KR20180013474A - Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item - Google Patents

Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item Download PDF

Info

Publication number
KR20180013474A
KR20180013474A KR1020160097266A KR20160097266A KR20180013474A KR 20180013474 A KR20180013474 A KR 20180013474A KR 1020160097266 A KR1020160097266 A KR 1020160097266A KR 20160097266 A KR20160097266 A KR 20160097266A KR 20180013474 A KR20180013474 A KR 20180013474A
Authority
KR
South Korea
Prior art keywords
task
schedule
evaluation
business
memory area
Prior art date
Application number
KR1020160097266A
Other languages
Korean (ko)
Inventor
최재호
Original Assignee
최재호
델타피디에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최재호, 델타피디에스 주식회사 filed Critical 최재호
Priority to KR1020160097266A priority Critical patent/KR20180013474A/en
Priority to US15/276,319 priority patent/US11449834B2/en
Priority to JP2017145947A priority patent/JP6576981B2/en
Priority to US15/664,412 priority patent/US20180032956A1/en
Publication of KR20180013474A publication Critical patent/KR20180013474A/en
Priority to US17/874,878 priority patent/US11900326B2/en
Priority to US18/226,558 priority patent/US20240005281A1/en
Priority to US18/226,586 priority patent/US20230376906A1/en
Priority to US18/402,319 priority patent/US20240144186A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A business strategy map management method is executed by a business strategy map management server connected to a business strategy map user terminal. The method comprises: a project step of providing (1) a schedule-evaluation item having a schedule time line defined through start schedule and deadline schedule and business evaluation defined by unit of corresponding business or a plurality of sub-businesses for each of at least one business constituting a project read from a schedule-evaluation memory area, and (2) a business execution organization dependently associated with the schedule-evaluation item read from a business execution organization memory area; and a task step of providing a task-evaluation item having a task content designating a task constructor and task evaluation evaluated through a task creator about a task read from a task memory area, dependently associated with the schedule evaluation item, and defined by necessity of the task creator at the time of doing the business.

Description

일정-평가 아이템 및 할일-평가 아이템 기반의 업무전략의 수행을 지원하는 업무전략맵 관리 방법 및 장치{METHOD AND APPARATUS FOR ASSISTING STRATEGY MAP MANAGEMENT BASED ON SCHEDULE-ASSESSMENT ITEM AND TODO-ASSESSMENT ITEM}TECHNICAL FIELD [0001] The present invention relates to a business strategy map management method and apparatus for supporting the execution of business strategy based on an evaluation item,

본 발명은 업무전략맵 관리 기술에 관한 것으로, 보다 상세하게는, 업무 수행조직에 의해 수행되는 업무 프로젝트를 효율적으로 관리할 수 있는 일정-평가 아이템 및 할일-평가 아이템 기반의 업무전략의 수행을 지원하는 업무전략맵 관리 방법 및 장치에 관한 것이다.The present invention relates to a business strategy map management technology, and more particularly, to a business strategy map management technology that supports execution of business strategy based on schedule-evaluation items and task-evaluation items that can efficiently manage business projects performed by a task performing organization And more particularly, to a method and apparatus for managing a business strategy map.

기업의 ERP(Enterprise Resource Planning, 전사적자원관리)는 주로 전문가에 의해 관련 산업 및 업무 프로세스를 기초로 하여 해당 기업에 최적화되도록 개발 및 구축된다.Enterprise ERP (Enterprise Resource Planning) is mainly developed and built by experts based on related industry and business processes to optimize them.

종래의 ERP(Enterprise Resource Planning, 전사적자원관리)는 다수의 업무 수행조직에 의해 수행되는 업무 프로젝트의 일정을 효율적으로 관리하는 것에 있어서 많은 제약이 있다.Conventional Enterprise Resource Planning (ERP) has many limitations in efficiently managing the schedule of work projects performed by a plurality of task performing organizations.

한국 공개특허공보 제10-2007-0021858(2007.02.23)호는 전자적 네트워크 기반의 업무 스케줄 관리 장치에 관한 것으로, 기업 업무 진행의 효율을 향상시키고 MBO에 따른 업무 지시 및 상신 발생 그리고 해당 업무 진행시 업무의 특성에 따른 마일리지를 부여하여 업무 능률을 향상 시킬 수 있다.Korean Patent Application No. 10-2007-0021858 (Mar. 22, 2007) discloses an electronic network-based business schedule management apparatus, which improves the efficiency of corporate business progress, It is possible to improve the work efficiency by giving mileage according to the characteristic of work.

한국 공개특허공보 제10-2009-0001748(2009.01.09)호는 기업용 메신저 서비스 제공 시스템 및 방법에 관한 것으로, 상세하게는 기업용 메신저 상에서 기업 인프라 서비스의 정보 확인이 가능한 동시에, 기업 인프라 서비스로의 링크가 제공되고, 나아가서는 타사의 기업용 메신저 사용자와도 커뮤니케이션이 가능하도록 하는 기업용 메신저 서비스 제공 시스템 및 방법에 관한 것이다.Korean Patent Laid-Open Publication No. 10-2009-0001748 (2009.01.09) relates to a system and method for providing a messenger service for an enterprise, and more particularly to a system and method for providing a messenger service for a corporate, And moreover, to a system and a method for providing a messenger service for an enterprise that enables communication with a messenger user of a company of a third party.

한국 공개특허공보 제10-2010-0026086(2010.03.10)호는 업무지시시스템 및 방법에 관한 것으로, 운영업무를 담당자에게 지시하기 위한 업무지시시스템에 있어서, 상기 운영업무를 표시하기 위한 담당자단말기와; 2일 이상의 기간 동안 수행해야 할 운영업무 전체에 대한 전체업무정보가 저장되어 있는 데이터베이스를 가지고, 상기 데이터베이스에 저장된 전체업무정보에 기초하여 당일 수행해야 할 운영업무와 각 운영업무를 지시할 담당자단말기사이의 대응관계를 포함하는 일일업무정보를 생성하여 상기 담당자단말기에 전송하는 업무지시서버를 포함하는 것을 특징으로 한다. 이에 의해, 운영업무가 안정적으로 이루어 질 수 있다.[0002] Korean Patent Application No. 10-2010-0026086 (Mar. 3, 2010) discloses a business instruction system and method, and is a business instruction system for instructing a person in charge to perform an operation, ; And a database for storing overall business information on all of the operational tasks to be performed over a period of two or more days, And transmits the generated daily task information to the correspondent terminal. Thus, the operation can be stably performed.

1. 한국 공개특허공보 공개번호 제10-2007-0021858(2007.02.23)호1. Korean Unexamined Patent Publication No. 10-2007-0021858 (Feb. 23, 2007) 2. 한국 공개특허공보 공개번호 제10-2009-0001748(2009.01.09)호2. Korean Patent Laid-Open Publication No. 10-2009-0001748 (2009.01.09) 3. 한국 공개특허공보 공개번호 제10-2010-0026086(2010.03.10)호3. Korean Patent Publication No. 10-2010-0026086 (Mar. 10, 2010)

본 발명의 일 실시예는 업무 수행조직에 의해 수행되는 업무 프로젝트 및 일정을 효율적으로 관리할 수 있는 업무전략맵 관리 방법 및 장치를 제공하고자 한다.An embodiment of the present invention is to provide a business strategy map management method and apparatus capable of efficiently managing business projects and schedules performed by a business performance organization.

본 발명의 일 실시예는 일정-평가 아이템을 기반으로 업무 프로젝트 일정을 효율적으로 관리하고 평가할 수 있는 업무전략맵 관리 방법 및 장치를 제공하고자 한다.An embodiment of the present invention is to provide a business strategy map management method and apparatus capable of efficiently managing and evaluating work project schedule based on schedule-evaluation items.

본 발명의 일 실시예는 평가 매트릭스를 통해 업무 프로젝트 일정을 평가하여 업무 수행조직원들의 평가 및 정보 처리에 효율적으로 반영할 수 있는 업무전략맵 관리 방법 및 장치를 제공하고자 한다.An embodiment of the present invention is to provide a business strategy map management method and apparatus capable of evaluating a business project schedule through an evaluation matrix and efficiently reflecting it in evaluation and information processing of business execution personnel.

본 발명의 일 실시예는 할일-평가 아이템을 기반으로 업무 프로젝트에 관한 할일을 효율적으로 관리하고 평가할 수 있는 업무전략맵 관리 방법 및 장치를 제공하고자 한다.An embodiment of the present invention is to provide a method and apparatus for managing a task strategy map capable of efficiently managing and evaluating tasks related to task projects based on task tasks and evaluation items.

실시예들 중에서, 일정-평가 아이템 및 할일-평가 아이템 기반의 업무전략의 수행을 지원하는 업무전략맵 관리 서버에서 수행되는 업무전략맵 관리 방법은 (1) 일정-평가 메모리 영역으로부터 독출되는 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템과 (2) 업무 수행조직 메모리 영역으로부터 독출되는 상기 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 제공하는 프로젝트 단계 및 할일 메모리 영역으로부터 독출되며 상기 일정 평가 아이템과 종속적으로 연관되고 상기 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 제공하는 할일 단계를 포함한다.Among the embodiments, the task strategy map management method performed in the task strategy map management server supporting the performance of the task strategy based on the schedule-evaluation item and the task-to-evaluate item is as follows: (1) A schedule-time item defined by a start schedule and a deadline schedule for each of at least one task constituting the task and a task-evaluation item defined by the task or a plurality of corresponding sub-tasks, and (2) A project step for providing a task performance organization that is subordinated to the schedule-evaluation item read out from the organization memory area, a project step for reading out the task step from the to-be-memorized area and being associated with the schedule evaluation item, What to do with what is specified by the to-do handler And a step of providing the assessment items do-do-do have a rating that is evaluated by the constructor.

상기 프로젝트 단계는 상기 해당 업무가 완료되면 관리자 업무전략맵 사용자 단말로부터 상기 해당 업무 또는 상기 복수의 해당 서브-업무들에 관해 업무 처리자, 업무 목표 점수 및 업무 평가 점수를 통해 정의된 평가 매트릭스를 통해 평가된 업무평가를 수신하는 업무평가 단계를 포함할 수 있다.The project step is a step of evaluating the corresponding task or the plurality of corresponding sub-tasks from the manager task strategy map user terminal through the evaluation matrix defined by the task processor, the task goal score and the task score, And a task evaluation step for receiving the task evaluation.

상기 프로젝트 단계는 상기 업무평가가 완료되면 실제로 완료된 일정 타임라인을 일정-평가 아이템에 저장하고 상기 정의된 일정 타임라인과 상기 실제로 완료된 일정 타임라인 간의 분석을 기초로 상기 업무 수행조직의 업무 협동성(cooperativity)을 자동으로 평가하는 업무 수행조직 평가 단계를 포함할 수 있다.The project step stores the actually completed timeline in the schedule-evaluation item when the task evaluation is completed and determines the cooperativity of the task performing organization based on analysis between the defined schedule line and the actually completed schedule timeline ), Which is a function of the system.

상기 할일 단계는 상기 할일-평가 아이템의 제공 전에 상기 일정-평가 아이템에 종속적으로 연관되고 상기 프로젝트 또는 상기 적어도 하나의 업무 각각에 관해 업무 수행조직원에 의해 작성된 업무내역을 포함하는 업무활동을 수신하는 업무활동 기록 단계를 포함할 수 있다.Wherein the step of performing comprises the steps of: receiving a business activity that is subordinate to the schedule-evaluation item before the provision of the task-evaluation item, the business activity including a task description created by the task performing organization regarding the project or the at least one task; Activity recording step.

상기 업무활동은 상기 프로젝트 또는 상기 적어도 하나의 업무 각각에 관한 업무개선제안을 포함할 수 있다.The business activity may include a business improvement proposal for the project or each of the at least one business.

상기 할일 단계는 상기 업무개선제안이 수신되면 상기 업무 수행조직에 있는 적어도 일부의 업무 수행조직원에게 상기 업무개선제안에 관한 제안응답을 요청하여 상기 프로젝트의 일부에 관한 변경을 지원하는 업무활동 반영 단계를 더 포함할 수 있다.The step of performing the task includes a task activity reflecting step of requesting at least a task performing organization in the task performing organization to request a suggestion response regarding the task improvement suggestion and supporting a change regarding a part of the task when the task improvement proposal is received .

상기 할일 단계는 상기 할일-평가 아이템의 제공 전에 상기 일정-평가 아이템에 종속적으로 연관되고 상기 프로젝트, 상기 적어도 하나의 업무 각각 또는 상기 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드를 통해 구현될 수 있는 대화방을 제공하는 업무활동 논의 단계를 더 포함할 수 있다.Wherein the task step comprises a message thread that is subordinate to the schedule-evaluation item prior to the provision of the task-evaluation item and includes at least one message that can be shared with the project, the at least one task, And a business activity discussion step of providing a chat room that can be implemented through the Internet.

상기 할일 단계는 상기 메시지 쓰레드가 갱신될 때마다 업무 메신저를 통해 해당 업무 수행조직원에게 해당 메시지를 통보하는 단계를 포함하는 업무활동 알림 단계를 더 포함할 수 있다.The step of notifying may further include notifying the corresponding task performing agent through the task messenger whenever the message thread is updated.

상기 할일 단계는 상기 할일-평가 아이템을 상기 적어도 하나의 메시지 중 하나로 생성하는 단계를 포함하는 업무활동 갱신 단계를 더 포함할 수 있다.The step of performing the task may further include generating a task-evaluation item as one of the at least one message.

상기 할일 단계는 특정 시간 구간에서 전체 할일-평가 아이템의 개수 대비 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 개수를 기초로, 상기 업무 수행조직원에 대한 상기 프로젝트의 활동성(activity)을 평가하는 프로젝트 활동성 평가 단계를 포함할 수 있다.Wherein the task step includes a task activity evaluating activity of the project with respect to the task performing organization based on the number of task-evaluating items given to the specific task performing organization with respect to the total number of task-evaluating items in a specific time period And an evaluation step.

상기 할일 단계는 특정 시간 구간에서 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 평균적인 평가를 기초로 상기 특정 업무 수행조직원에 대한 상기 프로젝트의 적응성(adaptability)을 평가하는 프로젝트 적응성 평가 단계를 포함할 수 있다.The task step may include a project suitability evaluation step of evaluating the adaptability of the project to the specific task performing organization based on an average evaluation of task-to-evaluate items given to a specific task performing organization in a specific time period have.

상기 할일 단계는 특정 시간 구간에서 특정 업무활동에 종속적인 할일-평가 아이템의 예약점수의 합이 특정 기준 이상이면 해당 업무활동을 해당 업무 수행조직 외의 구성원에게도 알려줄 수 있는 주요 업무활동으로 설정하는 주요업무 설정 단계를 더 포함할 수 있다.The task step is to set the task activity as a main task activity that can notify the members other than the task performing organization if the sum of the scheduled scores of the task-to-be- And may further comprise a setting step.

상기 일정-평가 아이템은 업무활동 메모리 영역에 저장된 업무활동을 접근하기 위한 업무활동에 관한 연관자 및 메시지 메모리 영역에 저장되고 상기 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드를 통해, 구현될 수 있는 대화방을 접근하기 위한 대화방 연관자를 더 포함하고, 상기 적어도 하나의 메시지 중 적어도 일부는 상기 할일 메모리 영역에 저장된 할일-평가 아이템에 해당할 수 있다.The schedule-evaluation item includes an associator for business activities for accessing business activities stored in a business activity memory area and a message thread for storing at least one message that is stored in a message memory area and can be shared about the business activity Further comprising a chat room associator for accessing a chat room that can be implemented through the at least one of the at least one message and the at least one of the at least one message.

실시예들 중에서, 업무전략맵 관리 서버는 프로세서부(Processor Unit) 및 일정-평가 메모리 영역, 업무 수행조직 메모리 영역 및 할일 메모리 영역을 포함하는 메모리부(Memory Unit)를 포함하고, 상기 프로세서부는 (a) (1) 상기 일정-평가 메모리 영역으로부터 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템과 (2) 상기 업무 수행조직 메모리 영역으로부터 상기 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 가져오고, (b) 상기 할일 메모리 영역으로부터 상기 일정 평가 아이템과 종속적으로 연관되고 상기 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 가져온다.Among the embodiments, the task strategy map management server includes a processor unit, a memory unit including a schedule-evaluation memory area, a task performing organization memory area, and a task memory area, (1) a schedule line defined by a start schedule and a deadline schedule with respect to each of at least one task constituting a project from the schedule-evaluation memory area, and a schedule time line defined by a corresponding task or a plurality of corresponding sub- (2) a task performance organization that is subordinately related to the schedule-evaluation item from the task performance organization memory area, (b) a task performance organization that is subordinate to the schedule evaluation item To-do with respect to what is defined by the need of the to-do generator when dealing with said task To do with the assessment that evaluates to do with the information given to do, and constructors to do - get an evaluation item.

실시예들 중에서, 기록매체는 프로세서부 및 일정-평가 메모리 영역과 할일 메모리 영역을 포함하는 메모리부를 포함하는 업무전략맵 서버에서 수행되는 업무전략맵 관리 방법을 기록하고, 상기 업무전략맵 관리 방법은 (1) 일정-평가 메모리 영역으로부터 독출되는 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템과 (2) 업무 수행조직 메모리 영역으로부터 독출되는 상기 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 제공하는 프로젝트 단계 및 할일 메모리 영역으로부터 독출되며 상기 일정 평가 아이템과 종속적으로 연관되고 상기 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 제공하는 할일 단계를 포함한다.In embodiments, the recording medium records a business strategy map management method performed on a business strategy map server including a processor unit and a memory unit including a constant-evaluation memory area and a to-do memory area, (1) a schedule line defined by a start schedule and a deadline with respect to each of at least one task constituting a project read out from the schedule-evaluation memory area, and a task defined by a corresponding task or a plurality of corresponding sub-tasks Evaluation item having an evaluation and (2) a project step for providing a task performance organization that is dependent on the schedule-evaluation item read out from the task performance organization memory area, To the needs of the to-do generator when processing the relevant task Having to do with the assessment that evaluates to do more and do constructors specify a handler to do that is to do with respect to defined-do-do includes the steps of providing an evaluation item.

개시된 기술은 다음의 효과를 가질 수 있다. 다만, 특정 실시예가 다음의 효과를 전부 포함하여야 한다거나 다음의 효과만을 포함하여야 한다는 의미는 아니므로, 개시된 기술의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.The disclosed technique may have the following effects. It is to be understood, however, that the scope of the disclosed technology is not to be construed as limited thereby, as it is not meant to imply that a particular embodiment should include all of the following effects or only the following effects.

본 발명의 일 실시예에 따른 업무전략맵 관리 방법 및 장치는 업무 수행조직에 의해 수행되는 업무 프로젝트를 효율적으로 관리할 수 있다.The method and apparatus for managing a business strategy map according to an embodiment of the present invention can efficiently manage a business project performed by a business performing organization.

본 발명의 일 실시예에 따른 있는 업무전략맵 관리 방법 및 장치는 업무 수행조직에 의해 수행되는 업무 프로젝트 및 일정을 효율적으로 관리할 수 있다.A method and apparatus for managing a business strategy map according to an exemplary embodiment of the present invention can efficiently manage business projects and schedules performed by a task performing organization.

본 발명의 일 실시예에 따른 업무전략맵 관리 방법 및 장치는 일정-평가 아이템을 기반으로 업무 프로젝트 일정을 효율적으로 관리하고 평가할 수 있다.The method and apparatus for managing a business strategy map according to an embodiment of the present invention can efficiently manage and evaluate a business project schedule based on a schedule-evaluation item.

본 발명의 일 실시예에 따른 업무전략맵 관리 방법 및 장치는 평가 매트릭스를 통해 업무 프로젝트 일정을 평가하여 업무 수행조직원들의 평가 및 정보 처리에 효율적으로 반영할 수 있다.The method and apparatus for managing a business strategy map according to an embodiment of the present invention can evaluate the business project schedule through the evaluation matrix and efficiently reflect the evaluation of the business project schedule in the evaluation and information processing of business execution personnel.

본 발명의 일 실시예에 따른 업무전략맵 관리 방법 및 장치는 할일-평가 아이템을 기반으로 업무 프로젝트에 관한 할일을 효율적으로 관리하고 평가할 수 있다.The method and apparatus for managing a business strategy map according to an embodiment of the present invention can efficiently manage and evaluate a task related to a business project based on a task-evaluating item.

도 1은 본 발명의 일 실시예에 따른 업무전략맵 관리 시스템을 설명하는 도면이다.
도 2는 도 1에 있는 업무전략맵 관리 서버를 설명하는 블록도이다.
도 3은 도2에 있는 업무전략맵 관리 서버에 의하여 수행되는 업무전략맵 관리 프로시저를 프로젝트 단계를 중심으로 설명하는 흐름도이다.
도 4는 도2에 있는 업무전략맵 관리 서버에 의하여 수행되는 업무전략맵 관리 프로시저를 할일 단계를 중심으로 설명하는 흐름도이다.
도 5는 도 2에 있는 업무전략맵 실행기가 프로젝트 단계를 수행하는 과정을 나타내는 도면이다.
도 6은 도 1에 있는 업무전략맵 사용자 단말이 일정-평가 아이템 목록을 시각화한 것을 나타내는 도면이다.
도 7은 도 1에 있는 업무전략맵 사용자 단말이 일정-평가 아이템을 추가하는 과정(도 7a) 및 그에 따라 갱신된 일정-평가 아이템 리스트 화면(도 7b)을 나타내는 도면이다.
도 8은 도 1에 있는 업무전략맵 사용자 단말의 업무평가 전후로 보여지는 일정-평가 아이템 리스트 화면을 나타내는 도면이다.
도 9는 도 1에 있는 업무전략맵 사용자 단말이 할일-평가 아이템을 추가하는 과정을 나타내는 도면이다.
도 10은 도 1에 있는 업무전략맵 사용자 단말에서 보여지는 업무내역(활동기록) 리스트 화면을 나타내는 도면이다.
도 11은 도 1에 있는 업무전략맵 사용자 단말에서 보여지는 특정 일정-평가 아이템에 종속적인 업무대화방 화면을 나타내는 도면이다.
1 is a diagram illustrating a business strategy map management system according to an embodiment of the present invention.
2 is a block diagram illustrating the business strategy map management server of FIG.
FIG. 3 is a flowchart illustrating a business strategy map management procedure performed by the business strategy map management server shown in FIG. 2, focusing on a project stage.
FIG. 4 is a flowchart illustrating a task strategy map management procedure performed by the task strategy map management server in FIG. 2, with reference to a task step.
FIG. 5 is a diagram illustrating a process in which the task strategy map executor shown in FIG. 2 performs a project stage.
FIG. 6 is a diagram illustrating the visualization of a schedule-evaluation item list by the business strategy map user terminal of FIG. 1;
FIG. 7 is a diagram showing a process of adding a schedule-evaluation item (FIG. 7A) and a schedule-evaluation item list screen (FIG. 7B) updated by the task strategy map user terminal of FIG.
FIG. 8 is a view showing a schedule-evaluation item list screen shown before and after the task evaluation of the task strategy map user terminal shown in FIG. 1; FIG.
FIG. 9 is a diagram illustrating a process of adding a to-do item to the task strategy map user terminal of FIG. 1; FIG.
10 is a view showing a business history (activity record) list screen shown in the business strategy map user terminal of FIG.
FIG. 11 is a view showing a task chatting screen screen that is dependent on a specific schedule-evaluation item shown in the task strategy map user terminal of FIG.

본 발명에 관한 설명은 구조적 내지 기능적 설명을 위한 실시예에 불과하므로, 본 발명의 권리범위는 본문에 설명된 실시예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 본 발명의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다. 또한, 본 발명에서 제시된 목적 또는 효과는 특정 실시예가 이를 전부 포함하여야 한다거나 그러한 효과만을 포함하여야 한다는 의미는 아니므로, 본 발명의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.The description of the present invention is merely an example for structural or functional explanation, and the scope of the present invention should not be construed as being limited by the embodiments described in the text. That is, the embodiments are to be construed as being variously embodied and having various forms, so that the scope of the present invention should be understood to include equivalents capable of realizing technical ideas. Also, the purpose or effect of the present invention should not be construed as limiting the scope of the present invention, since it does not mean that a specific embodiment should include all or only such effect.

한편, 본 출원에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다.Meanwhile, the meaning of the terms described in the present application should be understood as follows.

"제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어들에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다.The terms "first "," second ", and the like are intended to distinguish one element from another, and the scope of the right should not be limited by these terms. For example, the first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component.

어떤 구성요소가 다른 구성요소에 "연결되어"있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어"있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.It is to be understood that when an element is referred to as being "connected" to another element, it may be directly connected to the other element, but there may be other elements in between. On the other hand, when an element is referred to as being "directly connected" to another element, it should be understood that there are no other elements in between. On the other hand, other expressions that describe the relationship between components, such as "between" and "between" or "neighboring to" and "directly adjacent to" should be interpreted as well.

단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, "포함하다"또는 "가지다" 등의 용어는 실시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.It is to be understood that the singular " include " or "have" are to be construed as including the stated feature, number, step, operation, It is to be understood that the combination is intended to specify that it does not preclude the presence or addition of one or more other features, integers, steps, operations, components, parts, or combinations thereof.

각 단계들에 있어 식별부호(예를 들어, a, b, c 등)는 설명의 편의를 위하여 사용되는 것으로 식별부호는 각 단계들의 순서를 설명하는 것이 아니며, 각 단계들은 문맥상 명백하게 특정 순서를 기재하지 않는 이상 명기된 순서와 다르게 일어날 수 있다. 즉, 각 단계들은 명기된 순서와 동일하게 일어날 수도 있고 실질적으로 동시에 수행될 수도 있으며 반대의 순서대로 수행될 수도 있다.In each step, the identification code (e.g., a, b, c, etc.) is used for convenience of explanation, the identification code does not describe the order of each step, Unless otherwise stated, it may occur differently from the stated order. That is, each step may occur in the same order as described, may be performed substantially concurrently, or may be performed in reverse order.

여기서 사용되는 모든 용어들은 다르게 정의되지 않는 한, 본 발명이 속하는 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. 일반적으로 사용되는 사전에 정의되어 있는 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한 이상적이거나 과도하게 형식적인 의미를 지니는 것으로 해석될 수 없다.All terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, unless otherwise defined. Commonly used predefined terms should be interpreted to be consistent with the meanings in the context of the related art and can not be interpreted as having ideal or overly formal meaning unless explicitly defined in the present application.

도 1은 본 발명의 일 실시예에 따른 업무전략맵 관리 시스템을 설명하는 도면이다.1 is a diagram illustrating a business strategy map management system according to an embodiment of the present invention.

도 1을 참조하면, 업무전략맵 관리 시스템(100)은 업무전략맵 관리 서버(110) 및 업무전략맵 사용자 단말(120)을 포함하고, 이들은 네트워크를 통해 연결될 수 있다.Referring to FIG. 1, a business strategy map management system 100 includes a business strategy map management server 110 and a business strategy map user terminal 120, which may be connected via a network.

업무전략맵 관리 서버(110)는 비휘발성 메모리(미도시됨)를 포함할 수 있고, 적어도 하나의 업무전략맵 사용자 단말(120)에 의해 원격으로 접속될 수 있으며, 복수의 메모리 영역들(221~225)을 비휘발성 메모리에 동기화할 수 있다. 예를 들어, 비휘발성 메모리는 데이터베이스를 통해 구현될 수 있다. 업무전략맵 관리 서버(110)는 적어도 하나의 업무전략맵 사용자 단말(120)과 연결되어 업무전략맵 관리 방법을 수행할 수 있고, 적어도 하나의 업무전략맵 사용자 단말(120)로부터 전송되는 메시지를 그룹화한 메시지 쓰레드를 관리할 수 있다.The task strategy map management server 110 may include a non-volatile memory (not shown), may be remotely connected by at least one task strategy map user terminal 120, and may include a plurality of memory areas 221 To 225 can be synchronized to non-volatile memory. For example, non-volatile memory may be implemented through a database. The task strategy map management server 110 may be connected to at least one task strategy map user terminal 120 to perform a task strategy map management method and may receive a message transmitted from at least one task strategy map user terminal 120 You can manage grouped message threads.

업무전략맵 사용자 단말(120)은 업무전략맵을 통해 기업의 업무 관리 프로세스를 수행하는 컴퓨팅 장치에 해당할 수 있다. 예를 들어, 업무전략맵 사용자 단말(120)은 데스크톱, 노트북, 태블릿 PC 또는 스마트폰으로 구현될 수 있다.The business strategy map user terminal 120 may correspond to a computing device that performs a business management process of an enterprise through a business strategy map. For example, the business strategy map user terminal 120 may be implemented as a desktop, laptop, tablet PC, or smart phone.

도 2는 도 1에 있는 업무전략맵 관리 서버를 설명하는 블록도이다.2 is a block diagram illustrating the business strategy map management server of FIG.

도 2를 참조하면, 업무전략맵 관리 서버(110)는 프로세서부(210), 메모리부(220), 저장부(230), 네트워크 인터페이스부(240), 사용자 인터페이스 입력부(250) 및 사용자 인터페이스 출력부(260)를 포함한다.2, the task strategy map management server 110 includes a processor unit 210, a memory unit 220, a storage unit 230, a network interface unit 240, a user interface input unit 250, (260).

프로세서부(Processor Unit)(210)는 업무전략맵 실행기(212), 메모리 관리자(214) 및 메모리 동기 스케쥴러(216)를 포함할 수 있다. 업무전략맵 실행기(212)은 도 3에 있는 업무전략맵 관리 프로시저를 실행할 수 있고, 실행 과정 중에 메모리 영역들(221~225)로부터 가져온 여러 가지 정보들을 필요에 따라 업무전략맵 사용자 단말(120)에 제공할 수 있다. 메모리 관리자(214)는 업무전략맵 실행기(212)에 의하여 읽혀지거나 또는 작성되는 메모리부(220)에 있는 메모리 영역들(221~225)을 관리할 수 있다. 메모리 동기 스케쥴러(216)는 메모리 영역들(221~225)과 업무전략맵 관리 서버(110)에 있는 비휘발성 메모리 간의 동기화 시간을 스케쥴할 수 있다.The processor unit 210 may include a task strategy map executor 212, a memory manager 214, and a memory synchronization scheduler 216. The task strategy map executor 212 may execute the task strategy map management procedure shown in FIG. 3 and may include various pieces of information from the memory areas 221 to 225 during the execution process, ). The memory manager 214 may manage the memory areas 221-225 in the memory 220 that are read or created by the task strategy map executor 212. [ The memory synchronization scheduler 216 may schedule the synchronization time between the memory areas 221 to 225 and the non-volatile memory in the task strategy map management server 110.

메모리부(Memory Unit)(220)는 일정-평가 메모리 영역(221), 업무 수행조직 메모리 영역(222), 할일 메모리 영역(223), 업무활동 메모리 영역(224) 및 메시지 메모리 영역(225)을 포함한다. 이러한 메모리 영역들(221~225)은 휘발성 또는 비휘발성 메모리로 구현될 수 있고, 만일 비휘발성 메모리로 구현되면 하이퍼링크를 통해 연결되도록 구현될 수 있다.The memory unit 220 includes a schedule-evaluation memory area 221, a task performing organization memory area 222, a task memory area 223, a task activity memory area 224, and a message memory area 225 . These memory areas 221 to 225 may be implemented as volatile or nonvolatile memory, and may be implemented to be connected via a hyperlink if implemented as a nonvolatile memory.

일정-평가 메모리 영역(221)은 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인(530 참조) 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템(도 6 참조)을 포함한다. 일 실시예에서, 일정-평가 아이템은 업무활동을 접근하기 위한 업무활동에 관한 연관자 및 메시지 쓰레드를 통해 구현될 수 있는 대화방을 접근하기 위한 대화방 연관자를 더 포함할 수 있다.The schedule-evaluation memory area 221 is defined as a schedule time line (see 530) defined by a start schedule and a deadline with respect to each of at least one task constituting the project and a task or a plurality of corresponding sub-tasks Evaluation item (see FIG. 6) having the task evaluation that has been performed. In one embodiment, the schedule-evaluation item may further include a chat room associator for accessing a chat room that may be implemented through an associate and message thread for accessing business activities to access business activities.

업무 수행조직 메모리 영역(222)은 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 포함한다. 여기에서, 업무 수행조직은 특정 일정-평가 아이템과 연관된 적어도 하나의 업무를 수행하는 적어도 하나의 업무 처리자를 포함하는 적어도 하나의 업무 수행조직을 의미한다.The task performing organization memory area 222 includes a task performing organization that is subordinate to the schedule-evaluation item. Herein, the task performing organization means at least one task performing organization including at least one task processor performing at least one task associated with a specific schedule-evaluation item.

할일 메모리 영역(223)은 일정-평가 아이템과 종속적으로 연관되고 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 포함한다. 일 실시예에서, 할일-평가 아이템은 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지 중 적어도 일부에 해당할 수 있다.The to-do memory area 223 is associated with the schedule-evaluation item and has to-do evaluations through the to-do constructor specifying the to-do handler with respect to the to-do definition defined by the needs of the to-do generator when processing the task, To-do items. In one embodiment, the to-do item may correspond to at least a portion of at least one message that can be shared about business activity.

업무활동 메모리 영역(224)은 업무활동(도 10 참조)을 저장할 수 있다. 일 실시예에서, 업무활동은 일정-평가 아이템과 종속적으로 연관되고, 프로젝트 또는 적어도 하나의 업무 각각에 관한 업무개선제안을 포함할 수 있다.The business activity memory area 224 may store business activity (see FIG. 10). In one embodiment, the business activity is subordinate to the schedule-evaluation item and may include a business improvement proposal for the project or at least one of the tasks.

메시지 메모리 영역(225)은 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드(도 11 참조)를 저장한다. 일 실시예에서, 메시지 메모리 영역(225)은 일정-평가 아이템에 종속적으로 연관되고 프로젝트, 적어도 하나의 업무 각각 또는 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드를 저장할 수 있다.The message memory area 225 stores a message thread (see FIG. 11) that contains at least one message that can be shared about business activity. In one embodiment, the message memory area 225 may store a message thread that is subordinate to the schedule-evaluation item and that includes at least one message that can be shared with the project, at least one task, or each business activity .

저장부(230)는 SSD(Solid State Disk) 또는 HDD(Hard Disk Drive)와 같은 비휘발성 메모리로 구현될 수 있고, 업무전략맵 관리 서버(110)에 필요한 데이터를 저장하는데 사용된다.The storage unit 230 may be implemented as a nonvolatile memory such as a solid state disk (SSD) or a hard disk drive (HDD), and is used to store data required by the task strategy map management server 110.

네트워크 인터페이스부(240)는 네트워크를 통해 업무전략맵 사용자 단말(120)과 연결하기 위한 환경을 포함하고, 예를 들어, LAN(Local Area Network) 통신을 위한 어댑터를 포함할 수 있다.The network interface unit 240 includes an environment for connecting with the task strategy map user terminal 120 through a network and may include an adapter for LAN (Local Area Network) communication, for example.

사용자 인터페이스 입력부(250)는 사용자 입력을 수신하기 위한 환경을 포함하고, 예를 들어, 마우스, 트랙볼, 터치 패드, 그래픽 태블릿, 스캐너, 터치 스크린, 키보드 또는 포인팅 장치와 같은 어댑터를 포함할 수 있다. 사용자 인터페이스 출력부(260)는 사용자에게 특정 정보(예를 들어, 일정 타임라인)를 출력하기 위한 환경을 포함하고, 예를 들어, 모니터 또는 터치스크린과 같은 어댑터를 포함할 수 있다.The user interface input 250 includes an environment for receiving user input and may include, for example, an adapter such as a mouse, trackball, touchpad, graphic tablet, scanner, touch screen, keyboard or pointing device. The user interface output 260 includes an environment for outputting specific information (e.g., a certain timeline) to a user and may include, for example, an adapter such as a monitor or a touch screen.

도 3은 도2에 있는 업무전략맵 관리 서버에 의하여 수행되는 업무전략맵 관리 프로시저를 프로젝트 단계를 중심으로 설명하는 흐름도이다.FIG. 3 is a flowchart illustrating a business strategy map management procedure performed by the business strategy map management server shown in FIG. 2, focusing on a project stage.

업무전략맵 실행기(212)는 일정-평가 메모리 영역(221)으로부터 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인(530) 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템을 가져오고, 업무 수행조직 메모리 영역(222)으로부터 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 가져오는 프로젝트 단계를 수행할 수 있다(단계S310). 이러한 내용은 도 5를 참조하여 설명한다.The task strategy map executor 212 receives from the schedule-evaluation memory area 221 a schedule time line 530 defined by a start schedule and a deadline with respect to each of at least one task constituting the project, Evaluation items having task evaluations defined in units of sub-tasks, and performing a project step of importing a task performance organization that is subordinate to the schedule-evaluation items from the task performance organization memory area 222 (Step S310). This will be described with reference to FIG.

도 5는 도 2의 업무전략맵 실행기(212)가 상기의 프로젝트 단계를 수행하는 과정을 나타내는 도면이다. 일 실시예에서, 업무전략맵 실행기(212)는 일정-평가 메모리 영역(221)으로부터 프로젝트, 업무 및 일정 타임라인을 포함하는 정보를 독출하여 업무전략맵 사용자 단말(120)에 제공할 수 있고, 업무전략맵 사용자 단말(120)에서 도 5에서와 같이, 가로 축 상에 프로젝트 셀(510)을 배치하고, 세로 축 상에 프로젝트 일정과 관련하여 연도, 월 및 일 정보를 포함하는 시간 셀(520)을 시계열로 배치하며, 적어도 하나의 교차지점을 그룹화한 일정 타임라인(530)을 배치하는 업무전략맵 일정 매트릭스(500)를 시각화하도록 지원할 수 있다. 업무전략맵 실행기(212)는 사용자의 요청에 따라 프로젝트 셀(510) 또는 일정 타임라인(530)을 추가할 수 있고, 시간 셀(520)은 일정 타임라인(530)에 포함되는 적어도 하나의 업무 각각에 관한 시작일정과 마감일정에 따라 조정될 수 있다.FIG. 5 is a diagram illustrating a process in which the task strategy map executor 212 of FIG. 2 performs the project steps. In one embodiment, the task strategy map executor 212 may retrieve and provide information from the schedule-evaluation memory area 221, including project, task and schedule timelines, to the task strategy map user terminal 120, 5, in the task strategy map user terminal 120, a project cell 510 is arranged on the horizontal axis, and a time cell 520 (see FIG. 5) including year, ), And to visualize a task strategy map schedule matrix 500 that places a schedule timeline 530 grouping at least one intersection point. The task strategy map executor 212 may add a project cell 510 or a certain timeline 530 according to a user's request and the time cell 520 may include at least one task included in a certain timeline 530 Can be adjusted according to the start schedule and deadline schedule for each.

일 실시예에서, 업무전략맵 실행기(212)는 업무 수행조직 메모리 영역(222)으로부터 일정-평가 아이템과 종속적으로 연관된 업무 수행조직 정보를 독출하여 업무전략맵 사용자 단말(120)에 제공할 수 있고, 업무전략맵 사용자 단말(120)에서 도 6에서와 같이, 특정 프로젝트와 종속적으로 연관되는 일정-평가 아이템 목록을 시각화하도록 지원할 수 있다. 예를 들어, 업무전략맵 실행기(212)는 업무전략맵 사용자 단말(120)로부터 사용자에 의한 특정 프로젝트(고온용필터(일본업체))와 종속적으로 연관되는 일정-평가 아이템 목록 조회 요청이 수신되면(업무전략맵 일정 매트릭스(500)에서 고온용필터(510) 클릭 또는 관련 일정 타임라인(530) 클릭 시) 해당 프로젝트에 종속적인 일정-평가 아이템 목록('필터 기능품질지수 개선'과 '고온용필터 시장조사')에 관한 정보들을 업무전략맵 사용자 단말(120)에 제공하여 시각화하도록 지원할 수 있다(도 6). 상기의 실시예를 나타내는 도 6에서, 진행상태는 '완료' 및 '진행중'을 포함하고 있으나, 다른 실시예에서, 진행상태는 '새로운', '하는중', '다했음' 및 '확인'을 포함할 수 있다.In one embodiment, the task strategy map executor 212 may retrieve task performance organization information that is subordinate to the schedule-evaluation item from the task performance organization memory area 222 and provide it to the task strategy map user terminal 120 , The task strategy map user terminal 120 may assist in visualizing a schedule-evaluation item list that is subordinate to a particular project, as in FIG. For example, the business strategy map executor 212 receives a schedule-evaluation item list query request that is related to a specific project (high-temperature filter (Japanese vendor)) by the user from the business strategy map user terminal 120 (When clicking the high temperature filter 510 or clicking on the relevant schedule timeline 530 in the job strategy map schedule matrix 500), a list of schedule-evaluation items ('Improve filter function quality index' and ' Filter market research ') to the business strategy map user terminal 120 (FIG. 6). 6, which shows the above embodiment, the progress state includes' completion 'and' in progress', but in another embodiment, the progress state may be 'new', 'during', ' . ≪ / RTI >

업무전략맵 실행기(212)는 사용자의 요청에 따라 일정-평가 아이템을 추가할 수 있다(단계S320). 일 실시예에서, 업무전략맵 실행기(212)는 업무전략맵 사용자 단말(120)로부터 사용자에 의한 일정-평가 아이템 추가 요청이 수신되면(도 6의 '일정 추가' 클릭 시) 도 7a에서와 같이, 해당 프로젝트(고온용필터(일본업체))에 종속적인 업무(샘플테스트하여 강도확인), 서브-업무(없음), 일정을 받는 사람(업무수행자, 변헌수), 시작일정(2013-12-18), 마감일정(2013-12-31) 및 평가점수(목표점수, 최대 7점)를 가지는 새로운 일정-평가 아이템을 추가할 수 있다(단계S320). 일 실시예에서, 서브-업무는 하나의 업무를 수행하기 위한 복수의 서브-업무들에 해당하고, 하나의 일정-평가 아이템을 추가하기 위해서 특정 서브-업무 설정이 반드시 요구되는 것은 아니다. 이처럼, 새로운 일정-평가 아이템(샘플테스트하여 강도확인)이 추가되면 업무전략맵 실행기(212)는 이를 일정-평가 메모리 영역(221)에 저장할 수 있고, 갱신된 정보를 반영하여 업무전략맵 사용자 단말(120)에서 도 7b에서와 같이, 추가된 일정-평가 아이템(샘플테스트하여 강도확인)을 조회할 수 있도록 정보를 제공할 수 있고, 필요한 경우 업무전략맵 일정 매트릭스(500)에서 고온용필터(510)에 종속적인 일정 타임라인(530)을 갱신하도록 할 수 있다.The task strategy map executor 212 may add a schedule-evaluation item at the request of the user (step S320). In one embodiment, the task strategy map executor 212, when receiving a schedule-evaluation item addition request by the user from the task strategy map user terminal 120 (at the "add schedule" , Sub-task (no), person receiving the schedule (worker, number of beneficiaries), start schedule (2013-12-18) , A deadline schedule 2013-12-31, and a new schedule-evaluation item having an evaluation score (target score, maximum 7 points) (step S320). In one embodiment, a sub-task corresponds to a plurality of sub-tasks for performing one task, and a specific sub-task setting is not necessarily required to add one schedule-evaluation item. When a new schedule-evaluation item (strength check by sample testing) is added, the task strategy map executor 212 can store the new schedule-evaluation item in the schedule-evaluation memory area 221, (E.g., strength test by sample testing), as shown in FIG. 7B in FIG. 7B, and may provide information to the high-temperature filter 500 in the task strategy map schedule matrix 500 510) to be updated.

업무전략맵 실행기(212)는 프로젝트 단계에서 해당 업무가 완료되면 관리자 업무전략맵 사용자 단말로부터 해당 업무 또는 복수의 해당 서브-업무들에 관해 업무 처리자, 업무 목표 점수 및 업무 평가 점수를 통해 정의된 평가 매트릭스를 통해 평가된 업무평가를 수신하는 업무평가 단계를 수행할 수 있다(단계S330). 여기에서, 업무평가는 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의될 수 있다. 일 실시예에서, 관리자 업무전략맵 사용자 단말은 사용자가 업무지정자에 해당하거나 평가 권한을 가지고 있는 것으로 확인되는 업무전략맵 사용자 단말(120)에 해당한다. 일 실시예에서, 업무전략맵 실행기(212)는 업무전략맵 사용자 단말(120)에 일정-평가 아이템 조회 정보를 제공할 수 있고, 도 8에서와 같이, 특정 프로젝트(고온용필터(일본업체))에 종속적인 일정-평가 아이템 조회 정보 중에서 복수의 서브-업무(강도 120%확인, 강도150%확인, 강도200%확인)을 가지는 특정 업무(샘플테스트하여 강도확인)에 대한 일정-평가 아이템이 포함될 수 있다. 위의 실시예에서, 각각의 서브-업무들은 시작일정 또는 마감일정을 기초로 1단계, 2단계 및 3단계를 포함하는 진행상태로 자동 분류될 수 있고, 업무전략맵 사용자 단말(120)로부터 해당 서브-업무들 각각의 업무수행자에 의해 진행상태가 모두 완료로 변경되면(예를 들어, 업무수행자가 진행상태 셀을 마우스 클릭하여 진행상태 변경 가능) 업무지정자에 해당하는 사용자는 업무전략맵 사용자 단말(120)을 통해 해당 업무(샘플테스트하여 강도확인)에 대한 종합적인 업무평가를 수행할 수 있다(예를 들어, 업무지정자가 평가점수 셀을 마우스 클릭하여 평가점수 할당 가능).When the task is completed in the project stage, the task strategy map executor 212 obtains, from the manager task strategy map user terminal, an evaluation defined by the task processor, the task goal score and the task score about the task or a plurality of corresponding sub- A task evaluation step may be performed to receive the task evaluation evaluated through the matrix (step S330). Here, the task evaluation may be defined as a task or a plurality of corresponding sub-tasks. In one embodiment, the manager business strategy map user terminal corresponds to a business strategy map user terminal 120 that the user is identified as having a business designator or an evaluation authority. In one embodiment, the task strategy map executor 212 can provide schedule-rating item inquiry information to the task strategy map user terminal 120, and as shown in Fig. 8, the specific project (high- Evaluation item for a specific task (sample test and strength check) having a plurality of sub-tasks (strength 120% confirmation, strength 150% confirmation, strength 200% confirmation) . In the above embodiment, each of the sub-tasks may be automatically classified into a progress state including steps 1, 2, and 3 based on a start schedule or a deadline schedule, When the progress status of the sub-tasks is changed to completion (for example, the task performer can click the progress status cell to change the progress status), the user corresponding to the task designator can receive the task strategy map user terminal (E.g., a task specifier can assign a score by mouse clicking on the score cell) through the task 120 (e.g., sample testing and strength verification).

위의 실시예에서, 업무평가 점수는 기 할당된 서브-업무들 각각의 목표점수(5, 7, 3)를 상한으로 평가점수를 부여할 수 있고, 도 8b에서와 같이, 해당 업무에 대하여 (4, 6, 3)/(5, 7, 3)에 해당하는, 즉, 목표점수 총점 15점 만점 중 평가점수 총점 13점에 해당하는 업무평가 결과를 가질 수 있다. In the above embodiment, the task score can be given an evaluation score at the upper limit of the target score (5, 7, 3) of each of the assigned sub-tasks, 4, 6, 3) / (5, 7, 3), that is, 13 out of 15 points out of the total score of the target score.

업무평가가 완료되면 업무전략맵 실행기(212)는 업무전략맵 사용자 단말(120)로부터 평가 매트릭스를 통해 평가된 업무평가를 수신할 수 있다(단계S330). 일 실시예에서, 업무전략맵 실행기(212)는 해당 업무에 대한 서브-업무들 각각에 관한 업무 처리자의 이름, 목표점수 및 평가점수를 기초로 3 x 3의 행렬 구조를 가지는 평가 매트릭스를 구성할 수 있고, 업무전략맵 사용자 단말(120)로부터 하기와 같이 구성된 평가 매트릭스(Appraisal Matrix, A.M.)를 수신하여 이후의 평가 관련 연산에 적용함으로써 특정 업무와 연관된 복수의 서브-업무 업무수행자들에 대한 정보 처리 효율성을 배가시킬 수 있다.When the task evaluation is completed, the task strategy map executor 212 may receive the task evaluation evaluated through the evaluation matrix from the task strategy map user terminal 120 (step S330). In one embodiment, the task strategy map executor 212 constructs an evaluation matrix having a 3 x 3 matrix structure based on the name, target score, and evaluation score of the task processor for each of the sub-tasks for that task And receives an Appraisal Matrix (AM) configured as follows from the task strategy map user terminal 120 and applies it to subsequent evaluation related operations to obtain information about a plurality of sub-task task performers associated with a particular task The processing efficiency can be doubled.

[업무평가 전의 평가 매트릭스(A.M.) - 도 8a][Evaluation matrix before work evaluation (A.M.) - Figure 8a]

Figure pat00001
Figure pat00001

[업무평가 후의 평가 매트릭스(A.M.) - 도 8b][Evaluation matrix after business evaluation (A.M.) - Figure 8b]

Figure pat00002
Figure pat00002

[도 8b 중에서 서브-업무 1단계(강도 120%확인)에 대한 업무평가만 진행된 후의 평가 매트릭스(A.M.)][Evaluation Matrix (A.M.) after only the business evaluation for sub-task 1 (strength 120% confirmation) in Fig. 8B]

Figure pat00003
Figure pat00003

업무전략맵 실행기(212)는 평가 매트릭스를 포함하여 수신된 업무평가 결과를 일정-평가 메모리 영역에 저장할 수 있고, 변경된 평가 매트릭스를 수신하면 일정-평가 메모리 영역에 저장된 관련 정보를 갱신할 수 있으며, 업무전략맵 사용자 단말(120)로부터 일정-평가 아이템 조회 요청 시 갱신된 평가 매트릭스를 제공할 수 있다(단계S340).The task strategy map executor 212 may store the received task evaluation results including the evaluation matrix in the constant-evaluation memory area, and may update the related information stored in the constant-evaluation memory area upon receiving the changed evaluation matrix, The updated evaluation matrix may be provided when the schedule-evaluation item inquiry is requested from the task strategy map user terminal 120 (step S340).

업무전략맵 실행기(212)는 프로젝트 단계에서 업무평가가 완료되면 실제로 완료된 일정 타임라인을 일정-평가 아이템에 저장하고 정의된 일정 타임라인과 실제로 완료된 일정 타임라인 간의 분석을 기초로 업무 수행조직의 업무 협동성(cooperativity)을 자동으로 평가하는 업무 수행조직 평가 단계를 수행할 수 있다(단계S350). 일 실시예에서, 업무전략맵 실행기(212)는 업무지정자가 지정하였던 마감일정을 통해 정의된 일정 타임라인(Target Schedule, T.S.)에 해당하는 날에서 실제로 업무수행자에 의해 완료 처리된 완료일을 통해 정의된 일정 타임라인(Finished Schedule, F.S.)에 해당하는 날의 차이를 카운트한 값을 'D(Difference)'로 정의하고(예를 들어, 마감일정이 12월 27일인 경우 완료일이 12월 25일이면 D는 양수인 +2가 되고, 완료일이 다음 해 1월 2일이면 D는 음수인 -6이 된다), 하기의 수학식 1을 적용하여 업무 협동성(cooperativity)을 계산할 수 있다.The task strategy map executor 212 stores the actually completed schedule timeline in the schedule-evaluation item when the task evaluation is completed in the project stage, and performs the task of the task performing organization based on the analysis between the defined schedule timeline and the actually completed schedule timeline A task performance evaluation step for automatically evaluating cooperativity may be performed (step S350). In one embodiment, the task strategy map executor 212 may define the task strategy map through a completion date that is actually completed by the task person on a day corresponding to a predetermined timeline (TS) defined through a deadline designated by the task assigner D (Difference) 'is a value obtained by counting the difference between days corresponding to the finished schedule (FS) (for example, if the deadline is December 27, the completion date is December 25 D is a positive number +2, and if the completion date is January 2 of the following year, D is a negative number of -6), then cooperativity can be calculated by applying Equation 1 below.

[수학식 1][Equation 1]

Figure pat00004
Figure pat00004

(여기에서, ave_g(D)는 특정 업무 수행조직에 대한 D 합의 평균 중에서 하위 20%를 제외한 평균에 해당하고, ave_t(D)는 전체 업무 수행조직에 대한 D 합의 평균 중에서 하위 20%를 제외한 평균에 해당함)Ave_g (D) is the average of the D-sum for the specific task performing organization, excluding the bottom 20%, and ave_t (D) is the average of the D- )

일 실시예에서, 업무전략맵 실행기(212)는 상기의 수학식 1을 적용하여 특정 업무 수행조직에 대한 업무 협동성(cooperativity)을 계산한 결과를 전체 업무 수행조직들에 대한 업무 협동성 계산 결과들과 비교 분석하여 전체 업무 수행조직의 상위 20% 대비 어느 정도 위치에 있는지에 대한 모범 업무 협동성을 연산하여 업무전략맵 사용자 단말(120)에 제공할 수 있다.In one embodiment, the task strategy map executor 212 applies the above Equation (1) to calculate the cooperativity of a specific task performing organization with the results of task cooperative work for all task performing organizations And calculate the best business cooperation with respect to the position of the top 20% of the entire task performing organization and provide the best business cooperation to the task strategy map user terminal 120.

도 4는 도2에 있는 업무전략맵 관리 서버에 의하여 수행되는 업무전략맵 관리 프로시저를 할일 단계를 중심으로 설명하는 흐름도이다.FIG. 4 is a flowchart illustrating a task strategy map management procedure performed by the task strategy map management server in FIG. 2, with reference to a task step.

업무전략맵 실행기(212)는 할일 단계에서 할일-평가 아이템의 제공 전에 일정-평가 아이템에 종속적으로 연관되고 프로젝트 또는 적어도 하나의 업무 각각에 관해 업무 수행조직원에 의해 작성된 업무내역을 포함하는 업무활동을 수신하는 업무활동 기록 단계를 수행할 수 있다(단계S410). 일 실시예에서, 일정-평가 아이템은 업무활동을 접근하기 위한 업무활동에 관한 연관자를 포함할 수 있고, 업무전략맵 실행기(212)는 특정 일정-평가 아이템(샘플테스트하여 강도확인)에 종속적으로 연관되고 프로젝트 또는 적어도 하나의 업무 각각에 관해 업무 수행조직원에 의해 작성된 업무내역을 포함하는 업무활동에 접근하기 위한 업무활동에 관한 연관자를 기초로 업무활동 메모리 영역(224)로부터 해당 업무활동을 독출하여 업무전략맵 사용자 단말(120)에 제공할 수 있다. 위의 실시예에 따라 업무전략맵 사용자 단말(120)에서 업무활동 리스트를 조회한 결과 화면은 10에서와 같이 나타낼 수 있고, 사용자에 의해 추가되거나 수정되는 업무활동은 해당 업무활동에 관한 연관자를 기초로 업무활동 메모리 영역(224)에 저장하여 갱신할 수 있다.The task strategy map executor 212 is responsible for carrying out task activities that are subordinate to the schedule-evaluation item before the task-evaluating item is provided in the task step and include the task details created by the task performing team regarding the project or at least one task And perform a business activity recording step of receiving (step S410). In one embodiment, the schedule-evaluation item may include an associate for a business activity to access business activity, and the business strategy map executor 212 may depend on a particular schedule-evaluation item Reads the corresponding business activity from the business activity memory area 224 based on the associator related to the business activity to be associated with the business activity including the business description created by the business performing organization about the project or at least one business And provide it to the business strategy map user terminal 120. According to the above embodiment, the result of querying the business activity list in the business strategy map user terminal 120 can be displayed as in FIG. 10, and the business activity added or modified by the user can be expressed as In the work activity memory area 224, and can update the work activity memory area 224.

업무전략맵 실행기(212)는 할일 단계에서 할일-평가 아이템의 제공 전에 일정-평가 아이템에 종속적으로 연관되고 프로젝트, 적어도 하나의 업무 각각 또는 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드를 통해 구현될 수 있는 대화방을 제공하는 업무활동 논의 단계를 더 수행할 수 있다(단계S420). 일 실시예에서, 일정-평가 아이템은 메시지 쓰레드를 통해 구현될 수 있는 대화방을 접근하기 위한 대화방 연관자를 포함할 수 있고, 업무전략맵 실행기(212)는 특정 일정-평가 아이템(샘플테스트하여 강도확인)에 종속적인 메시지 쓰레드(채팅방)를 통해 구현될 수 있는 대화방을 접근하기 위한 대화방 연관자를 기초로 메시지 메모리 영역(225)로부터 해당 메시지 쓰레드를 독출하여 업무전략맵 사용자 단말(120)에 제공할 수 있으며, 도 11과 같이 나타낼 수 있다.The task strategy map launcher 212 includes at least one message that is subordinate to the schedule-evaluation item before provision of the task-evaluating item in the task step and that can be shared with the project, each of the at least one task, A business activity discussion step of providing a chat room that can be implemented through the message thread may be performed (step S420). In one embodiment, the schedule-evaluation item may include a chat room associator for accessing a chat room that may be implemented via a message thread, and the task strategy map executor 212 may include a specific schedule- The user can read the corresponding message thread from the message memory area 225 based on the chat room associator for accessing the chat room that can be implemented through a message thread (chat room) And can be expressed as shown in FIG.

업무전략맵 실행기(212)는 할일 메모리 영역(223)으로부터 일정-평가 아이템과 종속적으로 연관되고 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 가져오는 할일 단계를 수행할 수 있다(단계S430). 일 실시예에서, 업무전략맵 실행기(212)는 업무전략맵 사용자 단말(120)에서 사용자에 의해 특정 일정-평가 아이템에 종속적인 할일-평가 아이템 리스트 조회 요청이 들어오면(예를 들어, 도 6의 일정-평가 아이템 조회 화면에 포함되는 특정 일정-평가 아이템과 연관되는 할일-평가 아이템 조회를 위한 하이퍼링크(미도시됨) 요청 수신 시) 상기의 할일 단계를 수행하여 해당되는 할일-평가 아이템의 리스트를 제공할 수 있다. The task strategy map executor 212 is connected to the schedule-evaluation item from the to-do memory area 223, and when processing the task, the task strategy map executor 212 generates a to-do list To-be-evaluated item having a to-do rating to be evaluated through the to-do item (step S430). In one embodiment, when the task strategy map executor 212 receives a task-to-assess item list query request that is dependent on a particular schedule-evaluation item by the user in the task strategy map user terminal 120 (e.g., (Not shown) request for a to-do item to be assessed associated with a specific schedule-to-be-evaluated item included in the schedule-evaluation item inquiry screen of the to-do item, You can provide a list.

업무전략맵 실행기(212)는 사용자의 요청에 따라 할일-평가 아이템을 추가로 생성할 수 있다. 업무전략맵 실행기(212)는 할일 단계에서 할일-평가 아이템을 적어도 하나의 메시지 중 하나로 생성하는 단계를 포함하는 업무활동 갱신 단계를 더 수행할 수 있다(단계S440). 일 실시예에서, 도 9에서처럼, 업무전략맵 사용자 단말(120)에서 업무전략맵 사용자에 의해 특정 일정-평가 아이템(샘플테스트하여 강도확인)에 종속적이고 할일내용(샘플테스트 분석을 위한 자료조사), 할일 처리자(변헌수), 기한(2015-1-5) 및 예약점수(최대 목표점수, 3점)를 가지는 특정 할일에 관한 할일-평가 아이템 추가 요청이 수신되면 업무전략맵 실행기(212)는 해당 할일-평가 아이템 정보를 할일 메모리 영역(223)에 저장할 수 있고, 업무전략맵 사용자 단말(120)에서 요청 시 할일 메모리 영역(223)으로부터 관련 정보를 독출하여 제공할 수 있다.The task strategy map executor 212 may additionally generate a task-evaluation item according to a user's request. The task strategy map executor 212 may further perform a business activity update step (step S440), which includes generating a task-evaluation item in one of at least one message in the task step. In one embodiment, as depicted in FIG. 9, the task strategy map user terminal 120 is responsible for task scheduling map users who are dependent on specific scheduling-evaluation items (sample checking and strength checking) Evaluation item addition request for a to-do item having a to-do list (number of revisions), a due date (2015-1-5), and a reserved score (maximum goal score, 3 points) is received, the task strategy map executor 212 To-be-evaluated item information can be stored in the to-do memory area 223 and the task strategy map user terminal 120 can read and provide related information from the to-be-accessed memory area 223.

업무전략맵 실행기(212)는 할일 단계에서 메시지 쓰레드가 갱신될 때마다 업무 메신저를 통해 해당 업무 수행조직원에게 해당 메시지를 통보하는 단계를 포함하는 업무활동 알림 단계를 더 수행할 수 있다. 업무전략맵 실행기(212)는 특정 할일에 관한 할일-평가 아이템에 관한 평가가 수행되면 해당 평가점수를 할일 메모리 영역(223)에 저장할 수 있다.The task strategy map executor 212 may further perform a task activity notification step including notifying the corresponding task execution personnel through the task messenger whenever a message thread is updated in the task task. The task strategy map executor 212 may store the evaluation score in the toll memory area 223 when evaluation is performed on the task-to-evaluate item related to the specific task.

업무전략맵 실행기(212)는 할일 단계에서 특정 시간 구간에서 전체 할일-평가 아이템의 개수 대비 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 개수를 기초로, 업무 수행조직원에 대한 프로젝트의 활동성(activity)을 평가하는 프로젝트 활동성 평가 단계를 수행할 수 있다(단계S450). 일 실시예에서, 업무전략맵 실행기(212)는 하기의 수학식 2를 적용하여 업무 수행조직원에 대한 프로젝트의 활동성(activity)을 계산할 수 있다.The task strategy map executor 212 calculates the activity of the project for the task performing organization based on the number of task-evaluating items given to the specific task performing organization relative to the total task-evaluating items in the specific time period at the task stage, (Step S450). ≪ / RTI > In one embodiment, the task strategy map executor 212 may calculate the activity of a project for a task performing organization by applying Equation (2) below.

[수학식 2]&Quot; (2) "

Figure pat00005
Figure pat00005

(여기에서, T은 특정 시간 구간 동안 특정 업무 수행조직원에게 주어진 할일(To-do)-평가 아이템의 개수의 합에 해당하고, ave(T)은 같은 시간 구간 동안 전체 업무 수행조직원에 대한 할일-평가 아이템의 개수 합의 평균 중에서 하위 20%를 제외한 평균에 해당함)(Where T is the sum of the number of To-do-evaluation items given to a specific task performing organization during a particular time interval, and ave (T) is the task-to- The average of the sum of the number of evaluation items is the average excluding the lower 20%)

일 실시예에서, 업무전략맵 실행기(212)는 상기의 수학식 2를 적용하여 특정 업무 수행조직원에 대한 프로젝트의 활동성을 계산한 결과를 전체 업무 수행조직원들에 대한 프로젝트의 활동성 계산 결과들을 비교 분석하여 전체 업무 수행조직원의 상위 20% 대비 어느 정도 위치에 있는지에 대한 모범 활동성을 연산하여 업무전략맵 사용자 단말(120)에 제공할 수 있다.In one embodiment, the task strategy map executor 212 compares the result of calculating the activity of the project with respect to a specific task performing organization by applying Equation (2) above, To the business strategy map user terminal 120 by calculating the exemplary activity level of how much the user is located relative to the top 20% of the total task performance members.

업무전략맵 실행기(212)는 할일 단계에서 특정 시간 구간에서 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 평균적인 평가를 기초로 특정 업무 수행조직원에 대한 프로젝트의 적응성(adaptability)을 평가하는 프로젝트 적응성 평가 단계를 수행할 수 있다(단계S450). 일 실시예에서, 업무전략맵 실행기(212)는 하기의 수학식 3를 적용하여 특정 업무 수행조직원에 대한 프로젝트의 적응성(adaptability)을 계산할 수 있다.The task strategy map executor 212 is a task adaptation evaluation system that evaluates the adaptability of a project to a specific task performing organization based on an average evaluation of a task-to-evaluate item given to a specific task performing member in a specific time period at a task step (Step S450). In one embodiment, the task strategy map executor 212 may calculate the adaptability of the project to a particular task performing organization by applying Equation 3 below.

[수학식 3]&Quot; (3) "

Figure pat00006
Figure pat00006

(여기에서, A(Appraisal)는 특정 시간 구간 동안 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 평가점수 합의 평균에 해당하고, ave(A)는 같은 시간 구간 동안 전체 업무 수행조직원에게 주어진 할일-평가 아이템의 평가점수 합의 평균 중에서 하위 20%를 제외한 평균에 해당함)Where A (Appraisal) corresponds to the average of the sum of the scores of the to-do items given to a specific task performing member during a certain time interval, and ave (A) corresponds to a task-to- The average of the sum of the items' evaluation points is the average excluding the lower 20%)

일 실시예에서, 업무전략맵 실행기(212)는 상기의 수학식 3을 적용하여 특정 업무 수행조직원에 대한 프로젝트의 적응성을 계산한 결과를 전체 업무 수행조직원들에 대한 프로젝트의 적응성 계산 결과들과 비교 분석하여 전체 업무 수행조직원의 상위 20% 대비 어느 정도 위치에 있는지에 대한 모범 적응성을 연산하여 업무전략맵 사용자 단말(120)에 제공할 수 있다.In one embodiment, the task strategy map executor 212 compares the result of calculating the adaptability of the project to a specific task performing organization by applying Equation (3) above to the adaptability calculation results of the project for all the task performing members And calculates the exemplary adaptability of how much the user is located relative to the top 20% of the total task performance members, and provides the calculated adaptability to the task strategy map user terminal 120.

업무전략맵 실행기(212)는 할일 단계에서 특정 시간 구간에서 특정 업무활동에 종속적인 할일-평가 아이템의 예약점수의 합이 특정 기준 이상이면 해당 업무활동을 해당 업무 수행조직 외의 구성원에게도 알려줄 수 있는 주요 업무활동으로 설정하는 주요업무 설정 단계를 더 수행할 수 있다. 일 실시예에서, 예약점수는 특정 할일-평가 아이템에 포함되고 해당 할일에 관하여 해당 할일 생성자를 통해 평가될 수 있는 점수의 최대 상한인 최대 목표점수를 의미한다. 일 실시예에서, 도 10에서와 같이, 특정 일정-평가 아이템(샘플테스트하여 강도확인)에 종속적이고 특정 업무 수행조직원(변헌수)에 의해 작성된 업무내역(활동기록)을 포함하는 업무활동은 해당 업무활동에 종속적인 할일-평가 아이템의 예약점수의 합(25점)이 특정 기준(20점) 이상이면 업무전략맵 실행기(212)에서 주요 업무활동으로 설정할 수 있고, 이에 따라 업무전략맵 사용자 단말(120)에서 해당 업무활동을 강조하는 시각적 표시를 하거나 해당 프로젝트와 연관되는 업무 수행조직원들에게 리마인드 메일 자동 발송 등을 수행하도록 할 수 있다.When the sum of the reservation scores of the task-to-be-assessed items that depend on the specific task activity in a specific time interval in the task step is greater than a specific criterion, the task strategy map executor 212 notifies the members other than the task performing organization You can perform more important business setup steps that you set up as business activities. In one embodiment, the reserved score means the maximum goal score, which is included in the specific to-do item and which is the maximum upper limit of the score that can be evaluated through the to-do generator with respect to the to-do item. In one embodiment, as in FIG. 10, a business activity that is dependent on a particular schedule-evaluation item (a strength test by sample testing) and includes a business record (activity record) created by a specific business performance member If the sum of the reservation scores (25 points) of the to-do items and the evaluation items depending on the activity is equal to or greater than the specific criterion (20 points), the business strategy map executor 212 can set the business activities as major business activities, 120) may have a visual indication that emphasizes the business activity, or may automatically send remind mail to the task performing personnel associated with the project.

일 실시예에서, 상기의 업무활동은 프로젝트 또는 적어도 하나의 업무 각각에 관한 업무개선제안을 포함할 수 있다. 업무전략맵 실행기(212)는 할일 단계에서 업무개선제안이 수신되면 업무 수행조직에 있는 적어도 일부의 업무 수행조직원에게 업무개선제안에 관한 제안응답을 요청하여 프로젝트의 일부에 관한 변경을 지원하는 업무활동 반영 단계를 더 수행할 수 있다. 일 실시예에서, 도 10의 '활동기록 추가'를 통해 업무전략맵 사용자 단말(120)에서 사용자에 의해 업무개선제안을 포함하는 새로운 활동기록이 추가되면 업무전략맵 실행기(212)는 해당 일정-평가 프로젝트와 연관되는 적어도 하나의 팀의 업무 수행조직원에게 업무개선제안에 관한 제안응답을 요청하는 메시지를 발송할 수 있다. 다른 실시예에서, 업무전략맵 실행기(212)는 업무개선제안이 수신되면 업무 수행조직원의 협의 하에 프로젝트 일정 및 내용 등을 변경할 수 있도록 지원할 수 있고, 업무전략맵 실행기(212)는 상기의 업무개선제안에 따라 프로젝트 일정 및 내용 변경을 요청하는 메시지를 발송하여 특정 비율 이상의 업무 수행조직원이 해당 메시지에 동의함을 의미하는 회신을 수신하면 프로젝트 일정 및 내용 등을 변경하여 관련된 복수의 메모리 영역들(221~225)에 관련 정보를 저장하고 업무전략맵 일정 매트릭스(500)를 갱신하도록 지원할 수 있다.In one embodiment, the task activity may include a task improvement proposal for each task or at least one task. The task strategy map executor 212 requests at least a part of the task executing organization in the task performing organization to request a suggestion response about the task improvement proposal when the task improvement proposal is received in the task task, The reflection step can be further performed. In one embodiment, when a new activity record including a task improvement proposal is added by the user in the task strategy map user terminal 120 through the 'add activity record' of FIG. 10, the task strategy map executor 212 displays the corresponding schedule- A message may be sent to the task performing member of at least one team associated with the evaluation project to request a proposal response regarding the task improvement proposal. In another embodiment, the task strategy map executor 212 may assist in changing the project schedule and contents, etc., in consultation with the task execution personnel when the task improvement proposal is received, and the task strategy map executor 212 may, A message requesting the project schedule and contents change is sent according to the proposal, and upon receiving a reply indicating that the work performing organization member having a certain ratio or more agrees with the message, the project schedule and the contents are changed so that the plurality of memory areas 221 ≪ / RTI > 225) and to update the task strategy map schedule matrix (500).

상기에서는 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구의 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the present invention as defined by the following claims It can be understood that

100: 업무전략맵 관리 시스템
110: 업무전략맵 관리 서버 120: 업무전략맵 사용자 단말
210: 프로세서부
212: 업무전략맵 실행기 214: 메모리 관리자
216: 메모리 동기 스케줄러
220: 메모리부
221: 일정-평가 메모리 영역 222: 업무 수행조직 메모리 영역
223: 할일 메모리 영역 224: 업무활동 메모리 영역
225: 메시지 메모리 영역
230: 저장부
240: 네트워크 인터페이스부
250: 사용자 인터페이스 입력부
260: 사용자 인터페이스 출력부
100: Business strategy map management system
110: business strategy map management server 120: business strategy map user terminal
210:
212: Business Strategy Map Launcher 214: Memory Manager
216: Memory Sync Scheduler
220:
221: schedule-evaluation memory area 222: task performing organization memory area
223: to-do memory area 224: business activity memory area
225: Message memory area
230:
240: Network interface unit
250: User interface input
260: User interface output section

Claims (15)

일정-평가 아이템 및 할일-평가 아이템 기반의 업무전략의 수행을 지원하는 업무전략맵 관리 서버에서 수행되는 업무전략맵 관리 방법에 있어서,
(1) 일정-평가 메모리 영역으로부터 독출되는 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템과 (2) 업무 수행조직 메모리 영역으로부터 독출되는 상기 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 제공하는 프로젝트 단계; 및
할일 메모리 영역으로부터 독출되며 상기 일정-평가 아이템과 종속적으로 연관되고 상기 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 제공하는 할일 단계를 포함하는 업무전략맵 관리 방법.
A task strategy map supporting a task strategy based on a schedule-evaluation item and a task-to-be-evaluated item, the method comprising:
(1) a schedule line defined by a start schedule and a deadline with respect to each of at least one task constituting a project read out from the schedule-evaluation memory area, and a task defined by a corresponding task or a plurality of corresponding sub-tasks Evaluation item having an evaluation and (2) a project stage for providing a task performance organization that is subordinate to the schedule-evaluation item read from the task performance organization memory area; And
To-do items, which are read from the to-do memory area and are related to the schedule-evaluation item and are defined by the need of the to-do creator when processing the corresponding task, A task strategy map management method comprising a task step of providing task-to-task items.
제1항에 있어서, 상기 프로젝트 단계는
상기 해당 업무가 완료되면 관리자 업무전략맵 사용자 단말로부터 상기 해당 업무 또는 상기 복수의 해당 서브-업무들에 관해 업무 처리자, 업무 목표 점수 및 업무 평가 점수를 통해 정의된 평가 매트릭스를 통해 평가된 업무평가를 수신하는 업무평가 단계를 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
2. The method of claim 1,
When the corresponding task is completed, a task evaluation evaluated through the evaluation matrix defined by the task processor, the task goal score and the task evaluation score about the corresponding task or the plurality of corresponding sub-tasks from the manager task strategy map user terminal And a task evaluation step of receiving a business strategy map.
제2항에 있어서, 상기 프로젝트 단계는
상기 업무평가가 완료되면 실제로 완료된 일정 타임라인을 일정-평가 아이템에 저장하고 상기 정의된 일정 타임라인과 상기 실제로 완료된 일정 타임라인 간의 분석을 기초로 상기 업무 수행조직의 업무 협동성(cooperativity)을 자동으로 평가하는 업무 수행조직 평가 단계를 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
3. The method of claim 2,
When the task evaluation is completed, the actually completed schedule timeline is stored in the schedule-evaluation item, and the cooperativity of the task performing organization is automatically calculated based on the analysis between the defined schedule timeline and the actually completed schedule timeline And evaluating a task performing organization to be evaluated.
제1항에 있어서, 상기 할일 단계는
상기 할일-평가 아이템의 제공 전에 상기 일정-평가 아이템에 종속적으로 연관되고 상기 프로젝트 또는 상기 적어도 하나의 업무 각각에 관해 업무 수행조직원에 의해 작성된 업무내역을 포함하는 업무활동을 수신하는 업무활동 기록 단계를 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
2. The method according to claim 1,
A business activity recording step of receiving a business activity that is related to the schedule-evaluation item before the provision of the task-evaluation item and that includes a task description created by the task performing organization about the project or the at least one task, Wherein the business strategy map management method comprises the steps of:
제4항에 있어서, 상기 업무활동은
상기 프로젝트 또는 상기 적어도 하나의 업무 각각에 관한 업무개선제안을 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
5. The method of claim 4,
And a task improvement proposal for each of the project or the at least one task.
제5항에 있어서, 상기 할일 단계는
상기 업무개선제안이 수신되면 상기 업무 수행조직에 있는 적어도 일부의 업무 수행조직원에게 상기 업무개선제안에 관한 제안응답을 요청하여 상기 프로젝트의 일부에 관한 변경을 지원하는 업무활동 반영 단계를 더 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
6. The method according to claim 5,
And a business activity reflecting step of requesting at least some business performance members in the business performance organization for a proposal response regarding the business improvement proposal to support a change regarding a part of the project when the business improvement proposal is received A business strategy map management method characterized by.
제4항에 있어서, 상기 할일 단계는
상기 할일-평가 아이템의 제공 전에 상기 일정-평가 아이템에 종속적으로 연관되고 상기 프로젝트, 상기 적어도 하나의 업무 각각 또는 상기 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드를 통해 구현될 수 있는 대화방을 제공하는 업무활동 논의 단계를 더 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
5. The method according to claim 4,
Is implemented through a message thread that is subordinate to the schedule-evaluation item prior to the provision of the task-evaluation item and that includes at least one message that can be shared with the project, the at least one task, or each task activity And a business activity discussion step of providing a chat room in which the business activity map can be provided.
제7항에 있어서, 상기 할일 단계는
상기 메시지 쓰레드가 갱신될 때마다 업무 메신저를 통해 해당 업무 수행조직원에게 해당 메시지를 통보하는 단계를 포함하는 업무활동 알림 단계를 더 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
8. The method of claim 7, wherein the step of performing comprises:
Further comprising the step of notifying the corresponding task execution personnel via the task messenger whenever the message thread is updated.
제7항에 있어서, 상기 할일 단계는
상기 할일-평가 아이템을 상기 적어도 하나의 메시지 중 하나로 생성하는 단계를 포함하는 업무활동 갱신 단계를 더 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
8. The method of claim 7, wherein the step of performing comprises:
Further comprising a business activity update step including the step of creating the task-evaluation item as one of the at least one message.
제9항에 있어서, 상기 할일 단계는
특정 시간 구간에서 전체 할일-평가 아이템의 개수 대비 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 개수를 기초로, 상기 업무 수행조직원에 대한 상기 프로젝트의 활동성(activity)을 평가하는 프로젝트 활동성 평가 단계를 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
10. The method according to claim 9,
And a project activity evaluation step of evaluating the activity of the project with respect to the task performing organization based on the number of task-evaluation items given to the specific task performing organization relative to the total task-evaluation items in the specific time period Wherein the business strategy map management method comprises:
제9항에 있어서, 상기 할일 단계는
특정 시간 구간에서 특정 업무 수행조직원에게 주어진 할일-평가 아이템의 평균적인 평가를 기초로 상기 특정 업무 수행조직원에 대한 상기 프로젝트의 적응성(adaptability)을 평가하는 프로젝트 적응성 평가 단계를 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
10. The method according to claim 9,
Evaluating the adaptability of the project to the specific task performing organization based on an average evaluation of task-to-evaluate items given to a specific task performing organization in a specific time period. How to manage strategy maps.
제4항에 있어서, 상기 할일 단계는
특정 시간 구간에서 특정 업무활동에 종속적인 할일-평가 아이템의 예약점수의 합이 특정 기준 이상이면 해당 업무활동을 해당 업무 수행조직 외의 구성원에게도 알려줄 수 있는 주요 업무활동으로 설정하는 주요업무 설정 단계를 더 포함하는 것을 특징으로 하는 업무전략맵 관리 방법.
5. The method according to claim 4,
If the sum of the reservation points of the evaluation item exceeds the specified standard, the main task setting step is set as the main business activity that can inform the members other than the task performing organization, Wherein the business strategy map management method comprises the steps of:
제1항에 있어서, 상기 일정-평가 아이템은
업무활동 메모리 영역에 저장된 업무활동을 접근하기 위한 업무활동에 관한 연관자; 및
메시지 메모리 영역에 저장되고 상기 업무활동에 관해 공유될 수 있는 적어도 하나의 메시지를 포함하는 메시지 쓰레드를 통해, 구현될 수 있는 대화방을 접근하기 위한 대화방 연관자를 더 포함하고,
상기 적어도 하나의 메시지 중 적어도 일부는 상기 할일 메모리 영역에 저장된 할일-평가 아이템에 해당하는 것을 특징으로 하는 업무전략맵 관리 방법.
The method of claim 1, wherein the schedule-
Associates relating to business activities for accessing business activities stored in the business activity memory area; And
Further comprising a chat room associator for accessing a chat room that can be implemented through a message thread that includes at least one message stored in a message memory area and that can be shared about the business activity,
Wherein at least some of the at least one message corresponds to a to-do item stored in the to-do memory area.
프로세서부(Processor Unit) 및 일정-평가 메모리 영역, 업무 수행조직 메모리 영역 및 할일 메모리 영역을 포함하는 메모리부(Memory Unit)를 포함하는 업무전략맵 관리 서버에 있어서,
상기 프로세서부는
(a) (1) 상기 일정-평가 메모리 영역으로부터 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템과 (2) 상기 업무 수행조직 메모리 영역으로부터 상기 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 가져오고,
(b) 상기 할일 메모리 영역으로부터 상기 일정 평가 아이템과 종속적으로 연관되고 상기 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 가져오는 업무전략맵 관리 서버.
1. A business strategy map management server comprising a memory unit including a processor unit, a schedule-evaluation memory area, a task performing organization memory area, and a to-do memory area,
The processor unit
(a) (1) A schedule line defined by a start schedule and a deadline schedule for each of at least one task constituting a project from the schedule-evaluation memory area, and a predetermined time line defined by the task or a plurality of corresponding sub- (2) a task performance organization that is subordinately related to the schedule-evaluation item from the task performance organization memory area,
(b) a to-do content, which is associated with the predetermined evaluation item from the to-do memory area, and which is defined by the to-do creator, Task-strategy map management server that obtains to-do items that have to-do items.
프로세서부 및 일정-평가 메모리 영역과 할일 메모리 영역을 포함하는 메모리부를 포함하는 업무전략맵 관리 서버에서 수행되는 업무전략맵 관리 방법을 기록한 기록매체에 있어서, 상기 업무전략맵 관리 방법은
(1) 일정-평가 메모리 영역으로부터 독출되는 프로젝트를 구성하는 적어도 하나의 업무 각각에 관하여 시작일정과 마감일정을 통해 정의된 일정 타임라인 및 해당 업무 또는 복수의 해당 서브-업무들 단위로 정의된 업무평가를 가지는 일정-평가 아이템과 (2) 업무 수행조직 메모리 영역으로부터 독출되는 상기 일정-평가 아이템과 종속적으로 연관된 업무 수행조직을 제공하는 프로젝트 단계; 및
할일 메모리 영역으로부터 독출되며 상기 일정 평가 아이템과 종속적으로 연관되고 상기 해당 업무를 처리할 때 할일 생성자의 필요에 의해 정의되는 할일에 관하여 할일 처리자를 지정한 할일내용과 할일 생성자를 통해 평가되는 할일평가를 가지는 할일-평가 아이템을 제공하는 할일 단계를 포함하는 기록매체.
A business strategy map management method performed on a business strategy map management server including a processor unit, a constant-evaluation memory area, and a memory unit including a toll memory area,
(1) a schedule line defined by a start schedule and a deadline with respect to each of at least one task constituting a project read out from the schedule-evaluation memory area, and a task defined by a corresponding task or a plurality of corresponding sub-tasks Evaluation item having an evaluation and (2) a project stage for providing a task performance organization that is subordinate to the schedule-evaluation item read from the task performance organization memory area; And
A to-do list, which is read from the to-do memory area and is related to the predetermined evaluation item and is defined by the to-do creator's need when the task is processed, To-be-evaluated item.
KR1020160097266A 2014-03-26 2016-07-29 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item KR20180013474A (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
KR1020160097266A KR20180013474A (en) 2016-07-29 2016-07-29 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item
US15/276,319 US11449834B2 (en) 2014-03-26 2016-09-26 Method of managing strategy-map executable by computer, server performing the same and storage media storing the same
JP2017145947A JP6576981B2 (en) 2016-07-29 2017-07-27 Hierarchical project management device
US15/664,412 US20180032956A1 (en) 2016-07-29 2017-07-31 Hierarchical project management apparatus
US17/874,878 US11900326B2 (en) 2014-03-26 2022-07-27 Method of managing strategy-map executable by computer, server performing the same and storage media storing the same
US18/226,558 US20240005281A1 (en) 2016-07-29 2023-07-26 Hierarchical project management apparatus
US18/226,586 US20230376906A1 (en) 2016-07-29 2023-07-26 Hierarchical project management apparatus
US18/402,319 US20240144186A1 (en) 2014-03-26 2024-01-02 Method of managing strategy-map executable by computer, server performing the same and storage media storing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160097266A KR20180013474A (en) 2016-07-29 2016-07-29 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020180113706A Division KR102151550B1 (en) 2018-09-21 2018-09-21 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item

Publications (1)

Publication Number Publication Date
KR20180013474A true KR20180013474A (en) 2018-02-07

Family

ID=61204050

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160097266A KR20180013474A (en) 2014-03-26 2016-07-29 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item

Country Status (1)

Country Link
KR (1) KR20180013474A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102036722B1 (en) * 2018-05-10 2019-10-25 주식회사 한글과컴퓨터 Spreadsheet driving apparatus for supporting automatic generation of gantt charts and operating method thereof
KR20200117355A (en) * 2019-04-04 2020-10-14 주식회사 핸디소프트 Intelligence collaboration assistant system based on analyzing user intent from message
CN113344518A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Project management system
KR20220118372A (en) * 2020-07-23 2022-08-25 최재호 File related work managing apparatus and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102036722B1 (en) * 2018-05-10 2019-10-25 주식회사 한글과컴퓨터 Spreadsheet driving apparatus for supporting automatic generation of gantt charts and operating method thereof
KR20200117355A (en) * 2019-04-04 2020-10-14 주식회사 핸디소프트 Intelligence collaboration assistant system based on analyzing user intent from message
CN111798193A (en) * 2019-04-04 2020-10-20 汉迪索夫特有限公司 Intelligent collaboration support system based on analysis of message intent
KR20220118372A (en) * 2020-07-23 2022-08-25 최재호 File related work managing apparatus and method
CN113344518A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Project management system

Similar Documents

Publication Publication Date Title
US20210110347A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US9928241B2 (en) Systems and methods for analyzing electronic communications to dynamically improve efficiency and visualization of collaborative work environments
US7788237B2 (en) Method and system for tracking changes in a document
US11307770B2 (en) Capacity forecasting based on capacity policies and transactions
US20190220796A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US9026984B2 (en) Integrated design application system
US8219435B2 (en) Determining task status based upon identifying milestone indicators in project-related files
KR102151550B1 (en) Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item
US10296859B1 (en) Workflow discovery through user action monitoring
US20140278663A1 (en) Electronic discovery systems and workflow management method
US20090063413A1 (en) Method and system for tracking allocations of assets and tasks
US11900326B2 (en) Method of managing strategy-map executable by computer, server performing the same and storage media storing the same
KR20180013474A (en) Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item
JP6435742B2 (en) Scheduling method, scheduling support apparatus, and computer program
US20140279588A1 (en) Legal mandate system and method
KR101725142B1 (en) Strategy map management method and device, and storage media storing the same
US20220092518A1 (en) Apparatus and method of processing work chat room
US20150046355A1 (en) Integrated temporary labor provisioning and monitoring
JP5652047B2 (en) Information processing apparatus and information processing program
De Leoni et al. Visual support for work assignment in process-aware information systems
JP7277877B2 (en) Signboard-based business processing device and business processing method
Simonova Identification of IT-service metrics for a business process when planning a transition to outsourcing
US7996299B2 (en) Trade services management system
KR101851602B1 (en) Apparatus for assisting strategy map management to provide internal customer satisfaction
US20210295274A1 (en) Workflow management device, workflow management system, method of managing workflow, and non-transitory recording medium

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
E902 Notification of reason for refusal
J201 Request for trial against refusal decision
J301 Trial decision

Free format text: TRIAL NUMBER: 2018101003954; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20180921

Effective date: 20191015