KR20210107315A - Pipe fixing system - Google Patents

Pipe fixing system Download PDF

Info

Publication number
KR20210107315A
KR20210107315A KR1020200022129A KR20200022129A KR20210107315A KR 20210107315 A KR20210107315 A KR 20210107315A KR 1020200022129 A KR1020200022129 A KR 1020200022129A KR 20200022129 A KR20200022129 A KR 20200022129A KR 20210107315 A KR20210107315 A KR 20210107315A
Authority
KR
South Korea
Prior art keywords
pipe
fixing part
frame
pipe fixing
fastening
Prior art date
Application number
KR1020200022129A
Other languages
Korean (ko)
Inventor
임영섭
Original Assignee
주식회사 가속
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 가속 filed Critical 주식회사 가속
Priority to KR1020200022129A priority Critical patent/KR20210107315A/en
Publication of KR20210107315A publication Critical patent/KR20210107315A/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/24Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with a special member for attachment to profiled girders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/002Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/03Pipe-laying vessels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/08Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using bands
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/202Accessories therefor, e.g. floats, weights fixed on or to vessels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/26Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting the pipes all along their length, e.g. pipe channels or ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention relates to a perfusion fixing apparatus and, more specifically, to a perfusion fixing apparatus for fixing a plurality of perfusions such as pipes to be seated and fixed on a frame. By providing the perfusion fixing apparatus, which is easy to be installed and can be fixed so that the pipe does not be shaken even under external influences, even if vibration occurs in a ship, no noise is generated, and the pipe is easily fixed, thereby improving the convenience of work. The perfusion fixing apparatus of the present invention comprises: a frame unit (110); a pipe supporting unit (120); and a pipe fixing unit (130).

Description

관류 고정장치 및 이의 설치방법{Pipe fixing system}Perfusion fixing device and its installation method {Pipe fixing system}

본 발명은 관류 고정장치에 관한 것으로, 구체적으로는 파이프 등의 다수의 관류가 프레임에 안착고정되도록 고정시키기 위한 관류 고정장치에 관한 것이다.The present invention relates to a perfusion fixture, and more particularly, to a perfusion fixture for fixing a plurality of perfusions such as pipes to be seated and fixed in a frame.

일반적으로, 조선용 및 육상용 배관 또는 덕트에 사용되는 금속 및 합성수지재로 구성된 다양한 종류의 파이프 또는 덕트는 고정 장치를 이용하여 원하는 설치 공간에 고정 설치되어 진다.In general, various types of pipes or ducts made of metal and synthetic resin materials used in shipbuilding and land piping or ducts are fixedly installed in a desired installation space using a fixing device.

종래 기술에 따른 파이프 고정 장치는 양측 단부 외주면으로 숫나사산이 형성되어 평행되게 연장된 한 쌍의 단부를 구비하는 유 볼트(U-Bolt)를 이용하여 관부(P)를 체결하는 방식이 개시된다. The pipe fixing device according to the prior art discloses a method for fastening the pipe portion P using a U-Bolt having a pair of ends extending in parallel with male threads formed on the outer peripheral surfaces of both ends.

여기서, 관부(Pipe)(P)는, 파이프(pipe), 덕트(duct) 등을 총칭하는 개념일 수 있다. 그러나, 반드시 속이 빈 상태의 관부(P)가 아니더라도 지름이 비교적 큰 봉이나 샤프트(Shaft)도 널리 포함되는 개념으로 이해될 수 있다. Here, the pipe (Pipe) (P) may be a concept that collectively refers to a pipe (pipe), a duct (duct), and the like. However, even if it is not necessarily a hollow pipe part (P), a rod or shaft having a relatively large diameter may be understood as a concept that is widely included.

종래 기술에 따른 파이프 고정 장치는 관부(P)의 일측 외주면이 앵글(Angle), 채널(Channel), 에이치 빔(H-Beam), 스퀘어 튜브(Square Tube) 및 아이 빔(I-Beam) 등과 같은 형강프레임에 밀착된 상태에서 유 볼트의 내측면이 관부(P)의 타측 외주면을 감싸면서 상술한 숫나사산이 형성된 양측 단부가 형강 프레임에 기 가공된 체결홀을 통해 관통된 후, 너트 등의 체결부재를 통하여 체결된다. The pipe fixing device according to the prior art has an outer peripheral surface of one side of the pipe portion P, such as an angle, a channel, an H-beam, a square tube, and an I-Beam. While the inner side of the U-bolt wraps around the outer circumferential surface of the other side of the pipe part (P) in a state in close contact with the section steel frame, both ends having the above-described male threads are penetrated through the pre-machined fastening hole in the section steel frame, and then fastening members such as nuts is concluded through

그러나, 상기와 같은 종래 기술에 따른 파이프 고정 장치는, 형강 프레임에 기 가공된 체결 홀의 위치가 형강 프레임의 설치 또는 배치 위치에 따라 조금만 어긋난 경우에도 관부(P)를 고정시키기 어려운 문제점이 있다. However, the pipe fixing device according to the prior art as described above has a problem in that it is difficult to fix the pipe portion P even if the position of the fastening hole machined in the section steel frame is slightly shifted depending on the installation or arrangement position of the section steel frame.

체결홀의 위치가 틀어지는 원인은, 상술한 형강 프레임(20)의 설치 또는 배치 위치가 잘못된 경우도 포함함은 물론, 설계 시 오작, 제작 시의 오작, 형강 프레임이 설치되는 위치의 평탄도가 나쁜 경우 등 다양하다. The cause of the misaligned position of the fastening hole includes a case where the installation or arrangement position of the above-described section steel frame 20 is incorrect, as well as a malfunction during design, a malfunction during manufacturing, and a poor flatness of the position where the section steel frame is installed. various etc.

한국등록특허공보 제10-0785430호 (2007.12.06)Korean Patent Publication No. 10-0785430 (2007.12.06) 한국등록특허공보 제10-0569853호 (2006.04.04)Korean Patent Publication No. 10-0569853 (2006.04.04)

본 발명의 목적은 설치가 용이하고 외부의 영향에도 파이프가 흔들리지 않도록 고정시킬 수 있는 관류 고정장치를 제공하는 것이다.An object of the present invention is to provide a perfusion fixing device that is easy to install and can fix the pipe so that it does not shake even under external influences.

상기와 같은 문제를 해결하기 위해, 본 발명은 선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되는 프레임부(110)와, 프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성되는 파이프받침부(120)와, 소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성되는 파이프고정부(130)를 포함하고, 상기 제1파이프받침부(120a)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제1프레임수용공간부(121a)와, 파이프(10)가 안착되기 위해 형성되는 제1파이프안착부(122a)를 포함하되, 상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하고, 상기 제2파이프받침부(120b)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제2프레임수용공간부(121b)와, 파이프(10)가 안착되기 위해 형성되는 제2파이프안착부(122b)를 포함하되, 상기 제2파이프안착부(122b)는 파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성되며, 상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성되는 것을 특징으로 하는 관류 고정장치와,In order to solve the above problems, the present invention provides a frame portion 110 that is seated on a ship and formed such that a plurality of pipes 10 are positioned thereon, and a first pipe support located on one side of the frame portion 110 . The pipe support part 120 is formed including the part 120a and the second pipe support part 120b formed at a position spaced apart from the first pipe support part 120b by a predetermined distance, and has a predetermined length and width. It is formed so that one side has a predetermined interval and includes a pipe fixing part 130 in which a fastening tooth part 131 is formed, and the first pipe support part 120a is one side of the frame part 110 is accommodated. A first frame accommodating space portion 121a formed to be coupled, and a first pipe seating portion 122a formed to seat the pipe 10, wherein the first pipe seating portion 122a is a pipe fixing portion A first pipe fixing part fixing groove 122-1a is included so that one side of the 130 is coupled and fixed, and the second pipe supporting part 120b is formed such that one side of the frame part 110 is accommodated and coupled. A second frame accommodating space portion (121b) which becomes a, and a second pipe seating portion (122b) formed to be seated, the second pipe seating portion (122b) is a pipe fixing portion (130) A first pipe fixing part passing hole 122-1b is formed on one side to pass through, and a second pipe fixing part passing hole (122-1b) is spaced apart from the first pipe fixing part passing hole 122-1b. 122-2b) is formed, and the inner surface of the first pipe fixing part through hole 122-1b corresponds to the toothed part 131 of the pipe fixing part 130 and a first locking part 122-1b'). is formed, and the inner surface of the second pipe fixing part through hole (122-2b) is formed with a second locking part (122-2b') so as to correspond to the fastening tooth part 131 of the pipe fixing part 140 A perfusion fixture, characterized in that

선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되는 프레임부(110)와, 프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성되는 파이프받침부(120)와, 소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성되는 파이프고정부(130); 파이프(10)의 상측 외주면 일부를 둘러싸도록 형성되는 파이프변위방지부재(200); 파이프고정부(130)에 파이프(10)가 둘러싸인 후 빈 공간에 삽입되기 위한 틈새마개부재(300);를 포함하고, 상기 제1파이프받침부(120a)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제1프레임수용공간부(121a)와, 파이프(10)가 안착되기 위해 형성되는 제1파이프안착부(122a)를 포함하되, 상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하고, 상기 제2파이프받침부(120b)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제2프레임수용공간부(121b)와, 파이프(10)가 안착되기 위해 형성되는 제2파이프안착부(122b)를 포함하되, 상기 제2파이프안착부(122b)는 파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성되며, 상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성되는 것을 특징으로 하고, 상기 파이프변위방지부재(200)는 파이프변위방재부재(200)의 내부면에 위치하되 요철형태를 가지도록 다수의 돌기 형태로 형성되는 파이프밀착부(210)와, 파이프변위방지부재(200)의 외부면 일측은 파이프이동방지부재(160)을 수용하되 골형상으로 형성되는 파이프이동방지부재체결홈(220)을 포함하고, 상기 틈새마개부재(300)는 파이프(10)에 둘러싸인 파이프고정부(130)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 형성되는 제1헤드부(311)가 일측에 형성되고 타측은 제2틈새마개부재(320)와 결합되도록 끼움홀(312)이 형성되는 제1틈새마개부재(310)와, 일측이 파이프이동방지부재(160)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 일측에 제2헤드부(321)가 형성되고 타측은 상기 제1틈새마개부재(310)의 끼움홀(312)에 결합되도록 돌출부(323)가 형성되는 제2틈새마개부재(320)를 포함하는 것을 특징으로 하는 관류 고정장치와,A frame part 110 that is seated on a ship and formed so that a plurality of pipes 10 are positioned thereon, a first pipe support part 120a positioned on one side of the frame part 110, and the first pipe support part ( 120b) and the pipe support portion 120 formed including the second pipe support portion 120b formed at a location spaced apart from each other by a predetermined distance, and formed to have a predetermined length and width, one side of which is provided with fastening teeth at a predetermined interval The pipe fixing part 130 in which the part 131 is formed; a pipe displacement preventing member 200 formed to surround a portion of an upper outer circumferential surface of the pipe 10; After the pipe 10 is surrounded by the pipe fixing part 130, a gap stopper member 300 for being inserted into the empty space; includes, wherein the first pipe support part 120a has one side of the frame part 110. A first frame accommodating space portion 121a formed to be received and coupled, and a first pipe seating portion 122a formed to seat the pipe 10, wherein the first pipe seating portion 122a is a pipe A first pipe fixing part fixing groove 122-1a is included so that one side of the fixing part 130 is coupled and fixed, and the second pipe support part 120b is received and coupled to one side of the frame part 110. A second frame accommodating space portion (121b) formed so as to include a second pipe seating portion (122b) formed for seating the pipe (10), wherein the second pipe seating portion (122b) is a pipe fixing portion ( A first pipe fixing part passing hole 122-1b is formed on one side to pass 130), and a second pipe fixing part passing hole 122-1b is spaced apart from the first pipe fixing part passing hole 122-1b. A hole (122-2b) is formed, and the inner surface of the first pipe fixing part through hole (122-1b) has a first locking part (122-1b) so as to correspond to the toothed part (131) of the pipe fixing part (130). ') is formed, and the inner surface of the second pipe fixing part through hole 122-2b has a second locking part 122-2b' to correspond to the fastening tooth part 131 of the pipe fixing part 140. The pipe displacement prevention member 200 is located on the inner surface of the pipe displacement disaster prevention member 200, but the pipe adhesion part 210 is formed in the form of a plurality of protrusions to have an uneven shape, and the pipe One side of the outer surface of the displacement prevention member 200 accommodates the pipe movement prevention member 160 but includes a pipe movement prevention member fastening groove 220 formed in a bone shape, and the gap stopper member 300 is a pipe 10 ), the first head portion 311 formed to have a greater width (R2) than the width of the empty space (R1) of the pipe fixing portion 130 is formed on one side and the other side is a second gap plug member (320) A first gap closure member 310 having a fitting hole 312 formed therein to be coupled with, and The second head part 321 is formed on one side so that the side has a width R2 greater than the width of the empty space R1 of the pipe movement preventing member 160, and the other side of the first gap plug member 310 A perfusion fixing device, characterized in that it includes a second gap plug member 320 having a protrusion 323 formed thereon to be coupled to the fitting hole 312;

선박의 일측에 프레임부(110)를 설치하는 프레임설치단계(S1); 상기 프레임설치단계(S1) 이후, 프레임부(110)의 일측에 제1파이프받침부(120a)와 제2파이프받침부(120b)를 포함하는 파이프받침부(120)를 설치하는 파이프받침부설치단계(S2); 상기 파이프받침부설치단계(S2)를 통해 제1파이프받침부(120a)와 제2파이프받침부(120b) 사이에 파이프(10)를 안착시키는 파이프안착단계(S3); 상기 파이프안착단계(S3) 이후 파이프(10)의 일측에 파이프변위방지부재(200)를 체결시키는 파이프변위방지부재체결단계(S4); 상기 파이프변위방지부재체결단계(S4) 이후, 파이프변위방지부재(200)의 파이프이동방지부재체결홈(220)에 파이프고정부(130)가 수용되도록 한 다음 제2파이프받침부(120b)의 제2파이프안착부(122b)에 형성된 제1파이프고정부통과홀(122-1b)로 파이프고정부(130)를 통과시킨 다음 제2파이프고정부통과홀(122-2b)로 파이프고정부(130)를 통과시키어 파이프(10)를 고정시키는 파이프고정부체결단계(S5); 상기 파이프고정부체결단계(S5) 이후, 파이프(10)와 파이프고정부(130) 사이의 빈 공간에 틈새마개부재(300)를 끼움결합하는 틈새마개부재체결단계(S6);를 포함하고, 프레임설치단계(S1)의 프레임부(110)는 선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되고, A frame installation step (S1) of installing the frame unit 110 on one side of the vessel; After the frame installation step (S1), a pipe support for installing a pipe support 120 including a first pipe support part 120a and a second pipe support part 120b on one side of the frame part 110 is installed. step (S2); a pipe seating step (S3) of seating the pipe 10 between the first pipe support part 120a and the second pipe support part 120b through the pipe support part installation step (S2); a pipe displacement preventing member fastening step (S4) of fastening the pipe displacement preventing member 200 to one side of the pipe 10 after the pipe seating step (S3); After the pipe displacement preventing member fastening step (S4), the pipe fixing part 130 is accommodated in the pipe movement preventing member fastening groove 220 of the pipe displacement preventing member 200, and then of the second pipe supporting part 120b. The pipe fixing part 130 is passed through the first pipe fixing part passing hole 122-1b formed in the second pipe receiving part 122b, and then the pipe fixing part 130 is passed through the second pipe fixing part passing hole 122-2b. 130) through a pipe fixing part fastening step (S5) to fix the pipe 10; After the pipe fixing part fastening step (S5), the gap plug member fastening step (S6) of fitting the gap plug member 300 in the empty space between the pipe 10 and the pipe fixing part 130; The frame portion 110 of the frame installation step (S1) is seated on the ship and is formed such that a plurality of pipes 10 are located at the upper portion,

파이프받침부설치단계(S2)의 파이프받침부(120)는 프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성되되, 상기 제1파이프받침부(120a)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제1프레임수용공간부(121a)와, 파이프(10)가 안착되기 위해 형성되는 제1파이프안착부(122a)를 포함하되, 상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하고, 상기 제2파이프받침부(120b)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제2프레임수용공간부(121b)와, 파이프(10)가 안착되기 위해 형성되는 제2파이프안착부(122b)를 포함하되, 상기 제2파이프안착부(122b)는 파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성되며, 상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성되는 것을 특징으로 하고, 파이프변위방지부재체결단계(S4)의 파이프변위방지부재(200)는 파이프(10)의 상측 외주면 일부를 둘러싸도록 형성되고, 파이프변위방재부재(200)의 내부면에 위치하되 요철형태를 가지도록 다수의 돌기 형태로 형성되는 파이프밀착부(210)와, 파이프변위방지부재(200)의 외부면 일측은 파이프이동방지부재(160)을 수용하되 골형상으로 형성되는 파이프이동방지부재체결홈(220)을 포함하고, 파이프고정부체결단계(S5)의 파이프고정부(130)는 소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성되고, 틈새마개부재체결단계(S6)의 틈새마개부재(300)는 파이프고정부(130)에 파이프(10)가 둘러싸인 후 빈 공간에 삽입되기 위한 것으로, 파이프(10)에 둘러싸인 파이프고정부(130)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 형성되는 제1헤드부(311)가 일측에 형성되고 타측은 제2틈새마개부재(320)와 결합되도록 끼움홀(312)이 형성되는 제1틈새마개부재(310)와, 일측이 파이프이동방지부재(160)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 일측에 제2헤드부(321)가 형성되고 타측은 상기 제1틈새마개부재(310)의 끼움홀(312)에 결합되도록 돌출부(323)가 형성되는 제2틈새마개부재(320)를 포함하는 것을 특징으로 하는 관류 고정장치의 설치방법을 제공한다.The pipe support part 120 of the pipe support part installation step (S2) is a position spaced apart from the first pipe support part 120a and the first pipe support part 120b located on one side of the frame part 110 by a predetermined distance. It is formed to include a second pipe support portion (120b) formed in the, the first pipe support portion (120a) is a first frame accommodating space portion (121a) formed so that one side of the frame portion 110 is accommodated and coupled. ) and a first pipe seating part 122a formed to be seated on the pipe 10, wherein the first pipe seating part 122a is a first pipe fixing part 130 such that one side of the pipe fixing part 130 is coupled and fixed. A second frame accommodating space portion (121b) including a pipe fixing portion fixing groove (122-1a), and the second pipe receiving portion (120b) is formed such that one side of the frame portion (110) is accommodated and coupled; The pipe 10 includes a second pipe seating portion 122b formed to be seated, wherein the second pipe seating portion 122b passes through the first pipe fixing portion on one side to allow the pipe fixing portion 130 to pass therethrough. A hole 122-1b is formed, and a second pipe fixing part passing hole 122-2b is formed at a position spaced apart from the first pipe fixing part passing hole 122-1b by a predetermined distance, and the first pipe A first locking part 122-1b' is formed on the inner surface of the fixing part passing hole 122-1b to correspond to the toothed part 131 of the pipe fixing part 130, and the second pipe fixing part passing hole is formed. The inner surface of (122-2b) is characterized in that the second locking part (122-2b') is formed to correspond to the fastening tooth part 131 of the pipe fixing part 140, and the pipe displacement preventing member fastening step ( The pipe displacement prevention member 200 of S4) is formed to surround a part of the upper outer peripheral surface of the pipe 10, and is located on the inner surface of the pipe displacement disaster prevention member 200, but is formed in the form of a plurality of protrusions to have an uneven shape One side of the outer surface of the pipe adhesion part 210 and the pipe displacement prevention member 200 accommodates the pipe movement prevention member 160 but includes a pipe movement prevention member fastening groove 220 formed in a bone shape, and the pipe height The pipe fixing part 130 of the government fastening step (S5) has a predetermined length and width. After the pipe 10 is surrounded by the pipe fixing part 130, the fastening tooth part 131 is formed on one side with a predetermined interval, and the gap plug member 300 of the gap plug member fastening step (S6) is To be inserted into the empty space, the first head portion 311 formed to have a width R2 greater than the width of the empty space R1 of the pipe fixing portion 130 surrounded by the pipe 10 is formed on one side. and the other side of the first clearance stopper member 310 having a fitting hole 312 formed thereon to be coupled with the second clearance stopper member 320, and one side of the empty space R1 of the pipe movement preventing member 160 is wider than the width A second gap in which a second head part 321 is formed on one side to have a large width R2 and a protrusion 323 is formed on the other side to be coupled to the fitting hole 312 of the first gap stopper member 310 . It provides a method of installing a perfusion fixing device, characterized in that it includes a stopper member (320).

본 발명은 설치가 용이하고 외부의 영향에도 파이프가 흔들리지 않도록 고정시킬 수 있는 관류 고정장치를 제공함으로써 배에서 진동이 발생되더라도 소음이 발생되지 않으며 파이프를 쉽게 고정시킬 수 있어 작업의 편리성이 향상되는 이점이 있다.The present invention provides a perfusion fixing device that is easy to install and can fix the pipe so that it is not shaken even by external influences, so that no noise is generated even if vibration occurs in the ship, and the pipe can be easily fixed to improve the convenience of work. There is an advantage.

도 1은 본 발명의 전체적인 모습을 나타낸 도면이다.
도 2 및 도 3은 본 발명의 파이프고정장치에 관한 도면이다.
도 4는 본 발명의 파이프고정장치의 작동예를 나타낸 도면이다.
도 5는 본 발명의 파이프고정장치의 실시예 2에 관한 도면이다.
도 6은 본 발명의 파이프고정장치의 실시예 2에 따른 파이프변위방지부재에 관한 도면이다.
도 7은 본 발명의 실시예 2에 따른 파이프변위방지부재가 파이프에 체결된 모습의 확대도이다.
도 8은 본 발명의 파이프고정장치의 실시예 3에 따른 틈새마개부재에 관한 도면이다.
도 9는 본 발명의 실시예 3에 따른 틈새마개부재가 체결된 파이프고정장치에 관한 도면이다.
도 10은 본 발명의 실시예 3에 따른 참고도면이다.
도 11은 본 발명의 파이프고정장치의 설치방법에 관한 순서도이다.
도 12 내지 도 17은 본 발명의 파이프고정장치의 설치방법에 관해 순서대로 나타낸 도면이다.
1 is a view showing the overall appearance of the present invention.
2 and 3 are views related to the pipe fixing device of the present invention.
4 is a view showing an operation example of the pipe fixing device of the present invention.
5 is a view related to the second embodiment of the pipe fixing device of the present invention.
6 is a view of a pipe displacement preventing member according to the second embodiment of the pipe fixing device of the present invention.
7 is an enlarged view of a state in which the pipe displacement preventing member according to the second embodiment of the present invention is fastened to the pipe.
8 is a view of a gap plug member according to the third embodiment of the pipe fixing device of the present invention.
9 is a view of a pipe fixing device to which a gap plug member is fastened according to a third embodiment of the present invention.
10 is a reference view according to Embodiment 3 of the present invention.
11 is a flow chart related to the installation method of the pipe fixing device of the present invention.
12 to 17 are views sequentially showing the installation method of the pipe fixing device of the present invention.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present specification and claims should not be construed as being limited to their ordinary or dictionary meanings, and the inventor may properly define the concept of the term in order to best describe his invention. Based on the principle, it should be interpreted as meaning and concept consistent with the technical idea of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1을 참고하면, 본 발명은 관류 고정장치에 관한 것으로, 구체적으로 선박의 여러 부분에 설치되어 있는 파이프(10)를 프레임 등에 견고하게 고정시켜주고 한번에 다수의 파이프(10)를 연결할 수 있도록 하는 관류 고정장치에 관한 것이다.Referring to Figure 1, the present invention relates to a perfusion fixing device, specifically, to securely fix pipes 10 installed in various parts of a ship to a frame, etc., and to connect a plurality of pipes 10 at once. It relates to a perfusion fixture.

본 발명의 관류고정장치(100)는 프레임부(110), 파이프받침부(120), 파이프고정부(130)를 포함하여 구성된다.The perfusion fixing device 100 of the present invention is configured to include a frame part 110 , a pipe support part 120 , and a pipe fixing part 130 .

각 구성요소를 구체적으로 설명하면 다음과 같다.Each component is described in detail as follows.

프레임부(110)는 선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되는 것이다.The frame part 110 is seated on a ship and is formed such that a plurality of pipes 10 are positioned thereon.

상기 프레임부(110)는 앵글(Angle), 채널(Channel), 에이치 빔(H-Beam), 스퀘어 튜브(Square Tube) 및 아이 빔(I-Beam) 등과 같은 지지체를 모두 총칭하는 개념으로 이해될 수 있다.The frame unit 110 may be understood as a concept that collectively refers to all supports such as an angle, a channel, an H-beam, a square tube, and an I-Beam. can

도 2 및 도 3을 참고하면 파이프받침부(120)는 프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성된다.Referring to FIGS. 2 and 3 , the pipe support part 120 is spaced apart from the first pipe support part 120a and the first pipe support part 120b located on one side of the frame part 110 by a predetermined distance. It is formed to include a second pipe support portion (120b) is formed.

제1파이프받침부(120a)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 제1프레임수용공간부(121a)가 형성되고 파이프(10)가 안착되기 위한 제1파이프안착부(122a)가 형성된다. 상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하여 구성된다.The first pipe support part 120a has a first frame accommodating space part 121a formed so that one side of the frame part 110 is accommodated and coupled, and a first pipe seating part 122a for the pipe 10 to be seated. is formed The first pipe seating part 122a is configured to include a first pipe fixing part fixing groove 122-1a so that one side of the pipe fixing part 130 is coupled and fixed.

제2파이프받침부(120b)는 상기 프레임부(110)의 일측이 수용되어 결합되도록 제2프레임수용공간부(121b)가 형성되고 파이프(10)가 안착되기 위한 제2파이프안착부(122b)가 형성된다.The second pipe support part 120b has a second frame accommodating space part 121b formed so that one side of the frame part 110 is accommodated and coupled, and a second pipe seating part 122b for the pipe 10 to be seated. is formed

상기 제2파이프안착부(122b)는 파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성된다.The second pipe seating part 122b has a first pipe fixing part passing hole 122-1b formed on one side so that the pipe fixing part 130 passes, and the first pipe fixing part passing hole 122-1b. ) and the second pipe fixing part through hole (122-2b) is formed at a spaced apart position.

상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성된다.A first locking part 122-1b' is formed on the inner surface of the first pipe fixing part through hole 122-1b to correspond to the toothed part 131 of the pipe fixing part 130, and the second pipe A second locking part 122-2b' is formed on the inner surface of the fixing part passing hole 122-2b to correspond to the fastening tooth part 131 of the pipe fixing part 140.

파이프고정부(130)는 소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성된다. 또한 상기 파이프고정부(130)의 일측은 상기 제1파이프받침부(120a)의 제1파이프고정부고정홈(122-1a)에 고정되도록 형성되며 파이프(10)의 외주연을 둘러싸되 타측은 제1파이프고정부통과홀(122-1b)과 제2파이프고정부통과홀(122-2b)을 각각 통과하도록 형성된다.The pipe fixing part 130 is formed to have a predetermined length and width, and one side of the pipe fixing part 130 has a predetermined interval and a fastening tooth part 131 is formed. In addition, one side of the pipe fixing part 130 is formed to be fixed to the first pipe fixing part fixing groove 122-1a of the first pipe supporting part 120a and surrounds the outer periphery of the pipe 10, but the other side is It is formed to pass through the first pipe fixing part through hole (122-1b) and the second pipe fixing part passing hole (122-2b), respectively.

도 4를 참고하면 파이프고정부(130)가 제1파이프고정부통과홀(122-1b)과 제2파이프고정부통과홀(122-2b)을 통과할 때 파이프고정부(130)에 형성된 체결톱니부(131)가 제1파이프고정부통과홀(122-1b)의 제1걸림부(122-1b')를 통과한 후(진행방향인 S1방향 참고), 제2파이프고정부통과홀(122-2b)의 제2걸림부(122-2b')를 통과함으로써(진행방향인 S2방향 참고) 파이프(10)를 움직이지 않도록 고정시킬 수 있으며, 상기 제1걸림부(122-1b')와 제2걸림부(122-2b')는 진행방향(S1,S2)으로 갈수록 하방경사진 형태의 톱니형태로 다수개가 형성되어 진행반대방향으로 이탈되지 않도록 하는 것이 바람직하다.Referring to FIG. 4 , the fastening formed in the pipe fixing part 130 when the pipe fixing part 130 passes through the first pipe fixing part passing hole 122-1b and the second pipe fixing part passing hole 122-2b. After the toothed part 131 passes through the first stopping part 122-1b' of the first pipe fixing part passing hole 122-1b (refer to the direction S1 which is the moving direction), the second pipe fixing part passing hole ( By passing the second locking part 122-2b' of 122-2b) (refer to the direction S2, which is the moving direction), the pipe 10 can be fixed so as not to move, and the first locking part 122-1b') and the second locking portion 122-2b ′ are preferably formed in a plurality of sawtooth shapes inclined downward toward the traveling directions S1 and S2 so as not to be separated in the opposite direction.

도 5 내지 도 7은 본 발명의 실시예 2에 따른 파이프고정장치에 관한 것으로, 실시예 2에 따른 파이프고정장치는 파이프변위방지부재(200)가 추가로 형성된다.5 to 7 relate to a pipe fixing device according to a second embodiment of the present invention, and the pipe fixing device according to the second embodiment is further provided with a pipe displacement preventing member 200 .

파이프변위방지부재(200)는 파이프(10)의 상측 외주면 일부를 둘러싸도록 형성되되, 파이프(10)가 제1파이프받침부(120a)와 제2파이프받침부(120b) 사이에 위치하도록 안착된 상태에서 제1파이프받침부(120a)와 파이프(10)가 만나는 일측부에서 제2파이프받침부(120b)와 파이프(10)가 만나는 타측부까지 둘러싸도록 형성되는 것이 바람직하다.The pipe displacement prevention member 200 is formed to surround a portion of the upper outer peripheral surface of the pipe 10, and the pipe 10 is seated so as to be positioned between the first pipe support part 120a and the second pipe support part 120b. In the state, it is preferable to surround from one side where the first pipe supporting part 120a and the pipe 10 meet to the other side where the second pipe supporting part 120b and the pipe 10 meet.

도 6을 참고하면 상기 파이프변위방지부재(200)의 내부면은 파이프(10)를 감쌀때 움직이지 않고 마찰력을 가지도록 요철형태를 가지도록 다수의 돌기 형태로 형성되는 파이프밀착부(210)가 형성된다. 파이프변위방지부재(200)의 외부면 일측은 파이프이동방지부재(160)을 수용하되 파이프이동방지부재(160)의 위치가 변위되는 것을 방지하도록 골형상으로 형성되는 파이프이동방지부재체결홈(220)이 형성된다.Referring to FIG. 6 , the inner surface of the pipe displacement preventing member 200 is formed in the form of a plurality of protrusions so as to have a concave-convex shape so as not to move when wrapping the pipe 10 and to have frictional force. is formed One side of the outer surface of the pipe displacement prevention member 200 accommodates the pipe movement prevention member 160, but the pipe movement prevention member fastening groove 220 is formed in a bone shape to prevent the position of the pipe movement prevention member 160 from being displaced. ) is formed.

도 7을 참고하면 파이프고정부(130)는 파이프변위방지부재(200)의 외주연을 둘러싸되, 파이프변위방지부재(200)의 파이프이동방지부재체결홈(220)에 파이프고정부(130)가 수용되도록 형성된다.Referring to FIG. 7 , the pipe fixing part 130 surrounds the outer periphery of the pipe displacement preventing member 200 , and the pipe fixing part 130 in the pipe movement preventing member fastening groove 220 of the pipe displacement preventing member 200 . is formed to accommodate

상기 파이프변위방지부재(200)가 형성됨으로써 외부의 진동 등에 의해 파이프고정부(130)가 슬립되는 것을 방지하여 파이프(10)를 단단하게 고정시킬 수 있는 이점이 있다.Since the pipe displacement preventing member 200 is formed, there is an advantage in that the pipe fixing part 130 is prevented from slipping due to external vibration, etc., and thus the pipe 10 can be firmly fixed.

도 8 및 도 9는 틈새마개부재(300)에 관한 도면으로, 파이프고정부(130)에 파이프(10)가 둘러싸인 후 빈 공간에 삽입되어 파이프(10)가 유격되는 것을 방지할 수 있다.8 and 9 are views of the gap plug member 300 , and after the pipe 10 is surrounded by the pipe fixing part 130 , it is inserted into an empty space to prevent the pipe 10 from having a gap.

도 9를 참고하면 틈새마개부재(300)는 제1틈새마개부재(310)와 제2틈새마개부재(320)를 포함하여 형성되되 제1틈새마개부재(310)는 파이프(10)에 둘러싸인 파이프고정부(130)의 빈 공간(T)의 폭(R1)보다 큰 폭(R2)을 가지도록 형성되는 제1헤드부(311)가 일측에 형성되고 타측은 제2틈새마개부재(320)와 결합되도록 끼움홀(312)이 형성된다(도 10 참고). Referring to FIG. 9 , the gap plug member 300 is formed to include a first gap plug member 310 and a second gap plug member 320 , and the first gap plug member 310 is a pipe surrounded by a pipe 10 . The first head part 311 formed to have a width R2 greater than the width R1 of the empty space T of the fixing part 130 is formed on one side, and the other side is formed with a second gap plug member 320 and A fitting hole 312 is formed to be coupled (refer to FIG. 10).

제2틈새마개부재(320)는 일측이 파이프이동방지부재(160)의 빈 공간(T)의 폭(R1)보다 큰 폭(R2)을 가지도록 일측에 제2헤드부(321)가 형성되고 타측은 상기 제1틈새마개부재(310)의 끼움홀(312)에 결합되도록 돌출부(323)가 형성된다(도 10 참고).A second head part 321 is formed on one side of the second gap plug member 320 so that one side has a width R2 larger than the width R1 of the empty space T of the pipe movement preventing member 160, On the other side, a protrusion 323 is formed to be coupled to the fitting hole 312 of the first gap plug member 310 (refer to FIG. 10).

도 10(a)는 파이프고정부(130)와 파이프(10) 사이의 빈 공간(T)을 표시한 것으로, 도 10(b)와 같이 빈 공간(T)에 틈새마개부재(300)를 체결할 수 있으며 빈 공간(T)의 폭(R1)보다 틈새마개부재(300)의 제1헤드부(311)와 제2헤드부(321)의 폭(R2)이 크기 때문에 틈새마개부재(300)가 이탈되지 않고 빈 공간(T)을 메울 수 있다.FIG. 10 (a) shows the empty space T between the pipe fixing part 130 and the pipe 10, and as shown in FIG. 10 (b), the gap plug member 300 is fastened to the empty space T. Since the width R2 of the first head part 311 and the second head part 321 of the gap plug member 300 is larger than the width R1 of the empty space T, the gap plug member 300 can fill the empty space T without being separated.

도 10는 설명의 편의를 위해 빈 공간(T)의 폭을 R1이라고 표시하였고, 틈새마개부재(300)의 구성요소인 제1헤드부(311)와 제2헤드부(321)의 폭을 R2라고 통칭하여 표현했으나 제1헤드부(311)와 제2헤드부(321)의 크기는 상이할 수 있음은 물론이다.10 shows the width of the empty space T as R1 for convenience of explanation, and the width of the first head part 311 and the second head part 321 which are components of the gap plug member 300 is R2. Although expressed collectively as, the sizes of the first head part 311 and the second head part 321 may be different, of course.

도 11은 본 발명의 파이프고정장치의 설치방법에 관한 순서도이다.11 is a flow chart related to the installation method of the pipe fixing device of the present invention.

본 발명의 파이프고정장치의 설치방법은 프레임부설치단계(S1), 파이프받침부설치단계(S2), 파이프안착단계(S3), 파이프변위방지부재체결단계(S4), 파이프고정부체결단계(S5), 틈새마개부재체결단계(S6)를 포함하여 진행된다.The installation method of the pipe fixing device of the present invention includes a frame part installation step (S1), a pipe support part installation step (S2), a pipe seating step (S3), a pipe displacement prevention member fastening step (S4), a pipe fixing part fastening step ( S5), it proceeds including the gap plug member fastening step (S6).

도 12 내지 도 17을 참고하여 본 발명의 고정장치의 설치방법을 구체적으로 설명한다.An installation method of the fixing device of the present invention will be described in detail with reference to FIGS. 12 to 17 .

S1) 프레임부설치단계S1) Frame part installation step

프레임설치단계(S1)는 선박의 일측에 프레임부(110)를 설치하는 단계이다.The frame installation step (S1) is a step of installing the frame unit 110 on one side of the ship.

상기 프레임설치단계(S1)는 도 12를 통하여 확인할 수 있다. 또한 상기 프레임설치단계(S1)는 파이프(10)를 양쪽으로 받칠 수 있도록 2개가 설치되는 것이 바람직하다.The frame installation step (S1) can be confirmed through FIG. 12 . In addition, in the frame installation step (S1), it is preferable that two are installed so as to support the pipe 10 on both sides.

S2) 파이프받침부설치단계S2) Pipe support part installation step

파이프받침부설치단계(S2)는 상기 프레임설치단계(S1) 이후, 프레임부(110)의 일측에 제1파이프받침부(120a)와 제2파이프받침부(120b)를 포함하는 파이프받침부(120)를 설치하는 단계이다.The pipe support part installation step (S2) is a pipe support part including a first pipe support part 120a and a second pipe support part 120b on one side of the frame part 110 after the frame installation step (S1) ( 120) is installed.

도 13을 참고하며 파이프받침부설치단계(S2)는 파이프받침부(120)가 프레임부(110)에 설치된 모습을 나타낸 도면으로 파이프받침부(120)의 파이프수용공간부(121)로 프레임부(110)가 수용되도록 설치되며, 2개의 프레임부(110)가 설치됨에 따라 2개의 파이프받침부(120)가 설치된다.Referring to FIG. 13, the pipe support part installation step (S2) is a view showing a state in which the pipe support part 120 is installed on the frame part 110, and the frame part into the pipe receiving space part 121 of the pipe support part 120. (110) is installed to be accommodated, and as the two frame parts 110 are installed, two pipe support parts 120 are installed.

S3) 파이프안착단계S3) Pipe seating step

파이프안착단계(S3)는 상기 파이프받침부설치단계(S2)를 통해 설치된 제1파이프받침부(120a)와 제2파이프받침부(120b) 사이에 파이프(10)를 안착시키는 단계이다.The pipe seating step (S3) is a step of seating the pipe 10 between the first pipe support part 120a and the second pipe support part 120b installed through the pipe support part installation step S2.

도 14는 파이프안착단계(S3)에 관한 도면으로, 파이프고정부(130)가 위치한 곳에 파이프(10)가 위치되도록 한다.14 is a view of the pipe seating step (S3), so that the pipe 10 is positioned where the pipe fixing part 130 is positioned.

S4) 파이프변위방지부재체결단계S4) Pipe displacement prevention member fastening step

파이프변위방지부재체결단계(S4)는 상기 파이프안착단계(S3) 이후 파이프(10)의 일측에 파이프변위방지부재(200)를 체결시킨다.In the pipe displacement preventing member fastening step (S4), the pipe displacement preventing member 200 is fastened to one side of the pipe 10 after the pipe seating step (S3).

도 15는 파이프변위방지부재체결단계(S4)에 관한 도면이며, 바람직하게는 파이프받침부(120)에 안착되는 부분의 파이프(10)에 파이프변위방지부재(200)를 체결시키되 두 개의 프레임부(110)가 형성됨에 따라 2개의 파이프변위방지부재(200)가 체결된다.15 is a view of the pipe displacement preventing member fastening step (S4), preferably fastening the pipe displacement preventing member 200 to the pipe 10 of the portion seated on the pipe supporting part 120, but two frame parts As the 110 is formed, the two pipe displacement preventing members 200 are fastened.

상기 파이프변위방지부재체결단계(S4)는 필요에 따라 생략될 수도 있으며, 파이프변위방지부재체결단계(S4)가 생략되는 경우 상기 파이프안착단계(S3)에서 파이프고정부체결단계(S5)로 진행된다.The pipe displacement preventing member fastening step (S4) may be omitted if necessary, and when the pipe displacement preventing member fastening step (S4) is omitted, the pipe fixing step (S5) proceeds from the pipe seating step (S3) do.

S5) 파이프고정부체결단계S5) Pipe fixing part fastening step

파이프고정부체결단계(S5)는 상기 파이프변위방지부재체결단계(S4) 이후, 파이프변위방지부재(200)의 파이프이동방지부재체결홈(220)에 파이프고정부(130)가 수용되도록 한 다음 제2파이프받침부(120b)의 제2파이프안착부(122b)에 형성된 제1파이프고정부통과홀(122-1b)로 파이프고정부(130)를 통과시킨 다음 제2파이프고정부통과홀(122-2b)로 파이프고정부(130)를 통과시키어 파이프(10)를 고정시키는 단계이다.In the pipe fixing part fastening step (S5), after the pipe displacement preventing member fastening step (S4), the pipe fixing part 130 is accommodated in the pipe movement preventing member fastening groove 220 of the pipe displacement preventing member 200, and then After passing the pipe fixing part 130 through the first pipe fixing part passing hole 122-1b formed in the second pipe receiving part 122b of the second pipe supporting part 120b, the second pipe fixing part passing hole ( 122-2b) is a step of fixing the pipe 10 by passing the pipe fixing part 130.

도 16은 상기 파이프고정부체결단계(S5)를 통해 파이프(10)가 고정된 모습에 관한 도면이며, 도 4를 참고하면 파이프변위방지부재(200)를 감싼 후 S1 방향을 따라 파이프고정부(130)가 파이프받침부(120)의 제1파이프고정부통과홀(122-1b)을 통과하고, S2 방향을 따라 파이프고정부(130)가 파이프받침부(120)의 제2파이프고정부통과홀(122-2b)을 통과한다.16 is a view of a state in which the pipe 10 is fixed through the pipe fixing part fastening step (S5). Referring to FIG. 4, after wrapping the pipe displacement preventing member 200, the pipe fixing part along the S1 direction ( 130) passes through the first pipe fixing part through hole 122-1b of the pipe supporting part 120, and the pipe fixing part 130 passes through the second pipe fixing part of the pipe supporting part 120 along the S2 direction. It passes through the hole (122-2b).

만일 파이프변위방지부재체결단계(S4)가 생략되는 경우 파이프(10)의 외주연을 따라 파이프고정부(130)가 감싸지도록 한다.If the pipe displacement preventing member fastening step (S4) is omitted, the pipe fixing part 130 is wrapped along the outer periphery of the pipe 10.

S6) 틈새마개부재체결단계S6) Interstitial plug member fastening step

틈새마개부재체결단계(S6)는 상기 파이프고정부체결단계(S5) 이후, 파이프(10)와 파이프고정부(130) 사이의 빈 공간에 틈새마개부재(300)를 끼움결합하는 단계이다.The gap plug member fastening step (S6) is a step of fitting the gap plug member 300 into the empty space between the pipe 10 and the pipe fixing part 130 after the pipe fixing part fastening step (S5).

도 17은 틈새마개부재체결단계(S6)에 관한 도면으로, 도면과 같이 틈새마개부재를 체결함으로써 파이프(10)가 유격되지 않도록 할 수 있다.17 is a view related to the step of fastening the gap plug member (S6). By fastening the gap plug member as shown in the drawing, the pipe 10 can be prevented from having a gap.

이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.The configuration shown in the embodiments and drawings described in the present specification as described above is only the most preferred embodiment of the present invention and does not represent all the technical spirit of the present invention, so various equivalents and modifications that can be substituted for them It should be understood that there may be examples.

10 파이프
100 관류고정장치
110 프레임부
120 파이프받침부
120a 제1파이프받침부
121a 제1프레임수용공간부
122a 제1파이프안착부
122-1a 제1파이프고정부고정홈
120b 제2파이프받침부
121b 제2프레임수용공간부
122b 제2파이프안착부
122-1b 제1파이프고정부통과홀
122-1b' 제1걸림부
122-2b 제2파이프고정부통과홀
122-2b' 제2걸림부
130 파이프고정부
200 파이프변위방지부재
210 파이프밀착부
220 파이프이동방지부재체결홈
300 틈새마개부재
310 제1틈새마개부재
311 제1헤드부
312 끼움홀
320 제2틈새마개부재
321 제2헤드부
323 돌출부
10 pipe
100 Perfusion Fixture
110 frame
120 pipe support
120a 1st pipe support part
121a first frame accommodating space
122a first pipe seating part
122-1a 1st pipe fixing part fixing groove
120b 2nd pipe support part
121b second frame accommodating space
122b second pipe seating part
122-1b 1st pipe fixing part passage hole
122-1b' first locking part
122-2b 2nd pipe fixing part passage hole
122-2b' second locking part
130 pipe fixing part
200 Pipe displacement prevention member
210 pipe fitting
220 Pipe movement prevention member fastening groove
300 gap plug member
310 First gap plug member
311 first head part
312 fitting hole
320 Second gap plug member
321 second head part
323 protrusion

Claims (3)

선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되는 프레임부(110)와,
프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성되는 파이프받침부(120)와,
소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성되는 파이프고정부(130)를 포함하고,

상기 제1파이프받침부(120a)는
상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제1프레임수용공간부(121a)와,
파이프(10)가 안착되기 위해 형성되는 제1파이프안착부(122a)를 포함하되,
상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하고,

상기 제2파이프받침부(120b)는
상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제2프레임수용공간부(121b)와,
파이프(10)가 안착되기 위해 형성되는 제2파이프안착부(122b)를 포함하되,
상기 제2파이프안착부(122b)는
파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성되며,
상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성되는 것을 특징으로 하는 관류 고정장치.
A frame portion 110 that is seated on a ship and formed such that a plurality of pipes 10 are positioned thereon;
A first pipe support part (120a) located on one side of the frame part (110) and a second pipe support part (120b) formed in a position spaced apart from the first pipe support part (120b) by a predetermined distance. The pipe support part 120 and
It is formed to have a predetermined length and width, and one side includes a pipe fixing portion 130 having a predetermined interval and a fastening tooth portion 131 is formed,

The first pipe support part (120a) is
A first frame accommodating space (121a) formed so that one side of the frame part (110) is accommodated and coupled;
Including a first pipe seating portion (122a) formed to be seated in the pipe (10),
The first pipe seating part 122a includes a first pipe fixing part fixing groove 122-1a so that one side of the pipe fixing part 130 is coupled and fixed,

The second pipe support part (120b) is
A second frame accommodating space portion 121b formed so that one side of the frame portion 110 is accommodated and coupled;
Including a second pipe seating portion (122b) formed to be seated in the pipe (10),
The second pipe seating portion (122b) is
A first pipe fixing part passing hole 122-1b is formed on one side so that the pipe fixing part 130 passes, and a second second pipe fixing part passing hole 122-1b is spaced apart from the first pipe fixing part passing hole 122-1b. A pipe fixing part through hole (122-2b) is formed,
A first locking part 122-1b' is formed on the inner surface of the first pipe fixing part through hole 122-1b to correspond to the toothed part 131 of the pipe fixing part 130, and the second pipe A perfusion fixing device, characterized in that the inner surface of the fixing part through hole (122-2b) is formed with a second locking part (122-2b') so as to correspond to the fastening tooth part (131) of the pipe fixing part (140).
선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되는 프레임부(110)와,
프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성되는 파이프받침부(120)와,
소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성되는 파이프고정부(130);
파이프(10)의 상측 외주면 일부를 둘러싸도록 형성되는 파이프변위방지부재(200);
파이프고정부(130)에 파이프(10)가 둘러싸인 후 빈 공간에 삽입되기 위한 틈새마개부재(300);를 포함하고,

상기 제1파이프받침부(120a)는
상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제1프레임수용공간부(121a)와,
파이프(10)가 안착되기 위해 형성되는 제1파이프안착부(122a)를 포함하되,
상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하고,

상기 제2파이프받침부(120b)는
상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제2프레임수용공간부(121b)와,
파이프(10)가 안착되기 위해 형성되는 제2파이프안착부(122b)를 포함하되,
상기 제2파이프안착부(122b)는
파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성되며,
상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성되는 것을 특징으로 하고,

상기 파이프변위방지부재(200)는
파이프변위방재부재(200)의 내부면에 위치하되 요철형태를 가지도록 다수의 돌기 형태로 형성되는 파이프밀착부(210)와,
파이프변위방지부재(200)의 외부면 일측은 파이프이동방지부재(160)을 수용하되 골형상으로 형성되는 파이프이동방지부재체결홈(220)을 포함하고,

상기 틈새마개부재(300)는
파이프(10)에 둘러싸인 파이프고정부(130)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 형성되는 제1헤드부(311)가 일측에 형성되고 타측은 제2틈새마개부재(320)와 결합되도록 끼움홀(312)이 형성되는 제1틈새마개부재(310)와,
일측이 파이프이동방지부재(160)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 일측에 제2헤드부(321)가 형성되고 타측은 상기 제1틈새마개부재(310)의 끼움홀(312)에 결합되도록 돌출부(323)가 형성되는 제2틈새마개부재(320)를 포함하는 것을 특징으로 하는 관류 고정장치.
A frame portion 110 that is seated on a ship and formed such that a plurality of pipes 10 are positioned thereon;
A first pipe support part (120a) located on one side of the frame part (110) and a second pipe support part (120b) formed in a position spaced apart from the first pipe support part (120b) by a predetermined distance. The pipe support part 120 and
The pipe fixing portion 130 is formed to have a predetermined length and width, one side of which has a predetermined interval and a fastening tooth portion 131 is formed;
a pipe displacement preventing member 200 formed to surround a portion of an upper outer circumferential surface of the pipe 10;
Including;;

The first pipe support part (120a) is
A first frame accommodating space (121a) formed so that one side of the frame part (110) is accommodated and coupled;
Including a first pipe seating portion (122a) formed to be seated in the pipe (10),
The first pipe seating part 122a includes a first pipe fixing part fixing groove 122-1a so that one side of the pipe fixing part 130 is coupled and fixed,

The second pipe support part (120b) is
A second frame accommodating space portion 121b formed so that one side of the frame portion 110 is accommodated and coupled;
Including a second pipe seating portion (122b) formed to be seated in the pipe (10),
The second pipe seating portion (122b) is
A first pipe fixing part passing hole 122-1b is formed on one side so that the pipe fixing part 130 passes, and a second second pipe fixing part passing hole 122-1b is spaced apart from the first pipe fixing part passing hole 122-1b. A pipe fixing part through hole (122-2b) is formed,
A first locking part 122-1b' is formed on the inner surface of the first pipe fixing part through hole 122-1b to correspond to the toothed part 131 of the pipe fixing part 130, and the second pipe The inner surface of the fixing part through hole (122-2b) is characterized in that the second locking part (122-2b') is formed so as to correspond to the fastening tooth part 131 of the pipe fixing part 140,

The pipe displacement preventing member 200 is
A pipe adhesion part 210 positioned on the inner surface of the pipe displacement disaster prevention member 200 and formed in the form of a plurality of protrusions to have an uneven shape;
One side of the outer surface of the pipe displacement prevention member 200 accommodates the pipe movement prevention member 160, but includes a pipe movement prevention member fastening groove 220 formed in a bone shape,

The gap plug member 300 is
The first head portion 311 formed to have a width R2 greater than the width R1 of the empty space R1 of the pipe 10 surrounded by the pipe 10 is formed on one side, and the second gap plug member is formed on the other side. A first gap plug member 310 in which a fitting hole 312 is formed so as to be coupled to the 320 and;
The second head part 321 is formed on one side so that one side has a width R2 greater than the width of the empty space R1 of the pipe movement preventing member 160, and the other side is the first gap stopper member 310. The perfusion fixing device, characterized in that it comprises a second gap stopper member (320) in which the protrusion (323) is formed so as to be coupled to the fitting hole (312).
선박의 일측에 프레임부(110)를 설치하는 프레임설치단계(S1);
상기 프레임설치단계(S1) 이후, 프레임부(110)의 일측에 제1파이프받침부(120a)와 제2파이프받침부(120b)를 포함하는 파이프받침부(120)를 설치하는 파이프받침부설치단계(S2);
상기 파이프받침부설치단계(S2)를 통해 제1파이프받침부(120a)와 제2파이프받침부(120b) 사이에 파이프(10)를 안착시키는 파이프안착단계(S3);
상기 파이프안착단계(S3) 이후 파이프(10)의 일측에 파이프변위방지부재(200)를 체결시키는 파이프변위방지부재체결단계(S4);
상기 파이프변위방지부재체결단계(S4) 이후, 파이프변위방지부재(200)의 파이프이동방지부재체결홈(220)에 파이프고정부(130)가 수용되도록 한 다음 제2파이프받침부(120b)의 제2파이프안착부(122b)에 형성된 제1파이프고정부통과홀(122-1b)로 파이프고정부(130)를 통과시킨 다음 제2파이프고정부통과홀(122-2b)로 파이프고정부(130)를 통과시키어 파이프(10)를 고정시키는 파이프고정부체결단계(S5);
상기 파이프고정부체결단계(S5) 이후, 파이프(10)와 파이프고정부(130) 사이의 빈 공간에 틈새마개부재(300)를 끼움결합하는 틈새마개부재체결단계(S6);를 포함하고,

프레임설치단계(S1)의 프레임부(110)는 선박에 안착되되 다수의 파이프(10)가 상부에 위치하도록 형성되고,

파이프받침부설치단계(S2)의 파이프받침부(120)는 프레임부(110)의 일측에 위치하는 제1파이프받침부(120a)와 상기 제1파이프받침부(120b)와 소정간격 이격된 위치에 형성되는 제2파이프받침부(120b)를 포함하여 형성되되,
상기 제1파이프받침부(120a)는
상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제1프레임수용공간부(121a)와,
파이프(10)가 안착되기 위해 형성되는 제1파이프안착부(122a)를 포함하되,
상기 제1파이프안착부(122a)는 파이프고정부(130)의 일측이 결합되어 고정되도록 제1파이프고정부고정홈(122-1a)을 포함하고,
상기 제2파이프받침부(120b)는
상기 프레임부(110)의 일측이 수용되어 결합되도록 형성되는 제2프레임수용공간부(121b)와,
파이프(10)가 안착되기 위해 형성되는 제2파이프안착부(122b)를 포함하되,
상기 제2파이프안착부(122b)는
파이프고정부(130)가 통과되기 위해 일측에 제1파이프고정부통과홀(122-1b)이 형성되고, 상기 제1파이프고정부통과홀(122-1b)과 소정 간격 이격된 위치에 제2파이프고정부통과홀(122-2b)이 형성되며,
상기 제1파이프고정부통과홀(122-1b)의 내부면은 파이프고정부(130)의 톱니부(131)와 대응되도록 제1걸림부(122-1b')가 형성되고, 상기 제2파이프고정부통과홀(122-2b)의 내부면은 파이프고정부(140)의 체결톱니부(131)와 대응되도록 제2걸림부(122-2b')가 형성되는 것을 특징으로 하고,

파이프변위방지부재체결단계(S4)의 파이프변위방지부재(200)는 파이프(10)의 상측 외주면 일부를 둘러싸도록 형성되고,
파이프변위방재부재(200)의 내부면에 위치하되 요철형태를 가지도록 다수의 돌기 형태로 형성되는 파이프밀착부(210)와,
파이프변위방지부재(200)의 외부면 일측은 파이프이동방지부재(160)을 수용하되 골형상으로 형성되는 파이프이동방지부재체결홈(220)을 포함하고,

파이프고정부체결단계(S5)의 파이프고정부(130)는 소정 길이와 폭을 가지도록 형성되며 일측면은 소정 간격을 가지고 체결톱니부(131)가 형성되고,

틈새마개부재체결단계(S6)의 틈새마개부재(300)는 파이프고정부(130)에 파이프(10)가 둘러싸인 후 빈 공간에 삽입되기 위한 것으로, 파이프(10)에 둘러싸인 파이프고정부(130)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 형성되는 제1헤드부(311)가 일측에 형성되고 타측은 제2틈새마개부재(320)와 결합되도록 끼움홀(312)이 형성되는 제1틈새마개부재(310)와,
일측이 파이프이동방지부재(160)의 빈 공간(R1)의 폭보다 큰 폭(R2)을 가지도록 일측에 제2헤드부(321)가 형성되고 타측은 상기 제1틈새마개부재(310)의 끼움홀(312)에 결합되도록 돌출부(323)가 형성되는 제2틈새마개부재(320)를 포함하는 것을 특징으로 하는 관류 고정장치의 설치방법.

A frame installation step (S1) of installing the frame unit 110 on one side of the vessel;
After the frame installation step (S1), a pipe support for installing a pipe support 120 including a first pipe support part 120a and a second pipe support part 120b on one side of the frame part 110 is installed. step (S2);
a pipe seating step (S3) of seating the pipe 10 between the first pipe support part 120a and the second pipe support part 120b through the pipe support part installation step (S2);
a pipe displacement preventing member fastening step (S4) of fastening the pipe displacement preventing member 200 to one side of the pipe 10 after the pipe seating step (S3);
After the pipe displacement preventing member fastening step (S4), the pipe fixing part 130 is accommodated in the pipe movement preventing member fastening groove 220 of the pipe displacement preventing member 200, and then of the second pipe supporting part 120b. The pipe fixing part 130 is passed through the first pipe fixing part passing hole 122-1b formed in the second pipe receiving part 122b, and then the pipe fixing part 130 is passed through the second pipe fixing part passing hole 122-2b. 130) through the pipe fixing part fastening step (S5) to fix the pipe 10;
After the pipe fixing part fastening step (S5), the gap plug member fastening step (S6) of fitting the gap plug member 300 in the empty space between the pipe 10 and the pipe fixing part 130;

The frame part 110 of the frame installation step (S1) is seated on a ship and is formed such that a plurality of pipes 10 are located on the upper part,

The pipe support part 120 of the pipe support part installation step (S2) is a position spaced apart from the first pipe support part 120a and the first pipe support part 120b located on one side of the frame part 110 by a predetermined distance. It is formed to include a second pipe support portion (120b) formed in the
The first pipe support part (120a) is
A first frame accommodating space (121a) formed so that one side of the frame part (110) is accommodated and coupled;
Including a first pipe seating portion (122a) formed to be seated in the pipe (10),
The first pipe seating part 122a includes a first pipe fixing part fixing groove 122-1a so that one side of the pipe fixing part 130 is coupled and fixed,
The second pipe support part (120b) is
A second frame accommodating space portion 121b formed so that one side of the frame portion 110 is accommodated and coupled;
Including a second pipe seating portion (122b) formed to be seated in the pipe (10),
The second pipe seating portion (122b) is
A first pipe fixing part passing hole 122-1b is formed on one side so that the pipe fixing part 130 passes, and a second second pipe fixing part passing hole 122-1b is spaced apart from the first pipe fixing part passing hole 122-1b. A pipe fixing part through hole (122-2b) is formed,
A first locking part 122-1b' is formed on the inner surface of the first pipe fixing part through hole 122-1b to correspond to the toothed part 131 of the pipe fixing part 130, and the second pipe The inner surface of the fixing part through hole (122-2b) is characterized in that the second locking part (122-2b') is formed so as to correspond to the fastening tooth part 131 of the pipe fixing part 140,

The pipe displacement prevention member 200 of the pipe displacement prevention member fastening step (S4) is formed to surround a portion of the upper outer peripheral surface of the pipe 10,
A pipe adhesion part 210 positioned on the inner surface of the pipe displacement disaster prevention member 200 and formed in the form of a plurality of protrusions to have an uneven shape;
One side of the outer surface of the pipe displacement prevention member 200 accommodates the pipe movement prevention member 160, but includes a pipe movement prevention member fastening groove 220 formed in a bone shape,

The pipe fixing part 130 of the pipe fixing part fastening step (S5) is formed to have a predetermined length and width, and one side of the pipe fixing part is formed to have a predetermined interval and a fastening tooth part 131 is formed,

The crevice plug member 300 in the step of fastening the gap plug member (S6) is to be inserted into the empty space after the pipe 10 is surrounded by the pipe fixing part 130, and the pipe fixing part 130 surrounded by the pipe 10. The first head portion 311 formed to have a width R2 greater than the width of the empty space R1 is formed on one side, and the fitting hole 312 is formed on the other side to be coupled with the second gap plug member 320. A first gap closure member 310 is formed, and
The second head part 321 is formed on one side so that one side has a width R2 greater than the width of the empty space R1 of the pipe movement preventing member 160, and the other side is the first gap stopper member 310. A method of installing a perfusion fixing device, characterized in that it includes a second gap plug member (320) in which a protrusion (323) is formed so as to be coupled to the fitting hole (312).

KR1020200022129A 2020-02-24 2020-02-24 Pipe fixing system KR20210107315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200022129A KR20210107315A (en) 2020-02-24 2020-02-24 Pipe fixing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200022129A KR20210107315A (en) 2020-02-24 2020-02-24 Pipe fixing system

Publications (1)

Publication Number Publication Date
KR20210107315A true KR20210107315A (en) 2021-09-01

Family

ID=77780108

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200022129A KR20210107315A (en) 2020-02-24 2020-02-24 Pipe fixing system

Country Status (1)

Country Link
KR (1) KR20210107315A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100569853B1 (en) 2003-02-20 2006-04-11 김상열 A through pipe for a vessel piping
KR100785430B1 (en) 2006-08-16 2007-12-13 김상열 Pipe fixing device for vessel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100569853B1 (en) 2003-02-20 2006-04-11 김상열 A through pipe for a vessel piping
KR100785430B1 (en) 2006-08-16 2007-12-13 김상열 Pipe fixing device for vessel

Similar Documents

Publication Publication Date Title
KR101076060B1 (en) System for dynamically sealing at least one conduit through which a pipe or cable extends
JP5924599B2 (en) Flange joint connection structure
JP2004245410A (en) Supporting element for tubular member
KR20150119226A (en) System for sealingly holding cables which extend through an opening
US7722092B2 (en) Pipe joint device by flange
US20190193216A1 (en) Bolt Tensioning Assembly and Method for Tensioning of a Bolt
US11505378B2 (en) Saddle that adjusts to a bundle diameter
JP5978328B2 (en) Cable fixing structure
EP2913574A1 (en) Conduit mounting device
KR20210011417A (en) Profile clamp
KR101918746B1 (en) Pipe support apparatus and Hanger including the same
KR20210107315A (en) Pipe fixing system
CA2662552A1 (en) Connecting means for two crossing cable strands of cable play systems
JP5719063B1 (en) U bolt unit
JP2011002090A (en) Fixing elongate hole and fixture
JP2005337403A (en) Pipe fitting
CN107620752A (en) With the anti-connector assembly assembly parts for jabbing feature
JP5057593B2 (en) Support device for non-average forces in pipes
TW202409462A (en) Steel pipe and joint connection mechanism
JP6888088B2 (en) Bracket support device
KR20210107307A (en) Rope-type clamping device
FR2858129A1 (en) Lattice duct/cable support e.g. cable tray, has successive sections whose ends are connected by splice plate that has flaps which are folded towards each other by including two weft wires pertaining to respective sections
US11306853B2 (en) Floating load ring for flexible joint
US20170299095A1 (en) Pipe joint
JP4387924B2 (en) Pipe support structure