Coupling device for architectural exterior and interior, and the method for fixing thereof Download PDF

Info

Publication number
KR20240082894A
KR20240082894A KR1020220167000A KR20220167000A KR20240082894A KR 20240082894 A KR20240082894 A KR 20240082894A KR 1020220167000 A KR1020220167000 A KR 1020220167000A KR 20220167000 A KR20220167000 A KR 20220167000A KR 20240082894 A KR20240082894 A KR 20240082894A
Authority
KR
South Korea
Prior art keywords
plate
hole
angle
section steel
fastening
Prior art date
Application number
KR1020220167000A
Other languages
Korean (ko)
Inventor
최부환
Original Assignee
최부환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최부환 filed Critical 최부환
Priority to KR1020220167000A priority Critical patent/KR20240082894A/en
Publication of KR20240082894A publication Critical patent/KR20240082894A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • E04F13/0808Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall adjustable in several directions one of which is perpendicular to the wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

본 발명은 건축물 내외장재 고정구(1)에 관한 것이다. 그러한 건축물 내외장재 고정구(1)는, 세로판(11) 및 가로판(9)으로 구성되고, 세로판(11)에는 제 1홀(15)이 형성되고, 가로판(9)에는 제 2홀(13)이 형성되는 앵글(3)과; 앵글(3)의 세로판(11)의 하부에 유동 가능하게 결합되어 형강(C)의 테두리부(25) 내면에 배치되고, 제 1홀(15)에 대응하는 위치에 제 1장공(17)이 형성되는 보조판(5)과; 앵글(3)의 가로판(9)에 유동가능하게 결합되고, 제 2홀(13)에 대응하는 위치에 제 2장공(19)이 형성되는 조정판(7)과; 보조판(5)의 제 1장공(17)과 세로판(11)의 제 1홀(15)을 체결하는 제 1체결부재(27,29)와; 그리고 조정판(7)의 제 2홀(13)과 가로판(9)의 제 2장공(19)을 체결하는 제 2체결부재(31,33)를 포함한다.The present invention relates to a fixture (1) for interior and exterior building materials. Such a building interior and exterior fixture (1) is composed of a vertical plate (11) and a horizontal plate (9), a first hole (15) is formed in the vertical plate (11), and a second hole (15) is formed in the horizontal plate (9). An angle (3) formed by 13); It is movably coupled to the lower part of the vertical plate 11 of the angle 3 and is disposed on the inner surface of the edge 25 of the section steel C, and the first long hole 17 is located at a position corresponding to the first hole 15. The auxiliary plate (5) is formed; an adjustment plate (7) movably coupled to the horizontal plate (9) of the angle (3) and having a second long hole (19) formed at a position corresponding to the second hole (13); First fastening members 27 and 29 for fastening the first long hole 17 of the auxiliary plate 5 and the first hole 15 of the vertical plate 11; And it includes second fastening members 31 and 33 for fastening the second hole 13 of the control plate 7 and the second long hole 19 of the horizontal plate 9.

Description

건축 내외장재 고정구 및 결합방법{Coupling device for architectural exterior and interior, and the method for fixing thereof}{Coupling device for architectural exterior and interior, and the method for fixing thereof}

본 발명은 건축 외장재 고정구 및 결합방법에 관한 것으로서, 보다 상세하게는 건축물 외장재 혹은 내장재를 외벽에 고정하는 고정구의 구조를 개선함으로써 보다 간편하고 신속하게 고정구를 설치할 수 있고, 보다 큰 중량의 내외장재를 안정적으로 설치할 수 있는 기술에 관한 것이다.The present invention relates to a fixture and connection method for building exterior materials. More specifically, by improving the structure of the fixture that fixes building exterior or interior materials to the exterior wall, the fixture can be installed more simply and quickly, and interior and exterior materials of greater weight can be installed stably. It is about technology that can be installed.

일반적으로 건축 내외장재로 흔히 사용되고 있는 대리석은 일정 형태 및 크기로 제작이 된 상태에서 별도의 건축 내외장재 설치용 고정구 및 앵커 볼트 등의 도구로써 건축물의 벽면에 고정 설치가 이루어진다.In general, marble, which is commonly used as an interior and exterior building material, is produced in a certain shape and size and then fixed and installed on the wall of a building using tools such as separate fixtures and anchor bolts for installing interior and exterior materials.

즉, 상당한 무게를 가지며 판 형태로 제작된 대리석 등의 건축 내외장재가 건축물의 외벽 또는 내벽에 부착된 상태가 유지될 수 있게 하기 위한 매개체로써 한쪽은 앵커 볼트를 통해서 건축물의 내부 또는 외부 벽체에 고정 설치되는 한편 다른 한쪽도 마찬가지로 앵커 볼트를 통해서 건축 내외장재에 고정설치되되, 건축물의 벽체와 일정거리를 가지도록 건축물의 벽체와 건축 내외장재의 간격을 조절하는 조절부재를 더 포함하는 형태의 건축 내외장재 설치용 고정구가 건축물의 벽체와 건축 내외장재 사이에 설치된다.In other words, it is a medium that allows architectural interior and exterior materials such as marble, which have considerable weight and are manufactured in the form of plates, to remain attached to the exterior or interior walls of a building, and one side is fixed to the interior or exterior wall of a building through an anchor bolt. Meanwhile, the other side is similarly fixed to the building interior and exterior materials through an anchor bolt, and further includes an adjustment member that adjusts the gap between the building wall and the building interior and exterior materials so that there is a certain distance from the building wall. It is installed between the wall of the building and the interior and exterior materials of the building.

그러나, 이러한 건축 내외장재의 고정구는 건축 외벽에 설치된 철재 등에 용접 등에 의하여 고정되므로 고정구를 설치하는 작업과정이 번거로운 문제점이 있다.However, since these fixtures for interior and exterior building materials are fixed to steel materials installed on the exterior wall of the building by welding, etc., there is a problem in that the work process of installing the fixtures is cumbersome.

특허 출원 제10-2011-0041871호(명칭:건축물의 외장패널 고정장치)Patent Application No. 10-2011-0041871 (Name: Building exterior panel fixing device)

따라서, 본 발명은 상기한 문제를 해결하기 위하여 제안된 것으로서, 본 발명의 과제는 건축물 외장재 혹은 내장재를 외벽에 고정하는 고정구의 구조를 개선함으로써 보다 간편하고 신속하게 고정구를 설치할 수 있고, 보다 큰 중량의 내외장재를 안정적으로 설치할 수 있는 기술을 제공하는 것이다.Therefore, the present invention was proposed to solve the above problems, and the object of the present invention is to improve the structure of the fixture that fixes the exterior or interior materials of a building to the exterior wall, so that the fixture can be installed more simply and quickly and has a greater weight. The goal is to provide technology that can stably install interior and exterior materials.

본 발명은 상기와 같은 과제를 해결하기 위하여 제안된 것으로, 본 발명의 일 실시예에 따른 건축물 내외장재의 고정구(1)는,The present invention was proposed to solve the above problems, and the fixture (1) for interior and exterior building materials according to an embodiment of the present invention is,

세로판(11) 및 가로판(9)으로 구성되고, 세로판(11)에는 제 1홀(15)이 형성되고, 가로판(9)에는 제 2홀(13)이 형성되는 앵글(3)과;An angle (3) consisting of a vertical plate (11) and a horizontal plate (9), with a first hole (15) formed in the vertical plate (11) and a second hole (13) formed in the horizontal plate (9). class;

앵글(3)의 세로판(11)의 하부에 유동 가능하게 결합되어 형강(C)의 테두리부(25) 내면에 배치되고, 제 1홀(15)에 대응하는 위치에 제 1장공(17)이 형성되는 보조판(5)과; It is movably coupled to the lower part of the vertical plate 11 of the angle 3 and is disposed on the inner surface of the edge 25 of the section steel C, and the first long hole 17 is located at a position corresponding to the first hole 15. The auxiliary plate (5) is formed;

앵글(3)의 가로판(9)에 유동가능하게 결합되고, 제 2홀(13)에 대응하는 위치에 제 2장공(19)이 형성되는 조정판(7)과; an adjustment plate (7) movably coupled to the horizontal plate (9) of the angle (3) and having a second long hole (19) formed at a position corresponding to the second hole (13);

보조판(5)의 제 1장공(17)과 세로판(11)의 제 1홀(15)을 체결하는 제 1체결부재(27,29와; 그리고First fastening members 27 and 29 for fastening the first hole 17 of the auxiliary plate 5 and the first hole 15 of the vertical plate 11; and

조정판(7)의 제 2홀(13)과 가로판(9)의 제 2장공(19)을 체결하는 제 2체결부재(31,33)를 포함한다.It includes second fastening members 31 and 33 for fastening the second hole 13 of the control plate 7 and the second long hole 19 of the horizontal plate 9.

본 발명의 다른 실시예는 건축물 내외장재의 고정구 결합방법을 제공하는 바,Another embodiment of the present invention provides a method of combining fixtures for interior and exterior materials of a building,

상기 고정구 결합방법은, 앵글(3)의 세로판(11)에 보조판(5)을 제 1체결부재(27,29)에 의하여 가 체결하고, 가로판(9)에 조정판(7)을 제 2체결부재(31,33)에 의하여 가 체결하는 단계와;In the fixture coupling method, the auxiliary plate (5) is temporarily fastened to the vertical plate (11) of the angle (3) by the first fastening members (27, 29), and the adjustment plate (7) is connected to the horizontal plate (9) by the second fastening member. A step of temporarily fastening by fastening members 31 and 33;

보조판(5) 및 세로판(11)을 포갠 후 일측부터 형강(C)의 내측으로 기울여서 진입시키는 단계와;After stacking the auxiliary plate (5) and the vertical plate (11), tilting them from one side toward the inside of the section steel (C) to enter them;

보조판(5) 및 세로판(11)이 형강(C)의 내측으로 완전히 진입한 후, 상부로 당겨서 보조판(5)의 상면 양측을 형강(C)의 테두리부(25) 저면에 접촉시키는 단계와;After the auxiliary plate (5) and the vertical plate (11) completely enter the inside of the section steel (C), pulling them upward and bringing both sides of the upper surface of the auxiliary plate (5) into contact with the bottom surface of the edge portion (25) of the section steel (C); ;

앵글(3)을 형강(C)에 대하여 측방향으로 당김으로써 제 1체결부재(27)가 제 1장공(17)을 따라 측방향으로 이동함으로써 세로판(11)이 형강(C)의 외측으로 이탈되는 단계와;By pulling the angle (3) laterally with respect to the section steel (C), the first fastening member (27) moves laterally along the first long hole (17) so that the vertical plate (11) moves to the outside of the section steel (C). a step of leaving;

앵글(3)을 회전시켜서 앵글(3)의 세로판(11)의 폭방향을 형강(C)의 길이 방향에 일치시키고 제 1체결부재(27,29)를 체결시키는 단계와;Rotating the angle (3) to match the width direction of the vertical plate (11) of the angle (3) with the longitudinal direction of the section steel (C) and fastening the first fastening members (27, 29);

조정판(7)을 앵글(3)의 가로판(9)상에서 전후방향으로 적절하게 이동시킨 후 제 2체결부재(31,33)를 체결하는 단계를 포함한다.It includes the step of appropriately moving the adjustment plate 7 in the front-back direction on the horizontal plate 9 of the angle 3 and then fastening the second fastening members 31 and 33.

상기한 바와 같이, 본 발명의 일 실시예는 다음과 같은 효과가 있다.As described above, one embodiment of the present invention has the following effects.

첫째, 건축물 외장재 혹은 내장재를 외벽에 고정하는 고정구의 구조를 개선함으로써 보다 간편하고 신속하게 고정구를 설치할 수 있고, 보다 큰 중량의 내외장재를 안정적으로 설치할 수 있는 효과가 있다.First, by improving the structure of the fixtures that secure exterior or interior materials to the exterior wall of a building, fixtures can be installed more simply and quickly, and interior and exterior materials of greater weight can be installed stably.

둘째, 본 발명의 고정구는 보조판에 장공을 각각 형성하여 고정시에는 타공위치를 일자로 동일하게 맞추고, 대각선으로 보조판 및 앵글을 같이 형상의 내부에 진입시켜서 보조판을 고정시키고 앵글을 회전시켜서 고정할 수 있다.Second, the fixture of the present invention forms long holes in each of the auxiliary plates, so that when fixing, the positions of the holes are aligned in a straight line, and the auxiliary plate and angle are diagonally entered into the inside of the shape to fix the auxiliary plate and rotate the angle. there is.

셋째, 보조판과 볼트를 분리함으로써 좌우로 움직여 보조판을 형강의 내부로 삽입하는 방식이어서 탈선 및 접착면이 넓어져서 압축강도가 강해 무거운 하중에 견딜 수 있다.Third, by separating the auxiliary plate and bolts, it moves left and right to insert the auxiliary plate into the inside of the section steel, which widens the derailment and adhesive surface, making it strong in compression and able to withstand heavy loads.

도 1은 본 발명의 일 실시예에 따른 건축 내외장재 고정구를 보여주는 사시도이다.
도 2는 도 1의 분해 사시도이다.
도 3은 도 1의 측면도이다.
도 4는 도 1에 도시된 건축 내외장재 고정구가 C형강의 내부에 결합되는 첫번째 단계를 보여주는 도면이다.
도 5는 도 4의 첫번째 단계 후 두번째 결합단계를 보여주는 도면이다.
도 6은 도 1에 도시된 건축 내외장재 고정구를 체결하는 단계를 실제로 순차적으로 보여주는 사진이다.
Figure 1 is a perspective view showing a fixture for interior and exterior construction materials according to an embodiment of the present invention.
Figure 2 is an exploded perspective view of Figure 1.
Figure 3 is a side view of Figure 1.
Figure 4 is a diagram showing the first step in which the building interior and exterior fixture shown in Figure 1 is coupled to the inside of the C-beam steel.
Figure 5 is a diagram showing the second combining step after the first step in Figure 4.
Figure 6 is a photograph sequentially showing the actual steps of fastening the interior and exterior building fixtures shown in Figure 1.

이하, 본 발명의 일 실시예에 따른 건축물 내외장재 고정구를 첨부된 도면을 참조하여 상세하게 설명한다.Hereinafter, a building interior and exterior fixture according to an embodiment of the present invention will be described in detail with reference to the attached drawings.

도 1 내지 도 6에 도시된 바와 같이, 본 발명이 제안하는 건축물 내외장재 고정구(1)는, 앵글(Angle;3)과; 앵글(3)의 세로판(11)의 하부에 유동 가능하게 결합되어 형강(C)의 내부에 결합되는 보조판(5)과; 앵글(3)의 가로판(9)에 유동가능하게 결합되는 조정판(7)과; 보조판(5)을 세로판(11)에 체결하는 제 1체결부재(27,29와; 조정판(7)을 가로판(9)에 체결하는 제 2체결부재(31,33)를 포함한다.As shown in Figures 1 to 6, the building interior and exterior fixture (1) proposed by the present invention includes an angle (Angle; 3); An auxiliary plate (5) movably coupled to the lower part of the vertical plate (11) of the angle (3) and coupled to the inside of the section steel (C); An adjustment plate (7) movably coupled to the horizontal plate (9) of the angle (3); It includes first fastening members 27 and 29 for fastening the auxiliary plate 5 to the vertical plate 11 and second fastening members 31 and 33 for fastening the adjustment plate 7 to the horizontal plate 9.

이러한 구조를 갖는 건축물 내외장재 고정구(1)에 있어서,In the building interior and exterior fixture (1) having this structure,

앵글(3)은 다양한 형태의 앵글(3)을 포함하는 바, 예를 들면 세로판(11) 및 가로판(9)으로 이루어진 "ㄱ"자형 앵글(3)을 포함한다.The angle 3 includes angles 3 of various shapes, for example, an “L” shaped angle 3 consisting of a vertical plate 11 and a horizontal plate 9.

이러한 앵글(3)의 세로판(11)에는 제 1홀(First hole;15)이 형성되고, 제 1홀(15)에는 제 1체결부재(27,29)가 체결된다. 이때 제 1홀(15)은 길게 형성된 장공 이며, 동일 직경의 정공이 선택적으로 형성될 수도 있다. 또한, 제 1체결부재(27,29))는 볼트와 너트로 구성되어 서로 조립될 수 있다.A first hole 15 is formed in the vertical plate 11 of the angle 3, and first fastening members 27 and 29 are fastened to the first hole 15. At this time, the first hole 15 is a long hole, and holes of the same diameter may be selectively formed. Additionally, the first fastening members 27 and 29 are composed of bolts and nuts and can be assembled together.

또한, 앵글(3)의 가로판(9)에는 제 2홀(Second hole;13)이 형성되고, 제 2홀(13)에는 제 2체결부재(31,33)가 체결된다. 이때, 제 2홀(13)은 장공이며, 정공이 선택적으로 형성될 수도 있다. 또한, 제 2체결부재(31,33)는 볼트와 너트로 구성되어 서로 조립될 수 있다.In addition, a second hole 13 is formed in the horizontal plate 9 of the angle 3, and second fastening members 31 and 33 are fastened to the second hole 13. At this time, the second hole 13 is a long hole, and the hole may be selectively formed. Additionally, the second fastening members 31 and 33 are composed of bolts and nuts and can be assembled together.

그리고, 앵글(3)의 세로판(11)에는 보조판(5)이 체결되는 바, 이러한 보조판(5)은 다양한 형상을 갖는 바, 예를 들면 사각형상을 갖는다.And, an auxiliary plate 5 is fastened to the vertical plate 11 of the angle 3, and this auxiliary plate 5 has various shapes, for example, a square shape.

또한, 보조판(5)에는 제 1장공(17)이 형성되며, 제 1장공(17)에는 제 1체결부재(27,29가 관통하여 가로판(9)의 제 1홀(15)에 체결된다.In addition, a first long hole 17 is formed in the auxiliary plate 5, and the first fastening members 27 and 29 pass through the first long hole 17 and are fastened to the first hole 15 of the horizontal plate 9. .

따라서, 보조판(5)은 제 1장공(17)에 제 1체결부재(27,29)가 관통함으로써 세로판(11)의 하부에 체결되며, 앵글(3)의 세로판(11)을 보조판(5)의 상부에 고정하는 경우 세로판(11)을 관통한 제 1체결부재(27,29)를 제 1장공(17)을 따라 적절하게 이동함으로써 보조판(5)도 세로판(11)의 하부를 따라 이동한 후 소정 위치에 고정할 수 있다.Therefore, the auxiliary plate 5 is fastened to the lower part of the vertical plate 11 by the first fastening members 27 and 29 penetrating the first long hole 17, and the vertical plate 11 of the angle 3 is connected to the auxiliary plate ( 5), by appropriately moving the first fastening members (27, 29) that penetrate the vertical plate (11) along the first long hole (17), the auxiliary plate (5) is also attached to the lower part of the vertical plate (11). It can be moved along and fixed in a predetermined position.

이와 같이 보조판(5)에 제 1장공(17)이 형성됨으로써 앵글(3)의 세로판(11)이 보조판(5)의 상부에 적절한 위치에 원활하게 고정될 수 있으며, 앵글(3)을 형강(C)상에서 상하로 위치 이동시킴으로써 건축 외장재 혹은 내장재의 위치에 대응시킬 수 있다.In this way, the first long hole 17 is formed in the auxiliary plate 5, so that the vertical plate 11 of the angle 3 can be smoothly fixed at an appropriate position on the upper part of the auxiliary plate 5, and the angle 3 can be connected to the section steel. By moving the position up or down in (C), it can be matched to the position of the exterior or interior materials of the building.

이때, 형강(C)은 "C"자 형상을 가지며, 양측단이 내측으로 절곡되어 일정 두께의 테두리부(25)가 형성된다.At this time, the section steel C has a “C” shape, and both ends are bent inward to form an edge portion 25 of a certain thickness.

그리고, 앵글(3)의 가로판(9)에는 조정판(7)이 결합되며, 조정판(7)에는 제 2장공(19)이 형성되며, 제 2장공(19)에는 제 2체결부재(31,33)가 관통하여 가로판(9)의 제 2홀(13)에 체결된다. In addition, an adjustment plate 7 is coupled to the horizontal plate 9 of the angle 3, a second long hole 19 is formed in the adjustment plate 7, and a second fastening member 31 is formed in the second long hole 19. 33) passes through and is fastened to the second hole 13 of the horizontal plate 9.

따라서, 조정판(7)은 제 2장공(19)에 제 2체결부재(31,33)가 관통함으로써 가로판(9)의 전면에 체결되며, 조정판(7)을 앵글(3)의 가로판(9) 전면에 고정하는 경우 가로판(9)의 제 2홀(13)을 관통한 제 2체결부재(31,33)를 제 2장공(19)을 따라 적절하게 전후방으로 이동함으로써 조정판(7)도 가로판(9)의 하부를 따라 이동한 후 소정 위치에 고정할 수 있다.Therefore, the adjustment plate 7 is fastened to the front of the horizontal plate 9 by the second fastening members 31 and 33 penetrating the second long hole 19, and the adjustment plate 7 is connected to the horizontal plate of the angle 3 ( 9) When fixing to the front, the second fastening members (31,33) penetrating the second hole (13) of the horizontal plate (9) are appropriately moved forward and backward along the second long hole (19) to adjust the adjustment plate (7). It can also be moved along the lower part of the horizontal plate 9 and then fixed at a predetermined position.

이와 같이 조정판(7)에 제 2장공(19)이 형성됨으로써 앵글(3)의 가로판(9)의 하부에 적절한 위치에 원활하게 고정될 수 있으며, 앵글(3)을 형강(C)상에서 전후로 위치 이동시킴으로써 건축 외장재 혹은 내장재의 위치에 대응시킬 수 있다.In this way, the second long hole 19 is formed in the adjustment plate 7, so that the angle 3 can be smoothly fixed in an appropriate position at the lower part of the horizontal plate 9, and the angle 3 can be moved back and forth on the section steel C. By moving the location, it can be matched to the location of the exterior or interior materials of the building.

이때, 형강(C)은 "C"자 형상을 가지며, 양측단이 내측으로 절곡되어 일정 두께의 테두리부(25)가 형성된다.At this time, the section steel C has a “C” shape, and both ends are bent inward to form an edge portion 25 of a certain thickness.

이러한 구조를 갖는 건축 내외장재 고정구(1)를 체결하는 과정을 첨부된 도면을 참조하여 보다 상세하게 설명한다.The process of fastening the architectural interior and exterior fixture 1 having this structure will be described in more detail with reference to the attached drawings.

도 4 및 도 6에 도시된 바와 같이, 건축물의 외벽에 내외장재 고정구(1)를 설치하는 경우, 먼저 앵글(3)의 세로판(11)에 보조판(5)을 제 1체결부재(27,29)에 의하여 가 체결하고, 가로판(9)에 조정판(7)을 제 2체결부재(31,33)에 의하여 가 체결하는 단계가 진행된다.[도 6(a)]As shown in Figures 4 and 6, when installing the interior and exterior fixture (1) on the exterior wall of a building, first attach the auxiliary plate (5) to the vertical plate (11) of the angle (3) with the first fastening members (27, 29). ), and the step of temporarily fastening the adjustment plate 7 to the horizontal plate 9 using the second fastening members 31 and 33 is performed. [Figure 6(a)]

이와 같이 앵글(3)의 세로판(11) 및 가로판(9)에 보조판(5) 및 조정판(7)이 가 체결된 상태에서, 보조판(5) 및 세로판(11)을 포갠 후 일측부터 형강(C)의 내측으로 기울여서 진입시키는 단계가 진행된다.[도 6(b)]In this way, with the auxiliary plate (5) and the adjustment plate (7) temporarily fastened to the vertical plate (11) and the horizontal plate (9) of the angle (3), the auxiliary plate (5) and the vertical plate (11) are stacked and then The step of entering the section by tilting it toward the inside of the beam (C) is carried out. [Figure 6(b)]

보조판(5) 및 세로판(11)이 형강(C)의 내측으로 완전히 진입한 후, 상부로 당겨서 보조판(5)을 형강(C)의 내부에서 상승시키는 단계가 진행된다.[도 6(c)]After the auxiliary plate 5 and the vertical plate 11 completely enter the inside of the section steel C, the step of pulling the auxiliary plate 5 upward from the inside of the section steel C is performed. [Figure 6(c) )]

이때, 보조판(5)의 제 1장공(17)은 형강(C)의 폭방향으로 배치되며, 제 1홀(15)과 동일 방향으로 배치된다.At this time, the first long hole 17 of the auxiliary plate 5 is arranged in the width direction of the section steel C and is arranged in the same direction as the first hole 15.

이 상태에서 앵글(3)을 형강(C)에 대하여 측방향(A)으로 당기는 경우, 세로판(11)의 제 1체결부재(27)가 보조판(5)의 제 1장공(17)을 따라 이동함으로써 세로판(11)이 형강(C)의 외측으로 이탈되어 형강(C)의 상측에 위치하는 단계가 진행된다. In this state, when the angle (3) is pulled in the lateral direction (A) with respect to the section steel (C), the first fastening member (27) of the vertical plate (11) follows the first long hole (17) of the auxiliary plate (5). By moving, the vertical plate 11 is separated from the outside of the section steel (C) and is located on the upper side of the section steel (C).

만약, 제 1장공(17)이 직경이 동일한 정공인 경우에는, 제 1체결부재(27)가 측방향으로 이동할 수 없어서 세로판(11)이 형강(C)의 내측으로부터 이탈되기 어렵다.If the first long hole 17 is a hole with the same diameter, the first fastening member 27 cannot move laterally, so it is difficult for the vertical plate 11 to separate from the inside of the section steel C.

세로판(11)이 형강(C)의 외측으로 이탈되어 형강(C)의 상측에 위치하게 되면, 보조판(5)의 가장자리는 형강(C)의 내부에서 형강(C)의 양 테두리부(25) 저면에 접촉한다.When the vertical plate 11 deviates to the outside of the shape steel C and is located on the upper side of the shape steel C, the edge of the auxiliary plate 5 is located on both edges of the shape steel C inside the shape steel C. ) contacts the bottom.

이와 같이 앵글(3)의 세로판(11)이 형강(C)의 외측으로 이탈된 후, 도 5에 도시된 바와 같이 앵글(3)을 90도 정도 회전시켜서 앵글(3)의 세로판(11)의 폭방향을 형강(C)의 길이 방향에 일치시킴으로써 세로판(11)의 양측 저면이 형강(C)의 테두리부(25)의 상면에 안착되도록 하는 단계가 진행된다.[도 6(d)]After the vertical plate 11 of the angle 3 is separated from the shape steel C in this way, the angle 3 is rotated about 90 degrees as shown in FIG. 5 to remove the vertical plate 11 of the angle 3. The step of ensuring that the bottom surfaces of both sides of the vertical plate 11 are seated on the upper surface of the edge portion 25 of the section steel (C) is carried out by matching the width direction of the section steel (C) to the longitudinal direction of the section steel (C). [Figure 6(d) )]

이 상태에서 제 1체결부재(27,29)를 최종적으로 체결함으로써 앵글(3)을 형강(C)에 고정시키는 단계가 진행된다.[도 6(e)]In this state, the step of fixing the angle 3 to the section steel C is performed by finally fastening the first fastening members 27 and 29 [Figure 6(e)].

그리고, 조정판(7)도 앵글(3)의 가로판(9)상에서 전후방향으로 적절하게 이동시킨 후 제 2체결부재(31,33)를 최종적으로 체결하는 단계가 진행된다.Then, the adjustment plate 7 is appropriately moved in the front-back direction on the horizontal plate 9 of the angle 3, and then the second fastening members 31 and 33 are finally fastened.

이와 같이, 앵글(3)이 형강(C)에 고정되는 경우, 보조판(5)의 양측은 형강(C)의 테두리부(25) 내면에 밀착적으로 고정되고, 세로판(11)은 형강(C)의 테두리부(25) 외면에 밀착적으로 고정됨으로써 안정적으로 형강(C)에 고정될 수 있다.In this way, when the angle 3 is fixed to the section steel C, both sides of the auxiliary plate 5 are tightly fixed to the inner surface of the edge portion 25 of the section steel C, and the vertical plate 11 is fixed to the section steel (C). By being tightly fixed to the outer surface of the edge portion 25 of C), it can be stably fixed to the section steel (C).

결과적으로, 고정구(1)에 과도한 하중이 작용하는 경우에도, 이 보조판(5) 및 세로판(11)에 의하여 견딜 수 있다.As a result, even if an excessive load is applied to the fixture 1, it can be withstood by the auxiliary plate 5 and the vertical plate 11.

이와 같이, 앵글(3)을 형강(C)에 고정한 후, 조정판(7)의 선단에 돌출된 상부 결합핀(21) 및 하부 결합핀(23)에 건축 외장재 혹은 내장재(20,24)를 결합시킬 수 있다.In this way, after fixing the angle (3) to the section steel (C), the building exterior or interior materials (20, 24) are coupled to the upper coupling pin (21) and lower coupling pin (23) protruding from the tip of the control plate (7). You can do it.

Claims (5)

세로판(11) 및 가로판(9)으로 구성되고, 세로판(11)에는 제 1홀(15)이 형성되고, 가로판(9)에는 제 2홀(13)이 형성되는 앵글(3)과;
앵글(3)의 세로판(11)의 하부에 유동 가능하게 결합되어 형강(C)의 테두리부(25) 내면에 배치되고, 제 1홀(15)에 대응하는 위치에 제 1장공(17)이 형성되는 보조판(5)과;
앵글(3)의 가로판(9)에 유동가능하게 결합되고, 제 2홀(13)에 대응하는 위치에 제 2장공(19)이 형성되는 조정판(7)과;
보조판(5)의 제 1장공(17)과 세로판(11)의 제 1홀(15)을 체결하는 제 1체결부재(27,29와; 그리고
조정판(7)의 제 2홀(13)과 가로판(9)의 제 2장공(19)을 체결하는 제 2체결부재(31,33)를 포함하는 건축물 내외장재 고정구(1).
An angle (3) consisting of a vertical plate (11) and a horizontal plate (9), with a first hole (15) formed in the vertical plate (11) and a second hole (13) formed in the horizontal plate (9). class;
It is movably coupled to the lower part of the vertical plate 11 of the angle 3 and is disposed on the inner surface of the edge 25 of the section steel C, and the first long hole 17 is located at a position corresponding to the first hole 15. The auxiliary plate (5) is formed;
an adjustment plate (7) movably coupled to the horizontal plate (9) of the angle (3) and having a second long hole (19) formed at a position corresponding to the second hole (13);
First fastening members 27 and 29 for fastening the first hole 17 of the auxiliary plate 5 and the first hole 15 of the vertical plate 11; and
A building interior and exterior fixture (1) including second fastening members (31, 33) for fastening the second hole (13) of the control plate (7) and the second long hole (19) of the horizontal plate (9).
제 1항에 있어서,
제 1홀(15) 혹은 제 2홀(13)은 장공 혹은 정공을 포함하는 건축물 내외장재 고정구(1).
According to clause 1,
The first hole (15) or the second hole (13) is a building interior/exterior material fixture (1) including a long hole or a hole.
제 2항에 있어서,
보조판(5)의 제 1장공(17)은 형강(C)의 폭방향으로 형성되어 제 1체결부재(27,29가 제 1장공(17)를 따라 이동가능한 건축물 내외장재 고정구(1).
According to clause 2,
The first long hole (17) of the auxiliary plate (5) is formed in the width direction of the section steel (C), and the first fastening members (27, 29) are movable along the first long hole (17). A building interior and exterior fixture (1).
제 1항에 있어서,
조정판(7)의 선단에는 상부 결합핀(21) 및 하부 결합핀(23)이 돌출되어 건축 외장재 혹은 내장재가 결합되는 건축물 내외장재 고정구(1).
According to clause 1,
A building interior and exterior material fixture (1) with an upper coupling pin (21) and a lower coupling pin (23) protruding from the tip of the control plate (7) to which exterior or interior materials are connected.
앵글(3)의 세로판(11)에 보조판(5)을 제 1체결부재(27,29)에 의하여 가 체결하고, 가로판(9)에 조정판(7)을 제 2체결부재(31,33)에 의하여 가 체결하는 단계와;
보조판(5) 및 세로판(11)을 포갠 후 일측부터 형강(C)의 내측으로 기울여서 진입시키는 단계와;
보조판(5) 및 세로판(11)이 형강(C)의 내측으로 완전히 진입한 후, 상부로 당겨서 보조판(5)의 상면 양측을 형강(C)의 테두리부(25) 저면에 접촉시키는 단계와;
앵글(3)을 형강(C)에 대하여 측방향으로 당김으로써 제 1체결부재(27)가 제 1장공(17)을 따라 측방향으로 이동함으로써 세로판(11)이 형강(C)의 외측으로 이탈되는 단계와;
앵글(3)을 회전시켜서 앵글(3)의 세로판(11)의 폭방향을 형강(C)의 길이 방향에 일치시키고 제 1체결부재(27,29)를 체결시키는 단계와;
조정판(7)을 앵글(3)의 가로판(9)상에서 전후방향으로 적절하게 이동시킨 후 제 2체결부재(31,33)를 체결하는 단계를 포함하는 건축물 내외장재 고정구(1)의 결합방법.




The auxiliary plate (5) is temporarily fastened to the vertical plate (11) of the angle (3) by the first fastening members (27, 29), and the adjustment plate (7) is fastened to the horizontal plate (9) by the second fastening members (31, 33). ) and the step of concluding;
After stacking the auxiliary plate (5) and the vertical plate (11), tilting them from one side toward the inside of the section steel (C) to enter them;
After the auxiliary plate (5) and the vertical plate (11) completely enter the inside of the section steel (C), pulling them upward and bringing both sides of the upper surface of the auxiliary plate (5) into contact with the bottom surface of the edge portion (25) of the section steel (C); ;
By pulling the angle (3) laterally with respect to the section steel (C), the first fastening member (27) moves laterally along the first long hole (17) so that the vertical plate (11) moves to the outside of the section steel (C). a step of leaving;
Rotating the angle (3) to match the width direction of the vertical plate (11) of the angle (3) with the longitudinal direction of the section steel (C) and fastening the first fastening members (27, 29);
A method of assembling a building interior and exterior fixture (1) including the step of moving the adjustment plate (7) appropriately in the front-back direction on the horizontal plate (9) of the angle (3) and then fastening the second fastening members (31, 33).




KR1020220167000A 2022-12-02 2022-12-02 Coupling device for architectural exterior and interior, and the method for fixing thereof KR20240082894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220167000A KR20240082894A (en) 2022-12-02 2022-12-02 Coupling device for architectural exterior and interior, and the method for fixing thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220167000A KR20240082894A (en) 2022-12-02 2022-12-02 Coupling device for architectural exterior and interior, and the method for fixing thereof

Publications (1)

Publication Number Publication Date
KR20240082894A true KR20240082894A (en) 2024-06-11

Family

ID=91471367

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220167000A KR20240082894A (en) 2022-12-02 2022-12-02 Coupling device for architectural exterior and interior, and the method for fixing thereof

Country Status (1)

Country Link
KR (1) KR20240082894A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110041871A (en) 2009-10-16 2011-04-22 삼성에스디아이 주식회사 Plasma display and driving apparatus thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110041871A (en) 2009-10-16 2011-04-22 삼성에스디아이 주식회사 Plasma display and driving apparatus thereof

Similar Documents

Publication Publication Date Title
US20170233996A1 (en) Connectors and methods of fabricating the same
KR102392409B1 (en) Structural modular building connector
US4266386A (en) Panel joint for assembling panel members
TWI610009B (en) Vertically connecting structure of hat-type steel sheet-pile, vertically connected hat-type steel sheet-pile unit, and steel wall
JP7205256B2 (en) Wall panel installation method
KR20240082894A (en) Coupling device for architectural exterior and interior, and the method for fixing thereof
JP2021134589A (en) Fixing structure and method of door frame and opening frame member
KR102505555B1 (en) H-beams for easy assembly and connection for building structures
JP6484751B1 (en) Bonded hardware and architectural panels
JP6445279B2 (en) Basic structure for solar carport
KR20220034433A (en) Prefabricated truss
JP2005090086A (en) Wood connecting structure
JP3477074B2 (en) Connection structure of horizontal members and vertical members on upper and lower floors
CN217840834U (en) Steel construction external scaffolding is wall structure and external scaffolding even
JP4712684B2 (en) Connection structure of building components
JP2007247220A (en) Mounting structure of alc wall panel
JP2005247447A (en) Jamb of elevator
JP4455069B2 (en) Shaft assembly joining equipment
EP1302349A2 (en) Door wing structure for tarpaulin-covered trucks and similar vehicles
JP6971790B2 (en) Pillar base hardware for wooden pillars
JPH0921178A (en) Joining structure between post and beam
JP3213425U (en) Hole-down hardware joint structure
JPH0579151A (en) Erecting method for plate-like architectural material
JP2005180043A (en) Connecting metal fitting of wooden building member
JPH10317511A (en) Beam coupling structure