KR800000720B1 - Control system for a nuclear power producing unit - Google Patents

Control system for a nuclear power producing unit Download PDF

Info

Publication number
KR800000720B1
KR800000720B1 KR7601050A KR760001050A KR800000720B1 KR 800000720 B1 KR800000720 B1 KR 800000720B1 KR 7601050 A KR7601050 A KR 7601050A KR 760001050 A KR760001050 A KR 760001050A KR 800000720 B1 KR800000720 B1 KR 800000720B1
Authority
KR
South Korea
Prior art keywords
steam
steam generator
reactor
nuclear power
generator
Prior art date
Application number
KR7601050A
Other languages
Korean (ko)
Inventor
더블류. 듀런트 오리버
Original Assignee
마틴 빅터
더 뱁콕 앤드 월콕스 캄파니
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 마틴 빅터, 더 뱁콕 앤드 월콕스 캄파니 filed Critical 마틴 빅터
Priority to KR7601050A priority Critical patent/KR800000720B1/en
Application granted granted Critical
Publication of KR800000720B1 publication Critical patent/KR800000720B1/en

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/08Regulation of any parameters in the plant
    • G21D3/12Regulation of any parameters in the plant by adjustment of the reactor in response only to changes in engine demand
    • G21D3/14Varying flow of coolant
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Abstract

A control system for a nuclear power producing unit comprises a pressurized water reactor(1), a once-through steam generator(3) provided with feedwater supply means, a turbine generator (13) supplied with steam from the steam generator, means for maintaining a flow of pressurized water(7,8) through the reactor, the second means for adjusting the reactor heat release, and the third means for adjusting the rate of flow of feedwater to the steam generator.

Description

원자력 발전설비를 위한 제어시스템Control system for nuclear power plant

제1도는 가압수형 원자로를 이용한 원자력발전 설비의 개요도이며, 제2도와 제3도에 도시한 제어시스템에서의 최초제어기와 최종제어요소들은 부호로 표시되어 있다.FIG. 1 is a schematic diagram of a nuclear power plant using a pressurized water reactor, and the first controller and the final control elements in the control system shown in FIG. 2 and FIG.

제2도는 제1도에 도시한 원자력 발전설비에 적용시킨 본 발명 제어시스템을 구체적으로 도시한 논리선도.2 is a logic diagram specifically showing the control system of the present invention applied to the nuclear power plant shown in FIG.

제3도는 고정점으로부터 임계시스템 매계변수의 편이를 결정하기 위하여 전형적인 배열을 도시하는 논리선도.3 is a logic diagram showing a typical arrangement for determining the deviation of critical system parameters from a fixed point.

본 발명은 높은 압력으로 가압된 물과 같은 냉각제를 가열시켜 여러개의 증기발생기를 병렬로 통과, 순환되게 한 후, 터어빈 발전기같은 원동기에 증기를 공급하도록 한 원자로를 가지는 원자력 발전설비를 위한 제어 시스템에 관한 것이다. 크기순에 따라서 이러한 장치의 원자로는 3,400 메가와트(Mw)이상의 열출력과 1,200메가와트(Mw)의 순수 전기적 출력을 가질 수 있다.The present invention is directed to a control system for a nuclear power plant having a nuclear reactor for supplying steam to a prime mover such as a turbine generator after heating a coolant such as pressurized water at high pressure to pass and circulate several steam generators in parallel. It is about. Depending on the size, the reactor of such a device may have a heat output of more than 3,400 megawatts (Mw) and a pure electrical output of 1,200 megawatts (Mw).

본 발명에 의하여 원하는 전력출력 또는 수요전력 출력에 일치하는 주급수전진 제어신호는, 전력수요를 충족하는데 요구되는 원자로열출력과, 임계시스템 매계변수를 고정점에 유지하는데 요구되는 증기발생기까지의 급수량의 전속도 및 증기 발생기로부터 나오는 증기유량의 전 속도를 개별적인 이산제어 루우프를 통하여 병행조정된다.According to the present invention, the main feed water forward control signal corresponding to the desired power output or demand power output includes the reactor heat output required to meet the power demand and the water supply amount to the steam generator required to maintain the critical system parameter at a fixed point. The total speed of the steam and the total speed of the steam flow from the steam generator are adjusted in parallel through separate discrete control loops.

본 발명에 의하여 각 이산제어 루우프로 가는 급수전진제어 신호는, 수요전력출력과 실제 전력출력간의 차를 시간적분으로 수정하여 싸이클(cycle) 효율에서의 변화 때문에 전력수요를 충족하는데 요구하는 원자로 열출력에서의 변화와 임계 시스템 매계변수를 고정점에 유지하는데 요구하는 증기발생기까지의 급수량의 전속도 및 증기발생기로부터 나오는 증기유량의 전속도에 일치하는 변화들을 정상상태 조건하에서 계속적으로 조정된다.According to the present invention, the feedwater forward control signal going to each discrete control loop is a reactor heat output required to meet the power demand due to a change in cycle efficiency by correcting the difference between the demand power output and the actual power output by time integration. Changes consistent with the flow rate at the steam generator and the flow rate from the steam generator to the steam generator required to maintain the critical system parameters at fixed points are continuously adjusted under steady-state conditions.

또한 본 발명에 의하여 각 이산제어루우프로 가는 급수전진 제어신호는 수요전력 출력 및 실제 전력 출력과 임계시스템 매계변수차에서의 일시적 변화에 비례를 이루도록 수정된다.In addition, according to the present invention, the feed water forward control signal to each discrete control loop is modified to be proportional to the temporary change in the demand power output and the actual power output and the critical system parameter difference.

또한 본 발명에 의하여 증기발생기까지의 급수량의 상태속도는 증기발생기를 통과하는 냉각재 유량의 상대속도 변화에 비례로 추가조정되며, 증기발생기까지의 급수량의 상대속도는 증기발생기내로 들어오는 급수온도차에 의하여 조정되고, 증기발생기까지 급수의 상대속도는 증기발생기에서의 평균냉각제 온도차를 시간적분함으로써 추가 조정된다.In addition, according to the present invention, the state speed of the water supply amount up to the steam generator is further adjusted in proportion to the change in the relative speed of the coolant flow rate through the steam generator, and the relative speed of the water supply amount up to the steam generator is adjusted by the water supply temperature difference introduced into the steam generator. The relative speed of feedwater up to the steam generator is further adjusted by time integration of the average coolant temperature difference in the steam generator.

본 발명의 목적은 다음의 도면을 참고하여 상세히 기술하고자 한다.The object of the present invention will be described in detail with reference to the following drawings.

제1도에는 가압기(2)에 의하여 소정의 작동압력에 유지되는 가압수형원자로(1)이 도시되었다. 가압수와 같은 원자로 냉각재는 원자로(1)을 통과하여 병렬 냉각재유량 루우프(A)와 (B)로 통하는 일회전용(once through) 증기 발생기(3)과 (4)에 개별적으로 통과하면서 순환된다. 루우프(A)를 통과하는 냉각재유량은 병렬로 배치한 순환펌프(7)과 (8)에 의하여 일정양이 설정되어 유지시킨다.1 shows a pressurized water reactor 1 maintained at a predetermined operating pressure by a pressurizer 2. Reactor coolant, such as pressurized water, is circulated separately through once reactor steam generators 3 and 4 through reactor 1 and into parallel coolant flow loops A and B. The amount of coolant flow through the loop A is set and maintained by the circulation pumps 7 and 8 arranged in parallel.

발생기(3)과 (4)로부터 나오는 증기는 도관(11)을 통과하여 부호(12)로 표시한 터어빈장치에 운반되며, 이 터어빈장치는 고압(HP)장치 또는 부호(14)로 표시한 중간전압 및 저압(IP & LP) 장치로써 이루어진다. 고압장치(13)과 중압 및 저압 장치(14)는 단 하나의 발전기(15)를 작동시켜 전기전력을 발행하여 그로부터 도전체(16),(17)과 (18)에 의하여 전송되게 했다. 선택하기에 따라서, 각 터어빈장치를 각 터어빈에 개별적으로 연결된 발전기를 작동하도록 배치하여 모든 전력을 공통모선에 공급할 수도 있다.Steam from generators 3 and 4 passes through conduit 11 and is transported to a turbine device indicated by the sign 12, which is in the middle of the high pressure (HP) device or the sign 14. It consists of voltage and low voltage (IP & LP) devices. The high pressure device 13 and the medium and low pressure device 14 operate only one generator 15 to generate electrical power and to be transmitted by the conductors 16, 17 and 18 therefrom. Optionally, each turbine unit may be arranged to operate a generator individually connected to each turbine to supply all power to the common bus.

증기는 부호(11)에 개략적으로 도시한 종래의 유량제어 밸브장치를 통하여 고압장치(13)에 인입되고, 도관(20)을 통과하여 재열기(21)로 인입하는데 이 재열기(21)은 도관(11)에서 나오는 가열증기를 분지도관(22)를 통하여 제공받는다.The steam enters the high pressure device 13 through a conventional flow control valve device schematically shown at 11 and passes through a conduit 20 into the reheater 21, which is reheated 21. Heated steam from the conduit (11) is provided through the branch pipe (22).

그 다음 고온재열증기는 도관(23)을 통과하여 중압 및 저압장치에 전송되며, 그로부터 복수기(24)에 인입한다.The hot reheat steam is then passed through conduit 23 to the medium and low pressure apparatus, from which it enters the condenser 24.

복수기(24)에서 나오는 복수(復水)는 복수펌프(25)에 의하여 펌프되어 저압가열기 스트링(string)(26)을 통과하면서 중압 및 저압장치(14)에서 나오는 추출증기에 의하여 가열된다. 급수는 보일러 공급펌프(27)과 (28)에 의하여 저압가열기 스트링(26)으로부터 병렬로 분류되어 나오게 된다.The plurality of water coming out of the condenser 24 is pumped by the plurality of pumps 25 and passed by the low pressure heater string 26 and heated by the extraction steam from the medium and low pressure devices 14. The feed water is sorted out in parallel from the low pressure heater string 26 by the boiler feed pumps 27 and 28.

보일러 공급펌프(27)로부터 방출된 급수는 고압장치(13)에서 나오는 추출증기로 가열되는 고압가열기(29)를 통과하여 증기 발생기(3)으로 들어간다. 또한 보일러 공급펌프(28)로부터 방출된 급수는 고압장치(13)으로부터 나오는 추출증기에 의하여 가열되는 고압가열기(30)을 통과하여 증기발생기(4)로 들어간다.The water discharged from the boiler feed pump 27 passes through the high pressure heater 29 which is heated by the extraction steam from the high pressure device 13 and enters the steam generator 3. The water discharged from the boiler feed pump 28 also enters the steam generator 4 through the high pressure heater 30 which is heated by the extraction steam from the high pressure device 13.

제2도는 제어시스템의 논리선도이다. 원자력발생설비의 부하수요는 부호(32)로 도시한 자동부하급송시스템 또는 다른 종류의 자동 및 수동장치에 의하여 설정되어 주급수 전진제어신호를 발생한다. 작동중의 원자력 발전 실비의 모든 보조장치들로 인한 최대 부하상태에서의 원자로 가능출력(capability)에 일치하고, 장치(33A)에서 결정된(최대 제한을 가진 급수전진 주제어 신호는, 신호도전제(34)를 지나 전송되도록 하여 고압 터어빈장치(13)에 대한 증기유량, 증기발생기(3)과 (4)에 대한 전급수량과 원자로(1)의 원자력 또는 열출력(Nd)들을 각 개별적인 이산제어 루우프를 통하여 병형조정하므로써 수요전력 출력과 동일한 원자력발전설비의 실제 전력출력을 실질적으로 유지하게 된다.2 is a logic diagram of the control system. The load demand of the nuclear power generation facility is set by an automatic load supply system shown by reference numeral 32 or another kind of automatic and manual device to generate a main water feed forward control signal. The feedwater main control signal determined by the apparatus 33A (with the maximum limit) corresponding to the reactor's capability at full load due to all auxiliary devices of the actual cost of nuclear power generation in operation, is a signal conductor (34). To the steam flow to the high-pressure turbine device (13), to the feedwater supply to the steam generators (3) and (4), and to the nuclear or heat output (Nd) of the reactor (1). Through parallel adjustment, the actual power output of the nuclear power plant is substantially maintained.

급수전진주제어 신호는 함수발생기(61A),(62A)와 (63A)를 통하여 개별적으로 이산제어 루우프에 입력되며, 이 신호의 목적은 주급수전진제어 신호를 수정하여 정상작동상태와 싸이클효율에서 그당시 현존하는 수요전력을 충족하는데 요구되는 원자로 열발생과 임계시스템 매개변수를 고정점에 유지하는데 요구되는 증기발생기까지의 급수량의 전속도와 증기 발생기에서 나오는 증기유량을 결정한다. 또한 각각의 제어루우프는 이후 상세히 설명되는 것과 같이 개별적으로 수정신호가 제공되어 실제 전력출력이 수요전력 출력과 조금도 틀림없이 동일하게 유지되며, 임계시스템 매개 변수는 싸이클효율에서의 변화와 작동상태에서의 변화의 단독 또는 복합적인 변화에도 불구하고 고정점에 유지된다.The feedwater main control signal is input to the discrete control loop individually through the function generators 61A, 62A and 63A. The purpose of this signal is to modify the main feedwater advance control signal at the time of normal operation and cycle efficiency. Determine the total speed of feedwater up to the steam generator required to maintain the reactor heat generation and critical system parameters required to meet existing demand power and the steam flow from the steam generator. In addition, each control loop is individually provided with a correction signal, as described in detail later, so that the actual power output must remain somewhat the same as the demand power output, and the critical system parameters can be changed in cycle efficiency and operating conditions. Remains at a fixed point despite single or multiple changes.

도면에는 종래의 제어논리회로를 사용하고 있다. 이 부호들이 나타내는 흔히들 하아드웨어라고 부르는 제어성분들은 상업적으로도 이용가치가 있으며, 이들에 대한 작동은 잘 알려져 있다. 또한 종래의 논리부호들이 사용되어 특별한 유형의 제어를 가지는 공기식, 수압식, 전기식 디지탈 및 이들의 조합으로써 이루어지는 제어시스템과의 동질성을 피하였으며, 이는 본 발명이 이들 유형의 어느 하나와 통합될 수도 있기 때문이다. 더욱 주의할 것은 논리선도에 도시된 주제어기들은 제1도에도 관련지어지며, 최종제어요소를 함께 지닌다.In the drawing, a conventional control logic circuit is used. Control components, commonly referred to as hardware, represented by these codes are commercially available and their operation is well known. Conventional logic codes have also been used to avoid homogeneity with control systems consisting of pneumatic, hydraulic, electric digital and combinations of these with special types of control, which may be incorporated into any one of these types. Because there is. It is further noted that the main controllers shown in the logic diagram are also associated with FIG. 1, with the final control elements.

개별적으로 각 이산제어 루우프에 분리인가되는 하나 또는 그 이상의 제2도에서의 수평신호들은 메가와트오차(MWe), 트로틀(throttle) 압력오차(TPe), 급수온도오차(FWTe)와 원자로 냉각재온도오차(RCTe)들로써 표시하였다.Horizontal signals in one or more of the second degrees, separately applied to each discrete control loop, include megawatt error (MWe), throttle pressure error (TPe), feed water temperature error (FWTe) and reactor coolant temperature error. (RCTe).

제3도는 이 수정신호들의 발생에 대한 서브 루우프(sub-loop)의 논리선도이다. 급수전진제어 신호는 신호도 전체(34)를 지나 함수발생기(35),(36),(37)과 (39)에 전송되며, 이 함수발생기의 목적은 급수전진제어신호를 조정하여 그로부터 나오는 출력신호가 그당시 현존하는 주급수전진제어신호의 크기와 관련지어진 가변성의 교정치 또는 고정치를 나타나게 하는 것이다. 함수 발생기(35)는 현존하는 주급수전진제어 신호를 위한 교정트로를 압력에 일치하는 고정점 신호를 발생하며, 이 고정점 신호는 조절압력 전송기(41)에서 발생된 신호와 비교장치(40)에서 비교되어 트로틀압력오차(TPe)에 일치하는 출력신호를 발생한다.3 is a logic diagram of a sub-loop for the generation of these correction signals. The feed water forward control signal is transmitted to the function generators 35, 36, 37, and 39 through the entirety of the signal diagram 34, and the purpose of the function generator is to adjust the feed water advance control signal and output it therefrom. The signal then causes a correction or fixed value of variability associated with the magnitude of the existing main water forward control signal. The function generator 35 generates a fixed point signal corresponding to the pressure of the calibration trolley for the existing main feed water forward control signal, which is compared with the signal generated by the regulating pressure transmitter 41 and the comparison device 40. Is compared to generate an output signal corresponding to the throttle pressure error (TPe).

때가와트오차(MWe)에 일치하는 오차신호는 함수발생기(36)에서 나오는 출력신호를 메가와트 전송기(42)에서 발생된 출력신호와 비교장치(43)에서 비교함으로써 발생된다.The error signal corresponding to the time wattage error MWe is generated by comparing the output signal from the function generator 36 with the output signal generated by the megawatt transmitter 42 in the comparator 43.

평균 급수온도오차(FWTe)에 일치하는 신호는 루우프(A)와 (B) 각각에 있는 급수온도오차(FWTeA)와 (FWTeB)를 평균하므로써 발생된다. 따라서 도시와 같이 부하수요에 관련하여 정상급수온도를 나타내고, 정상적으로 작동하는 모든 추출 급수열가열기를 가지는 함수발생기(37)에서 나오는 출력신호는 급수온도 전송기(46)에서 발생된 루우프(A)에서의 실제 급수온도에 일치하는 신호와 비교장치(44A)에서 비교된다. 같은 방법으로, 함수발생기(37)에서부터 나오는 출력신호는 급수온도변환기(47)에서 발생된 루우프(B)에서의 실제 급수온도에 일치하는 신호와 비교 장치(44B)에서 비교된다. 비교장치(44A)와 (44B)로부터 나오는 출력신호는 평균급수온도오차에 일치하는 출력신호(FWTe)를 발생하는 합산장치(45)에 입력된다.A signal coinciding with the mean feed water temperature error FWTe is generated by averaging the feed water temperature errors FWTeA and FWTeB in loops A and B, respectively. Therefore, as shown in the drawing, the output signal from the function generator 37 having the normal feed water temperature in relation to the load demand and having all the extracted feed water heaters operates in the loop A generated by the feed water temperature transmitter 46 The signal corresponding to the actual water supply temperature is compared in the comparison device 44A. In the same way, the output signal from the function generator 37 is compared in the comparison device 44B with a signal corresponding to the actual feed water temperature in the loop B generated by the feed water temperature converter 47. The output signals from the comparators 44A and 44B are input to the summing device 45 which generates an output signal FWTe corresponding to the average water supply temperature error.

원자로에 들어가거나 나오는 냉각제 온도오차(RCTe)에 일치하는 신호는 함수발생기(39)에서 나오는 출력신호를 평균냉각제 온도에 일치하는 신호와 비교장치(50)에서 비교하므로써 발생되며, 이 원자로에 들어가거나 나오는 평균냉각제온도는 합산장치(52),(53)에서 발생되는 신호들을 평균하는 합산장치(51)에서 발생된다. 합산장치(52)는 루우프(A)에서 원자로(1)을 들어가거나 나오는 냉각재의 온도에 일치하는 온도전송기(54),(55)에서 발생된 신호들을 평균한다.The signal coinciding with the coolant temperature error (RCTe) entering or exiting the reactor is generated by comparing the output signal from the function generator 39 with the signal corresponding to the average coolant temperature in the comparator 50 and entering or exiting the reactor. The average coolant temperature coming out is generated in the summation device 51 which averages the signals generated in the summation devices 52 and 53. The adder 52 averages the signals generated by the temperature transmitters 54 and 55 that correspond to the temperatures of the coolant entering or exiting the reactor 1 in the loop A.

같은 방법으로 합산장치(53)도 냉각재루우프(B)에서 원자로(1)에 들어가거나 나오는 냉각제의 온도에 일치하는 온도전송기(56),(57)에서 발생된 신호들을 평균한다.In the same way, the summation device 53 also averages the signals generated by the temperature transmitters 56 and 57 corresponding to the temperature of the coolant entering or exiting the reactor 1 in the coolant loop B.

제2도의 항목별 오차신호들은 하나 또는 그 이상의 계산장치에 인가된다. 도면에서의 복잡함을 피하기 위하여 비교장치(40),(43),(45)와 (50)에서 나오는 오차신호도 전체는 도시하지 않았다. 예를 들면 비교장치(40)에서 발생된 신호(TPe)는 이 입력으로 도시한 계산장치에 인가되어 있음이 분명하기 때문이다.Item-specific error signals of FIG. 2 are applied to one or more calculation devices. In order to avoid the complexity in the drawings, the error signals from the comparators 40, 43, 45, and 50 are not shown in their entirety. For example, it is apparent that the signal TPe generated by the comparison device 40 is applied to the calculation device shown as this input.

터어빈 증기유량, 급수량과 원자로의 열출력에 대한 제2도에서의 이산제어 루우프에 관하여, 어떤 오차신호가 적분장치(58),(59)와 (60)을 통하여 도입되며, 그로부터 출력신호들이 승산장치(61),(62)와 (63) 각각에 전송되어 정상상태수정의 교정을 주급수전진제어신호에 일치하도록 작용한다.Regarding the discrete control loop in FIG. 2 for the turbine steam flow, feed water and reactor heat output, an error signal is introduced through the integrators 58, 59 and 60 from which the output signals are multiplied. It is transmitted to the devices 61, 62 and 63 to actuate the correction of the steady state correction to match the main water feed forward control signal.

도시된 바와 같이 다른 신호들도 합산설비(64),(66)와 (66)에 도입되어 바이어스교정을 오찬신호에서의 일시적인 변화에 비례하는 주급수전진제어신호에 일치하도록 작용한다.As shown, other signals are also introduced into summing devices 64, 66 and 66 to actuate the bias correction to match the main water feed forward control signal proportional to the temporary change in the luncheon signal.

정상상태수정의 교정을 이루거나 바이어스교정 또는 일시적인 교정을 이루도록 인가된 이 특별한 오차신호는 문제의 이산제어루우프에 따라 좌우된다. 원자로 열출력제어 루우프에 대하여, 함수발생기(63A)에 의하여 설정된 수정급수 전진제어신호는 제어봉 구동장치(102)를 작동하여 정상상태조건하에 부하수요를 충족시키는데 필요한 출력과 동일한 원자로 열출력을 유지시킨다.This particular error signal, applied to correct steady state correction, bias correction, or temporary correction, depends on the discrete control loop in question. For the reactor heat output control loop, the quartz feed forward control signal set by the function generator 63A operates the control rod drive 102 to maintain the reactor heat output equal to the output required to meet the load demand under steady state conditions. .

정상상태수정의 교정을 하기 위하여 메가와트오차는 적분장치(6)과 승산장치(63)을 통하여 도입된다. 원자로에 들어오거나 나오는 냉각재 온도 오차에 일치하는 바이어스교정과 일시적 교정을 제공하는 신호들인 트로틀압력오차와 메가와트오차는 합산장치(66)를 통하여 도입된다. 제어봉구동장치(102)를 적소에 위치시키어 비교장치(103)을 이루는 국부궤환 루우프에 의하여 합산장치(66)으로부터 나오는 제어신호에 일치하는 실질원자로 열출력을 유지하게 되었으며, 합산장치(66)으로부터 나오는 출력신호는 원자력 전송기(48)에서 발생된 실제 원자력(Ni)에 일치하는 신호와 비교장치(103)에서 비교된다. 비교장치(103)부터 비례적분장치(104)를 통하여 나오는 출력신호는, 제어봉구동장치(102)의 작동을 조절하여 전력발전 설비의 전력출력을 합산장치(66)에 의하여 설정된 출력치에 유지하는데 요구되는 출력과 동일한 실제 원자력 출력을 유지시킨다.In order to correct the steady state correction, a megawatt error is introduced through the integrator 6 and the multiplier 63. The throttle pressure error and megawatt error, signals that provide bias correction and temporary correction to match the coolant temperature error entering or exiting the reactor, are introduced via summing device 66. Positioning the control rod drive device 102 in place to maintain the heat output to the real atom corresponding to the control signal from the summing device 66 by the local feedback loop forming the comparator 103, from the summing device 66 The output signal coming out is compared in the comparison apparatus 103 with a signal corresponding to the actual nuclear power Ni generated in the nuclear transmitter 48. The output signal from the comparator 103 through the proportional integral device 104 controls the operation of the control rod drive device 102 to maintain the power output of the power generation facility at the output value set by the summing device 66. Maintain an actual nuclear power output equal to the required power.

터어빈 증기유량제어 루우프에 대하여 수정급수 전진제어 신호는 터어빈제어밸브(19)를 작동시킨다. 제어밸브(19)에 전송된 제어신호는 A/D회로 등을 통하여 어느 특정한 유형의 터어빈 제어밸브 장치(mechanism)에 적용된다.For the turbine steam flow control loop, the quartz feedwater forward control signal actuates the turbine control valve 19. The control signal transmitted to the control valve 19 is applied to any particular type of turbine control valve mechanism via an A / D circuit or the like.

적분장치(58)을 통하여 도입된 트로틀 압력오차는 터어빈 밸브위치를 줄이고 이에 따르는 고정점 이하에서 증기압력의 감소에 따라 증기 유량에 대한 수요가 감소하며 이와 반대의 작용도 성립한다. 증기유량에 대한 부적당한 정상상태교정을 방지하기 위하여 메가와트오차에 비례하는 신호는 비교장치(70)에서 트로틀 압력오차에서 공제된다.The throttle pressure error introduced through the integrator 58 reduces the turbine valve position and thus reduces the steam pressure below the fixed point, thereby reducing the demand for steam flow rate and vice versa. The signal proportional to the megawatt error is subtracted from the throttle pressure error in the comparator 70 to prevent inadequate steady state calibration of the steam flow.

평균냉각재온도오차, 급수온도오차, 트로틀압력오차, 메가와트오차에 비례하는 신호들은 적당한 이득바이어스 교정으로 합산장치(64)에서의 급수전진제어신호에 인가된다. 작동중 평균냉각재 온도의 감소는 터어빈 증기유량의 감소를 발생시키며, 급수가열기의 정지로 인한 급수온도의 감소는 증기유량을 감소시키어 추출유량의 감소를 보상하며 따라서 다른 방법으로 생기게 될지도 모르는 전력출력의 일시적인 증가를 피하고, 트로틀 압력에서의 감소는 터어빈 증기유량을 감소시키는 한편, 전력출력에서의 감소는 터어빈 증기유량에 일치하는 감소를 일으킨다. 합산장치(64)를 통하여 인가된 비례교정은 일시적 상태에 있을 경우 원자력발전장치의 작동을 안정하게 하도록 작용한다. 합산장치(64)에서 나오는 제어신호는 최종제어요소인 터어빈 제어밸브(19)에 전송된다. 합산장치(64)에서 나오는 제어신호와 터어빈 증기유량의 속도사이에 변함없는 관계를 존속하기 위하여, 국부궤한루우프가 제공되었다. 실제터어빈 증기유량에 일치하는 신호는 첫째단 압력 전송기(71)에서 발생되어 합산장치(64)에서 나오는 출력신호와 비교장치(72)에서 비교된다. 비례적분장치(73)에서 발생된 신호는 전송기(71)에서 발생된 신호를 합산장치(64)에서 나오는 출력신호와 동일하게 유지하도록 터어빈 제어밸브를 조정한다.Signals proportional to the average coolant temperature error, feed water temperature error, throttle pressure error, and megawatt error are applied to the feed water forward control signal in the summing device 64 with appropriate gain bias correction. A decrease in the average coolant temperature during operation results in a reduction in the turbine steam flow, and a decrease in the feed water temperature due to the shutdown of the feed water heater reduces the steam flow and compensates for the reduction in the extraction flow and thus may result from other means. Avoiding a temporary increase in the throttle pressure decreases the turbine steam flow, while a decrease in power output results in a reduction corresponding to the turbine steam flow. The proportional correction applied through summing device 64 serves to stabilize the operation of the nuclear power plant when in a temporary state. The control signal from the summing device 64 is transmitted to the turbine control valve 19 which is the final control element. In order to survive the unchanged relationship between the control signal from the summing device 64 and the speed of the turbine steam flow, a localized loop is provided. The signal corresponding to the actual turbine steam flow rate is generated in the first stage pressure transmitter 71 and compared with the output signal from the summing device 64 in the comparison device 72. The signal generated by the proportional integration device 73 adjusts the turbine control valve to keep the signal generated by the transmitter 71 the same as the output signal from the summing device 64.

이미 위에 상세히 기술한 바와 같이 터어빈 증기유량 제어밸브(19)는 합산장치(64)에서 나오는 출력신호에 의하여 요구되는 터어빈 증기유량을 유지하도록 위치시킨다. 필요하다면 1975년 7월 15일자로 허여된 미국특허 제3,894,396호에 기재된 바와 같이 제한제어를 증기유량 제어루우프에 도입하면 그로 인하여 터어빈에 대한 증기유량의 속도는 소정의 제한을 초과하는 고정점으로부터 트로틀압력 폭주를 방지하도록 조정한다.As described in detail above, the turbine steam flow control valve 19 is positioned to maintain the turbine steam flow required by the output signal from the summing device 64. If necessary, as described in US Pat. No. 3,894,396, issued July 15, 1975, limiting control may be introduced into the steam flow control loop, whereby the rate of steam flow to the turbine may be throttled from a fixed point exceeding a predetermined limit. Adjust to prevent pressure runaway.

급수량제어에 관하여, 전 급수량은 개별적으로 수정된 급수전진 제어신호와 비례하여 유지되며, 다른 증기발생기(4)에 대한 급수량과 연관이 되는 한 증기발생기(3)에 대한 급수량은 루우프(A)와 (B)에서 평균냉각재 온도가 동일하재 유지하도록 조정된다.With regard to water supply control, the total water supply is maintained in proportion to the individually corrected water supply control signal, and the water supply to the steam generator 3 is equal to the loop (A) as long as it is related to the water supply to the other steam generator (4). In (B), the average coolant temperature is adjusted to remain the same.

함수발생기(62A)에서 수정된 급수전진 제어신호는 증기발생기(3)에 대한 급수량을 조정하는 밸브(75)와 증기발생기(4)에 대한 급수량을 조절하는 밸브(76)을 병렬로 작동시킨다. 증기발생기(3)과 (4)에 대한 총급수량은 유량전송기(77), 비교장치(78)과 비례적분장치(79)로서 이루어져 있는 궤환루우프에 의한 수요와 동일하게 유지된다. 비례적분장치(79)에서 발생된 출력신호는 도전체(80)과 (81)을 통하여 합산장치(82)와 (83)에 각각 전송되고, 증기발생기(3)과 (4)에 동일한 증기유량을 이루도록 조정된다. 따라서 정상상태에서 증기발생기로부터 나오는 증기출력은 동일하게 유지된다. 국부궤환루우프는 유량전송기(84), 비교장치(85)와 비례적분장치(86)로 구성한 증기발생기(3)을 위하여 마련되었다.The water feed forward control signal modified in the water generator 62A operates the valve 75 for adjusting the water supply amount to the steam generator 3 and the valve 76 for adjusting the water supply amount to the steam generator 4 in parallel. The total water supply to the steam generators 3 and 4 remains the same as the demand by the feedback loop, which consists of the flow transmitter 77, the comparator 78 and the proportional integral device 79. The output signal generated by the proportional integration device 79 is transmitted to the summing devices 82 and 83 through the conductors 80 and 81, respectively, and the same steam flow rate to the steam generators 3 and 4, respectively. Is adjusted to achieve. Therefore, the steam output from the steam generator in the steady state remains the same. The local feedback loop is provided for the steam generator 3 composed of the flow rate transmitter 84, the comparator 85 and the proportional integral device 86.

마찬가지로 똑같은 궤환루우프가 유량전송기(87), 비교장치(88)와 비례적분장치(89)로 구성한 증기발생기(4)를 위하여 마련되었다. 따라서 증기발생기(3)에 대한 급수량은 합산장치(82)에서 나오는 출력신호에 비례하여 유지되고, 증기발생기(4)에 대한 급수량은 합산장치(83)으로부터 나오는 출력신호에 비례하여 유지된다. 지금까지 기술한 바를 요약하면, 급수제어는, 합산장치(65)에서 발생된 신호에 비례하는 증기발생기(3)과 (4)에 대한 총급수량을 유지하도록 작동하고, 동시에 합산장치(82)로부터 나오는 출력신호에 비례하는 증기발생기(3)에 대한 급수량과 합산장치(83)으로부터 나오는 출력신호에 비례하는 증기발생기(4)에 대한 급수량을 유지한다. 그러나 증기발생기(3)과 (4)에 대한 급수량이 동등하다는 것은 루우프(A)와 (B)에서 평균냉각온도가 동등하게 유지하도록 계속적으로 수정이 이루어진다는 것이다.Similarly, the same feedback loop was provided for the steam generator 4 composed of the flow transmitter 87, the comparator 88 and the proportional integral device 89. Therefore, the amount of water supplied to the steam generator 3 is maintained in proportion to the output signal from the summing device 82, and the amount of water supplied to the steam generator 4 is maintained in proportion to the output signal from the summing device 83. Summarizing what has been described so far, the water supply control operates to maintain the total amount of water supplied to the steam generators 3 and 4 proportional to the signal generated by the adding device 65, and simultaneously from the adding device 82. The water supply amount to the steam generator 3 proportional to the output signal coming out and the water supply amount to the steam generator 4 proportional to the output signal coming out from the summing device 83 are maintained. However, the equivalence of the water supply to the steam generators 3 and 4 means that modifications are continuously made to keep the average cooling temperatures in loops A and B equal.

제3도의 도시에서와 같이 합산장치(52)로부터 나오는 출력신호는 원자로(1)에 들어가고 나오는 루우프(A)에서의 평균냉각재온도에 비례하고, 합산장치(53)으로부터 나오는 출력신호 또는 원자로(1)에 들어가고 나오는 루우프(B)에서의 평균냉각재온도에 비례한다. 제2도의 도시와 같이 루우프(A)와 루우프(B)에서의 냉각재온도차에 비례하는 출력신호는 비교장치(90)에서 발생되며, 비례적분장치(91)과 합산장치(92)를 통하여 합산장치(65)에서 나오는 출력신호를 받아들이는 승산장치(93)에 입력된다. 따라서 증기발생기(3)에 대한 급수량의 속도를 결정하는 급수전진제어 신호는 루우프(A)와 (B)에서의 평균냉각재온도차에 따라 수정된다.As shown in FIG. 3, the output signal from the adder 52 is proportional to the average coolant temperature in the loop A entering and exiting the reactor 1, and the output signal from the adder 53 or the reactor 1 Is proportional to the average coolant temperature at loops (B) entering and exiting As shown in FIG. 2, an output signal proportional to the coolant temperature difference in the loops A and B is generated in the comparator 90, and is added to the summation device through the proportional integration device 91 and the summation device 92. As shown in FIG. It is input to a multiplier 93 which receives an output signal from 65. Therefore, the feedwater forward control signal for determining the speed of the feedwater amount to the steam generator 3 is modified according to the average coolant temperature difference in the loops (A) and (B).

루우프(A)에서의 평균냉각재 온도가 루우프(B)에서의 평균냉각재 온도보다 작을 경우 증기발생기(3)에 대한 급수량은 감소될 것이며, 그와 반대의 경우도 성립된다.If the average coolant temperature in the loop A is less than the average coolant temperature in the loop B, the water supply to the steam generator 3 will be reduced, and vice versa.

동시에 증기발생기(3)에 대한 급수량에서의 변화에 따르는 제어는, 증기발생기(4)에 대한 급수량에서의 반대변화가 아닌 같은 변화가 발생하도록 작동한다. 증기발생기(3)에 대한 급수량의 수요를 나타내고 승산장치(93)에서 나오는 출력신호는, 신호도전체(94)를 통하여 비교장치(95)에 인가되고, 따라서 합산장치(65)로부터 나오는 출력신호에서 증기발생기(3)에 대한 급수량수요에 일치하는 양을 공제한다.At the same time, the control according to the change in the water supply amount to the steam generator 3 operates to cause the same change to occur rather than the opposite change in the water supply amount to the steam generator 4. The output signal indicating the demand of the water supply amount to the steam generator 3 and output from the multiplication device 93 is applied to the comparator 95 through the signal conductor 94, and thus the output signal from the summing device 65. Subtract the quantity corresponding to the water supply demand for the steam generator (3).

따라서 총 급수량의 수요와 증기발생기(3)의 급수 수용사이의 차에 비례하는 비교장치(95)에서 나오는 출력신호는 증기발생기(4)에 대한 고정급수 수요이다.Therefore, the output signal from the comparator 95 proportional to the difference between the demand of the total water supply and the water supply acceptance of the steam generator 3 is the fixed water supply demand for the steam generator 4.

평균냉각재 루우프 온도차에 기인한 오우버라이드(over ride)제어는 매우 정밀하지만, 온도 측정에 따라가 좌우되는 이유 때문에 응답이 비교적 느리며, 이 온도측정은 비교적 긴시간의 상수를 가진다. 다른 증기발생기(4)와 비교되는 한 증기발생기(3)의 증기가 점진적으로 중화되면서 야기되는 평균냉각재온도에서의 변화들을 충분히 조정되도록 한다.The over ride control due to the average coolant loop temperature difference is very precise, but the response is relatively slow because of the dependence on the temperature measurement, which has a relatively long time constant. Compared to other steam generators 4, it is possible to sufficiently adjust the changes in average coolant temperature caused by the gradual neutralization of the steam in the steam generator 3.

더욱이, 냉각재 펌프의 정지에 의하여 발생될지도 모르는 평균냉각재 온도에서의 급격히 빠르고 격렬한 큰 재해의 가능성이 있는 변화를 조정하기 위하여, 본 발명은 증기발생기에 대한 급수유량의 상대속도에서의 당면한 변화들을 푸쉬-풀(push-pull) 방식으로 평균냉각재 루우프 온도차에서의 최종변화에 접근시키도록 한다. 이러한 접근을 계속하면, 평균냉각제 루우프 온도차로 인하여 작동하는 이 제어는 평균냉각재 루우프온도가 동등하게 회복될 때까지 계속적인 변화를 비교적 느리게 도입한다.Moreover, in order to adjust for a potentially rapid and violent catastrophic change in average coolant temperature that may be caused by a stop of the coolant pump, the present invention pushes the immediate changes in the relative speed of the feedwater flow rate to the steam generator. A push-pull approach is used to approach the final change in mean coolant loop temperature difference. Continuing with this approach, this control, operating due to the mean coolant loop temperature difference, introduces continuous changes relatively slowly until the mean coolant loop temperature recovers equally.

제2도에서 이 원리는 루우프(A) 또는 (b)에서의 냉각재 펌프의 손실에 의해 발생될 수도 있는 냉각재유량의 급격한 변화에 적응시킨 것을 도시하였다. 다른 루우프(B)에서의 냉각재유량에 비교되는 루우프(A)에서의 냉각재유량의 어떠한 변화라도 증기발생기에 대한 급수량의 상대속도에 비례하는 변화를 발생시키며, 상대냉각재 루우프 유량에서의 변화에 기인하는 평균냉각재 온도변화를 예상할 수 있다. 함수발생기(96)은 유량전송기(97)에 의하여 결정되는 것과 같이 루우프(A)를 통하여 냉각재유량에 일치하는 출력신호를 발생한다. 함수발생기(98)은 유량전송기(99)에 의하여 결정되는 것과 같이 루우프(B)를 통과한 냉각재유량에 일치하는 출력신호를 발생한다. 이들 두개의 출력신호들은 비교장치(100)에서 비교되고, 비교장치에서 나오는 출력신호는 합산장치(92)에 입력된다. 예를 들면 냉각재펌프(7)의 정지로 인하여 야기되는 루우프(A)를 통과하는 냉각재 유량에서의 감소에 따라 이 제어는 증기발생기(3)에 대한 급수량이 비례적으로 감소하도록 작동하고, 증기발생기(4)에 대한 급수량과 비례를 이룬 증가를 일으키게 하며, 그와 반대의 작동이 일어날 수도 있다. 이후 평균루우프 온도차를 이용하는 이 제어는 평균루우프 온도와 동등해질 때까지 계속되는 기본원리를 근거로 하여 급수량의 상대속도에서의 변화를 수정한다. 이 원리는 급수가열기의 정지로 유래하는 증기발생기(3)과 (4)에 대한 상대급수온도의 변화에 의하여 야기된 평균냉각재루우프 온도차를 예상하도록 적용시킨 제2도에 도시하였다. 예를 들면, 급수가열기(29)가 정지되는 경우의 예상되는 결과는 증기발생기(3)으로부터 원자로(1)에 들어오는 냉각재온도하락이 있게됨에 따라서 루우프(A)의 평균냉각재온도가 낮아지게 된다.This principle in FIG. 2 shows the adaptation to a drastic change in coolant flow that may be caused by the loss of coolant pump in loops (A) or (b). Any change in the coolant flow rate in the loop A compared to the coolant flow rate in the other loop B results in a change in proportion to the relative velocity of the feedwater to the steam generator, resulting from the change in the relative coolant loop flow rate. Average coolant temperature changes can be expected. The function generator 96 generates an output signal corresponding to the coolant flow rate through the loop A as determined by the flow rate transmitter 97. The function generator 98 generates an output signal corresponding to the coolant flow rate passing through the loop B as determined by the flow transmitter 99. These two output signals are compared in the comparator 100, and the output signal from the comparator is input to the summing device 92. For example, with a decrease in the coolant flow rate through the loop A caused by the stop of the coolant pump 7, this control operates to proportionally reduce the water supply to the steam generator 3, It causes an increase in proportion to the water supply for (4), and vice versa. This control, which then uses the mean loop temperature difference, corrects for changes in the relative velocity of the water supply based on the fundamental principles that continue until equal to the mean loop temperature. This principle is shown in FIG. 2, which is applied to predict the mean coolant loop temperature difference caused by the change in the relative feedwater temperatures for the steam generators 3 and 4 resulting from the stop of the feedwater heater. For example, the expected result when the feedwater heater 29 is stopped is that the coolant temperature entering the reactor 1 from the steam generator 3 decreases, so that the average coolant temperature of the loop A is lowered. .

본 발명은 증기발생기까지의 급수량의 속도에 대한 즉각적인 변화를 일으키게 함으로써 이 변화를 예상한다. 합산장치(92)에서 작용하는 비교장치(101)에서부터 승제장치(93)까지의 바이어스 제어작용은 증기발생기(4)에 대한 급수량을 증가시키고, 증기발생기(3)에 대한 급수량을 감소시킨다.The present invention anticipates this change by causing an immediate change in the rate of feedwater up to the steam generator. The bias control action from the comparator 101 acting on the summing device 92 to the booster 93 increases the water supply to the steam generator 4 and reduces the water supply to the steam generator 3.

본 명세서를 간략하게 하기 위하여, 본 발명과 밀접하지 않고 종래의 잘 알려진 유형들에 관련된 도면과 설명은 삭제되었다. 따라서 제1도에서의 증기발생기(3)과 (4)는 일회전용 증기발생기에서 일상적으로 사용되는 다중 평행튜우브가 제공되었다. 마찬가지로 제어봉구동장치(102)와 원자로전력전송기(48)은 블록선도로 도시되어 이 제어시스템이 원자력 레벨과 그것에 관한 측정치를 조정하기 위하여 이용 가능한 몇가지 유형중 어느 한가지가 적용되고 있음을 나타내었다. 또한 원자력 발전소에서 이용된 종래의 방어시스템과 제한제어들이 포함되어 있다. 이러한 시스템과 제어장치들은 본 발명의 일부를 이루지 못하므로 도면과 설명에서 생략하였다.For simplicity of the present specification, drawings and descriptions related to well-known types that are not in close proximity to the present invention are omitted. Thus, the steam generators 3 and 4 in FIG. 1 were provided with multiple parallel tubes which are routinely used in single-use steam generators. Likewise, the control rod drive 102 and the reactor power transmitter 48 are shown in block diagrams to indicate that any of several types of control systems are available for adjusting the nuclear levels and their associated measurements. Also included are conventional defense systems and limiting controls used in nuclear power plants. These systems and controls do not form part of the present invention and are therefore omitted from the drawings and description.

도시와 설명은 단지 제어시스템의 한 일례이며, 본 발명은 첨부된 청구범위에서 정의하였다.The illustration and description are only one example of a control system, the invention being defined in the appended claims.

Claims (1)

도시하고 본문에 상술한 바와 같이, 가압냉각재를 이용한 원자로, 급수공급장치가 장비된 일주전용(once throug) 증기발생기, 증기발생기에서 나오는 증기를 공급받는 터어빈발전기와 원자로 및 증기발생기를 통과하는 냉각재유량을 유지시키는 장치들로 이루어진 원자력발전 설비를 위한 제어시스템에 있어서, 원자력발전 설비의 일정한 원자력출력과 비례를 이루는 급수전진제어 신호발생장치로, 원자로열발생 및 증기발생기까지의 급수량속도를 조정하고 급수전진제어 신호에서만 단독으로 응답하여 병렬로 작동되어, 증기발생기에 대한 원자로의 열발생과 급수량 속도가 급수전진 제어신호에 대하여 개별적인 함수관계를 유지토록 결합한 장치들로써 구성함을 특징으로 하는 원자력 발전설비를 위한 제어시스템.As shown and described in detail in this text, the reactor uses pressurized coolant, a once-throug steam generator equipped with a water supply device, a turbine generator supplied with steam from the steam generator, and a coolant flow through the reactor and the steam generator. In the control system for a nuclear power plant consisting of devices for maintaining the power supply, it is a feedwater forward control signal generator that is proportional to a constant nuclear power output of the nuclear power plant, the rate of supply to the reactor heat generation and steam generators A nuclear power plant characterized in that the reactors are operated in parallel in response only to the forward control signal, and are constituted by devices in which the heat generation of the reactor to the steam generator and the water supply rate are combined so as to maintain a separate functional relationship with the feedwater forward control signal. Control system.
KR7601050A 1976-04-27 1976-04-27 Control system for a nuclear power producing unit KR800000720B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR7601050A KR800000720B1 (en) 1976-04-27 1976-04-27 Control system for a nuclear power producing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR7601050A KR800000720B1 (en) 1976-04-27 1976-04-27 Control system for a nuclear power producing unit

Publications (1)

Publication Number Publication Date
KR800000720B1 true KR800000720B1 (en) 1980-07-23

Family

ID=19202215

Family Applications (1)

Application Number Title Priority Date Filing Date
KR7601050A KR800000720B1 (en) 1976-04-27 1976-04-27 Control system for a nuclear power producing unit

Country Status (1)

Country Link
KR (1) KR800000720B1 (en)

Similar Documents

Publication Publication Date Title
EP0098037B1 (en) Electric power generation systems and methods of operating such systems
EP0093118B1 (en) Hrsg damper control
US4061533A (en) Control system for a nuclear power producing unit
US4104117A (en) Nuclear reactor power generation
US3423285A (en) Temperature control for a nuclear reactor
US7053341B2 (en) Method and apparatus for drum level control for drum-type boilers
US4421068A (en) Optimization of steam distribution
CN103557511A (en) All-process control method for main steam temperature of utility boiler
US4275447A (en) Method of regulation of the water level in boilers or steam generators
US3894396A (en) Control system for a power producing unit
ES436795A1 (en) HTGR power plant hot reheat steam pressure control system
CN104864385A (en) Method and device for calculating feed water flow instruction of supercritical unit
CN112420231A (en) Method for controlling outlet temperature of direct-flow steam generator of nuclear power station
US3896623A (en) Boiler-turbine control system
US4187144A (en) Nuclear reactor power supply
KR800000720B1 (en) Control system for a nuclear power producing unit
US3934419A (en) Load control system especially adapted for a HTGR power plant turbine
CA1048662A (en) Control system for a nuclear power producing unit
US3619631A (en) Tracking means for a steam electric generating plant automatic control system
Durrant Control system for a nuclear power producing unit
Ray et al. Design of a practical controller for a commercial scale fossil power plant
GB2176248A (en) Turbine control
JP3112579B2 (en) Pressure control device
US4593364A (en) Floating deadband for speed feedback in turbine load control
JP3747253B2 (en) Thermal power plant protection system