KR20200089499A - Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof - Google Patents

Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof Download PDF

Info

Publication number
KR20200089499A
KR20200089499A KR1020190006314A KR20190006314A KR20200089499A KR 20200089499 A KR20200089499 A KR 20200089499A KR 1020190006314 A KR1020190006314 A KR 1020190006314A KR 20190006314 A KR20190006314 A KR 20190006314A KR 20200089499 A KR20200089499 A KR 20200089499A
Authority
KR
South Korea
Prior art keywords
slope
roll
log
mat
ground
Prior art date
Application number
KR1020190006314A
Other languages
Korean (ko)
Inventor
장창학
Original Assignee
(주)지오그린
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)지오그린 filed Critical (주)지오그린
Priority to KR1020190006314A priority Critical patent/KR20200089499A/en
Publication of KR20200089499A publication Critical patent/KR20200089499A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/20Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
    • A01G24/22Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing plant material
    • A01G24/25Dry fruit hulls or husks, e.g. chaff or coir
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/40Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
    • A01G24/44Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form
    • A01G24/46Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form multi-layered
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

The present invention relates to an eco-friendly slope greening method and a slope greening structure using the same. According to the greening method of the present invention, a plurality of log mats, where a wing part and a roll part which is wound multiple times to reach a predetermined diameter are connected by a stitching line and integrated, are installed on a slope, while a roll connection member is inserted into the roll part to improve a binding force and a fixing member is used to bind the wing part with the ground in a mutually combined state, and thus, separation or sagging caused by gravity, heavy rain or the like can be prevented, which protects the slope and maintains soil stability. According to the greening method of the present invention, since a roll of a log mat is manufactured by winding a mat on a prism having at least three apexes of the base side, the log mat can be prevented from falling down the slope, and a fixing member is installed from the first part where the roll and the ground come in contact to fix the roll to the ground, and thus, the roll can be more substantially fixed to the ground. According to the greening method of the present invention, since a ditch where the roll is located is installed and the roll is fixed to the ground of the ditch through the fixing member, the roll can be prevented from falling down the slope, and a slope erosion prevention agent including seeds is sprayed to the slope between log mats placed side by side in a line in an up-down direction to protect the slope while enabling the seeds to germinate and vegetate, thus effectively protecting the slope.

Description

침식, 침전 방지 및 산사태 방지용 친환경 사면 녹화공법 및 이를 이용한 사면 녹화구조{Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof}Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof}

본 발명은 침식, 침전 방지 및 산사태 방지용 친환경 사면 녹화공법 및 이를 이용한 사면 녹화구조에 관한 것이다. 상세하게는 산사태 등으로 발생한 침전, 침식 사면, 산불등으로 훼손된 사면, 성토 사면, 절토 사면, 기존 호안 블록 사면, 암반 절개지 사면 등의 보호 및 녹화 시공을 위한 친환경 사면 녹화공법 및 녹화구조에 관한 것이다.The present invention relates to an eco-friendly slope recording method for preventing erosion, precipitation, and landslides, and a slope recording structure using the same. In detail, it relates to an environmentally friendly slope greening method and greening structure for protection and greening of slopes damaged by sedimentation, erosion slopes, forest fires, embankment slopes, cut slopes, existing shoreline block slopes, and rock incision slopes caused by landslides, etc. .

산사태 등으로 침전, 침식된 사면, 산불 등으로 훼손된 사면, 도로를 확장하는 과정에서 드러난 사면, 하천의 유실로 인해 드러난 사면들은 방치할 경우 폭우 등에 의해 붕괴될 위험성이 있다. 종래의 사면보호 방법은 상기 사면에 콘크리트 구조물을 설치하는 방법을 사용하였다. 그러나 상기 종래의 방법은 주위 자연환경과 어울리지 않는 문제점이 있으며 이를 해결하기 위해 식생을 함께 설치하고 있으나, 상기 설치된 콘크리트가 식생의 생육을 제약하여 식생이 원활히 활착하는데 어려움이 있었다. Slopes that have been settled, eroded by landslides, damaged by forest fires, etc., slopes exposed in the process of expanding roads, and slopes exposed due to the loss of rivers are at risk of collapsing if left unattended. The conventional slope protection method used a method of installing a concrete structure on the slope. However, the conventional method has a problem that does not match with the surrounding natural environment, and vegetation is installed together to solve the problem. However, the installed concrete has difficulty in vegetation smoothly by restricting the growth of vegetation.

이를 해결하기 위하여 콘크리트를 사용하지 않는 사면 녹화공법이 시도되고 있다. 상기 사면 녹화공법은 식생매트에 의한 녹화공법, 식생스프레이에 의한 녹화공법, 식생블록에 의한 녹화공법 등이 있다. 상기 사면 녹화공법은 사질토의 토양이나 암반과 같이 생육환경여건이 전혀 갖추어지지 않는 사면에도 녹화가 가능한 장점이 있다. 특히 식생매트를 이용한 녹화공법은 침전이나 침식이 있는 해안, 산사태 위험지역, 산불 등으로 연약해진 산악지역의 사면에 주로 적용되는 공법으로 경제적이며 사면을 효과적으로 보호하면서도 친환경적인 자연형 사면을 만들 수 있는 장점이 있어 많이 사용되고 있다. 그러나 식생매트는 현장까지 운반이 불편하고 강풍 및 강우에 취약한 단점이 있었다. To solve this, a slope recording method without using concrete has been attempted. The slope greening method includes a greening method using a vegetation mat, a greening method using a vegetation spray, and a greening method using a vegetation block. The slope greening method has the advantage of being able to be green on a slope that does not have any growth environment conditions, such as soil or rock of sandy soil. In particular, the greening method using the vegetation mat is a method mainly applied to slopes of coastal areas where there is sedimentation or erosion, dangerous areas of landslides, and mountainous areas weakened by forest fires, etc. It has many advantages and is used a lot. However, vegetation mats had the disadvantages of being inconvenient to the site and vulnerable to strong winds and rainfall.

한국 공개특허 10-2010-0100509에는 상기 식생매트의 문제점을 해결하기 위하여 로그매트와 식생매트를 한 세트로 제작한 후에 이를 롤 형태로 말아서 현장으로 운반하고 이를 사면에 설치함으로서 운반 및 시공이 간편하고 안정적인 사면을 확보하는 사면 녹화방법이 개시되어 있다. 그러나 상기 사면 녹화방법은 상기 로그매트와 식생매트를 서로 겹치도록 하는 방법으로 사면의 좌우에 걸쳐 다수의 로그매트와 식생매트를 설치하는 방법이다. 따라서 중력이나 강우에 의해 일부 사면이 내려앉을 경우 로그매트 연결부위가 분리되거나 쳐지게 되어 이를 위한 보수가 요구되는 경우가 많았다. In Korean Patent Publication No. 10-2010-0100509, in order to solve the problem of the vegetation mat, a log mat and a vegetation mat are produced as a set, then rolled into a roll form, transported to the site, and installed on a slope to facilitate transport and construction. A slope recording method for securing a stable slope has been disclosed. However, the slope recording method is a method of overlapping the log mat and the vegetation mat to install a plurality of log mats and vegetation mats across the left and right sides of the slope. Therefore, when some slopes descend due to gravity or rainfall, the connection part of the log mat is separated or struck, and repair is often required.

본 명세서에서 언급된 특허문헌 및 참고문헌은 각각의 문헌이 참조에 의해 개별적이고 명확하게 특정된 것과 동일한 정도로 본 명세서에 참조로 삽입된다. The patent documents and references mentioned in this specification are incorporated herein by reference to the same extent that each document is individually and clearly specified by reference.

한국 공개특허 제10-2010-0100509호Korean Patent Publication No. 10-2010-0100509

본 발명은 상기의 문제점을 해결하기 위한 것으로 일정직경으로 수회 감긴 롤 부분과 날개 부분이 봉합선에 의해 연결되어 일체식으로 제작된 로그매트를 사면에 설치하되, 상기 롤 부분을 롤 연결부재로 서로 결합시키고 상기 로그매트의 날개 부분을 서로 접하도록 하여 지반에 고정시키며 상기 로그매트가 설치되지 않은 사면에 사면 침전 방지제를 더 살포하므로 사면의 좌우 방향으로 설치된 다수의 로그매트가 강수나 중력에도 서로 이탈하지 않고 사면을 보호하도록 한다. The present invention is to solve the above problems, and the roll part and the wing part wound several times in a certain diameter are connected by sutures to install an integrally manufactured log mat on a slope, but the roll parts are joined to each other by a roll connecting member. The log mat is fixed to the ground by making the wing parts of the log mat contact each other, and since a slope settling agent is further sprayed on the slope where the log mat is not installed, multiple log mats installed in the left and right directions of the slope do not deviate from each other even in precipitation or gravity. To protect the slope.

따라서 본 발명의 목적은 사면의 지반을 고르게 정리하는 제 1 단계; 상기 사면의 위아래 방향을 따라 로그매트의 롤 부분이 위 방향에 위치하고, 상기 로그매트의 날개 부분이 아래 방향으로 펼쳐지도록 배치하는 제 2 단계; 상기 로그매트 롤 부분의 일단에 롤 연결부재를 삽입하는 제 3 단계; 상기 롤 연결부재가 삽입된 로그매트 일단의 측면에 상기 제 2 단계의 방법으로 다른 로그매트를 위치시키는 제 4 단계; 및 상기 롤 연결부재에 상기 다른 로그매트 롤 부분의 일단을 삽입하여 롤 부분을 서로 연결시키고, 상기 로그매트와 상기 다른 로그매트의 날개 부분을 서로 접하도록 배치한 후 상기 로그매트의 날개 부분과 롤 부분에 고정부재를 설치하여 지반에 고정시키는 제 5 단계;를 포함하는 것을 특징으로 하는 사면녹화 및 보강공법을 제공하는데 있다.Therefore, the object of the present invention is a first step of evenly arranging the ground of the slope; A second step of arranging such that the roll portion of the log mat is positioned in an upward direction along the up and down direction of the slope, and the wing portion of the log mat is extended downward; A third step of inserting a roll connecting member into one end of the log mat roll portion; A fourth step of placing another log mat in the method of the second step on one side of the log mat where the roll connecting member is inserted; And connecting the roll portions to each other by inserting one end of the other log mat roll portion into the roll connecting member, arranging the log mat and the wing portions of the other log mat to contact each other, and then the wing and roll portions of the log mat. It is to provide a slope recording and reinforcement method characterized in that it comprises; a fifth step of fixing to the ground by installing a fixing member on the part.

또한 본 발명은 상기 사면녹화 및 보강공법을 이용하여 시공한 로그매트의 롤 부분이 위 방향에 위치하고, 상기 로그매트의 날개 부분이 아래 방향으로 펼쳐지도록 배치되며, 상기 롤 부분이 내부에 삽입된 롤 연결부재에 의해 서로 연결되고, 상기 롤 부분과 상기 날개부분이 고정부재에 의해 지반에 결합되는 구조로 이루어진 것을 특징으로 하는 사면녹화 및 보강구조를 제공하는 것을 목적으로 한다.In addition, the present invention is disposed so that the roll portion of the log mat constructed using the slope recording and reinforcing method is located in the upper direction, the wing portion of the log mat is spread in the downward direction, the roll portion is inserted into the roll An object of the present invention is to provide a slope recording and reinforcing structure, which is connected to each other by a connecting member, and the roll portion and the wing portion are configured to be coupled to the ground by a fixing member.

본 발명의 다른 목적 및 기술적 특징은 이하의 발명의 상세한 설명, 청구의 범위 및 도면에 의해 보다 구체적으로 제시된다. Other objects and technical features of the present invention are presented in more detail by the following detailed description of the invention, claims and drawings.

본 발명은 사면의 지반을 고르게 정리하는 제 1 단계; 상기 사면의 위아래 방향을 따라 로그매트의 롤 부분이 위 방향에 위치하고, 상기 로그매트의 날개 부분이 아래 방향으로 펼쳐지도록 배치하는 제 2 단계; 상기 로그매트 롤 부분의 일단에 롤 연결부재를 삽입하는 제 3 단계; 상기 롤 연결부재가 삽입된 로그매트 일단의 측면에 상기 제 2 단계의 방법으로 다른 로그매트를 위치시키는 제 4 단계; 및 상기 롤 연결부재에 상기 다른 로그매트 롤 부분의 일단을 삽입하여 롤 부분을 서로 연결시키고, 상기 로그매트와 상기 다른 로그매트의 날개 부분을 서로 접하도록 배치한 후 상기 로그매트의 날개 부분과 롤 부분에 고정부재를 설치하여 지반에 고정시키는 제 5 단계;를 포함하는 것을 특징으로 하는 사면녹화 및 보강공법을 제공한다.The present invention is a first step of evenly arranging the ground of the slope; A second step of arranging such that the roll portion of the log mat is positioned in an upward direction along the up and down direction of the slope, and the wing portion of the log mat is extended downward; A third step of inserting a roll connecting member into one end of the log mat roll portion; A fourth step of placing another log mat in the method of the second step on one side of the log mat where the roll connecting member is inserted; And connecting the roll portions to each other by inserting one end of the other log mat roll portion into the roll connecting member, arranging the log mat and the wing portions of the other log mat to contact each other, and then the wing and roll portions of the log mat. It provides a slope recording and reinforcing method characterized in that it comprises; a fifth step of fixing the fixing member to the ground by installing a fixing member.

상기 로그매트는 일정직경으로 수회 감긴 롤 부분과 날개 부분이 봉합선에 의해 연결되어 일체식인 것을 특징으로 하며 상기 로그매트의 롤 부분은 주트 네트, 야자섬유층, 상토+씨앗+비료층이 차례로 적층되어 조합된 후에 롤 형태로 말린 다음, 코이어 네트에 의해 바깥둘레가 감싸여진 형태로 이루어지며, 상기 로그매트의 날개부분은 코이어 네트로 상기 롤 부분과 봉합되어 한쪽으로 일정 길이로 길게 연장된 형태로 이루어진다.The log mat is characterized in that the roll portion and the wing portion wound several times at a certain diameter are connected by a suture line, and the roll portion of the log mat is a combination of a jut net, a palm fiber layer, a top soil + a seed and a fertilizer layer sequentially stacked. After being dried in a roll form, the outer circumference is wrapped by a coir net, and the wing part of the log mat is sealed with the roll part with a coir net to form a long extension to one side. .

상기 로그매트의 롤 부분은 밑면 꼭지점의 개수가 3 개 이상인 각기둥 또는 원기둥의 외부에 수회 감겨 상기 각기둥 또는 원기둥의 형태를 가지며 위아래의 방향을 따라 일렬로 나란하게 배치된 로그매트 사이의 사면에는 사면 침전 방지제가 더 살포된다.The roll portion of the log mat is wound several times on the outside of a prismatic column or column having three or more base vertices, and has the shape of the prismatic column or column, and the slopes are settled on the slopes between the log mats arranged in parallel along the direction of up and down. More inhibitors are applied.

본 발명은 사면의 지반을 고르게 정리하는 단계에서 도랑이 더 형성될 수 있으며 상기 도랑이 더 설치되는 경우에는 상기 로그매트의 롤 부분이 사면의 위아래 방향을 따라 상기 도랑의 위 방향에 위치하게 되고, 상기 로그매트의 날개 부분이 상기 도랑과 사면에 걸쳐 아래 방향으로 펼쳐지도록 배치된 후 다른 로그매트가 상기 로그매트의 측면에 위치하여 롤 연결부재 및 고정부재에 의해 서로 연결된 후 상기 연결된 롤 부분을 상기 도랑에 위치시켜 고정부재를 이용하여 지반에 고정시킨다. In the present invention, a ditch may be further formed in the step of evenly arranging the ground of the slope, and when the ditch is further installed, the roll portion of the log mat is positioned above the ditch along the up and down direction of the slope, and the log After the wing portion of the mat is arranged to spread downwardly across the ditch and the slope, other log mats are located on the sides of the log mat and connected to each other by a roll connecting member and a fixing member, and then the connected roll portions are connected to the ditch. Position it and fix it to the ground using a fixing member.

본 발명은 침식, 침전 방지 및 산사태 방지용 친환경 사면 녹화공법 및 이를 이용한 사면 녹화구조에 관한 것이다. The present invention relates to an eco-friendly slope recording method for preventing erosion, precipitation, and landslides, and a slope recording structure using the same.

본 발명의 녹화공법은 일정직경으로 수회 감긴 롤 부분과 날개 부분이 봉합선에 의해 연결되어 일체식으로 이루어진 다수의 로그매트를 사면에 설치하되, 상기 롤 부분에 롤 연결부재를 삽입하여 결속력을 향상시키고 고정부재를 이용하여 상기 날개 부분을 서로 결합된 상태로 지반에 결속시키므로 중력이나 강우 등으로 인해 서로 분리되거나 쳐지는 현상을 방지하여 사면을 더욱 안정적으로 보호하는 효과가 있다.In the greening method of the present invention, a plurality of log mats integrally formed by connecting a roll part and a wing part wound several times at a predetermined diameter by a suture line are installed on a slope, and the binding force is improved by inserting a roll connecting member into the roll part. Since the wing parts are bound to the ground in a state in which they are coupled to each other using a fixing member, there is an effect of preventing the phenomenon of being separated or struck from each other due to gravity or rainfall, thereby more stably protecting the slope.

본 발명의 녹화공법은 로그매트의 롤에 대하여 밑면 꼭지점의 개수가 3 개 이상인 각기둥에 매트를 감아 제조하므로 로그매트가 사면 아래로 굴러 떨어지는 것을 방지하였으며 롤과 지면이 접하는 최초 부위에서 부터 고정부재를 설치하여 지반에 고정시키므로 상기 롤이 지면으로부터 더욱 단단히 고정되는 효과가 있다.Since the greening method of the present invention is manufactured by wrapping a mat around a pillar having three or more base vertices with respect to the roll of the log mat, it prevented the log mat from rolling down the slope and fixed members from the first part where the roll and the ground contact. Since it is installed and fixed to the ground, there is an effect that the roll is fixed more firmly from the ground.

본 발명의 녹화공법은 상기 롤이 위치하는 도랑을 설치하고 상기 도랑의 지반에 상기 롤을 고정부재를 이용하여 고정시키므로 롤이 사면 아래로 굴러 떨어지는 것을 방지할 수 있으며 위아래의 방향을 따라 일렬로 나란하게 배치된 로그매트 사이의 사면에 씨앗을 포함하는 사면 침전 방지제를 살포하여 사면을 보호하면서도 씨앗이 발아하여 식생하므로 사면을 효과적으로 보호하도록 하는 효과가 있다.Since the greening method of the present invention installs a ditch in which the roll is located and fixes the roll to the ground of the ditch using a fixing member, it is possible to prevent the roll from rolling down the slope and lined up and down along the direction. It is effective to effectively protect the slope because the seeds germinate and vegetation while protecting the slope while spraying the slope precipitation inhibitor containing seeds on the slope between the log mats.

도 1은 본 발명의 사면녹화 및 보강구조의 로그매트가 롤 연결부재에 의해 연결되고 고정부재에 의해 지반에 결속된 사시도를 보여준다.
도 2는 본 발명의 사면녹화 및 보강구조의 로그매트가 감긴 롤 부분과 다양한 모양의 기둥을 중심으로 감긴 롤 부분의 측면도를 보여준다.
도 3은 본 발명의 사면녹화 및 보강구조의 로그매트가 사면에 설치되고 로그매트가 설치되지 않은 사면에 사면 친전 방지제가 살포된 사시도를 보여준다.
도 4는 본 발명의 사면녹화 및 보강구조의 로그매트를 사면에 설치하는 순서를 보여준다.
도 5는 본 발명의 사면녹화 및 보강구조의 로그매트가 사면에 설치된 측면도를 보여준다.
도 6은 본 발명의 사면녹화 및 보강구조가 설치되어 식생이 된 모습을 보여준다.
1 is a perspective view showing a log mat of a slope recording and reinforcing structure of the present invention connected by a roll connecting member and bound to the ground by a fixing member.
2 shows a side view of a roll portion wound around a log mat of a slope recording and reinforcing structure of the present invention and a roll portion wound around pillars of various shapes.
Figure 3 shows a perspective view of the slope recording and reinforcing structure of the present invention is a log mat is installed on the slope and the slope mat is sprayed on the slope where the log mat is not installed.
Figure 4 shows the order of installing the log mat of the slope recording and reinforcement structure of the present invention on the slope.
5 shows a side view of a log mat of a slope recording and reinforcing structure of the present invention installed on a slope.
Figure 6 shows the slope recording and reinforcement structure of the present invention is installed vegetation.

본 발명은 산사태 등으로 발생한 침전, 침식 사면, 산불 등으로 훼손된 사면, 성토 사면, 절토 사면, 기존 호안 블록 사면, 암반 절개지 사면 등의 보호 및 녹화 시공을 위한 친환경 사면 녹화공법 및 녹화구조에 관한 것으로 롤 부분과 날개 부분으로 이루어진 다수의 로그매트를 롤 연결부재를 이용하여 결속력을 향상시키고 고정부재를 이용하여 상기 날개 부분을 지반에 결속시키므로 중력이나 강우 등으로 인해 서로 분리되거나 쳐지는 현상을 방지하여 사면을 더욱 안정적으로 보호할 수 있다.The present invention relates to an environmentally friendly slope recording method and recording structure for protection and recording construction of slopes damaged by sedimentation, erosion slopes, forest fires, etc. due to landslides, embankment slopes, cut slopes, existing shoreline block slopes, rock incision slopes, etc. A plurality of log mats consisting of a roll portion and a wing portion is improved by using a roll connecting member to improve the binding force, and the fixing portion is used to bind the wing portion to the ground, thereby preventing separation or striking from each other due to gravity or rainfall. The slope can be protected more stably.

이하 첨부된 도면을 참고하여 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 두 개의 로그매트가 사면에 설치되면서 서로 고정된 모습을 보여준다. 본 발명의 로그매트(100)는 소정의 직경을 가지도록 수회에 걸쳐 둘둘 말아놓은 롤 부분(110)과 일정 면적과 길이를 갖는 날개 형태의 날개부분(120)으로 구성되며 봉제를 통해 일체형으로 제작한 로그매트(100)이다. 1 shows two log mats of the present invention fixed to each other while being installed on a slope. The log mat 100 of the present invention consists of a roll portion 110 rolled up several times to have a predetermined diameter and a wing portion 120 in the form of wings having a certain area and length, and is integrally manufactured through sewing. It is one log mat 100.

상기 로그매트의 롤 부분(110)은 주트 네트, 야자섬유층, 상토+씨앗+비료층이 차례로 적층되어 조합된 후에 롤 형태로 말린 다음, 코이어 네트에 의해 바깥둘레가 감싸여진 형태로 이루어지며, 상기 로그매트의 날개부분(120)은 코이어 네트로 상기 롤 부분과 봉합되어 한쪽으로 일정 길이로 길게 연장된 형태로 이루어진다. 상기 롤 부분(110)이 롤 형태로 말릴 때 부엽토, 낙엽 등을 더 포함시켜 롤 부분(110)을 제조할 수 있다. 상기 롤 부분에 부엽토, 낙엽(180) 등을 더 포함시키면 상기 로그매트(100)를 더 적은 회수로 감아 롤을 형성하여도 원하는 두께의 롤 부분(110)을 제조할 수 있으며 식생이 잘 활착하는 비료성분으로도 사용될 수 있는 장점이 있다. 상기 롤 부분(110)은 로그매트를 직접 일정 회수로 둘둘 말아서 제조할 수 도 있고 원통형 또는 각이 있는 기둥(170)의 외부로 성기 로그매트(100)를 말아 제조할 수 도 있다. 도 2는 본 발명의 사면녹화 및 보강구조의 로그매트가 감겨 형성한 롤 부분(110)의 측면도를 보여준다. 상기 롤 부분(110)은 다양한 모양의 기둥(170)을 중심으로 감겨 형성될 수 있으며 로그매트사이에 부엽토, 낙엽(180)등이 포함된 상태로 감겨 형성될 수 있다. 상기 각이 있는 기둥(170)은 밑면 꼭지점의 개수가 3 개 이상인 각기둥(170)이면 사용가능하나 바람직하게는 삼각 또는 사각 기둥을 사용하는 것이 좋다. 상기 기둥(170)은 내부가 빈 상태로 사용될 수도 있으며 이 경우 로그매트의 롤을 서로 연결하는 롤 연결부재(160)가 삽입될 수도 있다.The roll part 110 of the log mat is made of a jute net, a palm fiber layer, a topcoat+seed+fertilizer layer, which are sequentially stacked and combined, then dried in a roll form, and then wrapped in an outer circumference by a coir net. The wing portion 120 of the log mat is made of a form that is sealed with the roll portion with a coir net and elongated to a certain length. When the roll portion 110 is dried in the form of a roll, the roll portion 110 may be manufactured by further including side soil, fallen leaves, and the like. If the roll part further includes a bitumen soil, a fallen leaf 180, the roll part 110 of a desired thickness can be manufactured even if the roll of the log mat 100 is wound with less number of times to form a roll. There is an advantage that can be used as a fertilizer component. The roll portion 110 may be manufactured by rolling the log mat directly at a predetermined number of times, or may be manufactured by rolling the genital log mat 100 outside the cylindrical or angular pillar 170. Figure 2 shows a side view of the roll portion 110 formed by winding the log mat of the slope recording and reinforcing structure of the present invention. The roll part 110 may be formed around a pillar 170 of various shapes, and may be formed by winding a log mat in a state in which a side soil, a fallen leaf 180, and the like are included. The angled pillar 170 may be used as long as the number of base vertices is 3 or more, and preferably a triangular or square pillar. The pillar 170 may be used in an empty interior, and in this case, a roll connecting member 160 connecting the rolls of the log mat to each other may be inserted.

두 개 이상의 로그매트(100)가 연결되는 경우, 상기 롤 부분(110)에는 롤 연결부재(160)가 설치되어 중력이나 강우 등으로 인한 로그매트(100)의 이탈을 방지한다. 상기 롤 연결부재(160)는 일단에 돌기를 가져 로그매트의 롤 부위(110)에 한번 삽입되면 이탈을 어렵게 할 수 있다. 상기 돌기는 롤 부위의 섬유에서 저항을 증가시켜 상기 롤 연결부재(160)의 이탈을 방지할 수 있는 모양이면 제한 없이 사용 할 수 있다. When two or more log mats 100 are connected, a roll connecting member 160 is installed on the roll portion 110 to prevent the log mat 100 from being detached due to gravity or rainfall. The roll connecting member 160 may have protrusions at one end and, once inserted into the roll portion 110 of the log mat, may make it difficult to escape. The protrusion may be used without limitation, as long as it increases the resistance in the fiber of the roll portion and prevents the roll connecting member 160 from coming off.

상기 로그매트(100)는 다수의 고정부재에 의해 사면(10)의 지반에 고정된다. 상기 고정부재는 롤을 지반에 고정시키는 롤 고정부재(130), 로그매트의 날개 부분(120)을 지반에 고정시키는 날개 고정부재(140), 두 개의 로그매트 날개부분을 서로 연결하는 동시에 지반에 고정시키는 날개 연결 및 고정부재(150)로 구성될 수 있다. 상기 롤 고정부재(130)는 상리 로그매트의 롤 부분(110)을 관통하여 지반 내에 설치되므로 롤 부분(110)이 사면(10)으로부터 이탈되는 것을 방지한다. 상기 날개 고정부재(140)는 상기 날개 부분(120)을 관통하여 사면(10)의 지반에 고정되므로 상기 날개 부분(120)이 사면(10)으로부터 이탈되는 것을 방지한다. 상기 날개 연결 및 고정부재(150)는 두 로그매트(100)의 날개 부분(120)에 걸치어 설치되며 상기 날개부분(120)을 관통하여 상기 지반에 설치되므로 상기 날개부분(120)이 서로 이탈하거나 사면(10)으로부터 이탈하는 것을 방지한다. 상기 고정부재(130, 140, 150)는 지반에 설치되는 일단에 돌기를 포함하여 상기 지반에 설치된 후 쉽게 이탈하지 않는 구조일 수 있으며, 특히 상기 날개 연결 및 고정부재(150)는 고정부재의 머리 부분이 서로 연결된 “U”형으로 형성되어 있어 상기 날개 부분(120)을 모두 고정시킬 수 있으므로 두 로그매트(100)를 서로 결합시키는 결합부재의 역할을 수행하게 된다.The log mat 100 is fixed to the ground of the slope 10 by a plurality of fixing members. The fixing member is a roll fixing member 130 for fixing the roll to the ground, a wing fixing member 140 for fixing the wing portion 120 of the log mat to the ground, and connecting two log mat wing portions to each other at the same time. It may be composed of a fixed wing connection and the fixing member 150. Since the roll fixing member 130 penetrates the roll portion 110 of the upper log mat and is installed in the ground, the roll portion 110 is prevented from being separated from the slope 10. Since the wing fixing member 140 penetrates the wing portion 120 and is fixed to the ground of the slope 10, the wing portion 120 is prevented from being separated from the slope 10. The wing connection and fixing member 150 is installed across the wing portion 120 of the two log mats 100 and is installed on the ground through the wing portion 120 so that the wing portions 120 deviate from each other. Or, it is prevented from deviating from the slope 10. The fixing member (130, 140, 150) may be a structure that does not easily detach after being installed on the ground, including a protrusion at one end installed on the ground, in particular, the wing connection and the fixing member 150 is the head of the fixing member Since the portions are formed in a “U” shape connected to each other, both the wing portions 120 can be fixed, so that the two log mats 100 serve as a coupling member for coupling to each other.

도 3은 본 발명의 사면녹화 및 보강구조의 로그매트(100)가 사면(10)에 설치되고 로그매트가 설치되지 않은 사면(10)에 사면 침전 방지제(200)가 살포된 사시도를 보여주며 도 4는 본 발명의 사면녹화 및 보강구조의 로그매트를 사면(10)에 설치하는 순서를 보여준다.Figure 3 shows a perspective view of the slope recording and reinforcing structure of the present invention is a log mat 100 is installed on the slope 10, the slope is prevented by the precipitation agent 200 is sprayed on the slope 10 where the log mat is not installed. 4 shows the order of installing the log mat of the slope recording and reinforcement structure of the present invention on the slope 10.

본 발명의 로그매트(100)는 사면(10)의 지반을 고르게 정리하는 제 1 단계; 상기 사면(10)의 위아래 방향을 따라 로그매트의 롤 부분(110)이 위 방향에 위치하고, 상기 로그매트의 날개 부분(120)이 아래 방향으로 펼쳐지도록 배치하는 제 2 단계; 상기 로그매트 롤 부분(110)의 일단에 롤 연결부재(140)를 삽입하는 제 3 단계; 상기 롤 연결부재(140)가 삽입된 로그매트(100) 일단의 측면에 상기 제 2 단계의 방법으로 다른 로그매트(100)를 위치시키는 제 4 단계; 및 상기 롤 연결부재(140)에 상기 다른 로그매트 롤 부분(110)의 일단을 삽입하여 롤 부분을 서로 연결시키고, 상기 로그매트와 상기 다른 로그매트의 날개 부분(120)을 서로 접하도록 배치한 후 상기 로그매트의 날개 부분과 롤 부분에 고정부재(130, 140, 150)를 설치하여 지반에 고정시키는 제 5 단계;에 따라 설치될 수 있다. The log mat 100 of the present invention includes a first step of evenly arranging the ground of the slope 10; A second step of placing the roll portion 110 of the log mat along the up and down direction of the slope 10 so that the wing portion 120 of the log mat spreads downward; A third step of inserting the roll connecting member 140 at one end of the log mat roll portion 110; A fourth step of positioning the other log mat 100 by the method of the second step on one side of the log mat 100 into which the roll connecting member 140 is inserted; And inserting one end of the other log mat roll portion 110 into the roll connecting member 140 to connect the roll portions to each other, and to arrange the log mat and the wing portions 120 of the other log mat to contact each other. After the fifth step of fixing the base by installing the fixing member (130, 140, 150) on the wing portion and the roll portion of the log mat; can be installed according to.

본 발명의 사면 보강 및 녹화구조가 설치되는 사면(10)은 자연재해나 도로공사 등으로 침전 또는 침식된 사면이다. 따라서 상기 사면(10)을 고르게 정리할 필요성이 있다. 필요에 따라서 상기 로그매트의 롤 부분(110)이 위치할 도랑(11)을 설치하는 것도 가능하다. 상기 도랑(11)이 설치되는 경우 대략 5 내지 10 cm의 깊이로 설치할 수 있으며 상기 롤 부분(110)이 위치하여 쉽게 둘러 빠져나오지 않을 정도이면 충분하다. 상기 도랑(11)은 사면(10)의 위아래 방향을 따라 다수가 횡으로 형성될 수 있다. 상기 사면(10)이 정리되면 상기 사면(10)의 위아래 방향을 따라 로그매트의 롤 부분(110)이 위 방향에 위치하고, 상기 로그매트의 날개 부분(120)이 아래 방향으로 펼쳐지도록 배치한다. 상기 도랑(11)이 설치되는 경우 로그매트의 롤 부분(110)은 상기 사면(10)의 위아래 방향을 따라 상기 도랑(11)의 위 방향에 위치하도록 배치하고, 상기 로그매트의 날개 부분(120)이 상기 도랑(11)과 사면(10)에 걸쳐 아래 방향으로 펼쳐지도록 배치한다. 상기 위치한 로그매트(100)의 롤 부분(110)에는 상기 롤 연결부재(160)를 삽입하여 각 롤을 연결하고, 상기 로그매트(100) 측면에는 다른 로그매트를 위치시킨다. 상기 로그매트의 롤 부분(160)은 상기 롤 연결부재(160)에 의해 서로 결속되었으며 상기 로그매트(100)와 상기 다른 로그매트의 날개 부분(120)은 서로 접하도록 배치된 후 상기 로그매트의 날개 부분(120)과 롤 부분(110)사이에 고정부재가 설치되어 사면(10)의 지반에 고정된다. The slope 10 in which the slope reinforcement and greening structure of the present invention is installed is a slope that has been settled or eroded by natural disasters or road construction. Therefore, it is necessary to evenly arrange the slopes 10. If necessary, it is also possible to install a groove 11 in which the roll portion 110 of the log mat will be located. When the groove 11 is installed, it may be installed to a depth of approximately 5 to 10 cm, and it is sufficient if the roll portion 110 is located so that it does not easily escape. The ditch 11 may be formed horizontally in a plurality along the up and down direction of the slope (10). When the slope 10 is arranged, the roll portion 110 of the log mat is positioned in an upward direction along the up and down direction of the slope 10, and the wing portion 120 of the log mat is arranged to spread downward. When the groove 11 is installed, the roll portion 110 of the log mat is disposed to be located in the upper direction of the groove 11 along the up and down direction of the slope 10, and the wing portion 120 of the log mat ) Is arranged to spread downwardly across the trench 11 and the slope 10. The roll connecting member 160 is inserted into the roll portion 110 of the located log mat 100 to connect each roll, and another log mat is positioned on the side of the log mat 100. The roll portion 160 of the log mat is bound to each other by the roll connecting member 160, and the log mat 100 and the wing portions 120 of the other log mat are disposed to be in contact with each other, and then the log mat A fixing member is installed between the wing part 120 and the roll part 110 to be fixed to the ground of the slope 10.

상기 사면(10)에 도랑(11)이 설치 설치된 경우, 상기와 동일하게 설치하되, 상기 제 5 단계의 상기 로그매트의 날개 부분(120)에 날개 고정부재(140)를 설치하여 사면(10)의 지반에 먼저 고정시킨 후, 그 다음으로 상기 연결된 롤 부분(110)을 상기 도랑(11)으로 굴려 도랑(11)안에 배치시키고 롤 고정부재(130)를 설치하여 사면(10)의 지반에 고정시킨다. 상기 제 2 단계 및 5 단계를 반복하면 도 3에서와 같이 사면(10) 전체에 대하여 본 발명의 사면 녹화 및 보강 구조를 설치할 수 있다. When the groove 11 is installed and installed on the slope 10, it is installed in the same manner as above, but the wing fixing member 140 is installed on the wing portion 120 of the log mat in the fifth step to install the slope 10 First fixed to the ground, then, the rolled portion 110 is rolled into the trench 11 and placed in the trench 11, and the roll fixing member 130 is installed to fix it to the ground of the slope 10 Order. If the second and fifth steps are repeated, as shown in FIG. 3, the slope recording and reinforcement structure of the present invention can be installed on the entire slope 10.

본 발명의 사면 녹화 및 보강 구조에는 위아래의 방향을 따라 일렬로 나란하게 배치된 로그매트 사이의 사면(10)에 사면 침전 방지제(200)를 더 살포하여 사면(10)의 침전 및 침식을 방지 할 수 있다. 상기 사면 침전 방지제(200)는 음이온 폴리머와 씨앗을 포함하는 에멀젼 형태이어서 종래의 씨드스프레이(seed spray) 공법과 유사하게 기계를 이용하여 살포할 수 있다. 바람직하게는 상기 음이온 폴리머는 폴리 아크릴아미드일 수 있다. 상기 사면 침전 방지제(200)는 토양의 표면에 적용되어 강우로 인한 토양의 이동을 억제하고 바람에 의한 먼지의 발생을 방지하며 식물의 토양침투력 및 수분의 침투를 용이하게 하는 효과가 있다. 도 3에는 상기 사면 침전 방지제(200)가 살포되어 설치된 본 발명의 사면 녹화 및 보강 구조를 보여준다. The slope recording and reinforcing structure of the present invention further prevents precipitation and erosion of the slope 10 by further spraying a slope precipitation inhibitor 200 on the slope 10 between the log mats arranged side by side along the direction of up and down. Can. The slope settling inhibitor 200 is an emulsion form containing an anionic polymer and seeds, and thus can be sprayed using a machine similar to a conventional seed spray method. Preferably, the anionic polymer may be polyacrylamide. The slope settling inhibitor 200 is applied to the surface of the soil to suppress the movement of the soil due to rainfall, prevent the generation of dust caused by wind, and has the effect of facilitating the penetration of soil and the penetration of moisture in plants. 3 shows the slope recording and reinforcing structure of the present invention in which the slope precipitation inhibitor 200 is sprayed and installed.

도 5는 본 발명의 사면 녹화 및 보강 구조의 측면도를 보여준다. 상기 로그매트의 날개 부분(120)에는 다수의 날개 고정부재(140)가 설치된다. 상기 날개 고정부재(140)는 상기 롤 부분(110)과 상기 날개 부분(120)이 만나는 부분에 설치될 수 있고 상기 날개 부분(120)에 설치될 수 있다. 상기 롤 부분(110)과 상기 날개 부분(120)이 만나는 부분에 설치되는 날개 고정부재(140)는 상기 롤 부분(110)이 롤 고정부재(130)에 의해 지반에 고정되면 상기 롤 부분(110)의 하부에 위치하게 되어 상기 롤 부분(110)의 지반이탈을 방지하게 된다. 특히, 다수의 도랑(11)을 포함하는 본 발명의 사면 녹화 및 보강 구조의 경우 상기 날개 고정부재(140)가 상기 도랑(11)의 안쪽에 위치하여 상기 롤 부분(110)이 굴러 도랑(11)을 이탈하는 것을 방지하게 된다. 5 shows a side view of the slope greening and reinforcement structure of the present invention. A plurality of wing fixing members 140 are installed on the wing portion 120 of the log mat. The wing fixing member 140 may be installed at a portion where the roll part 110 and the wing part 120 meet, and may be installed at the wing part 120. When the roll portion 110 is fixed to the ground by the roll fixing member 130, the wing fixing member 140 installed at the portion where the roll portion 110 and the wing portion 120 meet is the roll portion 110 ) Is located at the bottom of the roll portion 110 to prevent ground separation. In particular, in the case of the slope recording and reinforcing structure of the present invention including a plurality of grooves 11, the wing fixing member 140 is located inside the groove 11 so that the roll portion 110 rolls and the groove 11 is rolled. ).

도 6은 본 발명의 사면 녹화 및 보강 구조를 보여준다. 본 발명의 사면 녹화 및 보강 구조는 로그매트의 롤 부분(110)이 위 방향에 위치하고, 상기 로그매트의 날개 부분(120)이 아래 방향으로 펼쳐지도록 배치되며, 상기 롤 부분(110)이 내부에 삽입된 롤 연결부재(160)에 의해 서로 연결되고, 상기 롤 부분(110)과 상기 날개 부분(120)이 고정부재(130, 140)에 의해 사면(10)의 지반에 결합되는 구조로 이루어진 것을 특징으로 하는 사면녹화 및 보강구조이다. 특히, 상기 사면에는 도랑(11)이 더 형성되면, 로그매트(10)의 롤 부분(110)이 상기 도랑(11)에 위치하고, 상기 로그매트(10)의 날개 부분(120)이 아래 방향으로 펼쳐지도록 배치되며, 상기 롤 부분(110)이 내부에 삽입된 롤 연결부재(160)에 의해 서로 연결되고, 상기 롤 부분(110)과 상기 날개 부분9120)이 고정부재(130, 140)에 의해 지반에 결합되는 구조를 이룬다. 특히 상기 로그매트(110)가 설치되지 않은 사면(10)에는 사면 침전 방지제(200)가 살포되어 사면을 더 보호하는 구조일 수 있다.6 shows the slope greening and reinforcement structure of the present invention. In the slope recording and reinforcing structure of the present invention, the roll portion 110 of the log mat is positioned in the upper direction, and the wing portion 120 of the log mat is disposed to be unfolded in the downward direction, and the roll portion 110 is disposed therein. It is connected to each other by the inserted roll connecting member 160, the roll portion 110 and the wing portion 120 is made of a structure that is coupled to the ground of the slope 10 by the fixing member (130, 140) It is characterized by slope recording and reinforcement structure. In particular, when the groove 11 is further formed on the slope, the roll portion 110 of the log mat 10 is located in the groove 11, and the wing portion 120 of the log mat 10 is downward. Arranged to be unfolded, the roll portion 110 is connected to each other by a roll connecting member 160 inserted therein, and the roll portion 110 and the wing portion 9120 are fixed by the fixing members 130 and 140 It forms a structure that bonds to the ground. In particular, a slope settling agent 200 may be sprayed onto the slope 10 where the log mat 110 is not installed to further protect the slope.

본 발명의 사면 녹화 및 보강 구조에 식재되는 식생식물은 식생의 생육특성 및 경관성 등 여건을 고려하여 적절히 선택할 수 있다. 예를 들면, 식생식물은 시공성이 우수하고 초기 피복 효과가 뛰어난 잔디나 초화류, 공사비가 저렴하고 시공성이 우수하며 다채로운 경관 조성에 유리한 양잔디+초화류 등을 사용할 수 있다. The vegetation plants planted on the slope greening and reinforcing structure of the present invention can be appropriately selected in consideration of conditions such as vegetation growth characteristics and scenery. For example, vegetation plants can be used such as grass or flowering plants having excellent workability and excellent initial coating effect, sheep grass + flowering plants having a low construction cost, excellent workability, and favorable for creating a colorful landscape.

본 발명의 로그매트(100)는 사면(10) 흐름을 효과적으로 방지하면서 식생초목의 뿌리에 공급될 수분을 보유하여 기본적인 식생지반을 확보하는 역할을 하며 한 세트로 이루어진 로그매트(100)는 일체식으로 이루어져 있기 때문에 식생매트를 추가로 설치해야 하는 불편함 없이 한 번에 포설하면 설치를 마칠 수 있다. 또한 본 발명의 로그매트(100)를 시공현장으로 운반할 때에도 둘둘 말아놓은 롤 형태로 옮겨다가 바닥에 펴서 시공하므로 운반이 간편하여 시공시간 및 경비를 절약할 수 있는 장점이 있다.The log mat 100 of the present invention serves to secure basic vegetation ground by retaining moisture to be supplied to the roots of vegetation vegetation while effectively preventing the flow of the slope 10, and the log mat 100 consisting of one set is integrated Because it is made of, you can finish the installation by installing it at once without the inconvenience of installing additional vegetation mats. In addition, even when the log mat 100 of the present invention is transported to a construction site, it is moved in a rolled form and spread on the floor, so it is easy to transport and saves construction time and expenses.

이상과 같이, 본 발명자에 의해서 이루어진 상기 실시예에 따라 구체적으로 설명하였지만, 본 발명은 상기 실시예에 한정되는 것은 아니고 그 요지를 이탈하지 않는 범위에서 여러 가지로 변경 가능한 것은 물론이다.As described above, although specifically described according to the above-described embodiment made by the present inventor, the present invention is not limited to the above-described embodiment, and it is needless to say that it can be changed in various ways without departing from the gist thereof.

즉, 상기 실시예에 있어서는 사면 녹화공법으로 한 세트의 로그매트를 이용하는 사면녹화공법에 대해 설명하였지만, 이에 한정되는 것은 아니며, 경사 사면구조물인 호안블록, 사석포설구간, 콘크리트 표면 및 옥상외 평면상태의 구조물과 일반 녹지대 및 경관조성공사 등에도 적용할 수 있음은 물론이다.In other words, in the above embodiment, the slope recording method using a set of log mats as a slope recording method has been described, but is not limited thereto, and the sloped slope structure of the revetment block, sandstone laying section, concrete surface, and out-of-roof plane state Of course, it can be applied to structures, general green areas, and landscape construction projects.

10: 사면 11: 도랑
100: 로그매트 110: 롤 부분
120: 날개 부분 130: 롤 고정부재
140: 날개 고정부재 150: 날개 연결 및 고정부재
160: 롤 연결부재 170: 기둥
180: 부엽토, 낙엽 200: 사면 침전 방지제
10: slope 11: ditch
100: log mat 110: roll portion
120: wing part 130: roll fixing member
140: wing fixing member 150: wing connection and fixing member
160: roll connecting member 170: pillar
180: beet soil, fallen leaves 200: slope precipitation inhibitor

Claims (12)

사면의 지반을 고르게 정리하는 제 1 단계;
상기 사면의 위아래 방향을 따라 로그매트의 롤 부분이 위 방향에 위치하고, 상기 로그매트의 날개 부분이 아래 방향으로 펼쳐지도록 배치하는 제 2 단계;
상기 로그매트 롤 부분의 일단에 롤 연결부재를 삽입하는 제 3 단계;
상기 롤 연결부재가 삽입된 로그매트 일단의 측면에 상기 제 2 단계의 방법으로 다른 로그매트를 위치시키는 제 4 단계; 및
상기 롤 연결부재에 상기 다른 로그매트 롤 부분의 일단을 삽입하여 롤 부분을 서로 연결시키고, 상기 로그매트와 상기 다른 로그매트의 날개 부분을 서로 접하도록 배치한 후 상기 로그매트의 날개 부분과 롤 부분에 고정부재를 설치하여 지반에 고정시키는 제 5 단계;
를 포함하는 것을 특징으로 하는 사면녹화 및 보강공법.

A first step of evenly organizing the ground of the slope;
A second step of arranging such that the roll portion of the log mat is positioned in an upward direction along the up and down direction of the slope, and the wing portion of the log mat is extended downward;
A third step of inserting a roll connecting member into one end of the log mat roll portion;
A fourth step of placing another log mat in the method of the second step on one side of the log mat where the roll connecting member is inserted; And
After inserting one end of the roll portion of the other log mat into the roll connecting member, the roll portions are connected to each other, the wing portions of the log mat and the other log mat are disposed to be in contact with each other, and then the wing portion and the roll portion of the log mat are disposed. A fifth step of installing a fixing member on the base and fixing it to the ground;
Slope recording and reinforcement method comprising a.

제 1 항에 있어서, 상기 로그매트는 일정직경으로 수회 감긴 롤 부분과 날개 부분이 봉합선에 의해 연결되어 일체식으로 이루어진 것을 특징으로 하는 사면녹화 및 보강공법.
[6] The method of claim 1, wherein the log mat is integrally formed by connecting a roll portion and a wing portion wound several times with a predetermined diameter by a suture line.
제 2 항에 있어서, 상기 로그매트의 롤 부분은 주트 네트, 야자섬유층, 상토+씨앗+비료층이 차례로 적층되어 조합된 후에 롤 형태로 말린 다음, 코이어 네트에 의해 바깥둘레가 감싸여진 형태로 이루어지며, 상기 로그매트의 날개부분은 코이어 네트로 상기 롤 부분과 봉합되어 한쪽으로 일정 길이로 길게 연장된 형태로 이루어진 것을 특징으로 하는 사면녹화 및 보강공법.
According to claim 2, The roll portion of the log mat is a jute net, palm fiber layer, top soil + seed + fertilizer layer are laminated in combination, dried in roll form, and then wrapped around the outer circumference by a coir net. It is made, and the wing part of the log mat is sealed with the roll part with a coir net, and the slope recording and reinforcing method is characterized in that it is formed in a shape extended to a certain length on one side.
제 2 항에 있어서, 상기 로그매트의 롤 부분은 밑면 꼭지점의 개수가 3 개 이상인 각기둥 또는 원기둥의 외부에 수회 감겨 상기 각기둥 또는 원기둥의 형태를 가지는 것을 특징으로 하는 사면녹화 및 보강공법.
The method of claim 2, wherein the roll portion of the log mat is wound several times on the outside of a prism or cylinder having three or more base vertices, and has the shape of the prism or cylinder.
제 1 항에 있어서, 상기 제 1 단계의 사면은 위아래 방향을 따라 다수의 도랑이 횡으로 더 형성되는 것을 특징으로 하는 사면녹화 및 보강공법.
The method of claim 1, wherein the slope of the first step is a slope recording and reinforcing method, characterized in that a plurality of grooves are further formed laterally along the up and down direction.
제 1 항에 있어서, 상기 제 1 단계의 사면에 도랑이 형성되면, 상기 제 2 단계의 로그매트의 롤 부분이 사면의 위아래 방향을 따라 상기 도랑의 위 방향에 위치하게 되고, 상기 로그매트의 날개 부분이 상기 도랑과 사면에 걸쳐 아래 방향으로 펼쳐지도록 배치되는 것을 특징으로 하는 사면녹화 및 보강공법.
According to claim 1, When the groove is formed on the slope of the first step, the roll portion of the log mat of the second step is located in the upper direction of the groove along the up and down direction of the slope, the wing portion of the log mat The slope recording and reinforcement method, characterized in that arranged to spread downwardly across the ditch and the slope.
제 1 항에 있어서, 상기 제 1 단계의 사면에 도랑이 형성되면, 먼저 상기 제 5 단계의 상기 로그매트의 날개 부분에 고정부재를 설치하여 지반에 고정시키고 그 다음으로 상기 연결된 롤 부분을 상기 도랑에 배치시킨 후 고정부재를 설치하여 지반에 고정시키는 것을 특징으로 하는 사면녹화 및 보강공법.
According to claim 1, When a groove is formed on the slope of the first step, first, a fixing member is installed on the wing portion of the log mat of the fifth step to fix it on the ground, and then the connected roll portion is attached to the groove. After the arrangement, a slope member is recorded and reinforced, characterized in that a fixing member is installed and fixed to the ground.
제 1 항에 있어서, 상기 사면의 지반에 제 2 단계 및 제 5 단계를 반복하여 서로 연결된 다수의 로그매트가 횡으로 설치되며 상기 서로 연결된 다수의 로그매트가 위아래의 방향을 따라 일렬로 나란하게 배치되도록 설치되는 것을 특징으로 하는 사면녹화 및 보강공법.
According to claim 1, By repeating the second and fifth steps on the ground of the slope, a plurality of log mats connected to each other are installed horizontally, and the plurality of log mats connected to each other are arranged side by side in a line along the direction of up and down. Slope recording and reinforcement method characterized in that it is installed as possible.
제 8 항에 있어서, 상기 위아래의 방향을 따라 일렬로 나란하게 배치된 로그매트 사이의 사면에는 사면 침전 방지제를 더 살포하는 것을 특징으로 하는 사면녹화 및 보강공법.
The slope recording and reinforcing method according to claim 8, wherein a slope sedimentation prevention agent is further applied to the slopes between the log mats arranged side by side in a line along the above and below directions.
고르게 정리된 사면에 둘 이상의 로그매트가 횡으로 설치되며 상기 횡으로 설치된 둘이상의 로그매트가 상기 사면의 위아래 방향을 따라 서로 이웃하게 설치된 사면녹화 및 보강구조에 있어서,
로그매트의 롤 부분이 위 방향에 위치하고, 상기 로그매트의 날개 부분이 아래 방향으로 펼쳐지도록 배치되며, 상기 롤 부분이 내부에 삽입된 롤 연결부재에 의해 서로 연결되고, 상기 롤 부분과 상기 날개부분이 고정부재에 의해 지반에 결합되는 구조로 이루어진 것을 특징으로 하는 사면녹화 및 보강구조.
In the slope recording and reinforcement structure in which two or more log mats are horizontally installed on evenly arranged slopes, and two or more log mats installed in the horizontal direction are installed adjacent to each other along the up and down directions of the slopes,
The roll portion of the log mat is located in the upward direction, and the wing portions of the log mat are arranged to spread downward, and the roll portions are connected to each other by a roll connecting member inserted therein, and the roll portion and the wing portion Slope recording and reinforcement structure, characterized in that it consists of a structure coupled to the ground by the fixing member.
제 10 항에 있어서, 상기 사면에는 도랑이 더 형성되어 로그매트의 롤 부분이 상기 도랑에 위치하고, 상기 로그매트의 날개 부분이 아래 방향으로 펼쳐지도록 배치되며, 상기 롤 부분이 내부에 삽입된 롤 연결부재에 의해 서로 연결되고, 상기 롤 부분과 상기 날개부분이 고정부재에 의해 지반에 결합되는 구조로 이루어진 것을 특징으로 하는 사면녹화 및 보강구조.
The roll connecting member according to claim 10, wherein a ditch is further formed on the slope so that the roll portion of the log mat is located in the ditch, and the wing portion of the log mat is spread downwardly, and the roll portion is inserted therein. It is connected to each other, and the slope recording and reinforcing structure, characterized in that the roll portion and the wing portion is made of a structure coupled to the ground by a fixing member.
제 10 항에 있어서, 상기 로그매트가 설치되지 않은 사면에는 사면 침전 방지제가 살포되는 구조로 이루어진 것을 특징으로 하는 사면녹화 및 보강구조.
The slope recording and reinforcing structure of claim 10, wherein the slope where the log mat is not installed has a structure in which a slope precipitation inhibitor is sprayed.
KR1020190006314A 2019-01-17 2019-01-17 Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof KR20200089499A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190006314A KR20200089499A (en) 2019-01-17 2019-01-17 Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190006314A KR20200089499A (en) 2019-01-17 2019-01-17 Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof

Publications (1)

Publication Number Publication Date
KR20200089499A true KR20200089499A (en) 2020-07-27

Family

ID=71894070

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190006314A KR20200089499A (en) 2019-01-17 2019-01-17 Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof

Country Status (1)

Country Link
KR (1) KR20200089499A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832261A (en) * 2021-01-04 2021-05-25 安徽理工大学 Side slope protection device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100100509A (en) 2009-03-06 2010-09-15 (주)지오그린 Greening works and inclined plane structure using greening works

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100100509A (en) 2009-03-06 2010-09-15 (주)지오그린 Greening works and inclined plane structure using greening works

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832261A (en) * 2021-01-04 2021-05-25 安徽理工大学 Side slope protection device

Similar Documents

Publication Publication Date Title
US20030143026A1 (en) Self-anchoring fiber block system
US9315962B2 (en) Fiber block planting system
US11459721B2 (en) Erosion control apparatus
US11492771B2 (en) Erosion control apparatus
US20230002988A1 (en) Erosion control apparatus
KR100504231B1 (en) A slope protection equipment for construction
KR101055635B1 (en) The bio-stone structure for protecting slope and the construction method thereof
JP6192763B1 (en) Geogrid / Honeycomb Retaining Wall
KR20200089499A (en) Eco-friendly Slope Protection And Greening Structure for Landslide Prevention And Construction Method Thereof
RU2582814C1 (en) Method for construction of landslide protection structure of biopositive
US20230002989A1 (en) Erosion control apparatus
KR100350423B1 (en) Landscape block for protecting a slop side and carrying out method of using it
US11306455B2 (en) Erosion control apparatus
RU2582813C1 (en) Landslide protection structure of biopositive design
US20220349139A1 (en) Erosion control apparatus
KR101018903B1 (en) Stabilizing assembly for preventing soil-flow of slope and greening
EP0796375B1 (en) Method and apparatus for supporting vegetative growth on a slope face
JP6186031B1 (en) Honeycomb retaining wall
KR100953216B1 (en) Unevenness green geo mat for protecting slope and structure of slantface planted and construction method thereof
KR200420007Y1 (en) Landscape bringing up structure in incline surface of incision ground of road
KR20060108900A (en) Slope-protect weight block for prevent degradation
RU2512192C2 (en) Method to erect anti-landslide system of biopositive design
KR101003737B1 (en) Eco-friendly slope protection construction method and that of structure
KR101224535B1 (en) Embankment Block for Slope-Stabilization and Vegetative Structure Using the Same
KR100805934B1 (en) An afforestation construction method of slope