KR20210026445A - Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint - Google Patents

Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint Download PDF

Info

Publication number
KR20210026445A
KR20210026445A KR1020190107232A KR20190107232A KR20210026445A KR 20210026445 A KR20210026445 A KR 20210026445A KR 1020190107232 A KR1020190107232 A KR 1020190107232A KR 20190107232 A KR20190107232 A KR 20190107232A KR 20210026445 A KR20210026445 A KR 20210026445A
Authority
KR
South Korea
Prior art keywords
constraint
generator
information
list
constrained
Prior art date
Application number
KR1020190107232A
Other languages
Korean (ko)
Other versions
KR102645327B1 (en
Inventor
고종민
김준성
서인용
송재주
최민희
최승환
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020190107232A priority Critical patent/KR102645327B1/en
Publication of KR20210026445A publication Critical patent/KR20210026445A/en
Application granted granted Critical
Publication of KR102645327B1 publication Critical patent/KR102645327B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention provides a system for analyzing and estimating constraint costs for each cause of constraints and analyzing a history and an error with respect to calculation of an appropriate constraint quantity and operation of constraints during operation of electricity dispatch to reduce the constraint costs. A constraint appropriateness evaluating system according to an embodiment of the present invention comprises: a constraint error analysis device receiving constraint information from an external server to generate a power generator-constraint quantity list for a constraint plan based on the constraint information wherein power generation cost information for each power generator is included in the list, receiving security constrained economic dispatch (SCED) data and power generator matching information from the external server to generate a power generator-constraint quantity list for constraint result based on the SCED data and the power generator matching information, and determining whether the power generator is identical, whether a power generator with power generation costs lower than planned exists, and whether the constraint quantity is identical on the basis of the power generator-constraint quantity list for the constraint plan and the power generator-constraint quantity list for the constraint result to generate a constraint error list; a constraint cost estimating device receiving a planned power generation quantity, a power generation result amount and resultant settlement money, wherein the power generation result amount includes at least one among demand information, backup power information, northward current information and heat constraint information, calculating settlement money for each element caused by at least one among the demand information, the backup power information, the northward current information and the heat constraint information based on the planned power generation quantity, the power generation result amount and the resultant settlement money, and storing the settlement money for each element; and a user error informing device receiving a constraint error list from the constraint cost estimating device and receiving the settlement money for each element from the constraint cost estimating device.

Description

제약의 원인별 제약비용 산출장치 및 제약 적정성 평가시스템{APPARATUS FOR ESTIMATING CONSTRAINT COST BASED ON CAUSES AND EVALUATION SYSTEM FOR APPROPRIATE CONSTRAINT}Pharmaceutical cost calculation device and constraint adequacy evaluation system for each cause of constraint {APPARATUS FOR ESTIMATING CONSTRAINT COST BASED ON CAUSES AND EVALUATION SYSTEM FOR APPROPRIATE CONSTRAINT}

본 발명은 적정 제약량 산정 및 급전운영에 있어서 제약운영의 오차를 분석하고 요인별 제약비용을 산출하는 방법에 관한 것이다.The present invention relates to a method of analyzing an error in constraint operation and calculating a constraint cost for each factor in calculating an appropriate constraint amount and power supply operation.

현재 전력시장은 하루전에 매시간별 수요에 따라 가장 마지막에 투입된 발전기 변동비에 의해 계통한계가격(SMP : System Marginal Price)으로 시장도매가격이 결정되는 변동비 반영시장(CBP : Cost Based Pool)이다.Currently, the electricity market is a variable cost-based pool (CBP) in which the market wholesale price is determined by the system marginal price (SMP) based on the variable cost of the generator that was last input according to the demand for each hour a day ago.

종래 하루전에 시장도매가격을 결정할 때, 각종 제약(송전제약, 발전기 자기제약, 예비력제약 등)은 반영하지 않고 발전계획과 도매시장가격이 결정되는 문제가 있다. 이와 달리, 실제 급전시에는 발생하는 제약 및 수급여건에 따라 제약을 반영하여 급전지시하기 때문에 가격결정발전계획과 실제 운전결과의 차이로 비용이 발생하는데 이 비용을 제약비용이라고 한다. 제약비용은 '18년 기준으로 한국전력공사가 전력구입비로 지출하는 약 52조원 중 5.9조원으로, 약 10%를 차지할 정도로 매우 큰 비중을 차지하고 있는 문제가 있다. 즉, 시장도매가격 결정시 제약이 합리적으로 반영하지 못한 결과, 막대한 제약비용을 사후적으로 발생시키고 있는 것이다.Conventionally, when determining the market wholesale price a day before, there is a problem in that the power generation plan and the wholesale market price are determined without reflecting various restrictions (transmission restrictions, generator self restrictions, reserve power restrictions, etc.). On the contrary, when supplying power by reflecting the restrictions according to the constraints and supply and demand conditions that occur during actual power supply, costs are incurred due to the difference between the price-determined power generation plan and the actual operation result, and this cost is called the constraint cost. The pharmaceutical cost is 5.9 trillion won out of the 52 trillion won that KEPCO spends in purchasing electricity as of 2018, and it has a problem that it occupies a very large proportion, accounting for about 10%. In other words, as a result of the constraints not reasonably reflected in determining the market wholesale price, enormous pharmaceutical costs are incurred afterwards.

한편, 최근 신재생의 지속적인 증가, 수요예측의 오차, 원전 중지, 예비력 확보 등의 상황에 따라 제약조건이 발생한다. 신재생의 증가로 인한 변동성을 유발되어 예비력 확보와 관련한 제약이 발생하고 있으며, 원전 중지 증가에 따른 남부권 LNG발전기의 가동으로 송전제약(남하조류) 발생하는 등 지속적으로 제약이 발생하고 있고, 제약비용 또한 증가하고 있다.On the other hand, constraints arise according to circumstances such as the recent continuous increase in new and renewable energy, errors in demand forecasting, stopping nuclear power plants, and securing reserves. Due to the volatility caused by the increase in new and renewable energy, there are restrictions related to securing reserves, and the operation of the southern LNG generators due to the increase in nuclear power plant shutdowns has resulted in continuous restrictions such as transmission restrictions (southern algae). It is also increasing.

그러나 종래 적정 계통제약량 산정과 실제 계통운영시 발전기의 출력의 차이를 분석하거나 검토하는 방법과 시스템이 부재하여 실제 제약에 따른 제약량을 적정하게 산정·계획했는지, 또는 산정·계획한 제약량대로 적정하게 운영했는지에 대한 적정성을 판단이 불가한 문제가 있었다. 따라서 적정 제약량 산정 및 급전운영시 제약운영에 대한 이력과 오차를 분석하기 위한 방법 및 시스템이 요구되는 실정이다.However, due to the lack of a method and system for analyzing or reviewing the difference in the output of the generator during the conventional calculation of the appropriate system constraints and the actual system operation, the constraints according to the actual constraints were appropriately calculated and planned, or the calculated and planned constraints. There was a problem in which it was impossible to judge the adequacy of whether it was properly operated. Therefore, there is a need for a method and system to analyze the history and error of the constraint operation when calculating the appropriate amount of constraints and power supply operation.

또한, 제약비용에 대하여 발생요인별/원인별로 분석하거나 추정할 수 있는 상세한 방법이나 시스템이 없다. 전력과 전력비용을 관리하는 주체로서는 제약비용 절감과 시장의 효율성, 계통의 안정성을 위해 제약비용을 발생요인별로 원인별로 분석하고 추정하여 비용 증가 유무 등을 분석하여 개선점을 도출할 필요가 있다.In addition, there is no detailed method or system for analyzing or estimating pharmaceutical costs by incurred factor/cause. As an entity that manages electricity and electricity costs, it is necessary to derive improvement points by analyzing and estimating constraint costs for each cause for reduction of pharmaceutical costs, market efficiency, and system stability, and analyzing whether or not there is an increase in costs.

본 발명은, 제약비용을 제약 원인별로 분석 및 추정하고, 적정 제약량 산정과 급전운영시 제약운영에 대한 이력과 오차를 분석하여 제약비용을 감소시킬 수 있는 시스템을 제공하는 것을 목적으로 한다.An object of the present invention is to provide a system capable of reducing pharmaceutical costs by analyzing and estimating constraint costs for each constraint cause, and by analyzing the history and errors of constraint operations during calculation of appropriate constraint amounts and power supply operations.

본 발명의 일 실시예에 따른 제약 적정성 평가시스템은, 외부의 서버로부터 제약정보를 수신하여 제약정보를 기초로 제약계획 발전기-제약량 리스트 - 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 생성하고, 외부의 서버로부터 SCED(안정도 제약 경제급전) 데이터 및 발전기 매칭 정보를 수신하여 SCED 데이터 및 발전기 매칭 정보를 기초로 제약실적 발전기-제약량 리스트를 생성하고, 제약계획 발전기-제약량 리스트 및 제약실적 발전기-제약량 리스트를 기초로 하여, 발전기 동일 여부, 계획보다 발전비용이 적은 발전기 존재 여부 및 제약량 동일 여부 중 적어도 하나를 판단하여, 제약 오류 리스트를 생성하도록 구성된, 제약오차분석장치; 외부의 서버로부터 발전계획량, 발전실적량 - 발전실적량은 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나를 포함한다 - 및 실적정산금을 수신하고, 발전 계획량, 발전실적량 및 실적정산금을 기초로 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나로 인한 요인별 정산금을 산정하고, 요인별 정산금을 저장하도록 구성된, 제약비용추정장치; 및 제약오차분석장치로부터 제약 오류 리스트를 수신하고, 제약비용추정장치로부터 요인별 정산금을 수신하도록 구성된, 사용자 오류 알림장치를 포함할 수 있다.The constraint adequacy evaluation system according to an embodiment of the present invention receives constraint information from an external server and generates a constraint plan generator-a list of constraints-the list includes information on generation cost for each generator-based on the constraint information, Receives SCED (Stability Constrained Economic Power Supply) data and generator matching information from an external server, and generates a pharmaceutical performance generator-constrained quantity list based on SCED data and generator matching information, and a pharmaceutical plan generator-constrained quantity list and a pharmaceutical performance generator -A constraint error analysis device configured to generate a constraint error list by determining at least one of whether a generator is the same, a generator having a lower generation cost than a plan, and whether a constraint is the same based on the constraint list; Power generation plan amount and power generation amount from an external server-The power generation amount includes at least one of demand information, reserve power information, North Korean tide information, and thermal constraint information-and receives the performance settlement amount, and the power generation plan amount, power generation amount and performance A pharmaceutical cost estimating device, configured to calculate a settlement amount for each factor due to at least one of demand information, reserve power information, north tide information, and thermal constraint information based on the settlement amount, and store the settlement amount for each factor; And a user error notification device configured to receive a constraint error list from the constraint error analysis device and receive a settlement fee for each factor from the constraint cost estimation device.

본 발명의 일 실시예에 따른 제약오차분석장치는, 외부의 서버로부터 제약정보를 수신하고, 제약정보를 기초로 제약계획 발전기-제약량 리스트 - 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 생성하도록 구성된 제약계획량 출력부; 외부의 서버로부터 SCED(안정도 제약 경제급전) 데이터 및 발전기 매칭 정보를 수신하고, SCED 데이터 및 발전기 매칭 정보를 기초로 제약실적 발전기-제약량 리스트를 생성하도록 구성된 제약실적량 출력부; 및 제약오차분석부를 포함하고, 제약오차분석부는, 제약계획 발전기-제약량 리스트 및 제약실적 발전기-제약량 리스트를 기초로 하여, 발전기 동일 여부, 계획보다 발전비용이 적은 발전기 존재 여부 및 제약량 동일 여부 중 적어도 하나를 판단하여, 제약 오류 리스트를 생성하도록 구성될 수 있다.The constraint error analysis apparatus according to an embodiment of the present invention receives constraint information from an external server, and generates a constraint plan generator-a list of constraints-the list includes information on generation cost for each generator-based on the constraint information. Constrained planning amount output unit; A limited amount output unit configured to receive SCED (stability-constrained economic power supply) data and generator matching information from an external server, and to generate a limited amount generator-constrained amount list based on the SCED data and the generator matching information; And a restriction error analysis unit, wherein the restriction error analysis unit is based on the restriction plan generator-constrained quantity list and the pharmaceutical performance generator-constrained quantity list, whether the generator is the same, whether or not there is a generator with less power generation cost than the plan, and the restriction quantity is the same. It may be configured to determine at least one of whether or not to generate a constraint error list.

본 발명의 일 실시예에 따른 제약오차분석장치가 제약계획과 제약실적간의 제약 오류 리스트를 생성방법은, 제약계획 발전기-제약량 리스트 - 상기 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 수신하는 단계; 제약실적 발전기-제약량 리스트를 수신하는 단계; 제약계획과 제약실적간 발전기가 동일한지 판단하는 단계; 발전기가 동일한 경우, 계획보다 발전비용이 적은 발전기 존재 여부를 판단하는 단계; 존재하지 않는 경우, 제약계획과 제약실적간 제약량이 동일한지 판단하는 단계; 제약량이 동일한 경우, 제약계획 발전기-제약량 리스트 및 제약실적 발전기-제약량 리스트를 저장하는 단계; 및 발전기가 동일하지 않거나, 계획보다 발전비용이 적은 발전기가 존재하거나 또는 제약량이 동일하지 않은 경우, 제약 오류 리스트를 생성하는 단계를 포함할 수 있다.A method for generating a list of constraint errors between a constraint plan and a constraint performance by the constraint error analysis apparatus according to an embodiment of the present invention includes: receiving a constraint plan generator-a constraint list-the list includes information on generation cost for each generator- ; Receiving a constraint performance generator-a list of constraints; Determining whether the generator is the same between the constraint plan and the constraint performance; If the generators are the same, determining whether there is a generator having a lower power generation cost than the plan; If it does not exist, determining whether the constraint amount between the constraint plan and the constraint performance is the same; If the constraint amount is the same, storing a constraint plan generator-constrained quantity list and a constraint performance generator-constrained quantity list; And generating a list of constraint errors when the generators are not the same, a generator having a lower generation cost than the plan exists, or the constraint amount is not the same.

본 발명의 일 실시예에 따른 제약비용 원인별 제약비용추정장치는, 외부의 서버로부터 발전계획량, 발전실적량 - 발전실적량은 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나를 포함한다 - 및 실적정산금을 수신하도록 구성된 통신부; 발전 계획량, 발전실적량 및 실적정산금을 기초로 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나로 인한 요인별 정산금을 산정하도록 구성된 처리부; 및 요인별 정산금을 저장하도록 구성된 저장부를 포함할 수 있다.The apparatus for estimating constraint cost for each cause of constraints according to an embodiment of the present invention includes at least one of demand information, reserve power information, north current information, and thermal constraint information from an external server. Including-and a communication unit configured to receive the performance payment; A processing unit configured to calculate a settlement amount for each factor due to at least one of demand information, reserve power information, North Korean tide information, and heat constraint information based on the planned amount of power generation, the amount of power generation, and the amount of performance settled; And a storage unit configured to store the settlement amount for each factor.

본 발명의 다른 실시예에 따른 제약비용 원인별 제약비용추정장치는, 외부의 서버로부터 비제약정산금, 제약반영정산금 - 제약반영정산금은 불시정지반영 정산금, 예비력반영 정산금, 수요예측반영 정산금, 열제약반영 정산금, 송전제약반영 정산금 중 적어도 하나를 포함한다 - 및 전체정산금을 수신하도록 구성된 통신부; 비제약정산금 및 제약반영정산금의 오차를 제약별로 각각 산정하고, 오차의 합을 산정하고, 전체정산금과 비제약정산금의 차이인 실제약비용을 산정하고, 제약별 오차 - 제약은 불시정지, 예비력, 수요예측, 열제약, 송전제약 중 적어도 하나를 포함한다 - 에 실제약비용을 곱한 값을 오차의 합으로 나누어 스케일링 정보를 생성하도록 구성된 처리부; 및 스케일링 정보를 저장하도록 구성된 저장부를 포함할 수 있다.According to another embodiment of the present invention, the pharmaceutical cost estimation apparatus for each cause of pharmaceutical costs is a non-constrained settlement from an external server, a pharmaceutical reflected settlement-The pharmaceutical reflected settlement is a temporary suspension reflected settlement, a reserve reflected settlement, a demand forecast reflected settlement, and thermal constraints. A communication unit configured to receive at least one of the reflected settlement amount and the transmission restriction reflected settlement amount-and the total settlement amount; Calculate the error of the non-constrained settlement amount and the restriction reflected settlement amount for each restriction, calculate the sum of the errors, calculate the actual drug cost, which is the difference between the total settlement amount and the non-constrained settlement amount, A processing unit configured to generate scaling information by dividing a value obtained by multiplying by the actual drug cost by the sum of errors; And a storage unit configured to store scaling information.

본 발명의 일 실시예에 의하면, 제약비용 절감과 시장의 효율성, 계통의 안정성을 위하여 제약비용을 발생요인별로 원인별로 분석하고 추정하여 비용 증가 유무 등을 분석하여 개선점을 도출할 수 있다.According to an embodiment of the present invention, for reduction of pharmaceutical costs, market efficiency, and system stability, improvement points can be derived by analyzing and estimating pharmaceutical costs for each cause of occurrence, and analyzing whether or not there is an increase in costs.

또한, 본 발명의 일 실시예에 의하면, 적정 제약량 산정 및 급전운영시 제약운영에 대한 이력과 오차를 분석 및 비용을 최소화할 수 있는 제약별 적정발전 리스트 산정 하기 위한 방법 및 시스템을 제공할 수 있다. In addition, according to an embodiment of the present invention, it is possible to provide a method and a system for calculating an appropriate amount of constraints and calculating an appropriate power generation list for each constraint capable of analyzing the history and error of constraint operation during power supply operation and minimizing costs. have.

이를 통하여 시장도매가격 결정시 제약을 합리적으로 반영하지 못하여 큰 제약비용이 발생하는 문제를 해결할 수 있는 효과가 있다. 구체적으로 시장운영자의 운영에 대한 이상유무를 판단하고 이상 진단시 비용 청구 및 규칙개정하여 종국적으로 제약비용을 절감할 수 있다. 오류검증을 통해 실제 제약에 대한 발전기 적정성 판단을 기준으로 해당 시간대의 발전비용 0.97원/kWh 절감시(영남파워1CC 102.54원/kWh을 GS당진복합4CC 101.57원/kWh로 변동시), 년간 약 55억원 전력구입비 절감을 기대할 수 있다.Through this, there is an effect of solving the problem of incurring large pharmaceutical costs by not reflecting the constraints reasonably when determining the market wholesale price. Specifically, it is possible to ultimately reduce pharmaceutical costs by judging whether there is an abnormality in the operation of the market operator, and by charging costs and revising rules when an abnormality is diagnosed. Based on the determination of the adequacy of the generator for actual constraints through error verification, when the power generation cost is reduced by 0.97 won/kWh during the time period (when the Youngnam Power 1CC is changed to 102.54 won/kWh to 101.57 won/kWh for the GS Dangjin Complex 4CC), it is about 55 per year. It can be expected to reduce the cost of purchasing electricity by KRW 100 million.

도 1은 본 발명의 일 실시예에 따른 제약 적정성 평가시스템과 MTAS(전력시장 종합분석시스템)의 통합 개념도이다.
도 2는 본 발명의 일 실시예에 따른 제약 적정성 평가시스템의 구성을 나타낸 도면이다.
도 3은 본 발명의 일 실시예에 따른 제약오차분석장치의 구성을 나타낸 도면이다.
도 4는 본 발명의 일 실시예에 따른 제약오차분석장치가 제약계획과 제약실적간의 제약 오류 리스트를 생성하는 방법을 나타낸 도면이다.
도 5는 본 발명의 일 실시예에 따른 정산금 비교부에서 정보의 흐름을 나타낸 도면이다.
도 6은 본 발명의 일 실시예에 따른 이력관리부가 이력을 관리하는 모습을 나타낸 도면이다.
도 7은 본 발명의 일 실시예에 따른 이력관리부가 이력을 관리하는 방법을 나타낸 도면이다.
1 is an integrated conceptual diagram of a constraint adequacy evaluation system and MTAS (Power Market Comprehensive Analysis System) according to an embodiment of the present invention.
2 is a diagram showing the configuration of a constraint adequacy evaluation system according to an embodiment of the present invention.
3 is a view showing the configuration of a constraint error analysis apparatus according to an embodiment of the present invention.
4 is a diagram illustrating a method of generating a list of constraint errors between a constraint plan and a constraint performance by the constraint error analysis apparatus according to an embodiment of the present invention.
5 is a view showing the flow of information in the settlement amount comparison unit according to an embodiment of the present invention.
6 is a diagram showing a state in which a history management unit manages a history according to an embodiment of the present invention.
7 is a diagram showing a method of managing a history by a history management unit according to an embodiment of the present invention.

본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 동일 또는 유사한 구성요소에 대해서는 동일한 참조 부호를 붙이도록 한다.In order to clearly describe the present invention, parts irrelevant to the description have been omitted, and the same reference numerals are attached to the same or similar components throughout the specification.

이하, 첨부한 도면을 참조하여 본 발명의 실시 예에 대하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시 예에 한정되지 않는다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art may easily implement the present invention. However, the present invention may be implemented in various different forms and is not limited to the embodiments described herein.

이하에서, 제약이라 함은 발전·급전에 있어서 제약이 될 수 있는 요소를 말하며, 예를 들면, 예비력제약, 불시정지제약, 송전제약, 열제약, 수요오차 등이 있을 수 있다. Hereinafter, the term “restriction” refers to an element that may be a restriction in power generation and dispatch, and may include, for example, a reserve power restriction, an emergency stop restriction, a transmission restriction, a heat restriction, a demand error, and the like.

도 1은 본 발명의 일 실시예에 따른 제약 적정성 평가시스템과 MTAS의 통합 개념도이다.1 is a conceptual diagram of an integrated pharmaceutical adequacy evaluation system and MTAS according to an embodiment of the present invention.

종래에 MTAS(120)(전력시장 종합분석시스템)가 구축되어 전력시장현안사항 발생시 또는 전력정책 변동시 SMP나 정산금 등 장기 예측분석과 단기 정밀분석 등을 수행하고 있다.In the past, MTAS 120 (Comprehensive Power Market Analysis System) has been established to perform long-term predictive analysis and short-term precise analysis such as SMP or settlement when power market issues occur or power policy changes.

MTAS는 전력시장 운영시스템으로부터 운영실적 및 공시된 예측데이터를 실시간으로 연동하여 전력시장 통합 데이터베이스(MTAS-DB)를 구축하고 장E단기 시장을 분석하는 구성을 포함하고 있다.MTAS includes the construction of an integrated power market database (MTAS-DB) by linking the operating performance and published forecast data from the power market operation system in real time and analyzing the long-E short-term market.

시장분석 프로그램, 즉 장기 MTAS-FA, 단기 MTAS-DA 및 MTAS-RSC에서는 MTAS- DB로부터 데이터를 수신하여 각각 장기 예측분석(장기 MTAS-FA) 또는 단기 정밀 분석(단기 MTAS-DA)을 수행하고, 발전비용 최소화를 위한 발전계획(MTAS-RSC)을 수립할 수 있다. MTAS-SMP는 수립된 발전계획(MTAS-RSC)의 결과를 이용하여 전력시장 계통한계가격(SMP) 및 정산금 등을 생성할 수 있다.Market analysis programs, i.e. long-term MTAS-FA, short-term MTAS-DA and MTAS-RSC, receive data from MTAS-DB and perform long-term predictive analysis (long-term MTAS-FA) or short-term precise analysis (short-term MTAS-DA), respectively. , A power generation plan (MTAS-RSC) can be established to minimize power generation costs. The MTAS-SMP can generate the power market system limit price (SMP) and settlement fees using the result of the established power generation plan (MTAS-RSC).

그러나 종래의 MTAS는 제약에 대한 가격결정과 실제 운영사이의 오차분석, 발생원인별 비용 검출방법 및 제약운영의 적정성을 판단하고 평가할 수 있는 방법 및 시스템이 미비했다.However, the conventional MTAS lacked a method and system for determining and evaluating the appropriateness of the constraints, such as an error analysis between price determination and actual operation, a cost detection method for each cause of occurrence, and adequacy of constraint operation.

따라서, 제약비용을 제약 원인별로 분석 및 추정하고, 적정 제약량 산정과 급전운영시 제약운영에 대한 이력과 오차를 분석하여 제약비용을 감소시킬 수 있는 시스템으로서 제약 적정성 평가시스템(110)이 구성될 수 있다. 제약 적정성 평가 시스템은 도면에서와 같이 MTAS(120)와 별도로 구성될 수 있고, MTAS(120)의 일 구성으로 통합 연동되어 구성될 수도 있다. 도면에서 MTAS-DB 및 MTAS-RSC 와 정보를 송/수신하도록 도시되어 있으나, 제약 적정성 평가시스템(110)이 송/수신할 수 있는 MTAS(120)의 구성은 이에 한정되지 않는다.Therefore, as a system that can reduce the pharmaceutical cost by analyzing and estimating the pharmaceutical cost for each constraint cause, and analyzing the history and error of the pharmaceutical operation during the calculation of the appropriate constraint amount and power supply operation, the pharmaceutical adequacy evaluation system 110 will be configured. I can. As shown in the figure, the constraint adequacy evaluation system may be configured separately from the MTAS 120, or may be integrated and interlocked with one configuration of the MTAS 120. In the drawing, the MTAS-DB and MTAS-RSC and information are shown to be transmitted/received, but the configuration of the MTAS 120 that can be transmitted/received by the constraint adequacy evaluation system 110 is not limited thereto.

도 2는 본 발명의 일 실시예에 따른 제약 적정성 평가시스템의 구성을 나타낸 도면이다.2 is a diagram showing the configuration of a constraint adequacy evaluation system according to an embodiment of the present invention.

일 실시예에 따른 일 실시예에 따른 제약 적정성 평가시스템(110)은 데이터 자동 취득장치(210), 제약오차분석장치(220), 제약비용추정장치(230) 및 사용자 오류 알림장치(240)을 포함할 수 있다. According to an embodiment, the constraint adequacy evaluation system 110 according to an embodiment includes an automatic data acquisition device 210, a constraint error analysis device 220, a constraint cost estimation device 230, and a user error notification device 240. Can include.

데이터 자동 취득장치(210)는 외부의 서버, 예를 들면 MTAS(120)로부터 제약정보, 발전기 자기제약 및 특성정보, 발전계획량, 발전실적량, 안정도 제약 경제급전 실적 등을 수신하고 이를 관리하고, 제약 적정성 평가시스템(110)의 다른 구성으로 제공할 수 있도록 구성될 수 있다. The automatic data acquisition device 210 receives and manages constraint information, generator self-constraint and characteristic information, power generation plan amount, power generation performance amount, stability constraint economic dispatch performance, etc. from an external server, for example, MTAS 120, It may be configured to be provided in a different configuration of the constraint adequacy evaluation system 110.

제약오차분석장치(220)는, 제약계획 및 실적에 대한 발전기와 출력·제약량 등을 포함한 리스트를 생성·분석하고 검증할 수 있도록 구성될 수 있다. 더욱 상세하게는, 운영발전계획 정보를 추출하여 제약계획 발전기 및 제약량 데이터 리스트를 산정하고, 안정도제약 경제급전실적 정보를 추출하여 제약실적 발전기 및 제약량 데이터 리스트를 산정하고, 계획과 실적간의 발전기 출력차이 등의 오차분석 및 이력관리를 수행하고, 오차에 대한 정산금 증감여부를 산출하고, 딥러닝기반 발전비용 최적 발전제약 추출 / 기존 정산금 비교분석을 수행하도록 구성될 수 있다. 도 2에 제약오차분석장치(220)는 데이터 자동 취득장치(210)를 통하여 발전에 관한 정보를 수신하도록 도시되어 있으나, 데이터 자동 취득장치(210)를 통하지 않고 MTAS로부터 직접 정보를 수신하도록 구성될 수 있다.The constraint error analysis device 220 may be configured to generate, analyze, and verify a list including generators, outputs, constraints, etc. for constraint plans and performance. More specifically, by extracting the operational development plan information, the constraint plan generator and the constraint amount data list is calculated, the stability constraint economic dispatch performance information is extracted to calculate the constraint performance generator and the constraint amount data list, and the generator between the plan and the performance. It can be configured to perform error analysis and history management such as output difference, calculate whether or not to increase or decrease the settlement amount for the error, and perform deep learning-based power generation cost optimal power generation constraint extraction / comparison and analysis of existing settlement amount. In FIG. 2, the constraint error analysis device 220 is shown to receive information on power generation through the automatic data acquisition device 210, but is configured to receive information directly from the MTAS without passing through the automatic data acquisition device 210. I can.

이러한 구성을 통하여, 실제 운영시의 제약에 대한 오차분석으로 계통운영에 대한 이상유무 판단과 정산금 증감여부에 대한 판단이 가능해, 시장운영자의 운영에 대한 이상유무 판단 및 정산금 증가시 비용 청구 등으로 활용이 가능한 효과가 있다. Through this configuration, it is possible to determine whether there is an abnormality in the system operation and determine whether the settlement amount is increased or decreased by analyzing the error of the constraints in actual operation, and it is used for determining the existence of an abnormality in the operation of the market operator and charging the settlement amount when the settlement amount increases. This has a possible effect.

제약비용추정장치(230)는, 실제 발전량 데이터를 바탕으로 제약비용을 역으로 추적하여 제약비용을 원인별/패턴별로 분류할 수 있는 구성 제공할 수 있다. 더욱 상세하게는, 제약비용 발생요인을 사전에 정의한 후, 발생요인별 제약발전량을 이용하여 제약비용을 산정하고, 제약별 우선순위를 설정하고 우선순위를 고려하여 제약비용 산정하고, 제약별 평균비용을 산정하고 총제약비용과의 스케일링 방법으로 제약비용 산정하고, 발전기별 제약발전 및 제약비발전 이용 제약비용 산정하고 전원별 제약비용을 분석하고, 위 네가지 제약별 비용 적정여부 검증할 수 있다. 도 2에 제약비용추정장치(230)는 데이터 자동 취득장치(210)를 통하여 발전에 관한 정보를 수신하도록 도시되어 있으나, 데이터 자동 취득장치(210)를 통하지 않고 MTAS로부터 직접 정보를 수신하도록 구성될 수 있다.The constraint cost estimating device 230 may provide a configuration capable of classifying the constraint cost by cause/pattern by tracking the constraint cost in reverse based on the actual power generation data. In more detail, after defining the factors incurring pharmaceutical costs in advance, calculating the pharmaceutical cost using the amount of pharmaceutical power generated by each incurred factor, setting the priority for each constraint, and calculating the pharmaceutical cost in consideration of the priority, and the average cost for each constraint. It is possible to calculate the pharmaceutical cost by the method of scaling with the total pharmaceutical cost, calculate the constraint cost for the use of pharmaceutical power generation and pharmaceutical power generation for each generator, analyze the constraint cost for each power source, and verify the appropriateness of the cost for each of the above four constraints. In FIG. 2, the constraint cost estimating device 230 is shown to receive information on power generation through the automatic data acquisition device 210, but is configured to receive information directly from the MTAS without passing through the automatic data acquisition device 210. I can.

사용자 오류 알림장치(240)는 제약오차분석장치(220)와 제약비용추정장치(230)으로부터 처리 상태, 입력 Data 이상유무 Check, 각종 오류메세지 등의 정보를 수신하여 자동으로 사용자에게 알려주도록 구성될 수 있다.The user error notification device 240 is configured to receive information such as processing status, input data abnormality check, and various error messages from the constraint error analysis device 220 and the constraint cost estimation device 230 and automatically notify the user. I can.

이러한 구성을 통하여 제약 적정성 평가시스템(110)은 제약비용을 발생요인별로 구분하여 분석·관리함으로써 제약비용을 최소화할 수 있는 정책을 마련하는 데에 기초를 제공할 수 있다. Through this configuration, the pharmaceutical adequacy evaluation system 110 can provide a basis for preparing a policy that can minimize pharmaceutical costs by analyzing and managing pharmaceutical costs by dividing them by incurred factors.

도 3은 본 발명의 일 실시예에 따른 제약오차분석장치의 구성을 나타낸 도면이다.3 is a view showing the configuration of a constraint error analysis apparatus according to an embodiment of the present invention.

일 실시예에 따른 제약오차분석장치(220)는, 제약계획량 출력부(310), 제약실적량 출력부(320), 제약오차분석부(330), 정산금 비교부(340) 및 이력관리부(350)를 포함할 수 있다. 제약오차분석장치(220)는 데이터 자동 취득장치(210)로부터 운영발전계획에서 계획된 제약정보와 실제 당일날의 안정도 제약 경제급전 실적자료를 취합하여 해당 발전기의 계획과 실제 발전기 출력의 차이를 분석하고 그 오차를 관리하며, 계획과 실적에 대한 정산금을 산정하여 비교할 수 있다. 또한 오차발생시 그 결과를 사용자 오류 알림장치(240)로 송신하도록 구성될 수 있다.The constraint error analysis device 220 according to an embodiment includes a constraint plan amount output unit 310, a constraint performance amount output unit 320, a constraint error analysis unit 330, a settlement amount comparison unit 340, and a history management unit 350. ) Can be included. The constraint error analysis device 220 analyzes the difference between the plan of the corresponding generator and the actual generator output by collecting the constraint information planned in the operation development plan from the data automatic acquisition device 210 and the stability constraint economic dispatch performance data of the actual day. The error is managed, and the settlement fee for the plan and performance can be calculated and compared. In addition, when an error occurs, it may be configured to transmit the result to the user error notification device 240.

일 실시예에 따르면, 제약계획량 출력부(310)는 MTAS와 같은 외부 서버로부터 운영발전계획에서 적용되는 제약정보를 추출하여, 발전기 그룹별 발전량 제약 및 기동제약을 추출할 수 있다. 이 자료를 바탕으로 제약이 반영된 발전기 및 제약량을 산출하여 제약계획 발전기-제약량 리스트를 생성하도록 구성될 수 있다. 제약계획 발전기-제약량 리스트에는 발전기별 발전비용 정보가 포함될 수 있다.According to an embodiment, the restriction plan amount output unit 310 may extract restriction information applied in the operation development plan from an external server such as MTAS, and extract the power generation amount restriction and start restriction for each generator group. Based on this data, it can be configured to generate a constraint plan generator-constrained quantity list by calculating the generator and the restriction quantity reflecting the restriction. The generator-constrained quantity list of the constraint plan may include information on the generation cost of each generator.

일 실시예에 따르면, 제약실적량 출력부(320)는 실제 당일날의 SCED(안정도 제약 경제급전) 데이터 및 발전기 매칭정보를 추출하고, 이들을 이용하여 당일의 제약 실적 발전기 및 제약량을 산출하여 제약실적 발전기-제약량 리스트를 생성하도록 구성될 수 있다. SCED는 발전기별 코드가 발전계획과 다를 수 있으므로 발전기의 용량자료를 분석하여 가장 적합하다고 판단되는 발전기코드와 매칭시킬 수 있다.According to an embodiment, the pharmaceutical performance output unit 320 extracts the actual day's SCED (stability constraint economic dispatch) data and generator matching information, and uses them to calculate the pharmaceutical performance generator and the constraint amount for the day to be restricted. It may be configured to generate a performance generator-constraints list. Since the code for each generator may be different from the power generation plan, the SCED can analyze the capacity data of the generator and match it with the generator code judged to be the most suitable.

일 실시예에 따르면, 제약오차분석부(330)는 제약계획량 출력부(310)와 제약실적량 출력부(320)에서 산출한 계획과 실적의 발전기-제약량 리스트의 내용을 비교하여 실제 계획대비 정확하게 출력되었는지에 대한 오차를 분석하도록 구성될 수 있다. 또한, 제약에 걸린 발전기의 기동순위가 비용최소화 원칙에 의거, 적정한 발전기가 선택되었는지, 적정한 발전량이 선택되었는지 판단하도록 구성될 수 있다. 나아가, 분석한 결과를 정산금 비교부(340)와 이력관리부(350)에 관련데이터를 송신하도록 구성될 수 있다. According to an embodiment, the constraint error analysis unit 330 compares the contents of the generator-constrained amount list of the results and the plan calculated by the constraint plan amount output unit 310 and the constraint amount output unit 320 to compare the actual plan. It can be configured to analyze the error as to whether it is output correctly. In addition, it may be configured to determine whether an appropriate generator has been selected or an appropriate amount of power generation has been selected based on the principle of cost minimization based on the start-up priority of the constrained generator. Further, the analysis result may be configured to transmit related data to the settlement amount comparison unit 340 and the history management unit 350.

제약오차분석부(330)는 제약계획과 제약실적간 발전기-제약량 리스트에서 서로 다른 발전기가 있는 경우 그에 대한 정보, 계획 발전기와 발전비용을 비교하여 발전비용이 적은 전체 발전기중 제약발전에 포함되지 않은 발전기, 즉 계획보다 발전비용이 적은 발전기가 존재하는 경우 그에 대한 정보 - 이 경우 발전비용이 적다라도 제약발전을 하지 못하는 경우는 제외할 수 있음 -, 제약계획과 제약실적의 발전기 중 제약발전량(제약량)이 다른 경우 그에 대한 정보등을 정산금 비교부(340)에 송신하여 입력데이터로 제공할 수 있다. 이 과정에서 여러 정보들을 반영하여 제약 수정 신규 발전기 - 제약량 리스트를 생성하여 제공하도록 할 수도 있다.The constraint error analysis unit 330 compares the information on the generator-constrained quantity list between the constraint plan and the constraint performance and the generator-constrained quantity list, and compares the planned generator and the power generation cost, and is not included in the limited power generation among all generators with low power generation costs. Information about when there is a generator that has no power generation cost, i.e., a generator with less power generation cost than the plan-In this case, it is possible to exclude cases in which limited power generation cannot be performed even if the power generation cost is low -, the limited power generation among the generators of the limited plan and the limited performance ( If the amount of restriction) is different, information about it may be transmitted to the settlement amount comparison unit 340 and provided as input data. In this process, it is also possible to create and provide a constraint modification new generator-restriction amount list by reflecting various information.

본 발명의 일 실시예에 따른 제약오차분석장치는, 외부의 서버로부터 제약정보를 수신하고, 제약정보를 기초로 제약계획 발전기-제약량 리스트 - 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 생성하도록 구성된 제약계획량 출력부; 외부의 서버로부터 SCED(안정도 제약 경제급전) 데이터 및 발전기 매칭 정보를 수신하고, SCED 데이터 및 발전기 매칭 정보를 기초로 제약실적 발전기-제약량 리스트를 생성하도록 구성된 제약실적량 출력부; 및 제약오차분석부를 포함하고, 제약오차분석부는, 제약계획 발전기-제약량 리스트 및 제약실적 발전기-제약량 리스트를 기초로 하여, 발전기 동일 여부, 계획보다 발전비용이 적은 발전기 존재 여부 및 제약량 동일 여부 중 적어도 하나를 판단하여, 제약 오류 리스트를 생성하도록 구성될 수 있다.The constraint error analysis apparatus according to an embodiment of the present invention receives constraint information from an external server, and generates a constraint plan generator-a list of constraints-the list includes information on generation cost for each generator-based on the constraint information. Constrained planning amount output unit; A limited amount output unit configured to receive SCED (stability-constrained economic power supply) data and generator matching information from an external server, and to generate a limited amount generator-constrained amount list based on the SCED data and the generator matching information; And a restriction error analysis unit, wherein the restriction error analysis unit is based on the restriction plan generator-constrained quantity list and the pharmaceutical performance generator-constrained quantity list, whether the generator is the same, whether or not there is a generator with less power generation cost than the plan, and the restriction quantity is the same. It may be configured to determine at least one of whether or not to generate a constraint error list.

현재까지 시장운영기관의 운영결과에 따라 전력구입비를 지급하고 있으면서도, 운영결과에 대한 적정성 검증을 시행하고 있지 않고 있다. 제약 발전기의 기동이 적절한지 제약량이 적절한지의 여부에 따라 비용이 증감되므로 급전운영의 이상유무와 적정성을 판단하는 것은 비용절감을 위해 매우 중요하다. 제약오차분석부(330)가 제약계획의 적절성을 판단함으로 인하여 이러한 종래의 문제를 해결하여 제약비용 절감을 기대할 수 있다.Until now, although the cost of purchasing electricity has been paid according to the operation result of the market operating institution, the adequacy verification of the operation result has not been carried out. Since the cost increases and decreases depending on whether the start of the pharmaceutical generator is appropriate or the amount of restriction is appropriate, it is very important to determine the abnormality and appropriateness of the power supply operation for cost reduction. As the constraint error analysis unit 330 determines the appropriateness of the constraint plan, it can be expected to reduce the pharmaceutical cost by solving such a conventional problem.

정산금 비교부(340)는 계획대비 실적 제약량에 대한 오차에 따라 발전비용과 정산금의 증감이 얼마나 되는지 판별할 수 있다. 즉 제약오차에 따라 전력구입비의 비합리적인 지출에 대한 적정성과 금액을 산출하는 구성을 포함할 수 있고, 이력관리부(350)는 제약오차분석부(330)와 정산금 비교부(340)에서 수신되는 결과값 정보를 일별/월별/년별로 그룹 관리하도록 구성될 수 있다.The settlement amount comparison unit 340 may determine how much an increase or decrease in the power generation cost and the settlement amount is according to an error in the performance constraint compared to the plan. That is, it may include a configuration that calculates the adequacy and amount for the irrational expenditure of the power purchase cost according to the constraint error, and the history management unit 350 is a result value received from the constraint error analysis unit 330 and the settlement fee comparison unit 340 It can be configured to manage information in groups by day/month/year.

도 4는 본 발명의 일 실시예에 따른 제약오차분석장치가 제약계획과 제약실적간의 제약 오류 리스트를 생성하는 방법을 나타낸 도면이다. 일 실시예에서, 상세하게는, 제약 오류 리스트의 생성은 제약오차분석부(330)에 의하여 수행될 수 있다.4 is a diagram illustrating a method of generating a list of constraint errors between a constraint plan and a constraint performance by the constraint error analysis apparatus according to an embodiment of the present invention. In an embodiment, in detail, the generation of the constraint error list may be performed by the constraint error analysis unit 330.

본 발명의 일 실시예에 따른 제약오차분석장치가 제약계획과 제약실적간의 제약 오류 리스트를 생성방법은, 먼저 제약계획 발전기-제약량 리스트를 수신하는 단계(S410) 및 제약실적 발전기-제약량 리스트를 수신하는 단계(S420)가 수행될 수 있다. 각각의 발전기-제약량 리스트에는 발전기, 제약량 및 발전기별 발전비용 정보가 포함될 수 있다.A method of generating a list of constraint errors between a constraint plan and a constraint performance by the constraint error analysis apparatus according to an embodiment of the present invention includes: first receiving a constraint plan generator-constrained quantity list (S410) and a constraint performance generator-constrained quantity list The step of receiving (S420) may be performed. Each generator-constrained quantity list may include generator, restriction quantity, and generation cost information for each generator.

다음 제약계획과 제약실적 리스트를 비교하여, 계획된 내용과 실제 실적 발전기가 동일한지 판단하는 단계(S430)가 수행될 수 있다. 판단결과, 발전기가 동일하지 않은 경우, 발전기가 상이하다는 내용을 포함하는, 제약 오류 리스트를 생성하는 단계(S470)가 수행될 수 있다.By comparing the next constraint plan and the constraint performance list, a step (S430) of determining whether the planned content and the actual performance generator are the same may be performed. As a result of the determination, if the generators are not the same, a step (S470) of generating a constraint error list including a content that the generators are different may be performed.

발전기가 동일한 경우, 다음 단계로서 계획보다 발전비용이 적은 발전기 존재 여부를 판단하는 단계(S440)가 수행될 수 있다. 이 단계는, 발전비용이 더 적은 발전기가 존재함에도 발전계획이 비경제적으로 작성되어, 제약비용의 증가를 야기한 경우 이러한 오류를 검출할 수 있다. 판단결과, 계획보다 발전비용이 적은 발전기가 존재하는 경우, 존재한다는 내용을 포함하는, 제약 오류 리스트를 생성하는 단계(S470)가 수행될 수 있다.When the generators are the same, a step (S440) of determining whether a generator having a lower power generation cost than the plan exists may be performed as a next step. This step can detect such an error when the power generation plan is uneconomically created even though there are generators with lower power generation costs, causing an increase in constraint costs. As a result of the determination, when there is a generator having a lower power generation cost than the plan, a step (S470) of generating a constraint error list including a content that exists may be performed.

존재하지 않는 경우, 그 다음 단계로서 제약계획과 제약실적간 제약량이 동일한지 판단하는 단계(S450)가 수행될 수 있다. 발전기는 동일하나, 제약량에서 차이가 있어 제약비용의 차이를 야기한 경우 이러한 오류를 검출할 수 있다. 제약량이 동일한 경우, 제약계획 발전기-제약량 리스트 및 제약실적 발전기-제약량 리스트를 저장하는 단계(S460)가 수행될 수 있다. 리스트 내지 이력의 저장은 제약오차분석부(330)에 구성된 저장모듈에 저장되도록 구성될 수 있고, 이력관리부(350)로 리스트가 송신되어 저장되도록 구성될 수도 있다. 제약량이 동일하지 않은 경우, 제약량이 동일하지 않다는 내용을 포함하는, 제약 오류 리스트를 생성하는 단계(S470)를 포함할 수 있다.If it does not exist, a step S450 of determining whether the constraint amount between the constraint plan and the constraint performance is the same may be performed as a next step. Generators are the same, but if there is a difference in the amount of constraints that causes a difference in the cost of the constraints, this error can be detected. When the constraint amount is the same, a step (S460) of storing the constraint plan generator-constrained amount list and the constraint performance generator-constrained amount list may be performed. The storage of the list or history may be configured to be stored in a storage module configured in the constraint error analysis unit 330, and the list may be transmitted to and stored in the history management unit 350. If the constraint amounts are not the same, the step of generating a constraint error list including a content that the constraint amounts are not the same (S470) may be included.

도 5는 본 발명의 일 실시예에 따른 정산금 비교부에서 정보의 흐름을 나타낸 도면이다.5 is a view showing the flow of information in the settlement amount comparison unit according to an embodiment of the present invention.

정산금 비교부(340)는 계획대비 실적 제약량에 대한 오차에 따라 발전비용과 정산금의 증감이 얼마나 되는지 판별할 수 있다. 즉 제약오차에 따라 전력구입비의 비합리적인 지출에 대한 적정성과 금액을 산출하는 구성을 포함할 수 있다. 정산금 비교부(340)가 정산금을 산출하는 과정은 기존에 개발된 MTAS(120)의 가격결정발전계획프로그램과 정산금산출프로그램을 이용하여 수행될 수 있다. 제약오차분석부(330)에서 제공한 데이터를 수신하여 입력데이터로 활용하도록 구성될 수 있는데, 이에 관하여는 앞서 제약오차분석부(330)에서 설명한 바와 같다.The settlement amount comparison unit 340 may determine how much an increase or decrease in the power generation cost and the settlement amount is according to an error in the performance constraint compared to the plan. That is, it may include a configuration that calculates the adequacy and amount for irrational expenditure of power purchase costs according to constraint errors. The process of calculating the settlement amount by the settlement amount comparison unit 340 may be performed using a price determination development plan program and settlement amount calculation program of the MTAS 120 that have been developed. It may be configured to receive data provided by the constraint error analysis unit 330 and use it as input data, as described above with respect to the constraint error analysis unit 330.

일 실시예에 따르면, 제약오차분석부는, 제약계획 발전기-제약량 리스트, 제약실적 발전기-제약량 리스트 및 제약 오류 리스트를 기초로, 제약 수정 신규 발전기-제약량 리스트를 생성하고, 정산금 비교부는, 제약계획 발전기-제약량 리스트 및 제약 수정 신규 발전기-제약량 리스트를 외부의 서버로 송신하고, 외부의 서버로부터 제약계획 발전기-제약량 리스트를 기초로 한 제1 SMP(계통한계가격), 제약 수정 신규 발전기-제약량 리스트를 기초로 한 제2 SMP, 제약계획 발전기-제약량 리스트를 기초로 한 제1 정산금 및 제약 수정 신규 발전기-제약량 리스트를 기초로 한 제2 정산금을 수신하고, 제1 SMP 및 제2 SMP를 비교하여 SMP 비교자료를 생성하고, 제1 정산금 및 제2 정산금을 비교하여 정산금 비교자료를 생성하도록 구성될 수 있다.According to an embodiment, the constraint error analysis unit, based on the constraint plan generator-constrained amount list, the constraint performance generator-constrained amount list, and the constraint error list, generates a new constraint-modified generator-constrained amount list, and the settlement amount comparison unit, Constrained plan generator-constrained quantity list and constraint modification The new generator-constrained quantity list is transmitted to an external server, and the first SMP (system limit price) based on the constraint-planned generator-constrained quantity list from the external server, constraint modification Receive a second settlement amount based on the new generator-constraints list, the second SMP based on the new generator-constraints list, the first settlement fee and the constraint modification based on the constraint plan generator-constraints list, and the first It may be configured to compare the SMP and the second SMP to generate SMP comparison data, and to compare the first settlement amount and the second settlement amount to generate settlement amount comparison data.

도 5에 이력관리부가 정산금 비교부(340) 내부 구성되도록 도시되어 있으나, 이력관리부는 정산금 비교부(340)의 외부에, 제약오차분석장치의 일 구성이 되도록 구성될 수 있다.Although the history management unit is shown to be configured inside the settlement amount comparison unit 340 in FIG. 5, the history management unit may be configured to be a configuration of the constraint error analysis device outside the settlement amount comparison unit 340.

도 6은 본 발명의 일 실시예에 따른 이력관리부가 이력을 관리하는 모습을 나타낸 도면이고, 도 7은 본 발명의 일 실시예에 따른 이력관리부가 이력을 관리하는 방법을 나타낸 도면이다.6 is a view showing a state in which a history management unit manages a history according to an embodiment of the present invention, and FIG. 7 is a view showing a method in which the history management unit manages a history according to an embodiment of the present invention.

이력관리부(350)는 제약오차분석부(330)와 정산금 비교부(340)에서 수신되는 결과값 정보를 일별/월별/년별로 그룹 관리하도록 구성될 수 있다. 또한 과거 정보를 기반으로 동일 제약에 발전비용 최소화 목적에 가장 적합한 발전기 및 발전량(제약량)을 산출하고 나아가 리스트를 생성하도록 구성될 수 있다. 정보들은 새로운 정보가 수신 또는 생성될 때 종전의 자료와 비교하여 갱신하는 학습기능을 포함할 수 있고, 해당 제약의 가장 최신의 발전비용 최소화 발전기 및 발전량 리스트를 구하는 구성을 포함할 수도 있다.The history management unit 350 may be configured to group-manage the result value information received from the constraint error analysis unit 330 and the settlement amount comparison unit 340 by day/month/year. In addition, based on past information, it may be configured to calculate the most suitable generator and generation amount (constrained amount) for the purpose of minimizing generation cost under the same constraint, and further create a list. The information may include a learning function to update compared to the previous data when new information is received or generated, and may include a configuration to obtain a list of the most up-to-date generation cost minimizing generator and generation amount of the corresponding constraint.

일 실시예에 따르면, 정산금 비교부는, SMP 비교자료 및 정산금 비교자료를 이력관리부로 송신하고, 이력관리부는, SMP 비교자료 및 정산금 비교자료를 관리하도록 구성될 수 있다.According to an embodiment, the settlement amount comparison unit may be configured to transmit SMP comparison data and settlement amount comparison data to the history management unit, and the history management unit may be configured to manage SMP comparison data and settlement amount comparison data.

제약 적정성 평가시스템(110)에서 제약비용추정장치(230)는 데이터 자동 취득장치(210)로부터 실제 당일의 발전실적량과 정산금 등의 정보를 수신하여 제약별 제약비용을 추정하는 구성이다. 발전실적량, 정산금 등의 정보는 데이터 자동 취득장치(210)의 구성을 통하지 않고, MTAS와 같은 외부의 서버로부터 직접 수신하도록 구성될 수도 있다. 발전실적정산금 기준으로 제약비용 원인별 구분 알고리즘을 생성하고 이 알고리즘에 의해 제약비용을 추정할 수 있다. 또한 전원별로 제약비용을 추정하도록 구성될 수 있으며, 제약비용 추세분석/이력관리 등을 수행할 수도 있다.In the pharmaceutical adequacy evaluation system 110, the pharmaceutical cost estimating device 230 is configured to receive information such as the amount of power generation and settlement on the actual day from the automatic data acquisition device 210 to estimate the constraint cost for each constraint. Information such as power generation amount and settlement amount may be configured to be directly received from an external server such as MTAS, without going through the configuration of the automatic data acquisition device 210. A classification algorithm for each cause of constraint costs can be created based on the power generation performance settlement amount, and the constraint costs can be estimated by this algorithm. In addition, it can be configured to estimate constraint cost for each power source, and it can also perform trend analysis/history management of constraint cost.

제약비용추정장치(230)가 제약별 제약비용을 산정하는 방법으로서 제약비용 발생요인을 이용한 추정방법, 임의 우선순위를 이용한 추정방법 및 제약별 평균비용산정을 이용한 추정방법 등을 이용할 수 있다. As a method for the pharmaceutical cost estimating device 230 to calculate the constraint cost for each constraint, an estimation method using a constraint cost incurrence factor, an estimation method using a random priority, and an estimation method using an average cost calculation for each constraint may be used.

본 발명의 일 실시예에 따른 제약비용 원인별 제약비용추정장치(230)는, 외부의 서버로부터 발전계획량, 발전실적량 - 발전실적량은 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나를 포함한다 - 및 실적정산금을 수신하도록 구성된 통신부; 발전 계획량, 발전실적량 및 실적정산금을 기초로 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나로 인한 요인별 정산금을 산정하도록 구성된 처리부; 및 요인별 정산금을 저장하도록 구성된 저장부를 포함할 수 있다.The constraint cost estimating device 230 for each cause of constraint cost according to an embodiment of the present invention includes a power generation plan amount and a power generation performance amount from an external server-the power generation performance amount is among demand information, reserve power information, North Korean tide information, and thermal constraint information. It includes at least one-and a communication unit configured to receive an earnings settlement fee; A processing unit configured to calculate a settlement amount for each factor due to at least one of demand information, reserve power information, North Korean tide information, and heat constraint information based on the planned amount of power generation, the amount of power generation, and the amount of performance settled; And a storage unit configured to store the settlement amount for each factor.

제약비용 발생요인을 이용한 추정방법은 발전기별 제약발전전력량 정산금(CON)과 제약비발전전력량 정산금(COFF)이 발생하는 경우를 하나씩 나열하여 제약비용을 산정하는 방법이다. 이하 예를 들어 설명한다.The estimation method using the constrained cost incurrence factor is a method of calculating the constrained cost by listing the cases in which the constrained power generation payment (CON) and the non-constrained generation wattage payment (COFF) for each generator are incurred. An example is given below and it demonstrates.

1.실적수요가 하루전 수요보다 큰 결과 CON비용이 발생(반대일 경우 COFF 발생)1. As a result of the actual demand being greater than the demand a day ago, CON costs are incurred (COFF occurs in the opposite case)

: 실적수요(62,000MW) - 하루전 수요(60,000MW) = 2,000MW CON발생: Performance demand (62,000MW)-Demand the day before (60,000MW) = 2,000MW CON generation

2.순동예비력+주파수조정예비력 확보를 위한 CON 발생2. CON generation to secure pure power reserve + frequency adjustment reserve

: 4,000MW CON발생: 4,000MW CON generation

3.북상조류에 의한 CON(COFF) 발생3. CON (COFF) occurrence by North Korean birds

: 경인수요(55,000MW), 비제약비경인발전량(45,000MW), 북상조류용량(9,000MW)일 경우 경인지역 CON 발생 = 1,000MW CON: Gyeongin demand (55,000MW), non-pharmaceutical un-gyeongin power generation (45,000MW), and northern algae capacity (9,000MW), Gyeongin area CON generation = 1,000MW CON

4.열제약 발전기의 발전실적 - 열제약발전기의 발전계획 = 열제약으로 인한 CON 발생4. Power generation performance of heat-constrained generator-Power generation plan of heat-constrained generator = CON generation due to heat-constrained power

: 4,000MW CON 발생: 4,000MW CON generated

위와 같은 예의 경우 CON비용은 4가지 원인별로 산정할 수 있다. COFF비용도 같은 방식으로 산정이 가능하다.In the case of the above example, the CON cost can be calculated for each of the four reasons. COFF cost can be calculated in the same way.

CON요소CON element 발생 CONOccurrence CON 수요예측 오차로 인한 CONCON due to demand forecast error 해당시간의 CON x 2/11CON x 2/11 of the time 예비력으로 인한 CONCON due to reserve force 해당시간의 CON x 4/11CON x 4/11 of the time 북상조류로 인한 CONCON due to North Korean birds 해당시간의 CON x 1/11CON x 1/11 of the time 열제약으로 인한 CONCON due to heat constraint 해당시간의 CON x 4/11CON x 4/11 of the time

우선순위를 이용한 제약비용 추정방법은 제약에 대한 우선순위를 부여하고, 실적의 제약비용을 원인별로 기존의 CON/COFF를 정의하는 것이다. 예를 들어 다음과 같이 정의할 수 있다. 이때 우선순위는 임의로 기준을 정립하여 가정한다.The method of estimating constraint cost using priority is to give priority to constraints and define the existing CON/COFF for each cause of constraint cost of performance. For example, it can be defined as follows. At this time, the priority is assumed to be arbitrarily established.

항목Item CON항목CON item COFF항목COFF item 우선순위
(임의)
Priority
(option)
불시정지(U)Emergency stop (U) CONUCONU COFFUCOFFU 1One 예비력(R)Reserve power (R) CONRCONR COFFRCOFFR 22 수요예측오차(L)Demand forecast error (L) CONLCONL COFFLCOFFL 33 열제약(H)Thermal constraint (H) CONHCONH COFFHCOFFH 44 송전제약(T)Transmission restriction (T) CONTCONT COFFTCOFFT 55

1순위. 불시정지에 따른 제약비용은 불시정지에 따른 대체 발전기가 기동되어야 하므로, 수요예측 다음으로 전력생산단가가 높은 발전기의 CON을 불지정지량만큼 CONU 산정한다.First priority. The constrained cost due to the sudden stoppage requires the replacement of the generator to be started. After the demand forecasting, the CON of the generator with the high power production unit is calculated by the amount of the non-designated amount.

2순위. 예비력에 따른 제약비용은 앞순위 제약비용을 받지 못한 발전기들에 한하여 COFF 및 CON을 누적하여 COFFR 및 CONR 산정한다.Second priority. The constraint cost according to the reserve power is calculated by accumulating COFF and CON for the generators that did not receive the preceding constraint cost and calculating COFFR and CONR.

3순위. 수요예측 오차로 인하여 증발 및 감발한 발전기를 대상으로 산정함. 우선순위가 가장 높은 경우이므로 오차량만큼 발전기의 증발 및 감발량을 산정함. 수요예측 > 수요실적일 경우, 수요예측치가 높아 발전기가 감발한 경우이므로 전력생산단가가 높은 발전기부터 COFF를 누적하여 COFFL 산정하고, 수요예측 < 수요실적일 경우, 수요예측치가 높아 발전기가 증발한 경우이므로 전력생산단가가 높은 발전기부터 CON을 누적하여 CONL 산정한다.Rank 3. Calculation is made for the generator that has evaporated and depleted due to the demand forecast error. Since this is the case with the highest priority, the amount of evaporation and depletion of the generator is calculated by the amount of error. Demand forecast> In the case of demand performance, when the generator is depressed due to the high demand forecast value, COFF is calculated by accumulating COFF from the generator with a high power production cost. Therefore, CONL is calculated by accumulating CON from a generator with a high power production unit.

4순위. 열제약의 경우는 사전 열제약계획시와 실적에 대한 차이로 해당 발전기에 대하여 계획<실적시는 CON을 누적하여 산정하고, 계획>실적시는 COFF를 누적하여 각각 CONH와 COFFH를 산정한다.Rank 4. In the case of thermal constraints, CONH and COFFH are calculated by accumulating CON for the generator in the case of prior thermal constraint planning and performance, accumulating CON in the case of planning <performance, and COFF in the case of planning> performance.

5순위. 기타 제약(송전제약 등)에 따른 제약비용은 앞순위 제약비용을 받지 못한 발전기들에 한하여 COFF 및 CON을 누적하여 COFFT 및 CONT 산정한다.Rank 5. Constrained costs due to other constraints (transmission constraints, etc.) are calculated by accumulating COFF and CON for the generators that have not received the preceding constraint costs.

본 발명의 다른 실시예에 따른 제약비용 원인별 제약비용추정장치(230)는, 외부의 서버로부터 비제약정산금, 제약반영정산금 - 제약반영정산금은 불시정지반영 정산금, 예비력반영 정산금, 수요예측반영 정산금, 열제약반영 정산금, 송전제약반영 정산금 중 적어도 하나를 포함한다 - 및 전체정산금을 수신하도록 구성된 통신부; 비제약정산금 및 제약반영정산금의 오차를 제약별로 각각 산정하고, 오차의 합을 산정하고, 전체정산금과 비제약정산금의 차이인 실제약비용을 산정하고, 제약별 오차 - 제약은 불시정지, 예비력, 수요예측, 열제약, 송전제약 중 적어도 하나를 포함한다 - 에 실제약비용을 곱한 값을 오차의 합으로 나누어 스케일링 정보를 생성하도록 구성된 처리부; 및 스케일링 정보를 저장하도록 구성된 저장부를 포함할 수 있다.The pharmaceutical cost estimating device 230 for each cause of pharmaceutical costs according to another embodiment of the present invention includes a non-constrained settlement amount, a pharmaceutical reflected settlement amount from an external server-the pharmaceutical reflected settlement amount is an unannounced reflected settlement amount, a reserve reflected settlement amount, a demand forecast reflected settlement amount , Including at least one of the heat constraints reflected settlement amount and the transmission limit reflected settlement amount-and a communication unit configured to receive the total settlement amount; Calculate the error of the non-constrained settlement amount and the restriction reflected settlement amount for each restriction, calculate the sum of the errors, calculate the actual drug cost, which is the difference between the total settlement amount and the non-constrained settlement amount, A processing unit configured to generate scaling information by dividing a value obtained by multiplying by the actual drug cost by the sum of errors; And a storage unit configured to store scaling information.

평균비용 방식은 기존 전력시장 종합분석시스템인 MTAS의 MTAS-RSC(발전계획프로그램)을 활용한다. MTAS-RSC는 비제약을 입력데이터로 반영하여 산정할 수 있다. 각각의 비용을 아래와 같이 재산정하여 그 값을 제약비용추정장치(230)가 수신하고, 전체비용에 대한 스케일링을 조정할 수 있다.The average cost method utilizes MTAS-RSC (Power Planning Program) of MTAS, which is an existing power market comprehensive analysis system. MTAS-RSC can be calculated by reflecting unconstrained data as input data. Each cost is recalculated as follows, the pharmaceutical cost estimating device 230 receives the value, and scaling for the total cost can be adjusted.

불시정지 - 불시정지반영 SMP 및 정산금 산출(MTAS-RSC)Untimely suspension-SMP reflecting untimely suspension and calculation of settlement amount (MTAS-RSC)

예비력 - 예비력반영 SMP 및 정산금 산출(MTAS-RSC)Reserve power-SMP reflecting reserve power and calculation of settlement amount (MTAS-RSC)

수요예측오차 - 수요예측 반영 SMP 및 정산금 산출(MTAS-RSC)Demand forecast error-Calculate SMP and settlement amount reflecting demand forecast (MTAS-RSC)

열제약 - 열제약 반영 SMP 및 정산금 산출(MTAS-RSC)Thermal constraint-Calculation of SMP and settlement amount reflecting thermal constraint (MTAS-RSC)

송전제약 - 송전제약 반영 SMP 및 정산금 산출(MTAS-RSC)Transmission Constraints-Calculation of SMP and Settlement Fees Reflecting Transmission Constraints (MTAS-RSC)

제약비용추정장치(230)는 산출된 정산금 수신하여 아래와 같이 제약별 정산금을 계산하여 스케일링 정보를 생산할 수 있다.The pharmaceutical cost estimating device 230 may receive the calculated settlement amount and calculate the settlement amount for each constraint as follows to produce scaling information.

1단계 : 제약별 정산금 산정Step 1: Calculation of the settlement fee for each pharmaceutical 2단계. 제약별 비용산정Step 2. Calculation of cost by pharmaceutical 3단계 : 전체비용대비 스케일링Step 3: Scaling versus total cost 상태state 비용(억원)Cost (100 million won) 상태state 비용(억원)Cost (100 million won) 상태state 비용(억원)Cost (100 million won) 비제약Non-pharmaceutical 5151 예비력비용Reserve cost 66-51=1566-51=15 예비력비용Reserve cost 15*20/34=8.815*20/34=8.8 예비력반영Reflecting reserve power 6666 불시정지비용Unannounced cost 52-51=152-51=1 불시정지비용Unannounced cost 1*20/34=0.61*20/34=0.6 불시정지Sudden stop 5252 송전제약비용Transmission restriction cost 55-51=455-51=4 송전제약비용Transmission restriction cost 4*20/34=2.44*20/34=2.4 송전제약반영Reflection of transmission restrictions 5555 열제약비용Heat constraint cost 57-51=657-51=6 열제약비용Heat constraint cost 6*20/34=3.56*20/34=3.5 열제약반영Heat constraint reflection 5757 수요오차반영Reflecting demand errors 59-51=859-51=8 수요오차반영Reflecting demand errors 8*20/34=4.78*20/34=4.7 수요오차반영Reflecting demand errors 5959 오차합Sum of errors 3434 스케일링
오차합
Scaling
Sum of errors
8.8+0.6+2.4+3.5+4.7=208.8+0.6+2.4+3.5+4.7=20
전체정산금Total settlement amount 7171 실제약비용Actual drug cost 71-51=2071-51=20

사용자 오류 알림장치(240)는 제약오차분석장치(220)와 제약비용추정장치(230)으로부터 처리 상태, 입력 Data 이상유무 Check, 각종 오류메세지 등의 정보를 수신하여 자동으로 사용자에게 알려주도록 구성될 수 있다. 사용자 오류 알림장치(240)가 수신하는 정보는, 앞서 설명한 각 장치의 구성으로부터 송신되는 여러 정보일 수 있다. 예를 들어 사용자 오류 알림장치(240)는 제약오차분석장치(220)의 정산금 비교부(340)로부터, SMP 비교자료 및 정산금 비교자료를 수신할 수 있고, 제약비용추정장치(230)으로부터 스케일링 정보 또는 요인별 정산금을 수신할 수 있다. 여기서 알림의 대상인 사용자는 거래소의 시스템의 운영자 및/또는 분석자일 수 있다.The user error notification device 240 is configured to receive information such as processing status, input data abnormality check, and various error messages from the constraint error analysis device 220 and the constraint cost estimation device 230 and automatically notify the user. I can. The information received by the user error notification device 240 may be various pieces of information transmitted from the configuration of each device described above. For example, the user error notification device 240 may receive SMP comparison data and settlement amount comparison data from the settlement amount comparison unit 340 of the constraint error analysis device 220, and scaling information from the pharmaceutical cost estimating device 230 Alternatively, you can receive the settlement fee for each factor. Here, the user to be notified may be an operator and/or an analyst of the system of the exchange.

본 발명에서 개시되는 제약비용 적정성 검증 방법 및 시스템은 한국전력공사에 운영되고 있는『전력시장 종합 분석시스템(MTAS)』과 통합되어 운영될 수 있으며, 전력구입비 52조원중 11%를 차지하는 6조원에 대한 비용검증에 적용될 수 있다.The method and system for verifying the adequacy of pharmaceutical costs disclosed in the present invention can be operated by being integrated with the MTAS (Power Market Comprehensive Analysis System) operated by the Korea Electric Power Corporation. It can be applied to cost verification for

현재 그리고 향후에는 에너지전환, 환경·안전중시의 정책으로 신재생 증가, 원전 축소, 미세먼지의 지속적 대책 등으로 전력시장의 불확실성은 커질것으로 예상된다. 이러한 불확실성으로 수요예측오차, 예비력확보, 송전제약 등은 지속 증가할 것이므로 이에 대한 제약운영에 대하여 적정성을 검증하는 것은 구입비용을 줄이는 효과가 있다.Currently and in the future, uncertainty in the power market is expected to increase due to energy conversion, increasing new and renewable energy through environmental and safety-oriented policies, reducing nuclear power plants, and continuing measures against fine dust. Due to this uncertainty, errors in demand forecasting, securing reserves, and transmission constraints will continue to increase. Therefore, verifying the appropriateness of the constraints on these constraints has the effect of reducing purchase costs.

또한 다양한 신규 시장참여자의 진입이 예상되기 때문에, 수익확보와 비용절감을 위한 전력시장의 신뢰와 계통운영의 적정성은 더욱 중요하다.In addition, since various new market participants are expected to enter, the reliability of the electricity market and the appropriateness of system operation for securing profits and reducing costs are more important.

본 발명이 속하는 기술 분야의 당업자는 본 발명이 그 기술적 사상이나 필수적 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있으므로, 이상에서 기술한 실시 예들은 모든 면에서 예시적인 것이며 한정적인 것이 아닌 것으로서 이해해야만 한다. 본 발명의 범위는 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 등가개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.Those skilled in the art to which the present invention pertains, since the present invention can be implemented in other specific forms without changing the technical spirit or essential features thereof, the embodiments described above are illustrative in all respects and should be understood as non-limiting. Only do it. The scope of the present invention is indicated by the claims to be described later rather than the detailed description, and all changes or modified forms derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention. .

110: 제약 적정성 평가 시스템
120: MTAS(전력시장 종합분석시스템)
210: 데이터자동취득장치
220: 제약오차분석장치
230: 제약비용추정장치
240: 사용자 오류 알림장치
310: 제약계획량 출력부
320: 제약실적량 출력부
330: 제약 오차분석부
340: 정산금 비교부
350: 이력관리부
110: pharmaceutical adequacy evaluation system
120: MTAS (Power Market Comprehensive Analysis System)
210: automatic data acquisition device
220: constraint error analysis device
230: Pharmaceutical cost estimating device
240: user error notification device
310: Constraint plan amount output
320: Constrained performance amount output unit
330: constraint error analysis unit
340: settlement amount comparison unit
350: history management department

Claims (11)

외부의 서버로부터 제약정보를 수신하고,
상기 제약정보를 기초로 제약계획 발전기-제약량 리스트 - 상기 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 생성하도록 구성된 제약계획량 출력부;
상기 외부의 서버로부터 SCED(안정도 제약 경제급전) 데이터 및 발전기 매칭 정보를 수신하고,
상기 SCED 데이터 및 발전기 매칭 정보를 기초로 제약실적 발전기-제약량 리스트를 생성하도록 구성된 제약실적량 출력부; 및
제약오차분석부를 포함하고,
상기 제약오차분석부는,
상기 제약계획 발전기-제약량 리스트 및 상기 제약실적 발전기-제약량 리스트를 기초로 하여, 발전기 동일 여부, 계획보다 발전비용이 적은 발전기 존재 여부 및 제약량 동일 여부 중 적어도 하나를 판단하여, 제약 오류 리스트를 생성하도록 구성된,
제약오차분석장치.
Receiving restriction information from an external server,
A restriction plan amount output unit configured to generate a restriction plan generator based on the restriction information-a restriction quantity list-the list includes information on generation cost for each generator -;
Receives SCED (stability-constrained economic power supply) data and generator matching information from the external server,
A constrained quantity output unit configured to generate a constrained performance generator-constrained quantity list based on the SCED data and generator matching information; And
Including a constraint error analysis unit,
The constraint error analysis unit,
Based on the restriction plan generator-constrained quantity list and the constrained performance generator-constrained quantity list, by determining at least one of whether the generator is identical, whether there is a generator having a lower generation cost than the plan, and whether the restriction quantity is the same, a restriction error list Configured to generate,
Pharmaceutical error analysis device.
제1항에 있어서,
정산금 비교부를 더 포함하고,
상기 제약오차분석부는,
상기 제약계획 발전기-제약량 리스트, 상기 제약실적 발전기-제약량 리스트 및 상기 제약 오류 리스트를 기초로, 제약 수정 신규 발전기-제약량 리스트를 생성하고,
상기 정산금 비교부는,
상기 제약계획 발전기-제약량 리스트 및 상기 제약 수정 신규 발전기-제약량 리스트를 상기 외부의 서버로 송신하고,
상기 외부의 서버로부터 상기 제약계획 발전기-제약량 리스트를 기초로 한 제1 SMP(계통한계가격), 상기 제약 수정 신규 발전기-제약량 리스트를 기초로 한 제2 SMP, 상기 제약계획 발전기-제약량 리스트를 기초로 한 제1 정산금 및 상기 제약 수정 신규 발전기-제약량 리스트를 기초로 한 제2 정산금을 수신하고,
상기 제1 SMP 및 상기 제2 SMP를 비교하여 SMP 비교자료를 생성하고,
상기 제1 정산금 및 상기 제2 정산금을 비교하여 정산금 비교자료를 생성하도록 구성된,
제약오차분석장치.
The method of claim 1,
It further includes a settlement fee comparison unit,
The constraint error analysis unit,
On the basis of the constraint plan generator-constrained quantity list, the constraint performance generator-constrained quantity list, and the restriction error list, a new constrained generator-constrained quantity list is generated,
The settlement amount comparison unit,
Transmitting the restriction plan generator-constrained quantity list and the restriction modified new generator-constrained quantity list to the external server,
The first SMP (system limit price) based on the restriction plan generator-constrained quantity list from the external server, the second SMP based on the restriction modified new generator-constrained quantity list, the restriction plan generator-constrained quantity Receiving a first settlement amount based on a list and a second settlement amount based on the restriction modified new generator-constrained amount list,
Comparing the first SMP and the second SMP to generate SMP comparison data,
Comprising to compare the first settlement amount and the second settlement amount to generate settlement amount comparison data,
Pharmaceutical error analysis device.
제2항에 있어서,
이력관리부를 더 포함하고,
상기 정산금 비교부는, 상기 SMP 비교자료 및 상기 정산금 비교자료를 이력관리부로 송신하고,
상기 이력관리부는, 상기 SMP 비교자료 및 상기 정산금 비교자료를 관리하도록 구성된,
제약오차분석장치.
The method of claim 2,
Further including a history management department,
The settlement amount comparison unit transmits the SMP comparison data and the settlement amount comparison data to a history management unit,
The history management unit is configured to manage the SMP comparison data and the settlement amount comparison data,
Pharmaceutical error analysis device.
제3항에 있어서,
상기 정산금 비교부는, 상기 SMP 비교자료 및 상기 정산금 비교자료를 외부의 사용자 오류 알림장치로 송신하도록 더 구성된,
제약오차분석장치.
The method of claim 3,
The settlement amount comparison unit is further configured to transmit the SMP comparison data and the settlement amount comparison data to an external user error notification device,
Pharmaceutical error analysis device.
제약오차분석장치가 제약계획과 제약실적간의 제약 오류 리스트를 생성하는 방법에 있어서,
제약계획 발전기-제약량 리스트 - 상기 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 수신하는 단계;
제약실적 발전기-제약량 리스트를 수신하는 단계;
제약계획과 제약실적간 발전기가 동일한지 판단하는 단계;
발전기가 동일한 경우, 계획보다 발전비용이 적은 발전기 존재 여부를 판단하는 단계;
존재하지 않는 경우, 제약계획과 제약실적간 제약량이 동일한지 판단하는 단계;
제약량이 동일한 경우, 상기 제약계획 발전기-제약량 리스트 및 상기 제약실적 발전기-제약량 리스트를 저장하는 단계; 및
발전기가 동일하지 않거나, 계획보다 발전비용이 적은 발전기가 존재하거나 또는 제약량이 동일하지 않은 경우, 제약 오류 리스트를 생성하는 단계를 포함하는, 방법
In the method for the constraint error analysis device to generate a list of constraint errors between the constraint plan and the constraint performance,
Receiving a constraint plan generator-a list of constraints-the list includes information on generation costs for each generator;
Receiving a constraint performance generator-a list of constraints;
Determining whether the generator is the same between the constraint plan and the constraint performance;
If the generators are the same, determining whether there is a generator having a lower power generation cost than the plan;
If it does not exist, determining whether the constraint amount between the constraint plan and the constraint performance is the same;
If the restriction amount is the same, storing the restriction plan generator-constrained quantity list and the restriction performance generator-constrained quantity list; And
The method comprising the step of generating a list of constraint errors when the generators are not the same, there are generators with lower generation costs than the plan, or the constraints are not the same
제약비용 원인별 제약비용추정장치에 있어서,
외부의 서버로부터 발전계획량, 발전실적량 - 상기 발전실적량은 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나를 포함한다 - 및 실적정산금을 수신하도록 구성된 통신부;
상기 발전 계획량, 상기 발전실적량 및 상기 실적정산금을 기초로 상기 수요 정보, 상기 예비력 정보, 상기 북상조류 정보 및 상기 열제약 정보 중 적어도 하나로 인한 요인별 정산금을 산정하도록 구성된 처리부; 및
상기 요인별 정산금을 저장하도록 구성된 저장부를 포함하는,
제약비용추정장치.
In the pharmaceutical cost estimating device for each cause of pharmaceutical cost,
A power generation plan amount and a power generation performance amount from an external server-the power generation amount includes at least one of demand information, reserve power information, north tidal current information, and heat restriction information-and a communication unit configured to receive a performance payment;
A processing unit configured to calculate a settlement amount for each factor due to at least one of the demand information, the reserve power information, the northern bird current information, and the heat restriction information based on the planned power generation amount, the power generation amount, and the performance settlement amount; And
Including a storage unit configured to store the settlement amount for each factor,
Pharmaceutical cost estimating device.
제6항에 있어서,
상기 통신부는;
상기 요인별 정산금을 외부의 사용자 오류 알림장치로 송신하도록 더 구성된,
제약오차분석장치.
The method of claim 6,
The communication unit;
Further configured to transmit the settlement amount for each factor to an external user error notification device,
Pharmaceutical error analysis device.
제약비용 원인별 제약비용추정장치에 있어서,
외부의 서버로부터 비제약정산금, 제약반영정산금 - 상기 제약반영정산금은 불시정지반영 정산금, 예비력반영 정산금, 수요예측반영 정산금, 열제약반영 정산금, 송전제약반영 정산금 중 적어도 하나를 포함한다 - 및 전체정산금을 수신하도록 구성된 통신부;
상기 비제약정산금 및 상기 제약반영정산금의 오차를 제약별로 각각 산정하고,
상기 오차의 합을 산정하고,
전체정산금과 비제약정산금의 차이인 실제약비용을 산정하고,
상기 제약별 오차 - 상기 제약은 불시정지, 예비력, 수요예측, 열제약, 송전제약 중 적어도 하나를 포함한다 - 에 실제약비용을 곱한 값을 상기 오차의 합으로 나누어 스케일링 정보를 생성하도록 구성된 처리부; 및
상기 스케일링 정보를 저장하도록 구성된 저장부를 포함하는,
제약비용추정장치.
In the pharmaceutical cost estimating device for each cause of pharmaceutical cost,
Non-constrained settlement from external server, pharmaceutical reflected settlement-The pharmaceutical reflected settlement includes at least one of the non-constrained settlement reflected, reserve reflected settlement, demand forecast reflected settlement, thermal constraint reflected settlement, and transmission constraint reflected settlement-and the total settlement. A communication unit configured to receive a signal;
The error of the non-constrained settlement amount and the pharmaceutical reflection settlement amount is calculated for each constraint
Calculate the sum of the errors,
Calculate the actual drug cost, which is the difference between the total settlement amount and the non-constrained settlement amount,
A processing unit configured to generate scaling information by dividing a value obtained by multiplying the error by the constraint by the sum of the errors by multiplying a value obtained by multiplying an actual drug cost by at least one of an untimely stop, a reserve force, a demand prediction, a heat constraint, and a transmission constraint; And
Comprising a storage unit configured to store the scaling information,
Pharmaceutical cost estimating device.
제8항에 있어서,
상기 통신부는;
상기 스케일링 정보를 외부의 사용자 오류 알림장치로 송신하도록 더 구성된,
제약오차분석장치.
The method of claim 8,
The communication unit;
Further configured to transmit the scaling information to an external user error notification device,
Pharmaceutical error analysis device.
외부의 서버로부터 제약정보를 수신하여 상기 제약정보를 기초로 제약계획 발전기-제약량 리스트 - 상기 리스트에는 발전기별 발전비용 정보가 포함됨 - 를 생성하고,
상기 외부의 서버로부터 SCED(안정도 제약 경제급전) 데이터 및 발전기 매칭 정보를 수신하여 상기 SCED 데이터 및 발전기 매칭 정보를 기초로 제약실적 발전기-제약량 리스트를 생성하고,
상기 제약계획 발전기-제약량 리스트 및 상기 제약실적 발전기-제약량 리스트를 기초로 하여, 발전기 동일 여부, 계획보다 발전비용이 적은 발전기 존재 여부 및 제약량 동일 여부 중 적어도 하나를 판단하여, 제약 오류 리스트를 생성하도록 구성된, 제약오차분석장치;
상기 외부의 서버로부터 발전계획량, 발전실적량 - 상기 발전실적량은 수요 정보, 예비력 정보, 북상조류 정보 및 열제약 정보 중 적어도 하나를 포함한다 - 및 실적정산금을 수신하고,
상기 발전 계획량, 상기 발전실적량 및 상기 실적정산금을 기초로 상기 수요 정보, 상기 예비력 정보, 상기 북상조류 정보 및 상기 열제약 정보 중 적어도 하나로 인한 요인별 정산금을 산정하고,
상기 요인별 정산금을 저장하도록 구성된, 제약비용추정장치; 및
상기 제약오차분석장치로부터 상기 제약 오류 리스트를 수신하고,
상기 제약비용추정장치로부터 상기 요인별 정산금을 수신하도록 구성된, 사용자 오류 알림장치를 포함하는,
제약 적정성 평가시스템.
Receiving restriction information from an external server and generating a restriction plan generator-constrained quantity list-the list includes information on generation cost for each generator-based on the restriction information,
Receiving SCED (stability-constrained economic power supply) data and generator matching information from the external server to generate a limited performance generator-constrained quantity list based on the SCED data and generator matching information,
Based on the restriction plan generator-constrained quantity list and the constrained performance generator-constrained quantity list, by determining at least one of whether the generator is identical, whether there is a generator having a lower generation cost than the plan, and whether the restriction quantity is the same, a restriction error list Constrained error analysis device configured to generate;
A power generation plan amount and a power generation amount from the external server-the power generation amount includes at least one of demand information, reserve power information, north-south tide information, and heat constraint information-and a performance settlement amount,
Calculate a settlement fee for each factor due to at least one of the demand information, the reserve power information, the north bird information, and the heat constraint information based on the planned power generation amount, the power generation amount, and the performance settlement amount,
A pharmaceutical cost estimating device configured to store the settlement amount for each factor; And
Receiving the constraint error list from the constraint error analysis device,
Including a user error notification device, configured to receive the settlement amount for each factor from the constraint cost estimating device,
Pharmaceutical adequacy evaluation system.
제10항에 있어서,
상기 제약오차분석장치는,
상기 제약계획 발전기-제약량 리스트, 상기 제약실적 발전기-제약량 리스트 및 상기 제약 오류 리스트를 기초로, 제약 수정 신규 발전기-제약량 리스트를 생성하고,
상기 제약계획 발전기-제약량 리스트 및 상기 제약 수정 신규 발전기-제약량 리스트를 상기 외부의 서버로 송신하고,
상기 외부의 서버로부터 상기 제약계획 발전기-제약량 리스트를 기초로 한 제1 SMP, 상기 제약 수정 신규 발전기-제약량 리스트를 기초로 한 제2 SMP, 상기 제약계획 발전기-제약량 리스트를 기초로 한 제1 정산금 및 상기 제약 수정 신규 발전기-제약량 리스트를 기초로 한 제2 정산금을 수신하고,
상기 제1 SMP 및 상기 제2 SMP를 비교하여 SMP 비교자료를 생성하고,
상기 제1 정산금 및 상기 제2 정산금을 비교하여 정산금 비교자료를 생성하도록 더 구성되고,
상기 사용자 오류 알림장치는 상기 제약오차분석장치로부터 상기 SMP 비교자료 및 상기 정산금 비교자료를 수신하도록 더 구성된,
제약 적정성 평가시스템.
The method of claim 10,
The constraint error analysis device,
On the basis of the constraint plan generator-constrained quantity list, the constraint performance generator-constrained quantity list, and the restriction error list, a new constrained generator-constrained quantity list is generated,
Transmitting the restriction plan generator-constrained quantity list and the restriction modified new generator-constrained quantity list to the external server,
A first SMP based on the restriction plan generator-constrained quantity list from the external server, the second SMP based on the restriction modified new generator-constrained quantity list, and the restriction plan generator-constrained quantity list based Receiving a first settlement amount and a second settlement amount based on the restriction modified new generator-constrained amount list,
Comparing the first SMP and the second SMP to generate SMP comparison data,
It is further configured to compare the first settlement amount and the second settlement amount to generate settlement amount comparison data,
The user error notification device is further configured to receive the SMP comparison data and the settlement amount comparison data from the constraint error analysis device,
Pharmaceutical adequacy evaluation system.
KR1020190107232A 2019-08-30 2019-08-30 Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint KR102645327B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190107232A KR102645327B1 (en) 2019-08-30 2019-08-30 Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190107232A KR102645327B1 (en) 2019-08-30 2019-08-30 Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint

Publications (2)

Publication Number Publication Date
KR20210026445A true KR20210026445A (en) 2021-03-10
KR102645327B1 KR102645327B1 (en) 2024-03-11

Family

ID=75148236

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190107232A KR102645327B1 (en) 2019-08-30 2019-08-30 Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint

Country Status (1)

Country Link
KR (1) KR102645327B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130045006A (en) * 2011-10-25 2013-05-03 한국전력공사 Method and system for managing electric power demand based on prior prediction of electric power demand
KR20140145804A (en) * 2013-06-14 2014-12-24 한국전력공사 Apparatus for generating prediction data to forecast power market
JP2015158750A (en) * 2014-02-21 2015-09-03 株式会社東芝 Power supply utilization planning apparatus, power supply utilization planning method, and power supply utilization planning program
JP2017220068A (en) * 2016-06-08 2017-12-14 株式会社東芝 Energy management device, energy management method and energy management program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130045006A (en) * 2011-10-25 2013-05-03 한국전력공사 Method and system for managing electric power demand based on prior prediction of electric power demand
KR20140145804A (en) * 2013-06-14 2014-12-24 한국전력공사 Apparatus for generating prediction data to forecast power market
JP2015158750A (en) * 2014-02-21 2015-09-03 株式会社東芝 Power supply utilization planning apparatus, power supply utilization planning method, and power supply utilization planning program
JP2017220068A (en) * 2016-06-08 2017-12-14 株式会社東芝 Energy management device, energy management method and energy management program

Also Published As

Publication number Publication date
KR102645327B1 (en) 2024-03-11

Similar Documents

Publication Publication Date Title
US11398000B2 (en) Methods and systems for machine-learning for prediction of grid carbon emissions
Kök et al. Investments in renewable and conventional energy: The role of operational flexibility
Hirth et al. Why wind is not coal: on the economics of electricity generation
Hu et al. Robust SCUC considering continuous/discrete uncertainties and quick-start units: A two-stage robust optimization with mixed-integer recourse
Roques et al. Nuclear power: a hedge against uncertain gas and carbon prices?
Grave et al. A method for estimating security of electricity supply from intermittent sources: Scenarios for Germany until 2030
Botterud et al. Use of wind power forecasting in operational decisions.
Braun et al. Intraday optimization of pumped hydro power plants in the German electricity market
Xiao et al. Stochastic up to congestion bidding strategy in the nodal electricity markets considering risk management
Pablo Luna et al. A discussion on electricity prices, or the two sides of the coin
Wu et al. Security‐Constrained Unit Commitment with Uncertainties
Gu Long-term power system capacity expansion planning considering reliability and economic criteria
Liu et al. Ex post payoffs of a tolling agreement for natural gas-fired generation in Texas
KR20210026445A (en) Apparatus for estimating constraint cost based on causes and evaluation system for appropriate constraint
Hidalgo González et al. Dispa-SET 2.0: unit commitment and power dispatch model
Logan et al. Modeling renewable energy resources in integrated resource planning
Basore Paths to future growth in photovoltaics manufacturing
Yang et al. Influences of uncertainties to the generation feasible region for medium-and long-term electricity transaction
Kirby et al. California renewables Portfolio standard renewable generation integration cost analysis
Shabanzadeh et al. Generation Maintenance Scheduling via robust optimization
Sieed et al. Application of INPRO methodology to assess economic feasibility of proposed rooppur nuclear power plant
Kearns Effects of intermittent generation on the economics and operation of prospective baseload power plants
Sheybanivaziri et al. Forecasting price spikes in day-ahead electricity markets: techniques, challenges, and the road ahead
Felder et al. A Reliability, Resiliency and Adaptability Policy Framework for Electric Power Systems
Chen et al. The scenario approach for demand response providers in capacity markets

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant