KR840000304Y1 - Prefabricating base block for a fence - Google Patents

Prefabricating base block for a fence Download PDF

Info

Publication number
KR840000304Y1
KR840000304Y1 KR2019820006371U KR820006371U KR840000304Y1 KR 840000304 Y1 KR840000304 Y1 KR 840000304Y1 KR 2019820006371 U KR2019820006371 U KR 2019820006371U KR 820006371 U KR820006371 U KR 820006371U KR 840000304 Y1 KR840000304 Y1 KR 840000304Y1
Authority
KR
South Korea
Prior art keywords
fence
support
block
blocks
foundation concrete
Prior art date
Application number
KR2019820006371U
Other languages
Korean (ko)
Inventor
정화영
Original Assignee
주식회사의성실업
정영화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사의성실업, 정영화 filed Critical 주식회사의성실업
Priority to KR2019820006371U priority Critical patent/KR840000304Y1/en
Application granted granted Critical
Publication of KR840000304Y1 publication Critical patent/KR840000304Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/016Flat foundations made mainly from prefabricated concrete elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

내용 없음.No content.

Description

울타리용지주의 조립식 기초 콘크리트 블록Prefabricated Precast Concrete Blocks

제1도는 본 고안을 조립 설치하는 과정을 나타낸 사시도.1 is a perspective view showing a process of assembling and installing the subject innovation.

제2도는 본 고안을 조립 설치한 상태의 일측면도.Figure 2 is a side view of the assembled state of the subject innovation.

제3도는 제2도의 A-A'선 단면도.3 is a cross-sectional view along the line AA ′ of FIG. 2.

본 고안은 울타리용 지주를 지지하는 기초콘크리트를 구성함에 있어서 울타리의 축조(築造)시 콘크리트를 타설하여 기초를 형성하지 않고 미리 성형된 조립식블록으로 지주를 용이하고 견고하게 지지함을 물론 단시간내에 지주를 구축할 수 있도록한 울타리용 지주의 기초콘크리트 블록에 관한 것이다. 일반적으로 울타리를 축조함에 있어서는 적당한 간격으로 지반을 굴삭하고, 이에 지주를 매립(埋立)시킨 다음, 콘크리트를 타설하여 지주를 지지하는 방법을 채택하는 것이 대부분이었는 바, 이는 지하에 매입된 지주주위에 콘크리트를 타설하고, 이 타설된 콘크리트가 완전히 경화(양생)할 동안 지반상에 가설물을 설치하여 지주를 고정시켜 주어야하는 번거로운 결함이 뒤따랐으며 뿐만아니라 기초콘크리트가 완전히 경화될때까지 울타리의 축조를 중단하여야 함으로서, 이에 따라서 울타이의 축조 공기가 매우 길어지게되는 등의 여러가지 결함이 있었다.The present invention is to construct the foundation concrete supporting the support for the fence in the construction of the fence when placing the concrete without forming the foundation, the pre-molded prefabricated block to support the support easily and firmly, as well as the support in a short time It relates to the basic concrete block of the support for the fence to be built. In general, when constructing a fence, the most common method is to excavate the ground at appropriate intervals, bury land struts, and then install concrete to support the struts. While the concrete was poured, the cumbersome defects that had to be fixed on the ground while the concrete was fully cured (cure) were followed, and the construction of the fence was stopped until the foundation concrete was completely hardened. As a result, there have been various defects such that the construction air of the wool tie becomes very long.

본 고안은 상기와 같은 제반 결함을 해소하기 위한 것으로 불록을 조립하는 구성으로 간편하고 견고하게 지반에 기초 콘크리트 블록을 형성하여 지주를 지지함과 동시에 울타리를 축조할 수 있도록함으로서 울타리의 축조공기(築造工期)를 단축 시켜주며, 기초 콘크리트타설시 지주를 고정시켜주는 별도의 가설물을 설치할 필요가 없으므로 울타리의 축조시 소요되는 시공비와 공기를 절감 및 단축시킬 수 있는 매우 경제적인 이점을 지닌것으로, 이를 첨부한 도면에 의하여 상세히 설명하면 다음과 같다.The present invention is to solve the above-mentioned defects, and as a result of assembling the block, it is easy and robust to form the foundation concrete block on the ground to support the support and at the same time to build the fence by building the fence air (築 造It has a very economical advantage to reduce construction costs and air required for the construction of fences because it does not need to install a separate temporary fixture that shortens the construction work and fixes the strut when laying the foundation concrete. When described in detail with reference to the drawings as follows.

즉, 지주(1)를 지지하는 기초 콘크리트(A)를 구성함에 있어서, 블록(2) 저면에 삽치요구(3)와 계합돌부(4)(4')를 양측에 마주보게 설치하고, 일측면 중앙부에 반원형요홈(5)을 일체로 요설한 삽지돌부(6)를 상면에 돌설하며, 상면 삽지돌부(6) 타측으로 개방된 개방공(8)(8')과 연통되게 천설된 관통공(7)(7')에 강봉(9)을 삽치시킨 다음, 2개의 블록(2)을 맞대어 지그자그 상으로 적층시켜서된 것으로 미설명부호, 10은 지주(1)의 하단부에 용착된 고정판, 12는 철망, 13은 철망(12) 괘지횡간, 14는 횡간(13)취부 보울트이다. 이와 같이 구성된 본 고안은 지주(1)의 고정판(10)이 굴삭된 지반에 접하게하고, 반원형요홈(5)이 지주(1)에 감합되게 2개의 블록(2)을 좌, 우 또는 전, 후측에서 마주보게 설치하기 전에 각블록(2)의 삽치요구(3)상 양측에 천공된 관통공(7)(7')을 통하여 미리 일단이 절곡된 4개의 강봉(9)을 삽통시켜 타단이 블록(2)의 상면 삽지돌부(6)상으로 길게 돌출되게 한 다음, 그 다음에 설치되는 2개의 블록(2)의 관통공(7)(7')으로 강봉(9)을 삽치시키게되는 데, 이때 2차로 설치되는 블록(2)은 1차로 설치된 블록(2)과는 직기 상으로 즉, 1차로 설초된 2개의 블록(2)의 상면 삽지돌부(6)가 모두가 2차로 적층되는 블록(2)저면 삽치요구(3)내에 삽지되며 대설된 2개의 삽지돌부(6)는 계합돌부(4)(4')에 의하여 견고히 괘지된 상태가 됨과 동시에 1차, 2차로 설치된 각블록(2)의 관통공(7)(7')에 삽치된 4개의 강봉(9)에 의하여 일체적으로 구성된 것처럼 지주(1)를 괘지하게되며, 이후 최상단을 형성하는 2개의 각블록(2)도 전술한 바와 동일한 방법으로 지그자그식으로 적층한 다음, 최상단의 블록(2)상면 삽지돌부(6)에 천설된 개방공(8)(8')에 돌출된 4개의 강봉(9) 끝단을 제3도와 같이 절곡시켜주므로서 각블록(2)의 삽지요구(3)에 삽치된 삽치돌부(6)와 강봉(9)에 의하여 전체가 일체화된 지주(1)의 기초콘크리트(A)를 형성하게되는 것이다.That is, in constructing the foundation concrete (A) supporting the support (1), the insertion request (3) and the engaging projection (4) (4 ') is provided on both sides facing the bottom of the block (2), one side The through hole which is formed in communication with the opening hole (8) (8 ') which is opened to the other side, and the insertion protrusion (6), which has the semi-circular groove (5) integrally formed in the center, on the upper surface ( 7) Inserting the steel bar 9 into 7 'and then stacking the two blocks 2 together in a zigzag shape, unexplained reference numeral 10 denotes a fixed plate welded to the lower end of the support 1, 12 Is wire mesh, 13 is wire mesh 12, and 14 is transverse 13 mounting bolt. The present invention constituted as described above allows the fixed plate 10 of the support 1 to be in contact with the excavated ground, and the two blocks 2 are left, right or front and rear so that the semi-circular groove 5 is fitted to the support 1. The four ends of the bent ends are inserted through the through holes (7) (7 ') drilled on both sides of the insertion request (3) of each block (2) before the installation facing each other at After protruding long on the upper insertion protrusion (6) of (2), and then inserting the steel bar (9) into the through holes (7) (7 ') of the two blocks (2) to be installed, At this time, the block 2 installed secondly is a block in which all of the upper surface insertion protrusions 6 of the two blocks 2 installed on the loom are different from the block 2 installed primarily, that is, primary ( 2) The two insertion protrusions 6 inserted and inserted in the bottom insertion request 3 are rigidly held by the engagement protrusions 4 and 4 ', and at the same time, the first and second blocks each installed 2 and 2 respectively. Through hole (7) (7 The pillars 1 are hung as if they are integrally formed by four steel rods 9 inserted in the '), and then the two angular blocks 2 forming the top end are zigzag in the same manner as described above. After stacking, the ends of the four steel rods 9 protruding from the opening holes 8 and 8 'installed in the upper insertion block 6 of the uppermost block 2 are bent as shown in FIG. It is to form the foundation concrete (A) of the support (1) the whole is integrated by the insertion protrusion (6) and the steel bar (9) inserted into the insertion tool (3) of 2).

상기와 같은 본 고안을 산악지대에 울타리를 축조하는데 적용하게되면 종래와 같이 지주(1)의 기초 콘크리트(A)를 구축하기 위하여 시멘트, 모래, 자갈, 및 물을 따로따로 운반하여야 하는 불편을 해소할 수 있을 뿐만 아니라 본 고안의 블록(2)을 미리 성형하여 울타리가 축조되는 산악지대에 공중운반하여 투하할 수 있어 공수(空輸) 운반작업이 매우 간편하며 울타리의 축조작업을 신속하고 수행할 수 있게되는 것이다.When the present invention is applied to the construction of the fence in the mountainous area as described above to solve the inconvenience of having to transport the cement, sand, gravel, and water separately in order to build the basic concrete (A) of the support (1) In addition, the block 2 of the present invention can be molded in advance and can be dropped by air transport in the mountainous area where the fence is constructed, so that the air transport is very easy and the construction of the fence can be performed quickly and quickly. Will be.

이와 같은 본 고안은 미리 성형된 블록을 사용하여 울타리의 지주를 지지하는 기초 콘크리트를 간단하게 조립 적층하여 울타리를 축조하는데 소요되는 작업공기를 단축할 수 있을 뿐만 아니라 이에 따른 시공비를 절감할 수 있는 매우 경제적인 유용한 고안인 것이다.The present invention, such as using a pre-molded block can be easily assembled and laminated to the foundation concrete supporting the support of the fence to shorten the work air required to build the fence, as well as to reduce the construction cost accordingly It is an economical useful design.

Claims (1)

도시한 바와 같이 지주(1)를 지지하는 기초 콘크리트(A)를 구성함에 있어서, 블록(2) 저면에 삽치요구(3)와 계합돌부(4)(4')를 양측에 마주보게 설치하고 일측면 중앙부에 반원형요홈(5)을 일체로 요설한 삽지돌부(6)를 상면에 돌설하며, 상면 삽지돌부(6)타측으로 개방된 개방공(8)(8')과 연통되게 천설된 관통공(7)(7')에 강봉(9)을 삽치시킨 다음, 2개의 블록(2)을 마주보게 설치하여 지그자그상으로 적층시켜서된 울타리용 지주의 조립식 기초 콘크리트블록.As shown in the figure, in constructing the foundation concrete (A) supporting the support (1), the insertion request (3) and engaging projections (4) (4 ') on both sides of the block (2) is installed facing each other and working The through hole which is formed in communication with the opening hole 8, 8 'which is opened to the other side by the insertion protrusion part 6 which provided the semicircular groove 5 in the side center part integrally. (7) (7 ') Prefabricated foundation concrete blocks of fence posts which are placed in a jig-za shape by inserting two blocks (2) facing each other after inserting the steel bar (9).
KR2019820006371U 1982-08-12 1982-08-12 Prefabricating base block for a fence KR840000304Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019820006371U KR840000304Y1 (en) 1982-08-12 1982-08-12 Prefabricating base block for a fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019820006371U KR840000304Y1 (en) 1982-08-12 1982-08-12 Prefabricating base block for a fence

Publications (1)

Publication Number Publication Date
KR840000304Y1 true KR840000304Y1 (en) 1984-02-23

Family

ID=19226563

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019820006371U KR840000304Y1 (en) 1982-08-12 1982-08-12 Prefabricating base block for a fence

Country Status (1)

Country Link
KR (1) KR840000304Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101365236B1 (en) * 2013-07-24 2014-02-19 주식회사 스페이스업 Prefabricated modular foundation for fixing column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101365236B1 (en) * 2013-07-24 2014-02-19 주식회사 스페이스업 Prefabricated modular foundation for fixing column

Similar Documents

Publication Publication Date Title
US4231199A (en) Method and components for construction of building from concrete slabs
US4843658A (en) Swimming pool and method of construction
JP2001295298A (en) Foundation for columnar structure and its work execution method
KR101187682B1 (en) Rainwater storage tank
KR840000304Y1 (en) Prefabricating base block for a fence
KR102149662B1 (en) Method for constructing transfer layer of building using precast concrete slab
KR20220001271A (en) Noise barrier construction system using block module
JPH10299003A (en) Foundation work using precast concrete member
KR200260460Y1 (en) Construction for a culvert of road
JPH0517956A (en) Concrete form and building foundation execution method using this concrete form
KR19990075158A (en) Construction method of reinforced earth retaining wall using only natural stone and its structure
KR20010054238A (en) Precast concrete segment for arch type culvert and construction method using this segment
JPH0586628A (en) Continuous footing assembling construction with precast form of structure or the like, and precast foundation form
KR100569174B1 (en) mold for manhole manufacture and manhole structure of the same
JP3284009B2 (en) Building with basement
JPS627756Y2 (en)
JP2824374B2 (en) Concrete block for foundation, manufacturing method thereof, and foundation construction method using the same
JPS5856265Y2 (en) Reinforcement structure unit
JPH0227002Y2 (en)
KR100361318B1 (en) The manufacturing method of a panel of fence with compounded materials
JPH05112948A (en) Permanent form and foundation execution method using it
JPH01271526A (en) Construction method for foundation
JP3095417U (en) Large assembled culvert constructed of precast concrete and cast-in-place concrete
JP2547497Y2 (en) Precast foundation material for rectangular section concrete cloth foundation
JPS6011171Y2 (en) Hōto formwork