KR20180097034A - Mat installation method for land reclamation - Google Patents

Mat installation method for land reclamation Download PDF

Info

Publication number
KR20180097034A
KR20180097034A KR1020170023603A KR20170023603A KR20180097034A KR 20180097034 A KR20180097034 A KR 20180097034A KR 1020170023603 A KR1020170023603 A KR 1020170023603A KR 20170023603 A KR20170023603 A KR 20170023603A KR 20180097034 A KR20180097034 A KR 20180097034A
Authority
KR
South Korea
Prior art keywords
mat
barge
pulling member
reclamation
pulling
Prior art date
Application number
KR1020170023603A
Other languages
Korean (ko)
Inventor
김화성
이창헌
정민주
Original Assignee
김화성
이창헌
정민주
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김화성, 이창헌, 정민주 filed Critical 김화성
Priority to KR1020170023603A priority Critical patent/KR20180097034A/en
Publication of KR20180097034A publication Critical patent/KR20180097034A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/18Reclamation of land from water or marshes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a method to install a mat (100) under the water of a reclaimed area (10) to form a reclaimed area. According to the present invention, the method to install the mat (100) under the water comprises: a floating material preparation step of preparing a floating ship material (310) of a flexible material for making a floating ship (300) while being folded in a lateral direction; a floating ship making and mat stacking step of coupling a shape maintenance member (302) made of a floating material to the inside of the floating ship material (310) in the rear side of the reclaimed area (10) while unfolding the floating ship material (310) in the lateral direction by each one part so as to make the floating ship (300), and stacking the mat (100) on the floating ship (300); a mat rear end fixing step of fixing the rear end of the mat (100) to the rear side of the reclaimed land; a pulling material coupling step of coupling a pulling member (200) to the front end of the floating ship (300); and a mat installation step of allowing the mat (100) stacked on the floating ship (300) to be unfolded in the longitudinal direction as the floating ship (300) moves to the front side as the pulling member (200) is pulled to a front side in the front side of the reclaimed area (10), so as to allow the mat (100) to be installed while being floated on the water. Accordingly, installation is able to be facilitated and be performed without damaging the mat.

Description

부선을 이용한 간척지의 매트설치방법{MAT INSTALLATION METHOD FOR LAND RECLAMATION}{MAT INSTALLATION METHOD FOR LAND RECLAMATION}

본 발명은 건설 분야에 관한 것으로서, 상세하게는 부선을 이용한 간척지의 매트설치방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction field, and more particularly, to a method of installing a mat on a reclaimed land using a barge.

간척지(干拓地)를 형성하기 위하여, 제체사석 등에 의해 둑을 쌓아 그 내부에 간척영역을 형성하고, 간척영역 내에 매트를 설치한 후, 양수와 함께 매트 위에 토사(일반적으로 준설토)를 성토하고, 다양한 공법에 의한 연약지반 개량공사를 진행하는 공정을 취하는 것이 일반적이다.In order to form a reclaimed land, a dam is built up by a crushed stone or the like to form a reclamation area in the reclamation area, a mat is installed in the reclamation area, soil (generally dredged soil) It is common to take a process to carry out soft soil improvement work by various construction methods.

위 매트는 원지반을 성토지반과 분리하는 역할, 간척영역의 전체 지반이 균등하게 침하되도록 하는 역할 등의 중요역할을 수행한다.The mat plays an important role in separating the ground from the clay ground and the role of the entire ground in the reclamation area to settle down evenly.

그런데 종래에는 대단히 넓은 면적을 차지하는 간척영역에 대하여 매트를 손상 없이 설치하는 작업은 어렵다는 점, 간척영역은 아직 물이 많은 상태이므로 일반적인 육상장비가 들어가서 작업하기가 곤란하다는 점 등의 문제가 있었다.However, conventionally, there is a problem that it is difficult to install a mat on a reclamation area occupying a very large area without damaging it, and that the reclamation area is still in a state of being very watery, so that general land equipment is difficult to work.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 시공이 용이하고 매트의 손상 없는 설치가 가능하도록 하는 부선을 이용한 간척지의 매트설치방법을 제시하는 것을 그 목적으로 한다.SUMMARY OF THE INVENTION It is an object of the present invention to provide a method of installing a mat on a reclaimed land using a barge that is easy to install and allows installation without damaging the mat.

상기 과제의 해결을 위하여, 본 발명은 간척지를 형성하기 위하여, 간척영역(10)의 수중에 매트(100)를 설치하는 방법으로서, 부선(300)(艀船)을 제조하기 위한 가요성 재질의 부선자재(310)를 폭방향을 따라 접힌 상태로 준비하는 부선자재 준비단계; 상기 간척영역(10)의 후방에서, 상기 부선자재(310)를 일부분씩 폭방향을 따라 펼치면서, 상기 부선자재(310)의 내부에 부유하는 재질의 형상유지부재(302)를 결합하여 상기 부선(300)을 제조함과 아울러, 상기 부선(300)에 상기 매트(100)를 적치하는 부선 제조 및 매트 적치단계; 상기 매트(100)의 후단을 상기 간척지의 후방에 고정하는 매트 후단고정단계; 상기 부선(300)의 전단에 당김부재(200)를 결합하는 당김부재 결합단계; 상기 간척영역(10)의 전방에서 상기 당김부재(200)를 전방으로 당겨 상기 부선(300)이 전방으로 이동함에 따라, 상기 부선(300)에 적치된 상기 매트(100)가 길이방향을 따라 펼쳐지도록 함으로써, 상기 매트(100)가 수상에 부유하면서 설치되도록 하는 매트 설치단계;를 포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법을 제시한다.In order to solve the above problems, the present invention provides a method of installing a mat (100) in water of a reclamation area (10) in order to form a reclaimed land, comprising the steps of: Preparing a barbed line material 310 in a folded state along a width direction; The shape retaining member 302 which floats inside the barge member 310 is joined to the barge member 310 while the barge member 310 is stretched along the width direction at a portion behind the reclamation zone 10, 300 and a matting step for forming the mat 100 on the barge 300; Fixing the rear end of the mat (100) to the rear of the reclaimed paper; A pulling member coupling step of coupling the pulling member (200) to the front end of the barge (300); The pulling member 200 is pulled forward in front of the reclamation region 10 and the mat 100 is lifted along the longitudinal direction as the strand 300 moves forward, And a mat mounting step of allowing the mat (100) to float on the water phase by making the mat (100) float on the water surface.

상기 매트(100)는 상기 간척영역(10)의 폭 및 길이와 동일한 폭 및 길이를 갖도록 형성되고, 상기 부선 제조 및 매트 적치단계는, 상기 부선자재(310)의 제1 부분(311)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여 상기 부선(300)의 제1 부분(311)을 제조하는 부선 제1 부분 제조단계; 제조된 상기 부선(300)의 제1 부분(311)에 상기 매트(110) 중 일부를 길이방향을 따라 접힌 상태로 적치하는 매트 적치단계; 추가로 상기 부선자재(310)의 제2 부분(312)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여, 추가로 상기 부선(300)의 제2 부분(312)을 제조하는 부선 제2 부분 추가제조단계; 추가로 제조된 상기 부선(300)의 제2 부분(312)에 상기 매트(110) 중 추가로 일부를 길이방향을 따라 접힌 상태로 적치하는 추가 매트 적치단계;를 포함하는 것이 바람직하다.Wherein the mat 100 is formed to have a width and a length equal to the width and length of the reclamation region 10 and wherein the barge manufacturing and matting step comprises forming the first portion 311 of the barge- A first portion of the barge first portion 311 of the barge 300 by unfolding the barge material 310 and joining the shape retaining member 302 to the inside of the barge material 310; A matting step of stacking a part of the mat (110) in a folded state along a longitudinal direction on a first part (311) of the barge (300) manufactured; The second portion 312 of the barbed wire 310 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barbed wire 310, A barge second portion addition manufacturing step of manufacturing the second portion 312; And further mattressing the additional portion of the mat 110 in a folded state along the longitudinal direction to the second portion 312 of the barge 300 which is further manufactured.

상기 매트(100)는 상기 간척영역(10)의 길이와 동일한 길이를 갖도록 형성된 다수의 조각매트(110)의 폭방향 결합에 의해 형성되고, 상기 부선 제조 및 매트 적치단계는, 상기 부선자재(310)의 제1 부분(311)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여 상기 부선(300)의 제1 부분(311)을 제조하는 부선 제1 부분 제조단계; 제조된 상기 부선(300)의 제1 부분(311)에 상기 다수의 조각매트(110) 중 제1 조각매트(111)를 길이방향을 따라 접힌 상태로 적치하는 조각매트 적치단계; 추가로 상기 부선자재(310)의 제2 부분(312)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여, 추가로 상기 부선(300)의 제2 부분(312)을 제조하는 부선 제2 부분 추가제조단계; 추가로 제조된 상기 부선(300)의 제2 부분(312)에 상기 다수의 조각매트(110) 중 제2 조각매트(112)를 길이방향을 따라 접힌 상태로 적치하되, 상기 제1 조각매트(111)와 상기 제2 조각매트(112)를 결합하는 조각매트 결합 및 적치단계;를 포함하는 것이 바람직하다.Wherein the mat 100 is formed by a widthwise engagement of a plurality of engraved mats 110 formed to have a length equal to the length of the reclamation region 10, The first portion 311 of the barge 300 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barge material 310 to manufacture the first portion 311 of the barge 300, A first part manufacturing step; A step of stacking a first piece of mat (111) of the plurality of engraving mats (110) in a folded state along a length direction in a first portion (311) of the barge (300) manufactured; The second portion 312 of the barbed wire 310 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barbed wire 310, A barge second portion addition manufacturing step of manufacturing the second portion 312; A second piece of mat (112) of the plurality of piece mats (110) is folded along a longitudinal direction in a second part (312) of the barge (300) 111) and the second piece mat (112).

상기 부선자재 준비단계는, 가요성 재질의 재료를 말고 양단을 재봉하여 상기 부선자재(310)의 내부에 수납공간(301)이 형성되도록 하는 단계;를 포함하고, 상기 부선 제1 부분 제조단계는, 상기 부선자재(310)의 제1 부분(311)을 절개하여 절개트임부(301a)를 형성하고, 상기 절개트임부(301a)를 통해 상기 수납공간(301)에 상기 형상유지부재(302)를 수납한 후, 상기 절개트임부(301a)를 다시 봉합하는 단계;를 포함하는 것이 바람직하다.The step of preparing the barge material includes sewing both ends of the barge material without using a flexible material to form a storage space (301) inside the barge material (310), and the barge first part manufacturing step The first portion 311 of the barbed material 310 is cut to form a cutout portion 301a and the shape retaining member 302 is inserted into the accommodating space 301 through the cutout portion 301a, And then sewing the cutout portion 301a again.

상기 형상유지부재(302)는 스티로폼을 포함하는 것이 바람직하다.The shape retaining member 302 preferably includes styrofoam.

상기 매트 설치단계 이전, 상기 부선(300)의 전단 또는 후단에 상호 간격을 두고 다수의 보조부유체(320)를 결합하는 보조부유체 결합단계;를 포함하는 것이 바람직하다.And a subsidiary fluid coupling step of coupling a plurality of auxiliary fluid 320 at a front end or a rear end of the barge 300 before the mat installing step.

상기 당김부재(200)는, 중앙 당김부재(210); 전단이 상기 중앙 당김부재(210)의 중앙부에 결합하고, 후단이 각각 양측으로 벌어진 구조로 상기 매트(100)의 전단에 결합한 한 쌍의 보조 당김부재(220);를 포함하는 것이 바람직하다.The pulling member (200) includes a central pulling member (210); And a pair of auxiliary pulling members 220 coupled to a front end of the mat 100 in such a structure that a front end thereof is coupled to a central portion of the central pulling member 210 and a rear end thereof is opened to both sides.

상기 당김부재(200)는, 상기 중앙 당김부재(210), 보조 당김부재(220)의 상호 꼬임을 방지하도록, 상기 중앙 당김부재(210)의 중앙부에 결합한 꼬임방지부유체(230);를 더 포함하는 것이 바람직하다.The pulling member 200 further includes an anti-kinking fluid 230 coupled to a central portion of the central pulling member 210 to prevent mutual kinking of the central pulling member 210 and the auxiliary pulling member 220 .

상기 매트 설치단계는, 상기 간척영역(10)을 형성하는 둑(11) 위에 배치된 육상장비에 의해 상기 당김부재(200)를 전방으로 당기는 것이 바람직하다.It is preferable that the mat installing step pulls the pulling member 200 forward by the land equipment provided on the dam 11 forming the reclamation area 10. [

상기 매트 설치단계는, 상기 간척영역(10)의 외측에 배치된 선박에 의해 상기 당김부재(200)를 전방으로 당기는 것이 바람직하다.It is preferable that the mat installing step pulls the pulling member 200 forward by a ship disposed outside the reclamation area 10. [

본 발명은 시공이 용이하고 매트의 손상 없는 설치가 가능하도록 하는 부선을 이용한 간척지의 매트설치방법을 제시한다.The present invention proposes a method of installing a mat on a reclaimed land using a barge which is easy to install and enables installation without damaging the mat.

도 1 이하는 본 발명의 실시예를 도시한 것으로서,
도 1 내지 9는 부선 제조 및 매트 적치단계의 공정도.
도 10은 당김부재 결합단계의 공정도.
도 11은 매트 설치단계의 공정도.
1 shows an embodiment of the present invention,
Figs. 1 to 9 are process drawings of the barge manufacturing and matting step. Fig.
10 is a process chart of a step of engaging a pulling member.
Fig. 11 is a process chart of the mat mounting step. Fig.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 이하에 도시된 바와 같이, 본 발명은 기본적으로 간척지를 형성하기 위하여, 간척영역(10)의 수중에 매트(100)를 설치하는 방법에 관한 것으로서, 다음과 같은 공정에 의해 이루어진다.As shown in FIG. 1 and subsequent drawings, the present invention basically relates to a method for installing a mat 100 in a reclaimed region 10 in order to form a reclaimed land, by the following process.

부선(300)(艀船)을 제조하기 위한 비닐 등의 가요성 재질의 부선자재(310)를 폭방향을 따라 접힌 상태로 준비한다.A flexible wire material 310 made of a flexible material such as vinyl or the like for manufacturing the barge 300 is prepared in a folded state along the width direction.

간척영역(10)의 후방(육지 또는 둑)에서, 부선자재(310)를 일부분씩 폭방향을 따라 펼치면서, 부선자재(310)의 내부에 부유하는 재질의 형상유지부재(302)를 결합하여 부선(300)을 제조함과 아울러, 부선(300)에 매트(100)를 적치한다(도 1 내지 8).A shape retaining member 302 made of a material floating in the inside of the barbed wire 310 is stretched in the width direction of the barbed wire 310 at a rear portion (land or dike) of the reclamation region 10, And the mat 100 is mounted on the barge 300 (Figs. 1 to 8).

매트(100)의 후단을 간척지의 후방(육지 또는 둑)에 앵커(15) 등에 의해 고정하고, 부선(300)의 전단에 당김부재(200)를 결합한다(도 9,10).The rear end of the mat 100 is fixed to the rear of the reclaimed land by means of an anchor 15 or the like and the pulling member 200 is engaged with the front end of the barge 300 (Figs. 9 and 10).

간척영역(10)의 전방에서 당김부재(200)를 전방으로 당겨 부선(300)이 전방으로 이동함에 따라, 부선(300)에 적치된 상기 매트(100)가 길이방향을 따라 펼쳐지도록 함으로써, 매트(100)가 수상에 부유하면서 설치되도록 한다(도 11).By pulling the pulling member 200 forward from the front of the reclamation region 10 and allowing the mats 100 mounted on the barge 300 to spread along the longitudinal direction as the barges 300 move forward, (100) floats on the water surface (Fig. 11).

즉, 간척영역(10)의 후방에 부선(300) 및 매트(100)를 폭방향을 따라 펼쳐놓고, 당김부재(200)에 의해 부선(300)을 전방으로 당겨 매트(100)가 펼쳐지도록 함으로써 간척영역에 대하여 한번의 당김 공정에 의해 매트가 설치되도록 한 것이다.In other words, by spreading the barge 300 and the mat 100 along the width direction behind the reclamation area 10 and pulling the barge 300 forward by the pulling member 200, the mat 100 is unfolded And the mats are installed by a single pulling process on the reclamation area.

매트는 합성수지에 의한 천 재질이므로, 이것만으로는 넓은 영역의 간척영역에 대하여 일률적으로 펼쳐지기 어려우나, 매트(100)를 적치한 부선(300)을 전방으로 당기면서 매트(100)가 펼쳐지도록 하므로, 부선(300) 및 매트(100)의 부유성으로 인하여 매트(100)가 간척영역 내부의 수상에 부유하면서 설치될 수 있다.However, since the mat 100 is unfolded while pulling the barge 300 on which the mat 100 is placed forward, the bar 100 can not be unfolded uniformly, The mat 100 can be installed while floating on the water in the reclamation area owing to the floating property of the mat 300 and the mat 100.

따라서 시공이 용이하고 매트의 손상 없는 설치가 가능하다는 효과가 있다.Therefore, there is an effect that installation is easy and installation without damage of the mat is possible.

이하, 본 발명에 의한 공법의 구체적 실시예에 대하여 설명한다.Hereinafter, concrete examples of the method according to the present invention will be described.

간척사업은 일반적으로 폭, 길이가 수백m ~ 수km에 이르는 대단히 넓은 면적을 대상으로 하여 이루어지므로, 그 전영역을 덮도록 설치되는 매트의 크기도 대규모가 되어야 한다.Since reclamation projects are usually made on very large areas of widths and lengths ranging from hundreds of meters to several kilometers, the size of the mats installed to cover the entire area must also be large.

또한, 간척영역의 일부씩 나누어 다수의 매트를 설치하는 경우, 추후 이들을 수중(또는 뻘)에서 상호 봉합해야 한다는 어려움이 있으므로, 한번에 간척영역의 전영역을 덮을 수 있는 크기의 매트를 설치하는 것이 바람직하다.Further, when a plurality of mats are divided by a part of the reclamation area, it is difficult to mutually seal them in the water (or midge) in the future. Therefore, it is preferable to provide a mat having a size capable of covering the entire area of the reclamation area at one time Do.

부선의 경우에도, 간척영역의 폭과 동일한 폭을 갖는 규모의 부선을 미리 제조하여 현장에 운반하는 것은 대단히 어려운 일이므로, 비닐과 같은 부선자재(310)를 폭방향을 따라 접힌 상태로 현장에 가져와서, 일부씩 펼치면서 그 내부에 스티로폼 등의 형상유지부재(302)를 결합하는 방식으로 제조하는 것이 바람직하다.In the case of barges, it is very difficult to manufacture barges having a width equal to the width of the reclamation zone and transport them to the site in advance. Therefore, the barge material 310 such as vinyl is folded along the width direction It is preferable that the shape-retaining member 302 such as Styrofoam is coupled to the inside thereof while partially coming apart.

이에 관한 2가지 구체적 실시예에 대하여 설명한다.Two specific embodiments related to this will be described.

첫째, 매트(100)가 간척영역(10)의 폭 및 길이와 동일한 폭 및 길이를 갖도록 형성하는 경우이다.First, the mat 100 is formed so as to have the same width and length as the width and length of the reclamation area 10.

이를 위하여 미리 다수의 매트를 상호 봉합하여 간척영역의 전영역을 덮을 수 있는 크기의 매트를 제조하고, 제조된 매트(100)를 폭방향 및 길이방향을 따라 접힌 상태로 준비하여 현장으로 이동한다.To this end, a plurality of mats are sewn in advance to manufacture a mat having a size capable of covering the entire area of the reclamation area, and the manufactured mat (100) is prepared in a folded state along the width direction and the length direction.

부선자재(310)의 제1 부분(311)을 폭방향을 따라 펼치고, 부선자재(310)의 내부에 스티로폼 등의 형상유지부재(302)를 결합하여 부선(300)의 제1 부분(311)을 제조한다(도 1 내지 6).The first portion 311 of the barge 300 is extended along the width direction and the shape retaining member 302 such as styrofoam is coupled to the inside of the barge material 310, (Figs. 1 to 6).

제조된 부선(300)의 제1 부분(311)에 매트(110) 중 일부를 길이방향을 따라 접힌 상태로 적치한다(도 7).A part of the mat 110 is folded along the longitudinal direction on the first portion 311 of the manufactured barge 300 (FIG. 7).

추가로 부선자재(310)의 제2 부분(312)을 폭방향을 따라 펼치고, 부선자재(310)의 내부에 형상유지부재(302)를 결합하여, 추가로 부선(300)의 제2 부분(312)을 제조한다(도 8,9).The second portion 312 of the barge material 310 is further extended along the width direction and the shape retaining member 302 is coupled to the inside of the barge material 310 so that the second portion 312 of the barge material 310 312) (Figs. 8 and 9).

추가로 제조된 부선(300)의 제2 부분(312)에 매트(110) 중 추가로 일부를 길이방향을 따라 접힌 상태로 적치한다.And a further part of the mat 110 is folded along the longitudinal direction to the second portion 312 of the barge 300 which is further manufactured.

이 과정을 반복하여, 간척영역의 폭과 동일한 폭을 갖는 부선 위에 간척영역의 폭과 동일한 폭을 갖는 매트가 적치되도록 한다.This process is repeated so that a mat having a width equal to the width of the reclamation region is deposited on a barge having the same width as the width of the reclamation zone.

둘째, 매트(100)가 간척영역(10)의 길이와 동일한 길이를 갖도록 형성된 다수의 조각매트(110)의 폭방향 결합에 의해 형성되는 경우이다.Second, the mat 100 is formed by a widthwise coupling of a plurality of engraving mats 110 formed to have the same length as the length of the reclamation area 10. [

이는 공장에서 간척영역(10)의 길이와 동일한 길이를 갖는 다수의 조각매트(110)를 제조하고, 이를 접힌 상태로 현장에 가져와서 상호 재봉에 의해 결합하면서 설치하는 방식이다.This is a method of manufacturing a plurality of engraving mats 110 having the same length as the length of the reclamation area 10 at the factory, bringing them in a folded state, and installing them while being joined by mutual sewing.

상술한 바와 같이, 부선자재(310)의 제1 부분(311)을 폭방향을 따라 펼치고, 부선자재(310)의 내부에 스티로폼 등의 형상유지부재(302)를 결합하여 부선(300)의 제1 부분(311)을 제조한다(도 1 내지 6).As described above, the first portion 311 of the barbed wire 310 is extended along the width direction, and the shape retaining member 302 such as styrofoam is coupled to the inside of the barbed wire 310, 1 portion 311 (Figs. 1 to 6).

제조된 부선(300)의 제1 부분(311)에 다수의 조각매트(110) 중 제1 조각매트(111)를 길이방향을 따라 접힌 상태로 적치한다(도 7).The first piece mat 111 of the plurality of engraving mats 110 is folded along the longitudinal direction in a first portion 311 of the manufactured barge 300 (Fig. 7).

추가로 부선자재(310)의 제2 부분(312)을 폭방향을 따라 펼치고, 부선자재(310)의 내부에 형상유지부재(302)를 결합하여, 추가로 부선(300)의 제2 부분(312)을 제조한다(도 8).The second portion 312 of the barge material 310 is further extended along the width direction and the shape retaining member 302 is coupled to the inside of the barge material 310 so that the second portion 312 of the barge material 310 312) (FIG. 8).

추가로 제조된 부선(300)의 제2 부분(312)에 다수의 조각매트(110) 중 제2 조각매트(112)를 길이방향을 따라 접힌 상태로 적치하되, 제1 조각매트(111)와 제2 조각매트(112)를 결합한다(도 9).The second piece mat 110 of the plurality of piece mats 110 is folded along the longitudinal direction in a second portion 312 of the barge 300 which is further manufactured, The second engraving mat 112 is engaged (Fig. 9).

이 과정을 반복하여, 간척영역의 폭과 동일한 폭을 갖는 부선 위에 간척영역의 폭과 동일한 폭을 갖는 매트가 적치되도록 한다.This process is repeated so that a mat having a width equal to the width of the reclamation region is deposited on a barge having the same width as the width of the reclamation zone.

부선(300)은 구체적으로 다음과 같은 공정에 의해 현장에서 제조한다.The barge 300 is specifically manufactured on-site by the following process.

비닐 등의 가요성 재질의 재료를 말고 양단을 재봉하여 부선자재(310)의 내부에 수납공간(301)이 형성되도록 한다(도 2).The both ends are sewed without using a flexible material such as vinyl so that the storage space 301 is formed inside the barbed material 310 (Fig. 2).

부선자재(310)의 제1 부분(311)을 절개하여 절개트임부(301a)를 형성하고, 절개트임부(301a)를 통해 수납공간(301)에 형상유지부재(302)를 수납한 후, 절개트임부(301a)를 다시 봉합한다(도 3 내지 5).After cutting the first portion 311 of the flake 310 to form the cutout portion 301a and storing the shape retaining member 302 in the storage space 301 through the cutout portion 301a, And the incision spur part 301a is sewn again (Figs. 3 to 5).

형상유지부재(302)는 물에 부유하는 재질로서, 부선(300)이 일정한 형상을 유지하도록 하는 스티로폼 등의 재질을 사용하면 된다(도 3,5).The shape retaining member 302 may be made of a material such as styrofoam that allows the barge 300 to maintain a constant shape (FIGS. 3 and 5).

현장에서 위 형상유지부재(302)의 결합작업과 함께, 부선(300)의 전단 또는 후단에 상호 간격을 두고 다수의 보조부유체(130)를 결합하는 경우, 수상의 매트 설치작업을 더욱 안정적으로 수행할 수 있다(도 5,6).In the case where a plurality of auxiliary fluid 130 are joined to each other at the front end or the rear end of the barge 300 together with the engagement of the stiffening member 302 in the field, (Figs. 5 and 6).

이후, 당김작업을 위하여 부선(300)의 전단에 당김부재(200)를 결합하는데, 이는 중앙 당김부재(210); 전단이 중앙 당김부재(210)의 중앙부에 결합하고, 후단이 각각 양측으로 벌어진 구조로 매트(100)의 전단에 결합한 한 쌍의 보조 당김부재(220);를 포함하는 구조를 취하는 것이 안정적인 당김작업을 위하여 바람직하다(도 10).Thereafter, the pulling member 200 is coupled to the front end of the barge 300 for pulling operation, which includes a central pulling member 210; And a pair of auxiliary pulling members 220 joined to the front end of the mat 100 in such a structure that the front end is coupled to the central portion of the central pulling member 210 and the rear ends are respectively opened to both sides, (Fig. 10).

중앙 당김부재(210)의 중앙부에 부유하는 재질에 의한 꼬임방지부유체(230)가 결합하는 경우, 당김작업 중 중앙 당김부재(210), 보조 당김부재(220)의 상호 꼬임을 방지할 수 있다.The middle pulling member 210 and the auxiliary pulling member 220 can be prevented from mutual twisting during pulling operation when the anti-twisting fluid 230 by the floating material is engaged with the central portion of the central pulling member 210 .

부선(300)의 전방 이동 시 매트(100)가 펼쳐지도록 하기 위하여, 매트(100)의 후단을 간척지의 후방(육지 또는 둑)에 앵커(15) 등에 의해 고정한다(도 9,10).The rear end of the mat 100 is fixed to the back (land or dike) of the reclaimed land with an anchor 15 or the like (Figs. 9 and 10) so that the mat 100 can be unfolded when the barge 300 is moved forward.

위와 같이 설치준비작업이 완료되면, 간척영역(10)의 전방에서 당김부재(200)를 전방으로 당김에 따라 매트(100)가 길이방향을 따라 펼쳐지도록 함으로써, 매트(100)가 수상에 부유하면서 설치되도록 한다(도 11).When the installation preparation work is completed as described above, the mat 100 is extended along the longitudinal direction by pulling the pulling member 200 forward from the front of the reclamation area 10, so that the mat 100 floats on the water (Fig. 11).

위 당김작업은 간척영역(10)을 형성하는 둑(11) 위에 배치된 포크레인 등의 육상장비(12)에 의해 당김부재(200)를 전방으로 당기는 방식으로 이루어질 수도 있고, 간척영역(10)의 외측에 배치된 선박에 의해 당김부재(200)를 전방으로 당기는 방식으로 이루어질 수도 있다.The pulling operation may be performed in such a manner that the pulling member 200 is pulled forward by the land equipment 12 such as a fork crane disposed on the weir 11 forming the reclamation region 10, And the pulling member 200 may be pulled forward by the ship placed on the outside.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 제1 부분(311)에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.The foregoing is merely illustrative of the first portion 311 of the preferred embodiment that can be implemented by the present invention, so that the scope of the present invention should not be construed as limited to the above embodiments, It is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.

10 : 간척영역 11 : 둑
100 : 매트 110 : 조각매트
200 : 당김부재 210 : 중앙 당김부재
220 : 보조 당김부재 230 : 꼬임방지부유체
300 : 부선 301 : 수납공간
301a : 절개트임부 302 : 형상유지부재
310 : 부선자재 320 : 보조부유체
10: reclamation area 11: dike
100: mat 110: engraving mat
200: pulling member 210: central pulling member
220: auxiliary pulling member 230: anti-kinking fluid
300: Barge 301: Storage space
301a: incision bridge 302: shape holding member
310: Flap material 320: Auxiliary fluid

Claims (10)

간척지를 형성하기 위하여, 간척영역(10)의 수중에 매트(100)를 설치하는 방법으로서,
부선(300)(艀船)을 제조하기 위한 가요성 재질의 부선자재(310)를 폭방향을 따라 접힌 상태로 준비하는 부선자재 준비단계;
상기 간척영역(10)의 후방에서, 상기 부선자재(310)를 일부분씩 폭방향을 따라 펼치면서, 상기 부선자재(310)의 내부에 부유하는 재질의 형상유지부재(302)를 결합하여 상기 부선(300)을 제조함과 아울러, 상기 부선(300)에 상기 매트(100)를 적치하는 부선 제조 및 매트 적치단계;
상기 매트(100)의 후단을 상기 간척지의 후방에 고정하는 매트 후단고정단계;
상기 부선(300)의 전단에 당김부재(200)를 결합하는 당김부재 결합단계;
상기 간척영역(10)의 전방에서 상기 당김부재(200)를 전방으로 당겨 상기 부선(300)이 전방으로 이동함에 따라, 상기 부선(300)에 적치된 상기 매트(100)가 길이방향을 따라 펼쳐지도록 함으로써, 상기 매트(100)가 수상에 부유하면서 설치되도록 하는 매트 설치단계;를
포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
As a method of installing the mat 100 in the water of the reclamation area 10 to form a reclaimed land,
A barbed material preparation step of preparing a barbed material 310 of a flexible material for manufacturing the barbed wire 300 (folded wire) in a folded state along the width direction;
The shape retaining member 302 which floats inside the barge member 310 is joined to the barge member 310 while the barge member 310 is stretched along the width direction at a portion behind the reclamation zone 10, 300 and a matting step for forming the mat 100 on the barge 300;
Fixing the rear end of the mat (100) to the rear of the reclaimed paper;
A pulling member coupling step of coupling the pulling member (200) to the front end of the barge (300);
The pulling member 200 is pulled forward in front of the reclamation region 10 and the mat 100 is lifted along the longitudinal direction as the strand 300 moves forward, So as to allow the mat (100) to float on the water phase;
Wherein the method comprises the steps of:
제1항에 있어서,
상기 매트(100)는 상기 간척영역(10)의 폭 및 길이와 동일한 폭 및 길이를 갖도록 형성되고,
상기 부선 제조 및 매트 적치단계는,
상기 부선자재(310)의 제1 부분(311)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여 상기 부선(300)의 제1 부분(311)을 제조하는 부선 제1 부분 제조단계;
제조된 상기 부선(300)의 제1 부분(311)에 상기 매트(110) 중 일부를 길이방향을 따라 접힌 상태로 적치하는 매트 적치단계;
추가로 상기 부선자재(310)의 제2 부분(312)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여, 추가로 상기 부선(300)의 제2 부분(312)을 제조하는 부선 제2 부분 추가제조단계;
추가로 제조된 상기 부선(300)의 제2 부분(312)에 상기 매트(110) 중 추가로 일부를 길이방향을 따라 접힌 상태로 적치하는 추가 매트 적치단계;를
포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 1,
The mat (100) is formed to have the same width and length as the width and length of the reclamation area (10)
The barge manufacturing and mat-
The first portion 311 of the barge 310 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barge 310 so that the first portion 311 A first portion of a barge;
A matting step of stacking a part of the mat (110) in a folded state along a longitudinal direction on a first part (311) of the barge (300) manufactured;
The second portion 312 of the barbed wire 310 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barbed wire 310, A barge second portion addition manufacturing step of manufacturing the second portion 312;
And further mattressing the second portion (312) of the barge (300), which is further manufactured, with a further part of the mat (110) folded along the longitudinal direction
Wherein the method comprises the steps of:
제1항에 있어서,
상기 매트(100)는 상기 간척영역(10)의 길이와 동일한 길이를 갖도록 형성된 다수의 조각매트(110)의 폭방향 결합에 의해 형성되고,
상기 부선 제조 및 매트 적치단계는,
상기 부선자재(310)의 제1 부분(311)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여 상기 부선(300)의 제1 부분(311)을 제조하는 부선 제1 부분 제조단계;
제조된 상기 부선(300)의 제1 부분(311)에 상기 다수의 조각매트(110) 중 제1 조각매트(111)를 길이방향을 따라 접힌 상태로 적치하는 조각매트 적치단계;
추가로 상기 부선자재(310)의 제2 부분(312)을 폭방향을 따라 펼치고, 상기 부선자재(310)의 내부에 상기 형상유지부재(302)를 결합하여, 추가로 상기 부선(300)의 제2 부분(312)을 제조하는 부선 제2 부분 추가제조단계;
추가로 제조된 상기 부선(300)의 제2 부분(312)에 상기 다수의 조각매트(110) 중 제2 조각매트(112)를 길이방향을 따라 접힌 상태로 적치하되, 상기 제1 조각매트(111)와 상기 제2 조각매트(112)를 결합하는 조각매트 결합 및 적치단계;를
포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 1,
The mat (100) is formed by a widthwise coupling of a plurality of engraving mats (110) formed to have the same length as the length of the reclamation area (10)
The barge manufacturing and mat-
The first portion 311 of the barge 310 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barge 310 so that the first portion 311 A first portion of a barge;
A step of stacking a first piece of mat (111) of the plurality of engraving mats (110) in a folded state along a length direction in a first portion (311) of the barge (300) manufactured;
The second portion 312 of the barbed wire 310 is extended along the width direction and the shape retaining member 302 is coupled to the inside of the barbed wire 310, A barge second portion addition manufacturing step of manufacturing the second portion 312;
A second piece of mat (112) of the plurality of piece mats (110) is folded along a longitudinal direction in a second part (312) of the barge (300) 111) and the second engraving mat (112);
Wherein the method comprises the steps of:
제2항 또는 제3항에 있어서,
상기 부선자재 준비단계는,
가요성 재질의 재료를 말고 양단을 재봉하여 상기 부선자재(310)의 내부에 수납공간(301)이 형성되도록 하는 단계;를 포함하고,
상기 부선 제1 부분 제조단계는,
상기 부선자재(310)의 제1 부분(311)을 절개하여 절개트임부(301a)를 형성하고, 상기 절개트임부(301a)를 통해 상기 수납공간(301)에 상기 형상유지부재(302)를 수납한 후, 상기 절개트임부(301a)를 다시 봉합하는 단계;를 포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 2 or 3,
The method of claim 1,
And sewing both ends of the flexible material so that the storage space (301) is formed inside the barbed material (310)
In the barbed first part manufacturing step,
The first portion 311 of the barbed material 310 is cut to form a cutout portion 301a and the shape retaining member 302 is inserted into the accommodating space 301 through the cutout portion 301a And then sewing the incising trough portion (301a) again after storing the trough portion (301a).
제4항에 있어서,
상기 형상유지부재(302)는 스티로폼을 포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
5. The method of claim 4,
Wherein the shape retaining member (302) comprises styrofoam.
제1항에 있어서,
상기 매트 설치단계 이전,
상기 부선(300)의 전단 또는 후단에 상호 간격을 두고 다수의 보조부유체(320)를 결합하는 보조부유체 결합단계;를
포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 1,
Before the mat mounting step,
A subsidiary fluid coupling step of coupling a plurality of auxiliary fluid 320 at a front end or a rear end of the barge 300 with each other;
Wherein the method comprises the steps of:
제1항에 있어서,
상기 당김부재(200)는,
중앙 당김부재(210);
전단이 상기 중앙 당김부재(210)의 중앙부에 결합하고, 후단이 각각 양측으로 벌어진 구조로 상기 매트(100)의 전단에 결합한 한 쌍의 보조 당김부재(220);를
포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 1,
The pulling member (200)
A central pulling member (210);
A pair of auxiliary pulling members 220 coupled to the front end of the mat 100 in such a structure that a front end thereof is coupled to a central portion of the central pulling member 210 and a rear end thereof is opened to both sides,
Wherein the method comprises the steps of:
제7항에 있어서,
상기 당김부재(200)는,
상기 중앙 당김부재(210), 보조 당김부재(220)의 상호 꼬임을 방지하도록, 상기 중앙 당김부재(210)의 중앙부에 결합한 꼬임방지부유체(230);를
더 포함하는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
8. The method of claim 7,
The pulling member (200)
An anti-twist fluid 230 coupled to a central portion of the central pulling member 210 to prevent mutual twist of the central pulling member 210 and the auxiliary pulling member 220;
Wherein the method comprises the steps of:
제1항에 있어서,
상기 매트 설치단계는,
상기 간척영역(10)을 형성하는 둑(11) 위에 배치된 육상장비에 의해 상기 당김부재(200)를 전방으로 당기는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 1,
In the mat mounting step,
Wherein the pulling member (200) is pulled forward by a land equipment disposed on a dam (11) forming the reclamation zone (10).
제1항에 있어서,
상기 매트 설치단계는,
상기 간척영역(10)의 외측에 배치된 선박에 의해 상기 당김부재(200)를 전방으로 당기는 것을 특징으로 하는 부선을 이용한 간척지의 매트설치방법.
The method according to claim 1,
In the mat mounting step,
Wherein the pulling member (200) is pulled forward by a ship disposed outside the reclamation area (10).
KR1020170023603A 2017-02-22 2017-02-22 Mat installation method for land reclamation KR20180097034A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170023603A KR20180097034A (en) 2017-02-22 2017-02-22 Mat installation method for land reclamation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170023603A KR20180097034A (en) 2017-02-22 2017-02-22 Mat installation method for land reclamation

Publications (1)

Publication Number Publication Date
KR20180097034A true KR20180097034A (en) 2018-08-30

Family

ID=63453417

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170023603A KR20180097034A (en) 2017-02-22 2017-02-22 Mat installation method for land reclamation

Country Status (1)

Country Link
KR (1) KR20180097034A (en)

Similar Documents

Publication Publication Date Title
CA2882653C (en) Fiber block planting system
EP3155178B1 (en) Method and apparatus for placement of a subterranean curtain below the face of the earth
KR102412430B1 (en) Method for laying geotextile mat
KR20160057198A (en) Apparatus and Method of Scouring of Foundation
ITMI20081586A1 (en) METHOD AND PLANT TO INTERRUPT A STRETCHED AND CONTINUOUS ELEMENT IN A BED OF A WATER BASIN
KR101832891B1 (en) Fixing and placing method of a foundation layer in water by geotextile with pre-attached armourstone mattress bag and roll structure
KR20180097034A (en) Mat installation method for land reclamation
CN210517614U (en) Landing section cable laying system
JP6951221B2 (en) How to lay a geomembrane sheet
CN104612128A (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
KR20180097033A (en) Mat installation method for land reclamation
EP3111014A1 (en) Piping screen
JP3917146B2 (en) Laying method and removing method of lining plate in open shield method
RU2272869C2 (en) Storage pit building method
JP2010229816A (en) Vacuum consolidation method using horizontal drain
JP2015218552A (en) Sand pack, underwater structure and construction method of underwater structure
CN105649095A (en) Combined cofferdam and construction method thereof
CN204356731U (en) A kind of abysmal area sea wall sand is laid equipment
CN206202609U (en) A kind of islands and reefs foundation construction platform
JP2010242373A (en) Installation method for covering plate in open shield method
CN103147451A (en) Method of forming flow control interface of underground flow media
JPS615109A (en) Laying method of impervious sheet in closed wate area
JP2018048723A (en) Pipe burying method and pipe burying structure
CN107761752B (en) A kind of steel cofferdam sinks and anchoring process
JPS59106611A (en) Laying work of water sealing sheet

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right