Prior art keywords
building
view
architectural design
construction
final
Prior art date
Application number
KR1020220049901A
Other languages
Korean (ko)
Inventor
노성진
Original Assignee
주식회사 엔글링크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엔글링크 filed Critical 주식회사 엔글링크
Priority to KR1020220049901A priority Critical patent/KR20230150483A/en
Publication of KR20230150483A publication Critical patent/KR20230150483A/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/12Geometric CAD characterised by design entry means specially adapted for CAD, e.g. graphical user interfaces [GUI] specially adapted for CAD
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/20Finite element generation, e.g. wire-frame surface description, tesselation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/02CAD in a network environment, e.g. collaborative CAD or distributed simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/04Constraint-based CAD
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/18Details relating to CAD techniques using virtual or augmented reality

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Computer Hardware Design (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Evolutionary Computation (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Human Computer Interaction (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템에 관한 것으로, 건축설계에 관련되어 건축설계 관리정보에 접수한 회원들의 필요에 의하여 진행되어 지는 연계된 건축설계 관리정보 시스템에서, 어플리케이션의 시스템이 가동되어 오픈(open)되어지는 시스템 가동수단과, 건축설계에 관한 구성요소를 셋팅 하는 것으로, 각 분야 전문가그룹의 정보를 등록하게 되는 구성요소 셋팅하고, 2D 형태의 조감도, 건축물을 3D 형태로 표현하여 3D View 조감도로 구현하는 구성요소 결정 수단, 건축물의 치수결정수단, 건축물 요소결정 수단, 공사금액과 공사일정 및 원가관리 부분에 중요한 역할을 담당하는 최종 데이터 셋팅 수단, 최종건축물 구성 수단, 보고서 데이터 등록 및 보고서출력 수단으로 이루어져 건축설계 시스템이 완료되어지며, 건축물 요소결정 수단에서 최종 결과물 D/B에 문제리뷰로 등록되었을 경우에는 문제 해결을 위해 필요한 각각의 수단으로 피드백(feed back)되어 필요한 건축설계에 대한 조정 및 확인하는 관리시스템으로 구성수단을 포함하여 이루어진 것으로 기존의 2D 기반 설계도의 납품방식에서 3D모델을 활용한 각종 분석 등 BIM 설계환경은 건축설계를 포함한 건설 산업 전반에 초기단계부터 BIM 기반 친환경분석을 수행하고, BIM 모델을 통해 에너지, 일조, 일영, 기록 등을 분석함으로서 저에너지의 환경친화적인 건축물을 설계하는 것을 특징으로 하는 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템에 관한 것이다.The present invention relates to an architectural design management method and system based on a 3D model. In the linked architectural design management information system that is carried out according to the needs of members who have submitted architectural design management information related to architectural design, the application By setting the system operating means that opens the system and the components related to the architectural design, setting the components that register the information of the expert group in each field, a bird's eye view in 2D form, and a 3D view of the building A means of determining components that are expressed in form and implemented in a 3D bird's eye view, a means of determining the dimensions of a building, a means of determining building elements, a means of setting final data that plays an important role in the construction amount, construction schedule, and cost management, and a means of composing the final building. , the architectural design system is completed by means of report data registration and report output, and when a problem review is registered in the final result DB from the building element determination means, feedback is provided to each means necessary to solve the problem. It is a management system that adjusts and confirms the necessary architectural design and includes configuration means. The BIM design environment, such as various analyzes using 3D models in the existing 2D-based design delivery method, is initially used in the overall construction industry, including architectural design. An architectural design management method based on a 3D model, which is characterized by designing low-energy, environmentally friendly buildings by performing BIM-based eco-friendly analysis from the beginning and analyzing energy, sunlight, sunlight, and records through the BIM model. It's about the system.

Description

3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템{Architectural Design Management Method and System Based on 3D Model}Architectural Design Management Method and System Based on 3D Model}

본 발명은 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템에 관한 것으로, 건축설계에 관련되어 건축설계 관 리정보에 접수한 회원들의 필요에 의하여 진행되어지는 연계된 건축설계 관리정보 시스템에서, 기존의 2D 기반 설계도의 납품방식에서 3D모델을 기반으로 하는 완성도 높은 설계를 요구하고 있다.The present invention relates to an architectural design management method and system based on a 3D model, in a linked architectural design management information system that is carried out according to the needs of members who have submitted architectural design management information related to architectural design, The existing 2D-based design delivery method is demanding a highly complete design based on a 3D model.

따라서, 비형상 정보의 입력방법 문제화 3D모델을 활용한 각종 분석 등 BIM 설계환경은 건축설계를 포함한 건설 산업 전반에 걸쳐 초기단계부터 BIM 기반 친환경분석을 수행하고, BIM 모델을 통해 에너지, 일조, 일정, 기록 등을 분석함으로서 저에너지의 환경친화적인 건축물을 설계하는 것을 특징으로 하며, 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템에 관한 것이다.Therefore, the BIM design environment, including various analyzes using 3D models, problematizes the input method of non-geometric information, performs BIM-based eco-friendly analysis from the early stage throughout the construction industry, including architectural design, and analyzes energy, sunlight, and schedule information through the BIM model. It is characterized by designing low-energy, environmentally friendly buildings by analyzing records, etc., and is about architectural design management methods and systems based on 3D models.

일반적으로 사용자가 건축물을 새롭게 신축하거나 시설하기 위해서는 계획, 설계, 엔지니어링, 시공, 유지관리, 제반의 과정을 거쳐야 한다. 이러한 건축물 신축 과정에서 많은 업체들이 관여하게 되며, 각 업체 사이에 교류 되는 정보의 양도 상당히 많다. 즉, 건축물을 신축하려면 설계사와 시공사, 및 각종 설비공사가 필요한데, 설계 사는 기본계획, 건축 및 구조설계, 인허가, 감리 업무를 담당하고, 시공사는 홍보, 영업, 제작도, 납품 업무를 담당한다. 또한, 건축주는 홍보와 영업 업무를 담당하며 설계사는 건축설계 계획과 감리 업무를 하며, 건축물에 대한 설계가 완성되면 시공사는 구조설계, 공정관리, 소요자재 및 인원 투입 계획 업무를 담당한다.In general, in order for a user to construct a new building or provide facilities, he or she must go through planning, design, engineering, construction, maintenance, and other related processes. Many companies are involved in the process of constructing a new building, and the amount of information exchanged between each company is considerable. In other words, to construct a new building, a designer, construction company, and various facility works are required. The designer is responsible for basic planning, architectural and structural design, permits, and supervision, and the construction company is responsible for public relations, sales, production drawings, and delivery. In addition, the owner is responsible for public relations and sales, the designer is responsible for architectural design planning and supervision, and once the design for the building is completed, the contractor is responsible for structural design, process management, and material and personnel input planning.

그리고, 대부분은 건축업자가 전시회나 광고 등을 통해 고객에게 접근하거나 타인의 소개에 의존하는 방식으로 건축물의 의뢰가 이루어진다. 건축주는 여러 설계사, 시공사를 통하여 가격, 규모, 공간구성, 공법 등에 관한 요구조건을 듣고, 건축주가 구상한 평면도를 제시한 후에, 설계내용을 재구성하는 방식으로 평면설계를 진행한 후에 건축주가 요구조건에 부합하도록 건축사, 시공사, 관련 담당자들과 계속 협의하면서 새로운 평면도를 작성 한다. 평면도가 완성되면, 이 설계를 중심으로 하여 본격적인 완성된 설계에 맞추어 건축도, 구조도, 전기배선 도, 기계설계도와 건축법에 위배 여부 결정하여 작성하고, 경우에 따라서는 미니어쳐모형을 제작하거나 투시도 를 작성하기도 한다. 대지가 도시계획구역 내에 있는 경우에는 법령에 따라 신고 및 허가를 득해야 한다. 기본 설계가 완성되면, 시공사는 필요한 자재를 구매하고, 시공에 관련된 하도급업체를 선정한다. 하도급업체는 자체 적인 샵드로잉(shop drawing)을 작성하기도 하고, 기타 시공과정에서 설계 변경이나 비정형화된 문서로 인하여 건물의 완성 후에도 법적문제 많은 시간을 낭비한다.And, in most cases, requests for buildings are made by architects approaching customers through exhibitions or advertisements or relying on introductions from others. The owner listens to the requirements regarding price, scale, space composition, construction method, etc. through various designers and construction companies, presents the floor plan designed by the owner, and then proceeds with the floor plan by reconstructing the design details, and then the owner meets the requirements. A new floor plan is created while continuously consulting with architects, construction companies, and relevant personnel to comply with the requirements. Once the floor plan is completed, based on this design, the architectural drawing, structural drawing, electrical wiring diagram, mechanical design drawing, and building code are determined and drawn up in accordance with the full-scale completed design. In some cases, a miniature model is produced or a perspective drawing is prepared. It is also written. If the site is within an urban planning area, reporting and permission must be obtained in accordance with laws and regulations. Once the basic design is completed, the contractor purchases the necessary materials and selects subcontractors involved in the construction. Subcontractors sometimes create their own shop drawings and waste a lot of time on legal issues even after the building is completed due to design changes or irregular documents during the construction process.

위와 같이 직접 대면하여 향하는 업무협의형태는 시장영역을 제한하는 요인이 되며, 고비용이 소요되는 투시도 를 생략한 채 상상에 의존하여 공간개념을 느껴야 하고, 잦은 설계변경으로 인해 공사비가 상승하며, 하도급 및 재도급 등에 의해 공사비가 상승하며, 건축주가 프로젝트에 직접 참여할 기회가 적어 시공시 잦은 문제가 발생 하고, 품질 및 가격에 대한 고객의 확신이 부족하다는 것이다.The form of face-to-face business consultation as described above is a factor that limits the market area, requires relying on imagination to feel the spatial concept while omitting high-cost perspective drawings, frequent design changes increase construction costs, and subcontracting and Construction costs rise due to re-contracting, etc., construction owners have fewer opportunities to directly participate in the project, which leads to frequent problems during construction, and customers lack confidence in quality and price.

그러므로, 건축업계에서는 건축주가 의사결정에 참여하여 요구를 충분히 반영할 수 있는 시스템의 구축이 요구 된다. 또한, 건축설계의 구조에 대한 엔지니어링만 제공하는 것이 아니라 하우스의 건축설계, 인테리어, 시공관 리, 시공후 유지관리가 가능하도록 하는 토탈시스템이 요구된다.Therefore, in the construction industry, there is a need to build a system that allows building owners to participate in decision-making and sufficiently reflect their needs. In addition, a total system that not only provides engineering for the structure of the architectural design but also enables the architectural design, interior, construction management, and post-construction maintenance of the house is required.

따라서, 본 발명은 상술한 제반 문제점을 해결하기 위해 제안된 것으로서, 본 발명은Therefore, the present invention was proposed to solve the above-mentioned problems, and the present invention

건축주가 컴퓨터상에서 건축물을 설계 시뮬레이션 서비스를 제공받아서, 자신이 원하는 주택을 시뮬레이션하고 시공업체를 선정하며 시공과정을 관리할 수 있도록 하는 인터넷을 이용한 건축 시뮬레이션 및 시공관리방법을 제공하기 위한 것으로 보다 상세하게 설명하면, 기존의 2D 기반 설계도의 납품방식에서 3D모델을 기반으로 하는 완성도 높은 설계를 요구에 부흥하고자, 3D모델을 활용한 각종 분석 등 BIM 설계환경은 건축설계를 포함한 건설 산업 전반에 걸쳐 초기단계부터 BIM(Building information modeling) 기반 친환경분석을 수행하고, BIM 모델을 통해 자재소요량, 에너지, 일조, 일정, 인원, 공사기간에 대한 기록들을 종합적으로 분석함으로서 저에너지의 환경친화적인 건축물을 설계하는 것이며, BIM 이란 다차원 가상공간에 기획, 설계, 엔지니어링(구조, 설비, 전 기 등), 시공, 더 나아가 유지관리 및 폐기까지 가상으로 시설물을 모델링하는 과정을 말하며, 최첨단 디자인 및 친환경 에너지저감형 건축물을 설계 및 시공할 수 있게 해주며 다차원 가상설계건설과 유사한 개념이다.따라서, 분 발명에서는 건축설계에 관련되어 건축설계 관리정보에 접수한 회원들의 필요에 의하여 진행되어 지 는 연계된 건축설계 관리정보 시스템에서, 건축설계 관리정보 시스템을 시작(start)하게 되면 "시랑대-오랑대 iCon"이라 불리는 어플리케이션의 시스템이 가동되어 오픈(open)되어지는 시스템 가동수단과, 건축설계에 관한 구성요소를 셋팅하는 것으로, 각 분야 전문가그룹의 정보를 등록하게 되는 구성요소 셋팅하고, 2D 형태의 조감 도로 구현, 건축물을 3D 형태로 표현하여 3D View 조감도로 구현하는 구성요소 결정 수단, 건축물의 치수결정수 단, 건축물 요소결정 수단, 공사금액과 공사일정 및 원가관리 부분에 중요한 역할을 담당하는 최종 데이터 셋팅 수단, 최종건축물 구성 수단, 보고서 데이터 등록 및 보고서출력 수단으로 이루어져 건축설계 시스템이 완료되 어지며, 상기의 건축물 요소결정 수단에서 최종 결과물 D/B에 문제리뷰로 등록되었을 경우에는 문제 해결을 위 해 필요한 각각의 수단으로 피드백(feed back)되어 필요한 건축설계에 대한 조정 및 확인하는 관리시스템으로 구성수단을 포함하여 이루어진 것을 특징으로 하는 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템을 제공하 는데 그 목적이 있다.It is intended to provide architectural simulation and construction management methods using the Internet, which allow building owners to receive building design simulation services on a computer, simulate the house they want, select a construction company, and manage the construction process. To explain, in order to meet the demand for high-quality design based on 3D models in the existing 2D-based design delivery method, the BIM design environment, including various analyzes using 3D models, is in its early stages throughout the construction industry, including architectural design. We design low-energy, environmentally friendly buildings by performing eco-friendly analysis based on BIM (Building information modeling) and comprehensively analyzing records on material consumption, energy, sunlight, schedule, personnel, and construction period through the BIM model. BIM refers to the process of virtually modeling facilities in a multidimensional virtual space, from planning, design, engineering (structure, equipment, electricity, etc.), construction, and further maintenance and disposal. It designs cutting-edge design and eco-friendly energy-saving buildings. and construction, and is a similar concept to multidimensional virtual design and construction. Therefore, in the separate invention, in the linked architectural design management information system that is carried out according to the needs of members who have received architectural design management information related to architectural design, When the architectural design management information system is started, the application system called "Sirangdae-Orangdae iCon" is activated and opened by setting the system operating means and components related to the architectural design. A means of determining components that register information from a group of experts in the field, implementing a 2D bird's eye view, expressing the building in 3D form and implementing a 3D view, a means of determining the dimensions of the building, and a means of determining building elements. , the architectural design system is completed by consisting of a final data setting means that plays an important role in the construction amount, construction schedule, and cost management, a final building composition means, a report data registration and report output means, and a means for determining the building elements mentioned above. When a problem review is registered in the final result DB, it is characterized by including a management system that provides feedback to each means necessary to solve the problem and adjusts and confirms the necessary architectural design. The purpose is to provide an architectural design management method and system based on 3D models.

상술한 바와 같이 본 발명에 따르면, 3D모델을 활용한 각종 분석 등 BIM 설계환경을 통하여 다차원 가상공간에 기획, 설계, 엔지니어링(구조, 설비, 전기 등), 시공, 더 나아가 유지관리 및 폐기까지 가상으로 시설물을 모델 링함으로 건축주가 프로젝트에 직접 참여할 기회가 많아 시공 시에 잦은 문제해결과 품질 및 가격에 대한 고객 의 확신을 가질 수 있다는 효과가 있다.As described above, according to the present invention, planning, design, engineering (structure, equipment, electricity, etc.), construction, and even maintenance and disposal are performed in a multidimensional virtual space through a BIM design environment, including various analyzes using 3D models. By modeling the facility, the owner has many opportunities to directly participate in the project, which has the effect of enabling frequent problem solving during construction and ensuring customer confidence in quality and price.

또한, 건축주가 의사결정에 참여하여 요구를 충분히 반영할 수 있는 시스템의 구축으로 건축설계의 구조에 대한 엔지니어링만 제공하는 것이 아니라 하우스의 건축설계, 인테리어, 시공관리, 시공 후 유지관리가 가능하도록 하는 토탈시스템의 효과를 가진다.In addition, by establishing a system that allows building owners to participate in decision-making and fully reflect their needs, we not only provide engineering for the structure of the architectural design, but also enable architectural design, interior design, construction management, and post-construction maintenance of the house. It has the effect of a total system.

이하 실시예는 본 발명을 구체적으로 설명하기 위한 것으로, 본 발명의 범주가 이들 실시 예에 국한되는 것은 아니다.[ 실시예 1] 컴퓨터를 이용한 건축설계관리 시스템The following examples are intended to specifically illustrate the present invention, and the scope of the present invention is not limited to these examples. [Example 1] Architectural design management system using a computer

도 1은 본 발명의 컴퓨터를 이용한 건축설계관리 시스템의 전체 흐름도에서 나타낸 것과 같이, 건축설계에 관련 되어 건축설계 관리정보에 접수한 회원들의 필요에 의하여 진행되어 지는 연계된 건축설계 관리정보 시스템에서,As shown in Figure 1 as an overall flow chart of the computer-based architectural design management system of the present invention, in the linked architectural design management information system that is carried out according to the needs of members who have received architectural design management information related to architectural design,

인터넷, 전자메일, 온라인 같은 SNS(Social Network Service)를 통하여 "시랑대-오랑대 아이콘(iCon)" 어플리 케이션을 통하여 건축설계 관리정보 시스템을 시작(start)하게 되면 "시랑대-오랑대 iCon"이라 불리는 어플리케 이션의 시스템이 가동되어 오픈(open)되어지는 시스템 가동수단 ;When you start the architectural design management information system through the "Sirangdae-Orangdae icon (iCon)" application through SNS (Social Network Service) such as the Internet, e-mail, or online, it is called "Sirangdae-Orangdae iCon". System operation means by which the application system is operated and opened;

건축설계에 관한 구성요소를 셋팅 하는 것으로(도 2), 건물의 형태를 결정하기 위해 필요한 건축설계에 관련된 각 분야의 전문가들의 정보로 구성되는 전문가그룹의 정보를 등록하게 되는 구성요소 셋팅수단 ;A component setting means that sets the components related to architectural design (Figure 2) and registers the information of an expert group consisting of information from experts in each field related to architectural design necessary to determine the shape of the building;

상기 건축설계에 대한 정보를 담고 있는 전문가그룹은 건축주, 건물주, 건축 설계사, 디자인 전문가 건설 시공 사, 터파기, 가설공사, 파괴 공법 등의 분야별 시공 전문가, 건설 기계 전문가, 전기 전문가, 건축 환경 전문가, 건축 구조(지진 전문가), 배관 전문가, 창호 전문가, 조적 쌓기 전문가, 건축 법규 관련 전문가, 공정 관리 전문가, 인허가 관리 및 재무관련 관리 전문가, IT 관련 전문가, 기타 건설공사 관련 전문가들로 구성되어 진다.The expert group containing information on the above architectural design includes building owners, building owners, architectural designers, design experts, construction engineers, construction experts in fields such as excavation, temporary construction, and destruction methods, construction machinery experts, electrical experts, and built environment experts. It is comprised of architectural structure (earthquake experts), plumbing experts, window experts, masonry experts, building regulations experts, process management experts, permit management and financial management experts, IT experts, and other construction-related experts.

상기 구성요소가 셋팅된 정보를 통하여 컴퓨터를 통한 가상 데이터를 입력하여 전체 규모를 계략적으로 스케치 하여 1차 View하면서 치수들을 대략 조감도에 맞추어 반복하면서 최종 안을 도출시키는 1차 View D/B에 자료를 등록한 후, 1차 View D/B에 등록된 자료를 통하여, 전체 단면도, 각 층별 건물 내에 들어갈 구성 요소들의 배치 도 및 층별 단면도, 입면도, 측면도들을 CAD, AutoCAD, 다른 건축 툴로 2D 형태(도 3)로 표현하여 2차 View 조 감도로 구현하는 2D 형태의 조감도 셋팅수단;By inputting virtual data through a computer through the information on which the above components are set, the overall scale is schematically sketched and the data is submitted to the primary view DB, which derives the final plan by repeating the dimensions roughly according to the bird's eye view during the primary view. After registration, through the data registered in the primary View D/B, the overall cross-sectional view, layout diagram of components to be included in the building on each floor, cross-sectional view for each floor, elevation view, and side view can be created in 2D form using CAD, AutoCAD, and other architectural tools (Figure 3). A 2D bird's eye view setting means that is expressed as a secondary view bird's eye view;

상기 2D 형태의 조감도에 등록된 자료를 통하여, 대형 건축물의 건설시 제한 사항들을 체크하고, 건축법에 위반 되지 않도록 하며(도 4), 2D로 표현된 각 층별 단면도, 입면도, 측면도들의 구성 요소를 감안한 건축물을 3D 형 태로 표현하여 3D View 조감도로 구현하는 구성요소 결정 수단 ;Through the data registered in the 2D bird's eye view, restrictions in the construction of large buildings are checked and building laws are not violated (Figure 4), and the components of the cross-section, elevation, and side views of each floor expressed in 2D are taken into consideration. A means of determining components that express a building in 3D form and implement a 3D bird's eye view;

상기 3D View 조감도에 등록된 자료를 통하여, 건축하고자 하는 건물에 있어서 제한 사항 및 환경, 지형, 일조 건에 따른 조건 및 제한 사항들을 감안하여 각 층별에 들어갈 공간들의 치수의 크기 및 높이 등을 계산하여 가 로, 세로, 높이들을 결정(도 5)하여 구현하는 치수결정수단 ;Through the data registered in the 3D View bird's eye view, the size and height of the spaces to be entered on each floor are calculated by taking into account the limitations of the building to be built and the conditions and limitations depending on the environment, topography, and sunlight. Dimension determination means implemented by determining the width, length, and height (Figure 5);

상기 치수 및 수량결정 D/B에 등록된 자료를 통하여, 교통 및 환경, 지형, 일조건 평가, 각종 제한사항 등록, 요소자체 및 건축 구조, 배관부분, 전기설비분야, 조명 및 기계 설비 분야에 해당되는 제한사항을 제거하여 건 축물 각 부분의 View를 구현하는 건축물 요소결정 수단 ;Through the data registered in the size and quantity determination DB, traffic and environment, topography, solar condition evaluation, various restrictions registration, elements themselves and building structure, piping, electrical equipment, lighting and mechanical equipment fields are covered. A means of determining building elements that implements the view of each part of the building by removing the limitations;

상기 건축물 요소결정 수단에서 건축물의 세부 요소 결정을 살펴보면,Looking at the determination of detailed elements of a building in the above building element determination means,

1) 환경적 부분(도 6) : 대형 건축물의 용도에 맞는 채광을 고려하여, 건축물에서 일어나는 모든 요소들을 감안 하고, 관련된 모든 기능과 관리되어지는 동선들을 체크하여 분석된 데이터를 기준으로 규모와 크기를 고려한 정 확 수치를 결정한다.1) Environmental part (Figure 6): Considering lighting suitable for the purpose of large buildings, all elements occurring in the building are taken into consideration, and all related functions and managed movement lines are checked, and the scale and size are based on the analyzed data. Determine the exact value taking into account.

2) 건축 구조 부분(도 7) ; 건축 구조는 철근 콘크리트 구조(RC)와 철골 구조(S), 철골. 철근콘크리트 구조(SRC), 보강콘크리트 블록 구조 등이 있으나, 여기서는 라멘 구조와 철근 콘크리트 구조만 다룬다.2) Architectural structure part (Figure 7); The architectural structure is reinforced concrete structure (RC), steel structure (S), and steel frame. There are reinforced concrete structures (SRC) and reinforced concrete block structures, but only ramen structures and reinforced concrete structures are covered here.

①. 대형 건축물에서는 라멘 구조와 철근 콘크리트 구조들로 구성됨으로 장단점들을 비교 검토하여 지형 가장 적합한 것으로 한다.①. In large buildings, they are composed of ramen structures and reinforced concrete structures, so the pros and cons are compared and reviewed to determine which is most suitable for the terrain.

②. 내진 설계는 4축과 상, 하로 전문가 그룹들이 필요한 요소 내용을 데이터로 한다.②. Earthquake-resistant design uses data on four axes, top and bottom, with the necessary elements from expert groups.

3) 배관 부분(도 8); 급수, 배수, 급탕, 냉방, 난방, 가스관을 배치하는 것이며, 그리고 여러 설비 형태로 분류 되어 지며, 사후 관리 부분이 중요시 되는 부분이다.3) piping section (Figure 8); It is the arrangement of water supply, drainage, domestic hot water, cooling, heating, and gas pipes, and is classified into various types of facilities, with follow-up management being an important part.

4) 전기 설비 분야(도 9)로서 현대 대형 건축물에 있어서 모든 기능들이 전기에 의해서 이루어 진다. 따라서 전기 설비와 조명, 전기의 안전 등은 여러 측면에서 전문가들이 다루어야 한다.4) In the field of electrical equipment (Figure 9), all functions in modern large buildings are performed by electricity. Therefore, electrical equipment, lighting, and electrical safety must be handled by experts in many aspects.

5) 조명 및 기계 설비 분야(도 10); 대형 건축물에 있어서 기계 장치와 조명은 체육시설과 공연과는 다르며, 자 동화로 이루어져야 된다.5) lighting and mechanical equipment sector (Figure 10); In large buildings, mechanical devices and lighting are different from sports facilities and performances and must be automated.

상기 건축물 요소결정 수단에 모든 요소가 포함된 D/B의 자료를 통하여, 공정관리는 투입 물량 산출과 투입 인 원, 스케줄 등이 표시하는 단계이므로 공사금액과 공사일정 및 원가관리 부분에 중요한 역할을 담당(도 11)하는 최종 데이터 셋팅 수단;Through the data of D/B, which includes all elements in the above building element determination means, process management plays an important role in the construction amount, construction schedule, and cost management since it is the stage where input quantity calculation, input personnel, schedule, etc. are displayed. Responsible for final data setting (FIG. 11);

상기 최종 데이터 셋팅에 추가요소를 등록하여 등록된 모든 요소가 등록 완료된 D/B의 자료를 통하여,By registering additional elements in the final data setting above, through data from the D/B in which all registered elements have been registered,

최종 건축물 구성은 각 단계에서 정확한 수치 및 데이터 값을 셋팅하여(도 12), 컴퓨터와 인터페이스 (Interface) 과정으로 모든 요소를 확인하여 최종건축물 View로 구현하는 최종건축물 구성 수단;The final building composition is a means of constructing the final building by setting accurate numerical and data values at each stage (Figure 12), confirming all elements through a computer and interface process, and implementing the final building view;

상기 최종건축물 구성 단계에서 최종결과물 D/B를 통하여, 조감도, 평면도, 측면도, 관련도의 정확한 도면 처리 및 수치를 나타난 도면 및 3D 도면을 출력하는 단계(도 13)이며, 각종 계약서등을 문서화하여 관리하며, 각종보 고서를 출력하여 사용하는 보고서 데이터 등록 및 보고서출력 수단; 으로 이루어져 건축설계 시스템이 완료되어 지며,In the final building construction stage, through the final result DB, it is the step of printing drawings and 3D drawings showing accurate drawing processing and figures of bird's eye view, floor plan, side view, and related views (Figure 13), and documenting various contracts, etc. Report data registration and report output means for managing and printing various reports; The architectural design system is completed,

상기의 건축물 요소결정 수단에서 최종 결과물 D/B에 문제리뷰로 등록되었을 경우에는 문제 해결을 위해 필요한 각각의 수단으로 피드백(feed back)되어 필요한 건축설계에 대한 조정 및 확인하는 관리시스템으로 구성수단을 포함하여 이루어진 것을 특징으로 하는 컴퓨터를 이용한 건축설계관리 시스템을 제공하는데 그 목적이 있다.When a problem review is registered in the final result DB in the above building element determination means, it is fed back to each means necessary to solve the problem, and the composition means is converted into a management system that adjusts and confirms the necessary architectural design. The purpose is to provide an architectural design management system using a computer, which includes:

[ 실시예 2] 판넬화된 배송 방법[Example 2] Panelized delivery method

도 1은 본 발명의 판넬화된 배송 시스템의 전체 흐름도에서 나타낸 것과 같이, 건축설계에 관련되어 건축설계 관리정보에 접수한 회원들의 필요에 의하여 진행되어 지는 연계된 건축설계 관리정보 시스템에서,As shown in Figure 1 as an overall flow chart of the panelized delivery system of the present invention, in the linked architectural design management information system that is carried out according to the needs of members who have received architectural design management information related to architectural design,

인터넷, 전자메일, 온라인 같은 SNS(Social Network Service)를 통하여 "시랑대-오랑대 아이콘(iCon)" 어플리 케이션을 통하여 건축설계 관리정보 시스템을 시작(start)하게 되면 "시랑대-오랑대 iCon"이라 불리는 어플리케 이션의 시스템이 가동되어 오픈(open)되어지는 시스템 가동단계 ;When you start the architectural design management information system through the "Sirangdae-Orangdae icon (iCon)" application through SNS (Social Network Service) such as the Internet, e-mail, or online, it is called "Sirangdae-Orangdae iCon". System operation stage in which the application system is activated and opened;

건축설계에 관한 구성요소를 셋팅 하는 것으로, 건물의 형태를 결정하기 위해 필요한 건축설계에 관련된 각 분야의 전문가들의 정보로 구성되는 전문가그룹의 정보를 등록하게 되는 구성요소 셋팅단계 ;A component setting step in which information from an expert group consisting of information from experts in each field related to architectural design required to determine the form of a building is registered, which sets components related to architectural design;

상기 구성요소가 셋팅된 정보를 통하여 컴퓨터를 통한 가상 데이터를 입력하여 전체 규모를 계략적으로 스케치 하여 1차 View하면서 치수들을 대략 CAD 툴에 맞추어 반복하면서 최종 안을 도출시키는 1차 View D/B에 자료를 등록한 후, 1차 View D/B에 등록된 자료를 통하여, 전체 단면도, 각 층별 건물 내에 들어갈 구성 요소들의 배치 도 및 층별 단면도, 입면도, 측면도들을 CAD, AutoCAD, 다른 건축 툴로 2D 형태로 표현하여 2차 View 조감도로 구현하는 2D 형태의 조감도 셋팅수단;Through the information on which the above components are set, virtual data is entered through a computer, the overall scale is schematically sketched, and the dimensions are roughly adjusted to the CAD tool to repeat the first view, thereby deriving the final plan. After registering, through the data registered in the primary View D/B, the overall cross-sectional view, the layout of the components to be included in the building on each floor, and the cross-sectional view, elevation, and side view for each floor are expressed in 2D form using CAD, AutoCAD, and other architectural tools. A 2D bird's eye view setting means implemented as a secondary view bird's eye view;

상기 2D 형태의 조감도에 등록된 자료를 통하여, 대형 건축물의 건설시 제한 사항들을 체크하고, 건축법에 위반 되지 않도록 하며, 2D로 표현된 각 층별 단면도, 입면도, 측면도들의 구성 요소를 감안한 건축물을 3D 형태로 표현하여 3D View 조감도로 구현하는 구성요소 결정단계 ;Through the data registered in the 2D bird's eye view, restrictions in the construction of large buildings are checked, construction laws are not violated, and the building is constructed in 3D form taking into account the components of the cross-section, elevation, and side views of each floor expressed in 2D. Component decision step expressed as a 3D view and implemented as a bird's eye view;

상기 3D View 조감도에 등록된 자료를 통하여, 건축하고자 하는 건물에 있어서 제한 사항 및 환경, 지형, 일조 건에 따른 조건 및 제한 사항들을 감안하여 각 층별에 들어갈 공간들의 치수의 크기 및 높이 등을 계산하여 가 로, 세로, 높이들을 결정하여 구현하는 치수결정단계 ;Through the data registered in the 3D View bird's eye view, the size and height of the spaces to be entered on each floor are calculated by taking into account the limitations of the building to be built and the conditions and limitations depending on the environment, topography, and sunlight. A dimension determination step implemented by determining the width, length, and height;

상기 치수 및 수량결정 D/B에 등록된 자료를 통하여, 교통 및 환경, 지형, 일조건 평가, 각종 제한사항 등록, 요소자체 및 건축 구조, 배관부분, 전기설비분야, 조명 및 기계 설비 분야에 해당되는 제한사항을 제거하여 건 축물 각 부분의 View를 구현하는 건축물 요소결정 단계;Through the data registered in the size and quantity determination DB, traffic and environment, topography, solar condition evaluation, various restrictions registration, elements themselves and building structure, piping, electrical equipment, lighting and mechanical equipment fields are covered. A building element determination step that implements the view of each part of the building by removing any restrictions;

상기 건축물 요소결정단계에서 모든 요소가 포함된 D/B의 자료를 통하여, 공정관리는 투입 물량 산출과 투입 인 원, 스케줄 등이 표시하는 단계이므로 공사금액과 공사일정 및 원가관리 부분에 중요한 역할을 담당하는 최종 데이터 셋팅 단계;Through D/B data that includes all elements in the building element determination stage, process management plays an important role in the construction amount, construction schedule, and cost management since it is the stage where input quantity calculation, input personnel, schedule, etc. are displayed. Responsible for the final data setting step;

상기 최종 데이터 셋팅에 추가요소를 추가 등록하여 등록된 모든 요소가 등록 완료된 D/B의 자료를 통하여, 최 종 건축물 구성은 각 단계에서 정확한 수치 및 데이터 값을 셋팅하여, 컴퓨터와 인터페이스(Interface) 과정으 로 모든 요소를 확인하여 최종건축물 View로 구현하는 최종건축물 구성 단계 ;By registering additional elements in the final data setting above and using the data in the database where all registered elements have been registered, the final building composition is set up with accurate numerical and data values at each stage, and is interfaced with the computer. Final building construction stage where all elements are checked and implemented into the final building view;

상기 최종건축물 구성 단계에서 최종결과물 D/B를 통하여, 조감도, 평면도, 측면도, 관련도의 정확한 도면 처리 및 수치를 나타난 도면 및 3D 도면을 출력하는 단계이며, 각종 계약서등을 문서화하여 관리하며, 각종보고서를 출력하여 사용하는 보고서 데이터 등록 및 보고서출력 단계; 로 이루어져 건축설계 시스템이 완료되어지며,In the final building construction stage, it is the stage of printing drawings and 3D drawings showing accurate drawing processing and figures of bird's-eye view, floor plan, side view, and related view through the final result DB, documenting and managing various contracts, etc. Report data registration and report output steps for printing and using a report; The architectural design system is completed,

상기의 건축물 요소결정 수단에서 최종 결과물 D/B에 문제리뷰로 등록되었을 경우에는 문제 해결을 위해 필요한 각각의 단계로 피드백(feed back)되어 필요한 건축설계에 대한 조정 및 확인하는 관리시스템으로 구성단계를 포함하여 이루어진 것을 특징으로 하는 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템에 관한 것이다.When a problem review is registered in the final result DB in the above building element determination method, it is fed back to each stage necessary to solve the problem, and the configuration stage is established as a management system that adjusts and confirms the necessary architectural design. It relates to an architectural design management method and system based on a 3D model, which includes the following.

Claims (3)

건축설계에 관련되어 건축설계 관리정보에 접수한 회원들의 필요에 의하여 진행되어 지는 연계된 건축설계 관 리정보 시스템에서,
인터넷, 전자메일, 온라인 같은 SNS(Social Network Service)를 통하여 "시랑대-오랑대 아이콘(iCon)" 어플리 케이션을 통하여 건축설계 관리정보 시스템을 시작(start)하게 되면 "시랑대-오랑대 iCon"이라 불리는 어플리케 이션의 시스템이 가동되어 오픈(open)되어지는 시스템 가동수단 ;
건축설계에 관한 구성요소를 셋팅 하는 것으로, 건물의 형태를 결정하기 위해 필요한 건축설계에 관련된 각 분 야의 전문가들의 정보로 구성되는 전문가그룹의 정보를 등록하게 되는 구성요소 셋팅수단 ;
상기 구성요소가 셋팅된 정보를 통하여 컴퓨터를 통한 가상 데이터를 입력하여 전체 규모를 계략적으로 스케치 하여 1차 View하면서 치수들을 대략 CAD 툴에 맞추어 반복하면서 최종 안을 도출시키는 1차 View D/B에 자료를 등록한 후, 1차 View D/B에 등록된 자료를 통하여, 전체 단면도, 각 층별 건물 내에 들어갈 구성 요소들의 배치 도 및 층별 단면도, 입면도, 측면도들을 CAD, AutoCAD, 다른 건축 툴로 2D 형태로 표현하여 2차 View 조감도로 구현하는 2D 형태의 조감도 셋팅수단;
상기 2D 형태의 조감도에 등록된 자료를 통하여, 대형 건축물의 건설시 제한 사항들을 체크하고, 건축법에 위반 되지 않도록 하며, 2D로 표현된 각 층별 단면도, 입면도, 측면도들의 구성 요소를 감안한 건축물을 3D 형태로 표현하여 3D View 조감도로 구현하는 구성요소 결정 수단 ;
상기 3D View 조감도에 등록된 자료를 통하여, 건축하고자 하는 건물에 있어서 제한 사항 및 환경, 지형, 일조 건에 따른 조건 및 제한 사항들을 감안하여 각 층별에 들어갈 공간들의 치수의 크기 및 높이 등을 계산하여 가 로, 세로, 높이들을 결정하여 구현하는 치수결정수단 ;
상기 치수 및 수량결정 D/B에 등록된 자료를 통하여, 교통 및 환경, 지형, 일조건 평가, 각종 제한사항 등록, 요소자체 및 건축 구조, 배관부분, 전기설비분야, 조명 및 기계 설비 분야에 해당되는 제한사항을 제거하여 건 축물 각 부분의 View를 구현하는 건축물 요소결정 수단 ;
상기 건축물 요소결정 수단에 모든 요소가 포함된 D/B의 자료를 통하여, 공정관리는 투입 물량 산출과 투입 인 원, 스케줄 등이 표시하는 단계이므로 공사금액과 공사일정 및 원가관리 부분에 중요한 역할을 담당하는 최종 데이터 셋팅 수단;
상기 최종 데이터 셋팅에 추가요소를 등록하여 등록된 모든 요소가 등록 완료된 D/B의 자료를 통하여, 최종 건 축물 구성은 각 단계에서 정확한 수치 및 데이터 값을 셋팅하여, 컴퓨터와 인터페이스(Interface) 과정으로 모 든 요소를 확인하여 최종건축물 View로 구현하는 최종건축물 구성 수단;
상기 최종건축물 구성 단계에서 최종결과물 D/B를 통하여, 조감도, 평면도, 측면도, 관련도의 정확한 도면 처리 및 수치를 나타낸 도면 및 3D 도면을 출력하는 단계이며, 각종 계약서등을 문서화하여 관리하며, 각종보고서를 출력하여 사용하는 보고서 데이터 등록 및 보고서출력 수단; 으로 이루어져 건축설계 시스템이 완료되어지며,
상기의 건축물 요소결정 수단에서 최종 결과물 D/B에 문제리뷰로 등록되었을 경우에는 문제 해결을 위해 필요한 각각의 수단으로 피드백(feed back)되어 필요한 건축설계에 대한 조정 및 확인하는 관리시스템으로 구성수단을 포함하여 이루어진 것을 특징으로 하는 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템
In the linked architectural design management information system that is processed according to the needs of members who have received architectural design management information related to architectural design,
When you start the architectural design management information system through the "Sirangdae-Orangdae icon (iCon)" application through SNS (Social Network Service) such as the Internet, e-mail, or online, it is called "Sirangdae-Orangdae iCon". System operation means by which the application system is operated and opened;
Component setting means for setting components related to architectural design and registering information of an expert group consisting of information from experts in each field related to architectural design necessary to determine the form of a building;
Through the information on which the above components are set, virtual data is entered through a computer, the overall scale is schematically sketched, and the dimensions are roughly adjusted to the CAD tool to repeat the first view, thereby deriving the final plan. After registering, through the data registered in the primary View D/B, the overall cross-sectional view, the layout of the components to be included in the building on each floor, and the cross-sectional view, elevation, and side view for each floor are expressed in 2D form using CAD, AutoCAD, and other architectural tools. A 2D bird's eye view setting means implemented as a secondary view bird's eye view;
Through the data registered in the 2D bird's eye view, restrictions in the construction of large buildings are checked, construction laws are not violated, and the building is constructed in 3D form taking into account the components of the cross-section, elevation, and side views of each floor expressed in 2D. A means of determining components that are expressed as a 3D view and implemented as a bird's eye view;
Through the data registered in the 3D View bird's eye view, the size and height of the spaces to be entered on each floor are calculated by taking into account the limitations of the building to be built and the conditions and limitations depending on the environment, topography, and sunlight. Dimension determination means implemented by determining the width, length, and height;
Through the data registered in the size and quantity determination DB, traffic and environment, topography, solar condition evaluation, various restrictions registration, elements themselves and building structure, piping, electrical equipment, lighting and mechanical equipment fields are covered. A means of determining building elements that implements the view of each part of the building by removing the limitations;
Through the data of D/B, which includes all elements in the above building element determination means, process management plays an important role in the construction amount, construction schedule, and cost management since it is the stage where input quantity calculation, input personnel, schedule, etc. are displayed. Responsible final data setting means;
By registering additional elements in the final data setting and using the data in the database where all registered elements have been registered, the final building composition is established through a computer and interface process by setting accurate numerical and data values at each stage. A means of constructing the final building that checks all elements and implements it into a final building view;
In the final building construction stage, it is the stage of printing drawings and 3D drawings showing accurate drawing processing and figures of bird's eye view, floor plan, side view, and related views through the final result DB, documenting and managing various contracts, etc. Report data registration and report output means used to print reports; The architectural design system is completed,
When a problem review is registered in the final result DB in the above building element determination means, it is fed back to each means necessary to solve the problem, and the composition means is converted into a management system that adjusts and confirms the necessary architectural design. Architectural design management method and system based on a 3D model, characterized by including
제 1항에 있어서,
상기 건축설계에 대한 정보를 담고 있는 전문가그룹은 건축주, 건물주, 건축 설계사, 디자인 전문가 건설 시공 사, 터파기, 가설공사, 파괴 공법 등의 분야별 시공 전문가, 건설 기계 전문가, 전기 전문가, 건축 환경 전문가, 건축 구조(지진 전문가), 배관 전문가, 창호 전문가, 조적 쌓기 전문가, 건축 법규 관련 전문가, 공정 관리 전문가, 인허가 관리 및 재무관련 관리 전문가, IT 관련 전문가, 기타 건설공사 관련 전문가인 것을 특징 으로 하는 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템.
According to clause 1,
The expert group containing information on the above architectural design includes building owners, building owners, architectural designers, design experts, construction engineers, construction experts in fields such as excavation, temporary construction, and destruction methods, construction machinery experts, electrical experts, and built environment experts. A 3D model characterized by being an architectural structure (earthquake expert), plumbing expert, window expert, masonry expert, building code expert, process management expert, permit management and financial management expert, IT expert, and other construction-related experts. Architectural design management method and system based on .
건축설계에 관련되어 건축설계 관리정보에 접수한 회원들의 필요에 의하여 진행되어 지는 연계된 건축설계 관 리정보 시스템에서,
인터넷, 전자메일, 온라인 같은 SNS(Social Network Service)를 통하여 "시랑대-오랑대 아이콘(iCon)" 어플리 케이션을 통하여 건축설계 관리정보 시스템을 시작(start)하게 되면 "시랑대-오랑대 iCon"이라 불리는 어플리케 이션의 시스템이 가동되어 오픈(open)되어지는 시스템 가동단계 ;
건축설계에 관한 구성요소를 셋팅 하는 것으로, 건물의 형태를 결정하기 위해 필요한 건축설계에 관련된 각 분 야의 전문가들의 정보로 구성되는 전문가그룹의 정보를 등록하게 되는 구성요소 셋팅단계 ;
상기 구성요소가 셋팅된 정보를 통하여 컴퓨터를 통한 가상 데이터를 입력하여 전체 규모를 계략적으로 스케치 하여 1차 View하면서 치수들을 대략 조감도에 맞추어 반복하면서 최종 안을 도출시키는 1차 View D/B에 자료를 등록한 후, 1차 View D/B에 등록된 자료를 통하여, 전체 단면도, 각 층별 건물 내에 들어갈 구성 요소들의 배치 도 및 층별 단면도, 입면도, 측면도들을 CAD, AutoCAD, 다른 건축 툴로 2D 형태로 표현하여 2차 View 조감도로 구현하는 2D 형태의 조감도 셋팅단계;
상기 2D 형태의 조감도에 등록된 자료를 통하여, 대형 건축물의 건설시 제한 사항들을 체크하고, 건축법에 위반 되지 않도록 하며, 2D로 표현된 각 층별 단면도, 입면도, 측면도들의 구성 요소를 감안한 건축물을 3D 형태로 표현하여 3D View 조감도로 구현하는 구성요소 결정단계 ;
상기 3D View 조감도에 등록된 자료를 통하여, 건축하고자 하는 건물에 있어서 제한 사항 및 환경, 지형, 일조 건에 따른 조건 및 제한 사항들을 감안하여 각 층별에 들어갈 공간들의 치수의 크기 및 높이 등을 계산하여 가 로, 세로, 높이들을 결정하여 구현하는 치수결정단계;
상기 치수 및 수량결정 D/B에 등록된 자료를 통하여, 교통 및 환경, 지형, 일조건 평가, 각종 제한사항 등록, 요소자체 및 건축 구조, 배관부분, 전기설비분야, 조명 및 기계 설비 분야에 해당되는 제한사항을 제거하여 건 축물 각 부분의 View를 구현하는 건축물 요소결정 단계;
상기 건축물 요소결정단계에서 모든 요소가 포함된 D/B의 자료를 통하여, 공정관리는 투입 물량 산출과 투입 인 원, 스케줄 등이 표시하는 단계이므로 공사금액과 공사일정 및 원가관리 부분에 중요한 역할을 담당하는 최종 데이터 셋팅 단계;
상기 최종 데이터 셋팅에 추가요소를 추가등록하여 등록된 모든 요소가 등록 완료된 D/B의 자료를 통하여, 최종 건축물 구성은 각 단계에서 정확한 수치 및 데이터 값을 셋팅하여, 컴퓨터와 인터페이스(Interface) 과정으로 모든 요소를 확인하여 최종건축물 View로 구현하는 최종건축물 구성 단계 ;
상기 최종건축물 구성 단계에서 최종결과물 D/B를 통하여, 조감도, 평면도, 측면도, 관련도의 정확한 도면 처리 및 수치를 나타난 도면 및 3D 도면을 출력하는 단계이며, 각종 계약서등을 문서화하여 관리하며, 각종보고서를 출력하여 사용하는 보고서 데이터 등록 및 보고서출력 단계; 로 이루어져 건축설계 시스템이 완료되어지며,
상기의 건축물 요소결정 단계에서 최종 결과물 D/B에 문제리뷰로 등록되었을 경우에는 문제 해결을 위해 필요한 각각의 단계로 피드백(feed back)되어 필요한 건축설계에 대한 조정 및 확인하는 관리시스템으로 구성단계를 포함하여 이루어진 것을 특징으로 하는 3D 모델을 기반으로하는 건축설계 관리방법 및 그 시스템
In the linked architectural design management information system that is processed according to the needs of members who have received architectural design management information related to architectural design,
When you start the architectural design management information system through the "Sirangdae-Orangdae icon (iCon)" application through SNS (Social Network Service) such as the Internet, e-mail, or online, it is called "Sirangdae-Orangdae iCon". System operation stage in which the application system is activated and opened;
A component setting step in which information from an expert group consisting of information from experts in each field related to architectural design required to determine the form of a building is registered, which sets components related to architectural design;
By inputting virtual data through a computer through the information on which the above components are set, the overall scale is schematically sketched and the data is submitted to the primary view DB, which derives the final plan by repeating the dimensions roughly according to the bird's eye view during the primary view. After registration, through the data registered in the primary view D/B, the overall cross-sectional view, the layout of the components to be included in the building on each floor, and the cross-sectional view, elevation view, and side view for each floor are expressed in 2D form using CAD, AutoCAD, and other architectural tools. A 2D bird's eye view setting step implemented as a bird's eye view of the car;
Through the data registered in the 2D bird's eye view, restrictions in the construction of large buildings are checked, construction laws are not violated, and the building is constructed in 3D form taking into account the components of the cross-section, elevation, and side views of each floor expressed in 2D. Component decision step expressed as a 3D view and implemented as a bird's eye view;
Through the data registered in the 3D View bird's eye view, the size and height of the spaces to be entered on each floor are calculated by taking into account the limitations of the building to be built and the conditions and limitations depending on the environment, topography, and sunlight. A dimension determination step implemented by determining the width, length, and height;
Through the data registered in the size and quantity determination DB, traffic and environment, topography, solar condition evaluation, various restrictions registration, elements themselves and building structure, piping, electrical equipment, lighting and mechanical equipment fields are covered. A building element determination step that implements the view of each part of the building by removing any restrictions;
Through D/B data that includes all elements in the building element determination stage, process management plays an important role in the construction amount, construction schedule, and cost management since it is the stage where input quantity calculation, input personnel, schedule, etc. are displayed. Responsible for the final data setting step;
By registering additional elements in the final data setting above and using the data in the database where all registered elements have been registered, the final building composition is established through a computer and interface process by setting accurate numerical and data values at each stage. The final building construction stage where all elements are checked and implemented into the final building view;
In the final building construction stage, it is the stage of printing drawings and 3D drawings showing accurate drawing processing and figures of bird's-eye view, floor plan, side view, and related view through the final result DB, documenting and managing various contracts, etc. Report data registration and report output steps for printing and using a report; The architectural design system is completed,
If a problem review is registered in the final result DB in the above building element determination stage, it is fed back to each stage necessary to solve the problem, and the configuration stage is established as a management system that adjusts and confirms the necessary architectural design. Architectural design management method and system based on a 3D model, characterized by including
KR1020220049901A 2022-04-22 2022-04-22 Architectural Design Management Method and System Based on 3D Model KR20230150483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220049901A KR20230150483A (en) 2022-04-22 2022-04-22 Architectural Design Management Method and System Based on 3D Model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220049901A KR20230150483A (en) 2022-04-22 2022-04-22 Architectural Design Management Method and System Based on 3D Model

Publications (1)

Publication Number Publication Date
KR20230150483A true KR20230150483A (en) 2023-10-31

Family

ID=88543393

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220049901A KR20230150483A (en) 2022-04-22 2022-04-22 Architectural Design Management Method and System Based on 3D Model

Country Status (1)

Country Link
KR (1) KR20230150483A (en)

Similar Documents

Publication Publication Date Title
Panteli et al. Building information modelling applications in smart buildings: From design to commissioning and beyond A critical review
Ge et al. Deconstruction waste management through 3d reconstruction and bim: a case study
Migilinskas et al. The benefits, obstacles and problems of practical BIM implementation
Zhang et al. Exploring the challenges to industrialized residential building in China
Häkkinen et al. Reducing embodied carbon during the design process of buildings
KR101406885B1 (en) Using a computer system and method for architectural design
Pheng et al. Integrating buildability in ISO 9000 quality management systems: case study of a condominium project
Marzouk et al. Analyzing sustainability in low-income housing projects using system dynamics
CN109583149A (en) Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
Mydin et al. Buildability attributes at design phase in Malaysian building construction
Shehata et al. (3Ts) Green conservation framework: A hierarchical-based sustainability approach
CN112465390A (en) BIM-based subway station construction progress management method
Nguyen et al. A theoretical BIM-based framework for quantity take-off to facilitate progress payments: the case of high-rise building projects in Vietnam
KR20230150483A (en) Architectural Design Management Method and System Based on 3D Model
Nath et al. Precast workflow productivity measurement through BIM adoption
KR20240062424A (en) Management method of architectural design management system in which 3d modeling-based bim design environment is implemented
KR20240062423A (en) Architectural design management system that provides total solutions for design, interior and construction management and maintenance
Dahiya et al. Life cycle energy analysis of buildings: A systematic review
KR20240061682A (en) Architectural design management system that models facilities in multidimensional virtual space through bim design environment
Hosny et al. Reducing Reinforced Concrete Materials Waste in Construction Projects Using Building Information Modeling in Egypt.
Oli Structural BIM Modelling Using Tekla Structures: Focus On A Modelling Process Of An Office Building
Assarehpour Assessment of BIM in construction management: the impact of the WBS, QTO, cost estimation and time analysis on decision making policy for optimization of energy efficency
Dogan et al. A research for efficiency of using prefabrication building components in Building Information Modeling (BIM) process
Hong A Study on the Utilization of BIM Digital File Tool in Consistency Review Stage of Facade Area Changes in Vista Planning of a Building
Le A bim-database-integrated system for evaluating building life-cycle costs using a multi-parametric model