 160 and the first hammer member 15 are in the state indicated by the double-dot chain line, the engagement state between the engagement tank 163 of the ring member 160 and the engagement plate 153 of the first hammer member 15 is released and the elastic return force of the compression spring 154 is achieved. As a result, the first hammer member 15 ascends violently and lifts up the first movable member 12 placed on the protrusion 400 of the mounting table 4 via the buffer end pipe 156.

이때 제1햄머부재 15는 압축스프링 154의 스프링힘에 의하여 실선상태에 있게된다.At this time, the first hammer member 15 is in a solid state by the spring force of the compression spring 154.

이 타상(打上)된 제1이동부재 12는 승강관 136을 쳐서 이승강관 136을 상승시키며 이에 따라서 승강관 136과 계합하는 링부재 133이 화살표방향으로 회동한다. 이때 링부재 133의 계합조 135가 치차 132와 교합되어 치차 132를 화살표방향로으 회전시킨다.The wound first moving member 12 strikes the elevating pipe 136 to raise the elevating pipe 136, whereby the ring member 133 engaging with the elevating pipe 136 rotates in the direction of the arrow. At this time, the engagement group 135 of the ring member 133 is engaged with the gear 132 to rotate the gear 132 in the direction of the arrow.

이결과 회전판 130이 화살표방향으로 회전된다. 그리하여 제1조작부재 10로부터 손을 떼면 인장스프링 162의 스프링복귀력에 의하여 제1조작부재 10 및 링부재 160은 이점쇄선의 상태로부터 실선상태로 복귀된다.As a result, the rotating plate 130 is rotated in the direction of the arrow. Thus, when the first operating member 10 is released, the first operating member 10 and the ring member 160 are returned to the solid state from the double-stranded chain by the spring return force of the tension spring 162.

다음에 제2조작부재 20의 손잡이부 200을 잡고 우방향 또는 좌방향으로 돌리면 제2조작부재 20의 캠202가 같은 방향으로 회동되고 이에 따라서 링부재 260의 일단이 캠 202의 곡부 204로부터 산부 203으로 활동(滑動)되고 이 링부재 260은 인장스프링 262의 스프링힘에 대항하여 실선상태로부터 이점쇄선상태로 회동된다.Next, by holding the handle 200 of the second operating member 20 and turning it to the right or left direction, the cam 202 of the second operating member 20 is rotated in the same direction, so that one end of the ring member 260 moves from the curved portion 204 of the cam 202 to the peak 203. The ring member 260 is rotated from the solid line state to the double-strength line state against the spring force of the tension spring 262.

이 링부재 260의 회동에 따라서 링부재 260의 계합조 263과 계합하는 제1햄머부재 251은 압축스프링254의 스프링힘에 대항하여 내려간다.As the ring member 260 rotates, the first hammer member 251 engaging with the engagement tank 263 of the ring member 260 descends against the spring force of the compression spring 254.

그리고 링부재 260 및 제2햄머부재 25가 이점쇄선으로 표시한 상태가 되면 링부재 260의 계합조 263과 제2햄머부재 25의 계합판부 253과의 계합상태가 해제되고 압축스프링 254의 스프링복귀력에 의하여 제2햄머부재 25는 힘차게 상승하여 착설대 4의 돌부 400위에 재치된 제2이동부재 22를 쳐 올린다. 이 타상된 제2이동부재 22는 승강관 232를 치고 이 승강관 232가 상승함에 따라서 스프링 234를 개재하여 강철구235가 벨 230에 닿아서 벨 230이 울린다.When the ring member 260 and the second hammer member 25 are in the state indicated by the double chain, the engagement state between the engagement member 263 of the ring member 260 and the engagement plate 253 of the second hammer member 25 is released and the spring return force of the compression spring 254 is achieved. As a result, the second hammer member 25 ascends violently and lifts up the second moving member 22 placed on the protrusion 400 of the mounting table 4. The wounded second moving member 22 hits the elevating pipe 232 and as the elevating pipe 232 rises, the steel ball 235 touches the bell 230 via the spring 234 and the bell 230 rings.

그리하여 제2조작부재 20으로부터 손을 떼면 262의 스프링복귀력에 의하여 링부재 260의 일단부가 캠 202의 제2봉부재 12으로부터 곡부 204에로 활동(滑動)되고 링부재 260 및 캠 202는 실선상태로 복귀된다.Thus, when the second operating member 20 is released, one end of the ring member 260 moves from the second rod member 12 of the cam 202 to the curved portion 204 by the spring return force of 262, and the ring members 260 and the cam 202 are in a solid state. Is returned.

그리고 제3조작부재 30의 본체 300을 압축스프링 302의 스프링에 대항하여 압하시킨다. 그러면 본체300의 304에 계합하는 링부재 360이 제9도의 상태로부터 제10도의 상태로 회동된다.Then, the main body 300 of the third operating member 30 is pressed against the spring of the compression spring 302. Then, the ring member 360 engaged with 304 of the main body 300 is rotated from the state of FIG. 9 to the state of FIG. 10.

이 링부재 360의 회동에 따라서 링부재 360과 계합하는 제3햄머부재 35는 힘차게 상승하여 착설대 4의 돌부 400위에 재치된 제3이동부재 32 및 보조작동부재 34가 타상(打上)된다.In response to the rotation of the ring member 360, the third hammer member 35 engaged with the ring member 360 ascends violently, and the third movable member 32 and the auxiliary operating member 34 mounted on the protrusion 400 of the mounting table 4 are wounded.

그러면 제3이동부재 32는 자중에 의하여 바로 하강한다. 그런데 보조작동부재 34는 제11도에 표시한 바와같이 스프링 345의 진동에 의하여 작은 새를 본뜬 본체 340이 실선의 상태와 이점쇄선의 상태 사이를 왕복운동하면서 보조작동부재 34는 하강한다. 그리고 제1수동작동부재 14를 잡고 우방향 또는 좌방향으로 회동시킨다.Then, the third moving member 32 immediately descends by its own weight. However, as shown in FIG. 11, the auxiliary operating member 34 descends while the main body 340, which is modeled after the small bird by the vibration of the spring 345, reciprocates between the state of the solid line and the state of the double-stranded chain. And grasping the 1st manual operation member 14, it rotates to the right direction or the left direction.

그러면 비행기를 본뜬 본체 140과 일체가 되어 있는 치차 141이 회동하여 이치차 142와 교합되는 판스프링 143이 퉁겨져서 소리를 발한다. 또 제2수동작동부재 24를 잡고 판스프링 242의 스프링힘에 대항하여 화살표방향으로 돌리고 손을 놓으면 작은 새를 본뜬 본체 240이 판스프링 242의 스프링복귀력에 의하여 화살표와 반대방향으로 힘차게 회동하여 작은 새를 본뜬 본체 240의 부리가 벨 230을 쳐서 벨 230이 울린다.Then, the gear 141, which is integrated with the main body 140, which is modeled after the plane, rotates, and the leaf spring 143 that interlocks with the tooth wheel 142 is bent to make a sound. When holding the second manual operation member 24 and turning it in the direction of the arrow against the spring force of the leaf spring 242 and releasing the hand, the main body 240, which is modeled after the small bird, rotates vigorously in the opposite direction to the arrow by the spring return force of the leaf spring 242. The bell of the body 240, modeling the bird, beats the bell 230, and the bell 230 rings.

이상의 실시예로부터 명백한바와 같이 본 고안의 완구는 조작부재를 조작하여 이동부재를 햄머부재로 처서 이동시키고 이 이동부재를 작동부재에 닿게하여 작동부재를 작동시키도록 구성한 것이므로 이동부재나 작동부재의 움직임, 또는 햄머부재가 이동부재를 치는 소리나 이동부재가 작동부재에 닿는 소리가 작동부재가 작동하는 소리등에 의하여 시각이나 청각을 통하여 젖먹이유아의 흥미를 일으키게함과 동시에, 조작부재의 조작을 통하여 젖먹이유아의 운동신경등을 향상시킬수가 있는 등의 효과가 있다.As apparent from the above embodiment, the toy of the present invention is configured to move the moving member to the hammer member by operating the operating member, and to move the moving member to the operating member to operate the operating member. , Or the sound of the hammer member striking the movable member or the sound of the movable member touching the actuating member causes the suckling infant's interest through sight or hearing, and the feeding through the manipulation of the actuating member. Infant exercise nerves, etc. can be improved.

또한 당연한 일이겠지만 본 고안의 완구는 상술한 실시예만에 한정되는 것은 아니다.As a matter of course, the toy of the present invention is not limited to the above-described embodiment only.

Claims (3)

착설대(4)에 조작부재(10, 20, 30)를 착설함과 동시에, 이착설대(4)에 봉부재(11, 21, 31)의 기단(基端 : 下端)을 고정시키고, 이봉부재(11, 21, 31)에 이동부재(12, 22, 32)를 봉부재의 축방향으로 슬라이드자재되게 감합시키고, 전기한 봉부재(11, 21, 31)의 선단에 착설부재(5)를 고정시키며, 이 착설부재(5)에 작동부재(13, 23)를 착설시키고, 전기한 착설대(4)에 이동부재(12, 22, 32)를 치는 햄머부재(15, 25, 35)를 착설하고, 이햄머부재(15, 25, 35)와 조작부재(10, 20, 30)과의 사이에 조작력 전달부재(16, 26, 36)을 개재시켜서, 전기한 조작부를 조작하여 이동부재(12, 22, 32)를 햄머부재(15, 25, 35)로 치고 이 이동부재(12, 22, 32)를 작동부재(13, 23)에 닿게하여 작동부재(13, 23)을 작동시키도록 구성함을 특징으로하는 완구.While mounting the operating members 10, 20, 30 on the mounting table 4, and fixing the base end of the rod members 11, 21, 31 on the mounting table 4, The movable members 12, 22, and 32 are fitted to the slide members 11, 21, and 31 so as to slide in the axial direction of the rod member. The hammer members 15, 25, 35 which mount the operating members 13, 23 on this mounting member 5, and hit the moving members 12, 22, 32 on the mounting table 4 mentioned above. It is installed, and the operation member which operated the said operation part by interposing the operation force transmission member 16, 26, 36 between the hammer member 15, 25, 35 and the operation member 10, 20, 30, and a moving member ( 12, 22, 32 is hammered by the members 15, 25, 35 and the movable members 12, 22, 32 are brought into contact with the operating members 13, 23 to operate the operating members 13, 23. Toys characterized by the construction. 제1항에 있어서, 작동부재(13, 23)는 착설부재(5)에 회전자재하게 착설된 회전체로서 이동부재(12, 22, 32)가 닿으면 회전함을 특징으로 하는 완구.The toy as claimed in claim 1, wherein the actuating member (13, 23) is a rotating body mounted on the mounting member (5) to rotate when the moving member (12, 22, 32) touches. 제1항에 있어서, 작동부재(13, 23)는 착설부재(5)에 착설된 벨로서 이동부재(12, 22, 32)가 닿으면 울리게됨을 특징으로하는 완구.The toy as claimed in claim 1, wherein the actuating member (13, 23) is a bell mounted on the snowing member (5) and rings when the moving member (12, 22, 32) touches.
KR2019830006606U 1983-07-27 1983-07-27 Toy KR850002525Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019830006606U KR850002525Y1 (en) 1983-07-27 1983-07-27 Toy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019830006606U KR850002525Y1 (en) 1983-07-27 1983-07-27 Toy

Publications (2)

Publication Number Publication Date
KR850001300U KR850001300U (en) 1985-04-08
KR850002525Y1 true KR850002525Y1 (en) 1985-10-21

Family

ID=70158648

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019830006606U KR850002525Y1 (en) 1983-07-27 1983-07-27 Toy

Country Status (1)

Country Link
KR (1) KR850002525Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100383677B1 (en) * 2000-12-22 2003-05-14 금호산업주식회사 Tire Mold with the Plural Air Plug

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100383677B1 (en) * 2000-12-22 2003-05-14 금호산업주식회사 Tire Mold with the Plural Air Plug

Also Published As

Publication number Publication date
KR850001300U (en) 1985-04-08

Similar Documents

Publication Publication Date Title
US4170215A (en) Disk toy and launcher
US4891032A (en) Flexible toy wand
US6669587B2 (en) Propeller enhanced toy football
US4181339A (en) Door knob stopper
US5868633A (en) Lighted novelty golf club with automated sound producing means
US3238665A (en) Movable element wheeled action toy
US4239222A (en) Pinball game flipper mechanism
US4019738A (en) Game device and game
KR850002525Y1 (en) Toy
US6237476B1 (en) Nutcracker
US3226878A (en) Motor driven toy bug
WO2021175167A1 (en) Early education toy
US4804192A (en) Movable target for a throwing game
US3947030A (en) Toy game of chance and skill
US2816536A (en) Ring projecting toy
US4591345A (en) Confined animation figure toy
JPH10156055A (en) Toy element
US5203559A (en) Bowling apparatus having spring driven wind-up striker
US2442296A (en) Tethered ball game device
US5722662A (en) Hand held amusement device
US3983659A (en) Stationary noisemaking toy
CN210625469U (en) Plastic toy ejection ball gun for children game
US3300892A (en) Walking doll or the like
US6042446A (en) Perking turkey paddle
US4200284A (en) Game in which objects are discharged from a receptacle

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee