KR20210145429A - Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line - Google Patents

Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line Download PDF

Info

Publication number
KR20210145429A
KR20210145429A KR1020200062306A KR20200062306A KR20210145429A KR 20210145429 A KR20210145429 A KR 20210145429A KR 1020200062306 A KR1020200062306 A KR 1020200062306A KR 20200062306 A KR20200062306 A KR 20200062306A KR 20210145429 A KR20210145429 A KR 20210145429A
Authority
KR
South Korea
Prior art keywords
bushing
work
replacement
ground switch
power transmission
Prior art date
Application number
KR1020200062306A
Other languages
Korean (ko)
Other versions
KR102375023B1 (en
Inventor
김주현
박기옥
하보현
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020200062306A priority Critical patent/KR102375023B1/en
Publication of KR20210145429A publication Critical patent/KR20210145429A/en
Application granted granted Critical
Publication of KR102375023B1 publication Critical patent/KR102375023B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/004Arrangements for interchanging inductances, transformers or coils thereof
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F29/00Variable transformers or inductances not covered by group H01F21/00
    • H01F29/02Variable transformers or inductances not covered by group H01F21/00 with tappings on coil or winding; with provision for rearrangement or interconnection of windings
    • H01F29/04Variable transformers or inductances not covered by group H01F21/00 with tappings on coil or winding; with provision for rearrangement or interconnection of windings having provision for tap-changing without interrupting the load current
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • H02G7/053Suspension clamps and clips for electric overhead lines not suspended to a supporting wire

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Insulators (AREA)

Abstract

In a ground switch PT replacement standardization method using a temporary power transmission device (1) of the present invention, if a potential transformer (PT) (140) of a ground switch (100) is defective or damaged, one among an electrical equipment ceasefire response (S20, S30-S50/S30-1, S30-2, S100), temporary power transmission establishment (S60-1), replacement of defective PT on-site (S70), and on-site inspection of defective PT (S80) is selected based on a standard operation manual. In a temporary transmission establishment state using the temporary power transmission device (1), defective PT field replacement (S70) is on-site constructed according to a work procedure of the standard operation manual. Thus, it is possible to improve the safety/efficiency of the PT replacement work and minimize the power outage time. In particular, through the establishment of a standard operation manual of the PT replacement standardization method, a usable switchgear is reused without waste disposal, eliminating waste factors, extending the life of equipment and maximizing the effect of use, and implementing the characteristics of economical power distribution facility construction.

Description

임시송전장치를 이용한 지상 개폐기 PT 교체 표준화 공법{Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line}Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line

본 발명은 지상 개폐기의 PT(Potential Transformer) 교체에 관한 것으로, 특히 PT 교체 표준화 공법 정립을 통해 지상 개폐기의 정전시간이 요구되던 작업 환경이 개선되면서 PT 교체만으로 사용가능한 PT 본체가 폐품 처리되지 않는 임시송전장치를 이용한 지상 개폐기 PT 교체 표준화 공법에 관한 것이다.The present invention relates to PT (Potential Transformer) replacement of ground switchgear. In particular, through the establishment of a PT replacement standardization method, the working environment that required blackout time for ground switchgear is improved, and the PT body that can be used only by PT replacement is not disposed of as a temporary waste. It is related to the standardization method of replacing the ground switch PT using a power transmission device.

일반적으로 지상 개폐기는 자동화개폐기로 22.9㎸-y 3상 지중 배전선로에 설치되고, 원격 또는 현장의 통합 단말장치에서 개폐조작을 하기 위하여 내부 전원 공급 장치(Potential Transformer)(이하 PT(Potential Transformer))로부터 전원을 공급받아야 하고, 공급된 전원은 제어함 내에 있는 제어전원용 축전지를 충전시켜 제어케이블을 통하여 개폐에 필요한 전원을 상시 공급받아야 하는 설비이다.In general, ground switchgear is an automatic switchgear and is installed on a 22.9kV-y three-phase underground distribution line, and an internal power supply (Potential Transformer) (hereinafter referred to as PT (Potential Transformer)) Power must be supplied from the power supply, and the supplied power is a facility that requires constant supply of power for opening and closing through the control cable by charging the control power storage battery in the control box.

일례로 상기 PT는 1차 전압 13,200[V]를 2차 전압 220[V]로 변환하여 단말장치에 전원을 공급하는 장치로서, 해당 개폐기의 정전시간을 가져오는 절연불량에 의한 소손을 발생시킬 수 있다.For example, the PT is a device that supplies power to a terminal device by converting a primary voltage of 13,200 [V] into a secondary voltage of 220 [V]. have.

그러므로 상기 PT는 PT 소손 시 그 교체 작업 동안 해당 개폐기에 대한 정전시간이 최대한 단축되는 지상 개폐기 PT 교체공법을 적용하고 있다.Therefore, the PT applies a ground switch PT replacement method that shortens the blackout time for the corresponding switch as much as possible during the replacement operation when the PT is damaged.

국내공개특허 10-2019-0138501(2019년12월13일)Domestic Patent Publication 10-2019-0138501 (December 13, 2019)

하지만, 기존의 지상 개폐기 PT 교체공법은 상시 전원 공급에 필요한 PT의 교체에 따른 해당 개폐기의 정전시간이 과도하게 소요되고 있으며, PT 교체공법이 표준화되지 못하여 정전시간을 감소하는데 역부족이라는 근본적인 문제를 가지고 있다.However, the existing ground switch PT replacement method takes excessive power outage time due to the replacement of the PT required for constant power supply, and the PT replacement method is not standardized, so it has a fundamental problem that it is insufficient to reduce the blackout time have.

특히 기존의 지상 개폐기 PT 교체공법은 지상개폐기 제어전원 공급용 PT의 소손에 대한 교체공법과 작업절차 부재로 인해 단순 PT 교체만으로 사용 가능한 지상 개폐기를 폐품 처리함으로써 기자재 수명 연장 및 활용 효과가 낮은 낭비요인도 갖고 있다.In particular, the existing ground switch PT replacement method is a waste factor that extends the lifespan of equipment and has a low utilization effect by disposing of ground switches that can be used only by simple PT replacement due to the absence of a replacement method and work procedure for the burnout of the PT for supplying ground switch control power. also have

이에 상기와 같은 점을 감안한 본 발명은 PT 소손 하에서도 임시송전 장치로 PT의 송전 기능을 유지한 채로 PT 교체 적업이 이루어짐으로써 작업의 안전성과 효율성을 동시에 향상시키면서 해당 지상 개폐기의 정비 후 정상화까지 소요되는 정전시간을 최대한 감소시켜 주고, 특히 PT 교체 표준화 공법이 표준 작업 매뉴얼로 정립되어 단순 PT 교체만으로 사용 가능한 개폐기를 폐품 처리하고 있는 현재의 낭비요인도 제거함으로써 기자재 수명연장 및 활용효과 극대화를 통한 경제적인 배전설비 구축이 가능한 임시송전장치를 이용한 지상 개폐기 PT 교체 표준화 공법의 제공에 목적이 있다.Therefore, in consideration of the above points, the present invention is a temporary power transmission device that maintains the power transmission function of the PT as a temporary power transmission device even under the PT burnout, thereby improving the safety and efficiency of the work at the same time, while also requiring normalization after maintenance of the ground switch. It reduces the power outage time as much as possible, and in particular, the PT replacement standardization method has been established as a standard operation manual, so it is economical by extending the lifespan of equipment and maximizing the effect of use by eliminating the waste factor that is currently disposing of switchgear that can be used only by simple PT replacement. The purpose of this is to provide a standardized method for replacing ground switch PT using a temporary power transmission device capable of constructing a power distribution facility.

상기와 같은 목적을 달성하기 위한 본 발명의 지상 개폐기 PT 교체 표준화 공법은 지상 개폐기에서 의 PT 불량 확인이 이루어지는 단계, 및 상기 PT 불량 확인 후, 표준 작업 매뉴얼에 기반 하여 전기설비 휴전 확립, 임시송전대응, 불량 PT 현장 교체가 이루어지는 PT 교체 작업 절차 수행 및 불량 PT 현장 점검이 이루어지는 PT 점검 작업 절차 수행중 어느 하나를 선택하고, 상기 표준 작업 매뉴얼의 작업 절차가 현장에서 시공되는 단계가 포함되는 것을 특징으로 한다.The ground switch PT replacement standardization method of the present invention for achieving the above object is a step in which the PT defect is confirmed in the ground switch, and after the PT defect is confirmed, an electrical facility truce is established based on the standard operation manual, and a temporary power transmission response , selecting any one of performing a PT replacement work procedure in which a defective PT on-site replacement is made and a PT inspection work procedure in which a defective PT on-site inspection is made, and the step of constructing the work procedure of the standard work manual on site do.

다른 한편으로 상기와 같은 목적을 달성하기 위한 본 발명의 지상 개폐기 PT 교체 표준화 공법은 지상 개폐기의 PT에 대한 PT 불량 확인이 이루어지는 단계, 주변 설비의 휴전에 대한 휴전 협의 작업절차가 요구되지 않을 때 상기 지상 개폐기에 대한 현장 실시 작업절차가 이루어지는 단계, PT 자재 보유 시 상기 지상 개폐기에 대한 임시송전장치의 시공으로 임시송전확립 후 상기 불량 PT를 교체해주는 PT 교체 작업 절차가 이루어지는 단계, 및 PT 자재 미 보유 시 상기 지상 개폐기에 대한 절연 캡의 시공 후 상기 불량 PT를 점검해주는 PT 점검 작업 절차가 이루어지는 단계가 포함되는 것을 특징으로 한다.On the other hand, in the ground switch PT replacement standardization method of the present invention for achieving the above object, when the PT defect check for the PT of the ground switch is made, the truce consultation work procedure for the truce of the surrounding facilities is not required. A step of performing on-site work procedures for ground switchgear, a step of performing a PT replacement work procedure that replaces the defective PT after temporary power transmission is established with the construction of a temporary power transmission device for the ground switch when holding PT materials, and non-owned PT materials It is characterized in that it includes a step of performing a PT check operation procedure for checking the defective PT after the construction of the insulation cap for the ground switch.

바람직한 실시예로서, 상기 전기설비 휴전 대응의 단계는, 상기 지상 개폐기의 일시적인 정전 발생에 대응하는 현장 실시 작업절차 및 상기 지상 개폐기의 고장 발생에 대응하는 휴전 협의 작업절차로 구분된다.As a preferred embodiment, the step of responding to the truce of the electrical equipment is divided into a field-implemented work procedure corresponding to the occurrence of a temporary blackout of the ground switch and a work procedure for truce consultation corresponding to the occurrence of a failure of the ground switch.

바람직한 실시예로서, 상기 현장 실시 작업절차의 단계는, 상기 PT의 PT 일시 고장에 대해 선로부하절체가 이루어지는 단계, 및 개폐기 사선 상태가 확립되는 단계로 수행된다.As a preferred embodiment, the steps of the field-implemented work procedure are performed with a line load changeover for a PT temporary failure of the PT, and a step with establishing a switchgear oblique state.

바람직한 실시예로서, 상기 휴전 협의 작업절차의 단계는, 전기시설 담당기관을 통해 작업 현장 휴전이 이루어지는 단계, 작업 현장에 대한 휴전 일정 확립이 이루어지는 단계, 및 휴전 일정 미 확립으로 지상 개폐기 PT 교체 작업 중단이 이루어지는 단계로 수행된다.As a preferred embodiment, the steps of the truce consultation work procedure include a step in which a work-site truce is made through an electrical facility in charge, a step in which a cease-fire schedule is established for the work site, and a ground switch PT replacement work is stopped due to the non-establishment of the cease-fire schedule This is carried out in the following steps.

바람직한 실시예로서, 상기 작업 현장 휴전의 단계 및 상기 휴전 일정 확립의 단계는 상기 현장 실시 작업절차의 단계로 전환된다.In a preferred embodiment, the steps of the operation site ceasefire and the establishment of the ceasefire schedule are converted into the phases of the field implementation work procedure.

바람직한 실시예로서, 상기 현장 실시 작업절차는 작업 순번을 포함하고, 상기 작업 순번 중 작업 순번#1은 작업구간/내용설명/임무부여의 안전회의 시행, 작업 순번#2는 안전구호 제창/교통통제/보행자유도 확립, 작업 순번#3은 자재와 공구배치/라바콘 설치/안전입간판 설치, 작업 순번#4는 활선고무절연장갑/배전자동화 개폐기 PT/임시송전장치/절연 캡/기타 관련공구 확인, 작업 순번#5는 개폐기 사선상태 유지를 통한 검전에 대한 작업 표준이 제시된다.As a preferred embodiment, the on-site work procedure includes a work order number, and work order #1 among the work order numbers is the execution of a safety meeting of work section/content description/mission assignment, and work order #2 is safety slogan proposal/traffic control /Pedestrian freedom establishment, work order #3 is material and tool arrangement/labor cone installation/safety signboard installation, work order #4 is live wire rubber insulated gloves/distribution automation switch PT/temporary power transmission device/insulation cap/other related tools check, work In sequence #5, the working standard for electric detection by maintaining the switch's oblique state is presented.

바람직한 실시예로서, 상기 임시송전확립의 단계는, 상기 PT 불량을 대체할 PT 자재 보유가 확인되는 단계, 상기 지상 개폐기의 특 고압 부싱이 분리되는 단계, 상기 특 고압 부싱이 임시송전 절연부싱과 결합된 상태에서 이탈방지 클램프가 체결되는 단계, 개폐기 투입이 이루어지는 단계, 및 임시송전이 이루어지는 단계로 수행된다.As a preferred embodiment, the step of establishing the temporary power transmission is a step in which it is confirmed that the PT material to replace the PT defect is secured, the special high voltage bushing of the ground switch is separated, the special high voltage bushing is combined with the temporary power transmission insulating bushing It is carried out in a step in which the escape prevention clamp is fastened in the closed state, a step in which the switch is put in, and a step in which temporary power transmission is made.

바람직한 실시예로서, 상기 불량 PT 현장 교체의 단계는, 상기 지상 개폐기의 접지단자 접지가 이루어지는 단계, 상기 지상 개폐기의 상기 PT 측 1차 부싱의 분리가 이루어지는 단계, 상기 1차 부싱에 대한 충전전류가 방전되는 단계, 먼지 침투 방지를 위해 상기 1차 부싱에 대한 보호 처리가 이루어지는 단계, 상기 PT 측 2차 부싱의 분리 및 보호 처리가 이루어지는 단계, 상기 PT의 분리 후 새로운 PT로 교체되는 단계, 및 상기 1차 부싱과 상기 2차 부싱이 분리의 역순으로 조립된 후 상기 지상 개폐기가 운전되는 단계로 수행된다.As a preferred embodiment, the step of replacing the defective PT on-site includes the steps of grounding the ground terminal of the ground switch, separating the PT-side primary bushing of the ground switch, and charging current for the first bushing. Discharging, protecting the primary bushing to prevent dust penetration, separating and protecting the secondary bushing on the PT side, replacing the PT with a new PT after separating the PT, and the After the primary bushing and the secondary bushing are assembled in the reverse order of separation, the above ground switch is operated.

바람직한 실시예로서, 상기 불량 PT 현장 교체는 작업 순번을 포함하고, 상기 작업 순번 중 작업 순번#1은 상기 지상 개폐기의 접지 시행, 작업 순번#2는 상기 PT 쪽 1차 부싱의 분리 및 보호, 작업 순번#3은 상기 PT 쪽 2차 부싱의 분리 및 보호, 작업 순번#4는 신규 PT 제품 확보에 따른 PT 본체 철거/신설, 작업 순번#5는 제어전원 케이블 연결, 작업 순번#6은 세척포를 이용한 부싱부 세척, 작업 순번#7은 절연 구리스 도포 작업, 작업 순번#8은 상기 1차 부싱과 상기 2차 부싱 결합, 작업 순번#9는 접지단자 연결, 작업 순번#10은 제어전원 케이블 연결, 작업 순번#11은 PT 교체 후 연동시험 및 운전상태 확인, 작업 순번#12는 교체 PT의 2차 전압 측정, 작업 순번#13은 작업 장소 주변청소 및 정리정돈에 대한 작업 표준이 제시된다.As a preferred embodiment, the replacement of the defective PT on-site includes a work sequence number, the work sequence number #1 among the work sequence numbers is grounding of the ground switch, and the operation sequence #2 is the separation and protection of the PT side primary bushing, work Sequence number #3 is the separation and protection of the secondary bushing on the PT side, operation sequence #4 is the removal/installation of the PT body according to the securing of new PT products, operation sequence #5 is the control power cable connection, and operation sequence #6 is the cleaning cloth. Washing of the bushing used, work sequence #7 is insulation grease application, operation sequence #8 is the combination of the primary and secondary bushings, operation sequence #9 is ground terminal connection, operation sequence #10 is control power cable connection, Work order #11 is the interlocking test and operation status check after PT replacement, work order #12 is the secondary voltage measurement of the replacement PT, and work order #13 is the work standard for cleaning and arranging around the work area.

바람직한 실시예로서, 상기 불량 PT 현장 점검의 단계는, 상기 지상 개폐기의 접지단자 접지가 이루어지는 단계, 상기 지상 개폐기의 상기 PT 측 1차 부싱의 분리가 이루어지는 단계, 상기 1차 부싱에 대한 충전전류가 방전되는 단계, 먼지 침투 방지를 위해 상기 1차 부싱에 대한 보호 처리가 이루어지는 단계, 상기 PT 측 2차 부싱의 분리 및 보호 처리가 이루어지는 단계, 상기 PT가 분리되는 단계, 분리된 PT 연결 케이블 보관, 세척포를 이용한 부싱부 세척 및 절연 구리스 도포 후 상기 지상 개폐기의 특 고압 부싱에 대한 절연 캡이 시공되는 단계, 상기 지상 개폐기에 대한 수동운전이 이루어지는 단계로 수행된다.As a preferred embodiment, in the step of inspecting the defective PT on-site, the ground terminal of the ground switch is grounded, the separation of the PT side primary bushing of the ground switch is made, and the charging current for the first bushing is Discharging, protecting the primary bushing to prevent dust penetration, separating and protecting the secondary bushing on the PT side, separating the PT, storing the separated PT connection cable, After cleaning the bushing using a washing cloth and applying insulating grease, an insulating cap for the special high-voltage bushing of the above-ground switch is installed, and a manual operation for the above-ground switch is performed.

바람직한 실시예로서, 상기 수동운전 후 상기 전기설비 휴전 대응의 휴전 협의 작업절차 단계로 전환된다.As a preferred embodiment, after the manual operation, the truce consultation operation procedure step is switched to the electrical equipment truce response.

바람직한 실시예로서, 상기 불량 PT 현장 점검은 작업 순번을 포함하고, 상기 작업 순번 중 작업 순번#1은 상기 지상 개폐기의 접지 시행, 작업 순번#2는 상기 PT 쪽 1차 부싱의 분리 및 보호, 작업 순번#3은 상기 PT 쪽 2차 부싱의 분리 및 보호, 작업 순번#4-1은 PT 연결 케이블 분리/보관, 세척포를 이용하여 붓싱부 세척, 절연 구리스 도포, 절연 캡 시공, 작업 순번#4-2는 상기 PT 분리 후 절연 캡의 이상 유무 확인에 대한 작업 표준이 제시된다.As a preferred embodiment, the defective PT on-site inspection includes a work order number, work order #1 among the work order numbers is grounding of the ground switch, and work order #2 is the separation and protection of the PT side primary bushing, work Sequence #3 is the separation and protection of the secondary bushing on the PT side, work sequence #4-1 is separation/storage of the PT connection cable, cleaning the bushing using a cleaning cloth, applying insulating grease, installing the insulating cap, and working sequence #4 In -2, the working standard for checking whether the insulation cap is abnormal after the PT separation is presented.

그리고 상기와 같은 목적을 달성하기 위한 본 발명의 임시송전장치는 지상 개폐기의 특 고압 부싱과 결합되어 PT의 소손 상태에서 PT 1차 절연부싱으로 기능하는 임시송전 절연부싱, 및 상기 임시송전 절연부싱과 체결되어 상기 특 고압 부싱에 대한 고정력을 형성 해주는 이탈방지 클램프가 포함되는 것을 특징으로 한다.And the temporary power transmission device of the present invention for achieving the above object is a temporary power transmission insulation bushing that functions as a PT primary insulation bushing in the state of PT burnout by being combined with a special high voltage bushing of a ground switch, and the temporary transmission insulation bushing and It is characterized in that it includes an anti-separation clamp that is fastened to form a fixing force for the special high-pressure bushing.

바람직한 실시예로서, 상기 임시송전 절연부싱은 엘보 구조로 이루어진 절연부싱 바디, 상기 이탈방지 클램프와 결합되는 클램프 고리, 및 상기 특 고압 부싱을 가리면서 결합되는 부싱 커버로 구성되며; 상기 이탈방지 클램프는 상기 클램프 고리와 결합되는 클램프 바디, 상기 절연부싱 바디를 고정하는 힌지 클램프, 및 상기 특 고압 부싱 쪽으로 스프링 탄성력을 가하는 스프링으로 구성된다.As a preferred embodiment, the temporary power transmission insulating bushing is composed of an insulating bushing body made of an elbow structure, a clamp ring coupled to the escape prevention clamp, and a bushing cover coupled to cover the special high-voltage bushing; The anti-separation clamp includes a clamp body coupled to the clamp ring, a hinge clamp for fixing the insulating bushing body, and a spring for applying a spring elastic force toward the special high-pressure bushing.

바람직한 실시예로서, 상기 부싱 커버에는 상기 특 고압 부싱과 결합되는 부싱 연결단자가 돌출된다. 상기 스프링은 상기 클램프 바디의 좌우에 각각 구비된 코일 스프링이다.As a preferred embodiment, a bushing connection terminal coupled to the special high-pressure bushing protrudes from the bushing cover. The springs are coil springs respectively provided on the left and right sides of the clamp body.

이러한 본 발명의 임시송전 장치를 이용한 지상 개폐기 PT 교체 표준화 공법은 하기와 같은 작용 및 효과를 구현한다.The ground switch PT replacement standardization method using the temporary power transmission device of the present invention implements the following actions and effects.

첫째, PT 전환 장치로 임시송전을 유지함으로써 지상개폐기에서 PT 만 별도로 교체하는 표준화 공법이 표준 작업 매뉴얼로 정립될 수 있다. 둘째, PT 교체 표준화 공법을 통해 PT만 별도로 교체함으로써 지상 개폐기 교체 시까지 불가피하게 발생되던 정전 문제가 간단한 작업만으로 해결될 수 있다. 셋째, 사용 가능한 지상 개폐기를 폐품 처리하지 않고 절연불량에 의한 PT 고장 발생 시 PT 만 단순 교체함으로써 기자재 수명연장 및 활용효과 극대화를 통한 경제적인 배전설비 구축이 가능하며, 또한 정전시간 감소와 작업의 안전성, 효율성을 동시에 향상시킴으로써 경쟁상 이점도 매우 큰 기술적인 장점이 있다. 넷째, 임시송전을 유지해 주는 PT 전환 장치가 이용됨으로써 해당 지상 개폐기 교체 또는 PT 교체시까지 불가피하게 발생되는 정전시간을 최소화하기 위한 추가적인 기술개발 없이도 현장에서 즉시 활용이 가능하다. 다섯째, PT 만 별도로 교체하는 표준화 공법 정립으로 정전시간 획기적 단축과 안전이 최우선 되어야 하는 작업현장을 조성할 수 있어 지속적인 사용이 가능하다.First, by maintaining temporary power transmission with the PT conversion device, the standardization method of separately replacing only the PT in the ground switch can be established as a standard operation manual. Second, by replacing only the PTs separately through the PT replacement standardization method, the blackout problem that inevitably occurred until the ground switch was replaced can be solved with a simple operation. Third, by simply replacing the PT in the event of a PT failure due to poor insulation without disposing of the usable ground switch, it is possible to build an economical power distribution facility by extending the lifespan of equipment and maximizing the utilization effect, and also reduces the power outage time and safety of work By simultaneously improving the efficiency, the competitive advantage is also a very large technical advantage. Fourth, since the PT conversion device that maintains temporary power transmission is used, it can be used immediately in the field without additional technology development to minimize the inevitably blackout time until the corresponding ground switch or PT replacement. Fifth, by establishing a standardized method of replacing only PTs separately, it is possible to create a work site where power failure time is drastically reduced and safety is the top priority, so continuous use is possible.

도 1은 본 발명에 따른 지상 개폐기 PT 교체 표준화 공법의 순서도이고, 도 2는 본 발명에 따른 지상 개폐기 PT 교체 표준화 공법에 적용되는 임시송전장치를 구성하는 임시송전 절연부싱과 이탈방지 클램프의 구성도이며, 도 3은 본 발명에 따른 임시송전 절연부싱과 이탈방지 클램프가 지상개폐기의 특고압 부싱과 결합되는 상태이고, 도 4는 본 발명에 따른 지상 개폐기의 불량 PT 발생의 예이며, 도 5는 본 발명에 따른 지상 개폐기 PT 불량 시 현장 실시 작업절차 표준화 작업 상태이고, 도 6은 본 발명에 따른 임시송전 절연부싱과 이탈방지 클램프가 지상 개폐기의 임시송전을 수행하는 상태이며, 도 7은 본 발명에 따른 PT 교체 작업 절차의 수행 순서도이고, 도 8 내지 도 10은 본 발명에 따른 PT 교체 작업 절차의 표준화 작업 상태이며, 도 11은 본 발명에 따른 PT 점검 작업 절차의 수행 순서도이고, 도 12는 본 발명에 따른 PT 점검 작업 절차의 표준화 작업 상태이다.1 is a flowchart of a ground switch PT replacement standardization method according to the present invention, and FIG. 2 is a configuration diagram of a temporary power transmission insulation bushing and separation prevention clamp constituting a temporary power transmission device applied to a ground switch PT replacement standardization method according to the present invention 3 is a state in which the temporary power transmission insulation bushing and the separation prevention clamp according to the present invention are combined with the extra-high voltage bushing of the ground switchgear, and FIG. 4 is an example of the occurrence of defective PT in the ground switch according to the present invention, FIG. According to the present invention, when the ground switch PT is defective, the on-site work procedure standardization work state, FIG. 6 is a state in which the temporary power transmission insulation bushing and the departure prevention clamp according to the present invention perform temporary power transmission of the ground switchgear, and FIG. 7 is the present invention is a flow chart of the PT replacement operation procedure according to , FIGS. 8 to 10 are the standardization operation status of the PT replacement operation procedure according to the present invention, FIG. 11 is a flowchart of the PT inspection operation procedure according to the present invention, and FIG. It is a standardization work state of the PT inspection work procedure according to the present invention.

이하 본 발명의 실시 예를 첨부된 예시도면을 참조로 상세히 설명하며, 이러한 실시 예는 일례로서 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 여러 가지 상이한 형태로 구현될 수 있으므로, 여기에서 설명하는 실시 예에 한정되지 않는다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying illustrative drawings, and since these embodiments are examples, those of ordinary skill in the art to which the present invention pertains may be implemented in various different forms. It is not limited to the embodiment.

도 1을 참조하면, 지상 개폐기 PT 교체 표준화 공법은 배전지능화 지상개폐기의 PT(Potential Transformer) 고장(또는 불량 또는 소손) 확인(S10~S20) 후 표준 작업 매뉴얼에 기반 하여 전기설비 휴전 대응(S20,S30~S50/S30-1,S30-2,S100), 임시송전확립(S60-1), 불량 PT 현장 교체가 이루어지는 PT 교체 작업 절차 수행(S70) 및 불량 PT 현장 점검이 이루어지는 PT 점검 작업 절차 수행(S80) 중 어느 하나를 선택하고, 표준 작업 매뉴얼의 작업 절차가 현장에서 시공되어 수행된다.Referring to Figure 1, the ground switch PT replacement standardization method is based on the standard operation manual after confirming the PT (Potential Transformer) failure (or defective or damaged) of the distribution intelligent ground switch (S10 ~ S20) to respond to the truce of electrical equipment (S20, S30~S50/S30-1,S30-2,S100), temporary power transmission establishment (S60-1), PT replacement work procedure for defective PT on-site replacement (S70), and PT inspection work procedure for defective PT on-site inspection Any one of (S80) is selected, and the work procedure of the standard work manual is constructed and performed on site.

특히 상기 표준 작업 매뉴얼은 주변 전기시설의 전기 공급이 중단되는 휴전 협의 작업절차(S20,S30-1,S30-2,S100)가 아닌 상태에서 현장 실시 작업절차(S20,S30~S50)로 진행함으로써 PT 자재 보유(S60) 시 임시송전확립(S60-1) 후 PT 교체 작업 절차(S70)를 수행하거나 또는 PT 자재 미 보유(S60) 시 PT 점검 작업 절차(S80)를 수행하도록 작업 절차가 구분된다.In particular, the standard work manual is not the truce consultation work procedure (S20, S30-1, S30-2, S100) in which the electricity supply to the surrounding electrical facilities is stopped, but the on-site work procedure (S20, S30~S50). The work procedure is divided to perform the PT replacement work procedure (S70) after temporary transmission establishment (S60-1) when holding the PT material (S60), or to perform the PT check work procedure (S80) when the PT material is not held (S60). .

따라서 상기 지상 개폐기 PT 교체 표준화 공법은 PT 교체 작업 절차(S70) 및 PT 점검 작업 절차(S80)로 제어전원 공급용 PT 교체 작업절차 기준을 확립함으로써 교체절차부재로 인한 작업 시 접지간 정전유도에 의한 안전사고 예방 및 불필요한 개폐기 교체 방지로 기자재 수명연장 및 활용효과 극대화로 경제적인 배전설비를 구축할 수 있고, 특히 PT 1차 절연부싱 및 스프링 고정형 엘보 이탈방지 클램프(도 2 내지 도 3 참조)를 교체 장비로 사용하여 소손된 PT가 신속히 분리됨으로써 최단 시간에 임시송전이 가능한 상태를 형성해 줄 수 있다.Therefore, the above ground switch PT replacement standardization method establishes the PT replacement operation procedure standard for control power supply with the PT replacement operation procedure (S70) and PT inspection operation procedure (S80). By preventing safety accidents and unnecessary replacement of switchgear, it is possible to build an economical power distribution facility by extending the lifespan of equipment and maximizing the effect of utilization. As the PT that is burned out by using it as equipment is quickly separated, it can form a state in which temporary power transmission is possible in the shortest time.

한편, 도 2 내지 도 3은 PT 교체 작업 절차(S70) 및 PT 점검 작업 절차(S80)에 의한 제어전원 공급용 PT 교체 작업절차기준 확립을 가능하게 하는 임시송전 장치(1)의 구성을 나타낸다.Meanwhile, FIGS. 2 to 3 show the configuration of a temporary power transmission device 1 that enables establishment of a PT replacement operation procedure standard for supplying control power by the PT replacement operation procedure (S70) and the PT inspection operation procedure (S80).

도 2를 참조하면, 상기 임시송전 장치(1)는 전기적, 기계적, 열적인 특성이 우수하며 수분침투 예방 및 장기간 사용하여도 열화되지 않는 PT 1차 절연부싱으로 기능하는 임시송전 절연부싱(10) 및 케이블 진동으로 인한 탈락 및 접촉불량을 예방하기 위해 스프링 고정형 엘보 이탈방지 클램프로 기능하는 이탈방지 클램프(20)로 구성된다.Referring to FIG. 2 , the temporary power transmission device 1 has excellent electrical, mechanical, and thermal characteristics, prevents moisture penetration, and functions as a PT primary insulation bushing that does not deteriorate even after long-term use. A temporary power transmission insulation bushing 10 and a release prevention clamp 20 that functions as a spring-fixed elbow release prevention clamp to prevent dropout and poor contact due to cable vibration.

구체적으로 상기 임시송전 절연부싱(10)은 절연부싱 바디(11), 클램프 고리(13) 및 부싱 커버(15)를 구성요소로 하며, 상기 이탈방지 클램프(20)는 클램프 바디(21), 힌지 클램프(23) 및 스프링(25)을 구성요소로 한다.Specifically, the temporary power transmission insulation bushing 10 has an insulation bushing body 11, a clamp ring 13 and a bushing cover 15 as components, and the separation prevention clamp 20 includes a clamp body 21, a hinge The clamp 23 and the spring 25 are components.

일례로 상기 임시송전 절연부싱(10)에서, 상기 절연부싱 바디(11)는 “ㄱ"자 형상의 엘보 구조로 이루어짐으로써 지상 개폐기(100)의 내부 공간에서 특 고압 부싱(110)에 대한 연결을 형성하는데 유용하고, 상기 클램프 고리(13)는 걸쇠구조로 이루어짐으로써 이탈방지 클램프(20)가 결합되는 부위로 이용되며, 상기 PT 커버(15)는 깔대기 구조로 이루어짐으로써 PT(110)를 감싸기 용이하다.For example, in the temporary power transmission insulation bushing 10, the insulation bushing body 11 is made of a “L”-shaped elbow structure, so that the connection to the special high voltage bushing 110 in the internal space of the ground switch 100 is performed. It is useful to form, and the clamp ring 13 has a clasp structure and is used as a portion to which the release prevention clamp 20 is coupled, and the PT cover 15 has a funnel structure, so that it is easy to wrap the PT 110 . do.

특히 상기 부싱 커버(15)에는 부싱 연결단자(15-1)가 형성되고, 상기 부싱 연결단자(15-1)는 PT(110)의 홈에 끼워지는 돌출 구조로 이루어진다.In particular, a bushing connection terminal 15 - 1 is formed on the bushing cover 15 , and the bushing connection terminal 15 - 1 has a protruding structure fitted into a groove of the PT 110 .

일례로 상기 이탈방지 클램프(20)에서, 상기 클램프 바디(21)는 중간부위에 개구 채널이 형성된 오발 접시(Oval Plate) 구조로 이루어짐으로써 클램프 고리(13)를 개구 채널로 끼워준 상태에서 절연부싱 바디(11)의 엘보 꺾임 부위에 용이하게 결합되며, 상기 힌지 클램프(23)는 클램프 바디(21)의 개구 채널 주변으로 힌지 구조로 결합됨으로써 한쪽으로 눕혀진 상태에서 절연부싱 바디(11)의 엘보 부위와 고정력을 형성하고, 상기 스프링(25)은 코일 스프링 구조로 이루어짐으로써 절연부싱 바디(11)의 엘보 부위에 대한 고정력을 스프링 탄성으로 강화시켜 준다.For example, in the anti-separation clamp 20, the clamp body 21 has an oval plate structure in which an opening channel is formed in the middle portion, so that the clamp ring 13 is inserted into the opening channel and the insulating bushing body The hinge clamp 23 is easily coupled to the elbow bent portion of 11, and the hinge clamp 23 is coupled in a hinge structure around the opening channel of the clamp body 21, so that the insulation bushing body 11 elbow portion in a state lying on one side. and a fixing force, and the spring 25 is made of a coil spring structure, so that the fixing force of the insulating bushing body 11 to the elbow portion is strengthened by spring elasticity.

특히 상기 스프링(25)은 클램프 바디(21)의 좌우에 각각 구비됨으로써 스프링 탄성에 의한 고정력을 보다 안정적이면서 균형 있게 형성하고, 결합 후 케이블 진동 및 차량충돌 등 외부 영향에 의한 탈락 및 접촉불량을 예방하는데 효과적이다.In particular, the spring 25 is provided on the left and right sides of the clamp body 21 to form a more stable and balanced fixing force due to spring elasticity, and to prevent falling off and poor contact due to external influences such as cable vibration and vehicle collision after coupling. effective to do

도 3을 참조하면, 상기 임시송전 절연부싱(10)과 상기 이탈방지 클램프(20)의 사용 예가 예시된다.Referring to FIG. 3 , an example of use of the temporary power transmission insulating bushing 10 and the separation prevention clamp 20 is illustrated.

일례로 임시송전 장치(1)의 조립상태에서, 클램프 바디(21)의 개구 채널로 절연부싱 바디(11)의 클램프 고리(13)를 끼워주는 간단한 동작만으로 임시송전 절연부싱(10)과 이탈방지 클램프(20)가 서로 결합된다. 그러면 2개의 스프링(25)은 클램프 바디(21)의 좌우에서 PT 커버(15) 부위로 위치된다.For example, in the assembled state of the temporary power transmission device 1, the temporary power transmission insulation bushing 10 and separation are prevented with a simple operation of inserting the clamp ring 13 of the insulating bushing body 11 into the opening channel of the clamp body 21 The clamps 20 are coupled to each other. Then, the two springs 25 are positioned from the left and right sides of the clamp body 21 to the PT cover 15 portion.

이어 임시송전장치(1)의 절연상태에서, 부싱 연결단자(15-1)가 지상 개폐기(100)의 특고압 부싱(110)의 홈 부위에 끼워주면서 부싱 커버(15)가 특고압 부싱(110)과 결합한 다음 힌지 클램프(23)를 한쪽으로 눕혀준다. 그러면 상기 부싱 커버(15)는 힌지 클램프(23)의 엘보 부위 접촉력과 스프링(25)의 스프링 탄성력으로 특고압 부싱(110)부위와 강한 고정 상태를 형성하여 준다.Then, in the insulating state of the temporary power transmission device (1), the bushing connection terminal (15-1) is inserted into the groove portion of the extra-high voltage bushing (110) of the ground switch (100) while the bushing cover (15) is connected to the extra-high voltage bushing (110). ) and then lay the hinge clamp 23 to one side. Then, the bushing cover 15 forms a strong fixed state with the extra-high pressure bushing 110 part by the elbow part contact force of the hinge clamp 23 and the spring elastic force of the spring 25 .

이하, 도 1의 상기 지상 개폐기 PT 교체공법을 도 3 내지 도 12를 참조로 상세히 설명한다.Hereinafter, the above ground switch PT replacement method of FIG. 1 will be described in detail with reference to FIGS. 3 to 12 .

먼저 S10 단계의 배전지능화타입 지상 개폐기의 PT 고장에 대해 S20과 같이 해당 지상 개폐기의 일시/순간적 정전 발생(또는 정전 미 발생) 또는 정전 발생이 없는 해당 지상 개폐기의 고장 발생이 확인된다.First, for the PT failure of the intelligent distribution type ground switch in step S10, as in S20, the occurrence of temporary/instant power failure (or no power outage) or failure of the ground switch without blackout is confirmed.

도 4를 참조하면, 불량 PT로 인한 지상 개폐기 작업 현황의 예가 예시된다. 도시된 바와 같이, 불량 PT 발생을 가져오는 고장유형 중 일시정전 및 순간정전에 대한 다양한 사례들이 예시됨을 알 수 있다.Referring to FIG. 4 , an example of a ground switchgear operation status due to a defective PT is exemplified. As shown, it can be seen that various cases of temporary power failure and instantaneous power failure are exemplified among the failure types that cause the occurrence of a bad PT.

특히 상기 고장유형에 따른 지상 개폐기의 PT 소손은 해당 개폐기를 교체할 때까지 일시적인 정전이 불가피함으로써 수많은 가정이나 기업체 등과 같은 수용가의 불편이나 경제적인 손실의 발생을 감수할 수밖에 없다.In particular, the PT burnout of the ground switchgear according to the above fault type causes a temporary power outage until the corresponding switchgear is replaced, which inevitably causes inconvenience or economic loss to consumers such as numerous homes and businesses.

일례로 하기 표 1,2는 PT 소손 현황을 예시한다.As an example, Tables 1 and 2 below illustrate the PT burnout status.

Figure pat00001
Figure pat00001

Figure pat00002
Figure pat00002

표 1의 지상개폐기 고장현황(최근 5개년) 및 표 2의 PT 소손 현황과 같이, 지상개폐기 제작 불량에 의한 정전건수는 매년 증가추세에 있으며, PT 절연불량에 의한 일시정전 발생 점유율도 4.5%에 달하고 있다.As shown in the breakdown status of ground switchgear in Table 1 (recent 5 years) and PT burnout in Table 2, the number of blackouts due to defective ground switch manufacturing is increasing every year, and the share of temporary power outages due to poor PT insulation is 4.5%. is reaching

구체적으로 PT 소손에 의한 파급유형은 외부전원만 상실되고 정전이 발생되지 않는 경우가 73.9%, 순간정전이 24.6%, 일시정전이 1.5%를 차지하고 있으며, PT 소손의 주요 원인은 고압권선층의 기포로 인한 부분방전 발생으로 1차권선부 층간 절연이 파괴되는 제조공정상의 문제와 서지, 고조파 발생으로 철심 과포화 및 계통사고 파급으로 1차권선이 열화되어 절연이 파괴되는 외부영향에 의한 것으로 요약된다.Specifically, as for the ripple type caused by PT burnout, 73.9% of cases where only external power is lost and no power outage occurs, momentary power failure 24.6%, and temporary power failure account for 1.5%. The main cause of PT burnout is air bubbles in the high-voltage winding layer It is summarized as a problem in the manufacturing process in which the interlayer insulation of the primary winding part is destroyed due to partial discharge caused by

특히 하자기간 경과 시 지상개폐기 PT 소손에 대한 교체 작업은 해당 개폐기의 제조사 없이 수행되나, 제조사별 별도의 교체공법 및 작업절차가 없기 때문에 해당 개폐기 전체를 교체하고 있어 막대한 인력과 예산 낭비를 가져오는 실정이다.In particular, when the defect period elapses, the replacement work for the PT burnout of the ground switch is performed without the manufacturer of the switch, but since there is no separate replacement method and work procedure for each manufacturer, the entire switch is replaced, resulting in a huge waste of manpower and budget. am.

이어 상기 S20 단계는, 일시/순간적 정전 발생(또는 정전 미 발생)을 해당 지상 개폐기의 PT 소손을 현장 실시 작업절차(S20,S30~S50)로 하는 대응 단계 및 정전 발생을 휴전 협의 작업절차(S20,S30-1,S30-2,S100)로 하는 대응 단계로 구분되어 진행한다.Then, the step S20 is a response step of making temporary/instantaneous power failure (or no power outage) as a field-implemented work procedure (S20, S30~S50) for the PT damage of the ground switch, and a truce consultation work procedure (S20) , S30-1, S30-2, S100) is divided into corresponding steps and proceeds.

일례로 상기 현장 실시 작업절차(S20,S30~S50)는 S30 단계에서 PT의 일시 고장 발생이 확인되면 S40 단계로 진행하고, S40 단계에서 선로부하절체가 이루어지고, S50 단계에서 개폐기 사선 상태(검전)가 확립되면, S60 단계에서 PT 자재 보유가 확인된다. 이 경우 상기 개폐기 사선 상태(검전)(S50)는 개폐기 교체를 위한 조작으로 지상 개폐기(100)에서 이루어진다.For example, in the field-implemented work procedure (S20, S30 ~ S50), if a temporary failure of the PT is confirmed in step S30, it proceeds to step S40, line load transfer is made in step S40, and the switchgear is in a slanted state (detection) in step S50. ) is established, PT material retention is confirmed in step S60. In this case, the switch slanted state (electric detection) (S50) is performed in the ground switch 100 as an operation for replacing the switch.

반면 S30 단계에서 PT의 일시 고장 발생이 확인되지 않으면 S50-1 단계로 전환하여 PT를 정상 상태로 하여 지상 개폐기 PT 교체 작업이 중단된다.On the other hand, if the occurrence of temporary failure of the PT is not confirmed in step S30, it switches to step S50-1, returns the PT to a normal state, and the ground switch PT replacement work is stopped.

도 5를 참조하면, 상기 현장 실시 작업절차(S20,S30~S50)는 작업 순번# 1,#2,#3, #4,#5를 통한 작업 구분으로 구체화됨을 알 수 있다.Referring to FIG. 5 , it can be seen that the field-implemented work procedures ( S20 , S30 - S50 ) are embodied as work divisions through work sequence numbers #1, #2, #3, #4, and #5.

일례로 작업 순번#1은 안전회의로 작업구간 및 내용설명과 함께 임무부여의 회의 표준을 제시하고, 작업 순번#2는 안전구호 제창 과 함께 교통통제 및 보행자유도 확립 작업의 표준을 제시하며, 작업 순번#3은 자재 및 공구배치로 라바콘 설치와 함께 안전입간판 설치 작업의 표준을 제시하고, 작업 순번#4는 활선고무절연장갑, 배전자동화 개폐기 PT, PT 엘보 절연캡, 기타 관련공구 작업의 표준을 제시하며, 작업 순번#5는 개폐기 교체를 위한 조작으로 개폐기 사선상태유지를 통한 검전 시행 작업의 표준을 제시한다.For example, task number #1 is a safety meeting, which presents the meeting standards for task assignment along with work sections and contents explanation, and task sequence #2 presents the standards for establishing traffic control and pedestrian guidance along with safety slogans. Sequence #3 presents the standard for safety signage installation along with the installation of rubber cones by material and tool arrangement, and operation sequence #4 is based on the standards for live wire rubber insulation gloves, distribution automation switch PT, PT elbow insulation cap, and other related tools. The work sequence #5 is the operation for switching the switch, and it presents the standard for the inspection operation by maintaining the switch's oblique state.

계속해서 일례로 상기 휴전 협의 작업절차(S20,S30-1,S30-2,S100)는 S30-1 단계에서 상부기관 또는 담당부서를 통해 휴전이 가능하거나 또는 S30-2 단계에서 휴전일정 합의 시간 도달한 경우 현장 실시 작업절차(S20,S30~S50)로 전환하여 S40의 선로부하절체, S50의 개폐기 시선상태(검전) 확립 및 S60의PT 자재 보유 확인 절차를 실행한다.Continuing, as an example, in the armistice consultation work procedure (S20, S30-1, S30-2, S100), a ceasefire is possible through the upper organ or department in charge in step S30-1, or an agreed time for the armistice schedule is reached in step S30-2 In one case, switch to the on-site work procedure (S20, S30~S50) and execute the line load transfer of S40, establishment of the switchgear gaze state (electrical detection) of S50, and the confirmation of holding of PT material in S60.

반면 S30-1 단계에서 상부기관 또는 담당부서를 통해 휴전이 가능하지 않은 상태에서 S30-2 단계에서도 휴전일정 합의가 불가한 경우 S100과 같이 공사 불가로 하여 지상 개폐기 PT 교체 작업이 중단된다.On the other hand, if an armistice schedule cannot be agreed upon in the S30-2 stage in a state where the armistice is not possible through the upper organ or department in charge in the S30-1 stage, the construction is impossible as in S100 and the ground switch PT replacement work is stopped.

이후 S60 단계에서 PT 자재가 보유된 경우엔 S60-1과 같이 임시송전 확립 절차 수행 후 S70의 PT 교체 작업 절차로 진입하는 반면 PT 자재가 보유되는 못한 경우에 S80의 PT 점검 작업 절차로 전환된다.Afterwards, if the PT material is retained in step S60, it enters the PT replacement work procedure of S70 after performing the temporary transmission establishment procedure as in S60-1, whereas if the PT material is not retained, it is converted to the PT inspection work procedure of S80.

일례로 상기 임시송전 확립 절차(S60-1)는 도 5를 통해 예시된다. 이 경우 상기 지상 개폐기(100)는 22.9㎸-y 3상 지중 배전선로에 설치된 자동화 개폐기이고, 상기 PT(110)는 1차 전압 13,200[V]를 2차 전압 220[V]로 변환하여 단말장치에 전원을 공급하도록 1,2차 부싱(120,130)으로 연결된 내부 전원 공급 장치이며, 상기 1,2차 부싱(120,130)은 접지간 정전유도에 의한 안전사고를 예방하는 개방회로 부싱이다.As an example, the temporary power transmission establishment procedure (S60-1) is exemplified through FIG. 5 . In this case, the ground switch 100 is an automatic switch installed on a 22.9 kV-y three-phase underground distribution line, and the PT 110 converts a primary voltage of 13,200 [V] into a secondary voltage of 220 [V] to be a terminal device. It is an internal power supply device connected to the primary and secondary bushings 120 and 130 to supply power to the .

도 6을 참조하면, 상기 임시송전 확립 절차(S60-1)는 ① PT소손 확인 -> ② 지상 개폐기(100)의 특 고압 부싱(110)에 대한 1차측 분리 -> ③ 절연부싱 삽입(또는 절연캡(30) 결합) -> ④ 개폐기 투입 -> ⑤ 임시송전으로 진행된다. 여기서 “->”는 작업 절차의 순차적인 진행 순서를 나타낸다. 또한 “③ 절연부싱 삽입”은 PT 교체 작업 절차(S70)를 나타내는 반면 “③ 절연캡(30) 결합“은 PT 점검 작업 절차(S80)를 나타낸다.6, the temporary power transmission establishment procedure (S60-1) is ① PT burnout confirmation -> ② primary side separation for the special high voltage bushing 110 of the ground switch 100 -> ③ inserting an insulating bushing (or insulation Cap (30) coupling) -> ④ Switching in -> ⑤ Temporary power transmission is carried out. Here, “->” indicates the sequential order of the work procedure. In addition, “③ Insert the insulation bushing” indicates the PT replacement operation procedure (S70), while “③ Combine the insulation cap 30” indicates the PT check operation procedure (S80).

이와 같이 임시송전 장치(1)의 임시송전 절연부싱(10) 및 이탈방지 클램프(20)는 지상 개폐기(100)의 특고압 부싱(110)을 이용하고, 이를 통해 지상 개폐기(100)에서 소손된 PT(110)가 신속히 분리될 수 있음으로써 지상 개폐기(100)의 PT(110) 부재에 따른 불시정전이 가져오는 고객 불편이나 경제적 손실이 최소화되도록 임시송전을 가능하게 한다.As such, the temporary power transmission insulation bushing 10 and the separation prevention clamp 20 of the temporary power transmission device 1 use the extra-high voltage bushing 110 of the ground switch 100, and through this, the ground switch 100 is damaged. Since the PT 110 can be quickly separated, it is possible to temporarily transmit power so that customer inconvenience or economic loss caused by an unexpected power failure due to the absence of the PT 110 of the ground switch 100 is minimized.

최종적으로 상기 PT 교체 작업 절차(S70)는 도 7 내지 도 10을 통해 예시된다.Finally, the PT replacement operation procedure ( S70 ) is illustrated through FIGS. 7 to 10 .

도 7을 참조하면, 상기 PT 교체 작업 절차(S70)는 S71의 접지단자에 대한 접지가 수행되고, S72의 고무절연장갑을 낀 상태에서 PT 1차 부싱(또는 PT 1차 붓싱) 분리가 수행되며, S73의 PT 1차 부싱(또는 PT 1차 붓싱) 충전전류 방전이 수행되고, S74의 PT쪽에 대한 먼지 침투 방지를 위해 PT 1차 부싱(또는 PT 1차 붓싱) 보호 처리가 수행되며, S75의 고무절연장갑을 낀 상태에서 PT 2차 부싱(또는 PT 2차 붓싱) 분리와 함께 보호 처리가 수행되고, S76의 새로운 PT를 이용하여 PT 본체 분리 후 교체가 수행된다.Referring to FIG. 7 , in the PT replacement operation procedure (S70), the grounding of the grounding terminal of S71 is performed, and the PT primary bushing (or PT primary bushing) separation is performed while wearing rubber insulating gloves of S72. , PT primary bushing (or PT primary bushing) charging current discharge of S73 is performed, and PT primary bushing (or PT primary bushing) protection treatment is performed to prevent dust penetration into the PT side of S74, and S75 Protective treatment is performed with separation of the PT secondary bushing (or PT secondary bushing) while wearing rubber insulating gloves, and replacement is performed after separation of the PT body using the new PT of S76.

이어 S77의 역순 PT 조립을 통해 PT 교체 완료 후 PT 1,2차 부싱(또는 PT 1,2차 붓싱)에 대한 조립이 이루어진 다음 지상 개폐기에 대한 정상 운전이 수행된다. 즉, 상기 역순 PT 조립(S77)은 S75의 PT 2차 부싱(또는 PT 2차 붓싱) 연결 및 보호 처리, S74의 PT 1차 부싱(또는 PT 1차 붓싱) 보호 처리, S72의 PT 1차 부싱(또는 PT 1차 붓싱) 연결, S71의 접지단자 조치로 수행된다.Then, after PT replacement is completed through PT assembly in the reverse order of S77, PT 1st and 2nd bushings (or PT 1st and 2nd bushings) are assembled, and then normal operation of the ground switch is performed. That is, the reverse order PT assembly (S77) is S75's PT secondary bushing (or PT secondary bushing) connection and protection processing, S74's PT primary bushing (or PT primary bushing) protection processing, S72's PT primary bushing (or PT primary bushing) connection, it is performed by the action of the ground terminal of S71.

한편, 도 8 내지 도 10을 참조하면, 상기 PT 교체 작업 절차(S70)가 작업 순번 # 1 내지 #13을 통한 작업 구분으로 구체화됨을 알 수 있다.On the other hand, referring to FIGS. 8 to 10 , it can be seen that the PT replacement operation procedure ( S70 ) is embodied as a division of operations through operation sequence numbers #1 to #13.

도 8을 참조하면, 작업 순번#1은 접지 시행의 작업 표준을 제시하고, 작업 순번#2는 고무절연장갑 착용 후 1차 부싱(120) 분리/충전전류 방전/1차 부싱(120) 보호 등을 위한 PT(140) 쪽 1차 부싱(120) 분리 및 보호 작업의 표준을 제시하며, 작업 순번#3은 PT(140) 쪽 2차 부싱(130)의 분리 및 보호 작업의 표준을 제시하고, 작업 순번#4는 신규 PT 제품 확보에 따른 PT 본체 철거/본체 신설 작업의 표준을 제시하며, 작업 순번#5는 제어전원 케이블 연결 작업의 표준을 제시한다.Referring to FIG. 8 , the work sequence number #1 presents the work standard for grounding enforcement, and the task sequence #2 is the primary bushing 120 separation/charging current discharge/primary bushing 120 protection after wearing rubber insulating gloves, etc. For the PT (140) side of the primary bushing 120 for the standard of separation and protection work, work sequence #3 presents the standard of the separation and protection work of the secondary bushing 130 on the PT (140) side, Work sequence #4 presents the standard for PT body removal/new body construction work according to securing new PT products, and work sequence #5 presents the standard for control power cable connection work.

도 9를 참조하면, 작업 순번#6은 세척포를 이용한 부싱부 세척 작업의 표준을 제시하고, 작업 순번#7은 절연 구리스 도포 작업의 표준을 제시하며, 작업 순번#8은 1,2차 부싱(120,130) 결합 작업의 표준을 제시하고, 작업 순번#9는 접지단자 연결 작업의 표준을 제시하며, 작업 순번#10은 제어전원 케이블 연결 작업의 표준을 제시한다.Referring to FIG. 9 , work sequence #6 suggests a standard for cleaning the bushing using a cleaning cloth, and job sequence #7 suggests a standard for insulating grease application, and job sequence #8 is the 1st and 2nd bushing (120,130) Suggests the standard of bonding work, work sequence #9 suggests the standard of ground terminal connection work, and work sequence #10 suggests the standard of control power cable connection work.

도 10을 참조하면, 작업 순번#11은 정상운전을 위한 선로 조작으로서 PT교체에 따른 연동시험 및 정상운전상태 확인 작업의 표준을 제시하고, 작업 순번#12는 PT 2차 전압측정으로서 교체한 PT 2차 전압 측정 작업의 표준을 제시하며, 작업 순번#13은 마무리로서 작업장소 주변청소 및 정리정돈 작업의 표준을 제시한다.Referring to FIG. 10, work sequence #11 presents the standard of interlocking test and normal operation status check work according to PT replacement as line operation for normal operation, and work order #12 is PT secondary voltage measurement. Suggests the standard for secondary voltage measurement work, and the work sequence #13 is the finishing touch, and presents the standard for cleaning and arranging work around the work place.

계속해서 상기 PT 점검 작업 절차(S80)는 도 11 내지 도 12를 통해 예시된다.Subsequently, the PT check operation procedure S80 is exemplified through FIGS. 11 to 12 .

도 11을 참조하면, 상기 PT 점검 작업 절차(S80)는 S81의 접지단자에 대한 접지가 수행되고, S82의 고무절연장갑을 낀 상태에서 PT 1차 부싱(또는 PT 1차 붓싱) 분리가 수행되며, S83의 PT 1차 부싱(또는 PT 1차 붓싱) 충전전류 방전이 수행되고, S84의 PT쪽에 대한 먼지 침투 방지를 위해 PT 1차 부싱(또는 PT 1차 붓싱) 보호 처리가 수행되며, S85의 고무절연장갑을 낀 상태에서 PT 2차 부싱(또는 PT 2차 붓싱) 분리와 함께 보호 처리가 수행되고, S86의 PT 소손된 기존 PT 본체 분리가 수행되며, S87의 분리된 PT 연결 케이블의 보관 및 세척포를 이용한 부싱부 세척, 절연 구리스 도포 후 절연 캡(30)의 시공이 수행된다. 이 경우 상기 절연 캡(30)의 시공은 도 6의 임시송전 확립 절차(S60-1) 중 ③ 절연캡(30) 결합 단계와 동일하므로 PT 점검 작업 절차(S80)에서 생략될 수 있음을 의미한다.11, in the PT check operation procedure (S80), the grounding of the grounding terminal of S81 is performed, and the PT primary bushing (or PT primary bushing) separation is performed while wearing the rubber insulating gloves of S82. , PT primary bushing (or PT primary bushing) charging current discharge of S83 is performed, and PT primary bushing (or PT primary bushing) protection processing is performed to prevent dust penetration into the PT side of S84, and S85 Protective treatment is performed with separation of the PT secondary bushing (or PT secondary bushing) while wearing rubber insulated gloves, the PT of S86 is separated from the existing PT body that has been damaged, storage of the separated PT connection cable of S87 and After cleaning the bushing using a cleaning cloth and applying insulating grease, the insulating cap 30 is installed. In this case, the construction of the insulation cap 30 is the same as the step ③ of the insulation cap 30 coupling of the temporary power transmission establishment procedure (S60-1) of FIG. 6, so it means that it can be omitted from the PT check operation procedure (S80). .

이어 S88의 수동운전이 수행되고, 상기 수동운전(S88)을 수행한 후 휴전 협의 작업절차(S20,S30-1,S30-2,S100)의 는 S30-1의 상부기관 또는 담당부서를 통해 휴전이 가능 문의 단계로 전환된다.Then, manual operation of S88 is performed, and after performing the manual operation (S88), the truce agreement work procedure (S20, S30-1, S30-2, S100) of the truce through the upper organ or department in charge of S30-1 This will switch to the possible inquiry stage.

그러므로 상기 PT 점검 작업 절차(S80)는 휴전 여부로 PT 교체 작업 절차(S70)로 전환될 수 있음을 알 수 있다.Therefore, it can be seen that the PT check operation procedure ( S80 ) can be switched to the PT replacement operation procedure ( S70 ) depending on whether there is a ceasefire.

한편, 도 12를 참조하면, 상기 PT 점검 작업 절차(S80)가 작업 순번# 1,#2,#3, #4-1,#4-2를 통한 작업 구분으로 구체화됨을 알 수 있다.Meanwhile, referring to FIG. 12 , it can be seen that the PT check operation procedure ( S80 ) is embodied as a division of operations through operation sequence numbers #1, #2, #3, #4-1, and #4-2.

일례로 작업 순번#1은 접지 시행의 작업 표준을 제시하고, 작업 순번#2는 고무절연장갑 착용 후 1차 부싱(120) 분리/충전전류 방전/1차 부싱(120) 보호 등을 위한 PT(140) 쪽 1차 부싱(120) 분리 작업의 표준을 제시하며, 작업 순번#3은 2차 부싱(130) 보호를 위한 PT(140) 쪽 2차 부싱(130)의 분리 작업의 표준을 제시한다.As an example, work sequence number #1 presents the work standard for grounding enforcement, and task sequence number #2 is PT ( 140) presents the standard of the primary bushing 120 separation operation, and the operation sequence #3 presents the standard of the separation operation of the secondary bushing 130 on the PT 140 side for the protection of the secondary bushing 130 .

반면 작업 순번#4-1은 PT 미확보에 따른 절연캡(30)의 적용으로서 PT연결 케이블을 분리하여 보관, 세척포를 이용하여 붓싱부 세척, 절연구리스 도포, 절연캡 시공 작업의 표준을 제시한다. 그리고 작업 순번#4-2는 PT 분리 후 절연캡(30)의 시공에 대한 이상 유무 확인 작업의 표준을 제시한다.On the other hand, work sequence #4-1 is the application of the insulation cap 30 according to the non-secured PT, and presents the standards for storing and storing the PT connection cable, cleaning the bushing using a cleaning cloth, applying insulation grease, and installing the insulation cap. . And work sequence #4-2 presents a standard for checking whether there is an abnormality in the construction of the insulating cap 30 after PT separation.

전술된 바와 같이, 본 실시예에 따른 임시송전장치(1)를 이용한 지상 개폐기 PT 교체 표준화 공법은 지상 개폐기(100)의 PT(Potential Transformer)(140)가 불양 또는 소손된 경우 표준 작업 매뉴얼에 기반 하여 전기설비 휴전 대응(S20,S30~S50/S30-1,S30-2,S100), 임시송전확립(S60-1), 불량 PT 현장 교체(S70) 및 불량 PT 현장 점검(S80) 중 어느 하나를 선택하고, 임시송전장치(1)를 이용한 임시송전확립 상태에서 불량 PT 현장 교체(S70)가 표준 작업 매뉴얼의 작업 절차에 따라 현장 시공됨으로써 PT 교체 작업의 안전성/효율성 향상 및 정전시간 최소화가 가능하고, 특히 PT 교체 표준화 공법의 표준 작업 매뉴얼 정립을 통하여 사용 가능한 개폐기를 폐품 처리하지 않고 제사용하여 낭비요인 제거와 함께 기자재 수명연장 및 활용효과 극대화를 통한 경제적인 배전설비 구축이 이루어진다.As described above, the ground switch PT replacement standardization method using the temporary power transmission device 1 according to the present embodiment is based on a standard operation manual when the PT (Potential Transformer) 140 of the ground switch 100 is defective or damaged. to respond to the truce of electrical equipment (S20,S30~S50/S30-1,S30-2,S100), temporary power transmission establishment (S60-1), replacement of defective PT on-site (S70), and on-site inspection of defective PT (S80) In the state of temporary power transmission established using the temporary power transmission device (1), defective PT on-site replacement (S70) is performed on-site according to the work procedure of the standard work manual, so the safety/efficiency of the PT replacement work can be improved and the power outage time can be minimized. In particular, through the establishment of a standard operation manual of the PT replacement standardization method, usable switchgear is used without waste treatment, eliminating waste factors, extending the lifespan of equipment and maximizing the utilization effect, and constructing an economical power distribution facility.

1 : 임시송전장치
10 : 임시송전 절연부싱 11 : 절연부싱 바디
13 : 클램프 고리 15 : 부싱 커버
15-1 : 부싱 연결단자
20 : 이탈방지 클램프 21 : 클램프 바디
23 : 힌지 클램프 25 : 스프링
30 : 절연 캡
100 : 지상 개폐기 110 : 특 고압 부싱
120,130 : 제1,2차 부싱 140 : PT(Potential Transformer)
1: Temporary power transmission device
10: temporary power transmission insulation bushing 11: insulation bushing body
13: clamp ring 15: bushing cover
15-1: bushing connection terminal
20: anti-separation clamp 21: clamp body
23: hinge clamp 25: spring
30: insulation cap
100: ground switch 110: extra high pressure bushing
120,130: 1st and 2nd bushings 140: PT (Potential Transformer)

Claims (17)

지상 개폐기에서 PT(Potential Transformer)의 PT 불량 확인이 이루어지는 단계, 및
상기 PT 불량 확인 후, 표준 작업 매뉴얼에 기반 하여 전기설비 휴전 대응, 임시송전확립, 불량 PT 현장 교체가 이루어지는 PT 교체 작업 절차 수행 및 불량 PT 현장 점검이 이루어지는 PT 점검 작업 절차 수행 중 어느 하나를 선택하고, 상기 표준 작업 매뉴얼의 작업 절차가 현장에서 시공되는 단계
가 포함되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
A step in which the PT defect check of the PT (Potential Transformer) is made in the ground switch, and
After confirming the above PT defect, based on the standard work manual, select either one of the PT replacement work procedure for responding to the truce of electrical equipment, the establishment of temporary power transmission, and the replacement of the defective PT on-site and the PT inspection work procedure for the on-site inspection of the defective PT. , the step in which the work procedure of the standard work manual is constructed on site
Ground switch PT replacement standardization method, characterized in that it is included.
청구항 1에 있어서, 상기 전기설비 휴전 대응의 단계는, 상기 지상 개폐기의 일시적인 정전 발생에 대응하는 현장 실시 작업절차 및 상기 지상 개폐기의 고장 발생에 대응하는 휴전 협의 작업절차로 구분되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The ground level according to claim 1, wherein the step of responding to the truce of the electrical equipment is divided into a field-implemented work procedure corresponding to the occurrence of a temporary power outage of the ground switch and a truce consultation work procedure corresponding to the occurrence of a failure of the ground switch. Switchgear PT replacement standardization method.
청구항 2에 있어서, 상기 현장 실시 작업절차의 단계는, 상기 PT의 PT 일시 고장에 대해 선로부하절체가 이루어지는 단계, 및 개폐기 사선 상태가 확립되는 단계
로 수행되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 2, wherein the steps of the field-implemented work procedure include: performing a line load transfer for a PT temporary failure of the PT; and establishing a switchgear oblique state.
Ground switch PT replacement standardization method, characterized in that performed with
청구항 2에 있어서, 상기 휴전 협의 작업절차의 단계는, 전기시설 담당기관을 통해 작업 현장 휴전이 이루어지는 단계, 작업 현장에 대한 휴전 일정 확립이 이루어지는 단계, 및 휴전 일정 미 확립으로 지상 개폐기 PT 교체 작업 중단이 이루어지는 단계
로 수행되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 2, wherein the steps of the truce consultation work procedure include: a step in which a work site truce is made through an authority in charge of electrical facilities; a step in which a ceasefire schedule is established for the work site; Steps in which this takes place
Ground switch PT replacement standardization method, characterized in that performed with
청구항 4에 있어서, 상기 작업 현장 휴전의 단계 및 상기 휴전 일정 확립의 단계는 상기 현장 실시 작업절차의 단계로 전환되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The ground switch PT replacement standardization method according to claim 4, wherein the stage of the work site ceasefire and the stage of establishing the ceasefire schedule are converted into the stage of the field implementation work procedure.
청구항 2에 있어서, 상기 현장 실시 작업절차는 작업 순번을 포함하고,
상기 작업 순번 중 작업 순번#1은 작업구간/내용설명/임무부여의 안전회의 시행, 작업 순번#2는 안전구호 제창/교통통제/보행자유도 확립, 작업 순번#3은 자재와 공구배치/라바콘 설치/안전입간판 설치, 작업 순번#4는 활선고무절연장갑/배전자동화 개폐기 PT/임시송전장치/절연 캡/기타 관련공구 확인, 작업 순번#5는 개폐기 사선상태 유지를 통한 검전에 대한 작업 표준이 제시되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 2, wherein the field-implemented work procedure includes a work order,
Among the above work order numbers, work order #1 is safety meeting of work section/content explanation/mission assignment, work order #2 is safety slogan proposal/traffic control/establishment of pedestrian freedom, work order #3 is material and tool arrangement/labacon installation / Safety signboard installation, work order #4 is live wire rubber insulated gloves/distribution automation switch PT/temporary power transmission device/insulated cap/other related tools check, work order #5 is the work standard for inspection by maintaining the switchgear in an oblique state Ground switch PT replacement standardization method, characterized in that
청구항 1에 있어서, 상기 임시송전확립의 단계는, 상기 PT 불량을 대체할 PT 자재 보유가 확인되는 단계, 상기 지상 개폐기의 특 고압 부싱이 분리되는 단계, 상기 특 고압 부싱이 임시송전 절연부싱과 결합된 상태에서 이탈방지 클램프가 체결되는 단계, 개폐기 투입이 이루어지는 단계, 및 임시송전이 이루어지는 단계
로 수행되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 1, wherein the step of establishing temporary power transmission is a step in which it is confirmed that a PT material to replace the PT defect is secured, the special high voltage bushing of the ground switch is separated, and the special high voltage bushing is combined with the temporary power transmission insulating bushing. A step in which the escape prevention clamp is fastened in the closed state, a step in which the switch is put in, and a step in which temporary power transmission is performed
Ground switch PT replacement standardization method, characterized in that performed with
청구항 1에 있어서, 상기 PT 교체 작업 절차 수행의 단계는, 상기 지상 개폐기의 접지단자 접지가 이루어지는 단계, 상기 지상 개폐기의 상기 PT 측 1차 부싱의 분리가 이루어지는 단계, 상기 1차 부싱에 대한 충전전류가 방전되는 단계, 먼지 침투 방지를 위해 상기 1차 부싱에 대한 보호 처리가 이루어지는 단계, 상기 PT 측 2차 부싱의 분리 및 보호 처리가 이루어지는 단계, 상기 PT의 분리 후 새로운 PT로 교체되는 단계, 및 상기 1차 부싱과 상기 2차 부싱이 분리의 역순으로 조립된 후 상기 지상 개폐기가 운전되는 단계
로 수행되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 1, wherein the step of performing the PT replacement work procedure comprises the steps of grounding the ground terminal of the ground switch, separating the PT-side primary bushing of the ground switch, and charging current for the first bushing discharging, protecting the primary bushing to prevent dust penetration, separating and protecting the PT-side secondary bushing is performed, replacing the PT with a new PT after separation of the PT, and After the primary bushing and the secondary bushing are assembled in the reverse order of separation, the ground switch is operated
Ground switch PT replacement standardization method, characterized in that performed with
청구항 1에 있어서, 상기 PT 교체 작업 절차 수행은 작업 순번을 포함하고,
상기 작업 순번 중 작업 순번#1은 상기 지상 개폐기의 접지 시행, 작업 순번#2는 상기 PT 쪽 1차 부싱의 분리 및 보호, 작업 순번#3은 상기 PT 쪽 2차 부싱의 분리 및 보호, 작업 순번#4는 신규 PT 제품 확보에 따른 PT 본체 철거/신설, 작업 순번#5는 제어전원 케이블 연결, 작업 순번#6은 세척포를 이용한 부싱부 세척, 작업 순번#7은 절연 구리스 도포 작업, 작업 순번#8은 상기 1차 부싱과 상기 2차 부싱 결합, 작업 순번#9는 접지단자 연결, 작업 순번#10은 제어전원 케이블 연결, 작업 순번#11은 PT 교체 후 연동시험 및 운전상태 확인, 작업 순번#12는 교체 PT의 2차 전압 측정, 작업 순번#13은 작업 장소 주변청소 및 정리정돈에 대한 작업 표준이 제시되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 1, wherein the PT replacement operation procedure execution includes a task sequence number,
Among the above work sequences, work sequence #1 is grounding of the ground switch, work sequence #2 is the separation and protection of the PT side primary bushing, and work sequence #3 is the PT side secondary bushing separation and protection, work sequence number #4 is demolition/new construction of the PT body according to the securing of new PT products, operation sequence #5 is control power cable connection, operation sequence #6 is the cleaning of the bushing using a cleaning cloth, operation sequence #7 is insulation grease application operation, operation sequence number #8 is the combination of the 1st bushing and the 2nd bushing, work order #9 is ground terminal connection, work order #10 is control power cable connection, work order #11 is interlock test and operation status check after PT replacement, work order #12 is the secondary voltage measurement of the replacement PT, and the work order #13 is the work standard for cleaning and arranging the work area around the ground switch PT replacement standardization method.
청구항 1에 있어서, 상기 PT 점검 작업 절차 수행의 단계는, 상기 지상 개폐기의 접지단자 접지가 이루어지는 단계, 상기 지상 개폐기의 상기 PT 측 1차 부싱의 분리가 이루어지는 단계, 상기 1차 부싱에 대한 충전전류가 방전되는 단계, 먼지 침투 방지를 위해 상기 1차 부싱에 대한 보호 처리가 이루어지는 단계, 상기 PT 측 2차 부싱의 분리 및 보호 처리가 이루어지는 단계, 상기 PT가 분리되는 단계, 분리된 PT 연결 케이블 보관, 세척포를 이용한 부싱부 세척 및 절연 구리스 도포 후 상기 지상 개폐기의 특 고압 부싱에 대한 절연 캡이 시공되는 단계, 상기 지상 개폐기에 대한 수동운전이 이루어지는 단계
로 수행되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 1, wherein the step of performing the PT inspection work procedure comprises the steps of grounding the ground terminal of the ground switch, separating the PT-side primary bushing of the ground switch, and charging current for the first bushing discharging, protecting the primary bushing to prevent dust penetration, separating and protecting the secondary bushing on the PT side, separating the PT, storing the separated PT connection cable , After cleaning the bushing using a washing cloth and applying insulating grease, an insulating cap for the special high-voltage bushing of the above-ground switch is installed, and manual operation of the above-ground switch is performed.
Ground switch PT replacement standardization method, characterized in that performed with
청구항 10에 있어서, 상기 수동운전 후 상기 전기설비 휴전 대응의 휴전 협의 작업절차의 단계로 전환되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 10, wherein the ground switch PT replacement standardization method is converted to the stage of the truce consultation work procedure in response to the truce of the electrical equipment after the manual operation.
청구항 1에 있어서, 상기 PT 점검 작업 절차 수행은 작업 순번을 포함하고, 상기 작업 순번 중 작업 순번#1은 상기 지상 개폐기의 접지 시행, 작업 순번#2는 상기 PT 쪽 1차 부싱의 분리 및 보호, 작업 순번#3은 상기 PT 쪽 2차 부싱의 분리 및 보호, 작업 순번#4-1은 PT 연결 케이블 분리/보관, 세척포를 이용하여 붓싱부 세척, 절연 구리스 도포, 절연 캡 시공, 작업 순번#4-2는 상기 PT 분리 후 절연 캡의 이상 유무 확인에 대한 작업 표준이 제시되는 것을 특징으로 하는 지상 개폐기 PT 교체 표준화 공법.
The method according to claim 1, wherein the performing of the PT inspection work procedure includes a work order, and among the work order numbers, work order #1 is grounding of the ground switch, and work order #2 is separation and protection of the PT side primary bushing, Task #3 is the separation and protection of the secondary bushing on the PT side, and task #4-1 is separation/storage of the PT connection cable, cleaning the bushing using a cleaning cloth, applying insulating grease, installing the insulating cap, and working sequence # 4-2 is a ground switch PT replacement standardization method, characterized in that the work standard for checking whether the insulation cap is abnormal after the PT separation is presented.
지상 개폐기의 특 고압 부싱과 결합되어 PT(Potential Transformer)의 소손 상태에서 PT 1차 절연부싱으로 기능하는 임시송전 절연부싱, 및 상기 임시송전 절연부싱과 체결되어 상기 특 고압 부싱에 대한 고정력을 형성 해주는 이탈방지 클램프
가 포함되는 것을 특징으로 하는 임시송전 장치.
Temporary power transmission insulating bushing that functions as a PT primary insulating bushing in the state of PT (Potential Transformer) burnout by combining with the special high voltage bushing of the ground switch, and the temporary power transmission insulating bushing to form a fixing force for the special high voltage bushing Anti-separation clamp
Temporary power transmission device, characterized in that it is included.
청구항 13에 있어서, 상기 임시송전 절연부싱은 엘보 구조로 이루어진 절연부싱 바디, 상기 이탈방지 클램프와 결합되는 클램프 고리, 및 상기 특 고압 부싱을 가리면서 결합되는 부싱 커버로 구성되며;
상기 이탈방지 클램프는 상기 클램프 고리와 결합되는 클램프 바디, 상기 절연부싱 바디를 고정하는 힌지 클램프, 및 상기 특 고압 부싱 쪽으로 스프링 탄성력을 가하는 스프링으로 구성되는 것을 특징으로 하는 임시송전 장치.
The method according to claim 13, wherein the temporary power transmission insulating bushing is composed of an insulating bushing body made of an elbow structure, a clamp ring coupled to the separation preventing clamp, and a bushing cover coupled to cover the special high-voltage bushing;
The anti-separation clamp comprises a clamp body coupled to the clamp ring, a hinge clamp for fixing the insulating bushing body, and a spring for applying a spring elastic force toward the special high-voltage bushing.
청구항 14에 있어서, 상기 부싱 커버에는 상기 특 고압 부싱과 결합되는 부싱 연결단자가 돌출되어진 것을 특징으로 하는 임시송전 장치.
The temporary power transmission device according to claim 14, wherein a bushing connection terminal coupled to the special high-voltage bushing protrudes from the bushing cover.
청구항 14에 있어서, 상기 스프링은 상기 클램프 바디의 좌우에 각각 구비되는 것을 특징으로 하는 임시송전 장치.
The temporary power transmission device according to claim 14, wherein the springs are provided on the left and right sides of the clamp body, respectively.
청구항 16에 있어서, 상기 스프링은 코일 스프링인 것을 특징으로 하는 임시송전 장치.The temporary power transmission device according to claim 16, wherein the spring is a coil spring.
KR1020200062306A 2020-05-25 2020-05-25 Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line KR102375023B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200062306A KR102375023B1 (en) 2020-05-25 2020-05-25 Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200062306A KR102375023B1 (en) 2020-05-25 2020-05-25 Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line

Publications (2)

Publication Number Publication Date
KR20210145429A true KR20210145429A (en) 2021-12-02
KR102375023B1 KR102375023B1 (en) 2022-03-17

Family

ID=78867306

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200062306A KR102375023B1 (en) 2020-05-25 2020-05-25 Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line

Country Status (1)

Country Link
KR (1) KR102375023B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110035103A (en) * 2009-09-29 2011-04-06 한국전력공사 Temporary transformer device and transformer changing method using the same
KR20140002007U (en) * 2012-09-27 2014-04-04 한국전력공사 Clamp apparatus for high voltage cable
KR101499420B1 (en) * 2013-10-10 2015-03-10 (주) 진흥이엔지 Temporary power supply through indirect methods for live
KR20190138501A (en) 2018-06-05 2019-12-13 한국전력공사 Bushing connector of ground switch enclosure
KR20200041535A (en) * 2018-10-12 2020-04-22 한국전력공사 Three Phases Pole Transformer for Uninterruptible Power Construction and Method Thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110035103A (en) * 2009-09-29 2011-04-06 한국전력공사 Temporary transformer device and transformer changing method using the same
KR20140002007U (en) * 2012-09-27 2014-04-04 한국전력공사 Clamp apparatus for high voltage cable
KR101499420B1 (en) * 2013-10-10 2015-03-10 (주) 진흥이엔지 Temporary power supply through indirect methods for live
KR20190138501A (en) 2018-06-05 2019-12-13 한국전력공사 Bushing connector of ground switch enclosure
KR20200041535A (en) * 2018-10-12 2020-04-22 한국전력공사 Three Phases Pole Transformer for Uninterruptible Power Construction and Method Thereof

Also Published As

Publication number Publication date
KR102375023B1 (en) 2022-03-17

Similar Documents

Publication Publication Date Title
KR102375023B1 (en) Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line
CN201341032Y (en) Online type emergency power source
KR101067594B1 (en) Customer electricity facilities management system
CN103647343A (en) Improvement method for spare power automatic switching operating mode of internal bridging line transformer substation
KR102332571B1 (en) An electric power supply method of the control unit for pad mounted type switchgear for underground line
CN201018221Y (en) Device for electric network live operation
KR101123272B1 (en) Temporary Transformer Device and Transformer Changing Method Using the Same
CN113437795B (en) Mobile box transformer substation vehicle with input voltage automatic switching function
CN202206125U (en) Portable protection device for electrification process after distribution system protection device failure
KR100757730B1 (en) The no blackout method for underground cable
KR101900930B1 (en) Battery repairing method of substation
KR100716897B1 (en) Apparatus for switching of load
KR101193220B1 (en) Method for emergency power supply of consumer
Hua et al. Investigation of Progressing Low and Medium Voltage DC Standards to Acquire the Implementation Scenarios for Domestic/Commercial and Industrial Converters and Enabling Technologies
KR100460622B1 (en) The apparatus of transformer with a built-in switch
CN113471863A (en) Method for maintaining uninterrupted power supply of direct current screen of transformer substation
CN103972804A (en) Outage-free operating method for temporarily obtaining electric power from ring main unit
KR102622675B1 (en) The ground transformer uninterruptible replacement method using the ground transformer elbow connector three phase batch separation connection apparatus and feed through
ES2887249T3 (en) Procedure for maintenance without voltage of a stationary transformer station and a mobile transformer station
CN219999093U (en) Main and standby power supply automatic conversion control device for dust removal system and dust removal system
KR102426832B1 (en) Power suplly apparatus for electric power distribution automation switch
CN216489768U (en) Power supply system for realizing complete uninterrupted replacement of transformer on column
Loeffler et al. Electrical: uninterruptible power supply system
KR930011774B1 (en) Hook being adapted for hanging suspended line
KR20090023524A (en) Pad mounted transfomer changing method on electric distribution lines with uninterruptible power supply attached a generator

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right