KR20200020162A - A Structure For Connecting Wall And Slab Forms - Google Patents

A Structure For Connecting Wall And Slab Forms Download PDF

Info

Publication number
KR20200020162A
KR20200020162A KR1020180095533A KR20180095533A KR20200020162A KR 20200020162 A KR20200020162 A KR 20200020162A KR 1020180095533 A KR1020180095533 A KR 1020180095533A KR 20180095533 A KR20180095533 A KR 20180095533A KR 20200020162 A KR20200020162 A KR 20200020162A
Authority
KR
South Korea
Prior art keywords
formwork
wall
slab
tie bar
connector
Prior art date
Application number
KR1020180095533A
Other languages
Korean (ko)
Other versions
KR102217031B1 (en
Inventor
박상목
Original Assignee
박상목
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박상목 filed Critical 박상목
Priority to KR1020180095533A priority Critical patent/KR102217031B1/en
Publication of KR20200020162A publication Critical patent/KR20200020162A/en
Application granted granted Critical
Publication of KR102217031B1 publication Critical patent/KR102217031B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • E04G17/0728Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts
    • E04G17/0742Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members the element consisting of several parts remaining completely or partially embedded in the cast material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a structure for connecting a wall mold and a slab mold, which connects an outer mold for a wall to the slab mold to be spaced apart at a predetermined interval. According to the present invention, the structure for connecting a wall mold and a slab mold comprises a connector (10) fixing one end part to the upper surface of the slab mold (1) and connecting the other end part with one end part of any one selected from a tie bar (50) and a wire (6) to be able to adjust the angle. The connector (10) comprises a fixing part (20) fixed to the slab mold and a connection part (30) extended from the fixing part (20) and disposed at an end part of the upper surface of the slab mold (1). Accordingly, since the other end part of the connector (10) connects the connection part (30) and one end part of any one selected from the tie bar (50) and the wire (6) fixed on the outer surface of the outer mold for a wall to be able to adjust the angle, the one end part of the tie bar is inserted into the connector fixed to the upper surface of the slab mold and connected by a wedge pin, the one end part of the tie bar can be connected to the connector at a position tilted by a predetermined angle, and the wire is selectively wound around the fixing part of the connector to be knotted on the outer surface of the outer mold of the wall, such that the wall mold can be strongly and simply installed on the slab mold, thereby providing an effect of increasing work efficiency.

Description

벽체 거푸집과 슬라브 거푸집 연결구조{A Structure For Connecting Wall And Slab Forms} A Structure For Connecting Wall And Slab Forms}

본 발명은 벽체 거푸집과 슬라브 거푸집 연결구조에 관한 것으로, 특히 타이볼트를 사용하거 와이어로 벽체 거푸집을 슬라브 거푸집에 대하여 일정 간격이 유지되게 고정하도록 개선된 벽체 거푸집과 슬라브 거푸집 연결구조에 관한 것이다.The present invention relates to a wall formwork and a slab formwork connection structure, and more particularly, to a wall formwork and a slab formwork connection structure, which is improved to fix a wall formwork with a wire by using a tie bolt or to maintain a predetermined distance with respect to the slab formwork.

일반적으로, 슬라브 거푸집의 하측 단부에 벽체 형성을 위한 벽체용 내측 거푸집 패널들을 결합하고, 벽체용 철근을 설치한 다음 상기 내측 거푸집으로 부터 일정 간격 이격된 위치에 벽체용 외측 거푸집을 설치하여 그 사이에 콘크리트를 타설하여 벽체를 형성한다. 이때, 슬라브 벽체용 외측 거푸집을 상방으로 연장된 상태에서 슬라브 거푸집 상면에 소정 두께로 콘크리트를 타설하여 슬라브를 형성하게 되며, 상기 벽체용 외측 거푸집을 슬라브 거푸집에 대해 일정 간격이 유지되게 고정시켜야 한다.Generally, the inner formwork panels for the wall for wall formation are joined to the lower end of the slab formwork, the wall reinforcing bars are installed, and the outer formwork for the wall is installed at a spaced distance from the inner formwork. Cast concrete to form walls. At this time, in the state in which the outer formwork for the slab wall is extended upward to form a slab by placing concrete on the upper surface of the slab form to a predetermined thickness, the outer formwork for the wall should be fixed so as to maintain a constant distance to the slab formwork.

이를 위하여 종래에는 도 1과 2에 도시된 바와 같이, 슬라브 거푸집(1) 상면에 못을 박고 그 못(2)에 와이어(3)를 걸고 벽체 거푸집(4)에 형성된 구멍을 통해 와이어(2)의 단부를 인출하여 매듭을 지어 묶음으로써 슬라브 거푸집(1)에 벽체용 거푸집(4)을 일정간격이 유지되게 하였다.To this end, conventionally, as shown in Figs. 1 and 2, nail the upper surface of the slab formwork (1), hook the wire (3) to the nail (2) and through the hole formed in the wall formwork (4) By pulling out the ends of the knots and tying them together in a knot, the wall formwork 4 on the slab formwork 1 was maintained at a constant interval.

그러나, 상기와 같은 종래 벽체 거푸집과 슬라브 거푸집 연결구조에서는 콘크리트가 양생된 다음에, 벽체용 외측 거푸집의 외측 표면에 있는 와이어의 매듭을 절단한다.However, in the conventional wall formwork and slab formwork connection structure as described above, after the concrete is cured, the knot of the wire on the outer surface of the outer formwork for the wall is cut.

그러나, 상기한 종래 기술에서 와이어에 의한 연결작업에 시간이 많이 소요되는 문제점이 있었고, 와이어가 슬라브 저면에 노출되어 마감처리를 별도로 해야 하고 우수가 와이어를 통해 내부로 유입되는 문제가 있었다.However, in the above-described prior art, there was a problem in that the connection work by the wire takes a lot of time, and the wire is exposed to the bottom surface of the slab, which requires a separate finishing process, and rainwater flows into the inside through the wire.

이러한 슬라브 거푸집과 벽체 거푸집 형성에 시스템화된 슬라브 거푸집을 사용하여 시공 정밀도를 향상시킬 수 있고, 설치 효율을 높일 수 있도록 하는 슬라브 거푸집을 시스템적으로 구성한 거푸집 구조가 국내 공개특허공보 제2004-42029호에 개시되어 있다.Forming structure that systematically constructs slab formwork to improve the construction accuracy by using the slab formwork systemized for forming the slab formwork and wall formwork and to increase the installation efficiency is disclosed in Korean Patent Laid-Open Publication No. 2004-42029. Is disclosed.

그러나, 상기와 같은 시스템 거푸집은 고비용이 소요되므로 고층 건물에 주로 사용하고, 작은 콘크리트 건축물이나 구조물에는 시공 원가 절감을 위해 사용하지 않으며, 특히 데크 지지바를 벽체 거푸집에 연결하기 위한 부재의 구조가 복잡하여 제작 비용이 증가하게 될 뿐만 아니라, 그 설치도 쉽지 않은 단점이 있다.However, the system formwork as described above is expensive and is mainly used for high-rise buildings, and is not used to reduce construction costs in small concrete buildings or structures, and in particular, the structure of the member for connecting the deck support bar to the wall formwork is complicated. Not only will the production cost increase, but also its installation is not easy.

국내 공개특허공보 제2004-42029호Korean Laid-Open Patent Publication No. 2004-42029

본 발명의 목적은 상기한 종래 벽체 거푸집과 슬라브 거푸집 연결구조에 대한 문제점을 해결하기 위하여, 슬라브 거푸집 상면에 고정되는 연결구로 벽체용 거푸집과 연결하기 위한 타이바를 고정하거나 와이어로 벽체용 거푸집과 연결하여 효율적이고 견고하게 슬라브 거푸집에 대해 벽체용 거푸집을 일정간격으로 설치하도록 개선된 벽체 거푸집과 슬라브 거푸집 연결구조를 제공하는 것이다. In order to solve the problems of the conventional wall formwork and slab formwork connection structure, the object of the present invention by fixing the tie bar for connecting to the wall formwork with the connector fixed to the upper surface of the slab formwork or by connecting to the wall formwork with a wire It is to provide an improved wall formwork and slab formwork connection structure to install wall formwork at regular intervals for slab formwork efficiently and firmly.

상기한 목적을 달성하기 위하여, 본 발명에 의한 벽체 거푸집과 슬라브 거푸집 연결구조는, 벽체용 외측 거푸집을 슬라브 거푸집에 대해 일정 간격 유지되게 연결하는 벽체 거푸집과 슬라브 거푸집 연결구조에 있어서, 슬라브 거푸집 상면에 일단부가 고정되고 타단부에 타이바와 와이어 중에서 선택된 어느 하나의 일단부를 각도 조정가능하게 연결하도록 된 연결구를 포함하며, In order to achieve the above object, the wall formwork and the slab formwork connecting structure according to the present invention, in the wall formwork and slab formwork connecting structure to connect the outer formwork for the wall to be maintained at a predetermined interval with respect to the slab formwork, the upper surface of the slab formwork One end is fixed and the other end includes a connector adapted to angularly adjust one end selected from the tie bar and the wire,

상기 연결구는 슬라브 거푸집에 고정되는 고정부와, 상기 고정부에서 연장되고 슬라브 거푸집 상면의 단부에 배치되는 연결부를 포함하며, 타단부가 벽체용 외측 거푸집 외측면에서 고정되는 타이바와 와이어 중에서 선택된 어느 하나의 일단부가 상기 연결부에 각도 조정가능하게 연결되도록 구성된 것을 특징으로 하여 구성된다.The connector includes a fixing part fixed to the slab formwork, and a connection part extending from the fixing part and disposed at an end portion of the upper surface of the slab formwork, wherein the other end is selected from tie bars and wires fixed at an outer surface of the outer formwork for the wall. One end of the configuration is characterized in that configured to be connected to the connection angle adjustable.

상기 연결부는 고정부에서 벽체용 거푸집을 향해 연장된 연장부의 단부가 수직 상방으로 돌출된 형상으로 형성되고 좌우 두개 부분들로 분할되게 수직 상하로 관통되는 절개부가 형성됨과 함께, 상기 절개부에 대해 직교되게 횡방향으로 관통되어 타이바 고정을 위해 웨지핀을 삽입하기 위한 홀이 형성되어 구성된다.The connection part is formed in a shape in which the end of the extension portion extending from the fixing part toward the wall formwork is vertically projected upwardly and is vertically penetrated to be divided into two left and right parts, and is perpendicular to the incision. In this case, a hole for inserting the wedge pin for fixing the tie bar is formed in the transverse direction.

상기 연장부와 연결부는 고정부의 저면에 보다 상측에 형성되고, 상기 연결부의 저면에는 하방으로 돌출되게 형성된 지지부에 의해 상기 연장부와 연결부의 저면들과 슬라브 거푸집 상면 사이에 타설되는 콘크리트가 유입될 수 있게 공간이 형성되도록 구성되는 것이 바람직하다.The extension part and the connection part are formed on the lower side of the fixing part more than the upper side, the bottom of the connection part by the support portion formed to protrude downward, the concrete poured between the bottom part of the extension part and the connection part and the upper surface of the slab formwork flows in. It is preferred that the space be configured such that it can be formed.

상기 절개부에는 측벽용의 외측의 거푸집과의 연결을 위한 타이바의 일단부가 삽입되며, 횡방향으로 관통된 홀과 타이바의 일단부에 형성된 홀에 웨지핀을 관통되게 삽입하여 상기 연결부에 대하여 타이바의 일단부를 웨지핀을 중심으로 회전하여 타이바를 각도조정가능하게 연결하도록 된다.One end of the tie bar is inserted into the cutout for connection with the formwork on the outside of the side wall, and a wedge pin is inserted through the hole formed in the transverse direction and one end of the tie bar to penetrate the connection part. One end of the tie bar is rotated about the wedge pin to connect the tie bar in an adjustable angle.

상기 고정부는 원형을 이루고 저면에서 이격된 측면의 위치에 환형의 요홈부가 형성된다.The fixing part is formed in an annular groove in a circular position and spaced apart from the bottom side.

상기 연결구의 고정부 측면에 형성된 요홈부 둘레로 와이어를 걸고 외측의 벽체용 거푸집에 형성된 홀을 통해 와이어의 단부를 인출한 다음 매듭을 지어서 상기 거푸집 외측에 고정하도록 구성될 수 있다.Hook the wire around the groove formed on the side of the fixing portion of the connector and withdraw the end of the wire through a hole formed in the formwork for the outer wall and then knotted to fix the outside of the formwork.

본 발명에 따라 슬라브 거푸집 상면에 고정되는 연결구에 타이바의 일단부를 삽입하여 웨지핀으로 연결하며, 상기 타이바의 일단부를 연결구에 임의의 각도로 경사진 위치에서도 연결가능하며, 선택적으로 와이어로 연결구의 고정부에 감아서 벽체용 외측 거푸집의 외측면에 매듭을 지어 슬라브 거푸집에 대해 벽체 거푸집을 견고하고 간편하게 설치할 수 있어 작업 효율이 향상되는 효과가 있다.According to the present invention, one end of the tie bar is inserted into the connector fixed to the upper surface of the slab formwork and connected by wedge pins, and the one end of the tie bar can be connected to the connector at an angle inclined at any angle, and optionally, the connector with a wire. Winding the fixed part of the wall formwork knot on the outer surface of the wall formwork to form a wall formwork against the slab formwork can be installed firmly and simply has the effect of improving the work efficiency.

또한, 본 발명에 의한 연결구는 와이어로 벽체용 외측 거푸집을 일정 간격유지하도록 사용할 수도 있고, 이 경우 와이어가 슬라브 저면에 노출되지 않고 슬라브의 콘크리트 속에 매립되어 우수의 유입을 방지하며, 별도의 마감처리를 하지 않아도 되므로 시공 작업을 간편하게 수행할 수 있다. In addition, the connector according to the present invention can also be used to maintain a predetermined distance for the outer formwork for the wall with a wire, in this case, the wire is not exposed to the bottom of the slab is embedded in the concrete of the slab to prevent the inflow of rainwater, separate finishing treatment Construction work can be easily performed because there is no need to.

도 1은 종래 슬라브 거푸집에 대한 벽체용 거푸집 연결구조를 보여주는 개략적인 단면도.
도 2는 도 1에서 타설된 콘크리트가 양생된 다음 거푸집이 제거된 상태의 단면도.
도 3은 본 발명에 의한 벽체 거푸집과 슬라브 거푸집을 연결하는데 사용하는연결구와 타이로드 및 웨지핀의 분해사시도.
도 4는 도 3의 연결구의 단면도.
도 5는 도 4의 연결구를 슬라브 거푸집에 고정한 상태의 단면도.
도 6은 도 5에서 연결구에 타이바의 일단을 웨지핀으로 고정하고 벽체용 거푸집에 타단을 고정한 사용상태를 보여주는 단면도.
도 7은 도 6에서 타이바의 타단을 벽체용 거푸집에 고정하기 위하여 벽체용 거푸집에 형성된 슬로트에 삽입하는 것을 보여주는 사시도.
도 8은 본 발명에 의한 슬라브 거푸집에 대한 벽체용 거푸집 연결구조의 사용상태 단면도
도 9는 도 8에서 콘크리트가 양생된 다음에 슬라브 거푸집과 측벽용 거푸집을 제거하고 측벽에서 타이바의 돌출된 타단부를 제거한 상태의 단면도.
도 10은 본 발명에 의한 연결구를 와이어로 외측의 벽체용 거푸집을 슬라브 거푸집에 연결하는 것을 보여주는 단면도.
1 is a schematic cross-sectional view showing the formwork for the wall connection to the conventional slab formwork.
Figure 2 is a cross-sectional view of the state in which the formwork is removed after the concrete poured in Figure 1 is cured.
Figure 3 is an exploded perspective view of the connector and tie rod and wedge pin used to connect the wall formwork and slab formwork according to the present invention.
4 is a cross-sectional view of the connector of FIG.
5 is a cross-sectional view of the connector of Figure 4 fixed to the slab formwork.
Figure 6 is a cross-sectional view showing a use state in which one end of the tie bar fixed to the connector in Figure 5 with the wedge pin and the other end fixed to the wall formwork.
Figure 7 is a perspective view showing the insertion of the other end of the tie bar in the slot formed in the wall formwork in Figure 6 to form the wall formwork.
Figure 8 is a cross-sectional view of the use state of the wall formwork connecting structure for the slab formwork according to the present invention
FIG. 9 is a cross-sectional view of the slab formwork and sidewall formwork removed after the concrete is cured in FIG. 8 and the protruding other end of the tie bar is removed from the sidewall. FIG.
10 is a cross-sectional view showing the connection of the wall formwork for the outer wall with the slab formwork using the connector according to the present invention.

이하에서는 본 발명의 실시예를 도시한 첨부 도면을 참고하여 본 발명을 보다 상세히 설명하기로 한다.Hereinafter, with reference to the accompanying drawings showing an embodiment of the present invention will be described in more detail the present invention.

도 3 내지 6에 있어서, 본 발명에 의한 벽체 거푸집과 슬라브 거푸집 연결구조는 슬라브 거푸집(1) 상면에 연결구(10)가 고정되고, 상기 연결구(10)의 단부에 일단이 삽입되어 웨지핀(40)으로 타이바(50)의 일단이 고정되고 타이바의 타단은 슬라브 거푸집 보다 상방으로 배치되는 벽체용의 외측의 거푸집(5)에 고정되어 벽체용 외측 거푸집을 일정 간격 유지되게 지지하도록 구성된다.3 to 6, the wall formwork and the slab formwork connection structure according to the present invention, the connector 10 is fixed to the upper surface of the slab formwork 1, one end is inserted into the end of the connector 10, the wedge pin 40 One end of the tie bar 50 is fixed and the other end of the tie bar is fixed to the outer formwork 5 for the wall disposed above the slab formwork so as to support the outer formwork for the wall to be maintained at a constant interval.

상기 연결구(10)는 슬라브 거푸집에 일단이 고정되는 고정부(20)와, 상기 고정부(20)에서 연장되고 슬라브 거푸집(1) 상면의 단부에 배치되는 연결부(30)를 포함한다.The connector 10 includes a fixing part 20 having one end fixed to the slab formwork, and a connecting part 30 extending from the fixing part 20 and disposed at an end of the upper surface of the slab formwork 1.

상기 고정부(20)에는 고정용 홀(21)이 도시된 실시예에서는 두개의 홀(21)이 형성되며, 바람직하게는 상기 홀(21)들은 벽체용 거푸집(5)에 대하여 예각을 이루도록 경사지게 형성되고, 도 5에 도시된 바와 같이 상기 홀(21)들을 관통하여 슬라브 거푸집(1)에 못(22)을 경사지게 박아서 벽체용의 내외측 거푸집들 사이에 타설되는 콘크리트에 의한 압력에 대한 지지력이 증가되게 한다. In the embodiment in which the fixing hole 21 is shown in the fixing part 20, two holes 21 are formed, and preferably, the holes 21 are inclined to form an acute angle with respect to the wall formwork 5. Formed, as shown in Figure 5 through the holes (21) inclined to nail the nail 22 in the slab formwork 1 to the bearing force against the pressure by the concrete cast between the inner and outer formwork for the wall Causes this to be increased.

또한, 상기 고정부(20)는 원형을 이루고 측면에 환형의 요홈부(23)가 형성되는 것이 바람직하며, 상기 요홈부(23)는 와이어로 벽체용 거푸집, 외측의 거푸집(5)과 연결하기 위해 이용될 수 있다. 이에 대한 상세한 설명은 후술한다.In addition, it is preferable that the fixing portion 20 forms a circular shape and an annular recess 23 is formed on the side, and the recess 23 is connected to the formwork for the wall and the formwork 5 on the outside by a wire. Can be used for Detailed description thereof will be described later.

상기 연결부(30)는 고정부(20)에서 벽체용 거푸집(5)을 향해 연장된 연장부(25)의 단부가 수직 상방으로 돌출된 형상으로 형성되고 좌우 두개 부분(31)들로 분할되게 수직 상하로 관통되는 절개부(32)가 형성됨과 함께, 상기 절개부(32)에 대해 직교되게 횡방향으로 관통되는 홀(35)이 형성되어 구성된다.The connecting portion 30 is formed so that the end portion of the extension portion 25 extending from the fixing portion 20 toward the wall formwork 5 is formed to protrude vertically upward and is divided into two left and right portions 31. The cutout portion 32 penetrates up and down is formed, and the hole 35 penetrates in the transverse direction perpendicular to the cutout portion 32 is formed.

상기 연장부(25)와 연결부(30)는 고정부(20)의 저면에 보다 상측에 형성되어 있어서, 고정부(20)가 슬라브 거푸집(1)에 배치될 때, 연장부(25)와 연결부(30)는 슬라브 거푸집(1)의 상면에서 이격되게 배치되며, 상기 연결부(30)의 저면에는 하방으로 하방으로 돌출된 지지부(36)가 형성되어서 상기 연장부(25)와 연결부(30)의 저면과 슬라브 거푸집 상면 사이에 공간이 형성되게 하여 타설되는 콘크리트가 상기 공간으로 원활하게 유입되도록 함으로써 연결구(10)가 콘크리트 속에 완전히 매립된 상태로 되게 하는 것이 바람직하다. The extension part 25 and the connection part 30 are formed at an upper side of the bottom of the fixing part 20 so that when the fixing part 20 is disposed in the slab formwork 1, the extension part 25 and the connecting part are formed. 30 is disposed spaced apart from the upper surface of the slab formwork (1), the bottom of the connecting portion 30 is formed with a support portion protruding downwards downwards of the extension portion 25 and the connection portion 30 It is preferable that the connector 10 is completely embedded in the concrete by allowing a space to be formed between the bottom surface and the upper surface of the slab formwork so that the concrete to be poured smoothly flows into the space.

상기 절개부(32)에는 측벽용의 외측의 거푸집(5)과의 연결을 위한 타이바(50)의 일단부가 삽입되며, 이때, 횡방향으로 관통된 홀(35)과 타이바(50)의 일단부에 형성된 홀(51)에 웨지핀(40)을 관통되게 삽입하여 상기 연결부(30)에 대하여 타이바(50)의 일단부를 고정시킨다.One end of the tie bar 50 for connection with the formwork 5 on the side wall is inserted into the cutout 32. In this case, the hole 35 and the tie bar 50 penetrated in the lateral direction are inserted. The wedge pin 40 is inserted into the hole 51 formed at one end to fix one end of the tie bar 50 with respect to the connection part 30.

상기 연결부(30)에 일단부가 웨지핀(40)에 의해 고정된 타이바(50)의 타단부는 측벽용 외측의 거푸집(5) 사이의 공간을 가로질러 측벽용 외측의 거푸집(5)의 외측면에서 웨지핀에 의해 고정된다.The other end of the tie bar 50, one end of which is fixed to the connecting portion 30 by the wedge pin 40, is disposed outside the formwork 5 for the side wall across the space between the formwork 5 for the side wall. Secured by wedge pins on the sides.

상기한 본 발명에 의한 벽체 거푸집과 슬라브 거푸집 연결구조의 사용예를 도 7 내지 9를 참고하여 설명하기로 한다.An example of using the wall formwork and the slab formwork connection structure according to the present invention will be described with reference to FIGS.

본 발명에 의한 벽체 거푸집과 슬라브 거푸집 연결구조를 슬라브 거푸집(1)과, 벽체용 내측의 거푸집(3)과 외측의 거푸집(5) 사이에 철근(6)을 배근한 거푸집 구조에 적용하여 콘크리트 타설시 발생되는 압력에 대해 벽체용 외측 거푸집을 지지하도록 한다.The wall formwork and the slab formwork connection structure according to the present invention are applied to the formwork in which the reinforcing bar 6 is disposed between the slab formwork 1 and the formwork 3 for the wall and the formwork 5 for the outside. Support the outer formwork for the wall against the pressure generated during

이를 위하여, 연결구(10)의 일측에 형성된 고정부(20)를 슬라브 거푸집(1) 상면에 배치하고, 고정부(20)에 경사지게 형성된 홀(21)을 통해 못(22)으로 고정하고, 상기 연결구의 타측에 형선된 연결부(30)의 절개부(32)로 타이바(50)의 일단부를 삽입한 다음, 상기 절개부(32)에 대해 직교되게 횡방향으로도 관통되는 홀(35)을 통해 웨지핀(40)을 삽입하여 상기 타이바(50)의 일단부에 형성된 홀(51)을 관통하게 배치함으로써, 타이바(50)의 일단부를 연결구(10)에 고정한다. 이때, 상기 연결부(30)의 절개부(32)에 배치되는 타이바(50)의 일단부는 웨지핀(40)을 중심으로 회전가능하게 배치된다. To this end, the fixing part 20 formed on one side of the connector 10 is disposed on the upper surface of the slab formwork 1, and fixed with a nail 22 through the hole 21 formed to be inclined in the fixing part 20, One end of the tie bar 50 is inserted into the cutout portion 32 of the connection portion 30 formed on the other side of the connector, and then a hole 35 is also penetrated in the transverse direction perpendicular to the cutout portion 32. By inserting the wedge pin 40 through the hole 51 formed in one end of the tie bar 50, the one end of the tie bar 50 is fixed to the connector 10. At this time, one end of the tie bar 50 disposed in the cutout portion 32 of the connecting portion 30 is rotatably disposed around the wedge pin 40.

그런 다음, 상기 타이바(50)의 타단부는 도 8에 도시된 바와 같이 벽체용의 외측 거푸집(5)의 단부들의 양측에 요홈 형태로 형성되거나 거푸집에서 관통되게 형성된 슬로트(8)를 통해 외측으로 돌출되게 배치하고, 그 타측 단부에 형성된 홀(52)에 통상적으로 하는 것과 같이 웨지핀을 끼워 슬라브 거푸집과, 그 슬라브 거푸집 위로 돌출되게 설치되는 외측의 벽체용 거푸집(5)의 간격을 타이바로 일정하게 유지되게 한다.Then, the other end of the tie bar 50 is formed in the groove shape on both sides of the ends of the outer formwork 5 for the wall as shown in Figure 8 through the slot 8 formed to penetrate the formwork Arranged so as to protrude outwardly, the wedge pin is sandwiched between the slab formwork and the outer wall formwork 5 protruding from the slab formwork, as is conventionally made in the hole 52 formed at the other end thereof. Keep it constant.

이때, 외측의 벽체용 거푸집(5)에 형성된 슬로트(8)의 위치와 슬라브 거푸집(1) 상면에 고정되는 연결구와의 수평이 맞지 않을 경우에도, 상기 연결구(10)의 연결구(30)에 형성된 절개부(32)에서 타이바(50)의 일단부가 회전가능하게 된 구조로 됨으로써 외측 벽체용 거푸집(5)에 형성된 슬로트(8) 위치에 적합하여 각도 조정하여 타이바(50)를 설치할 수 있어 시공 작업을 보다 효율적으로 간편하게 수행할 수 있다. At this time, even when the position of the slot 8 formed in the wall formwork 5 on the outside and the connector is fixed to the upper surface of the slab formwork 1 is not horizontal, to the connector 30 of the connector 10 One end of the tie bar 50 is rotatable in the formed cutout 32 so that the tie bar 50 can be installed by adjusting the angle to suit the position of the slot 8 formed in the formwork 5 for the outer wall. The construction work can be performed more efficiently and simply.

상기 내측의 벽체용 거푸집(3)과 외측 거푸집(5) 및 슬라브 거푸집(1) 위에 콘크리트를 타설하여 양생한 다음에, 상기 거푸집들을 탈거한 뒤에 통상적으로 콘크리트 벽체(9) 외측으로 돌출된 타이바의 단부를 절단하여 제거하고, 연결구(10)를 슬라브 거푸집(1)에 고정한 못(22)을 절단하여 제거한다. 이때, 상기 연결구(10)의 연결부(30)의 저면에 돌출된 지지부(36)에 의해 연결부(30)의 저면과 슬라브 거푸집 사이에 공간이 형성되고, 그 공간으로 콘크리트가 슈입되므로 연결구(10)가 콘크리트에 일체로 형성된다. After placing and curing concrete on the inner wall formwork (3), the outer formwork (5) and the slab formwork (1), and then removing the formwork, the tie bar typically protrudes out of the concrete wall (9). The end of the cut is removed and the nail 22 fixing the connector 10 to the slab formwork 1 is cut and removed. In this case, a space is formed between the bottom surface of the connection portion 30 and the slab formwork by the support portion 36 protruding from the bottom surface of the connection portion 30 of the connector 10, and the concrete is fitted into the space so that the connector 10 is connected thereto. Is formed integrally with the concrete.

또한, 본 발명에 의한 벽체 거푸집과 슬라브 거푸집 연결구조에서는 전술한 바와 같이 타이바로 연결하는 대신에, 시공 현장의 상황에 따라 종래와 같이 와이어를 연결구(10)의 연결부(20) 측면에 형성된 요홈부(22)에 걸고 상기 와이어의 단부를 외측의 벽체용 거푸집 외측면에서 매듭지어 고정하도록 시공할 수도 있으며, 이러한 시공예에 대하여 도 10에 도시되어 있다.In addition, in the wall formwork and the slab formwork connection structure according to the present invention, instead of connecting with a tie bar as described above, according to the situation of the construction site, the recess formed in the connection portion 20 side of the connector 20 as in the prior art The end of the wire may be hooked to 22 to be knotted and fixed at an outer wall formwork outer surface, which is shown in FIG.

도 10에 있어서, 본 발명에 의한 연결구(10)는 와이어(60)로 외측의 벽체용 거푸집(5)을 슬라브 거푸집(1)에 연결하도록 사용될 수 있다.10, the connector 10 according to the present invention can be used to connect the outer wall formwork 5 to the slab formwork 1 with a wire 60.

본 발명에 의한 연결구(10)를 슬라브 거푸집(1)의 단부 상면에 일측의 고정부(20)가 못으로 고정된 상태에서 고정부(20)의 측면에 형성된 요홈부(23) 둘레로 와이어(60)를 걸고 외측의 벽체용 거푸집(5)에 형성된 홀(8)을 통해 와이어의 단부를 인출한 다음 매듭을 지어서 상기 거푸집(5) 외측에 고정함으로써, 벽체용 거푸집(5)을 슬라브 거푸집(1)에 대하여 일정한 간격으로 유지되게 고정할 수 있게된다.The connector 10 according to the present invention is wired around the recess 23 formed on the side of the fixing part 20 in a state where the fixing part 20 of one side is fixed to the upper surface of the end of the slab formwork 1 by a nail ( 60, the end of the wire is drawn through the hole 8 formed in the wall formwork 5 on the outside, and then knotted and fixed to the outside of the formwork 5 so that the wall formwork 5 is slab formwork ( It can be fixed to maintain at regular intervals with respect to 1).

이때, 상기 연결구(10)의 고정부(20)의 요홈부(23)는 슬라브 저면에서 이격된 위치에 형성되어 있고, 연결부(30)의 저면에는 하방으로 돌출되게 지지부(36)가 형성됨으로써, 상기 와이어(60)는 슬라브 저면에서 내측에 위치하게 되어 슬라브 속에 매립된 상태로 노출되지 않게 되므로, 종래와 같은 별도의 마감처리를 필요로 하지 않으며, 벽체에 스며든 우수가 와이어를 타고 슬라브 내부로 유입되더라도 유입되는 우수는 와이어와 결합된 콘크리트에 의해 슬라브 내측으로의 우수의 유동을 막을 뿐만 아니라 우수는 유동과정에서 콘크리트에 흡수되어 마르게 되므로, 사실상 우수가 와이어를 타고 슬라브로 내로 유입되지 않는 것과 같은 효과를 얻게 된다. In this case, the recess 23 of the fixing portion 20 of the connector 10 is formed at a position spaced apart from the bottom of the slab, and the support portion 36 is formed to protrude downward from the bottom of the connecting portion 30, Since the wire 60 is located on the inner side of the slab bottom so that the wire 60 is not exposed in the slab, the wire 60 does not need a separate finish as in the prior art, and the rainwater permeated into the wall rides into the slab. Even if it flows in, the rainwater flowing in not only prevents the flow of rainwater inside the slab by the concrete combined with the wire, but the rainwater is absorbed and dried by the concrete during the flow process, so that rainwater does not actually flow into the slab through the wire. You get an effect.

본 발명은 벽체 거푸집을 슬라브 거푸집에 대해 일정 간격으로 유지되게 연결하도록 이용될 수 있다.The invention can be used to connect the wall formwork to be held at regular intervals relative to the slab formwork.

1 : 슬라브 거푸집 6 : 와이어
8 : 홀 10 : 연결구
20 : 고정부 21 : 관통홀
23 : 요홈부 25 : 연장부
30 : 연결부 32 : 절개부
35 : 홀 40 : 웨지핀
50 : 타이바 51 : 홀
60 : 와이어
1: slab formwork 6: wire
8: hole 10: connector
20: fixed portion 21: through hole
23: groove 25: extension
30: connection part 32: incision
35: hole 40: wedge pin
50: tie bar 51: hole
60: wire

Claims (6)

벽체용 외측 거푸집을 슬라브 거푸집에 대해 일정 간격 유지되게 연결하는 벽체 거푸집과 슬라브 거푸집 연결구조에 있어서,
슬라브 거푸집(1) 상면에 일단부가 고정되고 타단부에 타이바(50)와 와이어(6)중에서 선택된 어느 하나의 일단부를 각도 조정가능하게 연결하도록 된 연결구(10)를 포함하며,
상기 연결구(10)는 슬라브 거푸집에 고정되는 고정부(20)와, 상기 고정부(20)에서 연장되고 슬라브 거푸집(1) 상면의 단부에 배치되는 연결부(30)를 포함하며, 타단부가 벽체용 외측 거푸집 외측면에서 고정되는 타이바(50)와 와이어(60) 중에서 선택된 어느 하나의 일단부를 상기 연결부(30)에 각도 조정가능하게 연결하도록 구성된 것을 특징으로 하는 벽체 거푸집과 슬라브 거푸집 연결구조.
In the wall formwork and slab formwork connection structure for connecting the outer formwork for the wall to be maintained at a constant interval with respect to the slab formwork,
One end portion is fixed to the upper surface of the slab formwork (1) and the other end comprises a connector (10) for connecting the one end of any one selected from the tie bar 50 and the wire (6),
The connector 10 includes a fixing part 20 fixed to the slab formwork, and a connecting part 30 extending from the fixing part 20 and disposed at an end of the upper surface of the slab formwork 1, and the other end of which is a wall. Wall formwork and slab formwork connection structure, characterized in that configured to connect the one end of any one selected from the tie bar (50) and the wire (60) fixed on the outer side of the outer formable to the connecting portion (30).
제 1항에 있어서,
상기 연결부(30)는 고정부(20)에서 벽체용 거푸집(5)을 향해 연장된 연장부(25)의 단부가 수직 상방으로 돌출된 형상으로 형성되고 좌우 두개 부분(31)들로 분할되게 수직 상하로 관통되는 절개부(32)가 형성됨과 함께, 상기 절개부(32)에 대해 직교되게 횡방향으로 관통되어 타이바 고정을 위해 웨지핀(40)을 삽입하기 위한 홀(35)이 형성되어 구성된 것을 특징으로 하는 벽체 거푸집과 슬라브 거푸집 연결구조.
The method of claim 1,
The connecting portion 30 is formed so that the end portion of the extension portion 25 extending from the fixing portion 20 toward the wall formwork 5 is formed to protrude vertically upward and is divided into two left and right portions 31. A cutout portion 32 penetrating up and down is formed, and a hole 35 for inserting the wedge pin 40 for fixing the tie bar is formed by being penetrated in the transverse direction perpendicular to the cutout portion 32. Wall formwork and slab formwork connection structure, characterized in that configured.
제 1항 또는 제2항에 있어서,
상기 연장부(25)와 연결부(30)는 고정부(20)의 저면에 보다 상측에 형성되고, 상기 연결부(30)의 저면에는 하방으로 돌출되게 형성된 지지부(36)에 의해 상기 연장부(25)와 연결부(30)의 저면들과 슬라브 거푸집 상면 사이에 타설되는 콘크리트가 유입될 수 있게 공간이 형성되도록 구성된 것을 특징으로 하는 벽체 거푸집과 슬라브 거푸집 연결구조.
The method according to claim 1 or 2,
The extension part 25 and the connection part 30 are formed above the bottom of the fixing part 20 and the extension part 25 by the support part 36 protruding downward from the bottom of the connection part 30. The wall formwork and slab formwork connection structure, characterized in that the space is formed so that the concrete can be introduced between the bottom surface and the slab formwork upper surface of the connecting portion 30.
제 2항에 있어서,
상기 절개부(32)에는 측벽용의 외측의 거푸집(5)과의 연결을 위한 타이바(50)의 일단부가 삽입되며, 횡방향으로 관통된 홀(35)과 타이바(50)의 일단부에 형성된 홀(51)에 웨지핀(40)을 관통되게 삽입하여 상기 연결부(30)에 대하여 타이바(50)의 일단부를 웨지핀을 중심으로 회전하여 타이바를 각도조정가능하게 연결하도록 된 것을 특징으로 하는 벽체 거푸집과 슬라브 거푸집 연결구조.
The method of claim 2,
One end of the tie bar 50 for connection with the formwork 5 on the side wall is inserted into the cutout 32, and one end of the hole 35 and the tie bar 50 penetrated in the transverse direction. Insert the wedge pin 40 through the hole 51 formed in the through to rotate the one end portion of the tie bar 50 with respect to the connecting portion 30 about the wedge pin to connect the tie bar so that the angle adjustable. Wall formwork and slab formwork connecting structure.
제 3항에 있어서,
상기 고정부(20)는 원형을 이루고 저면에서 이격된 측면의 위치에 환형의 요홈부(23)가 형성된 것을 특징으로 하는 벽체 거푸집과 슬라브 거푸집 연결구조.
The method of claim 3, wherein
The fixing part 20 is a wall formwork and slab formwork connection structure, characterized in that the annular groove portion 23 is formed in the position of the side surface formed in a circular shape and spaced apart from the bottom.
제 5항에 있어서,
상기 연결구(10)의 고정부(20) 측면에 형성된 요홈부(23) 둘레로 와이어(60)를 걸고 외측의 벽체용 거푸집(5)에 형성된 홀(8)을 통해 와이어의 단부를 인출한 다음 매듭을 지어서 상기 거푸집(5) 외측에 고정하도록 된 것을 특징으로 하는 벽체 거푸집과 슬라브 거푸집 연결구조.
The method of claim 5,
Hook the wire 60 around the recess 23 formed in the side of the fixing part 20 of the connector 10 and withdraw the end of the wire through the hole 8 formed in the wall formwork 5 on the outside Wall formwork and slab formwork connection structure, characterized in that the knot is fixed to the outside of the formwork (5).
KR1020180095533A 2018-08-16 2018-08-16 A Structure For Connecting Wall And Slab Forms KR102217031B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180095533A KR102217031B1 (en) 2018-08-16 2018-08-16 A Structure For Connecting Wall And Slab Forms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180095533A KR102217031B1 (en) 2018-08-16 2018-08-16 A Structure For Connecting Wall And Slab Forms

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020190153443A Division KR102131736B1 (en) 2019-11-26 2019-11-26 A Structure For Connecting Wall And Slab Forms

Publications (2)

Publication Number Publication Date
KR20200020162A true KR20200020162A (en) 2020-02-26
KR102217031B1 KR102217031B1 (en) 2021-02-18

Family

ID=69637704

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180095533A KR102217031B1 (en) 2018-08-16 2018-08-16 A Structure For Connecting Wall And Slab Forms

Country Status (1)

Country Link
KR (1) KR102217031B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0135882Y1 (en) * 1996-02-01 1999-03-30 이해명 Flat tie support
KR200342780Y1 (en) * 2003-11-21 2004-02-18 서보가설산업 주식회사 a maintain distance device of one’ns figure with injection concrete
KR200442029Y1 (en) 2007-04-30 2008-09-30 권희운 Rice flour steamer for rice cake
KR20170100829A (en) * 2016-02-26 2017-09-05 서경선 Top of the spacing member dies
KR20180012535A (en) * 2016-07-27 2018-02-06 배용웅 Angle adjustment tie
KR20180058397A (en) * 2016-11-24 2018-06-01 이호근 Fixing device for construction mold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0135882Y1 (en) * 1996-02-01 1999-03-30 이해명 Flat tie support
KR200342780Y1 (en) * 2003-11-21 2004-02-18 서보가설산업 주식회사 a maintain distance device of one’ns figure with injection concrete
KR200442029Y1 (en) 2007-04-30 2008-09-30 권희운 Rice flour steamer for rice cake
KR20170100829A (en) * 2016-02-26 2017-09-05 서경선 Top of the spacing member dies
KR20180012535A (en) * 2016-07-27 2018-02-06 배용웅 Angle adjustment tie
KR20180058397A (en) * 2016-11-24 2018-06-01 이호근 Fixing device for construction mold

Also Published As

Publication number Publication date
KR102217031B1 (en) 2021-02-18

Similar Documents

Publication Publication Date Title
JP5965544B2 (en) H-bar, and method for installing form using this H-bar and non-metallic plate
KR20120005460U (en) Breast wall sleeve
US3195278A (en) Dual lag screw anchoring insert for a concrete slab
KR101220811B1 (en) construction method for building and form
KR20200020162A (en) A Structure For Connecting Wall And Slab Forms
KR200461661Y1 (en) Fixing structure for handrail
JP6943581B2 (en) Wall beam joint structure
KR200465434Y1 (en) wire anchor
KR20180057380A (en) Supporting and connecting apparatus for foamwork
KR102131736B1 (en) A Structure For Connecting Wall And Slab Forms
US1973941A (en) Concrete-wall-form tie
KR102065623B1 (en) the improved yoke truss and the wall form structure using the same
KR101127765B1 (en) Wier Ankar
KR200352506Y1 (en) Supporting structure of mold
KR200443097Y1 (en) steel rest including insert
KR20180058397A (en) Fixing device for construction mold
KR20160055330A (en) Reinforcing Method by External Precast Concrete Wall Panel Using Prestressing Strands
KR102189982B1 (en) Tie bar fixing apparatus for maintain spacing a foam
KR101272189B1 (en) A fixing structure of soundproofing panel for slab
KR200457690Y1 (en) Block for the ground reinforcement structure
KR101933535B1 (en) Iron bar Fixing Device
KR101857682B1 (en) Rope fixing device for building cleaning
KR200470376Y1 (en) Side tie for use of interval maintenance device of mold
KR200234872Y1 (en) An iron reinforcing bar prop
JP5452805B2 (en) Precast concrete column member

Legal Events

Date Code Title Description
A201 Request for examination
A107 Divisional application of patent
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right