KR20240048679A - Nuclear power plant operation restriction management system and operation method thereof - Google Patents

Nuclear power plant operation restriction management system and operation method thereof Download PDF

Info

Publication number
KR20240048679A
KR20240048679A KR1020220128292A KR20220128292A KR20240048679A KR 20240048679 A KR20240048679 A KR 20240048679A KR 1020220128292 A KR1020220128292 A KR 1020220128292A KR 20220128292 A KR20220128292 A KR 20220128292A KR 20240048679 A KR20240048679 A KR 20240048679A
Authority
KR
South Korea
Prior art keywords
information
power plant
nuclear power
action
management unit
Prior art date
Application number
KR1020220128292A
Other languages
Korean (ko)
Inventor
맹효영
이동욱
Original Assignee
한국수력원자력 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국수력원자력 주식회사 filed Critical 한국수력원자력 주식회사
Priority to KR1020220128292A priority Critical patent/KR20240048679A/en
Publication of KR20240048679A publication Critical patent/KR20240048679A/en

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Landscapes

  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Plasma & Fusion (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Emergency Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

원자력발전소 운전제한관리 시스템 및 그 운전방법을 제공한다. 원자력발전소 운전제한관리 시스템은 원자력발전소의 정상상태 혹은 비정상상태 여부를 포함하는 운전상태에 관한 운전상태정보를 생성하는 운전상태 관리유닛; 상기 운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 조치사항정보를 생성하는 조치사항 관리유닛; 및 상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보를 생성하는 제한시간 관리유닛을 포함하되, 상기 원자력발전소는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적 운전유닛을 통해 관리된다.Provides a nuclear power plant operation limit management system and its operation method. The nuclear power plant operation limit management system includes an operation status management unit that generates operation status information regarding the operation status of the nuclear power plant, including whether the nuclear power plant is in a normal or abnormal state; an action management unit that generates action information regarding actions required for the nuclear power plant in response to the operation status information; and a time limit management unit that generates time limit information at which the measures must be taken in response to the operation status information, wherein the nuclear power plant passively operates based on the measures information and the time limit information in the case of the abnormal state. Or, it is managed through an automatic operation unit.

Description

원자력발전소 운전제한관리 시스템 및 그 운용방법{Nuclear power plant operation restriction management system and operation method thereof}Nuclear power plant operation restriction management system and operation method thereof}

본 발명은 원자력발전소 운전제한관리 시스템 및 그 운용방법에 관한 것이다.The present invention relates to a nuclear power plant operation limit management system and its operation method.

원자력 발전소는 단위기기나 계통의 기능상실에 따른 운전제한조건 적용을 법으로 규정하고 있다. 운전제한조건이란 발전소 안전운전을 보장하기 위한 최소 요건들에 대한 규정으로, 각 불만족 상태에 따른 조치요구사항과 제한시간으로 구성된다. 하지만 그 종류가 너무 다양하여 운전원의 판단에만 의존하기에는 한계가 있다. 운전제한조건이 적시에 적용되지 않을 경우 발전 사업자에게 법적 책임사항(2019년 한빛 1호기 원자력안전법 위반사건시 운전제한조건에 대한 불이행으로 불구속 기소 사례 발생)이 부과된다. 때문에 원전 과도상태 발생시 운전원의 판단을 보조할 수 있도록 하는 것이 필요하다.Nuclear power plants are legally required to apply operating restrictions due to malfunction of unit devices or systems. Operation restriction conditions are regulations on the minimum requirements to ensure safe operation of a power plant, and consist of action requirements and time restrictions for each unsatisfactory state. However, there are so many different types that there is a limit to relying solely on the operator's judgment. If the operation restrictions are not applied in a timely manner, legal responsibilities are imposed on the power generation business (in the case of violation of the Nuclear Safety Act at Hanbit Unit 1 in 2019, there was a case of prosecution without detention due to non-compliance with the operation restrictions). Therefore, it is necessary to support the operator's judgment when a nuclear power plant transient occurs.

한국공개특허 제10-2014-0107957호Korean Patent Publication No. 10-2014-0107957

본 발명이 해결하고자 하는 과제는 원전 과도상태 발생 시에는 법으로 규정된 시간 안에 해당하는 기기의 운전제한조건을 설정하고 그에 따른 조치를 수행하되, 긴급 상황 발생 시 단순히 문서를 참조하지 않고 정확하고 신속한 조치가 가능하도록 하는 것이다.The problem that the present invention aims to solve is to set operation limit conditions for the corresponding equipment within the time stipulated by law and take action accordingly when a transient state of a nuclear power plant occurs. However, when an emergency situation occurs, it is possible to accurately and quickly do so without simply referring to documents. The goal is to make action possible.

특히 본 발명을 통하여 각 계통별 운전제한조건 적용기법을 제안하는 시스템을 통해 신속한 조치가 가능하고 해석의 모호성으로 인해 발생 가능한 인적오류 또한 저감 시켜 원전 안전 운영이 가능하도록 하는 것이다.In particular, the present invention enables rapid action through a system that proposes a technique for applying operating limitations for each system, and also reduces human errors that may occur due to ambiguity in interpretation, thereby enabling safe operation of nuclear power plants.

본 발명의 과제들은 이상에서 언급한 과제로 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.The problems of the present invention are not limited to the problems mentioned above, and other problems not mentioned will be clearly understood by those skilled in the art from the description below.

상기 과제를 달성하기 위한 본 발명의 일 면(aspect)에 원자력발전소 운전제한관리 시스템은 원자력발전소의 정상상태 혹은 비정상상태 여부를 포함하는 운전상태에 관한 운전상태정보를 생성하는 운전상태 관리유닛; 상기 운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 조치사항정보를 생성하는 조치사항 관리유닛; 및 상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보를 생성하는 제한시간 관리유닛을 포함하되, 상기 원자력발전소는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적 운전유닛을 통해 관리된다.In one aspect of the present invention for achieving the above task, a nuclear power plant operation limit management system includes an operation status management unit that generates operation status information regarding the operation status of the nuclear power plant, including whether the nuclear power plant is in a normal state or an abnormal state; an action management unit that generates action information regarding actions required for the nuclear power plant in response to the operation status information; and a time limit management unit that generates time limit information at which the measures must be taken in response to the operation status information, wherein the nuclear power plant passively operates based on the measures information and the time limit information in the case of the abnormal state. Or, it is managed through an automatic operation unit.

또한 운전상태 관리유닛의 상기 운전상태정보는, 상기 원자력발전소의 필수냉수계통의 운전상태에 관한 제1운전상태정보를 포함하며, 상기 조치사항 관리유닛의 상기 조치사항정보는, 상기 원자력발전소의 상기 제1운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 제1조치사항정보를 포함한다.In addition, the operation status information of the operation status management unit includes first operation status information regarding the operation status of the essential cold water system of the nuclear power plant, and the action information of the action management unit includes the action information of the nuclear power plant. It includes first action information regarding actions required for the nuclear power plant in response to the first operation status information.

또한 상기 제1운전상태정보는, 상기 필수냉수계통이 운전 불가능인 경우에 관한 제1-1운전상태정보와, 상기 운전유닛을 통한 상기 필수냉수계통에 관하여 필요한 조치가 기 설정된 제한시간 내에 수행되지 않은 경우에 관한 제1-2운전상태정보를 포함한다.In addition, the first operation state information includes 1-1 operation state information regarding the case where the essential cold water system is inoperable, and the necessary action regarding the essential cold water system through the operation unit is not performed within a preset time limit. Includes 1-2 operation status information for cases where this is not possible.

또한 상기 제1조치요구사항정보는, 상기 제1-1운전상태에 대응하여 상기 필수냉수계통을 운전 가능한 제1상태로 복구하도록 하는 제1-1조치요구사항정보와, 상기 제1-2운전상태에 대응하여 상기 필수냉수계통을 제1운전모드와, 상기 제1운전모드와 상이한 제2운전모드 중 적어도 어느 하나로 동작하도록 하는 제1-2조치요구사항정보를 포함하며, 상기 제한시간 관리유닛은, 상기 제1-1조치요구사항정보에 관한 제1제한시간정보를 생성하며, 상기 제1-2조치요구사항정보에 관한 제2제한시간정보를 생성하고, 상기 필수냉수계통은 상기 제1-1조치요구사항정보, 상기 제1-2조치요구사항정보, 상기 제1제한시간정보 및 상기 제2제한시간정보에 기반으로 관리된다.In addition, the first action requirement information includes 1-1 action requirement information for restoring the essential cold water system to an operable first state in response to the 1-1 operation state, and the 1-2 operation state. Contains 1-2 action requirement information for operating the essential cold water system in at least one of a first operation mode and a second operation mode different from the first operation mode in response to the state, and the time limit management unit generates first time limit information regarding the 1-1 measure requirement information, and generates second time limit information regarding the 1-2 measure requirement information, and the essential cold water system is the 1st time limit information. -Managed based on the 1st action requirement information, the 1-2 action requirement information, the first time limit information, and the second time limit information.

또한 상기 원자력발전소의 상기 운전상태정보, 상기 조치사항정보 및 제한시간정보 중 적어도 어느 하나에 기반하거나, 또는 독립적으로 상기 원자력발전소의 점검을 위한 점검사항정보를 생성하는 점검사항 관리유닛을 더 포함하되, 상기 원자력발전소는 상기 조치사항정보, 상기 제한시간정 및 점검사항정보를 기반으로 관리된다.In addition, it further includes an inspection management unit that generates inspection information for inspection of the nuclear power plant based on or independently of at least one of the operation status information, action information, and time limit information of the nuclear power plant, , the nuclear power plant is managed based on the action information, the time limit schedule, and the inspection information.

또한 상기 점검사항 관리유닛의 상기 점검사항정보는, 상기 필수냉수계통의 점검사항에 관한 제1점검사항정보를 포함하며, 상기 제1점검사항정보는, 필수냉수계통 유로상의 사건, 봉인 또는 다른 방식에 의하여 위치가 고정되지 않는 수동밸브, 동력구동밸브 및 자동밸브의 정위치 여부 확인에 관한 것을 포함한다.In addition, the inspection information of the inspection management unit includes first inspection information regarding inspection items of the essential cold water system, and the first inspection information includes an incident, seal, or other method on the essential cold water system flow path. This includes checking whether manual valves, power-driven valves, and automatic valves whose positions are not fixed are in the correct position.

또한 상기 점검사항정보에 대응하여 상기 원자력발전소의 상기 점검을 위한 점검주기에 관한 점검주기정보를 생성하는 점검주기 관리유닛을 더 포함하되, 상기 점검주기 관리유닛의 상기 점검주기정보는, 상기 필수냉수계통의 점검주기에 관한 제1점검주기정보를 포함한다.In addition, it further includes an inspection cycle management unit that generates inspection cycle information regarding the inspection cycle for the inspection of the nuclear power plant in response to the inspection item information, wherein the inspection cycle information of the inspection cycle management unit includes the essential cold water. Includes first inspection cycle information regarding the inspection cycle of the system.

또한 상기 운전상태 관리유닛은 상기 필수냉수계통에 문제가 발생된 것인 제1-1상황의 해당여부를 파악하고, 동작 불가능한 상기 필수냉수계통이 단수인지 여부에 관한 것인 제1-2상황의 해당여부를 파악하되, 상기 조치사항 관리유닛은, 상기 제1-2상황에 해당되면 기 설정된 제1운전제한조건을 기반으로 상기 필수냉수계통에 대한 관리를 위한 상기 제1-3조치사항정보를 생성하며, 상기 제1-2상황에 해당되지 않으면 상기 제1운전한조건과 다른 제2운전제한조건을 기반으로 상기 필수냉수계통에 대한 관리를 위한 제1-4조치사항정보를 생성한다.In addition, the operation status management unit determines whether situation 1-1, which is a problem in the essential cold water system, is applicable, and situation 1-2, which relates to whether the essential cold water system is inoperable and has a water outage. Determine whether this is applicable, and if the above-described situation 1-2 is applicable, the measure management unit provides the measure 1-3 information for management of the essential cold water system based on the preset first operation restriction condition. If the 1-2 situation does not apply, the 1-4 action information for management of the essential cold water system is generated based on the second operation restriction condition that is different from the first operation condition.

또한 운전상태 관리유닛의 상기 운전상태정보는, 상기 원자력발전소의 주제어실 공기조화계통의 운전상태에 관한 제2운전상태정보를 포함하며, 상기 조치사항 관리유닛의 상기 조치사항정보는, 상기 원자력발전소의 상기 제2운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 제2조치사항정보를 포함하되, 상기 운전상태 관리유닛은 상기 주제어실 공기조화계통에 문제 발생여부에 관한 것인 제2-1상황의 해당여부를 파악하고, 상기 주제어실 공기조화계통의 운전불가능 상태와, 기 설정된 운전모드 상태와, 상기 원자력발전소의 조사된 핵연료 집합체 이동중 상태 중 적어도 어느 하나에 해당되는지에 관한 것인 제2-2상황의 해당여부를 파악하되, 상기 조치사항 관리유닛은, 상기 제2-2상황에 해당되면 기 설정된 제3운전제한조건에 대응하는 제2-1조치사항정보를 생성하며, 상기 제2-2상황에 해당되지 않으면 상기 제3운전제한조건과 다른 제4운전제한조건에 대응하는 제2-2조치사항정보를 생성한다.In addition, the operation status information of the operation status management unit includes second operation status information regarding the operation status of the main control room air conditioning system of the nuclear power plant, and the action information of the action management unit includes the action information of the nuclear power plant. It includes second action information regarding necessary measures for the nuclear power plant in response to the second operation status information, and the operation status management unit is a second operation status management unit related to whether a problem occurs in the air conditioning system of the main control room. -1 Determine whether the situation applies, and determine whether it corresponds to at least one of the inoperable state of the main control room air conditioning system, the preset operation mode state, and the state in which the irradiated nuclear fuel assembly of the nuclear power plant is moving. Determine whether the 2-2 situation is applicable, and if the 2-2 situation is applicable, the action management unit generates 2-1 action information corresponding to the preset 3rd operation restriction condition, If the 2-2 situation does not apply, 2-2 action information corresponding to the 4th operation restriction condition, which is different from the 3rd operation restriction condition, is generated.

또한 상기 운전상태 관리유닛의 상기 제2-2조치사항정보는, 상기 제2-2상황 중 상기 운전불가능 샹태 및 상기 조사된 핵연료 집합체 이동중 상태에 해당되면 상기 조사된 핵연료 집합체 이동을 중지하도록 하기 위한 것인 제2-2a정보와, 상기 제2-2상황 중 상기 기 설정된 운전모드 상태 및 상기 조사된 핵연료 집합체 이동중 상태에 해당되면 상기 기 설정된 시간내에 상기 기 설정된 운전모드로 진입하도록 하기 위한 것인 제2-2정보를 포함한다.In addition, the 2-2 action information of the operation status management unit is for stopping the movement of the irradiated nuclear fuel assembly when the operation is impossible and the irradiated nuclear fuel assembly is in motion state among the 2-2 situations. 2-2a information, and if the preset operation mode state and the irradiated nuclear fuel assembly moving state among the 2-2 situations are for entering the preset operation mode within the preset time. Includes 2-2 information.

상기 과제를 달성하기 위한 본 발명의 다른 면에 원자력발전소 운전제한관리 시스템 운용방법은 운전상태 관리유닛에서 원자력발전소의 정상상태 혹은 비정상상태 여부를 포함하는 운전상태에 관한 운전상태정보가 생성되는 단계; 조치사항 관리유닛에서 상기 운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 조치사항정보가 생성되는 단계; 및 제한시간 관리유닛에서 상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보가 생성되는 단계를 포함하되, 상기 조치사항정보와 상이기 제한시간정보는 순차적 혹은 비순차적으로 생성되며, 상기 원자력발전소는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적 운전유닛을 통해 관리된다.In another aspect of the present invention for achieving the above task, a method of operating a nuclear power plant operation limit management system includes the steps of generating operation state information about the operation state, including whether the nuclear power plant is in a normal state or an abnormal state, in an operation state management unit; Generating action information regarding actions required for the nuclear power plant in response to the operation status information in an action management unit; and generating, in a time limit management unit, time limit information for which the action must be taken in response to the operation status information, wherein the action information and the time limit information are generated sequentially or non-sequentially, In the case of the abnormal state, the nuclear power plant is managed through a manual or automatic operation unit based on the action information and the time limit information.

상기와 같은 본 발명에 따르면 다음과 같은 효과가 하나 혹은 그 이상이 있다.According to the present invention as described above, one or more of the following effects are achieved.

본 발명은 원전 과도상태 발생 시에는 법으로 규정된 시간 안에 해당하는 기기의 운전제한조건을 설정하고 그에 따른 조치를 수행하되, 긴급 상황 발생 시 단순히 문서를 참조하지 않고 정확하고 신속한 조치가 가능하도록 한다.The present invention sets the operation limit conditions for the corresponding equipment within the time stipulated by law and takes action accordingly when a transient state of a nuclear power plant occurs, but when an emergency situation occurs, accurate and prompt action is possible without simply referring to documents. .

특히 본 발명을 통하여 각 계통별 운전제한조건 적용기법을 제안하는 시스템을 통해 신속한 조치가 가능하고 해석의 모호성으로 인해 발생 가능한 인적오류 또한 저감 시켜 원전 안전 운영이 가능하도록 한다.In particular, the present invention enables rapid action through a system that proposes a technique for applying operation limitations for each system, and also reduces human errors that may occur due to ambiguity in interpretation, enabling safe operation of nuclear power plants.

도 1은 본 발명의 일 실시예에 따른 원자력발전소 운전제한관리 시스템의 구성을 도시한 블록도이다.
도 2 내지 도 3은 도 1에 따른 구성을 세부적으로 도시한 블록도이다.
도 4 내지 도 7은 도 1에 따른 구성의 동작에 관련된 사항을 나타낸 참고도이다.
도 8은 본 발명의 일 실시예에 따른 원자력발전소 운전관리 시스템 운용방법을 순차적으로 도시한 흐름도이다.
1 is a block diagram showing the configuration of a nuclear power plant operation limit management system according to an embodiment of the present invention.
Figures 2 and 3 are block diagrams showing the configuration according to Figure 1 in detail.
Figures 4 to 7 are reference diagrams showing matters related to the operation of the configuration according to Figure 1.
Figure 8 is a flow chart sequentially showing a method of operating a nuclear power plant operation management system according to an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다. 본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 게시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시 예들은 본 발명의 게시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성 요소를 지칭한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the attached drawings. The advantages and features of the present invention and methods for achieving them will become clear by referring to the embodiments described in detail below along with the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below and may be implemented in various different forms. The present embodiments are merely intended to ensure that the disclosure of the present invention is complete and to provide common knowledge in the technical field to which the present invention pertains. It is provided to fully inform those who have the scope of the invention, and the present invention is only defined by the scope of the claims. Like reference numerals refer to like elements throughout the specification.

도 1을 참조하면 본 발명의 일 실시예에 따른 원자력발전소 운전제한관리 시스템(100)은 원전상태 관리유닛(110), 조치사항 관리유닛(120), 운전유닛(130), 제한시간 관리유닛(140) 및 점검사항 관리유닛(15)을 포함한다.Referring to Figure 1, the nuclear power plant operation limit management system 100 according to an embodiment of the present invention includes a nuclear power plant status management unit 110, an action management unit 120, an operation unit 130, and a time limit management unit ( 140) and inspection management unit 15.

여기서 상기 원자력발전소 운전제한관리 시스템(100)의 상기 운전상태 관리유닛(110)은 원자력발전소(1)의 정상상태 혹은 비정상상태 여부를 포함하는 운전상태에 관한 운전상태정보를 생성한다.Here, the operation status management unit 110 of the nuclear power plant operation limit management system 100 generates operation status information regarding the operation status of the nuclear power plant 1, including whether it is in a normal state or an abnormal state.

아울러 상기 원자력발전소 운전제한관리 시스템(100)의 상기 조치사항 관리유닛(120)은 상기 운전상태정보에 대응하여 상기 원자력발전소(1)에 필요한 조치사항에 관한 조치사항정보를 생성한다. In addition, the action management unit 120 of the nuclear power plant operation limit management system 100 generates action information regarding actions required for the nuclear power plant 1 in response to the operation status information.

상기 원자력발전소 운전제한관리 시스템(100)의 상기 제한시간 관리유닛(140)은 상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보를 생성한다. 상기 원자력발전소 운전제한관리 시스템(100)의 상기 운전유닛(130)은 상기 원자력발전소(1)의 운전관리를 위한 것이다.The time limit management unit 140 of the nuclear power plant operation limit management system 100 generates time limit information at which the measures must be taken in response to the operation status information. The operation unit 130 of the nuclear power plant operation limit management system 100 is for operation management of the nuclear power plant 1.

상기 원자력발전소 운전제한관리 시스템(100)의 상기 운전유닛(130)은 상기 원자력발전소(1)는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적으로 운전이 관리된다.The operation unit 130 of the nuclear power plant operation limit management system 100 manages the operation of the nuclear power plant 1 manually or automatically based on the action information and the time limit information in the case of the abnormal state. .

이러한 운전상태 관리유닛(110)의 상기 운전상태정보는, 상기 원자력발전소(1)의 필수냉수계통(160)의 운전상태에 관한 제1운전상태정보를 포함한다.The operation status information of the operation status management unit 110 includes first operation status information regarding the operation status of the essential cold water system 160 of the nuclear power plant 1.

상기 조치사항 관리유닛(120)의 상기 조치사항정보는, 상기 원자력발전소(1)의 상기 제1운전상태정보에 대응하여 상기 원자력발전소(1)에 필요한 조치사항에 관한 제1조치사항정보를 포함한다.The action information of the action management unit 120 includes first action information regarding actions required for the nuclear power plant 1 in response to the first operation status information of the nuclear power plant 1. do.

여기서 상기 제1운전상태정보는 제1-1운전상태정보와 제1-2운전상태정보를 포함한다. 상기 제1-1운전상태정보는 상기 필수냉수계통(160)이 운전 불가능인 경우에 관한 것이다.Here, the first driving state information includes 1-1 driving state information and 1-2 driving state information. The 1-1 operation status information relates to a case where the essential cold water system 160 is inoperable.

상기 제1-2운전상태정보는 상기 운전유닛(130)을 통한 상기 필수냉수계통(160)에 관하여 필요한 조치가 기 설정된 제한시간 내에 수행되지 않은 경우에 관한 것이다.The 1-2 operation status information relates to a case where necessary actions regarding the essential cold water system 160 through the operation unit 130 are not performed within a preset time limit.

도 1 및 도 4를 참조하면 상기 제1조치요구사항정보는 제1-1조치요구사항정보와 제1-2조치요구사항정보를 포함한다. 상기 제1-1조치요구사항정보는 상기 제1-1운전상태에 대응하여 상기 필수냉수계통(160)을 운전 가능한 제1상태로 복구하도록 하는 것이다. Referring to Figures 1 and 4, the first action requirement information includes the first action requirement information and the first action requirement information. The 1-1 action requirement information is used to restore the essential cold water system 160 to the first operable state in response to the 1-1 operation state.

이러한 상기 제1-2조치요구사항정보는 상기 제1-2운전상태에 대응하여 상기 필수냉수계통(160)을 제1운전모드와, 상기 제1운전모드와 상이한 제2운전모드 중 적어도 어느 하나로 동작하도록 하는 것이다.The 1-2 action requirement information sets the essential cold water system 160 in at least one of a first operation mode and a second operation mode that is different from the first operation mode in response to the first-2 operation state. to make it work.

아울러 상기 제한시간 관리유닛(140)은 상기 제1-1조치요구사항정보에 관한 제1제한시간정보와, 상기 제1-2조치요구사항정보에 관한 제2제한시간정보를 생성한다.In addition, the time limit management unit 140 generates first time limit information regarding the 1-1 action requirement information and second time limit information regarding the 1-2 action requirement information.

상기 필수냉수계통(160)은 상기 제1-1조치요구사항정보, 상기 제1-2조치요구사항정보, 상기 제1제한시간정보 및 상기 제2제한시간정보에 기반으로 관리된다.The essential cold water system 160 is managed based on the 1-1 action requirement information, the 1-2 action requirement information, the first time limit information, and the second time limit information.

한편 상기 점검사항 관리유닛(150)은 상기 원자력발전소(1)의 상기 운전상태정보, 상기 조치사항정보 및 제한시간정보 중 적어도 어느 하나에 기반하거나, 또는 독립적으로 상기 원자력발전소(1)의 점검을 위한 점검사항정보를 생성한다. Meanwhile, the inspection management unit 150 inspects the nuclear power plant 1 based on at least one of the operation status information, the action information, and the time limit information of the nuclear power plant 1, or independently. Create checklist information for

상기 원자력발전소(1)는 상기 조치사항정보, 상기 제한시간정 및 점검사항정보를 기반으로 관리된다. 상기 점검사항 관리유닛(150)의 상기 점검사항정보는, 상기 필수냉수계통(160)의 점검사항에 관한 제1점검사항정보를 포함한다.The nuclear power plant 1 is managed based on the action information, the time limit, and the inspection information. The inspection information of the inspection management unit 150 includes first inspection information regarding inspection of the essential cold water system 160.

도 2 및 도 5를 참조하면 이러한 상기 제1점검사항정보는 필수냉수계통(160) 유로상의 사건, 봉인 또는 다른 방식에 의하여 위치가 고정되지 않는 수동밸브, 동력구동밸브 및 자동밸브의 정위치 여부 확인에 관한 것 등을 포함한다. Referring to Figures 2 and 5, the first inspection information includes whether the manual valve, power-driven valve, and automatic valve whose positions are not fixed by an incident, seal, or other method in the essential cold water system 160 flow path are in the correct position. Includes matters related to verification.

도 3을 참조하면 상기 원자력발전소 운전제한관리 시스템(100)은 점검주기 관리유닛(155)을 더 포함한다. 이러한 상기 점검주기 관리유닛(155)은 상기 점검사항정보에 대응하여 상기 원자력발전소(1)의 상기 점검을 위한 점검주기에 관한 점검주기정보를 생성한다.Referring to FIG. 3, the nuclear power plant operation limit management system 100 further includes an inspection cycle management unit 155. The inspection cycle management unit 155 generates inspection cycle information regarding the inspection cycle for the inspection of the nuclear power plant 1 in response to the inspection information.

도 3 및 도 6을 참조하면 상기 점검주기 관리유닛(155)의 상기 점검주기정보는, 상기 필수냉수계통(160)의 점검주기에 관한 제1점검주기정보를 포함한다. 상기 운전상태 관리유닛(110)은 상기 필수냉수계통(160)에 문제가 발생된 것인 제1-1상황의 해당여부를 파악한다. Referring to FIGS. 3 and 6, the inspection cycle information of the inspection cycle management unit 155 includes first inspection cycle information regarding the inspection cycle of the essential cold water system 160. The operation status management unit 110 determines whether situation 1-1 occurs in which a problem occurs in the essential cold water system 160.

아울러 상기 운전상태 관리유닛(110)은 동작 불가능한 상기 필수냉수계통(160)이 단수인지 여부에 관한 것인 제1-2상황의 해당여부를 파악한다. 이때 상기 조치사항 관리유닛(120)은 상기 제1-2상황에 해당되면 기 설정된 제1운전제한조건을 기반으로 상기 필수냉수계통(160)에 대한 관리를 위한 상기 제1-3조치사항정보를 생성한다. In addition, the operation status management unit 110 determines whether situation 1-2, which is related to whether the essential cold water system 160, which is inoperable, is disconnected from water, is applicable. At this time, if the 1-2 situation is applicable, the action management unit 120 provides the 1-3 action information for management of the essential cold water system 160 based on the preset first operation restriction condition. create

상기 조치사항 관리유닛(120)은 상기 제1-2상황에 해당되지 않으면 상기 제1운전한조건과 다른 제2운전제한조건을 기반으로 상기 필수냉수계통(160)에 대한 관리를 위한 제1-4조치사항정보를 생성한다.If the action management unit 120 does not correspond to the 1-2 situation, the 1-2 operation for management of the essential cold water system 160 is performed based on the second operation restriction condition different from the first operation condition. 4Create action information.

아울러 운전상태 관리유닛(110)의 상기 운전상태정보는, 상기 원자력발전소(1)의 주제어실 공기조화계통(170)의 운전상태에 관한 제2운전상태정보 등을 포함한다. In addition, the operation status information of the operation status management unit 110 includes second operation status information regarding the operation status of the main control room air conditioning system 170 of the nuclear power plant 1, etc.

이러한 상기 조치사항 관리유닛(120)의 상기 조치사항정보는, 상기 원자력발전소(1)의 상기 제2운전상태정보에 대응하여 상기 원자력발전소(1)에 필요한 조치사항에 관한 제2조치사항정보를 포함한다.The action information of the action management unit 120 includes second action information regarding actions required for the nuclear power plant 1 in response to the second operation status information of the nuclear power plant 1. Includes.

도 3 및 도 7을 참조하면 상기 운전상태 관리유닛(110)은 상기 주제어실 공기조화계통(170)에 문제 발생여부에 관한 것인 제2-1상황의 해당여부를 파악한다.Referring to FIGS. 3 and 7, the operation status management unit 110 determines whether situation 2-1, which is related to whether a problem occurs in the main control room air conditioning system 170, is applicable.

상기 운전상태 관리유닛(110)은 상기 주제어실 공기조화계통(170)의 운전불가능 상태와, 기 설정된 운전모드 상태와, 상기 원자력발전소(1)의 조사된 핵연료 집합체 이동중 상태 중 적어도 어느 하나에 해당되는지에 관한 것인 제2-2상황의 해당여부를 파악한다.The operation status management unit 110 corresponds to at least one of an inoperable state of the main control room air conditioning system 170, a preset operation mode state, and a state in which the irradiated nuclear fuel assembly of the nuclear power plant 1 is in motion. Determine whether situation 2-2 applies or not.

상기 조치사항 관리유닛(120)은 상기 제2-2상황에 해당되면 기 설정된 제3운전제한조건에 대응하는 제2-1조치사항정보를 생성한다. 아울러 상기 운전상태 관리유닛(110)은 상기 제2-2상황에 해당되지 않으면 상기 제3운전제한조건과 다른 제4운전제한조건에 대응하는 제2-2조치사항정보를 생성한다.If the 2-2 situation is applicable, the action management unit 120 generates 2-1 action information corresponding to the preset third operation restriction condition. In addition, if the driving state management unit 110 does not correspond to the 2-2 situation, it generates 2-2 action information corresponding to the 4th driving restriction condition that is different from the 3rd driving restriction condition.

상기 운전상태 관리유닛(110)의 상기 제2-2조치사항정보는 상기 제2-2상황 중 상기 운전불가능 샹태 및 상기 조사된 핵연료 집합체 이동중 상태에 해당되면 상기 조사된 핵연료 집합체 이동을 중지하도록 하기 위한 것인 제2-2a정보를 포함한다.The 2-2 action information of the operation status management unit 110 is configured to stop the movement of the irradiated nuclear fuel assembly when the operation is impossible and the irradiated nuclear fuel assembly is in motion state among the 2-2 situations. Includes information 2-2a for this purpose.

뿐만 아니라 상기 제2-2상황 중 상기 기 설정된 운전모드 상태 및 상기 조사된 핵연료 집합체 이동중 상태에 해당되면 상기 기 설정된 시간내에 상기 기 설정된 운전모드로 진입하도록 하기 위한 것인 제2-2정보를 포함하는 것이 가능하다.In addition, if the 2-2 situation corresponds to the preset operation mode state and the irradiated nuclear fuel assembly moving state, it includes 2-2 information for entering the preset operation mode within the preset time. It is possible.

도 8은 본 발명의 일 실시예에 따른 원자력발전소 운전관리 시스템 운용방법(S100)를 순차적으로 도시한 흐름도이다. 도 8을 참조하면, 원자력발전소 운전관리 시스템 운용방법(S100)는 운전상태 관리유닛(110)에서 원자력발전소(1)의 정상상태 혹은 비정상상태 여부를 포함하는 운전상태에 관한 운전상태정보가 생성된다.Figure 8 is a flowchart sequentially showing a nuclear power plant operation management system operation method (S100) according to an embodiment of the present invention. Referring to FIG. 8, in the nuclear power plant operation management system operation method (S100), operation status information regarding the operation status including whether the nuclear power plant 1 is in a normal or abnormal state is generated in the operation status management unit 110. .

조치사항 관리유닛(120)에서 상기 운전상태정보에 대응하여 상기 원자력발전소(1)에 필요한 조치사항에 관한 조치사항정보가 생성된다. 제한시간 관리유닛(140)에서 상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보가 생성된다.In the action management unit 120, action information regarding actions required for the nuclear power plant 1 is generated in response to the operation status information. In the time limit management unit 140, time limit information within which the above measures must be taken is generated in response to the operation status information.

아울러 상기 조치사항정보와상기 제한시간정보는 순차적 혹은 비순차적으로 생성된다. 상기 원자력발전소(1)는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적 운전유닛(130)을 통해 관리된다.In addition, the action information and the time limit information are generated sequentially or non-sequentially. In the case of the abnormal state, the nuclear power plant 1 is managed through a manual or automatic operation unit 130 based on the action information and the time limit information.

이상과 첨부된 도면을 참조하여 본 발명의 실시예를 설명하였지만, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명이 그 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다.Although embodiments of the present invention have been described with reference to the above and the attached drawings, those skilled in the art will understand that the present invention can be implemented in other specific forms without changing the technical idea or essential features. You will understand that it exists. Therefore, the embodiments described above should be understood in all respects as illustrative and not restrictive.

1: 원자력 발전소
110: 운전상태 관리유닛
120: 조치사항 관리유닛
130: 운전유닛
140: 제한시간 관리유닛
150: 점검사항 관리유닛
155: 점검주기 관리유닛
160: 필수냉각수계통
170: 주제어실 공기조화계통
1: Nuclear power plant
110: Driving status management unit
120: Action management unit
130: Driving unit
140: Time limit management unit
150: Inspection management unit
155: Inspection cycle management unit
160: Essential coolant system
170: Main control room air conditioning system

Claims (10)

원자력발전소 운전제한관리 시스템으로서,
원자력발전소의 정상 혹은 비정상상태 여부를 포함하는 운전상태정보를 생성하는 운전상태 관리유닛;
상기 운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 조치사항정보를 생성하는 조치사항 관리유닛; 및
상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보를 생성하는 제한시간 관리유닛을 포함하되,
상기 원자력발전소는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적 운전유닛을 통해 관리되는 것인, 원자력발전소 운전제한관리 시스템.
As a nuclear power plant operation limit management system,
An operation status management unit that generates operation status information including whether the nuclear power plant is in a normal or abnormal state;
an action management unit that generates action information regarding actions required for the nuclear power plant in response to the operation status information; and
It includes a time limit management unit that generates time limit information at which the above measures must be taken in response to the driving status information,
A nuclear power plant operation limit management system in which the nuclear power plant is managed through a manual or automatic operation unit based on the action information and the time limit information in the case of the abnormal state.
제1항에 있어서,
운전상태 관리유닛의 상기 운전상태정보는, 상기 원자력발전소의 필수냉수계통의 운전상태에 관한 제1운전상태정보를 포함하며,
상기 조치사항 관리유닛의 상기 조치사항정보는, 상기 원자력발전소의 상기 제1운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 제1조치사항정보를 포함하는, 원자력발전소 운전제한관리 시스템.
According to paragraph 1,
The operation status information of the operation status management unit includes first operation status information regarding the operation status of the essential cold water system of the nuclear power plant,
The action information of the action management unit includes first action information regarding actions required for the nuclear power plant in response to the first operation status information of the nuclear power plant.
제2항에 있어서,
상기 제1운전상태정보는,
상기 필수냉수계통이 운전 불가능인 경우에 관한 제1-1운전상태정보와,
상기 운전유닛을 통한 상기 필수냉수계통에 관하여 필요한 조치가 기 설정된 제한시간 내에 수행되지 않은 경우에 관한 제1-2운전상태정보를 포함하는, 원자력발전소 운전제한관리 시스템.
According to paragraph 2,
The first driving state information is,
1-1 operation status information regarding the case where the essential cold water system is inoperable,
A nuclear power plant operation limit management system comprising 1-2 operation status information regarding the case where necessary actions regarding the essential cold water system through the operation unit are not performed within a preset time limit.
제3항에 있어서,
상기 제1조치요구사항정보는,
상기 제1-1운전상태에 대응하여 상기 필수냉수계통을 운전 가능한 제1상태로 복구하도록 하는 제1-1조치요구사항정보와,
상기 제1-2운전상태에 대응하여 상기 필수냉수계통을 제1운전모드와, 상기 제1운전모드와 상이한 제2운전모드 중 적어도 어느 하나로 동작하도록 하는 제1-2조치요구사항정보를 포함하며,
상기 제한시간 관리유닛은,
상기 제1-1조치요구사항정보에 관한 제1제한시간정보를 생성하며,
상기 제1-2조치요구사항정보에 관한 제2제한시간정보를 생성하고,
상기 필수냉수계통은 상기 제1-1조치요구사항정보, 상기 제1-2조치요구사항정보, 상기 제1제한시간정보 및 상기 제2제한시간정보에 기반으로 관리되는 것인, 원자력발전소 운전제한관리 시스템.
According to paragraph 3,
The above first measure requirement information is,
1-1 action requirement information for restoring the essential cold water system to an operable first state in response to the 1-1 operation state,
Contains 1-2 action requirement information for operating the essential cold water system in at least one of a first operation mode and a second operation mode different from the first operation mode in response to the 1-2 operation state; ,
The time limit management unit is,
Generate the first time limit information regarding the above 1-1 action requirement information,
Generate second time limit information regarding the 1-2 action requirement information,
Nuclear power plant operation restrictions, wherein the essential cold water system is managed based on the 1-1 measure requirement information, the 1-2 measure requirement information, the first time limit information, and the second limit time information. Management system.
제2항에 있어서,
상기 원자력발전소의 상기 운전상태정보, 상기 조치사항정보 및 제한시간정보 중 적어도 어느 하나에 기반하거나,
또는 독립적으로 상기 원자력발전소의 점검을 위한 점검사항정보를 생성하는 점검사항 관리유닛을 더 포함하되,
상기 원자력발전소는 상기 조치사항정보, 상기 제한시간정 및 점검사항정보를 기반으로 관리되는 것인, 원자력발전소 운전제한관리 시스템.
According to paragraph 2,
Based on at least one of the operation status information, action information, and time limit information of the nuclear power plant,
Or, it further includes an inspection management unit that independently generates inspection information for inspection of the nuclear power plant,
A nuclear power plant operation limit management system in which the nuclear power plant is managed based on the action information, the time limit schedule, and the inspection information.
제5항에 있어서,
상기 점검사항 관리유닛의 상기 점검사항정보는, 상기 필수냉수계통의 점검사항에 관한 제1점검사항정보를 포함하며,
상기 제1점검사항정보는,
필수냉수계통 유로상의 사건, 봉인 또는 다른 방식에 의하여 위치가 고정되지 않는 수동밸브, 동력구동밸브 및 자동밸브의 정위치 여부 확인에 관한 것을 포함하는, 원자력발전소 운전제한관리 시스템.
According to clause 5,
The inspection information of the inspection management unit includes first inspection information regarding the inspection of the essential cold water system,
The first inspection information is,
A nuclear power plant operation limit management system that includes confirmation of the correct position of manual valves, power-driven valves, and automatic valves whose positions are not fixed by incidents, seals, or other methods in the essential cold water system flow path.
제5항에 있어서,
상기 점검사항정보에 대응하여 상기 원자력발전소의 상기 점검을 위한 점검주기에 관한 점검주기정보를 생성하는 점검주기 관리유닛을 더 포함하되,
상기 점검주기 관리유닛의 상기 점검주기정보는, 상기 필수냉수계통의 점검주기에 관한 제1점검주기정보를 포함하는, 원자력발전소 운전제한관리 시스템.
According to clause 5,
It further includes an inspection cycle management unit that generates inspection cycle information regarding the inspection cycle for the inspection of the nuclear power plant in response to the inspection information,
The inspection cycle information of the inspection cycle management unit includes first inspection cycle information regarding the inspection cycle of the essential cold water system.
제3항에 있어서,
상기 운전상태 관리유닛은
상기 필수냉수계통에 문제가 발생된 것인 제1-1상황의 해당여부를 파악하고,
동작 불가능한 상기 필수냉수계통이 단수인지 여부에 관한 것인 제1-2상황의 해당여부를 파악하되,
상기 조치사항 관리유닛은,
상기 제1-2상황에 해당되면 기 설정된 제1운전제한조건을 기반으로 상기 필수냉수계통에 대한 관리를 위한 상기 제1-3조치사항정보를 생성하며,
상기 제1-2상황에 해당되지 않으면 상기 제1운전한조건과 다른 제2운전제한조건을 기반으로 상기 필수냉수계통에 대한 관리를 위한 제1-4조치사항정보를 생성하는, 원자력발전소 운전제한관리 시스템.
According to paragraph 3,
The driving status management unit is
Determine whether situation 1-1 occurs in which a problem occurs in the essential cold water system,
Determine whether situation 1-2, which is related to whether the essential cold water system that is inoperable is disconnected,
The above action management unit is,
If the 1-2 situation is applicable, the 1-3 action information for management of the essential cold water system is generated based on the preset first operation restriction condition,
If the 1-2 situation does not apply, nuclear power plant operation restrictions that generate 1-4 action information for management of the essential cold water system based on the 2nd operation restriction condition different from the 1st operation condition. Management system.
제3항에 있어서,
운전상태 관리유닛의 상기 운전상태정보는, 상기 원자력발전소의 주제어실 공기조화계통의 운전상태에 관한 제2운전상태정보를 포함하며,
상기 조치사항 관리유닛의 상기 조치사항정보는, 상기 원자력발전소의 상기 제2운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 제2조치사항정보를 포함하되,
상기 운전상태 관리유닛은
상기 주제어실 공기조화계통에 문제 발생여부에 관한 것인 제2-1상황의 해당여부를 파악하고,
상기 주제어실 공기조화계통의 운전불가능 상태와, 기 설정된 운전모드 상태와, 상기 원자력발전소의 조사된 핵연료 집합체 이동중 상태 중 적어도 어느 하나에 해당되는지에 관한 것인 제2-2상황의 해당여부를 파악하되,
상기 조치사항 관리유닛은,
상기 제2-2상황에 해당되면 기 설정된 제3운전제한조건에 대응하는 제2-1조치사항정보를 생성하며,
상기 제2-2상황에 해당되지 않으면 상기 제3운전제한조건과 다른 제4운전제한조건에 대응하는 제2-2조치사항정보를 생성하는, 원자력발전소 운전제한관리 시스템.
According to paragraph 3,
The operation status information of the operation status management unit includes second operation status information regarding the operation status of the main control room air conditioning system of the nuclear power plant,
The action information of the action management unit includes second action information regarding actions required for the nuclear power plant in response to the second operation status information of the nuclear power plant,
The driving status management unit is
Determine whether situation 2-1, which concerns whether a problem occurs in the air conditioning system of the main control room, is applicable,
Determine whether situation 2-2 is applicable, which relates to at least one of an inoperable state of the main control room air conditioning system, a preset operation mode state, and a state in which the irradiated nuclear fuel assembly of the nuclear power plant is in motion. However,
The above action management unit is,
If situation 2-2 is applicable, 2-1 action information corresponding to the preset third operation restriction condition is generated,
A nuclear power plant operation restriction management system that generates 2-2 action information corresponding to the 4th operation restriction condition that is different from the 3rd operation restriction condition if the 2-2 situation does not apply.
원자력발전소 운전관리 시스템 운용방법으로서,
운전상태 관리유닛에서 원자력발전소의 정상상태 혹은 비정상상태에 관한 운전상태정보가 생성되는 단계;
조치사항 관리유닛에서 상기 운전상태정보에 대응하여 상기 원자력발전소에 필요한 조치사항에 관한 조치사항정보가 생성되는 단계; 및
제한시간 관리유닛에서 상기 운전상태정보에 대응하여 상기 조치사항이 이루어져야 하는 제한시간정보가 생성되는 단계를 포함하되,
상기 조치사항정보와상기 제한시간정보는 순차적 혹은 비순차적으로 생성되며,
상기 원자력발전소는 상기 비정상상태의 경우 상기 조치사항정보 및 상기 제한시간정보를 기반으로 수동적 혹은 자동적 운전유닛을 통해 관리되는 것인, 원자력발전소 운전제한관리 시스템 운용방법.
As a method of operating a nuclear power plant operation management system,
A step of generating operation state information regarding the normal state or abnormal state of the nuclear power plant in the operation state management unit;
Generating action information regarding actions required for the nuclear power plant in response to the operation status information in an action management unit; and
Including a step of generating time limit information at which the above measures must be taken in response to the operation status information in the time limit management unit,
The action information and the time limit information are generated sequentially or non-sequentially,
A method of operating a nuclear power plant operation limit management system, wherein the nuclear power plant is managed through a manual or automatic operation unit based on the action information and the time limit information in the case of the abnormal state.
KR1020220128292A 2022-10-07 2022-10-07 Nuclear power plant operation restriction management system and operation method thereof KR20240048679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220128292A KR20240048679A (en) 2022-10-07 2022-10-07 Nuclear power plant operation restriction management system and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220128292A KR20240048679A (en) 2022-10-07 2022-10-07 Nuclear power plant operation restriction management system and operation method thereof

Publications (1)

Publication Number Publication Date
KR20240048679A true KR20240048679A (en) 2024-04-16

Family

ID=90882709

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220128292A KR20240048679A (en) 2022-10-07 2022-10-07 Nuclear power plant operation restriction management system and operation method thereof

Country Status (1)

Country Link
KR (1) KR20240048679A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140107957A (en) 2013-02-28 2014-09-05 한국원자력연구원 System for searching emergency operating procedure in nuclear power plant and method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140107957A (en) 2013-02-28 2014-09-05 한국원자력연구원 System for searching emergency operating procedure in nuclear power plant and method thereof

Similar Documents

Publication Publication Date Title
Rausand Reliability of safety-critical systems: theory and applications
Wood et al. Diversity strategies for nuclear power plant instrumentation and control systems
Hunton et al. Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade
KR20240048679A (en) Nuclear power plant operation restriction management system and operation method thereof
Lew et al. Computerized operator support system for nuclear power plant hybrid main control room
Bridges et al. Identify SIF and specify necessary SIL, and other IPLs, as part of PHA/HAZOP–or‐why it is not necessary to “boldly go beyond HAZOP and LOPA”
Li SIL implementation on safety functions in mass transit system
Fukumoto et al. A verification and validation method and its application to digital safety systems in ABWR nuclear power plants
Kosmowski Problems in designing and operating functional safety solutions of higher integrity levels
Patel et al. Performance Enhancement of Reactor Building Containment Isolation System by Use of Direct-Acting Solenoid Valves
Bollock NRC Inspection Manual Inspection Procedure 71111 Attachment 21N. 02: Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55 a Requirements Inspection Implementation Update and Lessons Learned
Thomas et al. Strategy for Safety-Related Digital I&C Qualification
Hasegawa Introduction of functional safety into the field of maintenance and preventive maintenance
KOSMOWSKI Human factors in designing the instrumentation and control systems important to safety
Samokhin Nuclear reactor safety
Zhukavin et al. Using mathematical models of a power unit for testing the algorithms of control systems for the Kudankulam nuclear power station
Devgun Procedures at nuclear sites
Jesty et al. Safety analysis of programmable automotive systems
Park et al. The development of a common cause factor score table on IEC 61508 Part 6 Edition 2.0
Bridges Equipment Assessment and Maintenance Technology, EPRI, Charlotte, North Carolina, United States of America
Timms IEC 61511/an aid to COMAH and safety case regulations compliance
KR20240056917A (en) Method for determining maintenace item for preventive maintenance in nuclear power plant
Cilliers 6. Article 4: Benchmarking an expert fault detection and diagnostic system on the Three Mile Island accident event sequence.
Love Protection Systems
Hanks An appreciation of common cause failures in reliability