KR20210021689A - System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance - Google Patents

System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance Download PDF

Info

Publication number
KR20210021689A
KR20210021689A KR1020190100902A KR20190100902A KR20210021689A KR 20210021689 A KR20210021689 A KR 20210021689A KR 1020190100902 A KR1020190100902 A KR 1020190100902A KR 20190100902 A KR20190100902 A KR 20190100902A KR 20210021689 A KR20210021689 A KR 20210021689A
Authority
KR
South Korea
Prior art keywords
tcc
tolerance
operation time
current value
applied current
Prior art date
Application number
KR1020190100902A
Other languages
Korean (ko)
Other versions
KR102240497B1 (en
Inventor
고영준
허희무
Original Assignee
한국수력원자력 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국수력원자력 주식회사 filed Critical 한국수력원자력 주식회사
Priority to KR1020190100902A priority Critical patent/KR102240497B1/en
Publication of KR20210021689A publication Critical patent/KR20210021689A/en
Application granted granted Critical
Publication of KR102240497B1 publication Critical patent/KR102240497B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3271Testing of circuit interrupters, switches or circuit-breakers of high voltage or medium voltage devices
    • G01R31/3272Apparatus, systems or circuits therefor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/333Testing of the switching capacity of high-voltage circuit-breakers ; Testing of breaking capacity or related variables, e.g. post arc current or transient recovery voltage
    • G01R31/3333Apparatus, systems or circuits therefor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides an operating time calculation system in which a time current curve (TCC) is a standard for tolerance application. The system comprises: a tolerance setting unit for setting the tolerance of corresponding equipment; a TCC generation unit for generating a first TCC or a second TCC corresponding to a limit of an allowable range by applying the tolerance based on a reference TCC; a current setting unit for setting an applied current value input to the reference TCC; and an operation time calculation unit for calculating an operation time of the first TCC or the second TCC corresponding to the applied current value. The first TCC or the second TCC is generated by translating the reference TCC by the minimum or maximum range of the tolerance. The operation time calculation unit is characterized in that the operation time is calculated through a commercial log calculation according to the commercial log characteristic of the first TCC or the second TCC. By calculating the operation time according to the allowable error range for the applied current value based on the reference TCC using commercial log analysis, it is possible to calculate the exact operation time, and it is possible to accurately design and engineer a small power system. It has the advantage of preventing economic damage due to an unexpected stop by securing circuit integrity in case of emergency.

Description

시간 전류 곡선을 공차 적용의 기준으로 하여 상용로그 특성에 따른 상용로그 해석을 통해 동작시간을 산출하는 시스템 및 방법{SYSTEM AND METHOD FOR CALCULATING OPERATING TIME THOUGH COMMERCIAL LOG ANALYSIS ACCORDING TO COMMERCIAL LOG CHARACTERISTICS ON THE BASIS OF THE TIME CURRENT CURVE BASED ON TOLERANCE}(SYSTEM AND METHOD FOR CALCULATING OPERATING TIME THOUGH COMMERCIAL LOG ANALYSIS ACCORDING TO COMMERCIAL LOG CHARACTERISTICS ON THE BASIS OF THE) TIME CURRENT CURVE BASED ON TOLERANCE}

본 발명은 동작시간을 산출하는 시스템 및 방법에 관한 것으로, 보다 상세하게는 시간 전류 곡선의 상용로그 특성을 이용하여 설비의 동작시간을 산출하는 시스템 및 방법에 관한 것이다.The present invention relates to a system and method for calculating an operating time, and more particularly, to a system and method for calculating an operating time of a facility using a common log characteristic of a time-current curve.

시간 전류 곡선(Time-Current Curve, TCC)은 시간과 전류의 관계를 나타낸 곡선으로, 특정 크기의 전류에서 퓨즈가 개방되는 시간을 나타낸 그래프이다. TCC는 상용로그스케일 기반으로 플로팅되며, 전류가 클수록 회로 퓨즈 개방에 소요되는 시간이 줄어든다.The Time-Current Curve (TCC) is a curve showing the relationship between time and current, and is a graph showing the time the fuse is opened at a current of a specific size. The TCC is plotted based on the commercial log scale, and the larger the current, the shorter the time it takes to open the circuit fuse.

한편, 동작시간이란 계전기 기타 전자기구의 권선에 전류를 통한 순간부터 그 기구가 소정의 기능을 다하기까지의 시간을 이른다. 스위칭 소자에서 입력이 주어지면서부터 스위치가 켜짐 또는 꺼짐이 될 때까지의 시간으로, 장치 또는 시스템의 가동률을 구할 때 필요한 데이터이다.On the other hand, the operating time refers to the time from the moment the current is passed through the windings of relays or other electronic devices until the device performs a predetermined function. This is the time from when an input is given to the switching element until the switch is turned on or off. This is the data required to calculate the operating rate of a device or system.

MCCB(배선용 회로 차단기)나 FUSE 등의 경우 제작사가 제시하는 시간 전류 곡선에 수직선으로 플롯팅한 시험전류값을 기준으로 공차(±10%, ±20% 등)를 적용하여 대략적으로 동작시간을 확인한다. 그러나, 시험전류값을 기준으로 시간 전류 곡선에 공차를 적용하는 것은 시간 전류 곡선의 상용로그적 특성을 고려하지 않은 것으로, 동작시간이 부정확하게 산출될 수 있는 문제가 있다.In the case of MCCB (wiring circuit breaker) or fuse, approximate operation time is checked by applying a tolerance (±10%, ±20%, etc.) based on the test current value plotted with a vertical line on the time current curve presented by the manufacturer. do. However, applying the tolerance to the time-current curve based on the test current value does not take into account the commercial logarithmic characteristics of the time-current curve, and there is a problem in that the operating time may be incorrectly calculated.

본 발명은 시간 전류 곡선의 상용로그 특성을 해석하여 설비의 동작시간을 산출하는 시스템 및 방법에 관한 것으로서, 해당 설비의 공차적용 기준을 시간 전류 곡선으로 함으로써, 정확한 동작시간을 산출하고자 한다.The present invention relates to a system and method for calculating an operating time of a facility by analyzing the commercial log characteristics of a time-current curve, and an accurate operating time is calculated by setting the tolerance application criterion of the facility as a time-current curve.

상기 목적을 달성하기 위하여 본 발명은, 시간전류곡선(TCC)이 공차 적용의 기준이 되는 동작시간 산출 시스템에 있어서, 해당 설비의 허용 오차를 설정하는 공차 설정부; 기준 TCC를 기준으로 상기 공차를 적용하여 허용 가능한 범위의 한계에 해당하는 제 1 TCC 또는 제 2 TCC를 생성하는 TCC 생성부; 상기 기준 TCC에 입력되는 인가 전류값을 설정하는 전류 설정부; 및 상기 인가 전류값에 해당하는 상기 제 1 TCC 또는 상기 제 2 TCC의 동작시간을 산출하는 동작시간 산출부를 포함하고, 상기 제 1 TCC 또는 상기 제 2 TCC는, 상기 기준 TCC가 상기 공차의 최소 또는 최대 범위만큼 평행이동되어 생성되며, 상기 동작시간 산출부는, 상기 제 1 TCC 또는 상기 제 2 TCC의 상용로그 특성에 따른 상용로그 계산을 통해 동작시간을 산출하는 것을 특징으로 하여, 상기 기준 TCC를 기준으로 하여 상기 인가 전류값에 대해 허용되는 오차범위에 따른 동작시간을 상용로그 해석을 이용하여 산출하는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a system for calculating an operating time in which a time current curve (TCC) is a criterion for application of a tolerance, comprising: a tolerance setting unit for setting a tolerance of a corresponding facility; A TCC generator configured to generate a first TCC or a second TCC corresponding to a limit of an allowable range by applying the tolerance based on a reference TCC; A current setting unit for setting an applied current value input to the reference TCC; And an operation time calculator configured to calculate an operation time of the first TCC or the second TCC corresponding to the applied current value, wherein the reference TCC is the minimum or It is generated by moving in parallel as much as a maximum range, and the operation time calculation unit calculates an operation time through a commercial log calculation according to the common log characteristic of the first TCC or the second TCC, based on the reference TCC. As a result, the operating time according to the allowable error range for the applied current value is calculated using a commercial logarithmic analysis.

바람직하게, 상기 인가 전류값은, 10n과 10n+1 범위 사이의 값인 경우, 하기 [수학식 1]에 따른 연산으로 산출하는 것을 특징으로 한다.Preferably, when the applied current value is a value between 10 n and 10 n+1 , it is characterized in that it is calculated by an operation according to the following [Equation 1].

[수학식 1][Equation 1]

Figure pat00001
Figure pat00001

여기서, x는 인가 전류값을 의미하고, A는 10n에서 인가 전류값까지의 길이를 의미하며, B는 10n에서 10n+1 까지의 길이를 의미한다.Here, x means the applied current value, A means the length from 10 n to the applied current value, and B means the length from 10 n to 10 n+1 .

바람직하게, 상기 제 1 TCC는, 상기 기준 TCC의 허용 범위 중 허용최소규격에 해당하는 TCC이고, 상기 제 2 TCC는, 상기 기준 TCC의 허용 범위 중 허용최대규격에 해당하는 TCC인 경우, 상기 기준 TCC와 상기 제 1 TCC의 수평 거리는 하기 [수학식 2]에 따른 연산으로 산출하고, 상기 기준 TCC와 상기 제 2 TCC의 수평 거리는 하기 [수학식 3]에 따른 연산으로 산출하는 특징으로 한다.Preferably, the first TCC is a TCC corresponding to an allowable minimum standard among the allowable ranges of the reference TCC, and the second TCC is a TCC corresponding to the allowable maximum standard among the allowable ranges of the reference TCC, the reference The horizontal distance between the TCC and the first TCC is calculated by an operation according to the following [Equation 2], and the horizontal distance between the reference TCC and the second TCC is calculated by an operation according to the following [Equation 3].

[수학식 2][Equation 2]

Figure pat00002
Figure pat00002

여기서, α는 기준 TCC와 제 1 TCC의 수평 거리를 의미하고, x는 인가 전류값을 의미하며, m은 공차를 의미한다. m은 퍼센트 단위이다. Here, α denotes a horizontal distance between the reference TCC and the first TCC, x denotes an applied current value, and m denotes a tolerance. m is in percent.

[수학식 3][Equation 3]

Figure pat00003
Figure pat00003

여기서, β는 기준 TCC와 제 2 TCC의 수평 거리를 의미하고, x는 인가 전류값을 의미하며, m은 공차를 의미한다. m은 퍼센트 단위이다. Here, β denotes a horizontal distance between the reference TCC and the second TCC, x denotes an applied current value, and m denotes a tolerance. m is in percent.

상기 목적을 달성하기 위하여 본 발명은, 시간전류곡선(TCC)이 공차 적용의 기준이 되는 동작시간 산출 방법에 있어서, (a) 해당 설비의 허용 오차를 설정하는 공차 설정 단계; (b) 기준 TCC를 기준으로 상기 공차를 적용하여 허용 가능한 범위의 한계에 해당하는 제 1 TCC 또는 제 2 TCC를 생성하는 TCC 생성 단계; (c) 상기 기준 TCC에 입력되는 인가 전류값을 설정하는 전류 설정 단계; 및 (d) 상기 인가 전류값에 해당하는 상기 제 1 TCC 또는 상기 제 2 TCC의 동작시간을 산출하는 동작시간 산출 단계를 포함하고, 상기 제 1 TCC 또는 상기 제 2 TCC는, 상기 기준 TCC가 상기 공차의 최소 또는 최대 범위만큼 평행이동되어 생성되며, 상기 동작시간 산출 단계는, 상기 제 1 TCC 또는 상기 제 2 TCC의 상용로그 특성에 따른 상용로그 계산을 통해 동작시간을 산출하는 것을 특징으로 하여, 상기 기준 TCC를 기준으로 하여 상기 인가 전류값에 대해 허용되는 오차범위에 따른 동작시간을 상용로그 해석을 이용하여 산출하는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a method for calculating an operating time in which a time current curve (TCC) is a criterion for applying a tolerance, the method comprising: (a) a tolerance setting step of setting a tolerance of a corresponding facility; (b) a TCC generation step of generating a first TCC or a second TCC corresponding to a limit of an allowable range by applying the tolerance based on a reference TCC; (c) a current setting step of setting an applied current value input to the reference TCC; And (d) calculating an operation time of the first TCC or the second TCC corresponding to the applied current value, wherein the first TCC or the second TCC is It is generated by moving in parallel as much as the minimum or maximum range of the tolerance, and the operation time calculation step is characterized in that the operation time is calculated through a common log calculation according to the common log characteristic of the first TCC or the second TCC, Based on the reference TCC, an operation time according to an allowable error range for the applied current value is calculated using a commercial log analysis.

본 발명에 따르면, 특정 설비의 허용 범위에 해당하는 동작시간을 산출함에 있어서, 시간 전류 곡선을 공차의 적용 기준으로 한다. 시간 전류 곡선은 상용로그스케일 형태이다. 그러나, 이러한 상용로그의 그래프적 특성을 고려하지 않고 시험전류값을 공차 적용기준으로 한다면, 산출되는 동작시간이 부정확할 수 있다. 그러나, 시간 전류 곡선을 공차의 적용 기준으로 하는 본 발명에 따르면, 상용로그의 특성을 고려하므로 정확한 동작시간을 산출하는 것이 가능하다. 본 발명에 따라 산출된 동작시간은 정확하므로 설비의 동작 불발 위험이 낮고, 그에 따른 계통 및 주변기기에 심각한 피해를 유발시키지 않는 장점이 있다. 또한, 소내전력계통을 정확하게 설계 및 엔지니어링 할 수 있고, 유사시 회로 건전성을 확보하여 불시정지로 인한 경제적 손해를 예방할 수 있는 장점이 있다. According to the present invention, in calculating the operating time corresponding to the allowable range of a specific facility, the time current curve is used as the application standard of the tolerance. The time current curve is in the form of a common logarithmic scale. However, if the test current value is used as a tolerance application criterion without taking into account the graphical characteristics of the commercial log, the calculated operating time may be inaccurate. However, according to the present invention in which the time current curve is used as the application criterion of the tolerance, it is possible to calculate an accurate operation time since the characteristic of the commercial log is considered. Since the operation time calculated according to the present invention is accurate, there is an advantage that the risk of malfunction of the facility is low, and serious damage to the system and peripheral devices is not caused accordingly. In addition, there is an advantage of being able to accurately design and engineer a power system within a small area, and to secure circuit integrity in case of emergency to prevent economic damage due to an emergency stop.

도 1은 본 발명의 실시예에 따른 동작시간 산출 시스템의 구성도를 나타낸다.
도 2는 본 발명의 실시예에 따른 시간 전류 곡선을 공차 적용의 기준으로 하여 시간 전류 곡선을 해석하는 그래프를 나타낸다.
도 3은 발명의 실시예에 따른 동작시간 산출 방법의 설비의 동작시간 산출 과정을 나타낸다.
1 shows a configuration diagram of a system for calculating an operating time according to an embodiment of the present invention.
2 shows a graph for analyzing a time current curve using a time current curve according to an embodiment of the present invention as a criterion for application of a tolerance.
3 shows a process of calculating an operating time of a facility in a method of calculating an operating time according to an embodiment of the present invention.

이하, 첨부된 도면들에 기재된 내용들을 참조하여 본 발명을 상세히 설명한다. 다만, 본 발명이 예시적 실시 예들에 의해 제한되거나 한정되는 것은 아니다. 각 도면에 제시된 동일 참조부호는 실질적으로 동일한 기능을 수행하는 부재를 나타낸다.Hereinafter, the present invention will be described in detail with reference to the contents described in the accompanying drawings. However, the present invention is not limited or limited by exemplary embodiments. The same reference numerals shown in each of the drawings indicate members that perform substantially the same function.

본 발명의 목적 및 효과는 하기의 설명에 의해서 자연스럽게 이해되거나 보다 분명해 질 수 있으며, 하기의 기재만으로 본 발명의 목적 및 효과가 제한되는 것은 아니다. 또한, 본 발명을 설명함에 있어서 본 발명과 관련된 공지 기술에 대한 구체적인 설명이, 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략하기로 한다.Objects and effects of the present invention may be naturally understood or more clearly understood by the following description, and the objects and effects of the present invention are not limited only by the following description. In addition, in describing the present invention, when it is determined that a detailed description of a known technology related to the present invention may unnecessarily obscure the subject matter of the present invention, a detailed description thereof will be omitted.

도 1은 본 발명의 실시예에 따른 동작시간 산출 시스템(1)의 구성도를 나타낸다. 1 shows a configuration diagram of an operation time calculation system 1 according to an embodiment of the present invention.

동작시간 산출 시스템(1)은 시간 전류 곡선(TCC)을 공차 적용의 기준으로 할 수 있다. 동작시간 산출 시스템(1)은 해당 설비의 자체 TCC를 공차 적용의 기준으로 하여, 인가 전류값에 대해 허용되는 오차범위에 따른 동작시간을 상용로그 해석을 이용하여 산출할 수 있다.The operating time calculation system 1 may use a time current curve TCC as a criterion for applying a tolerance. The operating time calculation system 1 may calculate the operating time according to the allowable error range for the applied current value by using a commercial log analysis using the TCC of the corresponding facility as a criterion for applying the tolerance.

도 1를 참조하면, 동작시간 산출 시스템(1)은 공차 설정부(11), TCC 생성부(13), 전류 설정부(15), 동작시간 산출부(17)를 포함할 수 있다. 본 구성은 설명의 편의를 위하여 정의된 것으로 실제 물리적으로 구분되지 않고 통합 구현되어도 무방하다.Referring to FIG. 1, the operation time calculation system 1 may include a tolerance setting unit 11, a TCC generation unit 13, a current setting unit 15, and an operation time calculation unit 17. This configuration is defined for convenience of explanation and may not be physically classified and may be implemented in an integrated manner.

공차 설정부(11)는 해당 설비의 허용 오차를 설정할 수 있다. 공차는 해당 설비의 성질 또는 종류에 따라 다양하게 설정될 수 있다.The tolerance setting unit 11 may set an allowable error of a corresponding facility. The tolerance can be set in various ways depending on the nature or type of the facility.

TCC 생성부(13)는 해당 설비 자체의 TCC를 기준 TCC로 공차를 적용하여, 허용 가능한 범위의 한계에 해당하는 제 1 TCC 또는 제 2 TCC를 생성할 수 있다. 제 1 TCC 또는 제 2 TCC는, 기준 TCC가 공차의 최소 또는 최대 범위만큼 평행이동되어 생성될 수 있다. 제 1 TCC는 기준 TCC의 허용 범위 중 허용 최소규격에 해당하는 TCC 일 수 있고, 제 2 TCC는 기준 TCC의 허용 범위 중 허용 최대규격에 해당하는 TCC 일 수 있다. The TCC generator 13 may generate a first TCC or a second TCC corresponding to a limit of an allowable range by applying a tolerance to the TCC of the corresponding facility itself as a reference TCC. The first TCC or the second TCC may be generated by moving the reference TCC in parallel by the minimum or maximum range of the tolerance. The first TCC may be a TCC corresponding to the allowable minimum standard among the allowable ranges of the reference TCC, and the second TCC may be a TCC corresponding to the allowable maximum standard among the allowable ranges of the standard TCC.

전류 설정부(15)는 기준 TCC에 입력되는 인가 전류값을 설정할 수 있다. 인가 전류값은 전류값이 10nA와 10n+1A 범위 사이의 값인 경우, [수학식 1]에 따른 연산을 통해 산출할 수 있다.The current setting unit 15 may set an applied current value input to the reference TCC. The applied current value can be calculated through an operation according to [Equation 1] when the current value is between 10 n A and 10 n+1 A.

[수학식 1][Equation 1]

Figure pat00004
Figure pat00004

여기서, x는 인가 전류값을 의미하고, A는 10n에서 인가 전류값(x)까지의 길이를 의미하며, B는 10n에서 10n+1까지의 길이를 의미한다. Here, x means the applied current value, A means the length from 10 n to the applied current value (x), and B means the length from 10 n to 10 n+1 .

이때, A를 수식으로 나타내면 다음 [수식 1]과 같이 나타낼 수 있다.In this case, if A is expressed as an equation, it can be expressed as the following [Equation 1].

[수식 1][Equation 1]

A =

Figure pat00005
A =
Figure pat00005

또한, 기준 TCC와 제 1 TCC의 수평 거리는 [수학식 2]에 따른 연산으로 산출할 수 있다.In addition, the horizontal distance between the reference TCC and the first TCC can be calculated by an operation according to [Equation 2].

[수학식 2][Equation 2]

Figure pat00006
Figure pat00006

여기서, α는 기준 TCC와 제 1 TCC의 수평 거리를 의미하고, x는 인가 전류값을 의미하며, m은 공차를 의미한다. m은 퍼센트 단위이다. Here, α denotes a horizontal distance between the reference TCC and the first TCC, x denotes an applied current value, and m denotes a tolerance. m is in percent.

예를 들어, 공차가 20 퍼센트인 경우, 제 1 TCC는 기준 TCC으로 20 퍼센트의 공차가 적용된 만큼 왼쪽으로 평행이동한다. 이때, 기준 TCC와 제 1 TCC의 수평 거리인 α는 다음 [수식 2]와 같이 나타낼 수 있다.For example, if the tolerance is 20 percent, the first TCC is translated to the left by applying a tolerance of 20 percent as the reference TCC. At this time, α, which is the horizontal distance between the reference TCC and the first TCC, can be expressed as the following [Equation 2].

[수식 2][Equation 2]

Figure pat00007
Figure pat00007

기준 TCC와 제 2 TCC의 수평 거리는 [수학식 3]에 따른 연산으로 산출할 수 있다.The horizontal distance between the reference TCC and the second TCC can be calculated by an operation according to [Equation 3].

[수학식 3][Equation 3]

Figure pat00008
Figure pat00008

여기서, β는 기준 TCC와 제 2 TCC의 수평 거리를 의미하고, x는 인가 전류값을 의미하며, m은 공차를 의미한다. m은 퍼센트 단위이다. Here, β denotes a horizontal distance between the reference TCC and the second TCC, x denotes an applied current value, and m denotes a tolerance. m is in percent.

예를 들어, 공차가 20 퍼센트인 경우, 제 2 TCC는 기준 TCC으로 20 퍼센트의 공차가 적용된 만큼 오른쪽으로 평행이동한다. 이때, 기준 TCC와 제 2 TCC의 수평 거리인 β는 다음 [수식 3]과 같이 나타낼 수 있다.For example, if the tolerance is 20 percent, the second TCC is translated to the right by applying a tolerance of 20 percent as the reference TCC. In this case, β, which is the horizontal distance between the reference TCC and the second TCC, can be expressed as the following [Equation 3].

[수식 3][Equation 3]

Figure pat00009
Figure pat00009

동작시간 산출부(17)는 인가 전류값에 해당하는 제 1 TCC 또는 제 2 TCC의 동작시간을 산출할 수 있다. 동작시간 산출부(17)는 제 1 TCC 또는 제 2 TCC의 상용로그 특성에 따른 상용로그 계산을 통해 동작시간을 산출할 수 있다. TCC는 상용로그스케일 기반으로 플로팅되어 있어 상용로그 성질 이해를 바탕으로 TCC를 해석하여 동작시간을 산출하여야 한다.The operation time calculator 17 may calculate an operation time of the first TCC or the second TCC corresponding to the applied current value. The operation time calculation unit 17 may calculate an operation time by calculating a common log according to the common log characteristic of the first TCC or the second TCC. Since the TCC is plotted based on the commercial log scale, the operation time must be calculated by analyzing the TCC based on understanding the properties of the commercial log.

도 2는 본 발명의 실시예에 따른 시간 전류 곡선을 공차 적용의 기준으로 하여 시간 전류 곡선을 해석하는 그래프를 나타낸다. 2 shows a graph for analyzing a time current curve using a time current curve according to an embodiment of the present invention as a criterion for application of a tolerance.

동작시간 산출 시스템(1)에서 공차 적용의 기준이 되는 TCC는 상용로그스케일 기반으로 플로팅되어 있으므로 상용로그 성질 이해를 바탕으로 TCC를 해석하여 동작시간을 산출하여야 한다.In the operation time calculation system (1), the TCC, which is the criterion for applying the tolerance, is plotted based on the commercial log scale, so the operation time must be calculated by analyzing the TCC based on the understanding of the commercial log property.

동작시간 산출 프로세스Operation time calculation process

1. 제작사의 카다로그나 매뉴얼 등을 통해 TCC 그래프를 확보하고 해당 품목의 동작시간의 공차를 확인한다. 1. Secure the TCC graph through the manufacturer's catalog or manual, and check the tolerance of the operating time of the item.

2. 품목의 동작시험을 위한 인가 2. Authorization for the operation test of the item

전류값을 선정한 후 공차를 적용한 전류값을 함께 플로팅하고 TCC 그래프를 해석한다.After selecting the current value, plot the current value to which the tolerance is applied and analyze the TCC graph.

3. 상용로그 성질을 바탕으로 기준 TCC와 제 1 TCC의 수평 거리인 α값을 산출하고, 기준 TCC와 제 2 TCC의 수평 거리인 β값을 산출한다. 3. Calculate the α value, which is the horizontal distance between the reference TCC and the first TCC, based on the common logarithmic property, and calculate the value β, which is the horizontal distance between the reference TCC and the second TCC.

4. 산출된 α, β값을 이용하여, TCC 그래프에서 해당 품목의 최소값동작시간과 최대값 동작시간을 산출한다. 4. Using the calculated α and β values, calculate the minimum and maximum operation time for the item in the TCC graph.

5. 상용로그 성질을 바탕으로 한 상용로그 계산로직 또는 TCC Digitizing을 통해 해당 품목의 인가 5. Authorization of the item through commercial log calculation logic or TCC digitizing based on the property of commercial log

전류값에서의 동작시간을 산출한다. Calculate the operating time at the current value.

도 3은 발명에 따른 다른 실시예로서, 해당 설비의 동작시간이 산출되는 과정을 나타낸다. 동작시간 산출 시스템(1)에서 허용 오차를 설정하는 (a)단계, 2개의 TCC를 생성하는 (b)단계, 인가 전류값을 설정하는 (c)단계, 동작시간을 산출하는 (d)단계를 포함할 수 있다.3 is another embodiment according to the invention, showing a process of calculating the operating time of the facility. In the operation time calculation system (1), step (a) of setting the tolerance, step (b) of generating two TCCs, step (c) of setting the applied current value, and step (d) of calculating the operating time are performed. Can include.

(a)단계는 해당 설비의 허용 오차를 설정하는 단계를 의미한다. (b)단계는 기준 TCC를 기준으로 공차를 적용하여 허용 가능한 범위의 한계에 해당하는 제 1 TCC 또는 제 2 TCC를 생성하는 단계를 의미한다. (c)단계는 기준 TCC에 입력되는 인가 전류값을 설정하는 전류 설정 단계를 의미한다. (d)단계는 인가 전류값에 해당하는 제 1 TCC 또는 제 2 TCC의 동작시간을 산출하는 동작시간 산출 단계를 의미한다. 제 1 TCC 또는 제 2 TCC는 기준 TCC가 공차의 최소 또는 최대 범위만큼 평행이동되어 생성되며, 동작시간 산출 단계는, 제 1 TCC 또는 제 2 TCC의 상용로그 특성에 따른 상용로그 계산을 통해 동작시간을 산출하는 것을 특징으로 하여, 기준 TCC를 기준으로 하여 인가 전류값에 대해 허용되는 오차범위에 따른 동작시간을 상용로그 해석을 이용하여 산출할 수 있다. (a) 내지 (d)단계는 전술한 동작시간 산출 시스템(1)의 실시예에서 수행되는 과정을 나타낸 것으로 각 단계의 의미와 의의를 전술한 바, 중복 설명은 생략한다.Step (a) refers to the step of setting the tolerance of the facility. Step (b) refers to a step of generating the first TCC or the second TCC corresponding to the limit of the allowable range by applying a tolerance based on the reference TCC. Step (c) refers to a current setting step of setting an applied current value input to the reference TCC. Step (d) refers to an operation time calculation step of calculating an operation time of the first TCC or the second TCC corresponding to the applied current value. The first TCC or the second TCC is generated by moving the reference TCC in parallel by the minimum or maximum range of the tolerance, and the operation time calculation step is the operation time by calculating the common log according to the common log characteristics of the first TCC or the second TCC. It is characterized in that it calculates, it is possible to calculate the operation time according to the allowable error range for the applied current value based on the reference TCC using a commercial log analysis. Steps (a) to (d) show processes performed in the embodiment of the operation time calculation system 1 described above, and the meaning and significance of each step have been described above, and redundant descriptions will be omitted.

이상에서 대표적인 실시예를 통하여 본 발명을 상세하게 설명하였으나, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자는 상술한 실시예에 대하여 본 발명의 범주에서 벗어나지 않는 한도 내에서 다양한 변형이 가능함을 이해할 것이다. 그러므로 본 발명의 권리 범위는 설명한 실시예에 국한되어 정해져서는 안 되며, 후술하는 특허청구범위뿐만 아니라 특허청구범위와 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태에 의하여 정해져야 한다.Although the present invention has been described in detail through exemplary embodiments above, those of ordinary skill in the art to which the present invention pertains will understand that various modifications can be made to the above-described embodiments without departing from the scope of the present invention. will be. Therefore, the scope of the present invention is limited to the described embodiments and should not be determined, and should be determined by all changes or modifications derived from the claims and the concept of equality as well as the claims to be described later.

1: 동작시간 산출 시스템
11: 공차 설정부
13: TCC 생성부
15: 전류 설정부
17: 동작시간 산출부
1: operation time calculation system
11: Tolerance setting section
13: TCC generator
15: current setting unit
17: operation time calculation unit

Claims (4)

시간전류곡선(TCC)이 공차 적용의 기준이 되는 동작시간 산출 시스템에 있어서,
해당 설비의 허용 오차를 설정하는 공차 설정부;
기준 TCC를 기준으로 상기 공차를 적용하여 허용 가능한 범위의 한계에 해당하는 제 1 TCC 또는 제 2 TCC를 생성하는 TCC 생성부;
상기 기준 TCC에 입력되는 인가 전류값을 설정하는 전류 설정부; 및
상기 인가 전류값에 해당하는 상기 제 1 TCC 또는 상기 제 2 TCC의 동작시간을 산출하는 동작시간 산출부를 포함하고,
상기 제 1 TCC 또는 상기 제 2 TCC는,
상기 기준 TCC가 상기 공차의 최소 또는 최대 범위만큼 평행이동되어 생성되며,
상기 동작시간 산출부는,
상기 제 1 TCC 또는 상기 제 2 TCC의 상용로그 특성에 따른 상용로그 계산을 통해 동작시간을 산출하는 것을 특징으로 하여,
상기 기준 TCC를 기준으로 하여 상기 인가 전류값에 대해 허용되는 오차범위에 따른 동작시간을 상용로그 해석을 이용하여 산출하는 동작시간 산출 시스템.
In the operating time calculation system in which the time current curve (TCC) is the criterion for application of tolerance,
Tolerance setting unit for setting the tolerance of the facility;
A TCC generator configured to generate a first TCC or a second TCC corresponding to a limit of an allowable range by applying the tolerance based on a reference TCC;
A current setting unit for setting an applied current value input to the reference TCC; And
An operation time calculator for calculating an operation time of the first TCC or the second TCC corresponding to the applied current value,
The first TCC or the second TCC,
The reference TCC is generated by moving in parallel by the minimum or maximum range of the tolerance,
The operation time calculation unit,
It characterized in that the operation time is calculated through a commercial log calculation according to the common log characteristic of the first TCC or the second TCC,
An operation time calculation system for calculating an operation time according to an allowable error range for the applied current value based on the reference TCC using a commercial log analysis.
제 1 항에 있어서,
상기 인가 전류값은,
10n과 10n+1 범위 사이의 값인 경우, 하기 [수학식 1]에 따른 연산으로 산출하는 것을 특징으로 하는 동작시간 산출 시스템.
[수학식 1]
Figure pat00010

여기서, x는 인가 전류값을 의미하고, A는 10n에서 인가 전류값까지의 길이를 의미하며, B는 10n에서 10n+1 까지의 길이를 의미한다.
The method of claim 1,
The applied current value is,
In the case of a value between 10 n and 10 n+1 , the operation time calculation system is calculated by an operation according to the following [Equation 1].
[Equation 1]
Figure pat00010

Here, x means the applied current value, A means the length from 10 n to the applied current value, and B means the length from 10 n to 10 n+1 .
제 1 항에 있어서,
상기 제 1 TCC는,
상기 기준 TCC의 허용 범위 중 허용최소규격에 해당하는 TCC이고,
상기 제 2 TCC는,
상기 기준 TCC의 허용 범위 중 허용최대규격에 해당하는 TCC인 경우,
상기 기준 TCC와 상기 제 1 TCC의 수평 거리는 하기 [수학식 2]에 따른 연산으로 산출하고,
상기 기준 TCC와 상기 제 2 TCC의 수평 거리는 하기 [수학식 3]에 따른 연산으로 산출하는특징으로 하는 동작시간 산출 시스템.
[수학식 2]
Figure pat00011

여기서, α는 기준 TCC와 제 1 TCC의 수평 거리를 의미하고, x는 인가 전류값을 의미하며, m은 공차를 의미한다. m은 퍼센트 단위이다.
[수학식 3]
Figure pat00012

여기서, β는 기준 TCC와 제 2 TCC의 수평 거리를 의미하고, x는 인가 전류값을 의미하며, m은 공차를 의미한다. m은 퍼센트 단위이다.
The method of claim 1,
The first TCC,
It is a TCC that corresponds to the minimum allowable standard among the allowable ranges of the standard TCC,
The second TCC,
In the case of a TCC that falls within the allowable maximum standard among the allowable ranges of the standard TCC,
The horizontal distance between the reference TCC and the first TCC is calculated by an operation according to the following [Equation 2],
The operation time calculation system characterized in that the horizontal distance between the reference TCC and the second TCC is calculated by an operation according to the following [Equation 3].
[Equation 2]
Figure pat00011

Here, α denotes a horizontal distance between the reference TCC and the first TCC, x denotes an applied current value, and m denotes a tolerance. m is in percent.
[Equation 3]
Figure pat00012

Here, β denotes a horizontal distance between the reference TCC and the second TCC, x denotes an applied current value, and m denotes a tolerance. m is in percent.
시간전류곡선(TCC)이 공차 적용의 기준이 되는 동작시간 산출 방법에 있어서,
(a) 해당 설비의 허용 오차를 설정하는 공차 설정 단계;
(b) 기준 TCC를 기준으로 상기 공차를 적용하여 허용 가능한 범위의 한계에 해당하는 제 1 TCC 또는 제 2 TCC를 생성하는 TCC 생성 단계;
(c) 상기 기준 TCC에 입력되는 인가 전류값을 설정하는 전류 설정 단계; 및
(d) 상기 인가 전류값에 해당하는 상기 제 1 TCC 또는 상기 제 2 TCC의 동작시간을 산출하는 동작시간 산출 단계를 포함하고,
상기 제 1 TCC 또는 상기 제 2 TCC는,
상기 기준 TCC가 상기 공차의 최소 또는 최대 범위만큼 평행이동되어 생성되며,
상기 동작시간 산출 단계는,
상기 제 1 TCC 또는 상기 제 2 TCC의 상용로그 특성에 따른 상용로그 계산을 통해 동작시간을 산출하는 것을 특징으로 하여,
상기 기준 TCC를 기준으로 하여 상기 인가 전류값에 대해 허용되는 오차범위에 따른 동작시간을 상용로그 해석을 이용하여 산출하는 동작시간 산출 방법.
In the method of calculating the operating time in which the time current curve (TCC) is the criterion for application of tolerance,
(a) a tolerance setting step of setting a tolerance of the facility;
(b) a TCC generation step of generating a first TCC or a second TCC corresponding to a limit of an allowable range by applying the tolerance based on a reference TCC;
(c) a current setting step of setting an applied current value input to the reference TCC; And
(d) an operation time calculation step of calculating an operation time of the first TCC or the second TCC corresponding to the applied current value,
The first TCC or the second TCC,
The reference TCC is generated by moving in parallel by the minimum or maximum range of the tolerance,
The operation time calculation step,
It characterized in that the operation time is calculated through a commercial log calculation according to the common log characteristic of the first TCC or the second TCC,
An operation time calculation method for calculating an operation time according to an allowable error range for the applied current value based on the reference TCC using a commercial log analysis.
KR1020190100902A 2019-08-19 2019-08-19 System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance KR102240497B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190100902A KR102240497B1 (en) 2019-08-19 2019-08-19 System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190100902A KR102240497B1 (en) 2019-08-19 2019-08-19 System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance

Publications (2)

Publication Number Publication Date
KR20210021689A true KR20210021689A (en) 2021-03-02
KR102240497B1 KR102240497B1 (en) 2021-04-14

Family

ID=75169576

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190100902A KR102240497B1 (en) 2019-08-19 2019-08-19 System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance

Country Status (1)

Country Link
KR (1) KR102240497B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040045543A (en) * 2002-11-25 2004-06-02 명지대학교 Over current relay satisfying arbitrary coordination condition
US20080204961A1 (en) * 2007-02-05 2008-08-28 S & C Electric Co. Fuse Saving Power Distribution System and Fault Protection
KR20130003504A (en) * 2011-06-30 2013-01-09 한국전기안전공사 System and method for alarm regard for time-characteristic
JP2017005800A (en) * 2015-06-05 2017-01-05 光洋電子工業株式会社 Power distribution board system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040045543A (en) * 2002-11-25 2004-06-02 명지대학교 Over current relay satisfying arbitrary coordination condition
US20080204961A1 (en) * 2007-02-05 2008-08-28 S & C Electric Co. Fuse Saving Power Distribution System and Fault Protection
US7773360B2 (en) * 2007-02-05 2010-08-10 S&C Electric Company Fuse saving power distribution system and fault protection
KR20130003504A (en) * 2011-06-30 2013-01-09 한국전기안전공사 System and method for alarm regard for time-characteristic
JP2017005800A (en) * 2015-06-05 2017-01-05 光洋電子工業株式会社 Power distribution board system

Also Published As

Publication number Publication date
KR102240497B1 (en) 2021-04-14

Similar Documents

Publication Publication Date Title
JP5926540B2 (en) Protection control system and merging unit
CN109342848B (en) Avalanche testing method and system for dispatching automation master station and terminal equipment
Panteli et al. Quantifying the reliability level of system integrity protection schemes
KR101323999B1 (en) Apparatus and method for correcting of acquired data
Zhu et al. Reliability and vulnerability assessment of interconnected ICT and power networks using complex network theory
US11038817B2 (en) Systems and methods for network failover in digital substations
KR102240497B1 (en) System and method for calculating operating time though commercial log analysis according to commercial log characteristics on the basis of the time current curve based on tolerance
KR102563470B1 (en) Protective relay and method for preventing operation error thereof
FI3830920T3 (en) A method and a device for supervision of a voltage transformer
Hu et al. A probabilistic method for certification of analytically redundant systems
CN107742046A (en) A kind of sneak circuit analysis method for considering the storage of relay class unit and degenerating
Pilch Extending the Possibilities of Quantitative Determination of SIL–a Procedure Based on IEC 61508 and the Markov Model with Common Cause Failures
Rástočný et al. Diagnostics of an output interface of a safety-related system with safety PLC
US11665165B2 (en) Whitelist generator, whitelist evaluator, whitelist generator/evaluator, whitelist generation method, whitelist evaluation method, and whitelist generation/evaluation method
EP3389227B1 (en) Systems and methods for network failover in digital substations
Bulba et al. Classification and research of the reactor protection instrumentation and control system functional safety Markov models in a normal operation mode
Börcsök et al. Estimation and evaluation of the 1004-architecture for safety related systems
JP5436334B2 (en) Overcurrent relay
CN105429788A (en) Configuration loading method and system and router
Hietikko et al. Comparing performance level estimation of safety functions in three distributed structures
Vujanic et al. Safety Certified Controllers with PL c and PL d Performance Levels-A Survey
Ilavský et al. Considerations of the recovery in 2-out-of-3 safety-related control system
KR101877234B1 (en) Over current blocking system and a method for blocking over current using the same
KR101968627B1 (en) Digital transducer
JP2015070769A (en) Protection control system and merging unit

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant