KR20210061655A - An Integrated Management Solution System for Developing Software - Google Patents

An Integrated Management Solution System for Developing Software Download PDF

Info

Publication number
KR20210061655A
KR20210061655A KR1020190149470A KR20190149470A KR20210061655A KR 20210061655 A KR20210061655 A KR 20210061655A KR 1020190149470 A KR1020190149470 A KR 1020190149470A KR 20190149470 A KR20190149470 A KR 20190149470A KR 20210061655 A KR20210061655 A KR 20210061655A
Authority
KR
South Korea
Prior art keywords
module
issue
charge
person
time
Prior art date
Application number
KR1020190149470A
Other languages
Korean (ko)
Other versions
KR102315547B1 (en
Inventor
이영석
고태우
Original Assignee
(주) 와이즈스톤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 와이즈스톤 filed Critical (주) 와이즈스톤
Priority to KR1020190149470A priority Critical patent/KR102315547B1/en
Publication of KR20210061655A publication Critical patent/KR20210061655A/en
Application granted granted Critical
Publication of KR102315547B1 publication Critical patent/KR102315547B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/10Requirements analysis; Specification techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Software Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to an integrated management solution system for software development and, more particularly, to an integrated management solution system for software development which stores and manages information on projects, issues, and workflows and processing results thereof through one system, and detects and processes delayed issues, thereby enabling smooth operation of a project.

Description

소프트웨어 개발을 위한 통합관리솔루션 시스템{An Integrated Management Solution System for Developing Software}An Integrated Management Solution System for Developing Software

본 발명은 소프트웨어 개발을 위한 통합관리솔루션 시스템에 관한 것으로, 더욱 상세하게는 하나의 시스템을 통해 프로젝트, 이슈, 워크플로우에 관한 정보와 이에 대한 처리결과가 저장되어 관리가 이루어지도록 하고, 지연되는 이슈를 감지하여 이에 대한 처리가 이루어지도록 함으로써 프로젝트의 원활한 운영이 가능하도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템에 관한 것이다. The present invention relates to an integrated management solution system for software development, and more specifically, information about a project, an issue, and a workflow and a result of processing thereof are stored through a single system to enable management and delayed issues. It relates to an integrated management solution system for software development that enables smooth operation of a project by detecting and processing it.

IoT, 초연결시대의 도래로 타 산업과의 융합이 확대되며 소프트웨어의 설계가 복잡해짐에 따라 개발 중인 혹은 제품화된 소프트웨어의 관리가 어려워지고 있다. With the advent of the IoT and hyper-connected era, convergence with other industries is expanding, and as software design becomes more complex, it is becoming difficult to manage software under development or commercialization.

특히, 빅데이터와 인공지능이 트렌드화 되며 이를 기반으로 한 자율주행기능, 자동제어 등이 널리 사용됨에 따라 소프트웨어의 품질이 안전과 직결되고 있다. In particular, as big data and artificial intelligence are trending, and autonomous driving functions and automatic controls based on them are widely used, the quality of software is directly related to safety.

한편, 개발프로젝트의 진행시 이슈 및 결함관리를 적절히 하지 못하면 운영유지보수 단계에서 끊임없는 시간과 수정비용이 투입되고 일정에 차질이 생겨 결국 프로젝트의 성과에 부정적인 영향을 미치게 된다. On the other hand, if issues and defects are not properly managed during the development project, endless time and correction costs are invested in the operation and maintenance phase, and schedule disruptions will eventually occur, which adversely affects the project's performance.

또한, 소프트웨어의 크기는 최근 5년간 10배, 향후 10년간 100배 이상으로 증가할 것이라고 추정되고 있으며 대형화, 복잡화로 인한 품질관리 비용이 폭발적으로 증가하고 있다. In addition, it is estimated that the size of software will increase by 10 times in the last 5 years and more than 100 times in the next 10 years, and quality control costs are exploding due to enlargement and complexity.

이러한 상황에서 대기업들은 다수의 개발사가 소프트웨어 개발에 참여함에 따라 의사소통이 어려워 관리가 제대로 이루어지지 못하고 있으며, 중소기업들은 프로세스 관리, 요구사항 관리, 버그 및 이슈관리 등의 프로세스가 각 기업별로 상이하여 이에 대한 관리를 제대로 하지 못하고 있고, 1인기업 또는 스타트업 개발자들은 개발방법론에 대한 경험부재, 요구사항 분석 미숙 등으로 잠재적 문제를 보유한 소프트웨어들을 여과 없이 출시하고 있다. In this situation, large companies are unable to properly manage communication due to difficulty in communication as many developers participate in software development, and SMEs have different processes such as process management, requirements management, and bug and issue management. It is not properly managed, and single-person companies or startup developers are releasing software that has potential problems due to lack of experience in development methodology and inexperience in requirements analysis.

따라서, 아래 특허문헌과 같이 소프트웨어의 개발시 요구사항 등을 분석하여 적용할 수 있는 시스템의 개발이 이루어지고 있으나, 다수의 프로젝트와 이슈, 요구사항, 업무처리 등을 종합적으로 관리할 수 있는 통합 시스템의 개발은 이루어지지 못하고 있다. Therefore, as in the following patent documents, a system that can be applied by analyzing requirements, etc. during software development is being developed, but an integrated system that can comprehensively manage a number of projects, issues, requirements, and business processing. Has not been developed.

(특허문헌)(Patent Literature)

등록특허공보 제10-2026839호(2019.09.24. 등록)"소프트웨어 개발 서비스 제공 장치 및 방법"Registered Patent Publication No. 10-2026839 (registered on September 24, 2019) "Device and method for providing software development service"

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, The present invention was devised to solve the above problems,

본 발명은 하나의 시스템을 통해 프로젝트, 이슈, 워크플로우에 관한 정보와 이에 대한 처리결과가 저장되어 관리가 이루어지도록 하고, 지연되는 이슈를 감지하여 이에 대한 처리가 이루어지도록 함으로써 프로젝트의 원활한 운영이 가능하도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. In the present invention, information about a project, an issue, and a workflow is stored and managed through a single system, and a project can be smoothly operated by detecting delayed issues and processing them. The purpose of this is to provide an integrated management solution system for software development.

본 발명은 각 이슈의 워크플로우에 따른 각 단계별 지연율에 따라 지연 이슈를 검출하도록 함으로써 지연에 대한 조치가 신속하고 효과적으로 이루어질 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. It is an object of the present invention to provide an integrated management solution system for software development that enables rapid and effective measures for delays by detecting delayed issues according to the delay rate at each stage according to the workflow of each issue.

본 발명은 지연 이슈의 담당자가 존재하면서 담당자의 처리가 가능한 경우에는 지연 여부를 담당자에게 알리는 것으로 처리를 종료하도록 하나, 담당자가 존재하지 않거나 담당자가 존재하나 처리가 불가능한 경우에는 새로운 담당자로의 교체를 지시하도록 함으로써 지연에 대한 처리가 효과적으로 이루어질 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. In the present invention, when the person in charge of the delayed issue exists and the person in charge is able to handle the delay, the process is terminated by notifying the person in charge of the delay. The purpose of this is to provide an integrated management solution system for software development that enables effective processing of delays by making instructions.

본 발명은 담당자의 업무능력을 고려하여 처리 가능 여부를 판단하도록 함으로써 이슈 처리의 반복적인 지연을 방지할 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. An object of the present invention is to provide an integrated management solution system for software development that can prevent repetitive delays in handling issues by determining whether or not it is possible to process them in consideration of the work capability of a person in charge.

본 발명은 담당자의 교체 지시가 발생할 경우 지연 이슈의 유형, 난이도, 새로운 담당자의 업무 현황, 능력 등을 고려하여 담당자의 추천이 이루어지도록 함으로써 업무의 고른 분배 및 업무에 따른 부하 방지가 가능하고 지연율을 낮출 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. The present invention makes it possible to evenly distribute the work and prevent the load according to the task by making the recommendation of the person in charge in consideration of the type of delay issue, the difficulty level, the work status of the new person in charge, and the ability, etc., when a replacement instruction of the person in charge occurs, and the delay rate is reduced. The purpose is to provide an integrated management solution system for software development that can be lowered.

본 발명은 시스템의 동시접속자수에 대한 상태를 모니터링하여 접속 이상을 감지하도록 함으로써, 이에 대한 신속한 대처가 가능하도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. An object of the present invention is to provide an integrated management solution system for software development that enables rapid response to this by monitoring the state of the number of simultaneous users of the system to detect connection abnormalities.

본 발명은 접속 이상뿐만 아니라 접속에 대한 고장 위험을 예측하고 성능 저하를 감지하여 이를 알리도록 함으로써 고장이 발생하기 전에 시스템 점검 및 개선이 이루어질 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. An object of the present invention is to provide an integrated management solution system for software development that enables system inspection and improvement before a failure occurs by predicting not only connection abnormalities but also the risk of failure for connection, detecting performance degradation, and notifying it. There is this.

본 발명은 시스템에 등록된 각 프로젝트, 이슈 등에 관한 알림을 각 사용자가 프로젝트, 이슈, 중요도 등에 따라 설정한 시간에 수신할 수 있도록 하여 알림에 대한 관리가 효과적으로 이루어질 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. The present invention is an integrated management for software development that allows each user to receive notifications on each project, issue, etc. registered in the system at a set time according to the project, issue, importance, etc., so that the management of the notifications can be effectively performed. The purpose is to provide a solution system.

본 발명은 사용자의 설정에 의한 알림이 정확하게 수신되고 있는지 모니터링할 수 있도록 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템을 제공하는데 목적이 있다. An object of the present invention is to provide an integrated management solution system for software development that enables monitoring whether a notification according to a user's setting is accurately received.

본 발명은 앞서 본 목적을 달성하기 위해서 다음과 같은 구성을 가진 실시예에 의해서 구현된다.The present invention is implemented by an embodiment having the following configuration in order to achieve the above object.

본 발명의 일 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템은 소프트웨어 개발을 위한 프로젝트, 이슈, 요구사항, 각 이슈에 대한 워크플로우 정보 및 각 워크플로우 대한 업무처리 정보, 사용자정보를 등록하여 저장하며, 이에 관한 정보를 사용자단말기로 출력하는 관리서버와; 상기 관리서버에 등록된 정보를 전달받아 표시하며, 프로젝트, 이슈, 업무처리 정보 등을 입력하여 관리서버로 전송하는 사용자단말기;를 포함하고, 상기 관리서버는 프로젝트, 이슈, 워크플로우에 관한 명칭, 기간, 유형, 난이도, 단계, 사용자 등의 정보를 등록하는 업무등록부와; 사용자단말기에 의한 업무처리결과의 입력에 따라 등록된 프로젝트, 이슈, 워크플로우에 대한 진행 상태를 변경하여 처리하는 업무처리부와; 각 이슈의 진행상태를 파악하여 지연 중인 이슈를 관리하는 이슈관리부;를 포함하는 것을 특징으로 한다. According to an embodiment of the present invention, the integrated management solution system for software development according to the present invention includes a project for software development, an issue, a requirement, workflow information for each issue, work processing information for each workflow, and a user. A management server that registers and stores information, and outputs the information to a user terminal; A user terminal that receives and displays information registered in the management server, inputs project, issue, business processing information, etc., and transmits it to the management server, wherein the management server includes a name for a project, an issue, and a workflow, A business register for registering information such as period, type, difficulty, stage, and user; A business processing unit that changes and processes a progress status of a registered project, issue, and workflow according to an input of a business processing result by a user terminal; It characterized in that it includes; an issue management unit that manages the pending issues by grasping the progress of each issue.

본 발명의 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 이슈관리부는 각 이슈의 진행 상태를 파악하여 지연 중인 이슈를 검출하는 지연이슈검출부와, 검출된 지연 이슈를 처리하는 지연처리부를 포함하고, 상기 지연이슈검출부는 각 이슈의 워크플로우에 의해 설정된 단계별 진행시간에 관한 정보를 수신하는 단계별초기설정시간수신모듈과, 각 단계의 설정된 시간으로부터 초과된 시간을 산출하는 초과시간산정모듈과, 단계별 초기설정시간 및 초과시간의 비율에 따라 지연율을 산출하는 지연율산출모듈과, 산출된 지연율이 설정된 값을 초과하는 경우 지연으로 판단하여 지연 이슈 정보를 생성하는 지연이슈정보생성모듈을 포함하는 것을 특징으로 한다. According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the issue management unit detects a delayed issue by grasping the progress of each issue, and the detected delay A delay processing unit for processing an issue, wherein the delayed issue detection unit receives a step-by-step initial setting time receiving module for receiving information on a step-by-step progress time set by the workflow of each issue, and a time exceeded from the set time of each step. An overtime calculation module that calculates, a delay rate calculation module that calculates a delay rate according to the ratio of the initial setting time and overtime for each step, and a delay issue that generates delay issue information by judging a delay when the calculated delay rate exceeds a set value. It characterized in that it comprises an information generation module.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 지연처리부는 지연 이슈의 담당자를 확인하는 담당자확인모듈과, 담당자가 존재하는 경우 담당자의 이슈 처리 가능 여부를 분석하는 담당자분석모듈과, 담당자의 처리가 가능한 것으로 분석되는 경우 담당자에게 지연 이슈 정보를 알리는 지연여부알림모듈을 포함하는 것을 특징으로 한다. According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the delay processing unit includes a person in charge identification module that checks the person in charge of the delay issue, and if the person in charge exists, the person in charge handles the issue. It characterized in that it comprises a person in charge analysis module for analyzing the possibility, and a delay notification module for notifying the person in charge of delay issue information when it is analyzed that the processing by the person in charge is possible.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 담당자분석모듈은 지연 이슈의 마감 잔여시간을 산출하는 잔여시간산출모듈과, 지연 이슈의 마감 잔여시간 및 잔여단계에 따른 잔여율을 산출하는 잔여율산출모듈과, 지연 이슈에 대한 담당자의 이슈 유형 및 난이도별 처리시간을 분석하는 유형별처리시간분석모듈과, 잔여율을 고려한 담당자의 처리가능시간을 고려하여 이슈의 처리 가능 여부를 판별하는 처리가능여부판별모듈을 포함하는 것을 특징으로 한다. According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the person in charge analysis module includes a remaining time calculation module that calculates the deadline remaining time of the delay issue, and the deadline remaining of the delay issue. A residual rate calculation module that calculates the residual rate according to the time and residual steps, a processing time analysis module for each type that analyzes the issue type and processing time by difficulty level of the person in charge for delayed issues, and the available processing time of the person in charge considering the residual rate. It characterized in that it comprises a processability determination module for determining whether or not the issue can be handled in consideration.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 지연처리부는 지연 이슈의 등록된 담당자가 존재하지 않거나 담당자의 처리가 불가능한 경우 프로젝트의 관리자에게 담당자 선정을 지시하는 담당자선정지시모듈을 포함하고, 상기 이슈관리부는 담당자 선정의 지시가 발생하는 경우 적합한 담당자를 검색하여 추천하는 담당자추천부를 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, in the case where the registered person in charge of the delay issue does not exist or the person in charge cannot handle the delay issue, the delay processing unit is in charge of the project manager. And a manager selection instruction module for instructing selection, and the issue management unit includes a manager recommendation unit that searches for and recommends a suitable person in charge when an instruction for selection of a person in charge occurs.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 담당자추천부는 지연 이슈의 유형, 난이도에 따라 처리가 가능한 담당자를 검색하는 담당자검색모듈과, 검색된 담당자의 업무를 분석하여 처리 가능여부를 판단하는 담당자업무분석모듈과, 처리가 가능한 담당자 정보를 제공하는 담당자정보제공모듈을 포함하고, 상기 담당자업무분석모듈은 검색된 담당자의 현재 담당하고 있는 이슈의 유형 정보를 불러오는 이슈정보로딩모듈과; 이슈정보로딩모듈에 의해 불러온 이슈의 잔여시간과 검색된 담당자의 이슈 유형별 처리시간을 고려하여 업무처리가 가능한 시간을 산정하는 처리시간산정모듈과; 지연 이슈의 잔여시간과 검색된 담당자의 업무처리 가능시간을 비교하여 지연 이슈의 처리 가능 여부를 판단하는 가능여부판단모듈;을 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the person in charge recommendation unit includes a person in charge search module that searches for persons in charge who can be processed according to the type and difficulty of the delay issue, and the searched A person in charge business analysis module that analyzes the work of the person in charge and determines whether it is possible to process, and a person in charge information providing module that provides information on the person in charge who can be processed, and the person in charge analysis module is the type of issue currently in charge of the searched person in charge. An issue information loading module for fetching information; A processing time calculation module that calculates a time available for business processing in consideration of the remaining time of the issue retrieved by the issue information loading module and the processing time for each issue type of the searched person in charge; And a feasibility determination module for determining whether delayed issues can be handled by comparing the remaining time of the delayed issue with the searched person's possible business processing time.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 관리서버는 시스템의 정상작동여부를 관리하는 작동관리부를 포함하고, 상기 작동관리부는 시스템의 동시접속에 관한 성능이 제대로 유지되고 있는지 모니터링하는 접속관리부를 포함하며, 상기 접속관리부는 사용자의 접속정보를 수신하는 접속정보수신모듈과, 접속정보에 따라 동시에 접속한 사용자수를 산출하는 접속자수산출모듈과, 사용자단말기로부터 접속 오류에 관한 정보를 수신하는 오류정보수신모듈과, 일정 단위시간 동안 설정된 동시접속자수 이하에서 접속 오류가 설정된 횟수 이상 발생하는 경우 시스템 접속 고장으로 진단하여 알리는 고장판단모듈을 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the management server includes an operation management unit that manages normal operation of the system, and the operation management unit simultaneously operates the system. A connection management unit that monitors whether or not performance related to connection is properly maintained, and the connection management unit includes a connection information receiving module that receives user connection information, and a visitor counting module that calculates the number of concurrently connected users according to the connection information. And, an error information receiving module that receives information about a connection error from a user terminal, and a failure determination module that diagnoses and informs a system connection failure when a connection error occurs more than a set number of times less than the set number of simultaneous users for a certain unit time. Characterized in that.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 접속관리부는 상기 고장판단모듈에 의해 고장으로 진단되지는 않았으나 일정 단위시간 동안 설정된 동시접속자수 이하에서 접속 오류 횟수가 일정 범위에서 발생하고, 이러한 단위시간이 설정된 기간 이상 연속하여 발생하는 경우 시스템의 고장위험상태로 진단하는 고장위험예측모듈;을 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the connection management unit is not diagnosed as a failure by the failure determination module, but is equal to or less than the number of concurrent users set for a certain unit time. And a failure risk prediction module for diagnosing a failure risk state of the system when the number of connection errors occurs within a certain range and the unit time is continuously generated for more than a set period of time.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 접속관리부는 고장위험상태에도 해당되지 않으나 단위시간 간격으로 설정된 동시접속자수 이하에서 발생하는 오류횟수의 변화율이 일정값을 초과하고, 이러한 상태가 설정된 기간 이상 계속되는 경우 시스템의 접속성능이 저하되고 있음을 인지하여 알리는 성능저하판단모듈;을 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the access management unit does not correspond to a failure risk state, but the number of errors occurring below the number of simultaneous users set at a unit time interval And a performance degradation determination module for recognizing and notifying that the connection performance of the system is deteriorating when the rate of change of exceeds a predetermined value and the state continues for a set period or longer.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 관리서버는 관리서버에 등록된 정보의 각 사용자에 대한 알림시간을 설정하여 저장하는 알림설정부를 포함하고, 상기 알림설정부는 각 사용자에 대한 정보를 저장하는 사용자정보저장부와, 각 사용자단말기를 통한 입력에 의해 프로젝트, 이슈, 중요도별 알림의 알림시간을 설정하여 저장하는 알림수신시간설정부를 포함하고, 상기 알림수신시간설정부는 각 사용자에 따라 프로젝트별 알림시간을 설정하는 프로젝트별시간설정모듈과, 이슈종류에 따라 알림시간을 설정하는 이슈종류별시간설정모듈과, 중요도에 따라 알림시간을 설정하는 중요도별시간설정모듈과, 긴급처리가 필요한 알림에 대한 알림시간을 설정하는 긴급처리알림시간설정모듈을 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the management server sets and stores a notification time for each user of information registered in the management server. The notification setting unit includes a user information storage unit that stores information for each user, and a notification reception time setting unit that sets and stores a notification time for notifications by project, issue, and importance by input through each user terminal. The notification reception time setting unit includes a project-specific time setting module that sets the notification time for each project according to each user, a time setting module for each issue type that sets the notification time according to the issue type, and the notification time according to the importance. It characterized in that it comprises a time setting module for each level of importance, and an emergency processing notification time setting module for setting a notification time for a notification requiring urgent processing.

본 발명의 또 다른 실시예에 따르면, 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템에 있어서, 상기 관리서버는 시스템의 정상작동여부를 관리하는 작동관리부를 포함하고, 상기 작동관리부는 상기 알림설정부의 정상작동 여부를 관리하는 알림관리부를 포함하며, 상기 알림관리부는 상기 관리서버에 의한 알림생성정보를 수신하는 알림생성정보수신모듈과, 알림생성정보의 사용자단말기에 대한 도달 여부정보를 검출하는 알림수신정보검출모듈과, 알림생성정보수신모듈에 의해 생성되었으나 사용자단말기에서 수신되지 못한 알림의 오류율을 산출하는 오류율산출모듈과, 오류율이 일정기간 동안 설정된 값을 초과하는 경우 알림설정부에 이상이 발생한 것으로 판단하여 이를 알리는 알림이상정보제공모듈을 포함하는 것을 특징으로 한다.According to another embodiment of the present invention, in the integrated management solution system for software development according to the present invention, the management server includes an operation management unit that manages whether the system is operating normally, and the operation management unit sets the notification. And a notification management unit for managing whether or not the unit operates normally, and the notification management unit includes a notification generation information receiving module receiving notification generation information by the management server, and a notification detecting information on whether the notification generation information reaches a user terminal. An error rate calculation module that calculates the error rate of notifications generated by the reception information detection module and the notification generation information reception module but not received from the user terminal, and when the error rate exceeds a set value for a certain period, an error occurs in the notification setting unit. It is characterized in that it comprises a notification abnormal information providing module to determine and notify this.

본 발명은 앞서 본 실시예와 하기에 설명할 구성과 결합, 사용관계에 의해 다음과 같은 효과를 얻을 수 있다.The present invention can obtain the following effects by the configuration, combination, and use relationship to be described below with the present embodiment.

본 발명은 하나의 시스템을 통해 프로젝트, 이슈, 워크플로우에 관한 정보와 이에 대한 처리결과가 저장되어 관리가 이루어지도록 하고, 지연되는 이슈를 감지하여 이에 대한 처리가 이루어지도록 함으로써 프로젝트의 원활한 운영이 가능하도록 하는 효과가 있다. In the present invention, information about a project, an issue, and a workflow is stored and managed through a single system, and a project can be smoothly operated by detecting delayed issues and processing them. It has the effect of making it happen.

본 발명은 각 이슈의 워크플로우에 따른 각 단계별 지연율에 따라 지연 이슈를 검출하도록 함으로써 지연에 대한 조치가 신속하고 효과적으로 이루어질 수 있도록 하는 효과가 있다. The present invention has the effect of enabling a quick and effective measure for delay by detecting a delay issue according to a delay rate at each stage according to the workflow of each issue.

본 발명은 지연 이슈의 담당자가 존재하면서 담당자의 처리가 가능한 경우에는 지연 여부를 담당자에게 알리는 것으로 처리를 종료하도록 하나, 담당자가 존재하지 않거나 담당자가 존재하나 처리가 불가능한 경우에는 새로운 담당자로의 교체를 지시하도록 함으로써 지연에 대한 처리가 효과적으로 이루어질 수 있도록 하는 효과가 있다. In the present invention, when the person in charge of the delayed issue exists and the person in charge is able to handle the delay, the process is terminated by notifying the person in charge of the delay. By giving the instruction, there is an effect that the delay can be effectively processed.

본 발명은 담당자의 업무능력을 고려하여 처리 가능 여부를 판단하도록 함으로써 이슈 처리의 반복적인 지연을 방지할 수 있도록 하는 효과가 있다. The present invention has the effect of preventing repetitive delays in handling issues by determining whether or not it is possible to process them in consideration of the work capability of the person in charge.

본 발명은 담당자의 교체 지시가 발생할 경우 지연 이슈의 유형, 난이도, 새로운 담당자의 업무 현황, 능력 등을 고려하여 담당자의 추천이 이루어지도록 함으로써 업무의 고른 분배 및 업무에 따른 부하 방지가 가능하고 지연율을 낮출 수 있도록 하는 효과가 있다. The present invention makes it possible to evenly distribute the work and prevent the load according to the task by making the recommendation of the person in charge in consideration of the type of delay issue, the difficulty level, the work status of the new person in charge, and the ability, etc., when a replacement instruction of the person in charge occurs, and the delay rate is reduced. It has the effect of lowering it.

본 발명은 시스템의 동시접속자수에 대한 상태를 모니터링하여 접속 이상을 감지하도록 함으로써, 이에 대한 신속한 대처가 가능하도록 하는 효과가 있다. The present invention monitors the state of the number of simultaneous users of the system and detects a connection abnormality, thereby enabling a rapid response to this.

본 발명은 접속 이상뿐만 아니라 접속에 대한 고장 위험을 예측하고 성능 저하를 감지하여 이를 알리도록 함으로써 고장이 발생하기 전에 시스템 점검 및 개선이 이루어질 수 있도록 하는 효과가 있다. The present invention has the effect of predicting a risk of failure of a connection as well as a connection abnormality, detecting a performance degradation, and notifying it, so that a system check and improvement can be made before a failure occurs.

본 발명은 시스템에 등록된 각 프로젝트, 이슈 등에 관한 알림을 각 사용자가 프로젝트, 이슈, 중요도 등에 따라 설정한 시간에 수신할 수 있도록 하여 알림에 대한 관리가 효과적으로 이루어질 수 있도록 하는 효과가 있다. The present invention has the effect of enabling each user to receive notifications about each project, issue, etc. registered in the system at a time set according to the project, issue, importance, etc., so that the notification can be effectively managed.

본 발명은 사용자의 설정에 의한 알림이 정확하게 수신되고 있는지 모니터링할 수 있도록 하는 효과가 있다. The present invention has the effect of enabling monitoring whether a notification according to a user's setting is correctly received.

도 1은 본 발명의 일 실시예에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템의 구성도
도 2는 도 1의 관리서버의 구성을 나타내는 블럭도
도 3은 도 2의 이슈등록부의 구성을 나타내는 블럭도
도 4는 이슈등록예를 나타내는 참고도
도 5는 워크플로우 설정예를 나타내는 참고도
도 6은 도 2의 업무처리부의 구성을 나타내는 블럭도
도 7은 도 2의 지연이슈검출부의 구성을 나타내는 블럭도
도 8은 도 2의 지연처리부의 구성을 나타내는 블럭도
도 9는 도 2의 담당자추천부의 구성을 나타내는 블럭도
도 10은 도 2의 워크플로우분석부의 구성을 나타내는 블럭도
도 11은 도 2의 워크플로우추천부의 구성을 나타내는 블럭도
도 12는 도 2의 접속관리부의 구성을 나타내는 블럭도
도 13은 도 2의 알림관리부의 구성을 나타내는 블럭도
도 14는 도 2의 알림설정부의 구성을 나타내는 블럭도
도 15는 알림예를 나타내는 참고도
1 is a configuration diagram of an integrated management solution system for software development according to an embodiment of the present invention
Figure 2 is a block diagram showing the configuration of the management server of Figure 1
3 is a block diagram showing the configuration of the issue registration unit of FIG. 2
4 is a reference diagram showing an example of registering an issue
5 is a reference diagram showing an example of a workflow setting
Figure 6 is a block diagram showing the configuration of the business processing unit of Figure 2
7 is a block diagram showing the configuration of the delayed issue detection unit of FIG. 2
8 is a block diagram showing the configuration of the delay processing unit of FIG. 2
9 is a block diagram showing the configuration of a person in charge recommendation unit of FIG. 2
10 is a block diagram showing the configuration of the workflow analysis unit of FIG. 2
11 is a block diagram showing the configuration of the workflow recommendation unit of FIG. 2
12 is a block diagram showing the configuration of the connection management unit of FIG. 2
13 is a block diagram showing the configuration of a notification management unit of FIG. 2
14 is a block diagram showing the configuration of a notification setting unit of FIG. 2
15 is a reference diagram showing an example of a notification

이하에서는 본 발명에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템의 바람직한 실시예들을 첨부된 도면을 참조하여 상세히 설명한다. 하기에서 본 발명을 설명함에 있어서 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략하도록 한다. 명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미하고, 또한 명세서에 기재된 "...부", "...모듈" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며 이는 하드웨어나 소프트웨어 또는 하드웨어 및 소프트웨어의 결합으로 구현될 수 있다.Hereinafter, preferred embodiments of an integrated management solution system for software development according to the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, when it is determined that a detailed description of a known function or configuration may unnecessarily obscure the subject matter of the present invention, a detailed description thereof will be omitted. Throughout the specification, when a part "includes" a certain component, it means that other components may be further included, and other components are not excluded unless specifically stated to the contrary, and also described in the specification. Terms such as "... unit" and "... module" mean a unit that processes at least one function or operation, which may be implemented by hardware or software, or a combination of hardware and software.

본 발명의 일 실시예에 따른 소프트웨어 개발을 위한 통합관리솔루션 시스템을 도 1 내지 도 15를 참조하여 설명하면, 상기 소프트웨어 개발을 위한 통합관리솔루션 시스템은 소프트웨어 개발을 위한 프로젝트, 이슈, 요구사항, 각 이슈에 대한 워크플로우 정보 및 각 워크플로우 대한 업무처리 정보, 사용자정보를 등록하여 저장하며, 이에 관한 정보를 사용자단말기(3)로 출력하는 관리서버(1)와; 상기 관리서버(1)에 등록된 정보를 전달받아 표시하며, 프로젝트, 이슈, 업무처리 정보 등을 입력하여 관리서버로 전송하는 사용자단말기(3);를 포함한다. When an integrated management solution system for software development according to an embodiment of the present invention is described with reference to FIGS. 1 to 15, the integrated management solution system for software development includes projects, issues, requirements, and each A management server 1 for registering and storing workflow information for issues, business processing information for each workflow, and user information, and outputting the information to the user terminal 3; And a user terminal 3 that receives and displays information registered in the management server 1, inputs project, issue, and business processing information, and transmits the information to the management server.

본 발명에 따른 통합관리솔루션 시스템은 대규모로 복잡·다양해지는 소프트웨어의 개발을 위해 개발 전 과정을 통합적으로 관리할 수 있도록 하는 것으로, 대기업의 회사 내부 서버에 설치되거나 클라우드 서버에 설치되어 접근 가능하도록 하는 방식으로 시스템의 이용이 가능하도록 한다. The integrated management solution system according to the present invention enables integrated management of the entire development process for the development of large-scale, complex and diversified software, and is installed on the internal server of a large company or installed on a cloud server to make it accessible. In a way that makes the use of the system possible.

본 발명은 소프트웨어의 개발을 위한 프로젝트, 각 프로젝트에 대한 요구사항, 결함, 테스트, 각종 작업, 새기능, 개선사항 등의 다양한 이슈, 그리고 각 이슈에 대한 진행과정을 나타내는 워크플로우를 관리서버(1)에 등록할 수 있도록 하고, 프로젝트의 관리자나 담당자(직원) 등은 사용자단말기(3)를 통해 이를 확인할 수 있도록 하며, 업무처리 내용을 등록하여 프로젝트의 진행 과정을 사용자 모두가 한 눈에 파악할 수 있도록 한다. The present invention manages a project for software development, a requirement for each project, a variety of issues such as defects, tests, various tasks, new functions, and improvements, and a workflow representing the progress of each issue. ), and the manager or person in charge (employee) of the project can check it through the user terminal (3), and all users can grasp the progress of the project at a glance by registering the work process details. To be there.

특히, 본 발명은 업무처리가 지연되고 있는 이슈를 파악하여 이에 대한 신속한 조치가 내려지도록 함으로써 프로젝트의 지연을 방지하도록 하고, 이때 각 담당자의 업무처리상황과 업무처리능력을 고려하여 조치가 내려지도록 함으로써 효과적인 프로젝트의 진행이 가능하도록 한다. In particular, the present invention prevents the delay of the project by identifying issues that are delayed in business processing and promptly taking measures for them, and taking measures in consideration of the business processing situation and business processing capability of each person in charge at this time. Make effective project progress possible.

또한, 본 발명은 각 사용자마다 이슈 유형별 워크플로우에 따른 업무처리효율을 분석하도록 하고, 새로운 이슈의 생성시 각 사용자의 업무처리효율을 고려하여 이슈 유형에 따른 워크플로우를 추천·제공하도록 함으로써 각 사용자의 업무처리효율을 극대화할 수 있도록 한다. In addition, the present invention allows each user to analyze work processing efficiency according to the workflow for each issue type, and recommends and provides a workflow according to the issue type in consideration of each user's work processing efficiency when creating a new issue. To maximize the efficiency of business processing.

또한, 본 발명은 프로젝트에 관한 다양한 알림들을 그 종류 및 중요도에 따라 시간대를 설정하여 사용자에게 전달되도록 함으로써 복잡한 프로젝트에서도 알림을 놓치는 등의 문제를 방지할 수 있도록 하고, 이러한 알림과 시스템에 대한 접속이 정상적으로 이루어지고 있는지 여부를 실시간으로 모니터링하여 시스템의 오류에 대한 신속한 조치가 이루어질 수 있도록 한다. In addition, the present invention makes it possible to prevent problems such as missed notifications even in complex projects by setting a time zone according to the type and importance of various notifications related to the project and delivering them to the user. It monitors in real time whether it is working normally, so that a quick action can be taken against system errors.

상기 관리서버(1)는 소프트웨어 개발을 위한 프로젝트, 이슈, 요구사항, 각 이슈에 대한 워크플로우 정보 및 각 워크플로우 대한 업무처리 정보를 등록·저장하는 구성으로, 기업 내부서버에 하드웨어의 형태로 설치되거나 또는 클라우드 서버에 저장되는 형태로 설치될 수 있다. 따라서, 상기 관리서버(1)는 설치 환경에 따라 사용자단말기(3)와 유선 또는 무선 통신으로 연결되어 정보의 송수신이 이루어지도록 할 수 있다. 상기 관리서버(1)는 도 2에 도시된 바와 같이 업무등록부(11), 업무처리부(12), 이슈관리부(13), 워크플로우제공부(14), 작동관리부(15), 알림설정부(16)를 포함할 수 있다. The management server 1 is a configuration that registers and stores project, issues, requirements for software development, workflow information for each issue, and business processing information for each workflow, and is installed in the form of hardware on the internal server of the company. Or it can be installed in the form of being stored on a cloud server. Accordingly, the management server 1 may be connected to the user terminal 3 through wired or wireless communication depending on the installation environment to enable transmission and reception of information. As shown in Fig. 2, the management server 1 includes a work registration unit 11, a work processing unit 12, an issue management unit 13, a workflow providing unit 14, an operation management unit 15, and a notification setting unit ( 16) may be included.

상기 업무등록부(11)는 시스템 상에서 관리되는 소프트웨어 개발과 관련된 다양한 업무정보 및 사용자정보를 등록하는 구성으로, 사용자단말기(3)의 입력을 통해 등록되도록 할 수 있으며, 프로젝트등록부(111), 이슈등록부(113), 사용자등록부(115)를 포함할 수 있다. The business registration unit 11 is a configuration for registering various business information and user information related to software development managed on the system, and can be registered through the input of the user terminal 3, and the project registration unit 111, the issue registration unit (113), it may include a user registration unit (115).

상기 프로젝트등록부(111)는 소프트웨어 개발과 관련된 프로젝트정보를 등록하는 구성으로, 회사 내에서는 다양한 소프트웨어에 관한 프로젝트가 진행될 수 있고, 회사의 규모가 클수록 동시에 많은 수의 프로젝트가 진행되므로, 프로젝트 정보를 등록하여 프로젝트별로 이슈 및 업무처리결과가 관리될 수 있도록 한다. The project registration unit 111 is a configuration for registering project information related to software development, and various software-related projects can be carried out within the company, and since the larger the company is, the larger the number of projects are simultaneously proceeding, so the project information is registered. Thus, issues and business results for each project can be managed.

상기 이슈등록부(113)는 각 프로젝트에 대한 이슈정보를 등록하는 구성으로, 각 프로젝트의 소프트웨어 개발과 관련된 결함, 기능개선, 요구사항, 테스트, 새기능, 다양한 작업 등의 이슈정보가 등록되도록 할 수 있다. 상기 이슈등록부(113)는 이러한 각 이슈의 유형을 지정하여 저장하도록 할 수 있으며, 작업기간, 난이도, 우선순위, 워크플로우, 단계별처리기간, 담당자 등의 정보를 저장하도록 할 수 있고, 도 4에 도시된 바와 같이 사용자단말기(3)의 화면을 통한 입력을 통해 저장이 이루어지도록 할 수 있다. 따라서, 이슈 등록의 권한를 가진 사람은 어디에서나 사용자단말기(3)를 통해 이슈정보를 등록하도록 할 수 있다. 상기 이슈등록부(113)는 도 3에 도시된 바와 같이 프로젝트연결모듈(113a), 명칭등록모듈(113b), 유형지정모듈(113c), 기간설정모듈(113d), 난이도설정모듈(113e), 우선순위설정모듈(113f), 워크플로우설정모듈, 단계별기간지정모듈(113h), 담당자지정모듈(113i)을 포함할 수 있다. The issue registration unit 113 is a configuration for registering issue information for each project. Issue information such as defects, functional improvements, requirements, tests, new functions, and various tasks related to software development of each project can be registered. have. The issue registration unit 113 may designate and store the types of each of these issues, and store information such as work period, difficulty level, priority, workflow, step-by-step processing period, person in charge, etc. As shown, the storage may be performed through an input through the screen of the user terminal 3. Therefore, a person with the authority to register an issue can register issue information anywhere through the user terminal 3. As shown in FIG. 3, the issue registration unit 113 includes a project connection module 113a, a name registration module 113b, a type designation module 113c, a period setting module 113d, a difficulty setting module 113e, and priority. A priority setting module 113f, a workflow setting module, a step-by-step period designation module 113h, and a person in charge designation module 113i may be included.

상기 프로젝트연결모듈(113a)은 등록될 이슈에 대한 프로젝트를 지정하여 연결시키는 구성으로, 프로젝트 정보에 포함되어 이슈가 관리될 수 있도록 한다. The project connection module 113a is a configuration that designates and connects a project for an issue to be registered, and is included in project information so that the issue can be managed.

상기 명칭등록모듈(113b)은 이슈에 대한 명칭을 등록하는 구성으로, 사용자단말기(3)를 통한 입력을 통해 등록되도록 할 수 있다. The name registration module 113b is configured to register a name for an issue, and may be registered through an input through the user terminal 3.

상기 유형지정모듈(113c)은 이슈의 유형을 지정하여 저장되도록 하는 구성으로, 결함, 기능개선, 요구사항, 테스트, 새기능, 다양한 작업 등의 유형으로 나뉘어 지정되도록 할 수 있으며, 그 밖에 프로젝트의 종류 등에 따라 다양한 유형으로 나뉘도록 할 수 있다. 상기 유형지정모듈(113c)에 의해 지정되는 이슈의 유형은 이슈 유형별 사용자의 업무처리효율, 워크플로우의 추천, 알림 등의 설정에 활용될 수 있다. The type designation module 113c is a configuration in which the type of issue is designated and stored, and can be divided into types such as defects, functional improvements, requirements, tests, new functions, and various tasks. It can be divided into various types depending on the type, etc. The type of issue designated by the type designation module 113c may be used for setting the user's work processing efficiency, workflow recommendation, notification, etc. for each issue type.

상기 기간설정모듈(113d)은 이슈의 처리기간에 관한 정보를 등록하는 구성으로, 이슈를 등록하려는 자가 프로젝트의 전체 기간을 고려하여 이슈가 처리되어야 할 기간을 설정하여 저장하도록 할 수 있다. The period setting module 113d is a configuration for registering information on a processing period of an issue, and a person who intends to register an issue may set and store a period in which the issue should be processed in consideration of the entire period of the project.

상기 난이도설정모듈(113e)은 이슈의 난이도에 관한 정보를 설정하는 구성으로, 상중하 등 일정 단계로 나뉘어 설정되도록 할 수 있으며, 난이도에 따라 업무처리효율의 가중치가 적용되고 담당자의 추천, 업무처리능력의 산정에 이용될 수 있다. The difficulty setting module 113e is a configuration for setting information on the difficulty level of an issue, and can be divided into certain stages such as upper, middle, and lower, and the weight of the work processing efficiency is applied according to the difficulty, and the person in charge's recommendation, work processing capability It can be used for the calculation of

상기 우선순위설정모듈(113f)은 각 이슈에 대한 우선순위, 특히 긴급처리 정보를 등록할 수 있도록 하는 구성으로, 긴급처리에 대한 알림이 우선적으로 사용자에게 보내지도록 할 수 있다. The priority setting module 113f is configured to register priorities for each issue, particularly emergency processing information, and may preferentially send a notification about emergency processing to the user.

상기 워크플로우설정모듈(113g)은 각 이슈의 처리단계에 관한 정보를 등록하는 구성으로, 이슈의 종류에 따라 다양한 단계로 설정되도록 할 수 있다. 상기 워크플로우설정모듈(113g)은 기본적으로 도 5에 도시된 바와 같이 생성 → 진행 → 확인 → 종료의 속성을 갖도록 단계를 설정하도록 할 수 있으며, 이슈의 종류에 따른 다양한 과정의 진행과 이에 대한 확인을 거쳐 이슈에 대한 작업이 종료되도록 할 수 있다. The workflow setting module 113g is configured to register information on processing steps of each issue, and may be set to various steps according to the type of issue. The workflow setting module 113g can basically set a step to have the attribute of creation → progress → confirmation → end, as shown in FIG. 5, and the progress of various processes according to the type of issue and confirmation thereof Through this, the work on the issue can be finished.

상기 단계별기간지정모듈(113h)은 상기 워크플로우설정모듈(113g)에 의해 설정되는 각 단계별로 처리되어야 할 기간을 설정하여 저장하는 구성으로, 설정된 기간에 따라 상기 이슈관리부(13)에 의해 업무의 지연율이 산출되고 이에 따른 조치가 이루어질 수 있도록 한다. The step-by-step period designation module 113h is a configuration for setting and storing a period to be processed for each step set by the workflow setting module 113g. The delay rate is calculated and measures can be taken accordingly.

상기 담당자지정모듈(113i)은 이슈에 대한 담당자를 지정하여 저장하는 구성으로, 담당자에 의한 업무처리가 가능하고 담당자에 따른 워크플로우의 분석, 지연의 처리, 알림의 설정 등이 이루어지도록 한다. The person in charge designation module 113i is configured to designate and store a person in charge for an issue, and enables work processing by the person in charge, and analyzes the workflow according to the person in charge, handles delay, and sets a notification.

상기 사용자등록부(115)는 시스템 상에 관리자 및 담당자 등의 사용자에 관한 정보를 등록하는 구성으로, 사용자의 식별정보, 권한 등에 관한 정보가 저장되도록 할 수 있으며, 각 사용자가 처리 가능한 이슈의 유형과 난이도 등에 관한 정보가 등록되어 이에 적합한 담당자의 추천이 이루어지도록 할 수 있다. The user registration unit 115 is a configuration that registers information about users such as administrators and managers on the system, and allows information on user identification information, authority, etc. to be stored, and the types of issues that can be handled by each user and Information on the difficulty level, etc. is registered so that the appropriate person in charge can recommend it.

상기 업무처리부(12)는 사용자단말기(3)를 통해 입력되는 업무정보에 따라 등록된 프로젝트, 이슈, 워크플로우 각 단계의 상태 변화가 이루어지도록 하는 구성으로, 각 담당자의 업무처리에 따른 결과 입력이 시스템에 반영되어 업무 진행 과정을 한 눈에 파악할 수 있도록 한다. 이를 위해, 상기 업무처리부(12)는 프로젝트선택모듈(121), 이슈선택모듈(122), 단계지정모듈(123), 업무정보입력모듈(124), 처리완료모듈(125)을 포함할 수 있다. The work processing unit 12 is configured to change the status of each step of the registered project, issue, and workflow according to the work information input through the user terminal 3, and the result input according to the work process of each person in charge is It is reflected in the system so that you can grasp the work progress at a glance. To this end, the work processing unit 12 may include a project selection module 121, an issue selection module 122, a step designation module 123, a work information input module 124, and a processing completion module 125. .

상기 프로젝트선택모듈(121), 이슈선택모듈(122), 단계지정모듈(123)은 업무가 이루어진 프로젝트, 이슈, 워크플로우 상의 단계를 선택하는 구성으로, 사용자단말기(3)를 통한 입력에 따라 선택된 프로젝트, 이슈, 워크플로우의 상태 정보가 변경되도록 한다. 따라서, 각 프로젝트의 이슈에 대한 업무는 워크플로우 상의 각 단계를 거쳐 이슈를 완료하고, 프로젝트에 대해 등록된 이슈를 처리함으로써 완료되며, 이러한 과정이 사용자단말기(3)의 입력을 통해 저장되고 표시될 수 있도록 하여 업무 진행 과정을 관리자 및 사용자 모두가 파악할 수 있게 된다. The project selection module 121, the issue selection module 122, and the stage designation module 123 are configured to select a project, issue, and step on the workflow in which the task was performed, and are selected according to input through the user terminal (3). It allows the status information of the project, issue, and workflow to be changed. Therefore, work on issues of each project is completed by completing the issues through each step in the workflow and processing the issues registered for the project, and this process is saved and displayed through the input of the user terminal (3). So that both managers and users can grasp the process of work.

상기 업무정보입력모듈(124)은 등록한 업무의 수행 내용에 관한 상세정보를 입력하는 구성으로, 기타 자료 정보와 함께 입력되도록 할 수 있으며, 이를 통해 업무에 대한 관리자의 확인이 이루어지도록 할 수 있다. The task information input module 124 is a configuration for inputting detailed information on the execution details of the registered task, and can be input together with other data information, through which the manager can confirm the task.

상기 처리완료모듈(125)은 입력된 내용에 대한 업무처리를 완료하는 구성으로, 상기 프로젝트선택모듈(121), 이슈선택모듈(122), 단계지정모듈(123)에 의해 선택된 정보에 따라 업무의 처리 상태가 변경되어 관리서버(1)에 저장된다. The processing completion module 125 is a configuration that completes business processing for the input content, and the task is performed according to the information selected by the project selection module 121, the issue selection module 122, and the step designation module 123. The processing state is changed and stored in the management server 1.

상기 이슈관리부(13)는 지연되는 이슈(이하 '지연이슈'라 함)에 대한 관리가 이루어지도록 하는 구성으로, 이슈에 대한 업무처리가 늦어지는 경우 프로젝트의 원활한 진행이 어려워지고 업무 처리 기간의 증가에 따른 손실이 발생하므로, 지연되는 이슈를 미리 인지하여 이에 대한 조치가 이루어지도록 함으로써 업무 지연으로 인한 피해를 미연에 방지할 수 있도록 한다. 또한, 상기 이슈관리부(13)는 지연이슈가 발생하는 경우 담당자가 없거나 담당자의 업무처리능력을 고려하여 담당자가 남은 시간 동안 해당 이슈를 처리할 수 없는 경우에는 새로운 담당자를 추천하여 이슈의 업무 처리가 이루어질 수 있도록 한다. 이때, 새로운 담당자의 추천은 담당자의 업무처리능력과 업무처리상황 등을 고려하여 이루어지도록 함으로써 추가적인 지연의 발생을 방지할 수 있도록 한다. 이를 위해, 상기 이슈관리부(13)는 지연이슈를 검출하는 지연이슈검출부(131), 지연된 이슈에 대한 처리가 이루어지도록 하는 지연처리부(133), 지연이슈에 대한 새로운 담당자를 추천하는 담당자추천부(135)를 포함한다. The issue management unit 13 is configured to manage delayed issues (hereinafter referred to as'delayed issues').If the issue is delayed, the smooth progress of the project becomes difficult and the work processing period increases. As a result of the loss occurs, the delayed issue is recognized in advance and measures are taken to prevent the damage caused by the delay in work. In addition, when a delayed issue occurs, the issue management unit 13 recommends a new person in charge to handle the issue when there is no person in charge or when the person in charge cannot handle the issue for the remaining time in consideration of the person in charge's work processing capability. Make it happen. At this time, the recommendation of a new person in charge is made in consideration of the person in charge's business processing capability and business processing situation, thereby preventing the occurrence of additional delays. To this end, the issue management unit 13 includes a delay issue detection unit 131 for detecting delayed issues, a delay processing unit 133 for processing delayed issues, and a person in charge recommendation unit for recommending a new person in charge for delayed issues ( 135).

상기 지연이슈검출부(131)는 이슈 처리의 지연이 발생하고 있는 이슈를 검출하는 구성으로, 전체 이슈처리기간에 따른 지연을 검출하는 것이 아니라 각 이슈의 단계별 처리시간에 대한 지연정도를 기준으로 지연이슈를 검출하도록 한다. 따라서, 상기 지연이슈검출부(131)는 전체 이슈처리가 지연되기 전에 미리 지연되는 이슈에 대한 처리가 이루어지도록 하여 전체 프로젝트 진행에 차질이 생기는 것을 차단하도록 한다. 이를 위해, 상기 지연이슈검출부(131)는 단계별초기설정시간수신모듈(131a), 초과시간산정모듈(131b), 지연율산출모듈(131c), 지연이슈정보생성모듈(131d)을 포함할 수 있다. The delayed issue detection unit 131 is a component that detects an issue that has a delay in handling the issue, and does not detect delay according to the entire issue processing period, but based on the degree of delay for each issue's step-by-step processing time. To detect. Accordingly, the delayed issue detection unit 131 prevents a disruption in the overall project progress by allowing the delayed issue to be processed in advance before the overall issue processing is delayed. To this end, the delay issue detection unit 131 may include a step-by-step initial setting time receiving module 131a, an excess time calculation module 131b, a delay rate calculation module 131c, and a delay issue information generation module 131d.

상기 단계별초기설정시간수신모듈(131a)은 상기 이슈등록부(113)의 단계별기간지정모듈(113h)에 의해 설정되는 각 이슈의 워크플로우 단계별 처리기간에 관한 정보를 수신하는 구성으로, 이를 기준으로 처리기간의 초과가 발생하였는지 여부를 판단하도록 한다. The step-by-step initial setting time receiving module (131a) is a configuration configured to receive information on the processing period for each step of the workflow set by the step-by-step period designating module (113h) of the issue register (113), and processed based on this. Determine whether or not exceeding the period has occurred.

상기 초과시간산정모듈(131b)은 이슈의 각 단계에 대한 초과시간을 산정하는 구성으로, 각 단계의 종료시간보다 지체된 시간을 산정하도록 한다. 상기 초과시간산정모듈(131b)은 각 단계의 종료정보가 입력될 때까지 일정 시간 간격으로 지속적으로 초과시간을 산정하도록 하며, 초과시간에 의해 지연율이 산출되어 지연이슈 여부가 검출될 수 있도록 한다. The overtime calculation module 131b is configured to calculate the overtime for each stage of the issue, and calculates a time delayed from the end time of each stage. The overtime calculation module 131b continuously calculates the overtime at regular time intervals until the end information of each step is input, and a delay rate is calculated by the overtime, so that a delay issue can be detected.

상기 지연율산출모듈(131c)은 단계별 설정 시간과 초과시간을 이용하여 각 단계의 지연정도를 산출하는 구성으로, 전체 예정시간에 대해 각 단계가 지체된 정도를 산출하도록 하며, 앞서 설명한 바와 같이 일정 시간 간격으로 지속적으로 산출된다. The delay rate calculation module 131c is a configuration that calculates the degree of delay of each step using a step setting time and an excess time, and calculates the degree of delay in each step for the total scheduled time. It is continuously calculated at intervals.

상기 지연이슈정보생성모듈(131d)은 상기 지연율산출모듈(131c)에 의해 산출되는 지연율이 설정된 값을 초과하는 경우 이슈의 처리가 지연되고 있는 것으로 판단하여 지연이슈에 관한 정보를 생성하는 구성으로, 담당자 여부에 따라 지연처리부(133)에 의한 조치가 이루어지도록 한다. 상기 지연이슈정보생성모듈(131d)은 각 이슈의 워크플로우 각 단계에서 단계가 종료될 때까지 일정 시간 간격으로 지연율을 산출하도록 하며, 지연율이 설정값을 초과하는 순간 지연이슈 정보를 생성하도록 한다. When the delay rate calculated by the delay rate calculation module 131c exceeds a set value, the delay issue information generation module 131d determines that processing of the issue is delayed and generates information on the delay issue, Depending on whether or not the person in charge, the delay processing unit 133 is to take action. The delayed issue information generation module 131d calculates the delay rate at regular time intervals until the stage is completed in each stage of the workflow of each issue, and generates delayed issue information as soon as the delay rate exceeds a set value.

상기 지연처리부(133)는 상기 지연이슈검출부(131)에 지연이슈 정보가 생성되는 경우 이에 대한 처리가 이루어지도록 하는 구성으로, 담당자의 존재 여부와 담당자의 업무처리가능 여부에 따라 상이한 조치를 취하도록 한다. 상기 지연처리부(133)는 지연이슈의 담당자가 존재하지 않는 경우에는 담당자의 지정이 누락된 것으로 관리자에게 지체없이 담당자의 선정을 지시하도록 한다. 또한 담당자가 존재하는 경우에는 지연 이슈의 남아있는 단계를 예정된 시간 내에 처리할 수 있는지 여부를 분석하도록 하며, 처리할 수 있는 경우에는 담당자에게 지연 여부를 알리도록 하고, 처리할 수 없는 경우에는 관리자에게 담당자의 교체를 지시하도록 한다. 이를 위해, 상기 지연처리부(133)는 담당자확인모듈(133a), 담당자분석모듈(133b), 지연여부알림모듈(133c), 담당자선정지시모듈(133d)을 포함할 수 있다. The delay processing unit 133 is configured to process delayed issue information when the delayed issue information is generated in the delayed issue detection unit 131, and take different actions according to the presence of a person in charge and whether or not the person in charge can handle the work. do. When the person in charge of the delay issue does not exist, the delay processing unit 133 indicates that the designation of the person in charge is omitted and instructs the manager to select the person in charge without delay. In addition, if there is a person in charge, it is analyzed whether the remaining steps of the delayed issue can be handled within the scheduled time, and if it can be handled, the person in charge is notified of the delay, and if it cannot be handled, the manager is informed. Order the replacement of the person in charge. To this end, the delay processing unit 133 may include a person in charge confirmation module 133a, a person in charge analysis module 133b, a delay notification module 133c, and a person in charge selection instruction module 133d.

상기 담당자확인모듈(133a)은 지연 이슈에 대한 담당자의 존재 여부를 확인하는 구성으로, 관리서버(1)에 등록된 정보를 확인하도록 하며, 담당자가 존재하는 경우에는 담당자분석모듈(133b)에 의해 담당자의 분석이 이루어지도록 하고, 담당자가 존재하지 않는 경우에는 상기 담당자선정지시모듈(133d)에 의해 관리자에게 담당자의 선정을 지시하도록 한다. The person in charge verification module 133a is a configuration for checking whether the person in charge for delayed issues exists, and allows to check the information registered in the management server 1, and if there is a person in charge, the person in charge analysis module 133b Analysis of the person in charge is performed, and if the person in charge does not exist, the manager is instructed to select the person in charge by the person in charge selection instruction module 133d.

상기 담당자분석모듈(133b)은 지연 이슈의 담당자에 대한 업무처리 가능 여부를 분석하는 구성으로, 지연 이슈의 남은 기간과 단계, 담당자의 업무처리 능력을 고려하여 분석하도록 한다. 상기 담당자분석모듈(133b)은 담당자의 이슈 유형별, 그리고 난이도에 따른 업무처리능력을 분석하도록 하며, 분석된 담당자의 업무처리 능력에 따라 지연 이슈를 정해진 기간 내에 처리할 수 있는지 여부를 판단하도록 한다. 이를 위해, 상기 담당자분석모듈(133b)은 잔여시간산출모듈(133b-1), 잔여율산출모듈(133b-2), 유형별처리시간분석모듈(133b-3), 처리가능여부판별모듈(133b-4)을 포함할 수 있다. The person in charge analysis module 133b is configured to analyze whether or not a person in charge of a delayed issue can handle a task, and analyzes it in consideration of the remaining period and stage of the delayed issue, and the person in charge's work processing capability. The person in charge analysis module 133b analyzes the task processing capability of the person in charge according to the type of issue and the difficulty level, and determines whether or not the delayed issue can be processed within a predetermined period according to the analyzed person's task processing ability. To this end, the person in charge analysis module 133b includes a residual time calculation module 133b-1, a residual rate calculation module 133b-2, a type-specific processing time analysis module 133b-3, and a processability determination module 133b- 4) may be included.

상기 잔여시간산출모듈(133b-1)은 지연이슈의 처리 완료 예정시간까지 현재 남아있는 시간을 산출하는 구성으로, 관리서버(1)에 등록되어 있는 이슈의 종료예정시점과 현재 시간의 차이를 계산하여 잔여시간을 산출하도록 한다. The remaining time calculation module (133b-1) is configured to calculate the current remaining time until the delayed issue is scheduled to be processed, and calculates the difference between the scheduled end time of the issue registered in the management server (1) and the current time. To calculate the remaining time.

상기 잔여율산출모듈(133b-2)은 지연이슈의 현재 남아있는 단계를 고려하여 이슈의 남아있는 업무 잔여율을 산출하는 구성으로, 전체 예정시간에서 남아있는 단계의 예정시간을 합친 비율에 따라 잔여율을 산출하도록 한다. The residual rate calculation module (133b-2) is configured to calculate the remaining work residual rate of the issue in consideration of the currently remaining stage of the delay issue, and the residual rate is calculated according to the sum of the estimated time of the remaining stages from the total scheduled time. Try to calculate the rate.

상기 유형별처리시간분석모듈(133b-3)은 담당자의 이슈 유형에 따른 처리시간을 분석하는 구성으로, 과거 동일한 이슈 유형에 대한 담당자의 처리시간을 통계적으로 분석하여 처리시간을 산출하도록 하며, 이슈의 난이도를 고려하여 가중치를 조정함으로써 정확한 유형별 처리시간이 도출될 수 있도록 한다. The type-specific processing time analysis module 133b-3 is a component that analyzes the processing time according to the type of issue of the person in charge, and calculates the processing time by statistically analyzing the processing time of the person in charge for the same type of issue in the past. By adjusting the weight in consideration of the difficulty level, it is possible to derive the correct processing time for each type.

상기 처리가능여부판별모듈(133b-4)은 담당자의 이슈 유형별 처리시간을 고려하여 지연이슈의 처리 가능 여부를 판별하는 구성으로, 잔여시간산출모듈(133b-1)에 의해 산출된 잔여시간과 잔여율산출모듈(133b-2)에 의해 산출된 잔여율을 고려하여 처리 가능 여부를 판별하도록 한다. 다시 말해 상기 처리가능여부판별모듈(133b-4)은 담당자의 이슈 유형에 따른 처리시간에 잔여율을 곱하여 잔여율에 따른 처리 가능 시간을 산출하도록 하고, 산출된 처리 가능 시간과 잔여시간을 비교하여 잔여시간과 동일하거나 더 많이 남아있는 경우 처리가 가능한 것으로 판단하도록 하며, 잔여시간이 더 적은 경우에는 처리가 불가능한 것으로 판단하도록 한다. The processing possibility determination module 133b-4 is configured to determine whether delay issues can be processed in consideration of the processing time of each issue type of the person in charge, and the remaining time calculated by the remaining time calculation module 133b-1 and the remaining time In consideration of the residual rate calculated by the rate calculation module 133b-2, it is determined whether or not processing is possible. In other words, the processing possibility determination module 133b-4 calculates the processing time according to the residual rate by multiplying the processing time according to the issue type of the person in charge by the residual rate, and compares the calculated processing time and the remaining time. When the remaining time is equal to or more than the remaining time, it is determined that processing is possible, and when the remaining time is less, it is determined that processing is impossible.

상기 지연여부알림모듈(133c)은 상기 처리가능여부판별모듈(133b-4)에 의해 처리 가능한 것으로 판단되는 경우 담당자에게 지연의 발생만을 알리도록 하는 구성으로, 지연에 따른 신속한 업무처리가 이루어질 수 있도록 한다. The delay notification module 133c is configured to notify the person in charge of only the occurrence of the delay when it is determined that the processing is possible by the processing possibility determination module 133b-4. do.

상기 담당자선정지시모듈(133d)은 담당자가 없거나 상기 처리가능여부판별모듈(133b-4)에 의해 담당자가 처리 불가능한 것으로 판단되는 경우 관리자에게 담당자의 선정을 지시하는 구성으로, 관리자의 사용자단말기(3)를 통해 알림이 발생하도록 하며, 상기 담당자추천부(135)에 의해 적합한 담당자가 함께 추천되어 제공된다.The manager selection instruction module 133d is a configuration that instructs the manager to select a manager when there is no person in charge or when it is determined that the person in charge cannot process the process by the processing possibility determination module 133b-4, the manager's user terminal (3) ), and a suitable person in charge is recommended and provided together by the person in charge recommendation unit 135.

상기 담당자추천부(135)는 담당자선정지시모듈(133d)에 의해 관리자에게 새로운 담당자의 선정 지시가 발생하는 경우 적합한 담당자를 선정하여 추천하는 구성으로, 지연이슈의 유형, 난이도를 고려하여 담당자를 검색하고 담당자의 현재 업무 현황과 업무처리 능력 등을 고려하여 담당자를 추천하도록 한다. 이를 위해, 상기 담당자추천부(135)는 담당자검색모듈(135a), 담당자업무분석모듈(135b), 담당자정보제공모듈(135c)을 포함할 수 있다. The person in charge recommendation unit 135 is a configuration that selects and recommends a suitable person in charge when a new person in charge selection instruction occurs to the manager by the person in charge selection instruction module 133d, and searches for a person in charge in consideration of the type and difficulty of delay issues. The person in charge should be recommended in consideration of the current status of the person in charge and the ability to process the work. To this end, the person in charge recommendation unit 135 may include a person in charge search module 135a, a person in charge business analysis module 135b, and a person in charge information providing module 135c.

상기 담당자검색모듈(135a)은 지연이슈에 적합한 담당자를 검색하는 구성으로, 지연이슈의 유형과 난이도를 처리 가능한 담당자를 검색하도록 하며, 상기 사용자등록부(115)에 의해 등록된 정보를 기반으로 검색하도록 한다. The person in charge search module 135a is configured to search for a person in charge suitable for a delay issue, and searches for a person in charge who can handle the type and difficulty of the delay issue, and searches based on the information registered by the user registration unit 115. do.

상기 담당자업무분석모듈(135b)은 상기 담당자검색모듈(135a)에 의해 검색된 담당자의 현재 업무 현황과 업무 능력을 고려하여 지연이슈의 담당 가능 여부를 판별하는 구성으로, 이슈정보로딩모듈(135b-1), 처리시간산정모듈(135b-2), 가능여부판단모듈(135b-3)을 포함할 수 있다. The person in charge business analysis module 135b is configured to determine whether delay issues can be handled in consideration of the current status and work capability of the person in charge searched by the person in charge search module 135a, and the issue information loading module 135b-1 ), a processing time calculation module 135b-2, and a feasibility determination module 135b-3.

상기 이슈정보로딩모듈(135b-1)은 검색된 담당자가 현재 담당하고 있는 이슈의 유형 및 난이도 정보를 불러오는 구성으로, 담당자의 업무 현황을 고려하여 업무가 가능한 잔여시간을 산출할 수 있도록 한다. The issue information loading module 135b-1 is a configuration for fetching information on the type and difficulty level of an issue currently in charge of the searched person in charge, and allows the remaining time for work to be calculated in consideration of the status of work of the person in charge.

상기 처리시간산정모듈(135b-2)은 검색된 담당자가 업무를 처리할 수 있는 처리시간을 산정하는 구성으로, 검색된 담당자의 이슈 유형별 업무처리시간에서 현재 검색된 담당자가 담당하고 있는 업무의 잔여단계와 잔여시간을 고려한 해당 업무에 투자해야할 시간을 더하여 업무를 처리할 수 있는 처리시간을 산정하도록 한다. 따라서, 상기 처리시간산정모듈(135b-2)는 상기 유형별처리시간분석모듈(133b-3)에 의해 산출되는 사용자의 이슈 유형별 처리시간을 나타내는 수치를 사용하도록 할 수 있다. 일 예로, 상기 유형별처리시간분석모듈(133b-3)에 의해 산출되는 담당자의 해당 이슈에 대한 업무처리시간이 10일이고, 현재 검색된 담당자가 진행하고 있는 업무에 투자해야할 시간이 5일인 경우 검색된 담당자는 업무를 처리할 수 있는 처리기간은 15일을 갖는 것으로 산정될 수 있다. The processing time calculation module 135b-2 is a configuration that calculates the processing time that the searched person in charge can handle the task, and the remaining steps and remaining steps of the task currently in charge of the person in charge of the searched person in charge of the searched person's issue type Considering the time, add the time to be invested in the relevant task and calculate the processing time that can handle the task. Accordingly, the processing time calculation module 135b-2 may be configured to use a value representing the processing time for each issue type of the user calculated by the processing time analysis module 133b-3 for each type. As an example, if the person in charge calculated by the type-specific processing time analysis module 133b-3 has 10 days to deal with the relevant issue, and the currently searched person in charge has 5 days to invest in the work being performed, the searched person in charge The processing period in which the business can be processed can be calculated as having 15 days.

상기 가능여부판단모듈(135b-3)은 검색된 담당자의 지연이슈의 처리 가능 여부를 판단하는 구성으로, 상기 처리시간산정모듈(135b-2)에 의해 산정되는 검색된 담당자의 업무 처리 가능시간과 지연 이슈의 잔여시간을 비교하여 처리 가능 여부를 판단하도록 한다. 일 예로, 검색된 담당자가 15일의 처리시간을 필요로하나 지연 이슈의 잔여시간이 10일인경 검색된 담당자는 지연 이슈를 처리할 수 없는 것으로 판단되어 추천될 담당자에서 제외되고, 10일 이하의 처리가능기간을 갖는 담당자만이 담당자로 추천된다. The availability determination module 135b-3 is a configuration that determines whether the searched person in charge can handle the delayed issue, and the searched person in charge's possible work processing time and delay issues calculated by the processing time calculation module 135b-2 The remaining time of is compared to determine whether it is possible to process. For example, if the searched person in charge needs 15 days of processing time, but the remaining time of the delayed issue is 10 days, the searched person in charge is determined to be unable to handle the delayed issue and is therefore excluded from the person in charge to be recommended, and can be processed for less than 10 days. Only the person in charge with a period of time is recommended as the person in charge.

상기 담당자정보제공모듈(135c)은 추천되는 담당자의 정보를 관리자에게 제공하는 구성으로, 상기 가능여부판단모듈(135b-3)에 의해 처리가 가능한 것으로 판단된 담당자정보를 제공하도록 하며, 바람직하게는 처리가능기간이 적은 담당자 순으로 추천이 이루어지도록 할 수 있다. 상기 담당자정보제공모듈(135c)은 담당자의 선정 지시와 함께 관리자의 사용자단말기(3)를 통해 알림의 형태로 제공될 수 있도록 한다. The person in charge information providing module 135c is configured to provide the information of the person in charge recommended to the manager, and provides the person in charge information determined to be processed by the possibility determination module 135b-3, preferably Recommendations can be made in the order of the person in charge with the smallest possible treatment period. The person in charge information providing module 135c can be provided in the form of a notification through the user terminal 3 of the administrator together with the selection instruction of the person in charge.

상기 워크플로우제공부(14)는 사용자의 이슈 유형에 따른 업무처리효율에 따라 적합한 워크플로우를 추천하여 제공하는 구성으로, 각 사용자의 이슈유형별 워크플로우에 따른 업무처리효율을 분석하는 워크플로우분석부(141)와, 이슈 유형에 따라 업무처리효율이 높은 워크플로우를 추천하는 워크플로우추천부(143)를 포함한다. The workflow providing unit 14 is a configuration that recommends and provides an appropriate workflow according to the business processing efficiency according to the user's issue type, and a workflow analysis unit that analyzes the business processing efficiency according to the workflow by each user's issue type. (141) and a workflow recommendation unit 143 that recommends a workflow with high work processing efficiency according to the type of issue.

상기 워크플로우분석부(141)는 각 사용자의 이슈 유형별 워크플로우에 따른 업무처리효율을 분석하는 구성으로, 사용자정보저장모듈(141a), 이슈유형저장모듈(141b), 워크플로우정보저장모듈(141c), 처리효율산출모듈(141d), 처리효율갱신모듈(141e)을 포함할 수 있다. The workflow analysis unit 141 is configured to analyze work processing efficiency according to the workflow for each user's issue type, and includes a user information storage module 141a, an issue type storage module 141b, and a workflow information storage module 141c. ), a processing efficiency calculation module 141d, and a processing efficiency update module 141e.

상기 사용자정보저장모듈(141a), 이슈유형저장모듈(141b), 워크플로우정보저장모듈(141c)은 각 이슈의 업무가 완료된 후, 각 이슈를 수행한 담당자, 이슈의 유형, 워크플로우 단계에 관한 정보를 저장하는 구성으로, 워크플로우의 각 단계를 처리한 시간에 따라 업무처리효율이 산출되어 워크플로우 단계의 추천이 이루어질 수 있도록 한다. The user information storage module 141a, the issue type storage module 141b, and the workflow information storage module 141c are responsible for performing each issue, the type of issue, and the workflow stage after each issue is completed. As a configuration for storing information, work processing efficiency is calculated according to the processing time of each step of the workflow, so that the recommendation of the workflow step can be made.

상기 처리효율산출모듈(141d)은 각 사용자의 이슈 유형에 따른 업무처리효율을 산출하는 구성으로, 사용자가 처리한 이슈에 대해 설정된 초기시간과 실제 업무처리시간의 비율에 따라 처리효율을 산출하도록 하며, 실제 업무처리시간은 관리자 등의 확인 등을 위해 소모된 시간을 제외한 실제 업무진행시간이 분석되어 적용되도록 한다. 또한, 상기 처리효율산출모듈(141d)은 이슈의 난이도에 따라 처리효율에 가중치를 두도록 하여 난이도에 따른 처리효율의 차이를 줄일 수 있도록 한다. 이를 위해, 상기 처리효율산출모듈(141d)은 설정시간저장모듈(141d-1), 처리시간저장모듈(141d-2), 업무진행시간분석모듈(141d-3), 처리효율연산모듈(141d-4), 가중치적용모듈(141d-5)을 포함할 수 있다. The processing efficiency calculation module 141d is a configuration that calculates work processing efficiency according to the type of issue of each user, and calculates the processing efficiency according to the ratio of the initial time set for the issue handled by the user and the actual work processing time. , The actual work processing time is analyzed and applied to the actual work processing time excluding the time spent for confirmation of the manager, etc. In addition, the processing efficiency calculation module 141d puts a weight on the processing efficiency according to the difficulty level of the issue, thereby reducing the difference in processing efficiency according to the difficulty level. To this end, the processing efficiency calculation module 141d includes a set time storage module 141d-1, a processing time storage module 141d-2, a work progress time analysis module 141d-3, and a processing efficiency calculation module 141d- 4), may include a weight application module (141d-5).

상기 설정시간저장모듈(141d-1)은 각 이슈에 대해 설정된 처리시간에 관한 정보를 저장하는 구성으로, 상기 이슈등록부(113)의 기간설정모듈(113d)에 의해 등록된 정보를 불러와 저장하도록 한다. The setting time storage module 141d-1 is configured to store information on the processing time set for each issue, and to load and store information registered by the period setting module 113d of the issue registration unit 113. do.

상기 처리시간저장모듈(141d-2)은 실제 이슈가 처리된 시간에 관한 정보를 저장하는 구성으로, 이슈가 생성된 시점부터 종료된 시점까지의 시간을 산출하여 저장하도록 한다. The processing time storage module 141d-2 is configured to store information on a time when an actual issue has been processed, and calculates and stores the time from the time when the issue is created to the time when the issue is ended.

상기 업무진행시간분석모듈(141d-3)은 상기 처리시간저장모듈(141d-2)에 의해 저장된 업무처리 시간에서 각 단계의 특성을 고려하여 실제 사용자가 업무를 진행한 단계를 특정하도록 하고, 특정된 단계가 진행된 시간을 산출하도록 한다. 예를 들어, 상기 업무진행시간분석모듈(141d-3)은 워크플로우 단계까 생성 → 진행 → 확인 → 종료의 단계인 경우 상기 처리시간저장모듈(141d-2)에 의해 저장된 시간에서 생성과 진행 사이의 시간, 확인을 위해 진행된 시간 등을 제외하고 실제 업무진행시간을 산출해내도록 할 수 있다. The work progress time analysis module (141d-3) allows the actual user to specify the step in which the work was performed in consideration of the characteristics of each step in the work processing time stored by the processing time storage module (141d-2). Calculate the time at which the previous step has progressed. For example, the work progress time analysis module (141d-3) is, in the case of creation → progress → confirmation → end, up to the workflow stage, between creation and progress at the time stored by the processing time storage module (141d-2). The actual work time can be calculated by excluding the time of work and the time done for confirmation.

상기 처리효율연산모듈(141d-4)은 상기 설정시간저장모듈(141d-1)에 의해 저장된 각 이슈의 설정 처리 기간과 상기 업무진행시간분석모듈(141d-3)에 의해 분석된 업무진행시간의 비율에 따라 업무처리효율을 산출하는 구성으로, 일 예로 전체 설정 처리 기간을 업무진행시간으로 나누어 업무처리효율을 계산해내도록 할 수 있으며, 계산된 값이 클수록 높은 업무처리효율을 갖는 것으로 해석될 수 있다. The processing efficiency calculation module (141d-4) is the set processing period of each issue stored by the setting time storage module (141d-1) and the work progress time analyzed by the business progress analysis module (141d-3). It is a configuration that calculates the work processing efficiency according to the ratio, for example, the total set processing period can be divided by the work progress time to calculate the work processing efficiency, and the larger the calculated value, the higher the work processing efficiency. .

상기 가중치적용모듈(141d-5)은 이슈의 난이도에 따른 가중치를 설정하여 처리효율연산모듈(141d-4)에 의한 업무처리효율의 산출에 적용되도록 하는 구성으로, 이슈의 난이도에 따른 큰 값의 가중치를 업무처리효율에 곱하여 최종적인 업무처리효율이 산출되도록 할 수 있다. 따라서, 상기 가중치적용모듈(141d-5)은 동일한 업무처리효율을 갖더라도 난이도가 높은 이슈에 대해 가중치를 부여하도록 하여 최종 업무처리효율을 더 높아지는 결과를 낳도록 할 수 있다. The weight application module 141d-5 is configured to set a weight according to the difficulty of an issue and applied to the calculation of work processing efficiency by the processing efficiency calculation module 141d-4. The weight can be multiplied by the business processing efficiency so that the final business processing efficiency can be calculated. Accordingly, the weight application module 141d-5 may give weights to issues of high difficulty even if they have the same business processing efficiency, resulting in higher final business processing efficiency.

상기 처리효율갱신모듈(141e)은 상기 처리효율산출모듈(141d)에 의해 산출되는 이슈 유형별 워크플로우 단계의 업무처리효율을 갱신하는 구성으로, 이슈의 종료가 이루어질 때마다 해당 사용자에 대한 업무처리효율의 갱신이 이루어지도록 하여 각 사용자의 업무처리효율의 변화를 반영할 수 있도록 한다. The processing efficiency update module 141e is a configuration for updating the work processing efficiency of the workflow step for each issue type calculated by the processing efficiency calculation module 141d, and the work processing efficiency for a corresponding user whenever an issue is terminated. The update is made so that the change in work processing efficiency of each user can be reflected.

상기 워크플로우추천부(143)는 이슈의 생성시 각 사용자에게 적합한 워크플로우를 추천하는 구성으로, 각 사용자에 대해 이슈 유형별로 업무처리효율이 높은 워크플로우를 찾아 사용자에게 제공할 수 있도록 한다. 이를 위해, 상기 워크플로우추천부(143)는 이슈정보입력모듈(143a), 사용자정보입력모듈(143b), 워크플로우비교모듈(143c), 추천워크플로우제공모듈(143d)을 포함할 수 있다. The workflow recommendation unit 143 is a configuration that recommends a workflow suitable for each user when an issue is generated, and enables each user to find a workflow with high work processing efficiency for each issue type and provide it to the user. To this end, the workflow recommendation unit 143 may include an issue information input module 143a, a user information input module 143b, a workflow comparison module 143c, and a recommended workflow providing module 143d.

상기 이슈정보입력모듈(143a)은 생성될 이슈의 유형정보가 입력되도록 하는 구성으로, 상기 유형지정모듈(113c)에 의해 지정되는 유형정보 중 하나가 입력될 수 있도록 한다. The issue information input module 143a is configured to input type information of an issue to be generated, and allows one of type information designated by the type designation module 113c to be input.

상기 사용자정보입력모듈(143b)은 이슈를 생성하는 사용자 또는 이슈의 담당자에 대한 정보가 입력되는 구성으로, 사용자단말기(3)를 통한 입력이 이루어지도록 할 수 있다. The user information input module 143b is a configuration in which information on a user who creates an issue or a person in charge of the issue is input, and can be input through the user terminal 3.

상기 워크플로우비교모듈(143c)은 이슈정보입력모듈(143a)에 의해 입력된 이슈 유형에 대해 상기 워크플로우분석부(141)에 의해 분석된 각 사용자의 워크플로우별 업무처리효율을 비교하는 구성으로, 업무처리효율이 높은 워크플로우의 추천이 이루어지도록 할 수 있다. 일 예로, 상기 워크플로우비교모듈(143c)은 테스트 이슈에 대해 테스트의 횟수, 테스트의 종류에 따라 상이하게 설정된 워크플로우들을 서로 비교하도록 할 수 있으며, 이중 테스트가 빨리 이루어지고, 관리자에 의한 재진행 등의 절차가 적게 이루어져 업무처리효율이 높은 것으로 분석된 워크플로우를 사용자에게 추천하도록 함으로써 시간이 단축된 효과적인 업무처리가 가능하도록 한다. The workflow comparison module 143c is configured to compare work processing efficiency for each user's workflow analyzed by the workflow analysis unit 141 with respect to the type of issue input by the issue information input module 143a. In addition, it is possible to recommend a workflow with high work processing efficiency. As an example, the workflow comparison module 143c may compare differently set workflows for test issues according to the number of tests and types of tests, and double tests are quickly performed, and re-progress by the administrator. The workflow, which has been analyzed as having high work processing efficiency, is recommended to the user because there are fewer procedures such as, so that effective work processing with reduced time is possible.

상기 추천워크플로우제공모듈(143d)은 워크플로우비교모듈(143c)에 의해 비교된 결과에 따라 업무처리효율이 높은 워크플로우 정보를 사용자에게 제공하는 구성으로, 이를 제공받은 사용자는 추천된 워크플로우 정보를 해당 이슈에 대해 등록하도록 하고, 이에 따라 업무진행이 이루어지도록 함으로써 사용자별, 이슈유형별로 업무 처리의 효율성을 높일 수 있도록 한다.The recommended workflow providing module 143d is a configuration that provides the user with workflow information having high work processing efficiency according to the result compared by the workflow comparison module 143c, and the user receiving the recommended workflow information It is possible to increase the efficiency of business processing by user and by issue type by registering for the relevant issue and making the work progress accordingly.

상기 작동관리부(15)는 시스템의 작동을 관리하는 구성으로, 접속에 관한 정상작동 여부를 관리하는 접속관리부(151)와, 알림설정부(16)에 의한 알림의 정상 작동 여부를 관리하는 알림관리부(153)를 포함할 수 있다. The operation management unit 15 is a component that manages the operation of the system, and a connection management unit 151 that manages whether a connection is normally operated, and a notification management unit that manages whether a notification by the notification setting unit 16 operates normally. (153) may be included.

상기 접속관리부(151)는 시스템에 대한 접속 상태를 모니터링하여 접속에 대한 이상을 진단하고 이에 대한 관리가 이루어지도록 하는 구성으로, 동시접속자수와 오류의 발생 정보를 이용하여 모니터링이 이루어지도록 한다. 이를 통해 상기 접속관리부(151)는 접속 계통의 고장을 진단할 수 있도록 하며, 고장뿐만 아니라 고장 위험의 예측과 성능 저하까지 진단하여 이에 대한 대비가 이루어지도록 할 수 있다. 이를 위해, 상기 접속관리부(151)는 접속정보수신모듈(151a), 접속자수산출모듈(151b), 오류정보수신모듈(151c), 고장판단모듈(151d), 고장위험예측모듈(151e), 성능저하판단모듈(151f)을 포함할 수 있다. The access management unit 151 monitors the connection status to the system to diagnose an abnormality in the connection and manages the connection. The connection management unit 151 is configured to perform monitoring using the number of simultaneous users and information on occurrence of errors. Through this, the connection management unit 151 can diagnose a failure of a connection system, and diagnose not only a failure, but also a failure risk prediction and performance deterioration, and prepare for this. To this end, the connection management unit 151 includes a connection information receiving module 151a, a number of users calculating module 151b, an error information receiving module 151c, a failure determination module 151d, a failure risk prediction module 151e, and performance. It may include a deterioration determination module (151f).

상기 접속정보수신모듈(151a)은 시스템에 대한 접속정보를 수신하는 구성으로, 실시간으로 접속정보를 수신하여 접속자수의 산출이 이루어지도록 한다. The access information receiving module 151a is configured to receive access information for a system, and receives access information in real time to calculate the number of users.

상기 접속자수산출모듈(151b)은 상기 접속정보수신모듈(151a)에 의해 수신되는 접속정보에 따라 접속자수를 산출하는 구성으로, 실시간으로 접속자수를 산출하도록 하며, 오류가 발생된 시점의 동시접속자수를 산출하여 고장판단모듈(151d), 고장위험예측모듈(151e), 성능저하판단모듈(151f)로 전달되도록 할 수 있다. The number of visitors calculation module 151b is configured to calculate the number of users according to the access information received by the access information receiving module 151a, and calculates the number of users in real time. The number may be calculated and transferred to the failure determination module 151d, the failure risk prediction module 151e, and the performance degradation determination module 151f.

상기 오류정보수신모듈(151c)은 사용자단말기(3)를 통한 시스템의 접속에 오류가 발생한 정보를 수신하는 구성으로, 각 사용자단말기(3)로부터 오류에 관한 정보를 수신하도록 하며 오류 횟수에 대한 정보를 산출하도록 할 수 있다. The error information receiving module 151c is configured to receive information about an error in connection to the system through the user terminal 3, and receives information about the error from each user terminal 3, and information about the number of errors. Can be made to yield.

상기 고장판단모듈(151d)은 접속 계통의 고장을 진단하는 구성으로, 일정 단위시간 동안 설정된 동시접속자수 이하에서 접속 오류가 설정된 횟수 이상 발생하는 경우 고장으로 판단하여 이를 관리자 및 사용자에게 알리도록 할 수 있다. 예를 들어, 상기 고장판단모듈(151d)은 하루의 단위 시간 동안 동시접속자수 1000명 이하에서 20번의 접속오류가 발생하는 경우 고장으로 판단하여 알리도록 할 수 있으며, 이는 예시에 불과할 뿐 다양한 시간 및 횟수 기준에 따라 고장을 진단하도록 할 수 있다. The failure determination module (151d) is a configuration for diagnosing a failure of the access system, and when a connection error occurs more than a set number of times less than a set number of simultaneous users for a certain unit time, it is determined as a failure and can be notified to the administrator and user. have. For example, the failure determination module 151d may determine and notify a failure when 20 access errors occur in 1000 or less concurrent users during a unit time of a day, and this is only an example, and various times and Failure can be diagnosed based on the number of times.

상기 고장위험예측모듈(151e)은 상기 고장판단모듈(151d)에 의해 고장으로 진단되지는 않았으나 고장이 근시일내에 발생할 것으로 예측되는 경우 이에 관한 정보를 사용자에게 알리도록 하는 구성으로, 고장판단모듈(151d)에 의해 횟수기준을 넘지는 않았으나 그 아래 일정 범위의 오류 횟수가 일정 기간 연속하여 발생하는 경우 고장의 징조로 판단하여 고장 위험에 대한 예측정보를 발생시키도록 한다. 이를 위해, 상기 고장위험예측모듈(151e)은 오류기준판단모듈(151e-1), 계속여부감시모듈(151e-2), 고장위험알림모듈(151e-3)을 포함할 수 있다. The failure risk prediction module 151e is configured to notify the user of information about the failure when the failure is not diagnosed as a failure by the failure judgment module 151d but is predicted to occur in the near future. According to 151d), if the number of errors in a certain range below the number of errors in a certain range occurs continuously for a certain period of time, it is judged as a sign of failure and predicted information on the risk of failure is generated. To this end, the failure risk prediction module 151e may include an error reference determination module 151e-1, a continuation monitoring module 151e-2, and a failure risk notification module 151e-3.

상기 오류기준판단모듈(151e-1)은 단위시간 동안의 접속 오류 횟수가 고장위험 예측의 횟수 범위 내인지를 판단하는 구성으로, 고장으로 진단되는 범위 아래의 일정 범위를 기준으로 하도록 한다. 예를 들어 상기 오류기준판단모듈(151e-1)은 하루의 단위시간 동안 1000명 이하에서 15번~19번의 접속오류가 발생하는 경우 고장위험이 예측될 수 있는 범위로 판단하도록 할 수 있으며, 이러한 범위 내의 오류가 발생하는 경우 그 지속시간이 산출되도록 한다. The error reference determination module 151e-1 is configured to determine whether the number of connection errors per unit time is within the range of the number of times of failure risk prediction, and is set based on a certain range below the range diagnosed as a failure. For example, the error criterion determination module 151e-1 may determine a failure risk within a predictable range when 15 to 19 connection errors occur in less than 1000 people during a unit time of a day. If an error occurs within the range, the duration is calculated.

상기 계속여부감시모듈(151e-2)은 상기 오류기준판단모듈(151e-1)에 의해 단위시간 동안의 설정된 동시접속자수 이하에서 접속 오류 횟수가 고장 위험 예측 범위 내로 판단되는 경우 그 지속시간을 감시하는 구성으로, 일정 횟수의 단위 시간동안 계속되는지 감시하도록 한다. The continuity monitoring module 151e-2 monitors the duration when the number of connection errors is determined to be within the predicted range of the risk of failure within the number of concurrent users set during the unit time by the error reference determination module 151e-1. It is configured to monitor whether it continues for a certain number of unit times.

상기 고장위험알림모듈(151e-3)은 상기 계속여부감시모듈(151e-2)에 의해 감시한 결과 고장 위험 예측 범위 내의 오류횟수가 설정된 단위시간 횟수동안 연속적으로 계속되는 경우에는 고장위험을 알리는 구성으로, 예를 들어 단위시간이 하루인 경우 5일 동안 지속되는 경우 고장위험을 알리도록 할 수 있다. 따라서, 상기 고장위험알림모듈(151e-3)은 고장이 발생하기 전이라도 고장 위험에 다다른 경우 이를 미리 인지하여 사용자에게 알릴 수 있도록 함으로써 이에 대한 점검 및 대처가 신속하게 이루어질 수 있도록 한다. The failure risk notification module 151e-3 is configured to notify a failure risk when the number of errors within the failure risk prediction range continues for a set unit time as a result of monitoring by the continuity monitoring module 151e-2. , For example, if the unit time is one day, if it lasts for 5 days, the risk of failure can be communicated. Accordingly, even before the failure occurs, the failure risk notification module 151e-3 can recognize and notify the user in advance of reaching the failure risk, so that the inspection and coping with the failure can be quickly performed.

상기 성능저하판단모듈(151f)은 접속 계통의 성능저하를 감지하는 구성으로, 고장 및 고장위험이 감지되지 않는 경우에도 접속 계통의 성능이 저하되고 있음을 감지하여 성능 개선을 위한 조치가 미리 취해질 수 있도록 한다. 상기 성능저하판단모듈(151f)은 단위 시간 동안의 오류 횟수가 고장범위 및 고장위험 범위에 들어가지 않으나 오류 횟수의 증가율이 설정된 값을 넘어 일정 단위시간 이상 계속되는 경우 접속계통의 성능 저하로 판단하도록 한다. 이를 위해, 상기 성능저하판단모듈(151f)은 오류변화율산출모듈(151f-1), 지속시간산출모듈(151f-2), 성능저하알림모듈(151f-3)을 포함할 수 있다. The performance deterioration determination module 151f is configured to detect the performance degradation of the access system, and even when a failure or a risk of failure is not detected, it detects that the performance of the access system is deteriorating, so that measures to improve performance can be taken in advance To be there. The performance deterioration determination module 151f determines that the performance of the connection system is degraded when the number of errors during a unit time does not fall within the range of failure and risk of failure, but the increase rate of the number of errors exceeds the set value and continues for a certain unit time. . To this end, the performance degradation determination module 151f may include an error change rate calculation module 151f-1, a duration time calculation module 151f-2, and a performance degradation notification module 151f-3.

상기 오류변화율산출모듈(151f-1)은 단위 시간 동안 설정된 동시접속자수 이하에서 발생하는 오류 횟수의 변화율을 산출하는 구성으로, 단위 시간 사이에서 오류 횟수에 대한 기울기를 산출하도록 한다. The error change rate calculation module 151f-1 is configured to calculate a change rate of the number of errors occurring below the number of simultaneous users set during a unit time, and calculates a slope for the number of errors between unit times.

상기 지속시간산출모듈(151f-2)은 오류 변화율이 설정된 값을 초과하는 경우 이러한 상태의 지속시간을 산출하는 구성으로, 각 단위시간 사이의 오류 변화율이 설정된 값을 초과하는 상태가 지속되는 시간을 산출하도록 한다. 상기 지속시간산출모듈(151f-2)은 오류 변화율이 증가하는 방향을 기준값으로 설정하도록 한다. The duration time calculation module 151f-2 is configured to calculate the duration of this state when the error change rate exceeds a set value, and the duration of the state in which the error change rate between each unit time exceeds the set value is measured. To calculate. The duration time calculation module 151f-2 sets the direction in which the error change rate increases as a reference value.

상기 성능저하알림모듈(151f-3)은 오류 횟수의 변화율이 설정된 값을 초과하는 상태로 일정 시간 이상 계속되는 경우 접속계통의 성능 저하로 판단하여 이를 알리도록 하는 구성으로, 예를 들어 설정값을 넘는 상태가 10일동안 계속되는 경우 성능저하로 판단하도록 할 수 있다. 따라서, 상기 성능저하알림모듈(151f-3)은 고장 및 고장 위험이 발생하기 전에도 성능 저하를 알리도록 하여 지속적인 점검과 보수가 이루어지도록 함으로써 고장 발생에 따른 유지 비용의 증가와 업무 처리의 지연을 미연에 방지할 수 있도록 한다. The performance degradation notification module 151f-3 is configured to determine that the performance of the access system is degraded and notify when the rate of change of the number of errors exceeds a set value and continues for a certain period of time. If the condition continues for 10 days, it can be judged as a deterioration in performance. Therefore, the performance degradation notification module (151f-3) notifies the performance degradation even before the occurrence of failure or failure, so that continuous inspection and maintenance are performed, thereby preventing an increase in maintenance cost and delay in business processing due to failure. To be able to prevent it.

상기 알림관리부(153)는 알림설정부(16)의 정상 작동 여부를 관리하는 구성으로, 알림설정부(16)에서는 시스템 상의 프로젝트, 이슈 등에 관한 알림이 사용자가 설정한 시간대에 따라 사용자단말기(3)로 전송되도록 하는데, 이에 대한 정상 작동 여부를 관리하도록 한다. 따라서, 상기 알림관리부(153)는 사용자가 설정한 시간에 설정된 종류의 알림이 정상적으로 수신되는지 여부를 확인할 수 있도록 하며, 이를 위해 알림생성정보수신모듈(153a), 알림수신정보검출모듈(153b), 오류율산출모듈(153c), 알림이상정보제공모듈(153d)을 포함할 수 있다. The notification management unit 153 is a component that manages whether the notification setting unit 16 operates normally. In the notification setting unit 16, notifications about projects and issues on the system are sent to the user terminal 3 according to a time zone set by the user. ), and manage whether it works normally. Accordingly, the notification management unit 153 enables the user to check whether or not a set type of notification is normally received at a time set by the user, and for this purpose, a notification generation information receiving module 153a, a notification receiving information detection module 153b, It may include an error rate calculation module (153c), a notification abnormality information providing module (153d).

상기 알림생성정보수신모듈(153a)은 시스템 상에서 알림이 발생하는 정보를 수신하는 구성으로, 프로젝트, 이슈, 워크플로우 등의 상태변경, 업무처리, 지시사항 등과 관련되어 사용자단말기(3)를 통해 통지되는 모드 알림에 대한 생성정보를 수신하도록 할 수 있다. The notification generation information receiving module (153a) is a configuration for receiving information that a notification occurs on the system, and is notified through the user terminal 3 in relation to status change, work processing, instructions, etc. of projects, issues, workflows, etc. It is possible to receive generation information about the mode notification that is being used.

상기 알림수신정보검출모듈(153b)은 사용자단말기(3)를 통해 수신되는 알림에 대한 정보를 검출하는 구성으로, 사용자단말기(3)를 통해 알림의 수신이 이루어지는 경우 자동으로 수신정보를 관리서버(1)로 전달하도록 하여 이에 대한 검출이 이루어지도록 할 수 있다. 또한, 상기 알림수신정보검출모듈(153b)은 사용자단말기(3)를 통해 알림이 수신된 시간, 종류, 중요도 등의 정보를 함께 검출하도록 하여 정해진 시간에 알림이 정확하게 도착했는지 확인할 수 있도록 한다. The notification reception information detection module 153b is configured to detect information on notifications received through the user terminal 3, and automatically manages the reception information when the notification is received through the user terminal 3 ( It can be detected by sending it to 1). In addition, the notification receiving information detection module 153b detects information such as the time, type, and importance of the notification received through the user terminal 3 together so that it is possible to check whether the notification has arrived correctly at a predetermined time.

상기 오류율산출모듈(153c)은 일정기간 동안 알림이 정해진 시간에 도착하지 않은 비율을 산출하는 구성으로, 상기 알림생성정보수신모듈(153a)에 의해 수신된 알림생성정보와 상기 알림수신정보검출모듈(153b)에 의해 검출된 알림수신정보를 비교하여 사용자가 설정한 시간에 정확하게 알림이 도착했는지 확인하도록 하고, 생성된 알림 중에서 설정한 시간에 도착하지 않은 알림의 비율을 오류율로 산출하도록 한다. 상기 오류율산출모듈(153c)은 일정기간의 오류율을 연속적으로 산출하도록 하며, 예를 들어 하루 단위로 오류율을 산출하여 설정값을 초과하는지 판단하도록 하고, 이러한 과정이 매일 연속적으로 이루어지도록 할 수 있다. The error rate calculation module 153c is configured to calculate a rate that a notification does not arrive at a predetermined time for a certain period of time, and the notification generation information received by the notification generation information receiving module 153a and the notification reception information detection module ( The notification reception information detected by 153b) is compared to check whether the notification arrives at a time set by the user, and the percentage of notifications that have not arrived at the set time among the generated notifications is calculated as an error rate. The error rate calculation module 153c continuously calculates an error rate for a certain period of time, for example, calculates an error rate on a daily basis to determine whether it exceeds a set value, and allows this process to be performed continuously every day.

상기 알림이상정보제공모듈(153d)은 상기 알림설정부(16)의 작동 이상이 발생한 정보를 사용자에게 알리도록 하는 구성으로, 오류율산출모듈(153c)에 의해 산출되는 오류율이 설정된 값을 초과하는 경우 이상으로 판단하도록 한다. 따라서, 상기 알림이상정보제공모듈(153d)은 알림설정부(16)의 작동 이상을 신속하게 인지할 수 있도록 하여 빠른 대처가 가능하도록 한다. The notification abnormality information providing module (153d) is configured to notify the user of the information on which the operation abnormality of the notification setting unit 16 has occurred, and when the error rate calculated by the error rate calculation module (153c) exceeds a set value Please judge as above. Accordingly, the notification abnormality information providing module 153d enables a quick response by allowing rapid recognition of an operation abnormality of the notification setting unit 16.

상기 알림설정부(16)는 시스템에서 발생하는 알림에 대해 각 사용자가 알림수신시간을 설정할 수 있도록 하는 구성으로, 프로젝트, 이슈의 종류 및 중요도에 따라 알림의 수신 시간을 설정하도록 할 수 있다. 소프트웨어의 개발을 위해서는 다수의 프로젝트가 동시에 진행되는 경우가 많고, 하나의 프로젝트 내에서도 수많은 이슈가 발생하며, 소프트웨어를 개발하고 관리하는 사용자는 복수의 프로젝트와 이슈를 담당하는 경우가 대부분이다. 따라서, 시스템 상에서 발생하는 프로젝트, 이슈, 워크플로우 등의 상태변경, 업무처리, 지시사항, 요구사항 등과 관련되는 수많은 알림이 도 15에 도시된 바와 같이 동시에 각 담당자에게 전달되므로 알림을 놓치는 경우가 빈번하게 발생하게 된다. 따라서, 상기 알림설정부(16)는 프로젝트, 이슈의 종류 및 중요도에 따라 알림의 수신시간을 설정하도록 하여 알림에 대한 관리가 사용자에게 맞게 효과적으로 이루어지도록 할 수 있으며, 긴급처리가 필요한 알림에 대해서도 일정한 시간에 전달이 이루어지도록 함으로써 긴급처리가 가능하도록 하면서도 원활한 관리까지 동시에 이루어질 수 있도록 하였다. 이를 위해, 상기 알림설정부(16)는 사용자정보를 저장하는 사용자정보저장부(161)와 사용자에 따른 알림시간을 설정하는 알림수신시간설정부(163)를 포함할 수 있다. The notification setting unit 16 is a configuration that allows each user to set a notification reception time for notifications occurring in the system, and may set the notification reception time according to a project, type of issue, and importance. For software development, a number of projects are often carried out at the same time, numerous issues arise within one project, and users who develop and manage software are in most cases in charge of multiple projects and issues. Therefore, a number of notifications related to state change, work processing, instructions, requirements, etc., such as project, issue, and workflow occurring on the system, are delivered to each person in charge at the same time as shown in FIG. Will occur. Therefore, the notification setting unit 16 sets the reception time of notification according to the type and importance of the project and the issue, so that the management of the notification can be effectively performed for the user. By ensuring that the delivery is done on time, it enables urgent handling and smooth management at the same time. To this end, the notification setting unit 16 may include a user information storage unit 161 that stores user information and a notification reception time setting unit 163 that sets a notification time according to the user.

상기 사용자정보저장부(161)는 알림에 대한 정보를 설정하는 사용자정보를 저장하는 구성으로, 해당 사용자에 대한 알림 시간이 설정될 수 있도록 한다. The user information storage unit 161 is configured to store user information for setting information on a notification, and allows a notification time for a corresponding user to be set.

상기 알림수신시간설정부(163)는 각 사용자에 대한 알림수신시간을 설정하는 구성으로, 프로젝트별 수신시간을 설정하는 프로젝트별시간설정모듈(163a), 이슈종류별 수신시간을 설정하는 이슈종류별시간설정모듈(163b), 중요도에 따른 수신시간을 설정하는 중요도별시간설정모듈(163c), 긴급처리알림의 수신시간을 설정하는 긴급처리알림시간설정모듈(163d)을 포함할 수 있다. The notification reception time setting unit 163 is a configuration for setting the notification reception time for each user, a project-specific time setting module 163a that sets the reception time for each project, and an issue type-specific time setting that sets the reception time for each issue type. It may include a module 163b, a time setting module 163c according to the importance level for setting a reception time according to the importance level, and an emergency processing notification time setting module 163d for setting a reception time of the emergency treatment notification.

상기 프로젝트별시간설정모듈(163a) 및 이슈종류별시간설정모듈(163b)은 프로젝트의 종류 및 이슈의 종류에 따라 알림 수신시간을 설정하는 구성으로, 예를 들어 프로젝트에 대한 알림은 일정 시간 간격으로 10시, 11시, 12시 등으로 나누어 설정되도록 할 수 있고, 각 프로젝트의 이슈에 따라 10분, 20분, 30분에 알림이 수신되도록 할 수 있다. The project-specific time setting module 163a and the issue type-specific time setting module 163b are configured to set the notification reception time according to the type of project and the type of issue. It can be divided into hours, 11 o'clock, 12 o'clock, etc., and notifications can be received at 10, 20, and 30 minutes depending on the issue of each project.

상기 중요도별시간설정모듈(163c)은 각 이슈에 대한 알림에서 중요도 순으로 알림시간이 설정되도록 할 수 있으며, 중요도가 높을수록 먼저 알림을 받도록 설정할 수 있다. 따라서, 상술한 예에서 중요도별시간설정모듈(163c)은 3분 간격으로 상중하의 중요도로 나누어 알림이 수신되도록 할 수 있다. The priority time setting module 163c may set notification times in order of importance from notifications for each issue, and set to receive notifications first as the importance level is higher. Accordingly, in the above-described example, the time setting module 163c according to the importance level can receive a notification by dividing the importance into upper, middle, and lower levels every 3 minutes.

상기 긴급처리알림시간설정모듈(163d)은 긴급처리가 필요한 알림에 대한 수신시간을 설정하는 구성으로, 긴급처리에 대한 알림은 프로젝트 및 이슈 종류, 중요도에 상관없이 우선적인 알림이 이루어지도록 한다. 다만, 전혀 아무런 제한없이 긴급처리알림이 수신되는 경우에는 많은 알림들속에 묻혀 알림을 놓치게 되는 문제가 발생할 수 있으므로, 상기 긴급처리알림시간설정모듈(163d)은 각 이슈의 마지막 타임에 긴급처리 알림이 수신되도록 할 수 있다. 예를 들어 상술한 예에서 긴급처리알림시간설정모듈(163d)은 각 이슈의 알림시간에서 3분 간격의 중요도별 알림 시간이 끝나는 마지막 1분에 긴금처리 알림이 수신되도록 할 수 있으며, 이때의 긴급처리알림은 프로젝트 및 이슈의 종류에 상관없이 해당시간에 수신되도록 할 수 있다. 따라서, 상기 긴급처리알림시간설정모듈(163d)은 신속한 처리가 필요한 알림에 대해 빠른 처리가 가능하도록 하면서도 알림을 놓치는 등의 문제를 방지할 수 있도록 한다. The emergency processing notification time setting module 163d is configured to set a reception time for a notification requiring urgent processing, and the notification on the urgent processing allows priority notification to be made irrespective of the project and issue type and importance. However, if an emergency handling notification is received without any restrictions at all, there may be a problem that the notification is missed because it is buried in many notifications, so the emergency handling notification time setting module 163d sends the emergency handling notification at the last time of each issue. Can be received. For example, in the above-described example, the emergency processing notification time setting module 163d may allow the emergency handling notification to be received in the last minute of the end of the notification time for each level of importance at 3 minute intervals from the notification time of each issue. Processing notifications can be received at the appropriate time regardless of the type of project or issue. Accordingly, the emergency processing notification time setting module 163d enables rapid processing of notifications requiring rapid processing while preventing problems such as missed notifications.

상기 사용자단말기(3)는 상기 관리서버(1)에 등록된 정보를 전달받아 표시하며, 프로젝트, 이슈, 업무처리 정보 등을 입력하여 관리서버로 전송하는 구성으로, 관리자 및 담당자(직원) 등 시스템을 이용하는 모든 사용자의 단말기를 포함한다. 상기 사용자단말기(3)는 도 1에 도시된 바와 같이 PC, 스마트폰, 태블릿 등 다양한 형태가 적용될 수 있으며, 업무의 등록과 처리, 각종 알림의 수신 및 정보의 제공 등이 이루어질 수 있도록 한다. The user terminal 3 receives and displays the information registered in the management server 1, and inputs project, issue, and business processing information and transmits it to the management server. Includes terminals of all users who use. As shown in FIG. 1, the user terminal 3 may be applied in various forms such as a PC, a smart phone, and a tablet, and register and process tasks, receive various notifications, and provide information.

이상에서, 출원인은 본 발명의 다양한 실시예들을 설명하였지만, 이와 같은 실시예들은 본 발명의 기술적 사상을 구현하는 일 실시예일 뿐이며, 본 발명의 기술적 사상을 구현하는 한 어떠한 변경예 또는 수정예도 본 발명의 범위에 속하는 것으로 해석되어야 한다.In the above, the applicant has described various embodiments of the present invention, but such embodiments are only one embodiment embodying the technical idea of the present invention, and any changes or modifications may be made as long as the technical idea of the present invention is implemented. It should be construed as falling within the scope of.

1: 관리서버
11: 업무등록부 111: 프로젝트등록부 113: 이슈등록부
113a: 프로젝트연결모듈 113b: 명칭등록모듈 113c: 유형지정모듈
113d: 기간설정모듈 113e: 난이도설정모듈 113f: 우선순위설정모듈
113g: 워크플로우설정모듈 113h: 단계별기간지정모듈
12: 업무처리부 121: 프로젝트선택모듈 122: 이슈선택모듈
123: 단계지정모듈 124: 업무정보입력모듈 125: 처리완료모듈
13: 이슈관리부 131: 지연이슈검출부
131a: 단계별초기설정시간수신모듈 131b: 초과시간산정모듈
131c: 지연율산출모듈 131d: 지연이슈정보생성모듈 133: 지연처리부
133a: 담당자확인모듈 133b: 담당자분석모듈
133b-1: 잔여시간산출모듈 133b-2: 잔여율산출모듈
133b-3: 유형별처리시간분석모듈 133b-4: 처리가능여부판별모듈
133c: 지연여부알림모듈 133d: 담당자선정지시모듈
135: 담당자추천부 135a: 담당자검색모듈 135b: 담당자업무분석모듈
135b-1: 이슈정보로딩모듈 135b-2: 처리시간산정모듈
135b-3: 가능여부판단모듈 135c: 담당자정보제공모듈
14: 워크플로우제공부 141: 워크플로우분석부
141a: 사용자정보저장모듈 141b: 이슈유형저장모듈
141c: 워크플로우정보저장모듈 141d: 처리효율산출모듈
141d-1: 설정시간저장모듈 141d-2: 처리시간저장모듈
141d-3: 업무진행시간분석모듈 141d-4: 처리효율연산모듈
141d-5: 가중치적용모듈 141e: 처리효율갱신모듈
143: 워크플로우추천부 143a: 이슈정보입력모듈
143b: 사용자정보입력모듈 143c: 워크플로우비교모듈
143d: 추천워크플로우제공모듈
15: 작동관리부 151: 접속관리부 151a: 접속정보수신모듈
151b: 접속자수산출모듈 151c: 오류정보수신모듈 151d: 고장판단모듈
151e: 고장위험예측모듈 151e-1: 오류기준판단모듈
151e-2: 계속여부감지모듈 151e-3: 고장위험알림모듈
151f: 성능저하판단모듈 151f-1: 오류변화량산출모듈
151f-2: 지속시간산출모듈 151f-3: 성능저하알림모듈
153: 알림관리부 153a: 알림생성정보수신모듈
153b: 알림수신정보검출모듈 153c: 오류율산출모듈
153d: 알림이상정보제공모듈 16: 알림설정부
161: 사용자정보저장부 163: 알림수신시간설정부
163a: 프로젝트별시간설정모듈 163b: 이슈종류별시간설정모듈
163c: 중요도별시간설정모듈 163d: 긴급처리알림시간설정모듈
1: Management server
11: Business Register 111: Project Register 113: Issue Register
113a: project connection module 113b: name registration module 113c: type designation module
113d: period setting module 113e: difficulty setting module 113f: priority setting module
113g: workflow setting module 113h: step-by-step period designation module
12: business processing unit 121: project selection module 122: issue selection module
123: step designation module 124: business information input module 125: processing completion module
13: Issue Management Department 131: Delayed Issue Detection Department
131a: step-by-step initial setting time reception module 131b: excess time calculation module
131c: delay rate calculation module 131d: delay issue information generation module 133: delay processing unit
133a: person in charge identification module 133b: person in charge analysis module
133b-1: remaining time calculation module 133b-2: remaining rate calculation module
133b-3: Processing time analysis module by type 133b-4: Determining whether processing is possible
133c: Delay notification module 133d: Staff selection instruction module
135: Person in charge recommendation department 135a: Person in charge search module 135b: Person in charge business analysis module
135b-1: Issue information loading module 135b-2: Processing time calculation module
135b-3: Availability judgment module 135c: Person in charge information provision module
14: workflow providing unit 141: workflow analysis unit
141a: User information storage module 141b: Issue type storage module
141c: workflow information storage module 141d: processing efficiency calculation module
141d-1: setting time storage module 141d-2: processing time storage module
141d-3: business progress time analysis module 141d-4: processing efficiency calculation module
141d-5: weight application module 141e: processing efficiency update module
143: workflow recommendation unit 143a: issue information input module
143b: user information input module 143c: workflow comparison module
143d: recommended workflow providing module
15: operation management unit 151: connection management unit 151a: connection information receiving module
151b: number of visitors calculation module 151c: error information receiving module 151d: failure determination module
151e: Failure risk prediction module 151e-1: Error criterion judgment module
151e-2: continuation detection module 151e-3: failure risk notification module
151f: Performance degradation judgment module 151f-1: Error change calculation module
151f-2: Duration calculation module 151f-3: Performance degradation notification module
153: notification management unit 153a: notification generation information receiving module
153b: notification reception information detection module 153c: error rate calculation module
153d: notification abnormal information providing module 16: notification setting unit
161: user information storage unit 163: notification reception time setting unit
163a: Time setting module for each project 163b: Time setting module for each issue type
163c: time setting module by importance level 163d: emergency processing notification time setting module

Claims (11)

소프트웨어 개발을 위한 프로젝트, 이슈, 요구사항, 각 이슈에 대한 워크플로우 정보 및 각 워크플로우 대한 업무처리 정보, 사용자정보를 등록하여 저장하며, 이에 관한 정보를 사용자단말기로 출력하는 관리서버와;
상기 관리서버에 등록된 정보를 전달받아 표시하며, 프로젝트, 이슈, 업무처리 정보 등을 입력하여 관리서버로 전송하는 사용자단말기;를 포함하고,
상기 관리서버는,
프로젝트, 이슈, 워크플로우에 관한 명칭, 기간, 유형, 난이도, 단계, 사용자 등의 정보를 등록하는 업무등록부와; 사용자단말기에 의한 업무처리결과의 입력에 따라 등록된 프로젝트, 이슈, 워크플로우에 대한 진행 상태를 변경하여 처리하는 업무처리부와; 각 이슈의 진행상태를 파악하여 지연 중인 이슈를 관리하는 이슈관리부;를 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
A management server that registers and stores project, issues, requirements for software development, workflow information for each issue, business processing information for each workflow, and user information, and outputs the information to a user terminal;
Including; a user terminal that receives and displays information registered in the management server, inputs project, issue, business processing information, etc., and transmits it to the management server; and
The management server,
A business register for registering information such as names, periods, types, difficulty levels, stages, users, etc. about projects, issues, and workflows; A business processing unit that changes and processes a progress status of a registered project, issue, and workflow according to an input of a business processing result by a user terminal; An integrated management solution system for software development, comprising: an issue management unit that manages pending issues by grasping the progress of each issue.
제 1 항에 있어서, 상기 이슈관리부는
각 이슈의 진행 상태를 파악하여 지연 중인 이슈를 검출하는 지연이슈검출부와, 검출된 지연 이슈를 처리하는 지연처리부를 포함하고,
상기 지연이슈검출부는,
각 이슈의 워크플로우에 의해 설정된 단계별 진행시간에 관한 정보를 수신하는 단계별초기설정시간수신모듈과, 각 단계의 설정된 시간으로부터 초과된 시간을 산출하는 초과시간산정모듈과, 단계별 초기설정시간 및 초과시간의 비율에 따라 지연율을 산출하는 지연율산출모듈과, 산출된 지연율이 설정된 값을 초과하는 경우 지연으로 판단하여 지연 이슈 정보를 생성하는 지연이슈정보생성모듈을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 1, wherein the issue management unit
It includes a delayed issue detection unit that detects delayed issues by grasping the progress of each issue, and a delayed processing unit that processes the detected delayed issues,
The delayed issue detection unit,
A step-by-step initial setting time receiving module that receives information about the step-by-step progress time set by the workflow of each issue, an overtime calculation module that calculates the exceeded time from the set time of each step, and the step-by-step initial set time and overtime Integration for software development, comprising: a delay rate calculation module that calculates a delay rate according to the ratio of and a delay issue information generation module that determines delay as a delay when the calculated delay rate exceeds a set value and generates delay issue information. Management solution system.
제 2 항에 있어서, 상기 지연처리부는
지연 이슈의 담당자를 확인하는 담당자확인모듈과, 담당자가 존재하는 경우 담당자의 이슈 처리 가능 여부를 분석하는 담당자분석모듈과, 담당자의 처리가 가능한 것으로 분석되는 경우 담당자에게 지연 이슈 정보를 알리는 지연여부알림모듈을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 2, wherein the delay processing unit
A person in charge identification module that checks the person in charge of delayed issues, a person in charge analysis module that analyzes whether or not the person in charge can handle the issue if there is a person in charge, and if it is analyzed that the person in charge can handle the issue, it notifies the person in charge of delayed issue information. An integrated management solution system for software development, comprising a module.
제 3 항에 있어서, 상기 담당자분석모듈은
지연 이슈의 마감 잔여시간을 산출하는 잔여시간산출모듈과, 지연 이슈의 마감 잔여시간 및 잔여단계에 따른 잔여율을 산출하는 잔여율산출모듈과, 지연 이슈에 대한 담당자의 이슈 유형 및 난이도별 처리시간을 분석하는 유형별처리시간분석모듈과, 잔여율을 고려한 담당자의 처리가능시간을 고려하여 이슈의 처리 가능 여부를 판별하는 처리가능여부판별모듈을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 3, wherein the person in charge analysis module
A residual time calculation module that calculates the deadline remaining time for delayed issues, a residual rate calculation module that calculates the residual rate according to the remaining deadline and remaining stages of delayed issues, and the handling time by issue type and difficulty level of the person in charge for delayed issues. An integrated management solution system for software development, characterized in that it comprises a processing time analysis module for each type that analyzes the data, and a processing availability determination module that determines whether or not an issue can be processed in consideration of the processing time of the person in charge considering the residual rate. .
제 4 항에 있어서, 상기 지연처리부는
지연 이슈의 등록된 담당자가 존재하지 않거나 담당자의 처리가 불가능한 경우 프로젝트의 관리자에게 담당자 선정을 지시하는 담당자선정지시모듈을 포함하고,
상기 이슈관리부는,
담당자 선정의 지시가 발생하는 경우 적합한 담당자를 검색하여 추천하는 담당자추천부를 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 4, wherein the delay processing unit
In the case that the registered person in charge of the delayed issue does not exist or the person in charge cannot handle it, it includes a person in charge selection instruction module that instructs the project manager to select a person in charge,
The issue management unit,
An integrated management solution system for software development, characterized in that it includes a person in charge recommendation unit that searches for and recommends an appropriate person in charge when an instruction to select a person in charge occurs.
제 5 항에 있어서, 상기 담당자추천부는
지연 이슈의 유형, 난이도에 따라 처리가 가능한 담당자를 검색하는 담당자검색모듈과, 검색된 담당자의 업무를 분석하여 처리 가능여부를 판단하는 담당자업무분석모듈과, 처리가 가능한 담당자 정보를 제공하는 담당자정보제공모듈을 포함하고,
상기 담당자업무분석모듈은,
검색된 담당자의 현재 담당하고 있는 이슈의 유형 정보를 불러오는 이슈정보로딩모듈과; 이슈정보로딩모듈에 의해 불러온 이슈의 잔여시간과 검색된 담당자의 이슈 유형별 처리시간을 고려하여 업무처리가 가능한 시간을 산정하는 처리시간산정모듈과; 지연 이슈의 잔여시간과 검색된 담당자의 업무처리 가능시간을 비교하여 지연 이슈의 처리 가능 여부를 판단하는 가능여부판단모듈;을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 5, wherein the person in charge recommendation unit
Provides a person in charge search module that searches for persons in charge who can be processed according to the type and difficulty of delayed issues, a person in charge business analysis module that analyzes the searched person’s work to determine whether it can be handled, and the person in charge information that provides information on the person in charge who can handle it. Contains modules,
The person in charge business analysis module,
An issue information loading module for calling information on the type of issue currently in charge of the searched person in charge; A processing time calculation module that calculates a time available for business processing in consideration of the remaining time of the issue retrieved by the issue information loading module and the processing time for each issue type of the searched person in charge; An integrated management solution system for software development, comprising: a feasibility determination module for determining whether delayed issues can be handled by comparing the remaining time of the delayed issue with the searched person's possible business processing time.
제 1 항에 있어서, 상기 관리서버는
시스템의 정상작동여부를 관리하는 작동관리부를 포함하고,
상기 작동관리부는 시스템의 동시접속에 관한 성능이 제대로 유지되고 있는지 모니터링하는 접속관리부를 포함하며,
상기 접속관리부는,
사용자의 접속정보를 수신하는 접속정보수신모듈과, 접속정보에 따라 동시에 접속한 사용자수를 산출하는 접속자수산출모듈과, 사용자단말기로부터 접속 오류에 관한 정보를 수신하는 오류정보수신모듈과, 일정 단위시간 동안 설정된 동시접속자수 이하에서 접속 오류가 설정된 횟수 이상 발생하는 경우 시스템 접속 고장으로 진단하여 알리는 고장판단모듈을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 1, wherein the management server
It includes an operation management unit that manages the normal operation of the system,
The operation management unit includes a connection management unit that monitors whether the performance of the simultaneous connection of the system is properly maintained,
The connection management unit,
An access information receiving module that receives the user's access information, a visitor counting module that calculates the number of concurrently connected users according to the access information, an error information receiving module that receives information about a connection error from a user terminal, and a certain unit An integrated management solution system for software development, comprising a failure determination module that diagnoses and informs a system connection failure when a connection error occurs more than a set number of times less than a set number of simultaneous users during a time.
제 7 항에 있어서, 상기 접속관리부는
상기 고장판단모듈에 의해 고장으로 진단되지는 않았으나 일정 단위시간 동안 설정된 동시접속자수 이하에서 접속 오류 횟수가 일정 범위에서 발생하고, 이러한 단위시간이 설정된 기간 이상 연속하여 발생하는 경우 시스템의 고장위험상태로 진단하는 고장위험예측모듈;을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 7, wherein the connection management unit
Although not diagnosed as a failure by the failure determination module, if the number of connection errors occurs within a certain range below the number of concurrent users set during a certain unit time, and if such unit time continues to occur for more than a set period, the system becomes a risk of failure. An integrated management solution system for software development, comprising: a fault risk prediction module to diagnose.
제 8 항에 있어서, 상기 접속관리부는
고장위험상태에도 해당되지 않으나 단위시간 간격으로 설정된 동시접속자수 이하에서 발생하는 오류횟수의 변화율이 일정값을 초과하고, 이러한 상태가 설정된 기간 이상 계속되는 경우 시스템의 접속성능이 저하되고 있음을 인지하여 알리는 성능저하판단모듈;을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 8, wherein the connection management unit
It does not correspond to a failure risk state, but the rate of change in the number of errors occurring below the number of concurrent users set at a unit time interval exceeds a certain value, and if this condition continues for more than a set period, it is notified by recognizing that the connection performance of the system is deteriorating. An integrated management solution system for software development comprising a; performance degradation determination module.
제 1 항에 있어서, 상기 관리서버는
관리서버에 등록된 정보의 각 사용자에 대한 알림시간을 설정하여 저장하는 알림설정부를 포함하고,
상기 알림설정부는,
각 사용자에 대한 정보를 저장하는 사용자정보저장부와, 각 사용자단말기를 통한 입력에 의해 프로젝트, 이슈, 중요도별 알림의 알림시간을 설정하여 저장하는 알림수신시간설정부를 포함하고,
상기 알림수신시간설정부는,
각 사용자에 따라 프로젝트별 알림시간을 설정하는 프로젝트별시간설정모듈과, 이슈종류에 따라 알림시간을 설정하는 이슈종류별시간설정모듈과, 중요도에 따라 알림시간을 설정하는 중요도별시간설정모듈과, 긴급처리가 필요한 알림에 대한 알림시간을 설정하는 긴급처리알림시간설정모듈을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 1, wherein the management server
Includes a notification setting unit for setting and storing a notification time for each user of the information registered in the management server,
The notification setting unit,
It includes a user information storage unit that stores information for each user, and a notification reception time setting unit that sets and stores a notification time for notifications by project, issue, and importance by input through each user terminal,
The notification reception time setting unit,
A time setting module for each project that sets the notification time for each project according to each user, a time setting module for each issue type that sets the notification time according to the issue type, a time setting module for each importance level that sets the notification time according to the importance, and emergency An integrated management solution system for software development, comprising: an emergency processing notification time setting module for setting a notification time for notifications that need to be processed.
제 10 항에 있어서, 상기 관리서버는
시스템의 정상작동여부를 관리하는 작동관리부를 포함하고,
상기 작동관리부는 상기 알림설정부의 정상작동 여부를 관리하는 알림관리부를 포함하며,
상기 알림관리부는,
상기 관리서버에 의한 알림생성정보를 수신하는 알림생성정보수신모듈과, 알림생성정보의 사용자단말기에 대한 도달 여부정보를 검출하는 알림수신정보검출모듈과, 알림생성정보수신모듈에 의해 생성되었으나 사용자단말기에서 수신되지 못한 알림의 오류율을 산출하는 오류율산출모듈과, 오류율이 일정기간 동안 설정된 값을 초과하는 경우 알림설정부에 이상이 발생한 것으로 판단하여 이를 알리는 알림이상정보제공모듈을 포함하는 것을 특징으로 하는 소프트웨어 개발을 위한 통합관리솔루션 시스템.
The method of claim 10, wherein the management server
It includes an operation management unit that manages the normal operation of the system,
The operation management unit includes a notification management unit for managing whether the notification setting unit is operating normally,
The notification management unit,
A notification generation information receiving module that receives notification generation information by the management server, a notification reception information detection module that detects whether the notification generation information reaches the user terminal, and a notification generation information receiving module. An error rate calculation module that calculates an error rate of a notification that has not been received from, and a notification error information providing module that determines that an error has occurred in the notification setting unit and informs the error rate when the error rate exceeds a set value for a certain period of time. Integrated management solution system for software development.
KR1020190149470A 2019-11-20 2019-11-20 An Integrated Management Solution System for Developing Software KR102315547B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190149470A KR102315547B1 (en) 2019-11-20 2019-11-20 An Integrated Management Solution System for Developing Software

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190149470A KR102315547B1 (en) 2019-11-20 2019-11-20 An Integrated Management Solution System for Developing Software

Publications (2)

Publication Number Publication Date
KR20210061655A true KR20210061655A (en) 2021-05-28
KR102315547B1 KR102315547B1 (en) 2021-10-21

Family

ID=76140406

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190149470A KR102315547B1 (en) 2019-11-20 2019-11-20 An Integrated Management Solution System for Developing Software

Country Status (1)

Country Link
KR (1) KR102315547B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102532750B1 (en) * 2023-02-24 2023-05-16 주식회사 슈퍼스타트 Software development project management system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160085174A (en) * 2015-01-07 2016-07-15 (주) 와이즈스톤 Apparatus for managing projct and the operation method thereof
KR101654266B1 (en) * 2014-12-18 2016-09-05 (주)에임투지 Monitoring device for monitoring using web connection managing system
KR101847946B1 (en) * 2016-10-18 2018-04-11 ㈜하이테크엔지니어링 Human resources management system and method specific project

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101654266B1 (en) * 2014-12-18 2016-09-05 (주)에임투지 Monitoring device for monitoring using web connection managing system
KR20160085174A (en) * 2015-01-07 2016-07-15 (주) 와이즈스톤 Apparatus for managing projct and the operation method thereof
KR101847946B1 (en) * 2016-10-18 2018-04-11 ㈜하이테크엔지니어링 Human resources management system and method specific project

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102532750B1 (en) * 2023-02-24 2023-05-16 주식회사 슈퍼스타트 Software development project management system and method

Also Published As

Publication number Publication date
KR102315547B1 (en) 2021-10-21

Similar Documents

Publication Publication Date Title
US20230367613A1 (en) Critical Event Management Using Predictive Models, And Related Methods And Software
US11775416B2 (en) System and method for continuous testing and delivery of software
CN111858120B (en) Fault prediction method and device, electronic equipment and storage medium
US7133804B2 (en) Maintenance request systems and methods
US8886551B2 (en) Centralized job scheduling maturity model
US10157052B2 (en) Software change management
US9183124B2 (en) Automation controller for next generation testing system
US9542160B2 (en) System and method for software development report generation
US9235440B2 (en) Managing job execution
US20080127089A1 (en) Method For Managing Software Lifecycle
US20080270213A1 (en) Process risk estimation indication
US10796361B2 (en) Auction based decentralized ticket allotment
JP2014093089A (en) Maintenance system for aircraft fleet and method for planning maintenance
US20170098164A1 (en) Computer implemented methods and systems for determining fleet conditions and operational management thereof
KR102192313B1 (en) An Integrated Management Solution System for Developing Software
EP3627264B1 (en) Plant assessment system and plant assessment method
KR20120111376A (en) Realtime and intelligent management system for devices
KR20210061655A (en) An Integrated Management Solution System for Developing Software
US20190362262A1 (en) Information processing device, non-transitory storage medium and information processing method
AU2009233598B2 (en) System and method for managing implementations
US20180349232A1 (en) Predictive analysis, scheduling and observation system for use with loading multiple files
KR20140055292A (en) System and method for relating between failed component and performance criteria of manintenance rule by using component database of functional importance determination of nuclear power plant
CN112540771A (en) Automated operation and maintenance method, system, equipment and computer readable storage medium
JP6890795B1 (en) Programs, methods, information processing equipment, and systems
Connelly et al. Reiki: serviceability architecture and approach for reduction and management of product service incidents

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right