KR20220001388A - A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions - Google Patents

A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions Download PDF

Info

Publication number
KR20220001388A
KR20220001388A KR1020200079669A KR20200079669A KR20220001388A KR 20220001388 A KR20220001388 A KR 20220001388A KR 1020200079669 A KR1020200079669 A KR 1020200079669A KR 20200079669 A KR20200079669 A KR 20200079669A KR 20220001388 A KR20220001388 A KR 20220001388A
Authority
KR
South Korea
Prior art keywords
case
trees
street
sidewalk
planting
Prior art date
Application number
KR1020200079669A
Other languages
Korean (ko)
Inventor
임민정
Original Assignee
주식회사 스토리아툼
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 스토리아툼 filed Critical 주식회사 스토리아툼
Priority to KR1020200079669A priority Critical patent/KR20220001388A/en
Publication of KR20220001388A publication Critical patent/KR20220001388A/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G23/00Forestry
    • A01G23/02Transplanting, uprooting, felling or delimbing trees
    • A01G23/04Transplanting trees; Devices for grasping the root ball, e.g. stump forceps; Wrappings or packages for transporting trees
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • A01G13/0256Ground coverings
    • A01G13/0281Protective ground coverings for individual plants, e.g. for plants in pots
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation
    • E01C9/005Coverings around trees forming part of the road

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Architecture (AREA)
  • Forests & Forestry (AREA)
  • Ecology (AREA)
  • Engineering & Computer Science (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a method for easily planting landscaping trees such as street trees in sidewalks and the like and ensuring good growth conditions and a case for the same. According to the present invention, the method comprises the following steps: performing excavation in an area to form a sidewalk and a road so that the raw ground is exposed; sequentially performing compaction layer formation and boundary stone installation in an area corresponding to the road among the excavated areas to pave the road; arranging a case, in which unit blocks are assembled and a vertical through-hole is formed, in a position to plant a street tree, which is a landscape tree of the sidewalk after the boundary stone of the road is installed, so that the raw ground for planting the street trees is secured; sequentially performing compaction layer formation, sand lamination, and paving in the sidewalk area except for the area where the case is disposed to pave the sidewalk; arranging the street tree inside the case after the sidewalk is paved; filling soil for vegetation in a space from which the case is withdrawn while withdrawing the case after the street tree is arranged; and installing an edge member on the upper part filled with the soil to protect the area where the street tree is planted.

Description

가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법{A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions}A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions

본 발명은 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법에 관한 것으로서, 조경수 식수 방법과 그에 이용되는 케이스에 관한 것이다.The present invention relates to a method for planting landscape trees that can easily plant landscape trees such as street trees on sidewalks, etc., and to ensure a good nurturing state, and to a method for planting landscape trees and a case used therefor.

일반적으로 도로 변에 식수하는 조경수인 가로수는 도로와 그의 변부의 인도를 포장한 상태에서 식수한다.In general, street trees, which are landscape trees planted on the side of the road, are planted in the state of paving the road and the sidewalk along the side of the road.

도로 변의 인도에는 터파기된 원지반 상부에 보조기층을 이루는 다짐층이 단단하게 다짐되고, 그 상부에 모래를 적층하며, 모래의 상부에 블록과 같은 포장재가 포장된다. 여기에서 다짐층은 20 내지 40 ㎜ 정도 사이즈의 배수 가능한 골재를 이용하며, 상당한 수준의 다짐밀도를 갖도록 형성된다.On the sidewalk along the road, the compaction layer constituting the sub-base layer is firmly compacted on the upper part of the excavated base, and sand is laminated on it, and pavement materials such as blocks are paved on the upper part of the sand. Here, the compaction layer uses a drainable aggregate having a size of about 20 to 40 mm, and is formed to have a significant level of compaction density.

상술한 다짐 상태를 갖는 인도와 같은 조경 영역에 조경수를 식수하는 종래의 방법은 여러 가지 문제점과 어려움을 갖는다.The conventional method of planting landscape trees in a landscape area such as a sidewalk having the aforementioned compaction state has several problems and difficulties.

첫째) 가로수 식수를 위하여 이미 포장된 다짐층과 모래를 다시 파내야하는 번거로움이 발생되며, 둘째) 식수 공간을 확보하기 위해서 단단한 다짐층을 다시 파야하는데, 이때 굴착 설비가 필요하고, 셋째) 가로수 식수를 위하여 파지는 골재 및 모래는 결과적으로 낭비되며, 넷째) 가로수 식수를 위하여 파진 골재와 모래로 인하여 포장이 완료된 인근 영역의 블록 등을 손상시키거나 미관을 훼손할 우려가 있어서 이들에 대한 정비 및 보수 작업이 추가로 발생하고, 다섯째) 상술한 요인들에 의하여 종래의 가로수 식수는 작업성이 현저히 떨어지며, 여섯째) 다짐층 상에 가로수를 식수하는 경우 다짐층의 다짐밀도에 때문에 가로수의 뿌리 내림에 스트레스가 작용하여 가로수의 원활한 생육이 어렵다.First) It causes the inconvenience of having to dig up the already paved compacted layer and sand again for planting trees, second) a hard compacted layer has to be dug again to secure a space for watering, and at this time, excavation facilities are required, and third) street trees Aggregate and sand dug up for planting are wasted as a result, and fourth) due to aggregate and sand dug up for planting street trees, there is a risk of damaging blocks, etc. in a nearby area where pavement is completed or impairing the aesthetics. Additional repair work occurs, 5) conventional street tree planting due to the above factors significantly lowers the workability, and 6) when planting street trees on the compacted layer, the compaction density of the compacted layer affects the rooting of street trees. The smooth growth of street trees is difficult due to stress.

본 발명은 상술한 문제점들을 해결하기 하고자 발명된 것이며, 본 발명은 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법을 제공한다.The present invention was invented to solve the above problems, and the present invention provides a method for planting landscape trees that can easily plant landscape trees such as street trees on sidewalks, etc., and ensure good growth conditions.

특히 본 발명은 인도가 포장되기 전 원지반을 확보한 상태에서 조경수인 가로수를 손쉽게 식수하는 방법을 제공한다.In particular, the present invention provides a method of easily planting a street tree, which is a landscape tree, in a state in which the original ground is secured before the sidewalk is paved.

또한 본 발명은 인도가 포장되기 전 확보된 원지반 상부에 양질의 토사를 이용하여 가로수를 식수함으로써 가로수의 원활한 생육 상태를 보장할 수 있는 방법을 제공한다.In addition, the present invention provides a method for ensuring the smooth growth of street trees by planting street trees using high-quality soil and soil on the upper part of the original ground secured before the sidewalk is paved.

또한, 본 발명은 인도를 포장하는 과정에서 가로수 식수를 위한 원지반을 확보할 수 있는 케이스를 제공한다.In addition, the present invention provides a case capable of securing the original ground for planting street trees in the process of paving the sidewalk.

본 발명에 따른 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법은, 인도와 도로를 형성할 영역에 원지반이 노출되도록 터파기를 수행하는 단계, 상기 터파기된 영역 중 상기 도로에 해당하는 영역에 대하여 다짐층 형성 및 경계석 설치를 순차적으로 수행하여 상기 도로를 포장하는 단계, 상기 도로의 경계석이 설치된 후 그에 접한 인도의 조경수인 가로수를 식수할 위치에 단위블럭들이 조립되어 수직 관통구가 형성된 케이스를 배치하여 상기 가로수의 식수를 위한 원지반을 확보하는 단계, 상기 케이스가 배치된 영역을 제외한 상기 인도 영역에 다짐층 형성, 모래 적층 및포장을 순차적으로 진행하여 상기 인도를 포장하는 단계, 상기 인도가 포장된 후 상기 케이스 내부에 상기 가로수를 배치하는 단계, 상기 가로수가 배치된 상태에서 상기 케이스를 인출하면서 상기 케이스가 인출되는 공간에 식생을 위한 토사를 메우는 단계 및 상기 토사가 메워진 상부에 테두리 부재를 설치하여 상기 가로수가 식수된 영역을 보호하는 단계를 포함함을 특징으로 한다.The method of planting landscape trees, which can easily plant landscape trees such as street trees according to the present invention on sidewalks, etc. and ensure a good nurturing state, comprises the steps of performing excavation so that the original ground is exposed in the area where the sidewalk and the road will be formed, the excavated area Paving the road by sequentially forming a compaction layer and installing a boundary stone for the area corresponding to the road, after the boundary stone of the road is installed, unit blocks are assembled at a location to plant a street tree that is a landscape tree in the sidewalk arranging a case in which a vertical through-hole is formed to secure the raw ground for planting the street tree, forming a compaction layer in the sidewalk area except for the area where the case is placed, and sequentially proceeding with sand lamination and paving to ensure the delivery. The steps of paving, arranging the street tree inside the case after the sidewalk is paved, taking out the case in a state where the street tree is arranged, filling the space from which the case is taken out with soil for vegetation, and the soil and sand It characterized in that it comprises the step of protecting the area where the street trees are planted by installing a rim member on the filled upper part.

또한 본 발명에 따른 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법은, 다짐층을 형성하기 위하여 원지반이 노출되도록 터파기를 수행하는 단계, 조경수를 식수할 위치에 단위 블럭들이 조립되어서 수직 관통구가 형성된 케이스를 배치하여 상기 조경 수를 식수할 원지반을 확보하는 단계, 상기 케이스가 배치된 영역을 제외한 영역에 상기 원지반 상부에 다짐 층과 상부층을 순차적으로 적층하는 단계, 상기 다짐층과 상기 상부층의 순차적인 적층이 완료된 후 상기 케이스 내부에 가로수를 배치하는 단계, 상기 조경수가 배치된 상태에서 상기 케이스를 인출하면서 상기 케이스가 인출되는 공간에 식생을 위한 토사를 메우는 단계 및 상기 토사가 메워진 상부에 테두리 부재를 설치하여 상기 조경수가 식수된 영역을 보호하는 단계를 포함함을 특징으로 한다.In addition, the landscape tree planting method, which can easily plant landscape trees such as street trees according to the present invention on sidewalks, etc. and ensure a good nurturing state, comprises the steps of performing excavation so that the original ground is exposed to form a compaction layer, in a position to plant landscape trees Placing a case in which the unit blocks are assembled to form a vertical through hole to secure the original ground for planting the landscape water, sequentially laminating the compaction layer and the upper layer on the top of the original ground in an area excluding the area where the case is disposed , arranging a street tree inside the case after the sequential lamination of the compaction layer and the upper layer is completed, while withdrawing the case in a state in which the landscape tree is arranged, filling the space from which the case is taken out with soil for vegetation And it characterized in that it comprises the step of protecting the planted area of the landscape tree by installing a rim member on the upper part filled with the soil.

여기에서, 상기 케이스는 상기 터파기된 상기 원지반에 20㎝ 내지 60㎝의 깊이의 구덩이를 파서 상기 구덩이 내에 배치할 수 있다.Here, the case may be disposed in the pit by digging a pit of a depth of 20 cm to 60 cm in the excavated base ground.

그리고, 상기 케이스는 원지반 상에 배치된 상태에서 인도가 포장된 높이보다 10㎝ 내지 50㎝ 더 높은 높이를 갖는 것이 이용될 수 있다.In addition, the case may be used to have a height of 10 cm to 50 cm higher than the height at which the sidewalk is paved in a state disposed on the original ground.

또한, 상기 케이스를 인출된 후 상기 단위 블럭 별로 해체되는 단계를 더 포함할 수 있다.In addition, the method may further include disassembling the case for each unit block after the case is withdrawn.

본 발명에 따른 케이스는, 조립되어서 수직 관통된 관통구를 이루며, 상측에 서로 대응되는 위치에 쌍을 이루는 인출구들이 형성되고, 조경수가 식수되는 원지반 상에 조립되어 배치되는 단위 블럭들 및 상기 단위 블럭 들의 조립에 의하여 형성되는 상기 관통구의 단면과 대응되는 형상을 가지며 상기 관통구의 입구에 끼워지는 삽입부가 저면에 형성되는 커버를 포함하며, 상기 원지반 상에 배치된 후 상기 커버로 상기 통체의 입구를 막고, 외부의 다짐층을 포함하는 적층이 이루어진 후 상기 커버가 제거되고 내부에 상기 조경수를 배치한 후인출되어 상기 단위 블럭들이 분해됨을 특징으로 한다.The case according to the present invention is assembled to form a vertically penetrating through hole, a pair of outlet openings are formed at positions corresponding to each other on the upper side, and the unit blocks and the unit blocks are assembled and arranged on the ground where landscape trees are planted. and a cover having a shape corresponding to the cross-section of the through hole formed by assembling of them and having an insertion part fitted to the inlet of the through hole formed on the bottom surface, and after being disposed on the base, the cover blocks the entrance of the cylindrical body, , characterized in that the unit blocks are disassembled by removing the cover after lamination including the external compaction layer is made, and then withdrawing after placing the landscape tree therein.

여기에서, 상기 단위 블럭들에는 서로 맞닿아서 인접하는 위치에 각각 체결구가 형성되고, 상기 단위블럭들은 상기 체결구를 관통하는 타이바를 포함하는 묶음부를 이용하여 조립될 수 있다.Here, the unit blocks each have fasteners formed at positions adjacent to each other in contact with each other, and the unit blocks may be assembled using a bundle including a tie bar penetrating the fasteners.

또한, 상기 단위 블럭들은 조립되어서 반원형, 원형 또는 장방형 중 어느 하나의 관통구를 형성할 수 있다.In addition, the unit blocks may be assembled to form a through hole in any one of a semi-circular shape, a circular shape, and a rectangular shape.

본 발명 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법에 의하면, 인도가 포장되기 전 케이스에 의하여 원지반이 확보되고, 이 상태에서 인도와 같은 주변 시설물의 포장이 이루어질 수 있다. 그러므로 미리 확보된 원지반에 다짐층 등의 형성이 배제됨으로써 원지반에 손쉽게 조경수인 가로수를 식수할 수 있다.According to the landscape tree planting method that can easily plant a landscape tree such as a street tree of the present invention on a sidewalk, etc. and ensure a good nurturing condition, the original ground is secured by the case before the sidewalk is paved, and in this state, the pavement of surrounding facilities such as sidewalks can be done Therefore, since the formation of a compacted layer, etc. is excluded on the original ground secured in advance, it is possible to easily plant street trees, which are landscape trees, on the original ground.

그리고, 상술한 방법으로 확보된 원지반 상부에 양질의 토사를 메워서 가로수를 식수함으로써 가로수의 뿌리 내림 환경이 원지반을 통하여 양호하게 진행될 수 있어서 가로수의 원활한 생육 상태가 보장될 수 있다.And, by planting street trees by filling the upper part of the original ground secured by the above-described method, the rooting environment of the roadside trees can proceed well through the original ground, and thus the smooth growth of the roadside trees can be guaranteed.

도 1은 본 발명에 따른 케이스가 배치되는 상태를 나타내는 배치도.
도 2 내지 도 8은 본 발명에 따른 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법을 설명하는 공정도.
도 9 a 내지 도 9e는 본 발명에 따른 케이스의 다양한 실시예를 나타내는 사시도 및 분해사시도.
도 10은 도 8에 이용되는 테두리 부재의 상세 실시예를 나타내는 평면도.
1 is a layout view showing a state in which a case according to the present invention is disposed.
2 to 8 are process diagrams for explaining a planting method for landscape trees that can easily plant a landscape tree such as a street tree according to the present invention on a sidewalk, etc., and ensure a good nurturing state.
9A to 9E are a perspective view and an exploded perspective view illustrating various embodiments of a case according to the present invention.
Fig. 10 is a plan view showing a detailed embodiment of the frame member used in Fig. 8;

본 발명은 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법에 관한 것으로, 원지반을 터파기하여 그 상부에 다짐층을 형성하는 장소에 조경수를 식수하는 방법을 개시하며, 조경수를 식수할 영역에 미리 케이스를 배치하여 원지반을 확보함으로써 케이스가 배치된 영역에는 다짐층이 형성되지 않는다. 케이스 주변에 대한 다짐층 형성과 같은 후차적인 적층 공정이 완료된 후, 케이스 내에 조경 수를 배치하고 케이스를 인출하면서 케이스의 인출에 의하여 형성되는 공간에 조경수의 식생에 필요한 양질의 토사를 메우는 일련의 과정이 진행될 수 있다.The present invention relates to a method of planting landscape trees that can easily plant landscape trees such as street trees on sidewalks, etc. and ensure a good nurturing condition. , a compaction layer is not formed in the area where the case is arranged by arranging the case in advance in the area to be planted with landscape trees to secure the original ground. After the subsequent lamination process such as the formation of a compaction layer around the case is completed, a series of processes of filling in the high-quality soil required for the vegetation of landscape trees in the space formed by taking out the case while placing the landscaping tree in the case and withdrawing the case This can proceed.

조경수 식수의 바람직한 일예로써 가로수를 식수하는 방법의 실시예를 첨부 도면과 더불어 설명한다.An embodiment of a method of planting a street tree as a preferred example of planting a landscape tree will be described in conjunction with the accompanying drawings.

도 1을 참조하면, 조경수로 이용되는 가로수는 인도에 식수되며, 인도는 도로의 변에 구획되고, 통상 도로와 인도는 대리석 또는 콘크리트 재질의 경계석으로 구분된다. 본 발명에 의하여 도 1의 인도에는 가로수 식수를 위한 후술되는 케이스를 배치하여 인도가 포장될 수 있다.Referring to FIG. 1 , a street tree used as a landscape tree is planted on the sidewalk, and the sidewalk is partitioned on the side of the road, and the road and sidewalk are usually divided by a boundary stone made of marble or concrete. According to the present invention, the sidewalk of FIG. 1 can be packaged by arranging a case to be described below for planting street trees.

도 1의 2-2 부분의 단면에 대응되는 식수 방법은 도 2 내지 도 8과 같으며, 이에 대한 구체적인 실시예를 설명한다.The drinking water method corresponding to the cross section of part 2-2 of FIG. 1 is the same as that of FIGS. 2 to 8 , and a specific embodiment thereof will be described.

먼저, 인도를 포함하는 도로를 형성하는 경우 도 2와 같이 인도와 도로를 포함하는 영역의 원지반(10)을 터파기 한다. 원지반(10)의 터파기는 가급적 평평하게 함이 바람직하다.First, when forming a road including a sidewalk, the original ground 10 of the area including the sidewalk and the road is excavated as shown in FIG. 2 . The excavation of the base ground 10 is preferably as flat as possible.

도 2의 터파기 후, 도 3과 같이 도로에 대응되는 영역에 대한 포장이 먼저 이루어진다. 즉, 터파기된 영역에서 도로에 해당하는 원지반(10) 상부에 다짐층(20)을 형성하고, 다짐층(20)의 상부에 인도와 구분을 위한 경계석(22)을 도로 영역의 길이 방향 변부에 설치한다.After the excavation of FIG. 2 , as shown in FIG. 3 , the pavement for the area corresponding to the road is first made. That is, in the excavated area, the compaction layer 20 is formed on the top of the original ground 10 corresponding to the road, and the boundary stone 22 for differentiation from the sidewalk is placed on the upper portion of the compaction layer 20 in the longitudinal direction of the road area. install on

다짐층(20)은 20 내지 40 ㎜ 정도 사이즈의 배수 가능한 골재를 이용함이 바람직하며, 통상 90% 이상의 다짐밀도를 갖도록 다짐 설비를 이용하여 원지반(10) 상부에 적층되는 골재를 다짐하여 형성할 수 있다.The compaction layer 20 is preferably formed by using a drainable aggregate having a size of about 20 to 40 mm, and can be formed by compacting the aggregate stacked on the base plate 10 using a compaction facility to have a compaction density of usually 90% or more. have.

그리고, 다짐층(20)의 두께는 설계자의 의도에 따라 달라질 수 있으나 통상적인 도로 포장에 요구되는 사양의 범위 내의 두께를 갖도록 형성됨이 바람직하다.In addition, the thickness of the compaction layer 20 may vary according to the intention of the designer, but is preferably formed to have a thickness within the range of specifications required for a typical road pavement.

도 3과 같이 도로에 대한 포장을 진행한 후 도 4와 같이 인도를 형성할 영역 중 조경수인 가로수를 식수할 위치에 케이스(30)를 배치한다.After paving the road as shown in FIG. 3 , as shown in FIG. 4 , the case 30 is disposed at a position to plant a street tree, which is a landscape tree, among the areas where the sidewalk is to be formed.

케이스(30)는 터파기한 원지반(10) 상부에 배치할 수 있고, 이와 다르게 터파기한 원지반(10)에 20㎝ 내지 60 ㎝의 깊이의 구덩이를 파서 그 구덩이 내에 배치할 수 있다.The case 30 may be disposed on the excavated base ground 10, and alternatively, a pit with a depth of 20 cm to 60 cm may be dug in the excavated base ground 10 and placed in the pit.

그리고, 도로 영역의 다짐층(20) 상부에는 케이스(30)을 배치하는 것과 별도로 아스콘(24)이 포장될 수 있으 며, 아스콘(24)은 통상적인 도로 포장에 요구되는 사양의 범위 내의 두께를 갖도록 형성됨이 바람직하다.In addition, the asphalt concrete 24 may be paved separately from the arrangement of the case 30 on the top of the compaction layer 20 in the road area, and the asphalt concrete 24 has a thickness within the range of specifications required for conventional road pavement. It is preferably formed to have.

도 4와 같이 케이스(30)가 배치된 후 인도에 대한 포장이 도 5와 같이 진행될 수 있다.After the case 30 is disposed as shown in FIG. 4 , packaging for delivery may proceed as shown in FIG. 5 .

즉, 인도 영역의 원지반(10) 상부의 다짐층(32)은 통상적인 인도 공사에 요구되는 사양의 범위 내의 두께를 갖도록 형성되며, 그 상부에 완충을 위한 모래(34)가 수 내지 수십 ㎝의 두께로 적층된다.That is, the compaction layer 32 on the top of the original ground 10 in the delivery area is formed to have a thickness within the range of specifications required for a typical Indian construction, and the sand 34 for buffering thereon is several to tens of centimeters thick. laminated to thickness.

도 5와 같이 인도에 대한 포장이 진행된 후 인도 상부에는 최종적으로 도 6과 같이 최상층에 블록(36) 등이 포장된다. 여기에서, 블록(36)은 통상 시멘트 계열의 재질로 형성된 것이 많이 이용되나, 제작자의 의도에 따라 다양한 대체 포장 부재로 대체될 수 있음은 자명하다.As shown in FIG. 5, after paving for the sidewalk is carried out, the block 36 and the like are finally paved on the uppermost layer as shown in FIG. 6 on the upper side of the sidewalk. Here, the block 36 is usually formed of a cement-based material, but it is obvious that it can be replaced with various alternative packaging members according to the intention of the manufacturer.

상술한 도 6과 같이 도로와 인도의 포장이 완료되면 케이스(30)로 원지반을 확보한 영역에 도 7과 같이 식수가 이루어진다.When the pavement of the road and sidewalk is completed as in FIG. 6 described above, drinking water is made in the area where the original ground is secured with the case 30 as shown in FIG. 7 .

도 7을 참조하면, 케이스(30) 내에 가로수를 배치하고, 그 후 케이스(30)를 화살표 A 방향으로 인출하며, 케이스(30)가 인출됨에 따라 형성되는 하부 공간에 화살표 B와 같이 양질의 토사(40)로 메우기를 진행한다.Referring to FIG. 7 , a street tree is placed in the case 30 , and then the case 30 is withdrawn in the direction of the arrow A, and good quality soil as shown by the arrow B in the lower space formed as the case 30 is withdrawn Fill in with (40).

이때, 케이스(30) 내에 가로수를 배치하기 전 또는 후에 가로수의 식생에 도움을 주기 위하여 거름이나 부엽토 등을 일정량 투입할 수 있다.At this time, a certain amount of manure, humus, etc. may be input to help the vegetation of the street trees before or after arranging the street trees in the case 30 .

도 7에서 가로수는 도면의 이해를 위하여 도시가 생략되었으나, 그 배치는 도 8을 참조하여 이해할 수 있을 것이다.Although the illustration of the street tree in FIG. 7 is omitted for the understanding of the drawing, the arrangement thereof will be understood with reference to FIG. 8 .

상술한 도 7과 같이 케이스(30)를 인출하면서 토사(40)를 메움으로써 가로수가 식수될 수 있고, 결과적으로도 8과 같은 상태로 식수가 이루어진다.As illustrated in FIG. 7 , street trees can be planted by filling the soil 40 while withdrawing the case 30 , and as a result, the planting is made in the same state as in FIG. 8 .

가로수의 식수가 완료된 상태에서 가로수가 식수된 영역의 보호를 위하여 토사(40)의 상부의 주연부에 테두리 부재(42)가 설치됨이 바람직하다.It is preferable that the rim member 42 is installed at the periphery of the upper portion of the soil 40 to protect the area where the street trees are planted in a state where the planting of the street trees is completed.

상술한 도 2 내지 도 8에서 이용되는 케이스(30)는 도 9a 내지 도 9e와 같이 다양한 형태로 구성될 수 있다.The case 30 used in FIGS. 2 to 8 described above may be configured in various forms as shown in FIGS. 9A to 9E .

먼저, 도 9a의 케이스(30a)를 참조하면, 케이스(30a)는 반원형 실린더 구조를 가지며 곡면을 이루는 단위블록 (30-1)과 평면을 이루는 단위블록(30-2)이 조립된다.First, referring to the case 30a of FIG. 9A , the case 30a has a semicircular cylinder structure, and a curved unit block 30-1 and a flat unit block 30-2 are assembled.

단위블록(30-1, 30-2)들의 내벽에는 눈금선(30a-1)이 형성됨으로써 가로수가 배치되는 깊이나 토사를 메우는 높이를 육안으로 확인하는데 이용될 수 있다. 눈금선(30a-1)은 홈이나 돌출된 형상을 갖는 라인으로 형성될수 있으며 대체로 10㎝ 단위로 이격되게 형성될 수 있다. 그리고, 단위블록(30-1, 30-2)들의 상단 대응되는 위치에 서로 마주보는 관통공들이 인출구(30a-2)로 형성된다.The grid lines 30a-1 are formed on the inner walls of the unit blocks 30-1 and 30-2, so that it can be used to visually confirm the depth at which the street trees are arranged or the height of filling the soil. The grid lines 30a - 1 may be formed as a line having a groove or a protruding shape, and may be formed to be spaced apart by approximately 10 cm. In addition, through-holes facing each other at positions corresponding to the upper ends of the unit blocks 30-1 and 30-2 are formed as the outlets 30a-2.

인출구(30a-2)는 도 7에서 설명된 바와 같이 케이스(30a)를 인출할 때 보다 용이한 인출을 위하여 장비 또는 도구를 이용하는데 이용될 수 있으며, 장비 및 도구의 고리와 같은 걸이 부재가 설치되어 상부로 케이스(30 a)를 끌어올리는데 이용될 수 있다.The withdrawal port 30a-2 may be used to use equipment or tools for easier withdrawal when withdrawing the case 30a as described in FIG. 7 , and a hook member such as a hook of equipment and tools is installed It can be used to raise the case (30 a) to the upper part.

또한, 단위블록(30-1, 30-2)들은 인접한 위치에 형성된 두 개의 체결구(30a-3)를 묶음부(30a-4)로 결합함으로써 조립될 수 있으며, 체결구(30a-3)는 단위블록(30-1, 30-2)들의 변부에 높이 방향의 상부와 하부 등에 분산 되어 형성될 수 있고, 묶음부(30a-4)는 타이 바등과 같이 인접한 한 쌍의 체결구(30a-3)를 관통하여 고정할수 있는 것이 이용될 수 있다.In addition, the unit blocks 30-1 and 30-2 may be assembled by combining two fasteners 30a-3 formed at adjacent positions as a bundle portion 30a-4, and the fasteners 30a-3 may be dispersed on the edges of the unit blocks 30-1 and 30-2 in the upper and lower portions in the height direction, and the bundle portion 30a-4 is a pair of adjacent fasteners 30a- such as a tie bar. 3) through which it can be fixed can be used.

상술한 바와 같이 두 개의 단위블록(30-1, 30-2)이 하나의 케이스(30a)를 이룸으로써, 케이스(30a)는 가로수를 심는 과정 또는 심은 후 인출하여 묶음부(30a-4)를 절단함으로써 분해할 수 있다.As described above, as the two unit blocks 30-1 and 30-2 form one case 30a, the case 30a is drawn out to form a bundle 30a-4 in the process of planting or after planting a street tree. It can be decomposed by cutting.

그리고, 케이스(30a)는 원지반(10) 상에 배치된 상태에서 인도가 포장된 높이보다 10㎝ 내지 50㎝ 더 높은 높이를 갖도록 구성됨이 바람직하며, 주변 토사에 매립된 상태에서 인도 상부로 돌출되는 영역에 인출구(30a-2)가 형성됨이 바람직하다.And, the case 30a is preferably configured to have a height of 10 cm to 50 cm higher than the paved height of the sidewalk in a state disposed on the base plate 10, and protrudes to the upper side of the sidewalk in a state buried in the surrounding soil It is preferable that the outlet 30a-2 is formed in the region.

케이스(30a)의 인출구(30a-2)가 인도 상부로 노출됨으로써 케이스(30a)의 인출을 위한 장비 및 도구의 설치가 보다 쉽게 이루어질 수 있다.Since the take-out port 30a-2 of the case 30a is exposed to the upper side of the sidewalk, equipment and tools for taking out the case 30a can be installed more easily.

한편, 케이스(30a)는 배치된 상태에서 인도의 포장 중에 이물질이나 빗물 등이 직접 투입되는 것을 방지하기 위하여 도 9b와 같이 커버(30a-5)가 구성될 수 있다.On the other hand, in the case 30a, the cover 30a-5 may be configured as shown in FIG. 9B in order to prevent foreign substances or rainwater from being directly injected during packaging in India in the disposed state.

또한, 커버(30a-5)는 케이스(30a)의 상부 입구에 삽입가능한 형상의 삽입부(30a-6)가 더 형성될 수 있으며, 삽입부(30a-6)는 커버(30a-5)의 고정 상태를 지지할 수 있다.In addition, the cover 30a-5 may further include an insertion part 30a-6 having a shape that can be inserted into the upper inlet of the case 30a, and the insertion part 30a-6 is the cover of the cover 30a-5. It can support a fixed state.

그리고, 도 9d와 같이 수평 단면이 장방형상으로 케이스(30b)가 구성될 수 있으며, 도 9d의 케이스(30b)는 ' ㄷ' 형상의 단위블록(30-3, 30-4)들이 조립된 상태를 예시하고 있다. 도 9d의 케이스(30b)도 각각 눈금선 (30b-1), 인출구(30b-2), 체결구(30b-3), 및 커버(30b-5)가 도 9c의 실시예와 유사하게 구성될 수 있으며 이에 대한 구체적인 설명은 생략한다.And, the case 30b may be configured in a rectangular shape with a horizontal cross-section as shown in FIG. 9d , and the case 30b of FIG. 9d is a state in which unit blocks 30-3 and 30-4 in a 'c' shape are assembled. is exemplifying In the case 30b of FIG. 9D , the grid lines 30b-1, the outlet 30b-2, the fastener 30b-3, and the cover 30b-5 are each configured similarly to the embodiment of FIG. 9C. and a detailed description thereof will be omitted.

또한, 도 9e와 같이 수평 단면이 원형상으로 케이스(30c)가 구성될 수 있으며, 도 9e의 케이스(30c)는 반원 형상의 단위블록(30-5)들이 조립된 상태를 예시하고 있다. 도 9e의 케이스(30c)도 각각 눈금선(30c-1), 인출 구(30c-2), 체결구(30c-3), 및 커버(30c-5)가 도 9c의 실시예와 유사하게 구성될 수 있으며 이에 대한 구체적인 설명은 생략한다.In addition, the case 30c may be configured in a circular shape with a horizontal cross section as shown in FIG. 9E , and the case 30c of FIG. 9E illustrates a state in which semicircular unit blocks 30 - 5 are assembled. The case 30c of FIG. 9E is also configured similarly to the embodiment of FIG. 9C in which the grid lines 30c-1, the pull-out hole 30c-2, the fastener 30c-3, and the cover 30c-5 are respectively configured. may be, and a detailed description thereof will be omitted.

그리고, 도시되지 않았으나, 도 9d 및 도 9e의 실시예도 커버에 도 9c의 실시예와 같이 삽입부가 형성될 수있다.Also, although not shown, the insert may be formed on the cover in the embodiment of FIGS. 9D and 9E as in the embodiment of FIG. 9C.

본 발명의 실시예로 예시된 도 9a 내지 도 9e의 단위 블록들은 운반 및 조립의 편리를 위하여 조합된 반원, 장방형 또는 원형에서 보다 세분하거나 다른 형태로 분할된 형상을 가질 수 있다.The unit blocks of FIGS. 9A to 9E exemplified as an embodiment of the present invention may have a shape divided into more subdivisions or other shapes than a semicircle, a rectangle, or a circle combined for convenience of transport and assembly.

그리고, 상술한 케이스(30, 30a, 30b, 30c)는 합성수지, 금속재 또는 시멘트계열의 재질을 가질 수 있으며, 보다 쉬운 인출을 위하여 내면이나 외면 또는 두면 모두 매끄럽게 표면 처리됨이 바람직하다.In addition, the above-mentioned cases 30, 30a, 30b, 30c may have a synthetic resin, a metal material, or a cement-based material, and for easier extraction, it is preferable that the inner surface, the outer surface, or both surfaces be treated smoothly.

한편, 도 8과 같이 조경수인 가로수가 식수된 토사의 상부에는 상술한 바와 같이 테두리 부재(42)가 설치될수 있으며, 테두리 부재(42)는 도 10과 같이 테두리석(42-1)들이 조립된 구조를 가짐이 바람직하며, 이 경우 테두리석(42-1)은 반원형, 장방형 및 원형의 조합된 형상을 갖도록 개별 형상이 결정될 수 있으며, 이들의 재질은 합성수지, 나무, 콘크리트 및 금속재와 같이 다양한 재질로 이루어질 수 있다.On the other hand, as described above, the frame member 42 may be installed on the upper part of the soil where street trees, which are landscape trees, are planted as shown in FIG. It is desirable to have a structure, and in this case, the individual shape of the edge stone 42-1 can be determined to have a combined shape of a semicircle, a rectangle, and a circle, and their material is made of various materials such as synthetic resin, wood, concrete and metal. can be made with

상술한 바와 같이 본 발명에 따른 실시예는 인도에 식수되는 가로수에 하여 설명되었으나, 이에 국한되지 않고 다짐층이 형성되는 다양한 영역에 이용될 수 있음은 자명하며, 이는 본 발명의 상세한 설명 및 특허청구범 위에 기재한 기술적 사항에 포함된다.As described above, the embodiment according to the present invention has been described with respect to a street tree planted in India, but it is not limited thereto and it is obvious that it can be used in various areas where a compacted layer is formed, which is described in the detailed description and claims of the present invention. Included in the technical matters described above.

상술한 본 발명에 의하여 원 지반을 확보한 상태에서 가로수와 같은 조경수가 식수될 수 있으므로 식수가 손쉽게 이루어질 수 있다.According to the present invention described above, in a state in which the original ground is secured, landscape trees such as street trees can be planted, so that planting can be easily performed.

그리고, 원지반이 확보된 상태에서 조경수가 식수됨으로써 원지반으로 배수가 원활하여 조경수의 생육에 최적의 토질이 보장될 수 있고, 조경수가 하부로 뿌리내림에 스트레스를 발생할 수 있는 요인이 배제됨으로써 원활한 생육 상태가 보장될 수 있다.In addition, the optimal soil quality for the growth of landscape trees can be ensured by smooth drainage to the native ground by planting landscape trees in a state in which the native ground is secured, and the factors that may cause stress in the rooting of the landscape trees are excluded, resulting in smooth growth. can be guaranteed.

Claims (8)

가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법에 있어서, 인도와 도로를 형성할 영역에 원지반이 노출되도록 터파기를 수행하는 단계, 상기 터파기된 영역 중 상기 도로에 해당하는 영역에 대하여 다짐층 형성 및 경계석 설치를 순차적으로 수행 하여 상기 도로를 포장하는 단계, 상기 도로의 경계석이 설치된 후 그에 접한 인도의 조경수인 가로수를 식수할 위치에 단위블럭들이 조립되어 수직 관통구가 형성된 케이스를 배치하여 상기 가로수의 식수를 위한 원지반을 확보하는 단계, 상기 케이스가 배치된 영역을 제외한 상기 인도 영역에 다짐층 형성, 모래 적층 및 포장을 순차적으로 진행하여 상기 인도를 포장하는 단계, 상기 인도가 포장된 후 상기 케이스 내부에 상기 가로수를 배치하는 단계, 상기 가로수가 배치된 상태에서 상기 케이스를 인출하면서 상기 케이스가 인출되는 공간에 식생을 위한 토사를 메우는 단계 및 상기 토사가 메워진 상부에 테두리 부재를 설치하여 상기 가로수가 식수된 영역을 보호하는 단계를 포함함을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.In the method of planting landscape trees that can easily plant landscape trees such as street trees on sidewalks, etc. and ensure a good nurturing state, performing excavation so that the original ground is exposed in an area to form a sidewalk and a road, the road among the excavated areas paving the road by sequentially forming a compaction layer and installing a boundary stone for the area corresponding to Step of arranging a case in which a sphere is formed to secure the raw ground for planting the street tree, and paving the sidewalk by sequentially performing compaction layer formation, sand lamination and paving in the sidewalk area except for the area where the case is disposed , arranging the street tree inside the case after the sidewalk is paved, filling the space from which the case is taken out while withdrawing the case in a state in which the street tree is placed, filling soil for vegetation, and the upper part where the soil is filled A landscape tree planting method that can easily plant a landscape tree, such as a street tree, on a sidewalk, etc., and ensure a good nurturing condition, comprising the step of installing a border member on the to protect the area where the street tree is planted. 제 1 항에 있어서, 상기 케이스는 상기 터파기된 상기 원지반에 20㎝ 내지 60㎝의 깊이의 구덩이를 파서 상기 구덩이 내에 배치 하는 것을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.According to claim 1, wherein the case digs a pit with a depth of 20 cm to 60 cm in the excavated original ground, and places it in the pit. Guaranteed way of planting landscape trees. 제 1 항 또는 제 2 항에 있어서, 상기 케이스는 원지반 상에 배치된 상태에서 인도가 포장된 높이보다 10㎝ 내지 50㎝ 더 높은 높이를 갖는 것이 이용되는 것을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.According to claim 1 or 2, wherein the case has a height 10 cm to 50 cm higher than the paved height of the sidewalk in a state disposed on the original ground, landscape trees such as street trees, characterized in that used in the sidewalk, etc. A method of planting landscape trees that can be easily planted and ensure good growth conditions. 제 1 항에 있어서, 상기 케이스는 인출된 후 상기 단위 블럭 별로 해체되는 단계를 더 포함하는 것을 특징으로하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.The method of claim 1, wherein the case further comprises the step of dismantling for each unit block after the case is withdrawn. 다짐층을 형성하기 위하여 원지반이 노출되도록 터파기를 수행하는 단계, 조경수를 식수할 위치에 단위 블럭들이 조립되어서 수직 관통구가 형성된 케이스를 배치하여 상기 조경수를 식수할 원지반을 확보하는 단계, 상기 케이스가 배치된 영역을 제외한 영역에 상기 원지반 상부에 다짐층과 상부층을 순차적으로 적층하는 단계, 상기 다짐층과 상기 상부층의 순차적인 적층이 완료된 후 상기 케이스 내부에 가로수를 배치하는 단계, 상기 조경수가 배치된 상태에서 상기 케이스를 인출하면서 상기 케이스가 인출되는 공간에 식생을 위한 토사를 메우는 단계 및 상기 토사가 메워진 상부에 테두리 부재를 설치하여 상기 조경수가 식수된 영역을 보호하는 단계를 포함함을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.Performing excavation to expose the raw ground to form a compaction layer, securing the raw ground for planting the landscape trees by arranging a case in which unit blocks are assembled at a position to plant a landscape tree and a vertical through hole is formed, the case Laying a compacted layer and an upper layer sequentially on the upper part of the base in an area other than the arranged area, arranging a street tree inside the case after the sequential lamination of the compacted layer and the upper layer is completed, the landscape tree is disposed Filling in soil for vegetation in the space from which the case is taken out while withdrawing the case from the state, and installing a rim member on the top of the filled soil to protect the area where the landscape trees are planted. A landscape tree planting method that can easily plant landscape trees, such as street trees, on sidewalks, etc., and ensure good nurturing conditions. 제 5 항에 있어서, 상기 케이스는 상기 터파기된 상기 원지반에 20㎝ 내지 60㎝의 깊이의 구덩이를 파서 상기 구덩이 내에 배치 하는 것을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.The method according to claim 5, wherein the case digs a pit with a depth of 20 cm to 60 cm in the excavated base ground and places it in the pit. Guaranteed way of planting landscape trees. 제 5 항 또는 제 6 항에 있어서, 상기 케이스는 원지반 상에 배치된 상태에서 인도가 포장된 높이보다 10㎝ 내지 50㎝ 더 높은 높이를 갖는 것이 이용되는 것을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.According to claim 5 or 6, wherein the case has a height 10 cm to 50 cm higher than the paved height of the sidewalk in a state disposed on the original ground, landscape trees such as street trees characterized in that it is used A method of planting landscape trees that can be easily planted and ensure good growth conditions. 제 5 항에 있어서, 상기 케이스는 인출된 후 상기 단위 블럭 별로 해체되는 단계를 더 포함하는 것을 특징으로 하는 가로수와 같은 조경수를 인도 등에 쉽게 심고, 양호한 육성 상태를 보장할 수 있는 조경수 식수 방법.[6] The method of claim 5, wherein the case further comprises the step of dismantling for each unit block after the case is withdrawn.
KR1020200079669A 2020-06-29 2020-06-29 A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions KR20220001388A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200079669A KR20220001388A (en) 2020-06-29 2020-06-29 A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200079669A KR20220001388A (en) 2020-06-29 2020-06-29 A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions

Publications (1)

Publication Number Publication Date
KR20220001388A true KR20220001388A (en) 2022-01-05

Family

ID=79349013

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200079669A KR20220001388A (en) 2020-06-29 2020-06-29 A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions

Country Status (1)

Country Link
KR (1) KR20220001388A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115843654A (en) * 2022-09-19 2023-03-28 北京市园林绿化科学研究院 Street tree planting soil structure and planting method suitable for cold regions

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115843654A (en) * 2022-09-19 2023-03-28 北京市园林绿化科学研究院 Street tree planting soil structure and planting method suitable for cold regions

Similar Documents

Publication Publication Date Title
US8282310B2 (en) Paver installation system
KR100813236B1 (en) The structure for a slope reinforcement and eco slope reinforcement method
KR101290672B1 (en) Tree protector for vegetation
CN103669291B (en) The construction method of articulated revetment brick bank protection
EP2398969A1 (en) Modular block
Jim Constraints to urban trees and their remedies in the built environment
CN110800415A (en) Ecological treatment method in Qinba mountain land remediation engineering
EP2047033A1 (en) Support member or reinforcement for use in earthworks
KR20220001388A (en) A method of planting landscaping water that can easily plant landscaping trees such as street trees, etc., and ensure good growth conditions
CN103290911A (en) Ecological reinforced concrete drainage ditch and construction method thereof
CN102493485B (en) Method for building slope protection retaining wall during filling
KR100945473B1 (en) Cast-in-place plant block and its constructing method
CN105178134B (en) Road green color transformation method
KR101158973B1 (en) Method for setting a a landscape-tree and case using the same
GB2488685A (en) Method of adapting a pavement
KR20060122367A (en) Tree pot and method of plant
KR100593187B1 (en) A slope protection equipment for road
JP5270748B2 (en) Planting base structure
CN106718596B (en) Deep water replenishing and rejuvenating device for street trees and construction method and application
JPH047207Y2 (en)
CN217997963U (en) Vegetation type concrete ecological slope protection
CN219604278U (en) Natural revetment structure of grass slope income water
KR101335543B1 (en) Plantable gabion and construction method thereof
CN214628404U (en) Afforestation cultivation device
CN211210816U (en) Landscape district tree planting cultivation structure