KR20200040464A - A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof - Google Patents

A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof Download PDF

Info

Publication number
KR20200040464A
KR20200040464A KR1020180120406A KR20180120406A KR20200040464A KR 20200040464 A KR20200040464 A KR 20200040464A KR 1020180120406 A KR1020180120406 A KR 1020180120406A KR 20180120406 A KR20180120406 A KR 20180120406A KR 20200040464 A KR20200040464 A KR 20200040464A
Authority
KR
South Korea
Prior art keywords
project
progress
management system
module
department
Prior art date
Application number
KR1020180120406A
Other languages
Korean (ko)
Other versions
KR102180345B1 (en
Inventor
나승준
Original Assignee
나승준
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 나승준 filed Critical 나승준
Priority to KR1020180120406A priority Critical patent/KR102180345B1/en
Publication of KR20200040464A publication Critical patent/KR20200040464A/en
Application granted granted Critical
Publication of KR102180345B1 publication Critical patent/KR102180345B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a total process management system capable of satisfying the quality of a product and service requested by various customers. According to the present invention, the total process management system comprises: a process integration solution connecting a consulted company employee terminal and a consulting company employee terminal online in a wired/wireless manner; a strategy module establishing risk analysis management and strategy for attaining a project to form a basis for advancing a process; a process design module using a web editor to make a flowchart for advancing the process in accordance with a goal of the project and storing data, such as regulation, in-house specification, and the like required in accordance with a process procedure or making the data to be linked to display the data; a key performance index (KPI) module linked with a calculation formula capable of defining and calculating a KPI of the project to monitor and evaluate an advancing process to visually display an advancing state; a project management system (PMS) module establishing an advancing schedule in accordance with the project to display an attainment state by step and visually displaying a situation that a management department manages the project; an operation module storing a business standard to enable a department actually advancing the project to advance business based on a related standard in accordance with the project, advancing the project in accordance with a manual, and statistically displaying a business status of the department advancing the project; and an improvement module examining, investigating, and evaluating the advanced project to check and post the state of project progress, and making a corrective action to be improved to improve the process of the project.

Description

온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템 및 그 운용방법{A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof}{A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof}

본 발명은 제품 및 서비스의 품질을 향상시켜 경쟁우위를 확보하기 위한 온라인 통합프로세스관리시스템에 관한 것으로, 자세하게는 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 및 그 시스템 운용하는 방법에 관한 것이다.The present invention relates to an online integrated process management system for securing a competitive advantage by improving the quality of products and services, and more particularly, to an IT-based integrated process management system using the online process integration solution and a method of operating the system .

일반적으로, TQM(Total Quality Management)은 고객만족을 목적으로 한 조직적인 품질관리를 넘어 마케팅, 엔지니어링, 생산 등 기업의 모든 분야의 관리 방법으로, 그동안 Off-Line 상태에서 전종업원 및 컨설팅 업체간 프로세스혁신을 위해서 진행되어온 종합적 품질경영 기법 이였다.  In general, TQM (Total Quality Management) is a method of managing all areas of a company such as marketing, engineering, and production beyond organizational quality management for the purpose of customer satisfaction.In the meantime, the process between all employees and consulting firms in the off-line state It was a comprehensive quality management technique that has been underway for innovation.

그러나 Off-Line 상태에서 TQM(Total Quality Management)은 시대적인 환경이 On-Line화 되고 있는 상황에서 많은 문제점들이 노출되었다.However, in the off-line state, TQM (Total Quality Management) exposed many problems in the situation that the times environment was on-line.

언제 어디서나 작업이 가능한 시대에 Off-Line 만을 이용한 TQM(Total Quality Management)은 시대적인 상황에 맞지 않고, 컨설팅 업체는 업체를 방문하여 지도하거나 조사(Audit)하는 형태는 막대한 시간적인 요인에 따른 경비부담의 증가요인으로 On-Line 환경의 새로운 솔루션이 요구되고 있다.In an era where work is possible anytime, anywhere, Total Quality Management (TQM) using only Off-Line is not suitable for the times, and consulting firms visit companies for guidance or research (Audit) to pay for expenses due to enormous time factors. As an increasing factor, a new solution in an on-line environment is required.

이러한 문제점을 해결하기 위하여 다양한 방법이 연구되고 있다. Various methods have been studied to solve these problems.

한국등록특허 10-1723767Korean Registered Patent 10-1723767

본 발명은 상기와 같은, 온라인 상태에서 컨설팅업체 직원의 단말과 컨설팅지도업체 단말이 유무선으로 연결된 상태의 프로세스통합솔루션을 이용한 통합 프로세스관리 시스템으로, 다양한 고객의 제품 및 서비스의 품질 요구를 해결하기 위한 시스템 및 그 시스템을 운용하는 방법을 제공한다. The present invention is an integrated process management system using a process integration solution in which the terminal of the consulting company employee and the terminal of the consulting guidance company are connected by wire or wireless in the online state as described above, for solving the quality needs of various customers' products and services. Provides a system and a method of operating the system.

상기와 같은 목적을 달성하기 위한 수단으로,As a means to achieve the above object,

온라인 상태에서 컨설팅업체 직원 단말과 컨설팅지도업체 단말이 유무선으로 연결된 상태의 프로세스통합솔루션;A process integration solution in which the terminal of the consulting company and the terminal of the consulting guidance company are connected by wire or wireless in the online state;

상기 프로세스통합솔루션에서 프로젝트를 달성하기 위한 리스크분석관리 및 전략을 세워 프로세스 진행을 위한 기초를 만드는 전략(strategy)모줄;Strategy module to establish the foundation for process progress by establishing risk analysis management and strategy to achieve the project in the process integration solution;

프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집기(web editor)를 이용하여 만들고, 프로세스 절차에 따라 필요한 법규, 사내 규격 등의 데이터가 저장되거나 링크되어 표시될 수 있는 프로세스설계(process design)모줄;Process design (process) in which a standard (flow chart) for processing a process according to the project goals is created using a web editor, and data such as required regulations and company standards can be stored or linked according to the process procedure. design) bar;

프로젝트 프로세스의 진행에 있어서 핵심성과지표를 정의하여 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시되는 핵심성과지표(KPI)모줄;A key performance indicator (KPI) module in which progress is monitored and evaluated in conjunction with a calculation formula that can be numerically calculated by defining key performance indicators in the progress of the project process, and progress is visually displayed;

프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 진행시간계획을 세워 단계별 달성상태가 표시되고 관리담당부서가 프로젝트를 관리하는 상황이 가시적으로 표시되는 프로젝트관리시스템(PMS)모줄; A project management system (PMS) module that displays progress status for each stage by establishing a time schedule according to the project for management of the project process and visually displays the status of the management department managing the project;

프로젝트를 실질적으로 진행하는 부서에서 프로젝트에 따라 관련 표준으로 업무가 진행될 수 있도록 업무표준이 저장되어 있으면서 매뉴얼에 따라 프로젝트를 진행하고, 각각의 관련 진행부서의 업무현황이 통계적으로 표시되는 실행(operation)모줄;In the department that is actually carrying out the project, the work standard is stored and the project is performed according to the manual so that work can be carried out according to the relevant standard according to the project, and the operation status of each relevant progress department is statistically displayed. Hairline;

진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 게시하고 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜는 개선(improvement)모줄;An improvement module that improves the project process by reviewing and evaluating the progress of the project, grasping and publishing the status of the project, and making corrective actions that can be improved;

프로젝트 진행을 위한 공지사항, 회의사항을 게시하고 알리는 커뮤니티(community)모줄; A community line that posts and announces announcements and meetings for project progress;

프로젝트를 콘트롤하는 부서 및 관련사항을 게시하는 시스템 컨트롤(system control) 모줄이 포함된다.It includes the department controlling the project and the system control module that posts related matters.

상기 프로세스통합솔루션은 웹서버에 저장되거나 사내 서버에 저장되어 운용되는 것을 포함한다.The process integration solution may be stored in a web server or stored and operated in an in-house server.

상기 프로세스설계모줄에서 프로세스를 진행하는 표준(flow chart)은 터틀차트(turtle chart)를 포함한다.In the process design line, a standard (flow chart) for performing a process includes a turtle chart.

상기 핵심성과지표(KPI)모줄은 품질, 환경, 안전등에 관한 성과관련 지식자산을 포함한다.The key performance indicator (KPI) line includes performance-related knowledge assets related to quality, environment, and safety.

상기 프로젝트관리시스템(PMS)모줄은 관리담당부서의 진행상태가 그래프 또는 경고표시등으로 가시적인 형태로 나타나는 것을 포함한다.The project management system (PMS) bar includes that the progress of the management department appears in a visible form with a graph or warning indicator.

상기 실행(operation)모줄은 진행부서의 업무현황이 실시간 데이터에 의해서 통계 처리되어 게시되는 것을 포함한다.The operation line includes that the progress of the department is statistically processed and posted by real-time data.

상기 개선(improvement)모줄은 컨설팅지도업체가 직접 방문조사하거나 유무선을 통하여 시스템에 접근하여 지도하는 것을 포함한다.The improvement (improvement) bar includes consulting and directing the visit to a consulting company or accessing the system through wired or wireless.

상기 개선(improvement)모줄에서 심사조사 평가는 프로그램적으로 가중치를 주어 평가되는 것을 포함한다.In the improvement (improvement) line, the evaluation of the evaluation of evaluation includes programmatically weighted evaluation.

상기와 같은 목적을 달성하기 위한 수단으로,As a means to achieve the above object,

프로젝트 리스크가 분석되고 평가되어 전략(strategy)모줄에 입력되는 단계;The project risk is analyzed and evaluated and entered into the strategy bar;

프로세스설계(process design)모줄에서 프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집(web editor)기를 이용하여 만들어 저장되는 단계;Creating and storing a standard (flow chart) that proceeds with a process according to a project goal in a process design line using a web editor;

핵심성과지표(KPI)모줄에서 프로젝트 프로세스의 진행에 있어서 핵심성과지표가 정의되어 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시되는 단계;In the key performance indicator (KPI) line, in the progress of the project process, the key performance indicator is defined and linked with a calculation formula that can be numerically calculated to monitor and evaluate the progress and visually display the progress;

프로젝트관리시스템(PMS)모줄에서 프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 관리담당부서의 진행시간계획에 맞추어 프로젝트를 관리하는 상황의 단계별 달성상태가 표시되는 단계; In the project management system (PMS) line, the step of displaying the achievement status of each stage in the situation of managing the project according to the progress time plan of the management department according to the project for managing the project process progress;

실행(operation)모줄에서 프로젝트를 실질적으로 진행하는 부서의 업무현황이 프로젝트에 따라 관련 표준으로 업무가 진행되면서 통계적으로 표시되는 단계; A step in which the work status of the department substantially performing the project in the operation line is statistically displayed as the work progresses according to the relevant standard according to the project;

개선(improvement)모줄에서 진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜는 단계를 포함한다.It includes the steps of improving the project process by making a corrective action that can be improved by grasping the progress of the project by examining and evaluating the project progressed in the improvement line.

상기 프로세스설계모줄에서 프로세스를 진행하는 표준(flow chart)은 터틀차트(turtle chart)로 만드는 것을 포함한다.In the process design line, the standard (flow chart) for performing the process includes making a turtle chart.

상기 프로젝트관리시스템(PMS)모줄은 관리담당부서의 진행상태가 그래프 또는 경고표시등으로 가시적인 형태로 나타내는 것을 포함한다.The project management system (PMS) line includes that the progress of the management department is shown in a visible form with a graph or warning indicator.

상기 개선(improvement)모줄은 컨설팅지도업체가 방문조사하거나 유무선을 통하여 시스템에 접근하여 지도하는 것을 포함한다.The improvement (improvement) bar includes a consulting guidance company to visit the survey or to access and guide the system through wired or wireless.

상기와 같은 본 발명에 따르면, 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 및 그 시스템이 운용하는 방법으로 프로젝트를 원활하게 수행하고 관리할 수 있다.According to the present invention as described above, an IT-based integrated process management system using an online process integration solution and a method operated by the system can smoothly perform and manage the project.

또한 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 및 그 시스템이 운용하는 방법으로 프로젝트 수행을 단순화 할 수 있다. In addition, it is possible to simplify project execution with an IT-based integrated process management system using an online process integration solution and a method operated by the system.

도 1은 본 발명의 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 개념을 보여주는 블록도이다.
도 2는 본 발명의 온라인 프로세스통합솔루션을 구성하는 모줄 구성을 보여주는 구성도이다.
도 3은 본 발명의 온라인 프로세스통합솔루션을 구성하는 전략(strategy)모줄 화면을 보여주는 사진이다.
도 4는 본 발명의 온라인 프로세스통합솔루션을 구성하는 전략(strategy)모줄의 세부 화면을 보여주는 사진이다.
도 5는 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로세스설계(process design)모줄 화면을 보여주는 사진이다.
도 6은 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로세스설계(process design)모줄 세부화면을 보여주는 사진이다.
도 7은 본 발명의 온라인 프로세스통합솔루션을 구성하는 핵심성과지표(KPI)모줄 화면을 보여주는 사진이다.
도 8은 본 발명의 온라인 프로세스통합솔루션을 구성하는 핵심성과지표(KPI)모줄 세부화면을 보여주는 사진이다.
도 9는 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로젝트관리시스템(PMS)모줄 화면을 보여주는 사진이다.
도 10은 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로젝트관리시스템(PMS)모줄 세부화면을 보여주는 사진이다.
도 11은 본 발명의 온라인 프로세스통합솔루션을 구성하는 실행(operation)모줄 화면을 보여주는 사진이다.
도 12는 본 발명의 온라인 프로세스통합솔루션을 구성하는 실행(operation)모줄 세부화면을 보여주는 사진이다.
도 13은 본 발명의 온라인 프로세스통합솔루션을 구성하는 개선(improvement)모줄 화면을 보여주는 사진이다.
도 14는 본 발명의 온라인 프로세스통합솔루션을 구성하는 개선(improvement)모줄 세부화면을 보여주는 사진이다.
도 15는 본 발명의 온라인 프로세스통합솔루션을 구성하는 커뮤니티(community)모줄 화면을 보여주는 사진이다.
도 16은 본 발명의 온라인 프로세스통합솔루션을 구성하는 시스템 컨트롤(system control) 모줄 화면을 보여주는 사진이다.
도 17은 본 발명의 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 운용 단계를 보여주는 순서도이다.
1 is a block diagram showing the concept of an IT-based integrated process management system using the online process integration solution of the present invention.
2 is a block diagram showing the configuration of the main line constituting the online process integration solution of the present invention.
Figure 3 is a picture showing a strategy (strategy) bar screen constituting the online process integration solution of the present invention.
4 is a photograph showing a detailed screen of a strategy bar constituting the online process integration solution of the present invention.
FIG. 5 is a photograph showing a process design module screen constituting the online process integration solution of the present invention.
FIG. 6 is a photograph showing a detailed screen of a process design module constituting the online process integration solution of the present invention.
7 is a photograph showing a key performance indicator (KPI) bar screen constituting the online process integration solution of the present invention.
8 is a photograph showing a detailed screen of key performance indicator (KPI) modules constituting the online process integration solution of the present invention.
9 is a photograph showing a project management system (PMS) module screen constituting the online process integration solution of the present invention.
10 is a photograph showing a detailed screen of a project management system (PMS) module constituting the online process integration solution of the present invention.
11 is a photograph showing an operation line screen constituting the online process integration solution of the present invention.
12 is a photograph showing a detailed screen of an operation line constituting the online process integration solution of the present invention.
13 is a picture showing an improvement (improvement) bar screen constituting the online process integration solution of the present invention.
FIG. 14 is a photograph showing a detailed screen of an improvement line constituting the online process integration solution of the present invention.
FIG. 15 is a photograph showing a community bar screen constituting the online process integration solution of the present invention.
16 is a photograph showing a system control module screen constituting the online process integration solution of the present invention.
17 is a flow chart showing the steps of operating the IT-based integrated process management system using the online process integration solution of the present invention.

본문에 게시되어 있는 본 발명의 실시예들에 대해서, 특정한 구조적 내지 기능적 설명들은 단지 본 발명의 실시예를 설명하기 위한 목적으로 예시된 것으로, 본 발명의 실시예들은 다양한 형태로 실시될 수 있으며 본문에 설명된 실시예 들에 한정되는 것으로 해석되어서는 아니 된다.With respect to the embodiments of the present invention published in the text, specific structural or functional descriptions are exemplified only for the purpose of illustrating the embodiments of the present invention, and the embodiments of the present invention can be implemented in various forms and the text It should not be construed as being limited to the embodiments described in.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 본문에 설명하고자 한다. 그러나 이는 본 발명을 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 각 도면을 설명하면서 유사한 참조부호를 구성요소에 대해 사용하였다.The present invention can be applied to various changes and may have various forms, and specific embodiments will be illustrated in the drawings and described in the text. However, this is not intended to limit the present invention to a specific disclosure form, it should be understood to include all modifications, equivalents, and substitutes included in the spirit and scope of the present invention. In describing each drawing, similar reference numerals are used for components.

제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 발명의 권리 범위로부터 이탈되지 않은 채 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다.Terms such as first and second may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from other components. For example, the first component may be referred to as the second component without departing from the scope of the present invention, and similarly, the second component may also be referred to as the first component.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.When an element is said to be "connected" or "connected" to another component, it is understood that other components may be directly connected to or connected to the other component, but other components may exist in the middle. It should be. On the other hand, when a component is said to be "directly connected" or "directly connected" to another component, it should be understood that no other component exists in the middle. Other expressions describing the relationship between the components, such as "between" and "immediately between" or "adjacent to" and "directly neighboring to," should be interpreted similarly.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 설시(說示)된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terms used in this application are only used to describe specific embodiments, and are not intended to limit the present invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this application, the terms "include" or "have" are intended to indicate that a feature, number, step, action, component, part, or combination thereof is provided, and that one or more of them are present. It should be understood that it does not preclude the presence or addition possibility of other features or numbers, steps, actions, components, parts or combinations thereof.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by a person skilled in the art to which the present invention pertains. Terms such as those defined in a commonly used dictionary should be interpreted as having meanings consistent with meanings in the context of related technologies, and should not be interpreted as ideal or excessively formal meanings unless explicitly defined in the present application. Does not.

이하, 첨부한 도면들을 참조하여, 본 발명의 바람직한 실시예를 설명하고자 한다. 도면상의 동일한 구성요소에 대해서는 동일한 참조부호를 사용하고 동일한 구성요소에 대해서 중복된 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. The same reference numerals are used for the same components in the drawings, and duplicate descriptions for the same components are omitted.

도 1은 본 발명의 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 개념을 보여주는 블록도이다.1 is a block diagram showing the concept of an IT-based integrated process management system using the online process integration solution of the present invention.

도 1을 참조하여 설명하면, IT 기반의 통합프로세스관리시스템(100)은 웹서버 또는 사내서버에 프로세스통합솔루션(Total Quality Management Solution TQMS 110)이 내장되어 있고, 프로세스통합솔루션(110)은 유무선으로 컨설팅업체직원 단말(120), 컨설팅지도업체직원 단말(130)과 연결되어 있다.Referring to FIG. 1, the IT-based integrated process management system 100 has a built-in process integration solution (Total Quality Management Solution TQMS 110) in a web server or an in-house server, and the process integration solution 110 is wired or wireless. It is connected to the consulting company employee terminal 120 and the consulting guidance company employee terminal 130.

자세한 설명은 세부 관련 도면을 참조하면서 설명하고자 한다.Detailed description will be made with reference to the detailed drawings.

도 2는 본 발명의 온라인 프로세스통합솔루션을 구성하는 모줄 구성을 보여주는 구성도이다.2 is a block diagram showing the configuration of the main line constituting the online process integration solution of the present invention.

도 2를 참조하여 설명하면, 본 발명의 온라인 프로세스통합솔루션(110)은, 프로젝트를 달성하기 위한 리스크분석관리 및 전략을 세워 프로세스 진행을 위한 기초를 만드는 전략(strategy)모줄(140); 프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집기(web editor)를 이용하여 만들고, 프로세스 절차에 따라 필요한 법규, 사내 규격 등의 데이터가 저장되거나 링크되어 표시될 수 있는 프로세스설계(process design)모줄(150); 프로젝트 프로세스의 진행에 있어서 핵심성과지표를 정의하여 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시되는 핵심성과지표(KPI)모줄(160); 프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 진행시간계획을 세워 단계별 달성상태가 표시되고 관리담당부서가 프로젝트를 관리하는 상황이 가시적으로 표시되는 프로젝트관리시스템(PMS)모줄(170); 프로젝트를 실질적으로 진행하는 부서에서 프로젝트에 따라 관련 표준으로 업무가 진행될 수 있도록 업무표준이 저장되어 있으면서 매뉴얼에 따라 프로젝트를 진행하고, 각각의 관련 진행부서의 업무현황이 통계적으로 표시되는 실행(operation)모줄(180); 진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 게시하고 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜는 개선(improvement)모줄(190); 프로젝트 진행을 위한 공지사항, 회의사항을 게시하고 알리는 커뮤니티(community)모줄(200); 프로젝트를 컨트롤하는 부서 및 관련사항을 게시하는 시스템 컨트롤(system control) 모줄(210)로 구성되어 있다. Referring to Figure 2, the online process integration solution 110 of the present invention, the risk analysis management and strategy for achieving the project to create a basis for the process progress (strategy) module 140; Process design (process) in which a standard (flow chart) for processing a process according to the project goals is created using a web editor, and data such as required regulations and company standards can be stored or linked according to the process procedure. design) bar 150; A key performance indicator (KPI) module 160 in which progress is monitored and evaluated in conjunction with a calculation formula that can be numerically calculated by defining key performance indicators in the progress of the project process, and progress is visually displayed; A project management system (PMS) module 170 in which a progress time step is established according to a project for progress management of a project process, and a status of each stage is displayed and a situation in which a management department manages a project is visually displayed; In the department that is actually carrying out the project, the work standard is stored and the project is performed according to the manual so that work can be carried out according to the relevant standard according to the project, and the operation status of each relevant progress department is statistically displayed. A stem 180; An improvement module 190 to improve the project process by making a corrective action that can be improved and grasping and publishing the progress of the project by examining and evaluating the progress of the project; A community bar 200 for posting and informing announcements and meetings for the progress of the project; It consists of the department controlling the project and the system control module 210 for posting related matters.

각 모줄의 자세한 설명은 모줄 호면과 중요 세부 관련 화면 사진을 참조하면서 설명하고자 한다.The detailed description of each line will be explained with reference to the picture of the screen of the main line and important details.

도 3은 본 발명의 온라인 프로세스통합솔루션을 구성하는 전략(strategy)모줄 화면을 보여주는 사진이다.Figure 3 is a picture showing a strategy (strategy) bar screen constituting the online process integration solution of the present invention.

도 4는 본 발명의 온라인 프로세스통합솔루션을 구성하는 전략(strategy)모줄의 세부 화면을 보여주는 사진이다.4 is a photograph showing a detailed screen of a strategy bar constituting the online process integration solution of the present invention.

도 3, 4를 참조하여 설명하면, 프로젝트 전략을 만들어 보관 공유하는 전략(strategy)모줄(140)로, 프로젝트 리스크를 분석하고, 리스크를 관리하기 위한 방안을 만들고, 프로젝트를 진행하는 구성원의 교육훈련계획 및 교육이력이 보관 공유된다. With reference to FIGS. 3 and 4, a strategy module 140 that creates and stores and shares project strategies, analyzes project risks, creates a plan for managing risks, and trains and trains members of the project The plan and training history are kept and shared.

전략을 세워 방안을 만드는 부서 및 작성자가 정해져 일을 처리하지만 IT환경에서 모든 구성원이 참여하고 공유가 가능함으로 프로젝트를 진행하는 구성원 누구든지 아이디어를 내어 게시하거나 공유할 수 있도록 전략(strategy)모줄이 구성되어 있다. Strategy modules are organized so that all the members of the project can come up with ideas and publish or share ideas, as all departments and creators who plan and set plans to handle the work are decided. It is done.

다만 교육훈련 이력 내용 등 구성원 자진의 이익을 위해서 데이터를 변경시키는 것을 막을 수 있도록, 자유스럽게 의견을 게시하는 영역과, 데이터 조작이 불가능한 영역을 구분하여 프로그램 적으로 구분되어 있다.However, in order to prevent changes to data for the benefit of members' voluntary activities, such as the contents of education and training history, it is divided programmatically by distinguishing areas where opinions are freely posted and areas where data manipulation is not possible.

IT 환경에서 프로젝트를 진행하는 프로세스이기 때문에 화면구성은 터치식 또는 마우스로 클릭하면 되는 형태로 되어있고, 프로젝트에 따라서 주제별로 파일 화되면서 종속적인 프로세스는 종속되는 파일로 데이터가 저장되어 있다.Because it is a process of project execution in the IT environment, the screen composition is in the form of clicking with a touch or a mouse, and depending on the project, the files are organized by subject, and the dependent processes are stored as dependent files.

예를 들어 교육훈련 화면(145)을 열면 부서별 교육계획이 게시되고, 부서별 교육계획에 종속되어 부서별 교육훈련이력이 게시되는 형태가 되어서, 내용의 저장이나 관람이 IT환경에 적합하도록 구성되어 있다.For example, when the education and training screen 145 is opened, an education plan for each department is posted, and a education and education history for each department is subordinated to the education plan for each department, so that content storage or viewing is suitable for the IT environment.

또한 온라인 상태에서 시스템이 연결되어 통합되어 연결되어 있는 상태이기 때문에 데이터가 자동으로 프로그램적으로 업데이터 된다. 예를 들어 교육훈련부서에서 교육받은 사람의 데이터가 입력되면, 전략(strategy)모줄의 교육훈련이력 데이터에 자동 연결되어 저장되어 개인이 자기의 이력을 입력할 필요 없이 열람만하여 자기이력을 확인할 수 있다. In addition, since the system is connected and integrated while online, the data is automatically updated programmatically. For example, when data of a person trained in the education and training department is input, it is automatically connected and stored in the education and training data of the strategy bar, so that an individual can check his / her history by reading without having to input his / her history. have.

시스템 구성이 통합되어 연결되어있기 때문에 각 모줄에 있는 같은 구성 데이터는 입력된 데이터의 최근 데이터로 업데이터 되고, 업무표준 등 공통적으로 쓰는 데이터는 서로 연결되어 각 모줄에서 내용은 같이 연동되어 나타난다. Since the system configuration is integrated and connected, the same configuration data in each line is updated with the latest data of the input data, and common data such as business standards are connected to each other, and the contents in each line appear together.

도 5는 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로세스설계(process design)모줄 화면을 보여주는 사진이다.FIG. 5 is a photograph showing a process design module screen constituting the online process integration solution of the present invention.

도 6은 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로세스설계(process design)모줄 세부화면을 보여주는 사진이다.FIG. 6 is a photograph showing a detailed screen of a process design module constituting the online process integration solution of the present invention.

도 5, 6을 참조하여 설명하면, 프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집기(web editor)를 이용하여 만들고, 프로세스 절차에 따라 필요한 법규, 사내 규격 등의 데이터가 저장되거나 링크되어 표시될 수 있는 프로세스설계(process design)모줄(150)이다.Referring to FIGS. 5 and 6, a standard (flow chart) for performing a process according to a project goal is created by using a web editor, and data such as required laws and regulations, and internal standards are stored according to the process procedure. It is a process design module 150 that can be displayed by linking.

도 6처럼 프로젝트 업무표준(flow chart)(155)을 만들 때 웹편집기(web editor)를 사용하여 표준을 만들기 때문에 표작성, 그림삽입 등이 쉽게 되어 있어 업무표준을 작성 방법이 매우 용이하다.When creating the project work standard (flow chart) 155, as shown in FIG. 6, the standard is created using a web editor, so it is easy to create a work standard because it is easy to create tables and insert pictures.

또한 업무표준이 프로세스 터틀차트(Turtle Chart) 방법으로 핵심요소를 반영하고 각 프로세스의 선후행을 링크시켜 작업되도록 프로세스설계(process design)모줄이 형성되어 있음으로 표준작업이 매우 쉽게 진행된다.In addition, the standard work is very easy because the process design line is formed so that the work standard reflects the key elements in the process Turtle Chart method and links the trailing lines of each process.

표준목록이나 ISO규격 등 국제표준이 IT환경에서 서로 연결되어 링크되도록 프로세스설계(process design)모줄이 구성되어 있음으로 작업을 하는 도중 다른 화면으로 이동 없이 할 수 있다.The process design line is configured so that international standards such as the standard list and ISO standards are linked and linked to each other in the IT environment.

도 7은 본 발명의 온라인 프로세스통합솔루션을 구성하는 핵심성과지표(KPI)모줄 화면을 보여주는 사진이다.7 is a photograph showing a key performance indicator (KPI) bar screen constituting the online process integration solution of the present invention.

도 8은 본 발명의 온라인 프로세스통합솔루션을 구성하는 핵심성과지표(KPI)모줄 세부화면을 보여주는 사진이다.8 is a photograph showing a detailed screen of key performance indicator (KPI) modules constituting the online process integration solution of the present invention.

도 7, 8을 참조하여 설명하면, 프로젝트 프로세스의 진행에 있어서 핵심성과지표를 정의하여 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시되는 핵심성과지표(KPI)모줄(160)이다.As described with reference to FIGS. 7 and 8, key performance indicators in which progress is monitored and evaluated in conjunction with calculation formulas that can be numerically calculated by defining key performance indicators in the progress of the project process are visually displayed. It is the (KPI) module 160.

프로젝트 진행에 있어서 핵심성과지표가 정의되면, 수치적으로 데이터화 할 수 있는 계산식이 프로그램화되어 있어, 진행되는 과정이 목표치와 같이 동시에 표시된다. When the key performance indicators are defined in the project progress, the calculation formula that can be numerically data is programmed, and the progress is displayed simultaneously with the target value.

목표치 달성율이 표시되면서 프로젝트의 성공을 미리 예측하여 정상적으로 진행될 수 있는 경우 노란 표시등이 켜지고, 프로젝트 진행 실적율이 저조하여 불량인 경우 붉은색 경고등이 켜지고, 프로젝트 진행이 순조롭게 진행되어 달성율이 100%를 넘는 경우 녹색등이 켜져서, 누구든지 프로젝트 진행상태를 쉽게 알 수 있다.As the target achievement rate is displayed, the success of the project is predicted in advance, and if the project can proceed normally, the yellow indicator lights up, and if the project progress rate is poor, the red warning light turns on, and the project progresses smoothly, so the achievement rate exceeds 100% If the green light is on, anyone can easily see the progress of the project.

도 8처럼 프로젝트 진행상황 모니터링은 분기, 반기, 회기연도별로 나누어 자동 게시되게 하여, 부서별 성과가 통계적으로 나타나서 최고 경영자뿐 아니라 전사원이 팀별 상황을 알 수 있어 투명하게 조직을 관리할 수 있다. As shown in Fig. 8, the project progress monitoring is divided into quarterly, semi-annually, and yearly, so that it is automatically posted, and the performance of each department is statistically displayed, so that not only the chief executive but also all employees can know the situation of each team so that the organization can be transparently managed.

도 9는 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로젝트관리시스템(PMS)모줄 화면을 보여주는 사진이다.9 is a photograph showing a project management system (PMS) module screen constituting the online process integration solution of the present invention.

도 10은 본 발명의 온라인 프로세스통합솔루션을 구성하는 프로젝트관리시스템(PMS)모줄 세부화면을 보여주는 사진이다.10 is a photograph showing a detailed screen of a project management system (PMS) module constituting the online process integration solution of the present invention.

도 9, 10을 참조하여 설명하면, 프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 진행시간계획을 세워 단계별 달성상태가 표시되고 관리담당부서가 프로젝트을 관리하는 상황이 가시적으로 표시되는 프로젝트관리시스템(PMS)모줄(170)이다.Referring to FIGS. 9 and 10, a project management system (PMS) module that displays progress status according to the project and displays the status of each stage for management of project process progress management and visually displays the status of management of the project by the management department (170).

프로젝트의 기본 정보가 등록되어 있고, 담당부서, 세부활동, 프로젝트관리활동, 실행기간 및 실행계획, 일정관리 진척율 등이 표시된다. Basic information of the project is registered, and the department in charge, detailed activities, project management activities, execution period and execution plan, and schedule management progress rate are displayed.

도 10처럼 프로젝트에 따라서 주관부서, 프로젝트기간, 관리하는 프로젝트의 일정에 따라 진행상태 등이 화면상에 가시적으로 표시된다.As shown in FIG. 10, depending on the project, the managing department, the project duration, and the progress of the project are visually displayed on the screen according to the schedule of the managed project.

표시되는 데이터화면(175)은 시스템이 통합적으로 연동되어 있기 때문에 현재 모줄 창에서 입력하고 계산되고 하는 것이 아니라, 통합 연동되어, 프로젝트별 데이터가 입력되면 최근 데이터를 기준으로 프로그램적으로 자동 업데이터 되어 표시된다.The displayed data screen 175 is not integrated and calculated in the current module window because the system is interlocked, but is interlocked and automatically updated and displayed programmatically based on the latest data when project-specific data is input. do.

도 11은 본 발명의 온라인 프로세스통합솔루션을 구성하는 실행(operation)모줄 화면을 보여주는 사진이다.11 is a photograph showing an operation line screen constituting the online process integration solution of the present invention.

도 12는 본 발명의 온라인 프로세스통합솔루션을 구성하는 실행(operation)모줄 세부화면을 보여주는 사진이다.12 is a photograph showing a detailed screen of an operation line constituting the online process integration solution of the present invention.

도 11, 12를 참조하여 설명하면, 프로젝트를 실질적으로 진행하는 부서에서 프로젝트에 따라 관련 표준으로 업무가 진행될 수 있도록 업무표준이 저장되어 있으면서 매뉴얼에 따라 프로젝트를 진행하고, 각각의 진행부서의 업무현황이 통계적으로 표시되는 실행(operation)모줄(180)이다.Referring to FIGS. 11 and 12, the work standard is stored and the project is performed according to the manual while the work standard is stored so that the business can proceed to the relevant standard according to the project. This is the operation line 180 that is statistically displayed.

업무관련 표준, 또는 국제표준은 외부기관의 사이트에 접속할 수 있도록 구성되어 실행단계에서 국제화된 업무를 진행할 수 있도록 구성되어 있다. The work-related standard or international standard is configured to access the site of an external organization and is configured to carry out internationalized work in the execution stage.

프로젝트 진행은 하나의 부서만이 프로세스 진행부서가 아니기 때문에 관련된 부서가 상호 협력하여 진행할 수 있도록 프로그램 적으로 관련부서와의 협력 및 진행순서가 표시되며, 부서별 통계도 하나의 표에서 게시되어 업무적인 유대관계를 쉽게 파악할 수 있다.Since only one department is not a process progress department, the progress and order of cooperation with related departments are displayed programmatically so that related departments can cooperate with each other. Statistics of each department are also posted in one table for business ties. Relationships can be easily identified.

관련부서의 진행상태가 하나의 실행 창에서 가시적으로 확인되도록, 작성, 검토, 확인, 승인 등 현재상태가 나타날 수 있도록 구성되어 있고, 현재상태를 세부화면을 통해서 내용을 파악할 수 있도록 도 12의 185 화면처럼 세부화면이 중첩되어 표시될 수 있도록 되어있다. It is structured so that the current status of creation, review, confirmation, approval, etc. can be visually confirmed in one execution window of the related department, and 185 of FIG. 12 can be used to grasp the current status through the detailed screen. Like the screen, the detailed screen can be displayed overlapping.

도 13은 본 발명의 온라인 프로세스통합솔루션을 구성하는 개선(improvement)모줄 화면을 보여주는 사진이다.13 is a picture showing an improvement (improvement) bar screen constituting the online process integration solution of the present invention.

도 14는 본 발명의 온라인 프로세스통합솔루션을 구성하는 개선(improvement)모줄 세부화면을 보여주는 사진이다.FIG. 14 is a photograph showing a detailed screen of an improvement line constituting the online process integration solution of the present invention.

도 13, 14를 참조하여 설명하면, 진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 게시하고 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜는 개선(improvement)모줄(190)이다.13 and 14, it is an improvement module 190 that improves the project process by reviewing and evaluating the progress of the project, grasping and publishing the status of the project, and making corrective actions that can be improved.

프로젝트의 진행상태를 지속적으로 개선시켜 성공할 수 있도록 내부 심사뿐만 아니라, 외부 컨설팅 지도업체와의 유기적인 심사 지도편달이 되도록 On-Line 상태에서 시정조치하고 인증할 수 있도록 프로그램화 되어있다.It is programmed to correct and rectify and certify in an on-line state so that the progress of the project can be continuously improved and succeeded.

프로젝트의 개선상태가 프로그램화되어 가시적으로 나타날 수 있도록, 심사대상 프로세스 표준이 선정되어 체크리스트가 자동으로 생성되어, 생성된 항목 중에서 심사대상이 선정되면서 가중치가 부여되어 엑셀 또는 프로그램 적으로 점수 계산이 되어서 개선 상태가 신호등처럼 적색, 노란색, 푸른색으로 표시되어 개선상태를 가시적으로 확인할 수 있다. In order for the improvement status of the project to be programmed and visually displayed, the process standard to be audited is selected and a checklist is automatically generated. The improvement status is displayed in red, yellow, and blue like a traffic light, so you can visually check the improvement status.

심사(Audit) 결과 부적합 상태의 프로젝트는 원인분석, 재발방지대책을 수립하고, 다시 수평 전개할 수 있도록 조치하면서, 조치완료 여부를 원격에서 모니터닝 할 수 있도록 하여, 부적합 프로젝트를 집중 관리하여 적합화 되도록 유도할 수 있게, 부적합프로젝트보고서를 프로그램 적으로 집중관리 할 수 있다. As a result of the audit, a project that is in a non-conforming state can be analyzed by establishing a cause analysis, prevention of recurrence, and horizontally deployed, while remotely monitoring whether the action has been completed, so that the non-conforming project is centrally managed and adapted. In order to induce as much as possible, the nonconforming project report can be intensively managed programmatically.

부서별 개선이슈 상태를 부서별로 파악하여 부서의 상태를 집중하여 미시적으로 볼 수 있고, 관련 부서를 모두 모아서 통계적으로 거시적으로 볼 수 있도록, 도 14의 195 화면처럼 미시적인 화면과 거시적인 화면이 세부적으로 나타날 수 있도록 프로그램화 되어있다. The microscopic and macroscopic screens, such as the 195 screen in FIG. 14, are detailed in order to grasp the status of each department's improvement issues for each department to focus on the department's status and collect all related departments for statistical and macroscopic view. It is programmed to appear.

도 15는 본 발명의 온라인 프로세스통합솔루션을 구성하는 커뮤니티(community)모줄 화면을 보여주는 사진이다.FIG. 15 is a photograph showing a community bar screen constituting the online process integration solution of the present invention.

도 15를 참조하여 설명하면, 프로젝트 진행을 위한 공지사항, 회의사항을 게시하고 알리는 커뮤니티(community)모줄(200)이다. 공지사항 목록, 진행된 회의 자료, 프로젝트 진행 시 프로세스의 업데이트 알림자료를 저장하여 프로젝트를 원활하게 진행할 수 있도록 관련자료를 공지하고 메일을 통해서 알려주는 메일 송수신 기능이 포함되어있다.Referring to FIG. 15, it is a community line 200 that posts and announces announcements and meetings for project progress. It includes a mail sending / receiving function to notify related data and notify via e-mail so that the project can be progressed smoothly by saving a list of announcements, proceedings of meetings, and update notifications of processes when the project is in progress.

도 16은 본 발명의 온라인 프로세스통합솔루션을 구성하는 시스템 컨트롤(system control) 모줄 화면을 보여주는 사진이다.16 is a photograph showing a system control module screen constituting the online process integration solution of the present invention.

도 16을 참조하여 설명하면, 프로젝트를 콘트롤하는 부서 및 관련사항을 게시하는 시스템 컨트롤(system control) 모줄(210)이다. 프로젝트를 콘트롤하는 부서 담당자의 데이터가 저장되어있고, 단계별 업무표준 및 업무표준 수정사항이 저장되어 있다.Referring to FIG. 16, it is a system control module 210 that posts departments and related matters that control a project. The data of department managers who control the project are stored, and the work standards and work standard modifications for each step are stored.

도 17은 본 발명의 온라인 프로세스통합솔루션을 이용한 IT 기반의 통합프로세스관리시스템 운용 단계를 보여주는 순서도이다.17 is a flow chart showing the steps of operating the IT-based integrated process management system using the online process integration solution of the present invention.

프로젝트 리스크가 분석되고 평가되고 리스크관리 계획이 수립되어 전략(strategy)모줄에 입력된다. (S100, S110)Project risk is analyzed and evaluated, and a risk management plan is established and entered into the strategy bar. (S100, S110)

프로젝트를 달성하기 위한 리스크분석관리 및 전략을 세워 프로세스 진행을 위한 기초사항들이 전략모줄에 입력된다. 프로젝트 리스크가 분석되면, 리스크를 관리하기 위한 방안을 만들고, 프로젝트를 진행하는 구성원의 교육훈련계획 및 교육이력이 보관 공유된다. Establish risk analysis management and strategies to achieve the project, and the basics for process progress are entered into the strategy bar. When the project risk is analyzed, a plan to manage the risk is created, and the education and training plan and education history of the members who carry out the project are archived and shared.

프로세스설계(process design)모줄에서 프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집(web editor)기를 이용하여 만들고 필요에 따라서 프로세스를 진행하는 표준(flow chart)을 레벨업 한다.(S120)In the process design line, create a standard (flow chart) that proceeds according to the project goals using a web editor, and level up the standard (flow chart) that progresses the process as needed. S120)

업무표준이 프로세스 터틀차트(Turtle Chart) 방법으로 핵심요소를 반영하고 각 프로세스의 선후행을 링크시켜 작업되도록 프로세스설계(process design)모줄이 형성되어 있음으로 표준작업이 매우 쉽게 진행된다.The standard work is very easy because the process design line is formed so that the work standard reflects the core elements in the process Turtle Chart method and links the predecessor of each process.

핵심성과지표(KPI)모줄에서 프로젝트 프로세스의 진행에 있어서 핵심성과지표가 정의되어 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시된다.In the key performance indicator (KPI) line, in the progress of the project process, the key performance indicator is defined and linked with a calculation formula that can be numerically calculated to monitor and evaluate the progress and visually display the progress.

프로젝트관리시스템(PMS)모줄에서 프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 관리담당부서의 진행시간계획에 맞추어 프로젝트을 관리하는 상황의 단계별 달성상태가 표시된다.(S130)In the project management system (PMS) line, for the project process progress management, the status of each stage of the project management is displayed according to the project's progress time plan according to the project (S130).

프로젝트 진행에 있어서 핵심성과지표가 정의되어, 핵심성과지표가 수치적으로 데이터화 할 수 있는 계산식을 프로그램화시켜, 진행되는 과정이 실시간 입력 데이터에 입각하여 목표치와 같이 동시에 표시된다. In the project progress, key performance indicators are defined, and a calculation formula capable of numerically dataizing the key performance indicators is programmed, and the progress is displayed simultaneously with the target value based on real-time input data.

목표치 달성율이 표시되면서 프로젝트의 성공을 미리 예측하여 정상적으로 진행될 수 있는 경우 노란 표시등이 켜지고, 프로젝트 진행 실적율이 저조하여 불량인 경우 붉은색 경고등이 켜지고, 프로젝트 진행이 순조롭게 진행되어 달성율이 100%를 넘는 경우 녹색등이 켜져서, 누구든지 프로젝트 진행상태를 쉽게 알 수 있게 된다.As the target achievement rate is displayed, the success of the project is predicted in advance, and if the project can proceed normally, the yellow indicator lights up, and if the project progress rate is poor, the red warning light turns on, and the project progresses smoothly, so the achievement rate exceeds 100% If the green light is on, anyone can easily see the progress of the project.

실행(operation)모줄에서 프로젝트을 실질적으로 진행하는 부서의 업무현황이 프로젝트에 따라 관련 표준으로 업무가 진행되면서 통계적으로 표시된다. (S140) In the operation line, the work status of the department that actually carries out the project is statistically displayed as the work progresses according to the relevant standard according to the project. (S140)

프로젝트를 실질적으로 진행하는 부서에서 프로젝트에 따라 관련 표준으로 업무가 진행될 수 있도록 업무표준이 저장되어 있으면서 매뉴얼에 따라 프로젝트를 진행하면서, 각각의 관련 진행부서의 업무현황이 실시간 데이터에 입각하여 통계적으로 표시된다.As the work standard is stored so that the work in the department that is actually carrying out the project can proceed to the relevant standard according to the project, the project progresses according to the manual while the work status of each relevant progress department is statistically displayed based on real-time data. do.

개선(improvement)모줄에서 진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜 프로젝트를 완료 성공시킨다.(S150, S160)By reviewing and evaluating the project progressed in the improvement line, grasp the status of the project progress, and make corrective actions that can be improved to improve the project process and complete the project successfully (S150, S160).

진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 게시하고, 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜 진행한다. The progress of the project is reviewed and evaluated to grasp and post the status of the project, and corrective actions that can be improved are made to improve the project process.

프로젝트의 진행상태를 지속적으로 개선시켜 성공할 수 있도록 내부 심사뿐만 아니라, 외부 컨설팅 지도업체가 심사 지도편달이 되도록 On-Line 상태에서 시정조치하고 인증한다.To improve the project's progress continuously and succeed, internal consulting, as well as external consulting guidance companies, correct and take corrective measures in the on-line state to facilitate guidance.

상술한 것과 같이, 본 발명의 바람직한 실시예를 참조하여 설명하였지만 해당분야에서 통상의 지식을 갖은 자라면 하기의 청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정하여 변경시킬 수 있음을 이해할 수 있을 것이다.As described above, the present invention has been described with reference to preferred embodiments, but those skilled in the art variously modify the present invention within the scope not departing from the spirit and scope of the present invention as set forth in the claims below. You can understand that you can change it.

본 발명은 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템 및 그 시스템 운용방법으로 확대하여 생산 등 기업의 모든 분야의 관리 방법으로 활용할 수 있다. The present invention can be extended to an integrated process management system using an online process integration solution and its system operation method and used as a management method in all areas of a company such as production.

또한 본 발명의 사상을 확대하여 언제 어디서나 작업이 가능한 시대에 On-Line을 이용한 업무 컨설팅을 할 수 있다.In addition, by expanding the spirit of the present invention, business consulting using On-Line can be performed at any time and anywhere.

100:통합프로세스관리시스템 110:프로세스통합솔루션
120:컨설팅업체직원단말 130:컨설팅지도업체직원단말
140:전략모줄 150:프로세스설계모줄
160:핵심성과지표모줄 170:프로젝트관리시스템모줄
180:실행모줄 190:개선모줄
200:커뮤니티모줄 210:시스템컨트롤모줄
100: integrated process management system 110: integrated process solution
120: Consulting company employee terminal 130: Consulting guidance company employee terminal
140: strategy bar 150: process design bar
160: Key performance indicator bar 170: Project management system bar
180: Execution bar 190: Improvement bar
200: Community bar 210: System control bar

Claims (9)

온라인 상태에서 컨설팅업체직원단말과 컨설팅지도업체직원단말이 유무선으로 연결된 상태의 프로세스통합솔루션;
상기 프로세스통합솔루션에서 프로젝트를 달성하기 위한 리스크분석관리 및 전략을 세워 프로세스 진행을 위한 기초를 만드는 전략(strategy)모줄;
프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집(web editor)기를 이용하여 만들고, 프로세스 절차에 따라 필요한 법규, 사내 규격 등의 데이터가 저장되거나 링크되어 표시될 수 있는 프로세스설계(process design)모줄;
프로젝트 프로세스의 진행에 있어서 핵심성과지표를 정의하여 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시되는 핵심성과지표(KPI)모줄;
프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 진행시간계획을 세워 단계별 달성상태가 표시되고 관리담당부서가 프로젝트를 관리하는 상황이 가시적으로 표시되는 프로젝트관리시스템(PMS)모줄;
프로젝트를 실질적으로 진행하는 부서에서 프로젝트에 따라 관련 표준으로 업무가 진행될 수 있도록 업무표준이 저장되어 있으면서 매뉴얼에 따라 프로젝트를 진행하고, 각각의 관련 진행부서의 업무현황이 통계적으로 표시되는 실행(operation)모줄;
진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 게시하고 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜는 개선(improvement)모줄;
프로젝트 진행을 위한 공지사항, 회의사항을 게시하고 알리는 커뮤니티(community)모줄;
프로젝트를 콘트롤하는 부서 및 관련사항을 게시하는 시스템 컨트롤(system control) 모줄이 있는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템.
A process integration solution in which the consulting company employee terminal and the consulting guidance company employee terminal are wired or wirelessly connected while online;
Strategy module to establish the foundation for process progress by establishing risk analysis management and strategy to achieve the project in the process integration solution;
Process design (process chart) in which a standard (flow chart) for processing a process according to the project goals is created using a web editor, and data such as required regulations and internal standards can be stored or linked according to the process procedure. design) bar;
A key performance indicator (KPI) module in which progress is monitored and evaluated in conjunction with a calculation formula that can be numerically calculated by defining key performance indicators in the progress of the project process, and progress is visually displayed;
A project management system (PMS) module that displays progress status for each stage by establishing a time schedule according to the project for management of project process progress, and visually displays the situation in which the management department manages the project;
In the department that is actually carrying out the project, the work standard is stored and the project is performed according to the manual so that the work can be carried out according to the relevant standard according to the project, and the operation status of each relevant progress department is statistically displayed. Hairline;
An improvement module that improves the project process by reviewing and evaluating the progress of the project, grasping and publishing the status of the project, and making corrective actions that can be improved;
A community line that posts and announces announcements and meetings for project progress;
An integrated process management system using an online process integration solution characterized by having a project control department and a system control module for posting related matters.
제 1항에 있어서, 상기 프로세스통합솔루션은 웹서버에 저장되거나 사내 서버에 저장되어 운용되는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템. The integrated process management system using an online process integration solution according to claim 1, wherein the process integration solution is stored in a web server or stored and operated in an in-house server. 제 1항에 있어서, 상기 프로세스설계모줄에서 프로세스를 진행하는 표준(flow chart)은 터틀차트(turtle chart)를 포함하는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템.The integrated process management system using an on-line process integration solution according to claim 1, wherein a standard flow chart in the process design line includes a turtle chart. 제 1항에 있어서, 상기 프로젝트관리시스템(PMS)모줄은 관리담당부서의 진행상태가 그래프 또는 경고표시등으로 가시적인 형태로 나타나는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템.According to claim 1, The project management system (PMS) module is an integrated process management system using an online process integration solution characterized in that the progress of the management department appears in a visible form as a graph or warning indicator. 제 4항에 있어서, 상기 경고표시등은 프로젝트의 성공을 미리 예측하여 정상적으로 진행될 수 있는 경우 노란 표시등이 켜지고, 프로젝트 진행 실적율이 저조하여 불량인 경우 붉은색 경고등이 켜지고, 프로젝트 진행이 순조롭게 진행되어 달성율이 100%를 넘는 경우 녹색등이 켜지는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템.The method according to claim 4, wherein the warning indicator predicts the success of the project in advance, and if it can proceed normally, the yellow indicator turns on, and if the project progress rate is poor, the red warning lamp turns on, and the project progress proceeds smoothly to achieve the achievement rate. An integrated process management system using an online process integration solution characterized by a green light when it exceeds 100%. 프로젝트 리스크가 분석되고 평가되어 전략(strategy)모줄에 입력되는 단계;
프로세스설계(process design)모줄에서 프로젝트 목표에 따라 프로세스를 진행하는 표준(flow chart)을 웹편집(web editor)기를 이용하여 만들어 저장되는 단계;
핵심성과지표(KPI)모줄에서 프로젝트 프로세스의 진행에 있어서 핵심성과지표가 정의되어 수치적으로 계산할 수 있는 계산식과 연동되어 진행되는 과정이 모니터링 되고 평가되어 진행상태가 가시적으로 표시되는 단계;
프로젝트관리시스템(PMS)모줄에서 프로젝트 프로세스 진행관리를 위하여 프로젝트에 따라 관리담당부서의 진행시간계획에 맞추어 프로젝트을 관리하는 상황의 단계별 달성상태가 표시되는 단계;
실행(operation)모줄에서 프로젝트을 실질적으로 진행하는 부서의 업무현황이 프로젝트에 따라 관련 표준으로 업무가 진행되면서 통계적으로 표시되는 단계;
개선(improvement)모줄에서 진행된 프로젝트를 심사 조사 평가하여 프로젝트 진행의 상태를 파악 개선될 수 있는 시정조치를 만들어 프로젝트 프로세스를 개선시켜는 단계를 갖는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템 운용방법.
The project risk is analyzed and evaluated and entered into the strategy bar;
Creating and storing a standard (flow chart) that proceeds with a process according to a project goal in a process design line using a web editor;
In the key performance indicator (KPI) line, in the progress of the project process, the key performance indicator is defined and linked with a calculation formula that can be numerically calculated to monitor and evaluate the progress and visually display the progress;
In the project management system (PMS) line, the step of displaying the achievement status of each step of managing the project according to the progress time plan of the management department according to the project for managing the project process progress;
In the operation (operation) line, the status of the work of the department that is actually carrying out the project is statistically displayed as the work progresses to the relevant standard according to the project;
Operation of an integrated process management system using an online process integration solution characterized by having a step of improving the project process by making a corrective action that can be improved by identifying and reviewing the progress of the project by examining and evaluating the project progressed in the improvement line Way.
제 6항에 있어서, 상기 프로세스설계모줄에서 프로세스를 진행하는 표준(flow chart)은 터틀차트(turtle chart)로 만드는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템 운용방법.The method of operating an integrated process management system using an online process integration solution according to claim 6, characterized in that the process chart in the process design line is a turtle chart. 제 6항에 있어서, 상기 프로젝트관리시스템(PMS)모줄은 관리담당부서의 진행상태가 그래프 또는 경고표시등으로 가시적인 형태로 나타내는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템 운용방법.7. The method of claim 6, wherein the project management system (PMS) module displays the progress of the management department in a visible form with graphs or warning indicators. 제 6항에 있어서, 상기 개선(improvement)모줄은 컨설팅지도업체가 방문조사하거나 유무선을 통하여 시스템에 접근하여 지도하는 것이 특징인 온라인 프로세스통합솔루션을 이용한 통합프로세스관리시스템 운용방법.7. The method of operating an integrated process management system using an online process integration solution according to claim 6, wherein the improvement line is characterized by a consulting guidance company visiting survey or accessing the system through wired or wireless.
KR1020180120406A 2018-10-10 2018-10-10 A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof KR102180345B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180120406A KR102180345B1 (en) 2018-10-10 2018-10-10 A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180120406A KR102180345B1 (en) 2018-10-10 2018-10-10 A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof

Publications (2)

Publication Number Publication Date
KR20200040464A true KR20200040464A (en) 2020-04-20
KR102180345B1 KR102180345B1 (en) 2020-11-18

Family

ID=70467133

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180120406A KR102180345B1 (en) 2018-10-10 2018-10-10 A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof

Country Status (1)

Country Link
KR (1) KR102180345B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116523471A (en) * 2023-06-25 2023-08-01 中建西南咨询顾问有限公司 Information generation method, apparatus, electronic device and computer readable medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101138444B1 (en) * 2011-12-05 2012-04-24 한국토지주택공사 Integrated risk management system and interated performance management system of the three-dimensional/complex development projects
KR20140034674A (en) * 2012-09-12 2014-03-20 한국디자인진흥원 Design consulting service system and method
KR101723767B1 (en) 2016-02-16 2017-04-05 주식회사 와이드티엔에스 Integration Electronic Approval System And Method Based On Business Process Management
KR101748399B1 (en) * 2016-11-21 2017-06-16 에버그린컨설팅(주) Optimized management method for integrated performance of public institution

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101138444B1 (en) * 2011-12-05 2012-04-24 한국토지주택공사 Integrated risk management system and interated performance management system of the three-dimensional/complex development projects
KR20140034674A (en) * 2012-09-12 2014-03-20 한국디자인진흥원 Design consulting service system and method
KR101723767B1 (en) 2016-02-16 2017-04-05 주식회사 와이드티엔에스 Integration Electronic Approval System And Method Based On Business Process Management
KR101748399B1 (en) * 2016-11-21 2017-06-16 에버그린컨설팅(주) Optimized management method for integrated performance of public institution

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116523471A (en) * 2023-06-25 2023-08-01 中建西南咨询顾问有限公司 Information generation method, apparatus, electronic device and computer readable medium
CN116523471B (en) * 2023-06-25 2023-09-22 中建西南咨询顾问有限公司 Information generation method, apparatus, electronic device and computer readable medium

Also Published As

Publication number Publication date
KR102180345B1 (en) 2020-11-18

Similar Documents

Publication Publication Date Title
Crane et al. Partnering measures
Kortelainen Global supply chains and social requirements: case studies of labour condition auditing in the People's Republic of China
Camison Total quality management and cultural change: A model of organisational development
Sharma et al. Performance measurement system: case studies from SMEs in India
KR20200040464A (en) A On-Line Total Process Management System With Total Quality Management Solution And A Operation Method With The Total Process Management System With Total Quality Management Solution Thereof
Mathur et al. Materiality analysis of SCM issues for Competitive Advantage: Study of an Indian FMEG Organization
Watson et al. Deploying Total Quality Management in Russia
US20080201154A1 (en) System and method for continuous process improvement
Stupak et al. Serving the American Public: Best Practices in Performance Measurement
Bos et al. An expert tool for integrating safety into project management
Woldesilassie et al. Quality management and its impact on product quality in manufacturing sectors in Ethiopia, Africa
Harris Connecting Quality Assurance With Safety Management in Construction
Storås Improvements to Contractor Workload Analysis
Manjunath et al. Manufacturing cost modelling and analysis for a Startup The case of 10MD
Siddika et al. Methodological Analysis of KPIs to Evaluate Contractor Performance of the Construction Project
Verkhovskaya et al. Particularities of the Implement of Quality Management System Based on the Requirements of the ISO 9001 in the Telecommunications Companies
Radulescu et al. Implementation of an environmental management system in a company for computers and electronic devices repairing
Porvari Improving the sales & operation planning process in a manufacturing company
Perković et al. Efficient project management by quality improvement of project processes
Criste Transition of INCD ECOIND SIMCM to the requirements of the new standards ISO 9001: 20015 and ISO 14001: 2015
Reniers INVESTIGATING THE FACTORS FACILITATING SAFETY AND SECURITY COLLABORATION IN THE CHEMICALS SECTOR
Nebeolisah Influence of supply chain quality management to competitive advantage
Ćorić et al. Business Process Management in Insurance Case of Jadransko Insurance Company
García et al. Quantification of the ethical-legal decisions
Boksha Operational risk assessment exercise and process proposition